Non-Material Mineral Properties

This section describes certain non-material mineral properties held by the Company. As these properties are not considered material to the Company’s business, the Company may choose to pursue or to take into consideration the potential sale, joint venture, trade or other transaction involving one or more of these projects. None of the Company’s non-material properties have any Mineral Resources or Mineral Reserves.

The Company holds the following non-material mineral properties:

Other ISR Projects

The Company’s Properties located in the Powder River Basin, Wyoming are as follows:

The Company’s properties in the Powder River Basin of Wyoming, but outside of the Nichols Ranch Project, include 4,359 acres owned 100% by the Company through its wholly owned subsidiary, Uranerz. These properties, located at Arkose, include the: Verna Ann, Niles Ranch, Arvina, Streeter, Table Mountain, Heldt Draw, Drew, Collins Draw and Jack properties. The Company, through Uranerz, also holds an 81% interest in the Arkose Joint Venture, which holds 40,602 net acres in the Powder River Basin.

In September 2016, Uranerz elected to forfeit 298 unpatented lode mining claims covering approximately 6,157 acres from its North Willow Creek (50 claims), Hat (61 claims), Divide (36 claims), North Nichols (107 Claims) and East Nichols (44 claims) properties, which constitutes all the claims in those projects.

In general, these ISR projects are located in basins containing sandstones of Tertiary age with known uranium mineralization. Limited exploration was conducted by Uranerz on each project.

Arkose Joint Venture, Powder River Basin, Wyoming:

The Company, through its wholly owned subsidiary Uranerz, holds an undivided 81% interest in the Arkose Joint Venture, which holds an additional 40,602 net acres in the Powder River Basin. Uranerz completed the acquisition of its interest in the Arkose Joint Venture mineral properties on January 15, 2008. This acquisition was completed pursuant to a purchase and sale agreement previously announced on September 19, 2007 between Uranerz, NAMMCO, Steven C. Kirkwood, Robert W. Kirkwood and Stephen L. Payne (collectively, the “NAMMCO Sellers”).

In connection with the acquisition of its interest in the Arkose Joint Venture, Uranerz entered into a venture agreement dated January 15, 2008 (the “Venture Agreement”) with United Nuclear, a limited liability company wholly owned by the NAMMCO Sellers and their designee under the purchase and sale agreement. Under the Venture Agreement, United Nuclear retained its nineteen percent (19%) working interest in the Arkose Joint Venture, and Uranerz assumed operations and management responsibilities of the Venture. Uranerz and United Nuclear agreed to contribute funds to programs and budgets approved under the Arkose Mining Venture in accordance with their respective interests in the Venture.

The Arkose Mining Venture includes the following property units on which Uranerz has conducted exploration:

North Jane*

South Doughstick

Cedar Canyon

East Buck

South Collins Draw

Sand Rock

Little Butte

Beecher Draw

Monument

Stage

*Now included in the Nichols Ranch Project as part of the Jane Dough Property.

In September 2016, the Arkose Joint Venture elected to forfeit 190 unpatented lode mining claims covering 3,925 acres from its Kermit property and 144 claims covering 2,975 acres from its Lone Bull property, which constitute all of the Arkose claims in those projects. In addition, four mineral leases comprising 592 acres in the East Buck project were allowed to expire in 2016 without attempting to negotiate extensions to those leases. In 2017, mineral leases in the Monument, Cedar Canyon, Sand Rock, East Buck and House Creek projects were allowed to expire; however, the expiry of those property interests did not materially affect the Company’s ability to continue exploration and extraction activities on its properties.

Other Conventional Uranium Projects

Arizona Strip

The Pinenut Project has been reclaimed except for a two-acre disturbance associated with a monitor well. Mineral extraction at the Company’s Arizona 1 Project commenced in December 2009 and continued until the project was placed on standby in February 2014 due to the depletion of the readily available resources. The Wate Project and EZ Project are in the evaluation stage. Permitting at the Wate and EZ Projects are currently on hold. In 2025, the Company will evaluate the existing mine plans and engineering associated with the EZ Complex and may determine to start the permitting process.

Colorado Plateau

The Whirlwind Project comprises 126 unpatented lode mining claims covered by three Mineral Leases and a Utah State Mineral Lease of 320 acres for a total acreage of about 2,800 acres. The property size has been reduced since the acquisition. The retained property continues to cover the known mineralized areas. The Whirlwind Project straddles the Utah/Colorado state line 4.5 miles southwest of Gateway, Colorado. Exploration drill projects were conducted in 2007, 2008, 2009, 2010, 2011 and 2012. In 2022, the Company initiated work at Whirlwind to rehabilitate the existing decline. Work progressed until December 2022, when it was put on hold due to inclement weather. The Company finished rehabilitation work on the decline in 2023. In 2024, the Company completed engineering design (60% level) on a water treatment plant for the Whirlwind Project. The Company is currently permitting the water treatment plant and plans to construct and commission the plant in 2025. Once operating, the Company can evaluate the condition of the underwater portion of the decline and if appropriate finish rehabilitating the decline.