Skip to main content

ENERGY FUELS INC

For the period ended Dec 31, 2024. Filed Feb 26, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Feb 26, 2025

UUUU$7.31+9.8%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits
Contents

ITEM 1. DESCRIPTION OF BUSINESS

General Development of the Business

Corporate Structure

Energy Fuels Inc. is an Ontario corporation with its corporate offices located in Lakewood, Colorado (a city in the Denver metropolitan area). It was incorporated on June 24, 1987 in the Province of Alberta under the name “368408 Alberta Inc.” In October 1987, 368408 Alberta Inc. changed its name to “Trevco Oil & Gas Ltd.” In May 1990, Trevco Oil & Gas Ltd. changed its name to “Trev Corp.” In August 1994, Trev Corp. changed its name to “Orogrande Resources Inc.” In April 2001, Orogrande Resources Inc. changed its name to “Volcanic Metals Exploration Inc.” On September 2, 2005, the Company was continued under the Business Corporations Act (Ontario) (the “OBCA”). On March 26, 2006, Volcanic Metals Exploration Inc. acquired 100% of the outstanding shares of “Energy Fuels Resources Corporation.” On May 26, 2006, Volcanic Metals Exploration Inc. changed its name to “Energy Fuels Inc.” On November 5, 2013, the Company amended its Articles of Incorporation to consolidate its issued and outstanding, freely tradable Common Shares on the basis of one post-consolidation Common Share for every 50 pre-consolidation Common Shares (the “Consolidation”).

The Company’s U.S.-based assets, which include uranium, vanadium and REE extraction, recovery, permitting, evaluation and exploration assets, are held directly and indirectly, as the case may be, by the Company’s wholly owned subsidiaries Energy Fuels Holdings Corp. (“EF Holdings”) and Strathmore Minerals Corp. (“Strathmore”). The Company, through its wholly owned subsidiary Energy Fuels Brazil Ltda., acquired the Bahia Project in the State of Bahia, Brazil on February 10, 2023, which consists of 19 mineral concessions totaling approximately 41,951 acres or 65.5 square miles. All of the Company’s U.S.-based employees are employed by its subsidiary Energy Fuels Resources (USA) Inc. (“EFUSA”), a wholly owned subsidiary of EF Holdings, which also serves as operator of all of the Company’s U.S. properties.

On June 3, 2024, the Company executed binding agreements (collectively, the “JV Agreements”) with Astron Corporation Limited (“Astron”) for the creation of a joint venture (the “Donald Project JV”) to jointly develop and operate the Donald Project. As of December 31, 2024, the Company owns 4.49% of the Donald Project JV. See “Part I, Item 1. Material Transactions and Corporate Developments,” below for more information.

On August 16, 2024, the Company acquired RadTran LLC (“RadTran”), a private company specializing in the separation of critical radioisotopes, to further the Company’s plans for development and production of medical isotopes used in cancer treatments. See “Part I, Item 1. Material Transactions and Corporate Developments,” for more information.

On October 2, 2024, the Company acquired Base Resources, which owns the now-winding-down Kwale HMS project in Kenya and the Toliara HMS and REE development project in Madagascar, further increasing its portfolio of other HMS/monazite/REE projects around the world. See “Part I, Item 1. Material Transactions and Corporate Developments,” for more information.

A diagram depicting the organizational structure of the Company and its subsidiaries, including the name, place of incorporation and proportion of ownership interest of each entity, is included as Exhibit 21.1 to this Annual Report. Energy Fuels owns a number of inactive subsidiaries which have no material assets or liabilities and do not engage in any material business activities.

Each of the Company’s U.S. subsidiaries has its principal place of business and corporate office at 225 Union Blvd., Suite 600, Lakewood, Colorado 80228, USA, though additional support offices are located at a number of Company properties. The registered office of EFUSA and principal place of business for the Company is at 225 Union Blvd., Suite 600, Lakewood, Colorado 80228, USA, and the registered office of the Company is located at 82 Richmond Street East, Suite 308 Toronto, Ontario, M5C 1P1, Canada. The Company’s website address iswww.energyfuels.com.

The primary trading market for Energy Fuels’ Common Shares is the NYSE American under the trading symbol “UUUU,” and the Company’s Common Shares are also listed on the TSX under the trading symbol “EFR.” Energy Fuels is a U.S. domestic issuer for SEC reporting purposes and, in addition, is a reporting issuer in all Canadian provinces. Options on Energy Fuels’ Common Shares are traded on The Chicago Board Options Exchange. The Designated Primary Market Maker for the Options is Group One Trading, LP. Citadel Securities is the Company’s Market Maker on the NYSE American.

Business Overview

We responsibly produce several of the raw materials needed for clean energy and advanced technologies, including uranium, vanadium, HMS and REE. The Company owns conventional uranium, uranium/vanadium and HMS properties and projects in various stages of operation, development, exploration and permitting, as well as fully permitted uranium and uranium/vanadium projects on standby.

The Mill is working to establish itself as a critical minerals hub in the U.S. with its uranium, vanadium, REE and potential radioisotope production. Uranium is the fuel for carbon-free, emission-free baseload nuclear power, and one of the cleanest forms of energy in the world. The REEs we are now producing are used to manufacture permanent magnets for electric vehicles (“EVs”), hybrid EVs, wind turbines, advanced robotics, defense technologies and other technologies. The radioisotopes we are evaluating recovering from our REE and uranium processing streams have the potential to provide materials needed for emerging TAT cancer-fighting therapeutics.

In addition, Energy Fuels recovers uranium from other uranium-bearing materials not derived from natural or native ores, referred to as “Alternate Feed Materials,” at its Mill, thereby recycling materials back into the market that would otherwise be lost to direct disposal.

The Company is currently acquiring monazite from a third-party miner in Florida and Georgia, which it processes into RE Carbonate and separated REEs.

The Company has also secured its own sources of uranium- and REE-bearing monazite sands in furtherance of a fully integrated U.S.-based REE supply chain, which include:

The Toliara Project in Madagascar acquired through the Company's 100% acquisition of Base Resources on October 2, 2024 (see “Part I, Item 1. Description of Business - Material Transactions,” and “Part I, Item 2. Description of Properties - The Toliara Project” below).

The Donald Project in Australia through the Company's Donald Project JV, which was created on June 3, 2024 when the Company executed JV Agreements with Astron to jointly develop and operate the Donald Project JV (see “Part I, Item 1. Description of Business - Material Transactions,” and “Part I, Item 2. Description of Properties - The Toliara Project” below).

The Bahia Project in Brazil acquired in February 2023 (“Part I, Item 2. Description of Properties - The Bahia Project” below).

The very heart of our business – uranium and rare-earth production and recycling – helps us play a part in addressing global climate change, reducing air pollution, and making the world a cleaner and healthier place.

Segment Information

Following the Company's acquisition of Base Resources (see “Part I, Item 1. Material Transactions and Corporate Developments,” below), the Company reevaluated its segments to reflect its operations and certain changes in the financial information regularly reviewed by the Company's Chief Operating Decision Maker (“CODM”).

Following this reevaluation, the Company has three reportable segments based on its operations and the financial information regularly reviewed by the CODM: (i) uranium, (ii) HMS and (iii) REE.

The uranium segment engages in conventional and ISR uranium extraction, recovery and sales of uranium from mineral properties and the recycling of uranium-bearing materials generated by third parties along with the exploration, permitting and evaluation of uranium properties in the United States. As part of these activities, the Company also acquires, explores, evaluates and, if warranted, permits uranium properties. The Company's final uranium product is natural uranium concentrate, or U 3 O 8, which is sold to customers for further processing into fuel for nuclear reactors. The Company also produces vanadium pentoxide, V 2 O 5, as a co-product of uranium at the Mill within the uranium segment. In addition, within the uranium segment, the Company is exploring opportunities to separate radium-226 and radium-228 as a byproduct of uranium and thorium process streams in its existing mines for potential use in the production of medical isotopes for emerging targeted alpha therapy (“TAT”) cancer treatments.

The HMS segment engages in the exploration, development and recovery of HMS at the Kwale Project (now in reclamation), Bahia Project, Toliara Project and the Company's equity method investment in the Donald Project JV. The Company has recovered HMS, with its stand-alone ilmenite, rutile and zircon to provide sources of titanium (“TiO 2”) and zirconium (“ZrO 2”) from the now-winding-down Kwale Project and plans to recovery HMS, TiO 2, ZrO 2 and monazite from its Bahia Project, Toliara Project and interest in the Donald Project, once all permitting and approvals are received and development is completed at those projects.

The REE segment is engaged in the Company's initiatives to progress towards full REE separation capabilities at the Mill to produce both “light” and (in the future) “heavy” separated REE oxides. The Company has been producing a mixed RE Carbonate from third-party sourced monazite sands at the Mill since 2021. During the year ended December 31, 2024, Energy Fuels completed the modifications and enhancements of its infrastructure at the Mill (“Phase 1”) to install the capacity to produce up to 800 – 1,000 metric tons (“tonnes”) of separated NdPr per year from monazite, from which the Company produced 38 tonnes of separated NdPr during 2024. Now that the Company has developed and commissioned its Phase 1 REE separation circuit, the Company’s focus will be on the production of separated REE products rather than the continued production of mixed RE Carbonate. The Company expects to procure monazite through Company-owned mines like the Toliara Project and Bahia Project, as well as its joint venture interest in the Donald Project and other potential joint ventures or other collaborations, in each case upon successful development of the projects and open market purchases.

Uranium Segment

Our primary product is U 3 O 8 (also known as natural uranium concentrate), which, when further processed, becomes the fuel for the generation of clean nuclear energy. According to the most recent data from the Nuclear Energy Institute, nuclear energy provides 18% of the total electricity and 46% of the clean, carbon-free electricity generated in the U.S. The Company generates uranium revenues from extracting and processing materials for the recovery of uranium (and vanadium) for our own account, as well as from purchasing and toll processing materials for others.

Energy Fuels is engaged in conventional and ISR uranium extraction and recovery, along with the exploration, permitting and evaluation of uranium properties in the U.S. The Company also extracts and recovers vanadium from certain of its uranium projects (and the projects of others), as market conditions warrant. The Company also continues to evaluate the potential to recover radioisotopes from its existing process streams needed for emerging TAT cancer therapeutics. The Company’s Mill is the only conventional uranium mill, and the only uranium, vanadium and REE recovery facility operating in the U.S., and has a licensed capacity to produce over 8 million pounds of U 3 O 8 per year.

In 2022, we entered into three long-term uranium contracts with major U.S. utilities, and in 2024, we entered into a fourth long-term contract with a major U.S. utility. During 2025, the Company expects to sell 200,000 to 300,000 pounds of uranium under these contracts during Q2- and Q3-2025, ramping up to 630,000 to 880,000 pounds of U 3 O 8 sales in 2026. To deliver under these contracts, the Company commenced ore production at three (3) of its conventional uranium mines in late-2023, Pinyon Plain, La Sal and Pandora, located in Arizona and Utah. During the year ended December 31, 2024, the Company mined ore containing 350,000 pounds of U 3 O 8 from these three mines.

Conventional Operations

The Company conducts its conventional uranium, vanadium and potential medical radioisotope extraction (along with REE activities discussed below) and recovery activities through the Mill, which is the only operating conventional uranium mill, and the only uranium and vanadium processing facility in the United States. The Mill, located near Blanding, San Juan County, Utah, is centrally located such that it can conveniently and cost-effectively be fed by a number of the Company’s uranium and uranium/vanadium projects in Colorado, Utah, Arizona and New Mexico, as well as by ore purchases or toll milling arrangements with third parties in the region, as market conditions warrant.

The Mill is licensed to process 2,000 tons of ore per day and produce over 8 million pounds of U 3 O 8 per year. It is primarily a uranium recovery facility but can also recover REEs and vanadium from various uranium ores. During the year ended December 31, 2024, the Company recovered 158,000 pounds of uranium at the Mill including 2,000 pounds of uranium from its monazite processing. An additional 4,000 pounds of uranium from its monazite processing is expected to remain in circuit and not be packaged until 2025 or later. The Mill can recycle other uranium-bearing materials not derived from natural or native ores, known as Alternate Feed Materials, for the recovery of uranium, alone or in combination with other metals. In addition, the Mill is also evaluating the potential to recover certain radioisotopes from its existing process streams that can be used for TAT medical purposes.

The Mill has historically operated on a campaign basis, whereby mineral processing occurs as mill feed, contract requirements and/or as market conditions warrant. Over the years, Company-owned and third-party owned conventional uranium properties in Utah, Colorado, Arizona and New Mexico have been both active and on standby in response to changing market conditions.

Once production is fully ramped up at the three mines, which is currently planned for 2025, the Company expects to be producing uranium at a run-rate of approximately 1.1 to 1.4 million pounds per year. Ore mined from the three mines during 2025 will be stockpiled at the Mill and be available for processing that may start as early as 2025 but may be deferred to later years, depending on market conditions, contract requirements and the Mill’s schedule. The Company is also preparing one (1) conventional mine (the Whirlwind mine) to commence uranium production within one year from a “go” decision, which (when combined with the Nichols Ranch ISR Project discussed below) would increase Energy Fuels' uranium production to a run-rate of over two (2) million pounds of U 3 O 8 per year.

During the year ended December 31, 2024, the Company continued to produce uranium from its alternate feed recycling program, which totaled approximately 158,000 pounds of finished U 3 O 8. During 2025, the Company expects to mine ore from its Pinyon Plain, La Sal and Pandora mines containing 730,000 to 1,170,000 pounds of U 3 O 8, depending on mining rates, contract requirements, and market conditions. In addition, the Company expects to receive additional alternate feed materials, cleanup material and to purchase ore from 3 rd party miners containing approximately 160,000 to 200,000 pounds of U 3 O 8, which when combined with the mined ore is expected to result in an increase in uranium contained in ore inventories and work in process during the year by 890,000 to 1,370,000 pounds of U 3 O 8. The Company also expects to produce between 200,000 and 250,000 pounds of finished U 3 O 8 during the first half of 2025 from existing conventional ore inventories and Alternate Feed Materials.

Additionally, the Company is preparing one additional conventional mine in Colorado (Whirlwind) for expected production within one year from a “go” decision and is advancing several other large-scale U.S. mine projects in order to increase uranium production in the coming years in response to potentially strong uranium market conditions. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production to a run-rate of over two million pounds of U 3 O 8 per year as early as 2026. In 2025, the Company plans to continue to advance permitting and development on the Roca Honda and Bullfrog projects, which together with the Company's Sheep Mountain Project, could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years, as market conditions warrant. The Company also expects to commence an ore buying program from third-party conventional miners in 2025, which is expected to further increase the Company's uranium production profile. As the Company is ramping up its uranium production, it can rely on its uranium inventories and potential purchases of U.S. origin uranium on the spot market to supplement its uranium production if necessary to fulfill its contract requirements.

The Company will continue to selectively sell its vanadium pentoxide (“V 2 O 5”) inventory (approximately 905,000 pounds as of December 31, 2024) on the spot market as markets warrant, but will otherwise continue to maintain it in inventory. No vanadium production is currently planned for 2025, though the Company continually monitors its inventory and vanadium markets to guide future potential vanadium production.

The Company currently has approximately 393,000 pounds of finished U 3 O 8 inventory held at the Mill and at conversion facilities owned by ConverDyn and Cameco, along with approximately another 725,000 pounds of U 3 O 8 contained in stockpiled Alternate Feed Materials, mineralized material inventory and work in process that is expected to be processed for recovery in the future. In addition, there remains an estimated 1.0 to 3.0 million pounds of solubilized recoverable V 2 O 5 remaining in the Mill’s tailings facility awaiting future recovery, as market conditions may warrant. See Part II, Item 7 “ISR Extraction Recovery Activities.”

The Company also owns the Sheep Mountain Project (the “Sheep Mountain Project”), which is a conventional uranium extraction project located in Wyoming. Due to its distance from the Mill, the Sheep Mountain Project is not expected to be a source of feed material for the Mill. The Sheep Mountain Project consists of permitted open pit and underground extraction components (the “Sheep Mountain Extraction Operation”) and a planned processing facility to process extracted mineralized material (the “Sheep Mountain Processing Operation”), which has not yet been permitted.

The Company’s principal conventional properties include the following:

the Mill, which is an operating 2,000 ton-per-day uranium, vanadium and REE processing facility located in Utah and held through the Company’s subsidiary EFR White Mesa LLC. See “Part I, Item 2. The White Mesa Mill”;

the Pinyon Plain Project, which is a fully permitted and operating uranium project with all surface facilities and a shaft in place (see “Part I, Item 2. The Pinyon Plain Project”);

the La Sal Complex of uranium and uranium/vanadium projects (the “La Sal Project”) (see “Part I, Item 2. The La Sal Project”) and the Whirlwind uranium/vanadium project (the “Whirlwind Project”), both of which are located near the Colorado/Utah border (the “Colorado Plateau”) and, in addition to nearby exploration properties, are held by the Company’s subsidiary EFR Colorado Plateau LLC. See “Part I, Item 2. Non-Material Mineral Properties – Other Conventional Projects – Colorado Plateau”;

the Roca Honda Uranium Project (the “Roca Honda Project”), which is located near the town of Grants, New Mexico, held by the Company’s subsidiaries Strathmore Resources (US), Ltd. and Roca Honda Resources LLC. See “Part I, Item 2. The Roca Honda Project”;

the Sheep Mountain Project, which is a uranium project located near Jeffrey City, Wyoming, including permitted open pit and underground components held by the Company’s subsidiary Energy Fuels Wyoming Inc. See “Part I, Item 2. The Sheep Mountain Project”;

the Bullfrog Project (the “Bullfrog Project”), which is located in south central Utah near the town of Ticaboo, and which is held by the Company’s subsidiary EFR Henry Mountains LLC. See “Part I, Item 2. The Bullfrog Project”;

the Wate project (the “Wate Project”), which is a uranium deposit in the permitting stage; the Arizona 1 Project, which is a fully permitted uranium project on standby; and the EZ properties, which are uranium deposits in the exploration and evaluation stage. All of the Company’s Arizona Strip properties are held by the Company’s subsidiary EFR Arizona Strip LLC, with the exception of the Wate Project, which is held by the Company’s subsidiary Wate Mining Company LLC. See “Part I, Item 2. Non-Material Mineral Properties – Other Conventional Uranium Projects – Arizona Strip”; and

a number of non-core uranium properties, which are held in various of the Company’s subsidiaries. See “Part I, Item 2. Non-Material Mineral Properties.”

ISR Operations

The Company conducts its ISR activities through its Nichols Ranch Project in northeast Wyoming, which it acquired in June 2015 through its acquisition of Uranerz Energy Corporation (“Uranerz”).

The Nichols Ranch Project includes: (i) a licensed and operating ISR processing facility (the “Nichols Ranch Plant”); (ii) licensed and operating ISR wellfields (the “Nichols Ranch Wellfields”); (iii) additional licensed ISR wellfields planned for future production (the “Jane Dough Property”); and (iv) a licensed satellite ISR uranium project (the “Hank Project”), which, if and when put into production would include an ISR satellite processing plant (the “Hank Satellite Plant”) that, when constructed, would produce loaded-resin, and associated planned wellfields (together, the “Hank Property”). See “The Nichols Ranch ISR Project” under Item 2 below. Also through the acquisition of Uranerz, the Company acquired the West North Butte property (the “West North Butte Property”) and the North Rolling Pin property (the “North Rolling Pin Property”), as well as the Arkose Mining Venture (the “Arkose Mining Venture”), which is a joint venture of Wyoming ISR properties held 81% by Energy Fuels and 19% by United Nuclear, LLC (see “Part II, Item 8. Financial Statements and Supplementary Data - Note 18 Related Party Transactions”).

The Nichols Ranch Project is an ISR facility with production currently on standby that recovers uranium through a series of injection and recovery wells. Using groundwater fortified with oxygen and sodium bicarbonate, uranium is dissolved within a deposit. The uranium-bearing groundwater is then collected in a series of recovery wells and pumped to the Nichols Ranch Plant where the uranium is extracted from the water. The Nichols Ranch Plant creates a yellowcake slurry that is transported by truck to the Mill, where it is dried and packaged into drums that are shipped to uranium conversion facilities.

Construction of the Nichols Ranch Plant, other than the elution, drying and packaging circuits, was completed in 2013, and it commenced uranium recovery activities in 2014. In 2015, the Company commenced construction of an elution circuit at the Nichols Ranch Plant, which was completed and began operations in early 2016. The Nichols Ranch Project was placed on standby in 2020. As a result, the Company recoveredde minimis pounds of U 3 O 8 from the Project in 2024 and expects to recoverde minimis quantities of U 3 O 8 in 2025, unless production recommences in 2025. Nichols Ranch is expected to be able to ramp back up to commercial production levels with limited required capital within approximately six to twelve months of a decision to recommence production. While production at the Nichols Ranch Project is currently being maintained on standby, the Company is undertaking exploration and development activities to expand the resources at the Nichols Ranch Project and to further develop a wellfield to be ready for potential recommencement of production within 12 months of a “go" decision. See “Part II, Item 7. Operations Update and Outlook for 2025: ISR Extraction and Recovery Activities.”

Mineral Exploration

Energy Fuels holds a number of exploration properties in the Colorado Plateau, Arizona Strip, and Powder River Basin Districts. Energy Fuels conducted intermittent exploration drilling on numerous projects in the period from February 2007 through December 2013. Several of those projects have been abandoned or sold. No further exploration drilling has been performed at these properties since 2013. See “Part I, Item 2. Non-Material Mineral Properties.”

In 2024, the Company conducted delineation drilling at the Nichols Ranch Project to plan out future wellfields to be ready for potential recommencement of production in late 2025 or 2026. In addition, in 2025, the Company is conducting additional infill drilling on land associated with the Jane Dough portion of the Nichols Ranch Project held by the Arkose JV. See “Part I, Item 2. The Nichols Ranch Project, The Company’s Planned Work”.

Following the completion of delineation drilling of the Juniper Zone at the Company's Pinyon Plain Project in 2025, the Company plans to update the Mineral Resource associated with the Juniper Zone and declare a Mineral Reserve on the Juniper Zone if mining of the Juniper Zone indicates positive economics. See “Part I, Item 2. The Pinyon Plain Project, The Company’s Planned Work.”

Recovering Medical Isotopes for Advanced Cancer Therapies

TAT is an in-development method of targeted radionuclide therapy for various cancers. It employs radioactive substances which undergo alpha decay to treat diseased tissue at close proximity. It has the potential to provide highly targeted treatment, especially to microscopic tumor cells. As in diagnostic nuclear medicine, appropriate alpha-emitting radionuclides can be chemically bound to a targeting biomolecule, such as a peptide, which carries the combined radiopharmaceutical to a specific treatment point (the cancerous cells). During the last decade, radiolabeled peptides that bind to different receptors on the tumors have been investigated as potential therapeutic agents both in the preclinical and clinical settings. Peptides, such as octreotide, alpha-melanocyte-stimulating hormone analogues, arginine-glycine-aspartic acid-containing peptides, bombesin derivatives and others may all be feasible for use with alpha-emitters.

The primary advantage of alpha particle emitters over other types of radioactive sources is their very high linear energy transfer and relative biological effectiveness. By comparison, beta particle emitters such as yttrium-90 can travel considerable distances beyond the immediate tissue before depositing their energy, thereby causing damage to surrounding healthy tissues, while alpha particles deposit their energy in 70–100 μm long tracks, thereby causing significantly less harm to surrounding healthy tissues. Further, alpha particles are more likely than other types of radiation to cause double-strand breaks to DNA molecules, which is one of several effective causes of cell death. In other words, the high level of radiobiological effectiveness of alpha particles, in comparison with beta emissions, requires fewer particle tracks to induce cell death.

Though many alpha emitters exist, useful isotopes need to have sufficient energy to cause damage to cancer cells, while at the same time have ahalf-life that is long enough to provide a therapeutic dose without remaining long enough to damage surrounding healthy tissue. Clinically effective alpha particle-emitting isotopes for cancer therapy should therefore have a short half-life, which will limit long-term radiation exposure and allow for the production, preparation, and administration of these isotopes for clinical use and application. Radium 223 dichloride is the first-in-class, commercially available targeted alpha therapy approved for the treatment of patients with metastatic castration-resistant prostate cancer with bone metastases. Given the established overall survival benefit conferred by radium 223 for patients with metastatic castration-resistant prostate cancer, several other targeted alpha therapies are being investigated in clinical trials across many tumor types.

Since July 2021, Energy Fuels and RadTran, a private company specializing in the separation of critical radioisotopes, have been working under a Strategic Alliance Agreement to evaluate the feasibility of recovering Ra-226 and Ra-228 from existing uranium process streams at the Mill. Recovered Ra-226 and Ra-228 would be made available to the pharmaceutical industry and others to enable the production of Ac-225, Pb-212 and potentially other leading medically attractive TAT isotopes. These isotopes are critical components in the development of targeted alpha therapies, which offer promising new treatments for various cancers. The global shortage of Ra-226 and Ra-228 currently presents a significant barrier to the advancement and commercialization of these therapies.

Energy Fuels received regulatory approval and licensing in 2023 for the concentration of R&D quantities of Ra-226 at the Mill and is currently completing test work and engineering on its R&D pilot facility for Ra-226 production. During the remainder of 2025, Energy Fuels plans to set up the first stages of the pilot facility and expects to produce R&D quantities of Ra-226 for testing by end-users of the product. Upon successful production of R&D quantities of Ra-226, Energy Fuels plans to develop capabilities at the Mill for the commercial-scale production of Ra-226 and potentially Ra-228 in 2027-2028, conditional on completion of engineering design, securing sufficient offtake agreements for final radium production, and receipt of all required regulatory approvals. The Company’s current R&D activities are being conducted using existing Mill facilities without the need for capital improvements of any significance. Capital development for future commercial production capabilities, upon successful production at the R&D level, would be expected to be supported by future offtake agreements for radium production.

On August 16, 2024, the Company acquired RadTran, to further the Company’s plans for development and production of medical isotopes used in cancer treatments. RadTran’s expertise includes separation of Ra-226 and Ra-228 from uranium process streams. This strategic acquisition is expected to significantly enhance Energy Fuels’ planned capabilities to address the global shortage of these essential isotopes used in emerging TAT for cancer treatment.

Under the Acquisition, the purchase price paid by Energy Fuels to the owners of RadTran consisted of: (i) on closing, $1.5 million in cash, $1.5 million in Common Shares and the grant of a 2% royalty on future revenues from the sale of produced radium, as well as certain other contractual commitments; and up to an additional $14 million in cash and Common Shares based on the satisfaction of a number of performance-based milestones, including achieving initial production, securing suitable offtake agreements to justify commercial production and reaching commercial production. See Note 3 – Transactions to the consolidated financial statements for more information.

There are a number of risks inherent to the Company’s isotope activities. See “Item 1A. Risk Factors” under Item 1A, below.

Heavy Mineral Sands Segment

Heavy mineral sands (“HMS”) are typically old beach or dunal sands that contain concentrations of important titanium minerals (including rutile and ilmenite), zircon and monazite. These minerals are physically heavy and are also called ‘heavy minerals’.

The titanium and zircon minerals can be used for a variety of industrial purposes and are found in a range of everyday consumer goods such as pigment for paint, paper and plastics as well as toothpaste, sun cream and homewares such as ceramics. Monazite is a rich source of rare earth elements prized for their use in permanent magnets, mostly for electric vehicle traction motors, advanced robotics, defense technologies, and direct drive wind turbines.

Because of their widespread use in industrial and consumer goods, demand for HMS is strongly linked to global GDP growth and, in the case of monazite, the world’s green energy transition and deployment of advanced technologies. New housing construction, health of emerging economies and the seasonal northern hemisphere painting season (dry and warm months) are all key drivers of demand for mineral sands.

Since 2021, the Company has been acquiring monazite from The Chemours Company's HMS operations in Florida and Georgia, USA, which it has used for the production of RE Carbonate and separated NdPr at the Mill.

As part of its strategy to procure monazite, the Company has acquired the Toliara Project in Madagascar through its acquisition of Base Resources, the Bahia Project in Brazil and a joint venture interest in the Donald Project in Australia, each of which the Company believes holds significant quantities of HMS, including monazite. As part of the Base Resources acquisition, the Company also acquired the Kwale Project in Kenya, which has ceased production at the end of 2024 and is currently in reclamation.

The Toliara Project

The Toliara Project is an HMS and REE project located in southwestern Madagascar that is in the permitting and development phase. The Ranobe deposit, which forms the basis of the Toliara Project, is located some 18 km inland and 45 km north of the regional port town of Toliara, approximately 640 km southwest of Antananarivo, the capital of Madagascar. The Company is currently working with the Government of Madagascar to formalize fiscal and other terms applicable to the Toliara Project through an investment agreement, amendments to existing laws or other mechanisms as appropriate, which includes adding monazite to the exploitation permit. The Company is also progressing towards a final investment decision (“FID”). It is expected to take until February 2026 to complete the following necessary work to reach a FID:

completion of the necessary land acquisitions;

finalization of funding arrangements;

addition of monazite as a mineral for exploitation to Permis D'Explotation 37242;

the formalization of fiscal terms with the Government of Madagascar; and

entry into of offtake agreements and major construction contracts.

(see “Part I, Item 2. The Toliara Project”)

The Donald Project

The Donald Project is an HMS and REE project in the permitting and development phase, located in the Wimmera region of Victoria, Australia. It is located approximately 300 km northwest of Melbourne. The Company has the right to earn up to a 49% interest in a joint venture on the project, by investing AUD$183 million in the project and issuing $17.5 million in shares. As of December 31, 2024, the Company has earned a 4.49% interest in the joint venture.

The Company is currently funding a Pre-FID budget to move the Donald Project to a FID. Ongoing work includes final permitting efforts, community engagement, final engineering design, and updating the JORC compliant Mineral Resources and Ore Reserves to S-K 1300 and NI 43-101 compliant Mineral Resources and Mineral Reserves. The Company plans to spend approximately AUD$22.3 million (approximately $13.9 million at December 31, 2024 exchange rates) during the Pre-FID period. (see “Part I, Item 2. The Donald Project”).

The Bahia Project

The Bahia Project is an HMS and REE project comprised of 19 heavy minerals concessions covering 41,951 acres or 65.5 square miles located in Brazil, that is in the exploration/permitting phase. The Company plans to restart is drilling program in 2025 once the appropriate permits and surface access arrangements are in place. In addition to the Company-owned sonic drill rig, the Company plans to employ a contract drill rig to increase the overall pace of drilling at the Project with the goal of getting enough information to declare a S-K 1300 compliant initial assessment and NI 43-101 compliant technical report in late 2025 or early 2026. The Company is also advancing its permitting efforts at the Bahia Project to include baseline studies and other necessary studies to move the Bahia Project forward. (see “Part I, Item 2. The Bahia Project”).

The Kwale Project

The Company also acquired the Kwale Project in Kenya as part of its acquisition of Base Resources. Mining at the Kwale Project commenced in 2013 and recently concluded at the end of December 2024, following depletion of the remaining ore reserves. Between October 2, 2024 and December 31, 2024, the Company sold 48,302 tonnes, 17,529 tonnes, and 2,477 of ilmenite, rutile, and zircon, respectively, from the Kwale Project, generating $39.87 million in revenues. Processing activities concluded in early January 2025. The sale of all remaining product stockpiles is underway and expected to be completed during the first quarter of 2025. Reclamation has been ongoing throughout the life of the Kwale Project and will continue until all the mining areas are fully reclaimed, scheduled for completion in 2025 with monitoring for a further 2 years prior to final site handover to the Government of Kenya. Reclamation of the tailings storage facility on site has commenced and is expected to be completed in 2027, with ongoing post-closure monitoring continuing through 2037. (see “Part I, Item 2. Non-Material Mineral Properties – Kwale Project”).

Mineral Exploration

As described above, the Company plans to restart its drilling program at the Bahia Project in 2025, once the appropriate permits and surface access arrangements are in place, with the goal of getting enough information to declare an S-K 1300 compliant initial assessment and NI 43-101 compliant technical report in late 2025 or early 2026. See “Part I, Item 2. The Bahia Project, The Company’s Planned Work.” In addition, the Company has been granted prospecting licenses in Kenya and is actively exploring one of these, which is located to the south of the Company’s Kwale operations, with an auger drill program in progress.

HMS Operations Managed out of the Company’s Perth, Australia, Office

The monazite concentrates produced from the Toliara, Donald and Bahia projects is expected to be shipped to the Company’s White Mesa Mill in Utah for processing into separated REE products. (See below). The Company’s HMS operations are managed out of the Company’s office in Perth Australia. As at December 31, 2024, 1,160 of the Company’s 1,370 employees were involved in the Company’s HMS operations.

Rare Earth Elements Segment

REEs are a group of 17 chemical elements (the 15 elements in the lanthanum series, plus yttrium and scandium) that have a variety of industrial, energy, and defense uses, including advanced permanent magnets for EVs and wind turbines, communications technology, clean energy production, consumer electronics, defense systems, lasers and numerous other applications. See “The Rare Earth Element Market” below.

The Company continues to advance its REE program at the Mill, along with the Mill’s uranium production, to fully capitalize on the Mill's unique and valuable capabilities. To further its REE initiatives, the Company constructed enhancements and modifications to existing circuits at the Mill for commercial separation of NdPr, while at the same time producing a “heavies” (Sm+) RE Carbonate. The Company completed construction of Phase 1 in late Q1-2024, fully commissioned its project in Q2-2024 and completed its initial run in Q3-2024. See “REE Separation Circuits at the Mill” below.

REE Separation Circuits at the Mill

The Company continues to make progress toward full REE separation capabilities at the Mill to produce both “light” and “heavy” separated REE oxides in the coming years. The Company produced a mixed RE Carbonate from monazite sands at the Mill between 2021 and 2024. In 2024, Energy Fuels completed the modification and enhancement of its infrastructure at the Mill (“Phase 1”), described in more detail below, which is now capable of producing up to 850 – 1,000 tonnes of separated

NdPr. The Company is also planning further enhancements to expand its NdPr production capability and to produce separated dysprosium (“Dy”), terbium (“Tb”) and potentially other REE materials in the future (“Phase 2”), described in more detail below, from monazite concentrates. The Company is focused on monazite at the current time, as it has superior concentrations of these four critical REEs (NdPr, Dy and Tb) compared to many other REE-bearing minerals. These REEs are used in the powerful neodymium-iron-boron (“NdFeB”) magnets that power the most efficient EVs and hybrid EVs, along with uses in other clean energy and defense technologies. The grade of uranium contained in the monazite, which is generally comparable to typical Colorado Plateau uranium deposits, will also be recovered at the Mill.

In 2022, the Company began development of its Phase 1 REE separation facilities at the Mill, which were completed in late Q1-2024, fully commissioned in Q2-2024 with the initial run completed in Q3-2024. The Phase 1 REE separation facilities involve modifications and enhancements to the existing solvent extraction (“SX”) circuits at the Mill and have the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of total rare earth oxides (“TREO”), containing approximately 850 to 1,000 tonnes of recoverable separated NdPr per year. Because Energy Fuels utilized existing infrastructure at the Mill, Phase 1 capital including commissioning totaled approximately $19 million (depending on the offset value of NdPr production during the commissioning process, which has yet to be sold). This is favorable to the Company’s initial budget by approximately $6 million due to higher than expected quantities of NdPr produced during commissioning.

Prior to the commissioning of the Phase 1 REE separation circuit, the Mill produced a mixed RE Carbonate that contained all the rare earth elements (light and heavy REEs). With the commissioning of the Phase 1 REE separation circuit, the Mill produces separated NdPr and an Sm+ mixed RE Carbonate that contains only the heavy REEs (including Dy and Tb). The Sm+ mixed RE Carbonate can be sold on the market to other facilities to separate the heavy REEs or stockpiled at the Mill for separation of the heavies upon completion of the Phase 2 REE separation facility. With the Commissioning of the Phase 1 REE separation facility and the planned development of the Phase 2 REE separation facility, the Company does not intend to continue production of a mixed RE Carbonate that contains both light and heavy REEs.

During Phase 2, Energy Fuels expects to expand its NdPr separation capabilities at the Mill, with an expected capacity to process approximately 40,000 to 60,000 tonnes of monazite per year, containing approximately 20,000 to 30,000 tonnes of TREO, containing approximately 4,000 to 6,000 tonnes of NdPr per year, or sufficient NdPr for 2.0 to 6.0 million EVs/hybrid EVs per year. Phase 2 is also expected to add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which may be developed as the first stage of Phase 2, prior to construction of the expanded NdPr separation capabilities.

During Phase 2, Energy Fuels also expects to add “heavy” REE separation capabilities at the Mill, including the production of Dy, Tb, and potentially other separated REE’s and advanced materials. The Company will also evaluate the potential to produce lanthanum (“La”) and cerium (“Ce”) products, along with potentially other REE products. Monazite naturally contains higher concentrations of “heavy” REEs, including Dy and Tb, versus many other REE-bearing ores, mainly due to the presence of xenotime, which is another REE-bearing phosphate mineral that is often found with monazite. Phase 2 is expected to enable Energy Fuels to produce separated Dy, Tb, and potentially other “light” and “heavy” products. Prior to the construction of Phase 2, the “heavy” Sm+ RE carbonate produced during Phase 1 will either be sold on the market or stockpiled at the Mill as feed for separation into Dy and Tb and potentially other separated REE's and advanced materials at the Mill once the Phase 2 separation circuit is available. The Company expects to complete Phase 2 in 2028, subject to licensing, financing, and receipt of sufficient feed.

The acquisitions of the Toliara Project, Bahia Project and the Company's joint venture interest in the Donald Project are part of the Company’s efforts to build a large and diverse book of monazite supply for its rapidly advancing REE processing business. The Company expects to procure monazite through these Company owned mines, joint ventures or other collaborations, and open market purchases, like the Company’s current arrangement with The Chemours Company.

See also “The Rare Earth Element Market,” below, for further details on the REE market and “Part II, Item 7. Rare Earth Sales” and “Rare Earth Element Initiatives” for further details on the above-referenced REE developments.

There are a number of risks inherent to the Company’s REE activities. See “Part I, Item 1A. Risk Factors.”

San Juan County Clean Energy Foundation

On September 16, 2021, the Company announced its establishment of the San Juan County Clean Energy Foundation (the “Foundation”), a fund specifically designed to contribute to the communities surrounding the Mill in southeastern Utah. Energy Fuels deposited an initial $1 million into the Foundation at the time of formation and now provides ongoing funding equal to 1% of the Mill’s revenues, thereby providing an ongoing source of funding to support local priorities. The Foundation focuses on supporting education, the environment, health/wellness, and local economic development in the City of Blanding, San Juan County, the White Mesa Ute Community, the Navajo Nation and other area communities.

An Advisory Board, comprised of local citizens from San Juan County, evaluates grant applications on a quarterly basis and makes recommendations to the Foundation’s Managers for final review and approval. As of December 31, 2024, the Foundation has awarded 30 grants totaling $0.64 million, of which $0.25 million was committed to American Indian initiatives. The Foundation’s website address is: https://sanjuancountycleanenergy.org/. The Foundation’s website and the contents thereof should not be considered to be incorporated by reference into this Annual Report.

Material Transactions and Corporate Developments

On October 2, 2024, Energy Fuels completed the acquisition of all of the fully paid ordinary shares (the “Transaction”) of Base Resources pursuant to a Scheme Implementation Deed (the “Deed”). Under the Deed, at closing, each holder of ordinary shares of Base Resources received share consideration and AUS$0.065 in cash, paid by way of a special dividend by Base Resources to its shareholders. The total share consideration issued by Energy Fuels was $178.44 million and the total special dividend value was approximately $55.1 million. Holders of ordinary shares of Base Resources that resided in certain jurisdictions received the net proceeds from the sale of the Company’s common shares made by a nominee in lieu of the share consideration. See Note 3 – Transactions to the consolidated financial statements.

The Company, through its newly acquired subsidiary Base Resources (as of October 2, 2024), owns the Toliara Project. In addition to its ilmenite, rutile and zircon production capability, the Toliara Project also contains large quantities of monazite, which, upon development, would be shipped to the Mill for the recovery of REEs and the contained uranium.

Although the Toliara Project holds a mining permit that allows production of ilmenite, rutile and zircon, development at the Project was suspended by the Government of Madagascar in November 2019 pending negotiation of fiscal terms applying to the Project. Based on progress made in the negotiation of fiscal terms, the Government of Madagascar lifted the suspension on November 28, 2024, and on December 5, 2024 the Company entered into a Memorandum of Understanding (the “MOU”) with the Government of Madagascar setting forth certain key terms applicable to the Toliara Project. The MOU is the culmination of extensive negotiations over several years with the Malagasy Government on fiscal and other terms applicable to the Toliara Project and is a major step forward in advancing the Project. Now that the Government has lifted the suspension, the Company has re-commenced development and investment in the Project, is re-establishing community and social programs, and is advancing the technical, environmental and social activities necessary to achieve a positive Financial Investment Decision (“FID”), which the Company expects to make in early 2026.

While the Company is progressing towards an FID, the Company will continue working with the Government of Madagascar to formalize the terms and conditions set out in the MOU through the implementation of a “Stability Mechanism” consisting of one or a combination of the following: (a) submittal of an Investment Agreement to the Madagascar Parliament for approval as law and certification of the Toliara Project (“Project Certification”) under existing law establishing a special regime for large scale investments in the Malagasy mining sector (the “LGIM”); (b) promulgation of amendments and revisions to the existing LGIM (the “LGIM Amendment”) in a form that provides for the necessary certainty of financial and legal terms, and reasonable financial, operational and legal requirements, for large-scale projects and have Project Certification under the amended LGIM, together with an Investment Agreement (if reasonably required) submitted to Parliament for approval as law; and/or (c) another agreed upon mechanism that achieves the necessary certainty of financial and legal terms, and reasonable financial, operational and legal requirements, applying to large-scale mining projects. The Company and the Government of Madagascar are currently pursuing option (b) by working towards an LGIM Amendment and to have Project Certification under the amended LGIM, together with an Investment Agreement (if reasonably required) submitted to Parliament for approval as law. As part of the Project Certification process, the Company and the Government of Madagascar will include the recovery of Monazite in the Toliara Project's mining permit The Company currently expects that the LGIM Amendment process could be completed in Q2 2025 with the Project Certification and Investment Agreement, if required, approval by the end of Q3 2025. However, there can be no assurance as to the timing of achieving sufficient legal and fiscal stability or the timing for approval of the addition of Monazite to the mining permit. If such approvals are not obtained, or obtained on terms less favorable than expected, this could delay any final investment decision in relation to the Toliara Project or prevent or otherwise have a significant effect on the development of the Toliara Project or ability to recover Monazite from the Toliara Project (see “Part I, Item 2. The Toliara Project”).

Base Resources also owns the Kwale Project in Kenya, which completed its mine life in December 2024 and has commenced reclamation activities. (see “Part I, Item 2. Non-Material Mineral Properties – Kwale Project”).

On June 3, 2024, the Company executed JV Agreements with Astron, creating the Donald Project JV to jointly develop and operate the Donald Project in Australia, which is a well-known HMS and REE deposit that the Company believes could provide it with another near-term, low-cost, and large-scale source of monazite sand that, upon development, would be transported to the Mill for the recovery of separated REE products. The Donald Project has most licenses and permits in place (or at an advanced stage of completion) for ilmenite, rutile and zircon production and is in the process of updating those licenses to also include the production of monazite. (see “Part I, Item 2. The Donald Project”). The JV Agreement provides Energy Fuels the right to invest up to AUS$183 million (approximately $114 million at December 31, 2024 exchange rates) to earn up to a 49% interest in the Donald Project JV, of which approximately $12.90 million was invested in 2024 in preparation of a final investment decision (“FID”), and, if a positive FID is made, the remainder would be invested to develop the project and to earn into the full 49% interest in the Donald Project JV. In addition, the Company would issue Common Shares to Astron having a value of up to $17.5 million, of which $3.5 million of Common Shares were issued in September 2024 upon the satisfaction of certain conditions precedent and the remainder would be issued upon a positive FID. See Note 3 – Transactions for more information.

Acquisition of RadTran LLC

On August 16, 2024, the Company acquired RadTran, a private company specializing in the separation of critical radioisotopes, to further the Company's plans for development and production of medical isotopes used in cancer treatments. RadTran's expertise includes separation of radium-226 (“Ra-226”) and radium-228 (“Ra-228”) from uranium and thorium process streams. This strategic acquisition is expected to significantly enhance Energy Fuels' planned capabilities to address the global shortage of these essential isotopes used in emerging TAT for cancer treatment.

In addition, as part of the Acquisition, Saleem Drera, PhD, President and CEO of RadTran, has joined Energy Fuels as Vice President of Radioisotopes, Radiological Systems, and Intellectual Property. In this role, Dr. Drera will lead Energy Fuels' efforts to integrate RadTran's proprietary technology, which includes a number of patents, pending patents, trade secrets and know-how relating to efficient separation of Ra-226 and Ra-228 from process streams, and drive innovation in the production of medical radioisotopes.

Under the Acquisition, the purchase price paid by Energy Fuels to the owners of RadTran consisted of: (i) on closing, $1.5 million in cash, $1.5 million in Energy Fuels common shares (“Common Shares”) and the grant of a 2% royalty on future revenues from the sale of produced radium, as well as certain other contractual commitments; and up to an additional $14 million in cash and Common Shares based on the satisfaction of a number of performance-based milestones, including achieving initial production, securing suitable offtake agreements to justify commercial production and reaching commercial production. As of December 31, 2024, the Company believes it is probable it will achieve the milestone related to achieving initial production.

During 2025, Energy Fuels plans to set up the first stages of the pilot facility and expects to produce R&D quantities of Ra-226 for testing by end-users of the product. Upon successful production of R&D quantities of Ra-226, Energy Fuels plans to develop capabilities at the Mill for the commercial-scale production of Ra-226 and potentially Ra-228 in 2027-2028, conditional on completion of engineering design, securing sufficient offtake agreements for final radium production, and receipt of all required regulatory approvals. However, there can be no assurances as to the success of this program. There are still a number of risks related to our potential recovery of radioisotopes at the Mill for use in our TAT initiatives, including a risk of technological or market changes that could impact the industry or our competitive position, and any expectation that: such potential recovery will be feasible or that the radioisotopes will be able to be sold on a commercial basis; all required licenses, permits and regulatory approvals will be obtained on a timely basis or at all; and the cancer treatment therapeutics will receive the required approvals and will be commercially successful.

Successful Commissioning of“Phase 1” REE Circuits

In 2022, the Company began development of its Phase 1 REE separation facilities at the Mill, which were completed in late Q1-2024, fully commissioned in Q2-2024 with the initial run completed in Q3-2024, producing 38 tonnes of on-spec separated NdPr. The Phase 1 REE separation facilities involved modifications and enhancements to the existing SX circuits at the Mill and have the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of TREOs, containing approximately 850 to 1,000 tonnes of recoverable separated NdPr per year. Because Energy Fuels is utilizing existing infrastructure at the Mill, Phase 1 capital including commissioning totaled approximately $19 million (depending on the offset value of NdPr production during the commissioning process, which has yet to be sold). This is favorable to the Company’s initial budget by approximately $6 million due to higher than expected quantities of NdPr produced during commissioning. See “Part 1, Item 1. REE Separation Circuits at the Mill” above for more information.

Uranium Production

In late-2023, the Company commenced uranium production at its Pinyon Plain Project and its La Sal and Pandora mines (the La Sal and Pandora mines each comprise a portion of the La Sal Project). During the year ended December 31, 2024, the Company mined 350,000 pounds of U 3 O 8 from these mines, which is contained in uranium ore inventory stockpiles at the mines and Mill. In addition, during the year ended December 31, 2024, the Company continued to produce uranium from its alternate feed recycling program, which totaled approximately 158,000 pounds of finished U 3 O 8.

Agreement with Navajo Nation

Production at the Pinyon Plain mine was delayed by a few months, as the Company engaged in discussions with the Navajo Nation, the largest and most populous indigenous tribe in the U.S. The Navajo Nation has suffered longstanding impacts from uranium mining conducted during the cold war era, resulting in numerous abandoned uranium mines and mill sites on their lands. This has understandably caused mistrust toward the U.S. government and energy companies. In order to address the Navajo Nation’s concerns and ensure that uranium ore transportation through the Navajo Nation will be done safely and respectfully, the Company and the Navajo Nation worked together in good faith to sign an agreement governing the transport of uranium ore along federal and state highways crossing the Navajo Nation, which was announced on January 29, 2025. Under the agreement, Energy Fuels has agreed to add additional protections and accommodations over and above the existing, strict U.S. Department of Transportation (“USDOT”) requirements, including:

limiting transportation to specified routes and hours of the day;

not transporting ore on days involving celebrations or public events in respect of the Navajo Nation's culture and traditions;

clearly spelled out emergency response procedures, notice and reporting requirements;

additional insurance requirements;

additional driver qualification and training requirements;

obtaining Navajo Nation transport licenses;

use of state-of-the-art cover systems to prevent fugitive dust from transport trucks;

provisions for escorts and blessings at the discretion of the Nation; and

additional inspection procedures that will enable the Navajo Nation to ensure that all applicable rules and agreements are being satisfied.

Additionally, the Company has committed to accepting and transporting, at no cost to the Nation, up to 10,000 tons of uranium-bearing cleanup materials from abandoned uranium mines within the Navajo Nation, which are primarily an unfortunate relic of old U.S. government uranium programs that began in the 1940s, in which Energy Fuels had no involvement. The Company has also committed to make further contributions to support the Nation's transportation safety programs, education, the environment, public health and welfare, and local economic development on the Navajo Nation relating to uranium matters. Negotiation of the agreement began in August 2024, after the Company voluntarily halted shipments of uranium ore, and has involved numerous in-person and virtual meetings between the Company and the Nation's senior leadership. Ore transportation re-commenced on February 12, 2025.

The Company is proud to be a part of this historic agreement with the Navajo Nation and hopes this agreement marks the beginning of a constructive relationship that restores trust with our neighbors, while also paving the way for future collaborations on cleanups and other areas of shared interest.

Uranium and Heavy Mineral Sands Sales

The Company completed the following 450,000 pounds of uranium sales for the year ended December 31, 2024 for total proceeds of $37.90 million and a weighted average sales price of $84.23 per pound:

January 2024: sold 200,000 pounds of U 3 O 8 for $15.03 million ($75.13 per pound) into its existing portfolio of long-term contracts.

March 2024: sold 100,000 pounds of U 3 O 8 on the spot market for $10.29 million ($102.88 per pound).

June 2024: sold 100,000 pounds of U 3 O 8 on the spot market for $8.59 million ($85.90 per pound).

September 2024: sold 50,000 pounds of U 3 O 8 on the spot market for $4.00 million ($80.00 per pound).

Additionally, following the acquisition of Base Resources and the Kwale Project, the Company sold 48,302 tonnes of ilmenite, 17,529 tonnes of rutile and 2,477 tonnes of zircon and low grade products for total sales of $39.87 million.

Directors

Effective October 2, 2024, the Company appointed Michael Stirzaker, former Chair of the Base Resources Board of Directors to the Board of Directors of Energy Fuels (the “Board").

Corporate Officers

Effective October 2, 2024, Tim Carstens assumed his appointment as the Company’s Executive Vice President, Heavy Mineral Sands Operations of Energy Fuels.

Company Strategy

As a result of the foregoing, we are now or intend to engage in the following activities in 2025:

During 2025, the Company expects to mine ore from its Pinyon Plain, La Sal and Pandora mines containing approximately 730,000 to 1,170,000 pounds of U 3 O 8, depending on mining rates, contract requirements, and market conditions. In addition, the Company expects to receive additional alternate feed materials, cleanup material and to purchase ore from 3 rd party miners containing approximately 160,000 to 200,000 pounds of U 3 O 8, which when combined with the mined ore is expected to result in an increase in uranium contained in ore inventories and work in process during the year by 890,000 to 1,370,000 pounds of U 3 O 8. Such uranium-bearing ore will be stockpiled at the mines and Mill for processing in 2025 or at a future date, subject to market conditions, contract requirements, and the Mill’s schedule. As the Company currently has sufficient finished U 3 O 8 inventory to meet its 2025 contract delivery requirements and may elect not to sell uranium into the spot market at current prices, the Company may decide to defer processing all or a portion of such stockpiled uranium ore inventories until after the end of 2025, thereby freeing up Mill capacity for an REE processing run or other uses during the second half of 2025. In addition, having stockpiled mined ore available at the Mill, which can be processed into finished U 3 O 8 product on relatively short notice, gives the Company more flexibility in securing long-term sales contracts on the most favorable terms when needed, rather than merely accepting contracts at current prices when the fundamentals suggest higher prices in the future may be expected;

the Company expects to produce between 200,000 and 250,000 pounds of finished U 3 O 8 during the first half of 2025 from existing conventional ore inventories and Alternate Feed Materials;

the Company expects to sell between 200,000 and 300,000 pounds of uranium during 2025, under the Company's existing long-term contracts with utilities. As a result of these sales, the Company expects that finished U 3 O 8 inventory will be approximately 290,000 to 445,000 pounds U 3 O 8 at the end of 2025 and contained uranium in stockpiled uranium ore inventories will be approximately 1,365,000 to 1,895,000 pounds of U 3 O 8, totaling to 1,655,000 to 2,340,000 pounds of contained uranium in ore inventories plus finished product at the end of 2025. Again, the mix between increased contained uranium in ore inventories and finished U 3 O 8 product inventory at the end of 2025 will depend on the timing of the processing of Pinyon Plain ore at the Mill, which could occur in 2025 or be deferred to subsequent years, and any spot uranium sales or purchases the Company may elect to complete in 2025;

the Company expects to continue performing exploration activities at its Nichols Ranch Project and further delineation drilling at its Pinyon Plain Project to increase its uranium resource base;

the Company expects to prepare two additional uranium mines (the Nichols Ranch ISR Project and the Whirlwind Project) to be ready to resume uranium ore production within 12 months of a “go" decision. The exact timing for resumption of production from each of these projects will be subject to current and future uranium market conditions and/or procurement of additional long-term contracts;

the Company expects to enter into uranium ore purchase agreement with one or more 3 rd party miners in the vicinity of the Mill;

the Company plans to continue advancing each of its Donald and Toliara HMS projects to a FID by late-2025 and mid-2026, respectively;

The Company plans to restart its drilling program at the Bahia Project in 2025 once the appropriate permits and surface access arrangements are in place, with the goal of getting enough information to declare an S-K 1300 compliant initial assessment and NI 43-101 compliant technical report in late 2025 or early 2026. The Company is also advancing its permitting efforts at the Project to include baseline studies and other necessary studies to move the Project forward;

the Company plans to advance the permitting and design of the Phase 2 REE expansion at the Mill to enable the production of up to 4,000 – 6,000 tonnes of separated NdPr, along with separated Dy, Tb and other REE materials;

the Company plans to continue to evaluate potential opportunities in REE metal, alloy and magnet-making as they may arise;

the Company plans to continue to pursue additional Alternate Feed Materials, third-party processing, ore purchases and other sources of feed for the Mill (including potential material recovered from AUM and other land cleanup work) and, when market conditions warrant, pursue the recovery of uranium and/or vanadium dissolved in the Mill’s tailings pond solutions;

the Company plans to continue to maintain selected projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant;

the Company plans to advance permitting and evaluation activities for the Roca Honda and Bullfrog Projects; and

the Company continue to evaluate the potential for recovering and selling certain radioisotopes from the Mill’s existing process streams for use in making medical isotopes for emerging TAT cancer treatments.

Uranium Sales

As of December 31, 2024, the Company has entered into four uranium sales contracts with U.S. nuclear utilities. Under the current portfolio of contracts, the Company expects to sell between 200,000 and 300,000 pounds of uranium during Q2- and Q3-2025. The Company holds uncommitted inventory and, with the benefit of production in 2025 and beyond, will continue to evaluate additional spot and/or long-term uranium sales opportunities up to 400,000 pounds during 2025 and beyond. The Company may also evaluate the purchase of uranium on the spot market, subject to market conditions and contract requirements.

As mentioned above, the Company expects total inventories of uranium contained in uranium ore inventories together with finished U 3 O 8 product inventories to total between approximately 290,000 and 445,000 pounds of U 3 O 8 at year-end 2025, subject to 2025 production levels and uranium sales and purchases, with the mix between uranium contained in ore inventories and finished uranium product dependent of whether the Company elects to process Pinyon Plain ores at the Mill during the second half of 2025. Energy Fuels’ uranium inventory provides the Company with financial flexibility, and the Company believes its existing inventories, purchases and new production will be sufficient to meet contract requirements through 2025 and over the life of the supply contracts, along with discretionary spot sales in 2025 and beyond, as market conditions may warrant.

Overview of Uranium Market

The primary use of uranium is to fuel nuclear power plants for the generation of carbon- and emission-free electricity.

According to the World Nuclear Association (“WNA”), as of January 2025, there were 440 operable nuclear reactors world-wide, which required approximately 175.5 million pounds of U 3 O 8 annually at full operation. Worldwide, there are currently 65 new reactors under construction with an additional 86 reactors on order or in the planning stage and an additional 344 proposed.

According to data from TradeTech LLC (“TradeTech”), the world continues to require more uranium than it produces from primary extraction. The gap between demand and primary supply is being filled by stockpiled inventories and secondary supplies, which the Company believes have dwindled significantly in recent years.

According to the WNA, the U.S. currently has 94 operating reactors, and another 13 reactors proposed. According to the U.S. Energy Information Administration (“EIA”), in 2024, the U.S. produced approximately 18.6% of its electricity from nuclear technology, while, according to the Nuclear Energy Institute (“NEI”), the U.S. achieved an average capacity factor of 93.0%, leading all other carbon-free sources by a wide margin. According to the EIA, U.S. utilities purchased approximately 51.6 million pounds of U 3 O 8 in 2023 (the last year reported).

In 2024, interest in the uranium and nuclear sectors continued to grow substantially, which the Company believes was driven by: (1) global efforts to reduce carbon emissions and a growing focus on electrification; (2) geopolitical tensions, particularly regarding Russia’s invasion of Ukraine; and (3) speculation based on supply and demand fundamentals. The Company believes that nuclear energy is essential to the global economy and addressing climate change, as it reliably and affordably provides electricity 24/7 and 365 days per year while generating lower life-cycle carbon emissions than other baseload energy sources (NREL, September 2021).

The Company continues to believe that certain uranium supply and demand fundamentals point to higher sustained uranium prices in the future, including significant production cuts in recent years, along with significant increased demand from utilities, financial entities, traders and producers. Recently, large technology companies including Google, Microsoft and Amazon have announced their interest in using nuclear energy to meet growing demand for energy needed for data centers to support artificial intelligence initiatives. Globally, the Company believes that nuclear energy is seeing greater acceptance by governments and policymakers as a solution to addressing the issues of climate change, increased energy demand and energy security. The Company believes that financial entities purchasing uranium on the spot market for long-term investment continue to represent a fundamental shift in the uranium market due to increasing demand and removing readily available material from the market that would otherwise serve as supply to utilities, traders and others. Further, the Company believes that Russia’s ongoing invasion of Ukraine has sparked a widespread trend away from Russian-sourced nuclear fuel supply. On May 13, 2024, President Joe Biden signed the Prohibiting Russian Uranium Imports Act, which bans the import of Russian uranium products into the U.S. Under the ban, which commences 90 days after enactment and terminates in 2040, all imports of uranium products from Russia will be banned, subject to waivers in the event “no alternative viable source of low-enriched uranium (“LEU”) is available to sustain the continued operation of a nuclear reactor or U.S. nuclear energy company.” However, the U.S. Department of Energy (“DOE”) has been granting waivers to the ban.

The Company also continues to believe that a large degree of uncertainty exists in the market, primarily due to, trade issues, the life of existing uranium mines, uncertainty on the timing and success of the commissioning of new mines, conversion and enrichment bottlenecks, the opaque nature of inventories and secondary supplies, unfilled utility demand, geopolitical risks including Russia’s ongoing invasion of Ukraine, transportation issues, and the market activity of state-owned uranium and nuclear companies.

According to data from TradeTech, during 2024, spot uranium enrichment prices rose from $155.00 per separative work unit (“SWU”) to $195.00 per SWU (up 26%); uranium conversion prices rose from $46.00 per KgU to $97.00 per KgU (up 111%); and U 3 O 8 prices declined from $91.00 per pound of U 3 O 8 to $73.50 per pound of U 3 O 8 (down 19%). The Company believes these prices reflect the significant bottleneck in uranium conversion and enrichment, which until resolved, could contribute to limiting upward price pressure for U 3 O 8.

Uranium is not traded on an open market or organized commodity exchange, although the CME Group provides financially settled uranium futures contracts. Typically, buyers and sellers negotiate transactions privately, either directly or through brokers and intermediaries. Spot uranium transactions typically involve deliveries that occur immediately and up to 12 months in the future. Term uranium transactions typically involve deliveries that occur more than 12 months in the future, with long-term transactions involving delivery terms of at least three years. Uranium prices, both spot and term, are primarily published by two independent market consulting firms, TradeTech and UxC, LLC, on a weekly and monthly basis, along with daily price indicators. Other brokers, including Uranium Markets LLC, Evolution Markets Inc. and Numerco Ltd., also publish daily average uranium prices.

Historically, most nuclear utilities have sought to purchase most of their uranium needs through mid- and long-term supply contracts, while other portions are bought on the spot market. According to EIA data, in 2023, U.S. utilities purchased 15% of their uranium on the spot market with the remaining 85% purchased under mid- and long-term contracts; through 2033, U.S. utilities have approximately 184.1 million pounds of unfilled uranium requirements (EIA, Uranium Marketing Annual Report, 2023). Buyers seek to balance the security of supply with the opportunity to take advantage of lower prices. For this reason, both buyers and sellers track current spot and term prices for uranium carefully, make considered projections as to future prices, and negotiate with one another on transactions which each deems favorable to their respective interests.

The graph, below, shows the monthly spot (blue line) and long-term (red line) uranium price from August 1969 up to January 2025 as reported by TradeTech (not adjusted for inflation):

To give a more recent perspective over the last five years, the graph below shows the monthly spot (blue line) and long-term (red line) uranium price from January 2020 up to January 2025, as reported by TradeTech (not adjusted for inflation):

According to monthly price data from TradeTech, uranium prices during 2024 decreased $17.50, or 19%, for the year. Monthly spot prices began the year at $91.00 per pound of U 3 O 8 on December 31, 2023 and ended the year at $73.50 per pound on December 31, 2024, reaching a high of $100.50 per pound for the month of December 2023 and a low of $73.50 per pound at the end of the period. According to TradeTech, the spot price was $65.25 per pound as of February 21, 2025. TradeTech price data also indicated that long-term U 3 O 8 prices began 2024 at $68.00 per pound and ended 2024 at $82.00 per pound. The high long-term price for 2024 was $82.00 per pound from July to December 2024, and the low long-term price was $68.00 per pound at the start of the period. The long-term price as of February 21, 2025 was $82.00 per pound.

Uranium Market Outlook and Uranium Marketing Strategy

The Company believes that world demand for clean, carbon-free, reliable, and affordable baseload electricity is growing. As a result of the expected growth of nuclear energy, the depletion of existing uranium mines and inventories, and geopolitical events putting a greater focus by buyers on security of supply, the Company believes the current- and long-term fundamentals of the uranium industry remain positive. Uranium spot prices dropped modestly during 2024, due to several factors, including uncertainty on Russian uranium imports into the U.S. (including waivers), transportation, trade policy, and the incoming Trump Administration. On the other hand, strong fundamentals underpin the market, including global clean energy goals, significant new demand for electricity (preferably clean electricity) from the technology sector including artificial intelligence (AI) and data centers, and trade restrictions. Therefore, while the spot market has experienced weakness, particularly during the second half of 2024 due to uncertainty surrounding waivers on the prohibition of Russian nuclear fuel imports into the U.S. along with the potential for retaliatory actions by Russia (which has delayed shipments), the Company continues to believe that uranium prices should rise to higher levels to support the additional primary production that will be required to meet the increasing demand. We continue to expect to see more nuclear units constructed around the world, along with existing capacity to be extended and protected, while primary mine production drops due to depletion of resources, reduced production and low prices. As a result, while spot prices have waned, long-term uranium prices have remained resilient (currently $82 per pound). 2023 saw the highest levels of long-term contracting since 2012. 2024 is expected to see slightly lower levels of contracting, due to renegotiation of existing contracts, but still strong. According to TradeTech, “[a] significant share of end-user demand has drifted into the long-term market.” “TradeTech expects term demand to emerge and retreat in cycles through 2025, largely on the expectation that government policy development will be unpredictable. However, the upward momentum on uranium demand generated by global net-zero and AI-development initiatives is expected to underpin renewed appetite to secure uranium supply in 2025.” TradeTech, Uranium Market Study, 2024: Issue 4.

According to TradeTech, world uranium requirements continue to exceed primary mine production, with the gap being bridged by dwindling secondary supplies and excess uranium inventories in various forms that have already been mined. At the same time, a large portion of global uranium production remains state-owned and state-subsidized, and therefore not subject to normal market fundamentals, which the Company believes present risks to the current strong market. However, Russia’s invasion of Ukraine, and continued attacks on civilian populations, has increased demand for non-Russian uranium. As a result, uranium prices exhibited strength throughout 2024, and the Company has observed significantly more interest in both spot transactions and long-term contracts for U 3 O 8 from utilities.

The Company believes that certain uranium supply and demand fundamentals point to sustained market strength and potentially higher prices in the future, increased demand from utilities and end-users (including the technology sector), financial entities, traders, and producers. However, the Company also believes that while uranium market conditions have improved significantly since 2021, they still could be vulnerable, primarily as a result of secondary uranium supplies, excess inventories, and non-market activities of state-owned enterprises. While U.S. and European utilities are reducing their exposure to Russian supply, the Company believes that Russia maintains significant capabilities across the nuclear fuel cycle, which could re-enter the global market in the future upon resolution of the conflict in Ukraine, circumvention of trade restrictions, or other factors.

The Company’s marketing strategy is to seek a base of earnings and cash flow through sales of a portion of its uranium into term contracts, to the extent such contracts are available at satisfactory prices. To gain exposure to increasing uranium prices, the Company seeks to sell a portion of its planned uranium extraction into contracts with market-related formulas, if available at satisfactory prices, and through future spot and term sales. Further exposure to increasing uranium prices can be generated through the Company’s ability to bring additional uranium extraction online in the future in response to increasing prices, which can be sold on a market-related or fixed basis at then prevailing prices.

During 2022, the Company entered into three long-term uranium sales contracts with U.S. nuclear utilities. During 2024, the Company entered into a fourth long-term uranium sales contract with a U.S. nuclear utility. These have remaining base deliver quantities of 2.8 million pounds with deliveries to occur during the 2025 – 2030 time period. Taking all options and quantity flexibility into account, deliveries under these contracts could range between 2.3 and 4.1 million pounds between 2025 and 2030. During 2024, the Company delivered 200,000 pounds of uranium under these contracts and sold another 250,000 pounds on the spot market. Annual quantities vary year-to-year, with lower delivery quantities in the early years, and higher quantities in the later years. During 2025, the Company has base delivery obligations of 250,000 pounds of uranium under these contracts, plus another 750,000 pounds in 2026. The Company’s contract pricing has a fixed price component (fully indexed to inflation) and a spot market component, along with floor and ceiling prices (fully indexed to inflation). The Company has filled deliveries during the early years of these contracts from produced inventories and expects to fill future deliveries through new production.

The Company’s uranium inventories, along with expected uranium production in 2025 and subsequent years, are expected to provide the Company with the flexibility to complete spot sales in 2025 in response to improved market conditions, should the Company desire to do so. The Company will also continue to evaluate the potential to complete opportunistic purchases of uranium during 2025.

The Vanadium Market

Vanadium is a metallic element that, when converted into ferrovanadium (“FeV”) (an alloy of vanadium and iron), is used primarily as an additive to strengthen and harden steel and make it anti-corrosive. According to market consultant FastMarkets, over 90% of FeV is used in the steel industry. In addition, vanadium is used in the aerospace and chemical industries, and continues to see interest in energy storage technologies, including vanadium redox flow batteries. China is the largest global producer of vanadium, with additional production coming from Russia, South Africa, and Brazil (Roskill).

The Company believes one of the main drivers of V 2 O 5 prices is demand for steel, including global prospects for economic growth, construction, infrastructure and auto manufacturing. According to Fastmarkets, spot vanadium prices have decreased due to “lower long-term contract offers from the major producers”. The same report indicated that “lower spot vanadium pentoxide prices upstream also put pressure on China's ferro-vanadium producers and traders to lower their offers, with less buying activity heard in the market.”China domestic vanadium prices dip amid reduced long-term contract offers, September 26, 2024.

During the year ended December 31, 2024, the mid-point price of vanadium in Europe decreased by 18% from $6.53 per pound V 2 O 5 as of December 31, 2023 to $5.37 per pound V 2 O 5 as of December 31, 2024. The price of vanadium has ranged from a high of $6.88 per pound V 2 O 5 between February 16, 2024 and February 23, 2024 and a low of $5.19 per pound V 2 O 5 between September 27, 2024 and October 10, 2024.

The Company believes one of the main drivers of V 2 O 5 prices is demand for steel, including global prospects for economic growth, construction, infrastructure and auto manufacturing. According to Fastmarkets, “The global ferro-alloys industry has been affected by factors including weak downstream steel demand in China, raw material supply disruptions and flaring geopolitical tensions in recent months, meaning uncertainty and volatility remain significant themes as 2025 kicks off,” and “[t]he situation has been particularly challenging in Europe due to high energy costs, which have affected both steel and ferro-alloys producers, with European steel association Eurofer issuing a stark warning of the potential for irreversible decline in the region’s steel and manufacturing sectors because of a lack of competitiveness.” Fastmarkets, Three things ferro-alloys traders want in 2025… and three they don’t: 2025 preview, January 6, 2025. The Company believes that V 2 O 5 prices will increase once confidence in the Chinese and global economy returns. As of February 21, 2025, the price of vanadium was $5.35 per pound V 2 O 5.

The Company expects to continue to sell vanadium from its inventory into rising markets if they continue, failing which the Company plans to maintain its vanadium inventory for future sales at opportune times. The Company currently has 905,000 pounds of V 2 O 5 in finished goods inventory and an estimated 1.0 to 3.0 million pounds of V 2 O 5 in its tailings solutions, which are available for future recovery, as market conditions warrant.

Heavy Mineral Sands Market

General

HMS are typically categorized into titanium dioxide-bearing minerals such as ilmenite and rutile (but also including leucoxene and upgraded products such as slag and synthetic rutile), zircon and monazite.

HMS are mined, processed and, in some cases, upgraded by many producers at numerous locations around the world. HMS deposits typically contain a mix of titanium dioxide minerals and zircon. China, with 52% of global production, dominates global titanium dioxide feedstock supply. South Africa (10%), Australia (8%) and Canada (6%) are other major suppliers of titanium dioxide feedstock. China (29%), South Africa (22%) and Australia (22%) are the world's biggest producers of zircon. While the assemblage of the range of heavy minerals will differ from one mineral sand deposit to another, in most cases, they are dominated by ilmenite. It is common for HMS deposits to contain monazite, a rare earth-bearing mineral, but this content is typically very low.

Total supply of titanium dioxide feedstock for 2024 is estimated at 9 million tonnes of TiO 2 units (with ilmenite making up approximately 50% of this total). Total supply of zircon for 2024 is estimated at 1.2 million tonnes. At its peak, Base Resources' Kwale operation produced approximately 15% of the world's natural rutile, 6% of the world's sulphate ilmenite and 3% of the world's zircon. The Toliara Project, upon becoming operational, is expected to produce up to approximately 10% of global sulphate ilmenite, 20% of global chloride ilmenite and 5% of global zircon. Toliara is also expected to become a globally significant source of monazite supply.

HMS products are sold under a mix of spot, quarterly, half yearly and long-term (multi-year) offtake contracts - depending on the customer and market segment. Terms and prices for offtake contracts are privately negotiated with each individual customer based on market conditions and long-term strategic considerations. Products may be shipped as dry bulk cargoes (for large consumers) or in shipping containers (either packed loose in the container or in bulk bags).

Titanium Dioxide Minerals

Ilmenite and rutile are primarily used as feedstock for the production of TiO 2 pigment, with a small percentage also used in the production of titanium metal and fluxes for welding rods and wire. TiO 2 is the most widely used white pigment because of its nontoxicity, brightness and very high refractive index. It is an essential component of consumer products such as paint, plastics and paper. Pigment demand is therefore the major driver of ilmenite and rutile pricing.

China is the world's biggest consumer of TiO 2 feedstock, accounting for nearly 60% of global consumption. Sulphate ilmenite, a low grade TiO 2 feedstock (containing approximately 48-54% TiO 2), is the main feedstock mineral consumed by the Chinese pigment sector. North America (17%) and Europe (12%) are the other two major consuming regions. Pigment producers in these regions typically consume high grade TiO 2 feedstock such as natural rutile (a mineral containing approximately 95% TiO 2).

The first half of 2024 saw an improvement in the global pigment market after a very subdued 2023. Pigment consumers began re-building inventories and underlying consumption improved. Western pigment producers increased their production rates from the very low operating rate at the end of 2023 to meet the improved demand which, in turn, led to increased demand for high grade TiO 2 feedstocks. Despite the improved conditions, the large overhang of rutile from the end of 2023 has not yet been fully absorbed, and downward pressure remained on prices into the second half of 2024.

The improved sentiment among major western pigment producers through the first half of 2024 turned more cautious by the middle of the year on the back of renewed concerns over global economic conditions and the impact on underlying pigment demand. Western pigment production rates remained below optimal levels and prices for high grade TiO 2 feedstocks continued to decline.

The introduction of new import tariffs on Chinese pigment in the European Union from July 2024 and Brazil in late 2024 may present upside to demand for western pigment at some point during 2025. The actual pace of recovery of the western pigment market will determine the extent to which the overhang of TiO 2 feedstock inventory is absorbed into the market and when prices begin to turn upward.

Despite subdued conditions since early to mid-2023, most Chinese pigment producers continue to operate at high rates. Major Chinese producers have counteracted a weak domestic pigment market by focusing on increased export sales. Chinese pigment exports to the European Union were strong through the first few months of 2024 as producers and consumers built stocks in Europe ahead of the introduction of the new tariffs in July 2024. Brazil introduced new tariffs on Chinese pigment in late 2024. Since mid-2024 Chinese pigment exporters have had some success in redirecting export sales from Europe and, more recently, Brazil to other key markets and have focused on increasing sales to other regions that are considering tariffs on Chinese pigment - including India. Ongoing high pigment production rates in China have supported firm demand for ilmenite. This is particularly the case for growing chloride pigment production in China which is heavily dependent on the quality of certain sources of imported ilmenite - including Kwale and Toliara ilmenite.

Ilmenite prices picked up slightly through the first half of 2024 as high Chinese pigment production rates, relating to the strong exports, out-stripped ilmenite supply. However, Chinese pigment producers become more cautious through late 2024 as their ability to compete in Europe becomes significantly hampered by the new tariffs. Demand and pricing for ilmenite depends on whether the success of Chinese pigment producers in re-directing export sales from Europe to other key markets is sustained.

Demand for rutile into the welding and titanium metal sectors has remained firm through 2024. The main drivers of demand have been booming shipbuilding and aerospace industries combined with sanctions on Russian-supply of raw materials. These sectors continue to attract a premium price and present good opportunities for Kwale rutile but they are relatively small sectors and the broader market will continue to be driven by the pigment sector.

While prices for ilmenite and rutile decreased in 2024, they remained at historically high levels.

The Company believes that longer term fundamentals for rutile and ilmenite are positive. Pigment demand, driving consumption of rutile and ilmenite, is expected to continue growing at the rate of global GDP to recover from current levels with growth in housing and building sectors across major markets. Supply of TiO 2 feedstock to meet future demand is dependent on a significant amount of new supply entering the market from new projects.

Zircon

Zircon has a range of end-uses, the predominant of which is in the production of ceramic tiles, accounting for more than 50% of global zircon consumption. Milled zircon enables ceramic tile manufacturers to achieve brilliant opacity, whiteness and brightness in their products. Zircon's unique properties include heat and wear resistance, stability, opacity, hardness and strength, making it sought after for other applications such as refractories, foundries and specialty chemicals.

Demand growth for zircon is closely linked to growth in global construction and increasing urbanization in the developing world.

China dominates the zircon market, accounting for over 45% of global consumption. Europe (mostly Italy and Spain) is the second biggest consumer with close to 20% of consumption. North America, India and other Asia (excluding China and India) are the next three biggest consumers - each accounting for approximately 9% of global consumption.

After price declines in 2023, zircon market conditions stabilized through early 2024 as consumers began re-building inventories and a major producer announced a reduction in zircon supply. However, underlying zircon demand was sluggish on the back of subdued economic conditions in all major markets through 2024 and prices have gradually trended downward – particularly as major zircon producers increased their supply into the market towards the end of 2024 and into the start of 2025.

The Company believes that the longer term fundamentals for zircon are positive. Zircon demand growth is expected to closely follow GDP and to be driven by recoveries in demand for ceramics in housing and building, as well as growth in industrial manufacturing including foundries for steel products and refractories for glass production (including solar panels). Supply of zircon to meet future demand is also highly dependent on a significant amount of new supply entering the market from new projects.

Monazite

The monazite is a source of rare earth elements, uranium and thorium. Rare earth elements are used in a wide variety of applications including, but not limited to, clean energy applications, permanent magnets, electric vehicles, electronics, glass polishing, catalysts, and defense applications. Recently, rare earth elements, specifically the magnetic rare earths neodymium, praseodymium, terbium, and dysprosium have received significant attention for their applications in permanent magnets for electric vehicles and other green technologies. Monazite is particularly rich in magnetic rare earth elements when compared to other rare earth bearing minerals. The uranium in monazite can be used for nuclear power and thorium can be used for thorium salt reactors and medical isotope production.

Most monazite produced from mineral sands is in the form of either a monazite concentrate or as monazite contained in a HMC. Currently, most monazite produced globally is shipped to China.

The monazite market almost completely disappeared between the late 1990s and about 2020. During this time most monazite was either stockpiled at HMS operations or buried with the tailings. This was due to monazite containing radioactive materials. Since approximately 2020, HMS producers have started to understand the contained rare earth value of monazite and have been looking to monetize this opportunity. Outside of China, there are a few groups processing monazite for rare earths. These include Energy Fuels, Lynas (who has a primary monazite deposit at Mt. Weld in Western Australia) and the Saskatchewan Research Council. Other miners, such as Iluka, are engineering or constructing REE recovery plants using monazite as a feedstock.

Current demand growth for monazite is closely linked to the growing push for clean energy technologies such as electric vehicles and wind turbines.

Monazite prices reached a historical peak in 2022 when rare earth prices reached their highest levels since the last rare earth price spike in 2011. Monazite prices typically trend along with the greater rare earth oxide market and are closely tied to the prices of neodymium, praseodymium, terbium, and dysprosium. After peaking in 2022, monazite prices trended downward matching declining rare earth prices in the rest of the market. Monazite prices have begun to recover in line with the rare earth oxide market and have been steady or slightly up since June of 2024.

The following table sets forth certain HMS prices in USD$/t, according to TZMI’s estimated market prices published in December 2024:

December 31,
20232024Percent
Product$/t$/tChange
Zircon (Premium)1,8801,840(2.1)%
Rutile (Premium, bulk)1,1351,1400.4%
Chloride Ilmenite (60 % TiO2)307305(0.7)%
Sulfate Ilmenite (50 % TiO2)275270(1.8)%

The Rare Earth Element Market

REEs are a group of 17 chemical elements (the 15 elements in the lanthanum series, plus yttrium and scandium) that are used in a variety of clean energy and advanced technologies, including wind turbines, EVs/Hybrid EVs, advanced robotics, cell phones, computers, flat panel displays, advanced optics, catalysts, medicine and national defense applications. Monazite, the source of REEs currently utilized by the Company, also contains significant recoverable quantities of uranium, which fuels the production of carbon-free electricity using nuclear technology. According to industry analyst Wood-Mackenzie, most demand for REEs is in the form of separated REEs, “as most end-use applications require only one or two separated rare earth compounds or products.” (Wood Mackenzie, Rare Earths, Outlook to 2030, 20th Edition). The main uses for REEs include: (i) battery alloys; (ii) catalysts; (iii) ceramics, pigments and glazes; (iv) glass polishing powders and additives; (v) metallurgy and alloys; (vi) permanent magnets; (vii) phosphors; and (viii) others (Adamas Intelligence). By volume, REEs used for permanent magnets (neodymium (Nd), praseodymium (Pr), Dy, and terbium (Tb)) and catalysts (cerium (Ce) and lanthanum (La)) comprised 60% of total consumption, yet over 90% of the value consumed.

Typical natural monazite sands from the southeast U.S. average approximately 55% TREO and 0.20% uranium, which is the typical grade of uranium found in uranium mines that have historically fed the Mill. Of the 55% TREO typically found in the monazite sands, the NdPr comprises approximately 22% of the TREO. NdPr is among the most valuable of the REEs, as it is the key ingredient in the manufacture of high-strength permanent magnets, which are essential to the lightweight and powerful motors required in EVs/hybrid EVs and permanent magnet wind turbines used for renewable energy generation, as well as in an array of other modern technologies, including advanced robotics, mobile devices and defense applications. Monazite concentrates also contain higher concentrations of “heavy” REEs, including Dy and Tb used in permanent magnets, relative to other common REE ores.

The Company is currently primarily focused on NdPr, Tb, Dy and, to a lesser extent, La, Ce and Sm. The REE supply chain starts at a mine. REEs are mined both as a primary target, like the Mountain Pass REE mine in California, and as a byproduct, which is the case of Chemours’ Offerman Mineral Sand Plant, where the natural monazite sands are physically separated from the other mined sands, and which is expected to occur at the Company’s Toliara, Donald and Bahia HMS projects. Mining creates an ore, which in the case of the Chemours material is the natural monazite sands that are physically separated from the other mined mineral sands. The ore then goes through a process of cracking and cleaning at the Mill that may include acids or caustic solutions, elevated temperature and pressure to recover the uranium and free the REEs from the mineral matrix. After removal of the uranium, which will be sold into the commercial nuclear fuel cycle for the creation of carbon-free nuclear energy, this solution is cleaned of any remaining deleterious elements (including remaining radioactive elements) and can be made into an RE Carbonate, which is a form acceptable as an SX feedstock for REE separation. SX facilities then use solvents and a series of mixer-settlers for the separation of the REEs (either from a RE Carbonate or directly from the cracking and cleaning process) from each other and to create the desired purified REE products (often as oxides or oxalates) for the market or particular end user. Separated REE products are typically sold to various markets, depending on the use. Separated REE products can be made into REE metals and metal-alloys, which are used for magnets and other applications.

To date, substantially all the RE Carbonate produced by the Mill has been sold to Neo Performance Materials (“Neo”). However, in 2024, the Mill successfully modified, enhanced and commissioned its existing SX facilities to result in an SX REE separation circuit at the Mill, which, is expected to be capable of producing up to 1,000 tonnes of separated NdPr per year. The Company is also currently evaluating the potential to produce other downstream REE materials, including REE metals and alloys, in the future at the Mill or elsewhere in the U.S. Moving forward, the Company does not expect to produce RE Carbonate available for sale.

REEs are commercially transacted in a number of forms and purities. Therefore, there is no single price for REEs collectively, but numerous prices for various REE compounds and materials. The primary value that the Company expects to generate in the short- to medium-term will come from NdPr, Dy, Tb, Ce and La, as those are the REEs the Company plans to target and the price the Company receives from the sale of any RE Carbonate is also tied to the prices of those REE oxides. In addition, as discussed above, the Company commenced production of separated NdPr in 2024. The following table sets forth certain REE compounds and materials mid-point prices in RMB¥/kg and their approximate value in USD$/kg, according to data from Asian Metal:

December 31, 2023 · December 31, 2024 · Percent · February 21, 2025
Product(RMB¥/kg)($/kg)(RMB¥/kg)($/kg)Change(RMB¥/kg)($/kg)
NdPr Oxide(Pr6O11: 25%;Nd2O3): 75%)4456339955(10)%44762
Ce Oxide (99.9%)6.750.967.651.0513%8.751.21
La Oxide (99.9%)4.150.593.550.49(14)%3.750.52
Dy Oxide2,6403741,600219(39)%1,740240
Tb Oxide7,6001,0765,570763(27)%6,150848

The rare earth magnet market is expected to see significant growth through 2040 per Adamas Intelligence, driven by increasing demand for NdFeB magnets in robotics, advanced air mobility, and electric vehicles. While demand for didymium, dysprosium, and terbium is projected to grow at a compound annual growth rate (“CAGR”) of 8.7%, global production will rise at a slower rate of 5.1%, leading to potential supply constraints. The total market for magnet rare earth oxides is forecasted to increase five-fold, from $7.8 billion in 2024 to $44.1 billion by 2040, with prices rising at CAGRs of 4.3% to 5.2%. Robotics is expected to become the largest demand driver for NdFeB magnets by 2040, followed by advanced air mobility, which will expand with the production of electric vertical takeoff and landing (eVTOL) aircraft. However, supply chain challenges may emerge between

2030 and 2040, as limited availability of rare earth feedstocks could constrain NdFeB magnet production, impacting key industries reliant on these materials.

While China consumes the most REEs in its manufacturing industries, much of it is consumed in the manufacture of end-use goods for export and by non-Chinese companies operating within China. REE separation facilities are additionally located in Vietnam, India, as well as Neo’s Silmet in Estonia, and use a variety of feedstocks and sources with small-scale or experimental operational facilities located elsewhere (Russia included).

The Company sees its prior commercial production of RE Carbonate and its recent commercial production of separated NdPr in 2024 as the first steps in an effort to restore the REE supply chain in the U.S., where one currently does not exist. By acquiring the Bahia Project, the Toliara Project and the right to earn into a 49% interest in the Donald Project, the Company has secured what it believes will be low-cost feedstock that can be processed in the U.S. into competitive separated REE products available for sale to U.S. and allied customers. Upon successful development of those projects, expected to be in the 2027-2028 time frame, the Company will have secured monazite sources capable of producing up to approximately 4,500 tonnes per year of separated NdPr, of which up to 1,000 tonnes per year can be produced utilizing existing Mill facilities. The Company’s next step in restoring the REE supply chain in the US will be the development of the Mill’s planned Phase 2 separation circuit, also expected in the 2027-2028 time frame, which would have the capacity to allow the Mill to produce up to 6,000 tonnes per year of separated NdPr, along with 200 to 300 tonnes per year of separated Dy and Tb, which would utilize all the monazite expected to be mined from the Company’s Bahia, Toliara and Donald Projects, along with additional monazite expected to be sourced from Chemours’ mines on the east coast of the US and others. As demand for clean energy technologies and other advanced technologies increases in the coming years, the Company expects demand and prices for REEs to increase. Increases in supply sources for REEs are expected in conjunction with this anticipated rising demand.

Multiple potential domestic sources of mined heavy mineral sands, including monazite, exist in North America and are potential feedstocks for the Mill; in addition, there is one producer of REEs from hard rock mining in California, which currently ships its material to Asia. On a global level, there is a potential to acquire natural monazite sands from the following locations: Australia, South Africa, Madagascar, New Zealand, the Philippines, Indonesia, Brazil, Malaysia, Thailand, India, Russia and others.

As demand for clean energy technologies and other advanced technologies increases in the coming years, the Company expects demand and prices for REEs to increase. Increases in supply sources for REEs are expected in conjunction with this anticipated rising demand.

Competition

The uranium industry is highly competitive. The Company competes with mining and exploration companies for uranium sales, the acquisition of uranium mineral properties, and the procurement of equipment, materials and personnel necessary to explore, develop, and extract uranium from such properties. There is competition for a limited number of uranium acquisition opportunities, including competition with other companies having substantially greater financial resources, staff and facilities than the Company. As a result, the Company may encounter challenges in acquiring attractive properties, and exploring and advancing properties currently in the Company’s portfolio. In addition, Energy Fuels competes with other uranium recovery companies, along with traders, brokers, financial institutions, converters, enrichers, and other market actors, including some that are state-owned and state-subsidized, for uranium sales. Due to the Company’s limited capital, personnel and the relative size of its operations, the Company may be at a competitive disadvantage compared to some other companies with regard to exploration and, if warranted, development of and production from mining properties and securing uranium sales. The Company believes that competition for acquiring mineral prospects and completing uranium sales will continue to be intense in the future.

The HMS market is highly competitive. The industry is primarily concentrated in Australia, though South Africa, India and China are also major producers. Other countries with significant HMS deposits include the U.S., Brazil and Mozambique. The key industry participants include Iluka Resources, Rio Tinto and Tronox, which are among the largest producers of HMS in the world. Other major players include Kenmare Resources and our newly acquired subsidiary, Base Resources. The market for HMS products is driven by a wide range of factors, including global economic growth, industrial demand and technological innovation. In recent years, the market has faced a number of challenges in line with general economic conditions, including declining demand for certain products, increased competition from alternative materials and the general environmental concerns related to all mining and processing.

Despite these challenges, the HMS market is expected to continue to grow in coming years on the back of forecasted economic growth fueling demand in pigments, ceramics and other mature end-use applications. With this growth, the industry will also need to ensure that its sustainability objectives keep pace, including the need to continue to reduce environmental impacts and improve social and economic outcomes for local communities.

However, the Company believes it has a competitive advantage over many of its peers in the U.S. domestic uranium space and in the world REE space, outside of China, to the extent it has diversified business opportunities, including its ability to produce uranium, its ability to recover REE Carbonate, from monazite sand ores and its ability to produce separated REEs oxides at the Mill, its ability to recover vanadium as market conditions may warrant, its existing HMS business, and its potential ability to recover certain radioisotopes for use in TAT medical treatments.

The availability of funds for the acquisition, exploration, evaluation, permitting and construction of HMS and monazite projects and the development of REE separation, metal and metal alloy making and magnet making is limited, and the Company may find it difficult to compete on an international scale with larger and more established and/or subsidized companies for capital. The Company's inability to continue exploration, advancement, the acquisition of new properties and the development of REE separation, metal and metal alloy making and magnet making, due to lack of funding, could have a material adverse effect on the Company's future operations and/or financial position.

The REE industry is also highly competitive, particularly to the extent it is dominated by China, which produces nearly 90% of refined REE products according to the International Energy Agency. Chinese companies bid aggressively to acquire monazite and other minerals to feed this production. The Company competes with Chinese companies and companies from other countries that are in or trying to break into the REE market, for sources of monazite and will be expected to compete with Chinese companies and companies from other countries as they develop production capacity at the RE Carbonate crack and leach, REE separation, REE metal and alloy making, REE magnet making, and REE product marketing and sales stages of the REE supply chain, as well as for the acquisition of monazite and other mineral properties, for mining and exploration on such properties, and for the procurement of equipment, materials and personnel necessary to explore, develop, and extract monazite from such properties. There is competition for a limited number of monazite acquisition opportunities, including competition with other companies having substantially greater financial resources, staff and facilities than the Company. As a result, the Company may encounter challenges in acquiring attractive properties, and exploring and advancing properties currently in the Company’s portfolio. In addition, Energy Fuels will compete with other REE companies, along with traders, brokers, financial institutions, and other market actors, including some that are state-owned or state-supported or subsidized, for RE Carbonate and REE oxide sales. Due to the Company’s limited capital, personnel and the relative size of its operations, the Company may be at a competitive disadvantage compared to some other companies with regard to the acquisition, exploration and, if warranted, development of and production from mining properties, production of REE products and securing REE product sales. The Company believes that competition for acquiring monazite prospects, production of REE products and completing REE product sales will continue to be intense in the future. To the extent many Chinese companies are state-subsidized or otherwise supported, the Company expects to continue to face tough competition in the REE space.

The availability of funds for the acquisition, exploration, evaluation, permitting and construction of monazite projects and the development of REE separation, metal and metal alloy making and magnet making is limited, and the Company may find it difficult to compete on an international scale with larger and more established and/or subsidized REE companies for capital. The Company’s inability to continue exploration, advancement, the acquisition of new properties, and the development of REE separation, metal and metal alloy making and magnet making, due to lack of funding, could have a material adverse effect on the Company’s future operations and financial position.

However, the Company believes it has a competitive advantage over many of its peers in the U.S. domestic uranium space and in the world REE space, outside of China, to the extent it has diversified business opportunities, including its ability to produce uranium, its ability to recover RE Carbonate, from monazite sand ores, its ability to recover vanadium as market conditions may warrant, and its potential ability to recover certain radioisotopes for use in TAT medical therapeutics.

Government Regulation

The Company’s properties and facilities are subject to extensive laws and regulations which are overseen and enforced by multiple federal, state, local, and foreign authorities. These laws govern exploration, construction, extraction, recovery, processing, exports, various taxes, labor standards, occupational health and safety, waste disposal, protection and remediation of the environment, protection of endangered and protected species, toxic and hazardous substances, and other matters. Uranium minerals exploration, extraction, recovery, and processing are also subject to risks and liabilities associated with the perceived potential for impacts to the environment and disposal of waste products occurring as a result of such activities.

Compliance with these laws and regulations may impose substantial costs on the Company and may subject the Company to significant potential liabilities. Changes in these regulations or changes in regulatory attitudes or interpretations could require the Company to expend significant resources to comply with new laws or regulations, attitudes or interpretations relating thereto, or changes to current requirements and could have a material adverse effect on the Company’s business operations. However, compliance with government regulations generally, including but not limited to environmental regulations, is an integral part of the Company’s day-to-day business and impacts virtually all the Company’s capital expenditure and operating decisions at its facilities, as the Company’s facilities and operations must comply with this extensive array of environmental, health and safety laws and regulations. The costs of compliance with these laws and regulations are therefore well understood and assumed by the Company in all its capital budgeting decisions, project analyses and cost and earnings projections. As all the Company’s competitors in the uranium mining industry in the U.S. face the same or similar regulatory requirements, the Company does not believe its need to comply with this extensive array of laws and regulations materially affects the Company’s competitive position within the U.S. uranium mining industry.

As monazite is a uranium-bearing ore and is processed through the White Mesa Mill for the recovery of uranium and REEs, and all separation activities are expected to take place at the Mill, all the regulations applicable to uranium recovery and processing at the Mill apply to the processing of monazite at the Mill, the production of RE Carbonate and the separation of REEs at the Mill.

Environmental Regulations

The Company's projects, exploration, and development activities, and mining and processing operations are subject to the federal, state, regional and local environmental laws and regulations of the jurisdictions in which the Company's activities and facilities are located. For example, in the U.S., the Company is subject to a number of such laws and regulations including, without limitation: the Comprehensive Environmental Response, Compensation and Liability Act; the Atomic Energy Act; the Uranium Mill Tailings Radiation Control Act; the Emergency Planning and Community Right to Know Act; the Endangered Species Act; the Federal Land Policy and Management Act; the National Environmental Policy Act; the Resource Conservation and Recovery Act; and related state laws. The Company is subject to similar laws in other jurisdictions in which it operates. In all jurisdictions in which the Company operates, environmental licenses, permits and other regulatory approvals are required to engage in projects, exploration, mining and processing, and mine closure and reclamation activities. Regulatory approval of a detailed plan of operations and an environmental impact assessment (or equivalent) is required prior to initiating mining or processing activities or for any substantive change to previously approved plans. In all jurisdictions in which the Company operates, specific statutory and regulatory requirements must be met throughout the life of the mining or processing operations regarding air quality, water quality, fisheries, wildlife and biodiversity protection, archaeological and cultural resources, solid and hazardous waste management and disposal, the management and transportation of hazardous chemicals, toxic substances, noise, community right-to-know, land use and reclamation. Such laws and regulations, which may change over time, increase the costs of these activities and may prevent or delay the commencement or continuance of a given operation. Compliance with these laws and regulations has not had a material effect on our operations or financial condition to date, compared to industry norms.

Uranium milling in the U.S. is primarily regulated by the United States Nuclear Regulatory Commission (the “NRC”) pursuant to the Atomic Energy Act of 1954, as amended. Its primary function is to ensure the protection of employees, the public, and the environment from radioactive materials, and it also regulates most aspects of the uranium recovery process. The NRC regulations pertaining to uranium recovery facilities are codified in Title 10 of the Code of Federal Regulations.

On August 16, 2004, the State of Utah became an Agreement State for the regulation of uranium mills. This means that the primary regulator for the Mill is now the State of Utah Department of Environmental Quality (“UDEQ”) rather than the NRC. At that time, the Mill’s NRC Source Material License was transferred to the State of Utah and became Radioactive Materials License Number UT 1900479 (the “Radioactive Materials License”), which was renewed in January 2018 as Amendment #8 (Renewal), then reissued as a Revised Renewal on February 16, 2018, by UDEQ’s Division of Waste Management and Radiation Control (“DWMRC”). The Radioactive Materials License is up for renewal in February 2028. The State of Utah incorporates, through its own regulations or by reference, all aspects of Title 10 pertaining to uranium recovery facilities. When the State of Utah became an Agreement State, it required that a Groundwater Discharge Permit (“GWDP”) be put in place for the Mill. The GWDP is required for all similar facilities in the State of Utah, and specifically tailors the implementation of the state groundwater regulations to the Mill site. The State of Utah requires that every operating uranium mill have a GWDP, regardless of whether the facility discharges to groundwater. The GWDP for the Mill was finalized and implemented in March 2005, then renewed in January 2018. Most recently, the GWDP renewal application was submitted in July 2022 and remains under consideration with DWMRC. The Mill also maintains a permit approval for air emissions with the UDEQ, Division of Air Quality.

Conventional uranium extraction is subject to regulation by a number of agencies including: (1) local county and municipal government agencies; (2) the applicable state divisions responsible for mining and protecting the environment within Utah, Colorado, Arizona, New Mexico, and Wyoming; (3) the U.S. Bureau of Land Management (the “BLM”) and the United States Forest Service (the “USFS”) on public lands under their jurisdiction; (4) the U.S. Mine Safety and Health Administration (“MSHA”); (5) the United States Environmental Protection Agency (the “EPA”) for radon emissions from underground mines; and (6) other federal agencies, including without limitation the U.S. Fish and Wildlife Service, U.S. Army Corps of Engineers (“USACE”) and the DOE, where certain conditions exist. In addition, a uranium processing facility at the Sheep Mountain Project, if and when constructed, will be subject to regulation under the State of Wyoming, as an NRC Agreement State, as a uranium processing facility and for permanent disposal of the resulting tailings.

The provisions of the Atomic Energy Act and its regulations that are applicable to uranium milling also apply to our ISR facilities in Wyoming. The Nichols Ranch Project has a Source Material License. The Nichols Ranch Source Material License was originally issued by the NRC; however, the State of Wyoming became an NRC Agreement State on September 30, 2018 and the Wyoming Department of Environmental Quality (“WDEQ”) - Land Quality Division (“WDEQ-LQD”) subsequently assumed all management and oversight functions. The Nichols Ranch Source Material License was issued most recently by the NRC on March 22, 2017 as Amendment No. 5, which is currently in timely renewal with WDEQ-LQD. Nichols Ranch is also regulated by the State of Wyoming and the EPA under the Clean Water Act, the Clean Air Act and the Resource Conservation and Recovery Act. In addition, ISR wellfields require an Underground Injection Control (“UIC”) Permit under the Safe Drinking Water Act, as administered by the State and/or EPA. ISR operations are subject to regulations by the U.S. Occupational, Safety and Health Administration, rather than MSHA.

Because monazite sands are a naturally occurring uranium ore, which also contain REEs, monazite sands are processed at the Mill under the Mill's existing Radioactive Materials License, GWDP and other permits as a uranium ore, and the resulting RE Carbonate and separated REE oxides are also recovered under those existing licenses and permits. The Company is evaluating whether any additional licenses or permits or amendments to existing licenses or permits may be required for any of the modifications and enhancements to existing Mill facilities required for and the operation of its planned Phase 2 REE separation circuit at the Mill.

The Company currently has an R&D license for the recovery of R&D quantities of Ra-226 at the Mill, issued by DWMRC in 2023. It is expected that the potential recovery and concentration of R&D quantities of Th-232, Ra-228 and/or Th-228 will also require similar R&D licenses or amendments to the existing Ra-226 R&D license and that the potential recovery and concentration of commercial quantities of Th-232, Ra-228, Th-228 and/or Ra-226 will require additional licensing by DWMRC at the Mill.

Reclamation bonds or the equivalent have been posted for each of the Company’s material properties in the U.S. that have structures or facilities. Energy Fuels is required to have export licenses issued by the NRC for its uranium exports, unless otherwise permissible pursuant to the Mill’s existing Radioactive Materials License due to the nature of the material in question. Such licenses are obtained by the Company as required.

The Company is required to comply with applicable environmental and regulatory laws and regulations in the other countries in which it operates, and also applies international standards where appropriate.

Land and Mineral Tenure

U.S. Land Tenure

The Company’s land holdings in the U.S. are held either by leases from the fee simple owners (private parties or the State) or unpatented mining claims located on property owned and managed by the U.S. Federal Government. Annual fees must be paid to maintain unpatented mining claims, but work expenditures are not required. Holders of unpatented mining claims are generally granted surface access to conduct mineral exploration and extraction activities. However, additional permits and plans are generally required prior to conducting exploration or mining activities on such claims.

On July 9, 2009, BLM issued a Notice of Proposed Withdrawal (“2009 Notice”) under which it proposed that a total of approximately one million acres of public lands around the Grand Canyon National Park be withdrawn from location and entry under the Mining Law of 1872 (the “Mining Law”), subject to valid existing rights. In the 2009 Notice, BLM stated that the purpose of the withdrawal, if determined to be appropriate, would be to protect the Grand Canyon watershed from any adverse effects of locatable hardrock mineral exploration and mining. The 2009 Notice segregated the lands from location and entry under the mining laws for up to two years to allow time for various studies and analyses, including appropriate National Environmental Policy Act (“NEPA”) analysis. In order to allow more time for BLM to complete its NEPA analysis, the U.S. Department of the Interior (the “DOI”) published Public Land Order 7773 on June 21, 2011, which effected a six-month emergency withdrawal of the area. The emergency withdrawal prevented the lands from being open to location and entry under the Mining Law upon expiration of the two-year segregation while the DOI completed the decision–making process on the proposed withdrawal. The emergency withdrawal was effective from July 21, 2011 to January 20, 2012. During the two-year segregation and six-month emergency withdrawal, the BLM, along with its cooperating agencies, completed various studies and analyses of resources in the withdrawal area, including an Environmental Impact Statement (“EIS”) under NEPA. These studies and analyses were undertaken to provide the basis for the final decision regarding whether to proceed with the proposed withdrawal or to select an alternative action. Based on this analysis, on January 9, 2012, the DOI announced its final decision to withdraw from location and entry under the Mining Law, subject to valid existing rights, the total of approximately one million acres of lands originally proposed in the 2009 Notice (the “Withdrawn Lands”), for a 20-year period. Lawsuits challenging this decision were filed by various industry groups and interested parties. In addition, legislation has been proposed in both the U.S. House of Representatives and U.S. Senate, which would make the withdrawal permanent, subject to preexisting rights. The Company will continue to track the progress of this and any other relevant legislation.

Then, on August 8, 2023, President Biden designated the Baaj Nwaavjo I’tah Kukveni – Ancestral Footprints of the Grand Canyon National Monument, which comprised approximately one million acres of previously Withdrawn Lands in three distinct areas to the south, northeast and northwest of Grand Canyon National Park. As stated in the fact sheet for the national monument designation, “The national monument designation recognizes and respects valid existing rights. The proclamation specifies that maintenance and upgrades to water infrastructure for flood control, utilities, water district facilities, wildlife water catchments, and other similar uses may continue; and that utility lines, pipelines, and roads can continue to be maintained, upgraded, and built consistent with proper care and management of the monument objects. Existing mining claims – predating a 20-year mineral withdraw initiated in 2012 – will remain in place, and the two approved mining operations within the boundaries of the monument would be able to operate.”

As a result of the 2009 withdrawal from location and entry and the 2023 national monument designation, no new mining claims may be staked on the Withdrawn Lands or within the boundaries of the national monument, and no new Plans of Operations may be approved, other than Plans of Operations on mining claims that were valid at the time of the segregation, withdrawal or national monument designation, as applicable, and that remain valid at the time of plan approval. Case law indicates that a miner establishes valid Congressionally provided rights under the Mining Law through certain unilateral acts, and that such acts are presumptively recognized as valid claims in which the holder has valid existing rights unless and until the DOI or U.S. Federal Courts declare otherwise. However, the BLM and USFS, each at their discretion, may perform a mineral examination and Mineral Report, which involves an economic evaluation of a project, in order to reflect an agency’s belief about certain mining claims that may be used in support of a future mining claim contest on the validity of existing rights. All the Company’s properties located on the Arizona Strip, with the exception of its Wate Project and certain exploration properties held by the Company’s subsidiary, Arizona Strip Partners LLC, are located within the Withdrawn Lands and boundaries of the Grand Canyon National Monument. A mineral examination on the Company’s EZ Project will need to be completed by BLM, in conjunction with its review of the Company’s proposed Plan of Operations for that project. Mineral examinations were not required for the Company’s Arizona 1 and Pinenut projects, which had previously approved Plans of Operations and were previously active. Although the Company’s Pinyon Plain Project also has an approved Plan of Operations, and a mineral examination is not required, the USFS voluntarily performed a mineral examination on that project in 2012 in order to clarify the agency’s own position on the underlying claims and concluded that the Pinyon Plain Project’s claims constituted valid existing rights (“VERs”). The USFS also concluded that no additional approvals were required on the Pinyon Plain Project that would trigger any further NEPA analysis as a major federal action.

The Company believes that all its material projects within the Withdrawn Lands and boundaries of Grand Canyon National Monument are on valid mining claims that will withstand a mineral examination. However, market conditions may postpone or prevent the performance of mineral examinations on certain properties and, if a mineral examination is performed on a property, there can be no guarantee that the mineral examination would not result in one of more of the Company’s mining claims being deemed invalid and/or that ongoing litigation challenging the validity of a VER determination would not result in the overturn of such determination, either of which could prevent a project from proceeding.

Former President Obama additionally designated the Bears Ears National Monument by executive order in December of 2016, which comprised 1.35 million acres of land in San Juan County, Utah. The designated land included a portion of County Road 258, which the Company formerly relied on for access to its formerly owned Daneros Project, and a property boundary that abutted the boundary of the Mill and encompassed two water sampling sites the Company monitors for the Mill. In December 2017, President Trump in his first term issued a Proclamation that amended former President Obama’s 2016 Proclamation and reduced the monument to two parcels encompassing a total of 201,876 acres, releasing 1.15 million acres. That Proclamation was later challenged in Federal Court. On December 23, 2017, the Company issued a press release reiterating its past and present support of Bears Ears National Monument, and clarifying that the Company sought only minor adjustments to the original boundaries of the monument to prevent the boundary from directly abutting some of its existing operations, which were very minor adjustments, insignificant compared to the original size of the monument and not a reflection of President Trump’s nearly 85% reduction. Then, on October 8, 2021, President Biden issued a new proclamation restoring the original borders of Bears Ears National Monument, which consists “of those lands reserved as part of the Bears Ears National Monument as of December 3, 2017, and the approximately 11,200 acres added by Proclamation 9681, encompassing approximately 1.36 million acres.” In doing so, all such lands and interests contained within the monument were “appropriated and withdrawn from all forms of entry, location, selection, sale, or other disposition under the public land laws or laws applicable to the USFS, from location, entry, and patent under the mining laws, and from disposition under all laws relating to mineral and geothermal leasing, other than by exchange that furthers the protective purposes of the monument” (see “A Proclamation on Bears Ears National Monument,” dated October 8, 2021). As a result, it is possible that the Mill could become subject to additional requirements, restrictions and costs if the reversion to the original designation is upheld in Court, pending any legal challenges by the State of Utah or otherwise.

Brazilian Land Tenure

Mineral tenure is guaranteed by the Federal Constitution in Brazil. Mineral resources are separate from the surface owners (i.e. split estate), and the Republic of Brazil is the owner of all mineral resources. The federal government can grant mineral rights for exploration and production to Brazilian companies (or foreign companies with established Brazilian entities). Brazilian entities that are granted mining rights have the ownership of the product they are mining. Mineral rights can be assigned, transferred or subject to encumbrance, provided that legal requirements are fulfilled and that the transaction is registered with and approved by the Brazilian National Mining Agency (“ANM”).

Mineral rights do not grant the land where the mineral deposits are located, but do provide the possibility of creating a mineral easement that allows holders of the mineral rights the ability to explore or mine the mineral and take ownership of the product. This right of access also includes neighboring lands, as long as ANM recognizes that such lands are needed for exploration and production. The surface owners are entitled to a royalty and damages caused by exploration, mining and ancillary activities. A maximum royalty is set at half the federal government royalty. If the company and the surface owner are unable to reach an agreement the matter will be settled by the local court based on criteria provided in applicable laws.

The granting of mineral rights in Brazil is performed in four steps:

  1. Exploration Authorization: A 1-3 year authorization that is renewable for an additional 1-3 years. Exceptions can be made for additional renewals following the first authorization. The purpose of this authorization is to allow a company to explore for a mineral of interest. The company must then submit an exploration report to ANM. ANM will approve or deny the report based on the economic and technical feasibility of exploiting the mineral explored for under the report.

  2. Right to Request a Mining Concession: Following approval of the exploration report the company has 1 year to apply for a mining concession. This request period can be renewed, upon request and justification, based on ANM’s criteria. If ANM does not agree with the justification, ANM may request the holder of the mineral right to proceed with the request for a mining concession stage. Eventually, ANM can forfeit the request right if there is clear and strong evidence of procrastination.

  3. Mining Concession Request: The request for a mining concession has to include a mine development plan. Furthermore, the mining concession will only be granted once an environmental construction permit is obtained. Extensions can be granted if the environmental permitting process is delayed. The holder must use best efforts to obtain the environmental permit and report to ANM. Eventually, ANM can deny the request if there is clear and strong evidence of procrastination.

  4. Mining Concession: This is the approval to mine. Once this is granted the company has six months to start mining and is required to provide an annual report to ANM. The mining concession is valid for the life of the mine.

Kenya Land Tenure

In Kenya, mining rights are separate from ownership of land surface rights. Under the Kenyan Constitution, all minerals vest in and are held by the national government in trust for the people of Kenya. The Constitutional provisions relating to mineral resources are implemented by the Mining Act No. 12 of 2016 (“Mining Act”).

A person shall not search for, prospect or mine any mineral, mineral deposit or tailings in Kenya unless that person has been granted a permit or license under the Mining Act. A mineral right may be granted to, among others, individuals or companies which are registered and established in Kenya that demonstrate the required technical capacity, expertise, experience and financial capacity.

A mineral right means a prospecting license, retention license, mining license, prospecting permit, mining permit or artisanal permit. Practically, of most relevance for large scale operations are the following:

  1. Prospecting license: a license relating to large scale operations that authorizes the holder to exclusively carry out prospecting operations pursuant to an approved program for those prospecting operations, the procurement of local goods and services, a plan to employ and train Kenyan citizens and an approved environmental impact assessment report, social heritage impact assessment and environmental management plan. A prospecting license is granted for a maximum term of three years and the area must not exceed 1,500 contiguous blocks. It may be renewed twice for three years each, subject to the area of the license being reduced by not less than one-half each renewal.

  2. Mining license: a license relating to large-scale operations that authorizes the holder to exclusively carry out mining operations pursuant to an approved program and a feasibility study demonstrating the feasibility of the project (including evidence of the financial and technical resources available to the applicant), a plan with respect to the employment and training of Kenyan citizens, a plan for the procurement of local goods and services, an applicable environmental impact assessment license, a social heritage impact assessment and environmental management plan, and a plan with respect to socially responsible investments for the local community. A mining license must not exceed 300 contiguous blocks and has a maximum term of 25 years, with a renewal period of 15 years.

Applications for a mineral right are to be considered, processed and determined on a first-come first-served basis. The holder of a mineral right must pay royalties to the State at the prescribed rate. Where a mineral right is granted for a large-scale mining operation, the State will acquire a 10% free carried interest. A holder of a mining license whose planned capital expenditure exceeds the prescribed limit must list at least 20% of its equity on a local stock exchange within three years of commencing production (subject to market conditions).

The Cabinet Secretary for Mining (“Cabinet Secretary”), on the recommendation of the Mineral Rights Board, may grant, deny or revoke a mineral right. Mineral rights applications are made to the Cabinet Secretary. Upon receipt, the Cabinet Secretary is required to give notice to the landowner or lawful occupier of the land where the mineral is located, the community and the relevant county Government and to publish notice of the pending application in a newspaper of wide circulation. A person or community may object to the grant of the license within 21 days (in the case of an application for a prospecting license) and within 42 days (in the case of a mining license). The Cabinet Secretary hears and determines any objection to an application through the Mineral Rights Board.

Prospecting and other mining rights may not be granted with respect to private land without the express consent of the registered owner, and such consent shall not be unreasonably withheld. Consent is deemed to be given where the owner of the private land has entered into a legally binding arrangement with the applicant or with the Government which allows for the conduct of prospecting or mining operations, or an agreement with the applicant providing for payment of adequate compensation.

Prospecting and other mining rights may not be granted with respect to community land without the consent of the authority obligated by the law relating to administration and management of community land, or the National Land Commission in relation to land that is unregistered. Consent is deemed to be given where the registered owners of community land have entered into a legally binding arrangement with the applicant or with the Government which allows for the conduct of prospecting or mining operations, or an agreement with the applicant providing for payment of adequate compensation.

The Cabinet Secretary may take steps under the law relating to compulsory acquisition to vest the land or area in the Government or on behalf of Government, where consent is unreasonably withheld or where the Cabinet Secretary considers that withholding of consent is contrary to the national interest.

A mineral right may not be assigned, transferred, mortgaged or traded without the consent of the Cabinet Secretary (not to be unreasonably withheld) on recommendation of the Mineral Rights Board.

The Kwale Project operates pursuant to the terms of Special Mining Lease 23 (“SML 23”), issued by the Mines and Geological Department on July 6, 2004 under the former Mining Act CAP 306 (now repealed). SML 23 provides Base Titanium with the full and exclusive right, liberty and license to carry out mining operations for ilmenite, rutile and zircon within the defined area of SML 23. Base Titanium's rights under SML 23 were preserved under the transitional provisions of the Mining Act. SML 23 expires on June 30, 2025 and is not renewable. As Base Titanium (a wholly owned subsidiary of Base Resources) will require continued access to the SML 23 area following its expiry to complete its decommissioning and rehabilitation plan, Base

Titanium is currently discussing with the Government of Kenya the most appropriate tenure instrument to be granted upon SML 23's expiration. With Kenya's National Environment Management Authority (“NEMA”) recently approving Base Titanium's decommissioning and rehabilitation plan, Base Titanium does not anticipate any issues or delays obtaining appropriate replacement tenure from the Government of Kenya that will allow Base Titanium to complete the plan that has been endorsed by NEMA.

Australian Land Tenure

The Company has an indirect interest in mineral tenements in Australia through its ownership interest in Donald Project Pty Ltd and the Donald (Heavy Minerals Sands and Rare Earths) Project based in Victoria, Australia.

In Australia, mining rights are separated from the ownership of the land surface rights and are held by the state. Rights to access the land surface area are regulated both by legislation and by private access and compensation contracts with landholders. Mining rights are obtained by applying to the relevant state or territory government on a first-come, first-served basis, or in some instances, by a tender-based process. Mining rights may also be acquired by entering into a contractual arrangement with the existing holder of the mining right (by way of purchase or farm-in).

Each tenement delineates its area and duration. A holder must comply with the various terms and conditions of the permit, which include: the payment of annual rents, the payment of royalties once the mineral is extracted, meeting minimum annual expenditure obligations, agreeing to future mine rehabilitation plans and annual reporting requirements, as well as the provision of any environmental bond requirements.

Each state's mining legislation governs the grant of exploration licenses and mining leases, with some states also issuing a retention lease which allows an entity to maintain possession of a right to a mineral rich area pending improvement in economic conditions.

Once granted, tenements may be transferred or used as security. Tenements may be cancelled if the holder fails to meet the terms of their issue.

In the State of Victoria, Australia, the types of mineral license for heavy mineral sands and rare earths include exploration licenses, retention licenses and mining leases.

  1. Exploration licenses: gives the license holder exclusive rights to explore for specific minerals within the specified license area. However, an exploration license is not an exclusive right to occupy the surface area. It is a right of access only for approved exploration activities, and subject to negotiated land compensation and access arrangements. Holders of an exploration license have a priority right to apply for a mining lease. Exploration licenses may be renewed for new terms, depending on the state legislation.

  2. Retention license: is suitable where a mineral resource is identified but the resource is not yet determined to be commercially viable to mine but may become so in the future or the resource is required to support an existing mining operation in the future. It is a license between the exploration and mining stages, providing the license holder with tenure over the land as they transition toward obtaining a mining lease.

  3. Mining lease: gives the holder the sole right to mine and explore for specific minerals and construct mining facilities related to the mining operation in the land covered by the lease. Mining leases may be subject to existing competing rights such as coal seam gas rights or infrastructure rights.

The Donald project holds retention license RL2002, which progresses to a mining lease. In order to advance this retention license to mining lease, the applicant must satisfy the relevant minister that the applicant is a fit and proper person to hold a license, intends to comply with relevant legislation, genuinely intends to do work, has an appropriate program of work (with a defined mineral resource), and is likely to be able to finance the proposed work and any rehabilitation.

Madagascar Land Tenure

Tenure for mining in Madagascar is governed by Law 2023-007 of July 27, 2023 relating to the New Mining Code (the “New Mining Code”), which has been in force since October 2, 2023 and replaced the former Mining Code, the Law 2005-021 of October 17, 2005 amending Law No. 99-022 of August 19, 1999 (the “Former Mining Code”). Like the Former Mining Code, the New Mining Code provides that all mineralization on the surface and in the subsoil, waters and seabed of the territory of Madagascar, are the property of the Malagasy State.

The New Mining Code covers all aspects of mining, including tenure. Under the New Mining Code, Madagascar is divided into squares of 625 meters a side. Grant of mining permits occurs on the basis of these squares and only one mining permit can exist per square.

Mining permits are administered by the Bureau de Cadastre Minier de Madagascar (“BCMM”), the Madagascar Mining Registry. The BCMM is in charge of the management of mining permits from the filing of the permit application to the expiration of the mining permits. It is a public entity under the supervision of the Ministry in charge of mines. The BCMM processes every mining permit application; however, grant of a mining permit requires issuance of an order duly signed by the Minister in charge of mines.

Like the Former Mining Code, there remain two key mining permits available under the New Mining Code:

  1. Permis De Recherche (or Research Permit), which confers on its holder the exclusive right to carry out prospecting and research within the permit area. A Research Permit is valid for an initial period of five years, renewable twice for a further three years (a total of eleven years).

  2. Permis D'Exploitation (or Exploitation Permit), which confers on its holder the exclusive right to undertake mining as well as prospecting and research within the permit area. An Exploitation Permit granted under the New Mining Code is valid for twenty-five (25) years and is renewable once for a period of fifteen (15) years. Further renewals (of fifteen (15) years) are possible provided certain conditions are met.

Both Research and Exploitation Permits are real property rights that can be bought, sold, pledged and mortgaged. An environmental authorization is required before exploration activities may be carried out on an area the subject of a Research Permit. This is issued by the Ministry in charge of Mines after completion of an Environmental Commitment Program. Research Permit holders are required to undertake an Environmental Impact Assessment and be issued an environmental permit before their Research Permit is able to be transformed into an Exploitation Permit. The environmental permit is issued by the National Office for Environment (Office National pour l'Environnement or “ONE”).

A mining permit holder is granted certain rights to occupy the relevant land under the New Mining Code and must inform the rightful claimants of such rights of occupation. However, the exercise of occupation rights is subject to the conclusion of a written agreement with the rightful claimants. In the case of an Exploitation Permit, the agreement must take the form of a lease agreement, specifying the parties' respective rights and obligations. In addition to registered legal title, Madagascar has a system of customary title, giving land rights to traditional occupiers of land even though they do not have a registered title. The holder of a mining permit must also reach a written agreement with (as applicable) any traditional occupiers or usufructaries (beneficial occupants) of the land within the permit area.

Base Toliara SARL's Exploitation Permit, Permis D'Exploitation 37242 (“PE 37242”), was granted under the Former Mining Code. The validity and continuation of Exploration and Exploitation Permits issued under the Former Mining Code, like PE 37242, is presently not affected by the New Mining Code, subject to payment of prescribed administrative fees and compliance with provisions relating to the transition of the Former Mining Code to the New Mining Code. The initial term of PE 37242 remains forty (40) years, notwithstanding that the New Mining Code provides that Exploitation Permits have a term of twenty-five (25) years. However, with the introduction of the New Mining Code, the term of any renewal of PE 37242 has been reduced to fifteen (15) years (from twenty (20) years).

Environmental and Social Efforts and Impacts

Uranium is the fuel for carbon-free, emission-free baseload nuclear power and is a key factor in successfully combating global climate change. In addition to producing uranium from our mines, we recycle other companies’ uranium-bearing tailings or wastes (Alternate Feed Materials) at the Mill for the extraction of uranium that would otherwise have been permanently disposed of, thereby reducing the need for new mining by maximizing extraction of existing sources and limiting the number of constituents ultimately disposed of. We also recover previously disposed of uranium and vanadium by recycling the Mill’s tailings solutions. Furthermore, our production of a commercially salable RE Carbonate and separated REEs through the recycling of natural monazite sands, which have historically been considered wastes due to their radioactive content, allow us to provide crucial links in a commercially viable U.S. REE supply chain for use in key green energy technologies, such as solar panels, wind turbines, and electric and hybrid car batteries. In addition, our program for the potential recovery of radioisotopes for use in the production of TAT therapeutics for cancer treatments involves recycling the Mill’s existing process streams for the recovery of valuable radioisotopes that have traditionally been considered wastes and have been permanently disposed of.

Through these operations and initiatives, we remain diligent in our efforts to ensure our operations minimize any impacts to public health, safety and the environment, including any impacts to water, air, wildlife, soil, cultural resources, the occupational health and safety of our workers and any impacts to members of the public. Our Environment, Health, Safety and Sustainability (“EHSS”) Committee has been delegated authority by the Board to monitor and guide the Company in developing and implementing its core EHSS principles, including maintaining radiation exposures not only within regulatory limits but as low as reasonably achievable through an extensive internal audit program, as well as authority for monitoring programs to identify and mitigate risks in ensuring the highest standards of environmental protection and human health and safety across the Company’s operations. The EHSS Committee also monitors the Company’s sustainability programs, including its efforts to pro-actively evaluate its programs and activities to ensure they meet the Company’s sustainability goals and objectives. Our Sustainability Report, which was first released in 2020 and is in the process of being updated, is available on the Company’s website atwww.energyfuels.com.

Our U.S. operations are located primarily in rural and underserved areas and support the local economies, not only through the taxes we pay to local authorities and the salaries and wages we pay to our employees and to numerous third-party contractors, such as transportation companies, equipment rental companies, equipment vendors and service providers, but also indirectly through the “multiplier effect” to the communities as a whole. That is, the money we pay directly to our employees, contractors, vendors and providers is spent by them in the communities, thereby providing income to local businesses and wages and salaries to employees and owners of those business, who in turn spend their income, salaries and wages on other businesses in the community. Indeed, as the largest private employer in San Juan County, Utah, the Mill is a very significant factor in the local economy.

In furtherance of our sustainability objectives, the Company’s Foundation contributes to the communities surrounding the Mill in Southeastern, Utah by providing funding to support local priorities. The Foundation focuses on supporting education, the environment, health/wellness, and local economic development in the City of Blanding, San Juan County, Indigenous and other area communities. See “San Juan County Clean Energy Foundation.”

Kwale Project and Toliara Project

Both the Kwale Project in Kenya and Toliara Project in Madagascar are located in regions of high conservation value and recognized for their biodiversity richness. They are also areas facing significant anthropogenic pressures, such as deforestation and wide scale land clearing. To support conservation and biodiversity efforts in these areas, a range of programs have been established, including a propagation research program to grow endemic plants, including rare and endangered species.

The Kwale Project's indigenous tree and plant nursery has achieved success since being established in 2012 and is now one of the largest of its kind in Africa, having propagated over 400,000 indigenous plants to date across 307 species. The use of locally sourced indigenous grass seed and endemic trees from the nursery has provided the opportunity to restore mined out and disturbed areas to ecologically functioning habitats, which if linked to established forest patches, are expected to result in functioning ecosystems that can support Kenya's broader conservation and biodiversity efforts. In Madagascar, an endemic indigenous tree and plant nursery has also been established and is in readiness for development of the Toliara Project. Despite limited opportunities to extend our seed collection efforts and collaborate with conservation organizations because of Toliara's suspension of activities, Base Resources has managed to propagate over 75,000 trees and plants from an estimated 206 species, including three of Madagascar's iconic baobab species endemic to the project region.

Employees

As of December 31, 2024, the Company and its subsidiaries have approximately 1,370 full-time employees, 210 of whom are employed through the Company’s wholly owned, indirectly held subsidiary EFUSA and 1,160 of whom are employed through the Company's wholly owned, indirectly held subsidiary Base Resources. Our operations in the U.S. are in established mining areas where we have found sufficient available personnel for our business plans. While our operations in Kenya and Madagascar are in less developed mining jurisdictions, Base Resources has recruited or trained sufficient personnel to execute on its business plans.

Energy Fuels is an equal opportunity employer and is committed to making employment decisions based on valid job requirements, without regard to race, color, national origin, gender, religion, age, sex, sexual orientation, gender identity or gender expression, disability, veteran status or any other legally protected status. The Company also provides reasonable accommodation for qualified individuals in the U.S. with known disabilities and employees whose work requirements interfere with a religious belief unless doing so would result in an undue hardship to the Company or cause a direct threat to health or safety, and is evaluating the extent to which these policies can be applied to its non-U.S. employees.

The Company actively engages with its Board of Directors (the “Board”) to continually make improvements to diversity through inclusion. Pursuant to the Company’s Diversity Policy, Energy Fuels’ Governance and Nominating Committee (“GN Committee”) is required to monitor, on an ongoing basis, the implementation and effectiveness of the Diversity Policy and to, at least annually, assess: (i) the mix of diversity, skill and expertise on the Board and the Executive Team, (ii) the measurable objectives set pursuant to the Policy, and (iii) progress in achieving such measurable objectives, including any targets, if set. As a part of its annual assessment, the GN Committee reviews its Diversity Policy for relevance and effectiveness, any new shareholder advisory guidelines, TSX and NYSE American company guides and any changes to legal requirements, and provides to the Company’s Board its Annual Report with recommendations to improve and sustain diversity at the executive and Board levels. Most recently, in January 2024, the GN Committee recommended to the Board, and the Board approved and adopted, a number of diversity-based recommendations that include maintaining its measurable objectives of having, at current Board size, a qualified Board that is at least 30% gender diverse (including a minimum of one woman) at all times with at least one qualified racially or ethnically diverse director on the Board at all times. See the Company’s Proxy Statement on Schedule 14A, filed April 24, 2024, for our most recent disclosure on Energy Fuels’ diversity statistics.

Available Information

Detailed information about Energy Fuels is, and will continue to be, included in our annual reports on Form 10-K, our quarterly reports on Form 10-Q, current reports on Form 8-K, proxy statements on Schedules 14A and other reports, and amendments to those reports that we file with or furnish to the SEC and, for Canadian purposes, the Ontario Securities Commission (“OSC”). The Company is a U.S. domestic issuer for SEC reporting purposes, most of its shareholders are U.S. residents, the Company is required to report its financial results under U.S. GAAP and its primary trading market is the NYSE American. However, prior to January 1, 2016, we were a foreign private issuer subject to limited periodic disclosure and current reporting requirements of the U.S. Securities Exchange Act of 1934, as amended (the “Exchange Act”), so we did not file Forms 10-K or 10-Q prior to January 2016. All such Forms 10-K, 10-Q and 8-K, including any amendments to such reports, filed after January 1, 2016 are available free of charge on our website, www.energyfuels.com, as soon as reasonably practicable after we electronically file such reports with, or furnish such reports to, the SEC. However, our website and any contents thereof should not be considered to be incorporated by reference into this Annual Report. In addition, all public filings, including Insider Reports, of the Company can be found on the SEC’s Electronic Data Gathering, Analysis, and Retrieval (“EDGAR”) platform, and on the OSC’s System for Electronic Data Analysis and Retrieval + (“SEDAR+”) and System of Electronic Disclosure by Insiders (“SEDI”). We will furnish copies of such reports free of charge upon written request to our Investor Relations department. You can contact our Investor Relations department at:

Energy Fuels Inc.

225 Union Blvd., Suite 600

Lakewood, Colorado, 80228

Tel: 303.974.2140

Fax: 303.974.2141

Toll Free: 1.888.864.2125

E-mail: investorinfo@energyfuels.com

Additionally, our Articles of Incorporation and By-laws, Charters of the Audit, Compensation, GN and EHSS Committees, Sustainability Report, and the majority of our Company policies, are available on our website. We will furnish copies of such information free of charge upon written request to our Investor Relations department.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.