ITEM 1A. RISK FACTORS
There have been no material changes from the risk factors disclosed in Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2023, other than as disclosed in this Form 10-Q for the three and nine months ended September 30, 2024.
New Risk Factors Resulting from the Company’s Acquisition of Base Resources on October 2, 2024
Risks relating to forward-looking statements include:
failure to complete and integrate proposed acquisitions, and/or to incorrectly assess the value of or risks associated with completed acquisitions, including our acquisition of mineral concessions at the Bahia Project, the Donald Project and Base Resources (which owns the Toliara Project) and any future acquisitions; and
risks associated with fluctuations in price levels for HMS concentrate (“HMC”) and its components, including the prices for ilmenite, rutile, titanium and zircon, which could impact planned production levels or the feasibility of production of HMC and monazite from our Bahia Project, Toliara Project, the Donald Project and any other HMS project the Company may acquire or participate in, which could impact monazite supply for our RE Carbonate, separated REE and any other REE value-added product production.
Risks Related to our Business
Mining, extraction, recovery, processing, construction, development and exploration activities depend, to a substantial degree, on adequate infrastructure.
Reliable roads, bridges, power sources and water supply are important determinants affecting capital and operating costs for existing and planned operations. For the Toliara Project, the Donald Project and the Bahia Project, new infrastructure will need to be built to support activities. However, unusual or infrequent weather phenomena, including drought, flooding, sabotage, government and/or other interference in the maintenance or provision of such infrastructure could adversely affect our operations and activities, financial condition and results of operations.
Risks associated with our REE business.
There are a number of risks inherent to our REE activities, which include the following revised risk:
The risk of achieving and maintaining an adequate supply of monazite feed for processing at the Mill. Although the Company has acquired the Bahia Project, it is currently at the exploration and permitting stage and is not an operating mine. The same consideration applies to the Toliara Project and the Donald Project, although the Toliara Project is at a more advanced stage. As a result, the Company does not currently own its own operating monazite-bearing mine(s) and is completely dependent on contractual arrangements for its REE feed sources at this time. There can be no guarantee that the Company will be able to secure adequate monazite supply over the long-term at suitable prices or that the Bahia Project, Toliara Project or the Donald Project will be developed into operating monazite-producing mines. In addition, the price the Company may be required to pay for monazite sands is subject not only to commercial factors but also to the risk of influence by foreign policy and/or foreign state-owned enterprises. We will evaluate potential acquisitions of additional mines or resource properties and joint ventures with mine or resource property owners, but there can be no guarantee that any such acquisitions or joint ventures can be realized on acceptable terms. Further, to the extent the Company is required to purchase monazite ore sources and rely on REE separation facilities located outside the U.S., we may be at a transportation cost disadvantage compared to processing facilities in China or elsewhere that may be closer to potential ore sources and/or REE separation facilities.
We may need additional financing in connection with the implementation of our business and strategic plans from time to time.
The exploration, construction, development and acquisition of mineral properties and the ongoing operation of mines and other facilities, including the Toliara Project, the Donald Project, the Bahia Project, and the Phase 2 and 3 REE separation circuits of the Mill, requires a substantial amount of capital and may depend on our ability to obtain financing through joint ventures, debt financing, equity financing and/or other means. We may accordingly need further capital in order to take advantage of further opportunities or acquisitions. Our financial condition, general market conditions, volatile REEs, HMC, uranium and vanadium markets, volatile interest rates, legal claims against us, a significant disruption to our business or operations, or other factors may make it difficult to secure financing necessary for the expansion of mining activities or to take advantage of opportunities for acquisitions. Further, volatility in the credit markets may increase costs associated with debt instruments due to increased spreads over relevant interest rate benchmarks, or may affect our ability, or the ability of third parties we seek to do business with, to access those markets. Continued volatility in equity markets, specifically including energy and commodity markets, may increase the costs associated with equity financings due to a low share price and may create the potential need for us to offer higher discounts and other value (e.g., warrants). There is no assurance that we will be successful in obtaining required financing as and when needed on acceptable terms, if at all.
We are subject to costs associated with decommissioning and reclamation of our properties.
For so long as we are and remain the owner and operator of the Mill, Kwale Operations, the Nichols Ranch Project and numerous HMC, uranium, uranium/vanadium, REE and HMS projects and other facilities located in the U.S., Brazil, Africa and elsewhere, and certain other permitting, construction, development and exploration properties, we are obligated to ultimately reclaim or participate in the reclamation of our properties upon the occurrence of certain predetermined criteria using closely monitored and carefully developed, approved methods. Our reclamation obligations in the U.S. are bonded, and cash and other assets have been reserved to secure a portion, but not all, of the bonded amounts. Although our financial statements will record a liability for the asset retirement obligation, and the bonding requirements are generally periodically reviewed by applicable regulatory authorities, there can be no assurance or guarantee that the ultimate cost of such reclamation obligations will not exceed the estimated liability to be provided on our financial statements. Further, to the extent the bonded amounts are not fully collateralized, we will be required to come up with additional cash to perform our reclamation obligations when they occur.
Decommissioning plans for our properties in the U.S. have been filed with applicable regulatory authorities. These regulatory authorities have accepted the decommissioning plans in concept, not upon a detailed performance forecast, which has yet to be generated. Over time, further regulatory review of the decommissioning plans may result in additional decommissioning requirements, associated costs and the requirement to provide additional financial assurances, including as our properties approach or go into decommissioning. It is not possible to predict what level of decommissioning and reclamation (and financial assurances relating thereto) may be required in the future by regulatory authorities. The decommissioning and rehabilitation plan for Kwale Operations has been filed with the Kenyan National Environment Management Authority with approval to proceed granted on September, 25 2024. While the financial statements of Base Resources provide for the estimated costs of this decommissioning and rehabilitation for Kwale Operations, there can be no assurance or guarantee that the ultimate cost of such decommissioning and rehabilitation will not exceed the estimated liability provided in the financial statements.
We face heightened risks relating to the business we conduct in foreign jurisdictions which could have a material adverse effect on our operations, liquidity and/or financial condition.
The Company faces a number of risks related to conducting business operations in foreign jurisdictions (including Brazil, Australia and Africa), such as heightened risks of political instability, expropriation of assets, business interruption, increased taxation, import/export controls, unilateral modification of concessions and contracts. We also face the typical risks associated with doing business in foreign countries, including: different market and economic forces, resulting from new business environments with new competitors and different consumer preferences; dealing with local suppliers who may have a strong foothold in the area; the need to build up brand awareness and trust in a new market; different customer and supplier demographics; language and cultural barriers; extreme weather events and natural disasters that can present a sustained business risk relating to supply logistics and other factors; the additional requirements of foreign legal systems; the impacts of foreign tax requirements; the need to comply with foreign regulations and operations compliance; the need to comply with foreign legal systems, including as they relate to contract enforceability; the requirement to stay abreast of and remain in compliance with changing laws and regulations; inconsistent application of existing laws; social unrest; and the lack of purchasing power parity compared to domestic competitors. Any number of these risks could have a material adverse effect on our operations, liquidity and/or financial condition.
Our operations outside the United States and Canada require us to comply with a number of United States, Canadian and international regulations, violations of which could have a material adverse effect on our business, consolidated results of operations, and consolidated financial condition.
Our operations outside the United States and Canada require us to comply with a number of United States, Canadian, Australian, African and other international regulations. For example, our operations in countries outside the United States and Canada are subject to the United States Foreign Corrupt Practices Act (“FCPA”), which prohibits United States companies and their agents and employees from providing anything of value to a foreign official for the purposes of influencing any act or decision of these individuals in their official capacity to help obtain or retain business, direct business to any person or corporate entity, or obtain any unfair advantage, as well as to the Corruption of Foreign Public Officials Act (“CFPOA”), which is the Canadian equivalent of the FCPA. Our activities create the risk of unauthorized payments or offers of payments by our employees, agents, or joint venture partners that could be in violation of anti-corruption laws, even though some of these parties are not subject to our control. We have internal control policies and procedures and are implementing additional training and compliance programs for our employees and agents with respect to the FCPA and CFPOA. However, we cannot assure that our policies, procedures, and programs will always protect us from reckless or criminal acts committed by our employees or agents. We are also subject to the risks that our employees, joint venture partners, and agents outside of the U.S. may fail to comply with other applicable laws. Allegations of violations of applicable anti-corruption laws may result in internal, independent, or government investigations. Violations of anti-corruption laws may result in severe criminal or civil sanctions, and we may be subject to other liabilities, which could have a material adverse effect on our business, consolidated results of operations and consolidated financial condition.
The Company may face tax risks in certain operating foreign jurisdictions and unexpected taxes could be imposed on us which could have a material and adverse effect on our financial position.
Our operations and business in foreign jurisdictions, including Brazil, Australia and Africa, may increase our susceptibility to sudden tax changes. Taxation laws in these jurisdictions are complex, subject to varying interpretations and applications by the relevant tax authorities and subject to changes and revisions in the ordinary course. Any unexpected taxes imposed on us could have a material and adverse impact on our financial position.
We face risks associated with a Brazilian federal or state government enacting or managing a conservation unit or environmental protection area which could have a material adverse effect on our operations, liquidity and/or financial condition.
In respect of the Company’s Bahia Project in Brazil, there is a risk of a Brazilian federal or state government enacting or managing a conservation unit or environmental protection area or implementing a management plan in connection therewith that could impact planned production at or restrict the Company’s ability to or prevent the Company from mining the Company’s Bahia Project, or portions thereof. Such an action could have a material adverse effect on our operations, liquidity and/or financial condition.
Our operations in Africa expose us to regional-specific social, political, economic and/or other risks.
The Company’s operations in Africa may expose us to uncertain social, political or economic conditions and/or other risks. Government agencies or other counterparties could seek to assert rights of expropriation, renegotiation or nullification of existing concessions, contracts and pricing benchmarks, challenges to title to properties or mineral rights or delays renewing licenses and permits. Such government agencies or other counterparties may also seek to impose onerous fiscal policy, onerous regulation, changes in law or policy governing existing operations, financial constraints and unreasonable taxation.
There is also a risk that foreign public officials or government agencies will act unreasonably towards us. There can be no assurance that these foreign public officials or government agencies or other counterparties will not take the steps noted above in respect of the Company’s operations and, if any such steps are taken, there can be no assurance that sufficient remedies will be available to recoup the investments that have been made to date in such areas. The occurrence of any such events in respect of the Company’s operations in such foreign nations could adversely affect the Company’s business and results of operations.
The development of the Toliara Project requires certain actions of the Government of Madagascar and the Company entering into binding agreements, neither of which may occur on a timely basis, at all or on acceptable terms. Further, the development of the Toliara Project is dependent on several factors beyond our control.
Development of the Toliara Project is dependent on lifting the current suspension of on-ground activities imposed by the Government of Madagascar and an agreement on the fiscal terms applicable to the project. There is no certainty that binding fiscal terms for the Toliara Project will be agreed and that the suspension will be lifted or that these milestones will be achieved on a timely basis.
Once the suspension is lifted, development of the Toliara Project will be dependent on several factors including, but not limited to:
securing requisite fiscal and legal stability (e.g. through eligibility certification under the Law No. 2001-031 on large scale mining investments dated 8 October 2002 as amended by law No. 2005-022 dated 27 July 2005 and put into effect by Decree no 2003-784 dated 8 January 2003);
entering into an acceptable investment agreement (or similar agreement) addressing fiscal and other key terms governing the Project and also providing necessary legal clarifications in relation to applicable law;
ratification by the Malagasy Parliament of an acceptable investment agreement (or similar agreement);
having monazite included as a mineral for exploitation on the Toliara exploitation permit on a timely basis or at all;
securing requisite land access for the Toliara exploitation permit and the Toliara Project’s associated infrastructure;
access to adequate capital to fund development;
obtaining regulatory consents and approvals necessary for, or exemptions beneficial to, development and production on a timely basis or at all;
commodity prices and securing necessary offtakes on reasonable terms;
geotechnical conditions;
recruitment and retention of appropriately skilled and experienced employees, contractors and consultants; and
maintaining positive relations with host communities and regional and national governments/officials.
Risk associated with the closure of Kwale Operations.
The closure of Kwale Operations and conclusion of mining and processing activities is subject to several risks for the Company including, but not limited to:
adequate financial provisioning for closure and rehabilitation;
environmental contamination, including soil erosion and water pollution;
potential harm to personnel on site during closure, including employees and contractors;
meeting and adherence to evolving regulations and standards, as well as international industry good practice;
managing community and Government relations and expectations and addressing any concerns;
technical challenges in implementing effective rehabilitation methods;
long-term monitoring as part of ensuring rehabilitation effectiveness and management of the tailings storage facility;
maintaining public trust and social license through communication and engagement; and
resolving current and potential legal disputes on acceptable terms, including with community, government and government related bodies, third party royalty holders and site employees (for example, over contractual obligations, severance packages, and associated employment termination issues).
Risks associated with the Donald Project Joint Venture.
Our ability to earn our 49% interest in the Donald Project is dependent on the occurrence of a positive FID. The development of the Donald Project and the ability of the parties to approve the FID and to develop and operate the project is dependent on a number of factors including, but not limited to:
the project being fully permitted, including receiving approval of the work authority for the phase 1 mine plan and additional regulatory approvals required for the mining, transport and export of REE concentrate;
an evaluation of the economics of phase 1 taking into account: the conclusions and recommendations in the Updated Phase 1 Definitive Feasibility Study; expected REE concentrate and HMC recoveries from the planned facilities; the development plan and budget for phase 1, and cash flow forecasts for both the joint venturers;
the Company having secured commitments for satisfactory offtake and/or sales agreements for the separated REE products expected to be produced at the Mill from the Donald Project REE concentrate;
Astron and/or the joint-venture entity, Donald Project Pty Ltd, having secured commitments for satisfactory offtake and/or sales agreements for HMC;
Donald Project Pty Ltd having secured commitments for non-recourse and/or government-backed debt financing for the project development costs required in addition to the Company’s A$183 million earn-in amount;
Donald Project Pty Ltd having secured certain land rights and/or access agreements for the project including its associated infrastructure;
Donald Project Pty Ltd maintaining and renewing tenements relating to the Donald Project, including MIN5532, the current term of which expires in 2030 (and, for phase 2, the conversion of RL2002 into a mining lease);
counter party risk in relation to Astron’s ability to perform its obligations under the Joint Venture Agreements;
obtaining all required local, state and federal consents and approvals required on a timely basis; and
securing construction and engineering contracts, as well as equipment and spare parts, on acceptable terms and in accordance with project requirements.
We are subject to foreign currency risks which could have a material impact on our cash flows and profitability.
Our operations are subject to foreign currency fluctuations. Our operating expenses and revenues are primarily incurred in U.S. dollars, while some of our cash balances and expenses are measured in Canadian dollars. The operations of Base Resources are also primarily conducted in U.S. dollars, but Base Resources conducts some of its business in currencies other than the U.S. dollar (including, Australian dollars, Kenyan Shillings and Malagasy Ariary). The fluctuation of the Canadian dollar, Australian dollar, Kenyan Shilling and/or Malagasy Ariary in relation to the U.S. dollar will consequently have an impact on our profitability and may also affect the value of our assets and shareholders’ equity. In addition, any strengthening of the U.S.
dollar relative to other currencies makes our mineral extraction and recovery less competitive in relation to similar activities in other countries. Any strengthening of the U.S. dollar in relation to the currencies of other countries makes the Company’s mineral impact less competitive in relation to similar activities in other countries and could have a material impact on our cash flows and profitability and affect the value of our assets and shareholders’ equity.
We may not realize the anticipated benefits of previous acquisitions which could impair our results of operations, profitability and/or financial results.
We may not realize the anticipated benefits of acquiring: the Sheep Mountain Project in 2012; Denison Mines Corp.’s U.S. Mining Division in 2012, including the Mill, certain of the Arizona Strip Properties, the Bullfrog Project and the La Sal Project; Strathmore in 2013, including the Roca Honda Project; Uranerz in 2015, including the Nichols Ranch Project; the Bahia Project in Brazil in 2023; the Donald Project in Australia in 2024; and Base Resources in 2024, which owns the Toliara Project in Africa, due to integration, operational and uranium, REE, HMC, uranium and/or vanadium market challenges. Decreases in commodity prices have required us to place or maintain a number of acquired properties and facilities on standby and to defer permitting and construction and development activities on certain other acquired assets, until market conditions warrant otherwise, and, in some cases, we have elected to sell or abandon certain of these properties at a loss. Our success following those acquisitions will depend in large part on the success of our management in valuing the acquired assets and integrating the acquired assets into the Company. Our failure to properly value the assets and to achieve such integration and to mine or advance such assets could result in our failure to realize the anticipated benefits of those acquisitions and could impair our results of operations, profitability and/or financial results.
Our relationship with our employees may be impacted by changes in labor relations which could have a material adverse impact on our cash flows, earnings, results of operations and/or financial condition.
One of our new subsidiaries, Base Titanium Limited (“Base Titanium”), is a party to a collective bargaining agreement for a significant portion of its Kwale Operations workforce; however, none of our other operations or activities currently directly employ unionized workers who work under collective agreements. There can be no assurance that our employees or the employees of our contractors will not become unionized in the future or, in relation to Base Resources, that it will not become the subject of industrial action in relation to the portion of its Kwale Operations workforce that work under a collective agreement, which may impact our operations and activities. Any lengthy work stoppages may have a material adverse impact on our future cash flows, earnings, results of operations and/or financial condition.
Investors in jurisdictions outside of Canada may have difficulty bringing actions and enforcing judgments under their respective jurisdiction’s securities laws against an Ontario corporation.
Although our primary trading market is the NYSE American, a majority of our outstanding voting securities are registered in the names of holders in the U.S. and we are a U.S. domestic issuer for reporting purposes with the SEC, and substantially all of our assets, operations and employees are in the U.S., the Company was incorporated in Ontario and, as a result, investors in the U.S. or in other jurisdictions outside of Canada may have difficulty bringing actions and enforcing judgments against us, our directors, our executive officers and some of the experts named in this Form 8-K and the Company’s other SEC filings, including the FY23 Form 10-K, based on civil liabilities provisions of the federal securities laws or other laws of the U.S. or any state thereof or the equivalent laws of other jurisdictions of residence.
General Risk Factors
Russia’s Invasion of Ukraine is severely and unpredictably impacting global energy markets and supply chains, and rising concerns over a second severe nuclear accident in Ukraine could seriously hurt public reception to nuclear energy.
Russia’s February 2022 invasion of Ukraine continues to severely impact global energy markets and supply chains by causing economic uncertainty, price volatility, supply shortages and national security concerns to such a degree that the International Energy Agency (“IEA”) has called it “the first truly global energy crisis, with impacts that will be felt for years to come.” As the Company is engaged in a number of energy sectors, including REEs, HMS, uranium and vanadium, it is expected that such global impacts will necessarily impact the Company, though the full extent of any such impacts are not well understood at this time. While supply and shipping impacts could materially interfere with our ability to conduct business, other global responses – such as the U.S. Inflation Reduction Act’s provision of funds for energy and climate programs, including the expansion of tax credits and incentives to promote clean energy technologies, and an apparent shift away from global reliance on Russian exports via government sanctions and other means – could materially benefit our business by creating additional market opportunities with utilities providers attempting to lessen their reliance on Russian markets.
The uranium industry also potentially faces renewed skepticism and distrust as a result of Russia’s invasion of Ukraine. According to the World Nuclear Association (“WNA”), “In the early hours of 4 March the Zaporizhzhia plant in southeastern Ukraine became the first operating civil nuclear power plant to come under armed attack. Fighting between forces overnight resulted in a projectile hitting a training building within the site of the six-unit plant. Russian forces then took control of the plant. The six reactors were not affected and there was no release of radioactive material. Since late October 2022, Russia has repeatedly targeted Ukraine’s civilian infrastructure, including the country’s energy system, with missile strikes. Widespread blackouts have resulted, and external power supply to all four of the country’s nuclear plants has been affected.” (WNA, “Ukraine: Russia-Ukraine War and Nuclear Energy,” Feb. 6, 2023). Russia’s interference with Ukrainian nuclear plants in violation of Article 56 of the Additional Protocol of 1979 to the Geneva Conventions, which states that nuclear power plants “shall not be made the object of attack, even where these objects are military objectives, if such an attack may cause the release of dangerous forces and consequent severe losses among the civilian population” (WNA, 2023), may result in increased and serious harm to global reception to nuclear energy due to the current war’s proximity to Chernobyl, site of the then-Soviet Union’s 1986 nuclear accident.