Power Supply and Load Management Resources
General
TVA is focused on building an American energy future — one that provides energy security and national security. TVA seeks to balance production capabilities with power supply requirements by promoting the conservation and efficient use of electricity and, when necessary, buying, building, or leasing assets or entering into power purchase agreements ("PPAs"). TVA also seeks to employ a diverse mix of energy generating sources, which enables TVA to better meet changing market conditions, including load growth, while ensuring affordable, reliable, and resilient electricity for its customers.
To accomplish this, TVA is making investments in its generating portfolio and infrastructure. TVA continues to evaluate adding flexible gas plants as a strategy to maintain reliability. TVA is also reviewing how recent executive orders ("EOs"), the evolving regulatory environment, and overall system performance are impacting the operation of its coal-fired fleet. Commercial operations began on Johnsonville Aeroderivative Combustion Turbine Units ("CTs") 21-30 in 2025, and TVA has ongoing natural gas projects at its Cumberland Fossil Plant ("Cumberland") site and its Kingston Fossil Plant ("Kingston") site, an aeroderivative CT project at TVA's Allen CT site, and a new Caledonia simple cycle CT project on TVA land. TVA is also evaluating natural gas projects for the replacement generation for the second unit at Cumberland and a new CT project at TVA's Lagoon Creek site. TVA is committed to investing in the future of nuclear with the evaluation of emerging advanced nuclear technologies, such as small modular reactors ("SMRs"), while working to renew its existing nuclear generation fleet licenses. TVA has been implementing the Hydro Life Extension Program and exploring new hydroelectric pumped-storage power. In addition, the Inflation Reduction Act of 2022 ("IRA") makes certain tax-exempt entities, including TVA, eligible for a direct-pay option for certain energy tax credits. TVA is currently pursuing funding opportunities of various types; however, this does not guarantee that TVA or its partners will receive funds.
Power generating facilities operated by TVA at September 30, 2025, included three nuclear sites, 18 natural gas and/or oil-fired sites, four coal-fired sites, 29 conventional hydroelectric sites, one pumped-storage hydroelectric site, one diesel generator site, and nine operating solar installations. See Item 2, Properties —Generating Properties—Net Capability for a discussion of the units at these facilities. TVA also acquires power under PPAs of varying durations, including short-term contracts. See Power Purchase and Other Agreements below.
The following table shows TVA's generation and purchased power by generating source as a percentage of all electric power generated and purchased (based on kilowatt hours ("kWh")) for the periods indicated:
| Total Power Supply by Generating SourceFor the years ended September 30 | |||
|---|---|---|---|
| Generation Resource(1) | 2025 | 2024 | 2023 |
| Nuclear | 33% | 39% | 42% |
| Natural gas and/or oil-fired | 24% | 23% | 22% |
| Coal-fired | 15% | 13% | 13% |
| Hydroelectric | 8% | 7% | 8% |
| Purchased power | 20% | 18% | 15% |
Note
(1) TVA's non-hydro renewable resources from TVA facilities are less than one percent for all periods shown, and therefore are not represented on the table above. Purchased power contains the majority of non-hydro renewable energy supply. TVA acquires RECs in connection with certain purchased power transactions and sells some of these RECs to customers.
Nuclear
At September 30, 2025, TVA had three nuclear sites consisting of seven units in operation. The units at Browns Ferry Nuclear Plant ("Browns Ferry") are boiling water reactor units, and the units at Sequoyah Nuclear Plant ("Sequoyah") and Watts Bar Nuclear Plant ("Watts Bar") are pressurized water reactor units. Operating information for each of these units is included in the table below.
| TVA Nuclear PowerAt September 30, 2025 | |||
|---|---|---|---|
| Nuclear Unit | Summer Net Capability (MW) | Net CapacityFactor for2025 (%) | Date of Expirationof OperatingLicense |
| Browns Ferry Unit 1 | 1,227 | 97.3 | 2033 |
| Browns Ferry Unit 2 | 1,208 | 82.0 | 2034 |
| Browns Ferry Unit 3 | 1,227 | 86.7 | 2036 |
| Sequoyah Unit 1 | 1,152 | 90.7 | 2040 |
| Sequoyah Unit 2 | 1,140 | 25.0 | 2041 |
| Watts Bar Unit 1 | 1,169 | 55.1 | 2035 |
| Watts Bar Unit 2 | 1,179 | 86.8 | 2055 |
Nuclear Fleet License Extensions. TVA is seeking to renew all nuclear generation units' licenses for an additional 20 years. The first license renewal application was submitted to the Nuclear Regulatory Commission ("NRC") in January 2024 for the three units at Browns Ferry. See Part II, Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations —Key Initiatives and Challenges —Capacity—Nuclear—Nuclear Fleet License Extensions.
Other Nuclear Initiatives. TVA has an Early Site Permit to potentially construct and operate SMRs at TVA's Clinch River Nuclear Site in Oak Ridge, Tennessee. TVA has requested public comment on a draft Supplemental Environmental Impact Statement ("EIS") that addresses potential environmental effects associated with site preparation, construction, operation, and decommissioning of the GE Vernova Hitachi Nuclear Energy BWRX-300 SMR at the Clinch River Nuclear Site. TVA also submitted a construction permit application to the Nuclear Regulatory Commission ("NRC") for a BWRX-300 reactor at the Clinch River Nuclear Site. The application was accepted for review by the NRC in July 2025. See Part II, Item 7, Management's
Discussion and Analysis of Financial Condition and Results of Operations —Key Initiatives and Challenges —Capacity —Nuclear —Small Modular Reactors.
Other Nuclear Matters. Operating nuclear facilities subjects TVA to waste disposal, decommissioning, and insurance requirements, as well as litigation risks. See Fuel Supply —Nuclear Fuel below for a discussion of spent nuclear fuel and low-level radioactive waste and Note 23— Commitments and Contingencies — Contingenciesfor a discussion of TVA's nuclear decommissioning liabilities and the related trust and nuclear insurance, which discussions are incorporated herein by reference.
Natural Gas and/or Oil-Fired
At September 30, 2025, TVA's natural gas and oil-fired fleet consisted of 93 combustion turbine power blocks (68 simple-cycle units, one cogeneration unit, 10 aeroderivative units, and 14 combined-cycle power units), accounting for 12,643 MW of summer net capability. Forty-nine of the simple-cycle units are currently capable of quick-start response allowing full generation capability in approximately 10 minutes. The economic dispatch of natural gas-fired plants depends on both the day-to-day price of natural gas and the price of other available intermediate resources such as coal-fired plants. TVA uses simple-cycle units to meet peaking or backup power needs. The natural gas-fired fleet supports reliability across all hours, as well as the flexibility to help manage ramping and intermittency.
Commercial operations began on Johnsonville Aeroderivative CT Units 21-30 in 2025. TVA has ongoing natural gas projects at its Cumberland site and its Kingston site, an aeroderivative CT project at TVA's Allen CT site, and a new Caledonia simple cycle CT project on TVA land. TVA is also evaluating natural gas projects for the replacement generation for the second unit at Cumberland and a new CT project at TVA's Lagoon Creek site. TVA may decide to make further strategic investments in natural gas-fired facilities in the future by purchase, construction, or lease, to help support portfolio diversification and system reliability.
See Item 2, Properties— Generating Properties, Note 9 —Leases, and Note 15— Debt and Other Obligationsfor a discussion of lease arrangements into which TVA has entered in connection with certain natural gas-fired facilities. See Part II, Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations— Key Initiatives and Challenges — Capacity — Natural Gas-Fired Unitsfor a discussion of ongoing projects at certain natural gas-fired facilities.
Coal-Fired
At September 30, 2025, TVA had four coal-fired plants consisting of 24 active units, accounting for 5,815 MW of summer net capability. TVA considers units to be in an active state when the unit is generating, available for service, or temporarily unavailable due to equipment failures, inspections, or repairs.
Coal-fired plants have been subject to increasingly stringent regulatory requirements over the last few decades, including those under the Clean Air Act ("CAA"), the Clean Water Act ("CWA"), and the Resource Conservation and Recovery Act ("RCRA"). There have also been recent executive actions regarding these acts. See Environmental Matters below. TVA is pursuing a programmatic approach for the evaluation of its sites where coal combustion residuals ("CCR") are stored to meet all applicable state and federal regulations. See Part II, Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations— Key Initiatives and Challenges — Coal Combustion Residuals — Coal Combustion Residuals Facilities.
TVA is evaluating the impact of retiring the balance of the coal-fired fleet by 2035, and that evaluation includes environmental reviews and TVA Board approval. TVA is also reviewing how recent EOs, the evolving regulatory environment, and overall system performance are impacting the operation of its coal-fired fleet. An evaluation of the continued operation of coal-fired units is being conducted and will consider material condition, plant performance, system flexibility needs, environmental requirements, grid support, and other factors. In January 2023, TVA issued its Record of Decision to retire the two coal-fired units at Cumberland by the end of calendar year ("CY") 2026 and CY 2028. In April 2024, TVA issued its Record of Decision to retire the nine coal-fired units at Kingston by CY 2027. See Part II, Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations —Key Initiatives and Challenges —Capacity—Coal-Fired Fleet.
Diesel Generators
At September 30, 2025, TVA had one diesel generator plant consisting of five units, and this facility accounted for nine
MW of summer net capability. These units are not currently dispatched for generation to the transmission grid.
Hydroelectric Pumped-Storage
At September 30, 2025, TVA had four units at Raccoon Mountain Pumped-Storage Plant ("Raccoon Mountain") with a total net summer capability of 1,715 MW. These units are utilized to balance the transmission system as well as generate power. TVA uses electricity generated by its fleet during periods of low demand to operate pumps that fill the reservoir at Raccoon Mountain. Then, during periods of high or peak demand, the water is released and the pumps reverse to work as power generating turbines.
TVA is also exploring new hydroelectric pumped-storage to meet peak demands and allow more baseload generation while ensuring the reliability and resiliency of the grid. See Part II, Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations —Key Initiatives and Challenges —Capacity—Hydroelectric Pumped-Storage.
Renewable Energy Resources
The utility industry is evolving in support of changing customer preferences. As TVA evolves, it will see impacts to the way it does business through the pricing of products, transmission of energy, and development of new products and services. TVA is investing in existing hydroelectric assets through the Hydro Life Extension Program and exploring solar projects. TVA also supports various programs and offerings, including the Green Invest Program, which matches customer demand with renewable supply and is designed to meet the needs of customers.
Conventional Hydroelectric Dams. At September 30, 2025, TVA's hydroelectric fleet consisted of 29 conventional hydroelectric dams throughout the Tennessee River system with 109 conventional hydroelectric units (106 active units and three units in long-term outage and unavailable for service), that accounted for 3,783 MW of summer net capability. Wilbur Hydroelectric Facility Units 1-3 were in long-term outage and unavailable for service at September 30, 2025. The amount of electricity that TVA is able to generate from its hydroelectric plants depends on a number of factors, including the amount of precipitation and runoff, initial water levels, generating unit availability, and the need for water for competing water management objectives. When these factors are unfavorable, TVA must increase its reliance on higher cost generation plants and purchased power. In addition, TVA receives a portion of energy generated by eight of the U.S. Army Corps of Engineers ("USACE") dams on the Cumberland River system, and electric generation from the USACE dams is dependent on the same factors that affect generation from the TVA-owned dams. See Dam Safety Assurance Programand Weather and Seasonality below.
Hiwassee Hydro Unit 2 has a unique reversible turbine/generator that acts as a pump and a turbine enhancing TVA's ability to balance baseload generation. At September 30, 2025, Hiwassee Hydro Unit 2 accounted for 86 MW of the conventional hydroelectric summer net capability.
TVA has a Hydro Life Extension Program which focuses on recovering and preserving TVA's extensive hydroelectric fleet, improving efficiency and flexibility, and ensuring long-term reliability of this vital energy asset. As part of this program, TVA is working to add additional capacity to some of its existing hydroelectric units. In a separate effort, TVA is working to improve transmission system reliability by upgrading or adding synchronous condensing capability to several of the conventional hydro units in the fleet.
Dam Safety Assurance Program. TVA has an established dam safety program, which includes procedures based on the Federal Guidelines for Dam Safety, with the objective of reducing the risk of a dam safety event. The program analyzes, evaluates, and manages risks through a systematic and thorough process that facilitates decision-making for the safety of a structure, identifying necessary actions to reduce risk, including remediation projects, and prioritization of actions for TVA's river dams. Prioritization is driven by reducing risk to the public and asset preservation. TVA also continues to provide routine care of the dams as part of the dam safety program through inspections, monitoring, and maintenance, among other activities.
Solar. TVA owns nine operating solar installations that account for approximately one MW of nameplate capacity. In November 2022, the TVA Board approved the opportunity for TVA to explore the development of a utility-scale solar project, contingent on successfully completing environmental reviews under NEPA and other applicable laws and obtaining the necessary state permits. The project would utilize TVA land, deploying a solar cap system on the closed CCR facility at the TVA Shawnee Fossil Plant ("Shawnee") in Paducah, Kentucky. See Part II, Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations —Key Initiatives and Challenges —Capacity —Solar.
During 2019, the TVA Board approved the opportunity for TVA to explore being directly involved in the development of a utility-scale solar project. The project experienced delays and cost increases; therefore, in 2024, TVA elected to pursue a competitive selection process with third parties and planned to enter into a long-term PPA to purchase the energy generated by the facility. However, in the fourth quarter of 2025, TVA decided to not move forward with this solar project. As a result, TVA recognized $25 million in Operating and maintenance expense related to project write-offs, including $19 million related to a down payment for solar panels.
Other Renewable Energy Resources. Other renewable energy resources include renewable energy purchases, a majority associated with TVA renewable programs, which are described below. See Power Purchase and Other Agreements for information on renewable PPAs.
The Green Invest Program matches customer demand with renewable supply through a Green Invest Agreement. The goal of the Green Invest Program is to meet the long-term sustainability needs of customers. TVA procures the needed renewable supply through a diversified approach, which could include a competitive procurement process, strategic partnerships, or construction of renewable facilities to meet these needs. As of September 30, 2025, more than 2,000 MW of renewable PPAs have been matched to customers through the Green Invest Program. In addition, Generation Flexibility is a solution available to LPCs participating in TVA's Partnership Agreement and supports the deployment of up to 2,000 MW of distributed solar to provide clean, local generation. See Note 18— Revenue.
The Green Switch Program allows customers to support solar resources through purchasing solar energy generated in the Tennessee Valley. The product is sold in blocks of 200 kWh or matches 100 percent of a customer's electricity usage (available through select LPCs). During the year ended September 30, 2025, participants purchased 87,675 MWh through the Green Switch Program.
The Green Flex Program gives commercial and industrial customers the ability to meet sustainability goals and to make renewable energy claims through RECs from wind generation located outside TVA's service area. During the year ended September 30, 2025, participants purchased approximately 792,000 RECs through the Green Flex Program.
TVA tracks its renewable energy commitments and claims through the management of RECs. The RECs, which each represent one megawatt-hour ("MWh") of renewable energy generation, are principally associated with wind, solar, biomass, and low-impact hydroelectric. TVA continues to evaluate ways to adjust to customer preferences, including the acquisition of RECs from renewable purchased power that can be sold to customers to meet their needs. Overall, TVA will procure needed renewable supply through a diversified approach, which could include a competitive procurement process, strategic partnerships, or construction of renewable facilities to meet these needs.
Total Renewable Energy Resources. As of September 30, 2025, TVA had 7,252 MW of operating renewable energy resources and 2,528 MW of contracted renewable resources not yet online. In addition, TVA has a self-directed solar project currently under development, which is not represented in the table below. See Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations— Key Initiatives and Challenges — Solar.
Notes
(1) Contracted resources are executed PPAs expected to come online at a future date.
(2) Hydroelectric power consists of 3,783 MW from TVA-owned conventional hydroelectric facilities and 779 MW from renewable PPAs.
(3) TVA acquires RECs in connection with certain purchased power transactions and sells some of these RECs to customers.
TVA's operating renewables by location and by source are detailed below:
Notes
(1) In-Valley refers to the renewable energy that is sourced within TVA's service territory. Out-of-Valley refers to the renewable energy that is sourced outside of TVA's service territory and solely consists of wind power.
(2) See Power Purchase and Other Agreements below. PPAs also include capability from various historical renewable energy programs primarily with individuals and small businesses.
(3) TVA acquires RECs in connection with certain purchased power transactions and sells some of these RECs to customers.
Distributed Energy Resources
Consumer desire for energy choice, among other things, is driving the expectation for flexible options in the electric industry. TVA and LPCs are working together to leverage the strengths of the Tennessee Valley public power model to provide distributed energy solutions that are economical, sustainable, and flexible. TVA will focus on the safety and reliability impacts of these resources as they are interconnected to the grid and will aim to ensure that the pricing of electricity remains as low as feasible. Additional regulatory considerations and analysis may be required as the distributed energy resources ("DER") market, technologies, and programs evolve.
In 2017, the TVA Board authorized up to$300 million to be spent over the next 10 years, subject to annual budget availability and necessary environmental reviews, to build an enhanced fiber optic network that will better connect TVA's operational assets. Fiber is a vital part of TVA's modern communication infrastructure and is needed to help manage DER as they enter the market. The new fiber optic lines will also improve the reliability and resiliency of the generation and transmission system. See Part II, Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations— Key Initiatives and Challenges — Fiber Optic Network.
New energy management systems and energy storage technologies present opportunities for more sophisticated and integrated operation of the entire grid. The advent of electric vehicles and small-scale renewable generation has hastened the development of energy storage technologies that have the potential to mitigate the intermittent supply issues associated with many renewable generation options. Implementation of these technologies in conjunction with two-way communication to the site creates the potential for more efficient usage of other DER on the grid.
On-site energy management technologies and the proliferation of companies interested in providing services to support and aggregate the impacts of such systems provide another DER opportunity. Such systems can afford the consumer benefits through reduced consumption, increased comfort, detailed energy use data, and savings from time-sensitive rate structures. TVA and LPCs must consider the impacts of integration from changes in energy usage patterns resulting from the operation of such systems.
Demand response systems that take advantage of the increasing sophistication in communication to homes, businesses, and distribution system assets also afford the opportunity for more granular control of system demand. Technologies can manage individual customer systems to shift usage from peak to off-peak periods and create significant reductions in the need for peak generation output or curtail usage for short periods to balance system demand. More sophisticated distribution control systems can also lower peak demand through control of excess voltage on the grid on either a dispatchable or continuous basis. Some large industrial customers also have the capacity to respond within a designated notice period and can augment operational flexibility by providing ancillary services. See Community Energy Portfolio below.
Community Energy Portfolio
TVA continues to make investments in its community energy portfolio, consisting of energy efficiency, demand response, renewable, and resiliency programs, as part of its commitment to meet the Tennessee Valley’s growing energy needs and to support a decarbonized and more resilient grid. TVA is expanding its portfolio and plans to invest more than $1.5 billion in its energy efficiency and demand response programs from 2024 – 2028. Over this five-year period, TVA anticipates approximately 1,600 gigawatt hours of net incremental energy efficiency savings and expects to have over 2,200 MW of demand response portfolio capacity in 2028. These amounts are forward-looking and subject to various uncertainties. See Forward-Looking Informationand Item 1A, Risk Factors. In 2025, TVA invested $242 million in its energy efficiency and demand response programs. As of September 30, 2025, TVA had 1,693 MW of demand response peak season portfolio capacity and effectively reduced 2025 energy needs by approximately 257 gigawatt hours of net incremental energy efficiency savings.
TVA's community energy portfolio consists of programs aimed at balancing system needs by lowering costs, shaping energy usage, increasing capacity, and decarbonizing the grid, all through the participation of end-use consumers. These programs help end-use consumers save on their bills and reduce some of the need for new generation in the future and are offered to both end-use residential customers and businesses and industries. TVA also has energy programming focused on expanding partnerships, improving program access, and catalyzing investment in communities where all individuals can benefit from TVA's resources. TVA's Uplift Programs, a component of the community energy portfolio, include (1) the Home Uplift Program, which completes home evaluations and makes high-impact home energy upgrades for qualifying homeowners at no cost to the homeowners, (2) the School Uplift Program, which assists schools with adopting strategic energy management practices, and (3) the Small Business Uplift Program, which assists small businesses located within underserved communities with energy evaluations and energy improvement investments provided by TVA at no cost to the small business. TVA anticipates additional community energy portfolio programs to be developed over the coming years to grow the community energy portfolio. See Distributed Energy Resources above for further discussion on demand response systems.
Power Purchase and Other Agreements
TVA acquires power from a variety of power producers generally through long-term and short-term PPAs as well as through spot market purchases. During 2025, TVA acquired approximately 95 percent of the power that it purchased through the long-term PPAs described below, including agreements for long-term renewable generation resources, approximately three percent on the spot market, and approximately two percent through short-term PPAs. During 2024, TVA acquired approximately 98 percent of the power that it purchased through long-term PPAs, and approximately two percent on the spot market.
TVA's capability provided by PPAs is primarily provided under contracts that expire through 2045 and are described in the table below.
| Power Purchase Agreements(1)At September 30, 2025 | |||||
|---|---|---|---|---|---|
| Type of Facility · Location · Number of Contracts · Contract Capacity (MW)(2) · Contract Termination Date | |||||
| Operating | |||||
| Coal(3) | Georgia | 1 | 250 | 2026 | |
| Coal(3) | Mississippi | 1 | 500 | 2026 | |
| Lignite | Mississippi | 1 | 440 | 2032 | |
| Total Operating Coal | 3 | 1,190 | |||
| Natural Gas | Alabama | 4 | 1,788 | 2026 - 2033 | |
| Natural Gas | Georgia | 3 | 692 | 2026 - 2028 | |
| Natural Gas | Illinois | 1 | 479 | 2028 | |
| Natural Gas(4) | Missouri | 1 | 50 | 2026 | |
| Natural Gas(4) | North Carolina | 1 | 100 | 2026 | |
| Natural Gas | Pennsylvania | 1 | 500 | 2028 | |
| Total Operating Natural Gas | 11 | 3,609 | |||
| Diesel | Alabama | 1 | 10 | 2035 | |
| Diesel | Mississippi | 2 | 46 | 2028 | |
| Diesel | Tennessee | 4 | 59 | 2028 - 2032 | |
| Total Operating Diesel | 7 | 115 | |||
| Solar | Alabama | 2 | 302 | 2037 - 2041 | |
| Solar | Kentucky | 1 | 173 | 2045 | |
| Solar | Mississippi | 2 | 350 | 2044 - 2045 | |
| Solar | Tennessee | 10 | 613 | 2032 - 2045 | |
| Total Operating Solar | 15 | 1,438 | |||
| Wind | Iowa | 2 | 159 | 2030 - 2031 | |
| Wind | Illinois | 3 | 450 | 2032 - 2033 | |
| Wind | Kansas | 2 | 311 | 2032 - 2033 | |
| Total Operating Wind | 7 | 920 | |||
| Biomass | Tennessee | 1 | 5 | 2031 | |
| Biomass | Mississippi | 1 | 25 | 2028 | |
| Total Operating Biomass | 2 | 30 | |||
| Hydroelectric | Tennessee, Kentucky, and North Carolina | 2 | 779 | 2035 and upon three years' notice | |
| Battery Storage | Mississippi | 2 | 100 | 2044 - 2045 | |
| Subtotal Operating | 49 | 8,181 | |||
| Contract Renewable Resources(5) | 301 | ||||
| Total Operating PPAs | 8,482 | ||||
| Contracted (not yet online) | |||||
| Nuclear | 1 | 50 | |||
| Solar | 31 | 2,528 | |||
| Battery | 3 | 270 | |||
| Total Contracted (not yet online) PPAs | 35 | 2,848 | |||
Notes
(1) TVA acquires RECs in connection with certain purchased power transactions and sells some of these RECs to customers.
(2) Represents capability specified in TVA's PPA contracts. The measurement for nonrenewable resources is contracted capacity, adjusted for any contractual summer output constraints. The measurement for renewable resources is contracted capacity of the renewable resources' nameplate capacity. Nameplate capacity does not account for real-time operating constraints, such as intermittency of renewable resources associated with weather, delivery mechanisms, or other factors.
(3) Included in the table above is 250 MW of power delivery in Georgia and 500 MW of power delivery in Mississippi that expire on November 30, 2025. These contracts were replaced with one natural gas contract for 670 MW in Georgia and Mississippi that commences on December 1, 2025. The new contract is not reported in the table above.
(4) Included in the table above is 50 MW of power delivery in Missouri and 100 MW of power delivery in North Carolina that expire on November 30, 2025 and December 31, 2025, respectively. The Missouri and North Carolina contracts were replaced with 200 MW and 75 MW of natural gas contracts, respectively, which commence on December 1, 2025 and January 1, 2026, respectively. The two new contracts are not reported in the table above.
(5) Contract Renewable Resources is capability from various historical renewable energy programs that consist of PPAs primarily with individuals and small businesses.
Under federal law, TVA is required to purchase energy from qualifying facilities (cogenerators and small power producers) at TVA's avoided cost of either generating this energy itself or purchasing this energy from another source. TVA fulfills this requirement through the Dispersed Power Production Program. At September 30, 2025, there were 1,344 generation sources, with a combined qualifying capacity of 281 MW, whose power TVA purchases under this program.