Skip to main content

Tennessee Valley Authority

For the period ended Sep 30, 2025. Filed Nov 13, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Nov 13, 2025

TVE$23.24+0.1%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits
Contents

Fuel Supply

General

TVA's consumption of various types of fuel depends largely on the demand for electricity by TVA's customers, the availability of various generating units, and the availability and cost of fuel. See Part II, Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations —Results of Operations—Financial Results —Operating Expenses.

Nuclear Fuel

Current Fuel Supply. Converting uranium to nuclear fuel generally involves four stages: the mining and milling of uranium ore to produce uranium concentrates; the conversion of uranium concentrates to uranium hexafluoride gas; the enrichment of uranium hexafluoride; and the fabrication of the enriched uranium hexafluoride into fuel assemblies. TVA plans to continue using contracts of various products, lengths, and terms as well as inventory to meet the projected nuclear fuel needs of its nuclear fleet. The net book value of TVA's nuclear fuel was $1.2 billion and $1.3 billion at September 30, 2025 and 2024, respectively.

TVA's nuclear fuel is supplied primarily by U.S., Canadian, Australian, and European Union sources, and TVA has existing physical inventories located in the United States and Canada sufficient to fuel its reactors for many years. TVA is not contracted to purchase any Russian or Chinese origin nuclear fuel, and has no Russian or Chinese origin nuclear fuel in inventory for use in its reactors. TVA could be impacted by higher market prices as a result of general market impacts resulting from potential trade restrictions; however, at this time TVA's nuclear fuel is obtained predominantly through long-term contracts.

TVA and the DOE are parties to an interagency agreement (referred to as the Down-blend Offering for Tritium), under which surplus DOE highly-enriched and other uranium is processed by third-party contractors into low-enriched uranium, which is then fabricated into fuel for use in TVA's nuclear power plants. Production of the low-enriched uranium began in 2019 and will continue through the end of the interagency agreement term in September 2027. After that date, any remaining uranium in storage will be managed to ensure that the uranium is unencumbered by policy restrictions, so that it can be used in connection with the production of tritium. Under the terms of the interagency agreement, the DOE reimburses TVA for a portion of the costs of converting the highly enriched uranium to low-enriched uranium. See Note 1 —Summary of Significant Accounting Policies—Down-blend Offering for Tritium for a more detailed discussion of the Down-blend Offering for Tritium project.

Low-Level Radioactive Waste. Certain materials and supplies used in the normal operation of nuclear electrical generating units are potentially exposed to low levels of radiation. TVA sends shipments of low-level radioactive waste to burial facilities in Clive, Utah, and Andrews, Texas. TVA is capable of storing some low-level radioactive waste at its own facilities for an extended period of time, if necessary.

Spent Nuclear Fuel. All three nuclear sites have dry cask storage facilities. Sequoyah will need additional capacity by 2029. Browns Ferry will need additional capacity by 2037. Watts Bar will need additional capacity by 2039. To recover the cost of providing long-term, on-site storage for spent nuclear fuel, TVA filed a breach of contract suit against the U.S. in the U.S. Court of Federal Claims in 2001. As a result of this lawsuit and related agreements, TVA has collected approximately $517 million through 2025.

Tritium-Related Services. TVA and the DOE are engaged in a long-term interagency agreement under which TVA, at the DOE's request, irradiates tritium-producing burnable absorber rods ("TPBARs") to assist the DOE in producing tritium for the Department of Defense, which is also known as the Department of War. This interagency agreement requires the DOE to reimburse TVA for the costs that TVA incurs in connection with providing irradiation services and to pay TVA an irradiation services fee at the specified rate per TPBAR over the period when irradiation occurs. This interagency agreement terminates in 2036.

In general, TPBARs are irradiated for one operating cycle, which lasts about 18 months. At the end of the cycle, TVA removes the irradiated rods and loads them into a shipping cask. The DOE then ships them to its tritium-extraction facility. TVA loads a fresh set of TPBARs into the reactor during each refueling outage. Irradiating the TPBARs does not affect TVA's ability to safely operate the reactors to produce electricity.

TVA has provided irradiation services using Watts Bar Unit 1 since 2003 and Watts Bar Unit 2 since 2021. The DOE notified TVA of future increased needs for tritium, and TVA submitted a License Amendment Request in 2023 to fulfill this request. This request was approved by the NRC in 2024 and allows for irradiation of TPBARs at Sequoyah in the future; however, TVA does not have plans to employ Sequoyah units for tritium production in the near term.

Natural Gas and Fuel Oil

During 2025, TVA purchased a significant amount of its natural gas requirements from a variety of suppliers under contracts with terms of up to 10 years and purchased substantially all of its fuel oil requirements on the spot market. The net book value of TVA's natural gas inventory was $33 million and $23 million at September 30, 2025 and 2024, respectively. The net book value of TVA's fuel oil inventory was $74 million and $72 million at September 30, 2025 and 2024, respectively. At September 30, 2025, 56 of the combustion turbine assets were dual-fuel capable, and TVA has fuel oil stored on each of these sites as a backup to natural gas.

TVA purchases natural gas from multiple suppliers on a daily, monthly, seasonal, and term basis. TVA uses contracts of various lengths and terms to meet the projected natural gas needs of its natural gas fleet. During 2025, TVA arranged for the transportation of natural gas on eight separate pipelines, with approximately 65 percent being transported on two pipelines. During 2025, TVA maintained a total of approximately 1,941,833 million British thermal unit(s) ("mmBtu") per day of firm transportation capacity on eight major pipelines, with approximately 63 percent of total firm transportation capacity being maintained on two pipelines.

TVA utilizes natural gas storage services at eight facilities with a total capacity of 8.3 billion cubic feet ("Bcf") of firm service and 6.5 Bcf of interruptible service to manage the daily balancing requirements of the eight pipelines used by TVA, with approximately 56 percent of the total storage capacity being maintained at two facilities. During 2025, storage levels were generally maintained between 40 and 80 percent of the maximum contracted capacity at each facility. As TVA's natural gas requirements grow, it is anticipated that additional storage capacity may need to be acquired to meet the needs of the generating assets.

Coal

Coal consumption at TVA's coal-fired generating facilities during 2025 and 2024 was approximately 14 million tons and 12 million tons, respectively. At September 30, 2025 and 2024, TVA had 33 days and 28 days of system-wide coal supply at full burn rate, respectively, with net book values of $171 million and $191 million, respectively.

TVA utilizes both short-term and long-term coal contracts. During 2025, long-term contracts made up 100 percent of coal purchases. TVA plans to continue using contracts of various lengths, terms, and coal quality to meet its expected consumption and inventory requirements. During 2025 and 2024, TVA purchased coal by basin as follows:

The following charts present the proportion of each delivery method TVA utilizes for its coal supply for the periods indicated:

Coal inventory levels at September 30, 2025 remained consistent with those at September 30, 2024. In 2025, coal supply availability and transportation logistics stabilized, enabling TVA to reliably meet generation needs during a period of increased domestic coal consumption. Despite these improvements, the evolving regulatory environment and corresponding market dynamics continue to challenge the balance between coal demand and available supply. In response, TVA has secured additional multi-year coal supply agreements to enhance supply stability. These strategic investments are expected to strengthen TVA's overall fuel resilience and help ensure continued reliability of coal-fired generation.