Item 4. Controls and Procedures

(a)Evaluation of disclosure controls and procedures.

The Company's principal executive officer and principal financial officer have evaluated the Company's disclosure controls and procedures as of February 29, 2024 and have concluded that as of the evaluation date, the disclosure controls and procedures were effective to ensure that information required to be disclosed in the reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the Commission’s rules and forms and that information required to be disclosed in the reports we file or submit under the Exchange Act is accumulated and communicated to our management, including our chief executive officer and chief financial officer to allow timely decisions regarding required disclosure.

(b)Changes in internal control over financial reporting.

There have been no changes in the Company's internal controls over financial reporting that occurred during the fiscal quarter ended February 29, 2024 that have materially affected, or are reasonably likely to materially affect, the Company's control over financial reporting.

Part II - Other Information

ITEM 1Legal Proceedings Taylor Devices Inc. (the “Company”) has been named as a Third-Party Defendant in an action captioned Board of Managers of the 432 Park Condominium, et al. v. 56th and Park (NY) Owner LLC, et al. Index No. 655617/2021 (S.Ct. N.Y. Co.) (the “Action”). The Action was filed on or about September 23, 2021. In an amended Complaint dated April 29, 2022, the Board of Managers of 432 Park Condominium (the “Owner”), a condominium association for a high-rise condominium building (the “Building”) located at 432 Park Avenue in New York, N.Y., has asserted a claim against the condominium sponsor, 56th and Park (NY) Owner LLC (the “Sponsor”). The Owner alleges “over 1500 identified construction and design defects to the common elements of” residential and commercial units at the Building, based upon a report generated by a consultant (SBI Consultants Inc.) retained by the Owner. The alleged defects include, but are not limited to, allegedly-excessive noise and vibration, water leaks and elevator failures. The SBI report allegedly identified defects in the Building’s: (a) structural/envelope system; (b) mechanical/electrical & plumbing systems; (c) architectural/interiors; and (d) elevators/vertical systems. On March 14, 2022, the Sponsor filed a Third-Party Complaint against LendLease Construction (US) LMB (“LendLease”), as well as the architects of record on the project (SLCE Architects), the lead structural engineer (Cantor ESA) and the head mechanical engineer (Flack + Kurtz) involved in the Building’s design. As to LendLease, the Third-Party Complaint alleges breach of a Construction Management Contract between LendLease and Sponsor and negligence arising from purported failure to perform under the contract. On March 22, 2023, LendLease initiated a Third-Party action against various entities with whom LendLease had contracted for the supply of materials and services in connection with construction of the Building. The Third-Party defendants include the suppliers of products and services relating to the automatic sprinkler system, structural steel, mechanical systems, electrical systems, sheet metal, component assembly, roofing, the building exterior, plumbing, concrete, curtain walls, custom machine work and elevators. The Third-Party Complaint also names the Company as a Third-Party Defendant, based upon a contract between the Company and LendLease to supply 16 Viscous Damping Devices (“VDDs”) that were incorporated into a Tuned Mass Damper (“TMD”) system designed by another company to limit accelerations of the Building during wind events. On July 5, 2023, the Company timely filed and served an Answer to LendLease’s Third-Party Complaint. Additional third-party actions have been filed by parties named as defendants in the Third-Party Complaint. Presently, seven third-party actions are pending. The Progress of the Matter to Date. The matter, and all of the related third-party actions, are pending in the Commercial Division of the Supreme Court, New York County before Justice Melissa A. Crane. Justice Crane has appointed Hon. Andrew J. Peck, a retired justice of the Supreme Court, as Special Master to hear and determine disputes regarding all or any part of any discovery issue. On August 8, 2023, the Court entered into a Second Amended Scheduling Order. Among the directives in the Second Amended Scheduling Order is a requirement that: (a) all parties complete fact depositions and fact discovery by June 17, 2024; and (b) all parties complete expert discovery by November 28, 2024.