Skip to main content

Bitfarms Ltd

For the period ended Dec 31, 2025. Filed Mar 31, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Mar 31, 2026

KEEL$1.87+13.3%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

Cover page

Show cover page

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-K

(Mark One)

☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31,2025

Or

☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from to

Commission File No.001-40370

Bitfarms Ltd.

(Exact name of registrant as specified in its charter)

OntarioN/A
(State or other jurisdiction of incorporation or organization)(I.R.S. Employer Identification No.)
110 Yonge Street, Suite 1601 Toronto, Ontario, Canada M5C 1T4120 Broadway, Suite 1075 New York, New York, 10004

(Address of Principal Executive Offices)

(929) 264-5151

(Registrant’s telephone number, including area code)

Securities registered pursuant to Section 12(b) of the Act:

Title of each classTrading Symbol(s)Name of each exchange on which registered
Common SharesBITFNasdaq Stock Market LLC

Securities registered pursuant to Section 12(g) of the Act:

None

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☒ No ☐

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes ☐No ☒

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer☐Accelerated filer☒
Non-accelerated filer☐Smaller reporting company☐
Emerging growth company☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report.☒

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements.☐

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to § 240.10D-1(b). ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act): Yes ☐ No☒

The aggregate market value of the registrant’s Common Shares held by non-affiliates, based on the closing price of the Common Shares as reported by the Nasdaq Stock Market LLC (“Nasdaq”) on June 30, 2025, the end of the registrant’s most recently completed second fiscal quarter, was $406,181,039.

The registrant had 602,851,137 Common Shares issued and outstanding as of March 27, 2026.

DOCUMENTS INCORPORATED BY REFERENCE

Not Applicable.

INTRODUCTORY NOTE

Bitfarms Ltd., a corporation incorporated pursuant to the laws of Canada and continued under theBusiness Corporation Act (Ontario)(“Bitfarms”), currently qualifies as a foreign private issuer in the United States for purposes of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). Although, as a foreign private issuer, Bitfarms is not required to do so, Bitfarms has chosen to file annual reports on Form 10**-K, quarterly reports on Form 10-Q and current reports on Form 8-**K with the U.S. Securities and Exchange Commission (“SEC”) instead of filing the reporting forms available to foreign private issuers.

On February 6, 2026, Bitfarms announced that its board of directors (the “Board”) approved a plan of arrangement (the “Arrangement”) under which Bitfarms will redomicile from Canada to the United States (the “U.S. Redomiciliation”), subject to receipt of shareholder, stock exchange and court approvals. Upon completion of the U.S. Redomiciliation, the ultimate parent company of Bitfarms will be a new corporation formed under the laws of the State of Delaware that will operate under the name Keel Infrastructure Corp. (“Keel Infrastructure”). To effect the U.S. Redomiciliation, each outstanding common share of Bitfarms (a “Common Share”) will be exchanged for one share of common stock of Keel Infrastructure (“Keel Common Stock”), pursuant to the Arrangement. Following completion of the U.S. Redomiciliation, Bitfarms will become an indirect wholly owned subsidiary of Keel Infrastructure, which together with Bitfarms and its other subsidiaries will carry on the business currently conducted by Bitfarms and its subsidiaries.

The Arrangement was approved by Bitfarms’ shareholders at a special meeting held on March 20, 2026. The Ontario Superior Court of Justice (Commercial List) issued its final order approving the Arrangement on March 24, 2026.

Upon completion of the U.S. Redomiciliation, Keel Common Stock is expected to trade on the Nasdaq Stock Market (the “Nasdaq”) and the Toronto Stock Exchange (the “TSX”) under the ticker symbol “KEEL”, subject to receipt of all necessary approvals of the Nasdaq and the TSX.

All approvals having been obtained, the U.S. Redomiciliation is expected to be completed on or about April 1, 2026.

BITFARMS LTD.

FORM 10-K FOR THE YEAR ENDED DECEMBER 31, 2025

TABLE OF CONTENTS

Page
PART I.1
Item 1.Business.1
Item 1A.Risk Factors.9
Item 1B.Unresolved Staff Comments.43
Item 1C.Cybersecurity.43
Item 2.Properties.45
Item 3.Legal Proceedings.45
Item 4.Mine Safety Disclosures.45
PART II.46
Item 5.Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities.46
Item 6.[Reserved]48
Item 7.Management’s Discussion and Analysis of Financial Condition and Results of Operations49
Item 7A.Quantitative and Qualitative Disclosures About Market Risk81
Item 8. · Financial Statements and Supplementary Data · F-1
Item 9.Changes in and Disagreements With Accountants on Accounting and Financial Disclosure.82
Item 9A.Controls and Procedures82
Item 9B.Other Information.83
Item 9C.Disclosure Regarding Foreign Jurisdictions that Prevent Inspections.83
PART III.84
Item 10.Directors, Executive Officers and Corporate Governance.84
Item 11.Executive Compensation.89
Item 12.Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters.111
Item 13.Certain Relationships and Related Transactions, and Director Independence.113
Item 14.Principal Accountant Fees and Services.113
Item 15.Exhibits, Financial Statement Schedules.114

i

GLOSSARY OF COMMONLY USED TERMS

The following are abbreviations and definitions of certain terms used in this Annual Report on Form 10-K, some of which are commonly used in the data center, digital infrastructure, and Bitcoin Mining industries:

AECAlternative energy credit. A tradable certificate representing one megawatt-hour of electricity generated from a qualifying alternative energy source under the AEPS Act.
AEPS ActThe Pennsylvania Alternative Energy Portfolio Standards Act, which establishes requirements for the generation of electricity from alternative energy sources in Pennsylvania.
AIArtificial intelligence. Computational methods, including machine learning and deep learning, that require large-scale data processing and high-performance computing infrastructure to train and deploy models capable of performing tasks that typically require human intelligence.
ASCAccounting Standards Codification.
ASICApplication-specific integrated circuit. A specialized microchip designed to perform a specific function, such as Bitcoin Mining.
ASUAccounting Standards Update.
Behind-the-meterPower generation that is located at or near the point of consumption, on the customer’s side of the electric meter, and that can supply electricity directly to collocated load without transmission through the broader electric grid.
BTC or BitcoinA decentralized digital currency that operates on a peer-to-peer network using blockchain technology, without the need for a central authority or intermediary.
Bitcoin Block RewardsSubsidies paid in Bitcoin that are programmed into the Bitcoin software and awarded to a miner, or a group of miners, for providing a valid solution to the cryptographic problem required to publish a new block of transactions on the Bitcoin blockchain.
Bitcoin HalvingHas the meaning given to it under “Risks Related to Bitcoin.”
CapexCapital expenditures. Funds used by the Company to acquire, upgrade, develop, or construct physical assets, including HPC data center infrastructure, power generation facilities, land, and Mining Equipment.
Colocation or coloA data center model in which an operator provides building infrastructure, power, cooling, and physical security, and tenants install, own, and operate their own computing equipment within the facility.
CompanyHas the meaning give to it under “General Matters.”
Convertible NotesThe Company’s 1.375% Convertible Senior Notes due January 15, 2031, issued in October 2025 in an aggregate principal amount of $588 million.
CPIConsumer Price Index.

ii

Critical IT load or IT loadThe electrical power consumed by computing, storage, and networking equipment within a HPC data center, excluding power consumed by cooling systems, lighting, and other facility infrastructure.
Current Energized CapacityGross power capacity provided by utilities and currently being used at our U.S. Sites and Quebec Sites.
EH/sExahashes per second. A unit of measurement equal to one quintillion (10¹⁸) hashes per second, used to measure the computational power (hashrate) applied to Bitcoin Mining.
Energized capacityThe amount of electrical capacity, measured in megawatts, that is currently connected to and capable of drawing power from a utility grid or on-site generation source.
ESAElectric service agreement. A contract between a utility and a customer that establishes the terms under which the utility will deliver electricity to the customer, including contracted capacity, delivery timeline, and pricing.
FASBFinancial Accounting Standards Board.
FERCFederal Energy Regulatory Commission.
FPPSFull pay per share. A Bitcoin Mining Pool payout method under which miners receive a fixed payment for each valid share of work submitted, regardless of whether the pool successfully mines a block.
Free coolingA cooling method for HPC data centers that uses ambient outside air or other natural environmental conditions to dissipate heat, reducing or eliminating the need for mechanical refrigeration.
Go to marketThe phase of the Company’s development process in which a project that has reached or is approaching construction readiness is marketed to prospective tenants for lease execution.
GPUGraphics processing unit. A specialized electronic processor originally designed for rendering graphics, now widely used to accelerate AI training, AI inference, and other HPC workloads due to its ability to perform parallel computations efficiently.
Gross capacity or gross power capacityThe total electrical power capacity provided to a site for all purposes, not limited to critical IT load.
GWGigawatt. One billion watts of electrical power.
HalvingThe process designed to control the overall supply and reduce the risk of inflation in Bitcoin’s proof-of-work consensus algorithm.
HashrateThe total computational power being used to mine and process transactions on a proof-of-work blockchain network, such as Bitcoin. Measured in hashes per second.
HPCHigh-performance computing. Computing workloads that require substantially greater processing power, power density, and cooling capacity than traditional enterprise or cloud computing workloads, including AI training and inference workloads.
HPC data centersData centers which host customer-provided compute equipment, including GPUs; distinct from HPC Infrastructure, which is used to describe the growth area covering development, ownership, and operations of such data centers.
HPC InfrastructureThe Company’s primary growth area, encompassing the development, ownership, and operation of data centers designed to support HPC environments. This term is used solely to refer to the Company’s growth area.

iii

HPC workloadsCompute-intensive applications and processes that require high levels of processing performance, power density, and advanced cooling capabilities, including AI training and inference workloads.
Hydro-QuébecThe public utility responsible for the generation, transmission, and distribution of electricity in the Province of Québec, Canada.
HyperscalerA large-scale cloud computing and HPC data center operator that deploys and operates computing infrastructure at significant scale to serve global demand for cloud, AI, and enterprise services.
Identified Additional Gross Data Center CapacityGross power capacity that has not been contracted under an electric supply agreement but is currently being evaluated at the U.S. Sites and Quebec Sites. This includes capacity that is currently under utility load studies as well as potential on-site, behind-the-meter natural gas power generation at Scrubgrass.
Infrastructure AssetsThe Company’s sites and related assets, including land, power capacity, power purchase or supply arrangements, grid interconnections, and associated infrastructure, excluding Bitcoin Mining Equipment.
IFRS Accounting StandardsInternational Financial Reporting Standards as issued by the International Accounting Standards Board.
InterconnectionThe physical and contractual arrangement by which a facility is connected to the electric grid, enabling the import and/or export of electricity. Obtaining grid interconnection typically requires utility approval, engineering studies, and infrastructure upgrades, and can involve multi-year lead times in supply-constrained markets.
IRSThe Internal Revenue Service of the United States of America.
ITInformation technology. The use of computers, software, networks, and related systems to store, process, transmit, and manage data.
Keel or Keel Infrastructure or Keel Infrastructure Corp.Keel Infrastructure Corp., the newly formed public company incorporated in the State of Delaware which will be the parent company of Bitfarms Ltd. following completion of the U.S. Redomiciliation, expected on or about April 1, 2026.
kWKilowatt. One thousand watts of electrical power.
kWhKilowatt-hour. A unit of energy equal to one kW of power sustained for one hour.
Load studyA utility-conducted engineering assessment to evaluate the feasibility and cost of delivering a specified amount of electrical power to a site, including any required grid upgrades or infrastructure improvements.
Miners or Mining EquipmentASIC-based computing devices purpose-built to perform the cryptographic calculations required to validate transactions and add new blocks on a proof-of-work blockchain network, such as Bitcoin.
Macquarie Credit Facility or Credit FacilityThe $300.0 million credit facility that the Company entered into with Macquarie Equipment Capital, Inc. in April 2025.
MiningThe process of using specialized computing equipment to validate transactions and add new blocks to a proof-of-work blockchain, such as the Bitcoin network. Participants that successfully add a block are rewarded with newly issued cryptocurrency and transaction fees.
Mining PoolA group of miners that combine their computational resources over a network to increase the probability of successfully validating transactions and adding new blocks to a proof-of-work blockchain. Rewards earned are distributed among participants based on their contributed computational power.

iv

Moses LakeThe Company’s HPC data center development site located in Moses Lake, Washington, U.S. Moses Lake is currently being used for Bitcoin Mining operations.
MWMegawatt. One million watts of electrical power.
MWhMegawatt-hour. A unit of energy equal to one MW of power sustained for one hour.
N, N+1 and N+2Redundancy configurations used in data center design. “N” refers to the minimum infrastructure capacity (including power, cooling, or network capacity) required to support the facility’s full IT load. “N+1” indicates one additional redundant unit beyond the minimum, and “N+2” indicates two additional redundant units, providing progressively higher levels of fault tolerance.
NeocloudAn emerging category of cloud and compute service providers that focus on delivering GPU-based infrastructure for AI training and inference workloads, as distinguished from traditional hyperscale cloud service providers.
Network DifficultyNetwork difficulty is a measure of how difficult it is to solve a block on the Bitcoin blockchain. Network difficulty is adjusted every 2,016 blocks, or approximately every two weeks, so that the average time between each block is approximately ten minutes. A high difficulty means that it will take more computing power to solve a block and earn a new bitcoin reward, which, in turn, makes the Bitcoin network more secure.
NVIDIA GB300A GPU developed by NVIDIA Corporation for AI and HPC workloads, part of the Blackwell architecture product family. Moses Lake is designed to support configurations aligned with the NVIDIA GB300 NVL72 reference architecture.
NVIDIA Vera RubinA next-generation GPU platform developed by NVIDIA Corporation, anticipated to succeed the Blackwell architecture. The Company is designing a significant portion of its development portfolio to support GPU platforms of this class.
NVL72A reference architecture developed by NVIDIA Corporation that specifies the configuration of 72 GPUs and associated networking and cooling infrastructure within a single rack-scale system.
Panther CreekThe Company’s HPC data center development site located in Nesquehoning, Pennsylvania, U.S. Panther Creek also contains a waste-to-energy facility and is currently being used for Bitcoin Mining operations.
PJM or PJM InterconnectionPJM Interconnection, L.L.C., a regional transmission organization that coordinates the movement of wholesale electricity across all or parts of 13 states and the District of Columbia. PJM operates the largest wholesale electricity market in the world.
PPLPPL Electric Utilities Corporation, a regulated electric utility operating in eastern Pennsylvania that provides electric service to the Company’s Panther Creek site.
PUEPower usage effectiveness. A metric used to measure the energy efficiency of a data center, calculated as total facility energy consumption divided by IT equipment energy consumption. A PUE of 1.0 indicates that all energy consumed by the facility is used by IT equipment.
PURPAPublic Utilities Regulatory Policies Act of 1978. A U.S. federal law that, among other things, established a regulatory framework for qualifying facilities that generate electric energy using renewable resources or cogeneration.
QF or qualifying facilityA power generation facility that meets certain ownership, operating, and efficiency criteria established by FERC under PURPA, and that is entitled to certain regulatory benefits, including the right to sell electricity at avoided-cost rates.
Québec SitesThe Company’s facilities located in the following cities: Farnham, Saint-Hyacinthe, Cowansville, Baie-Comeau, Magog, Bunker, Sherbrooke Leger, Sherbrooke, and Garlock in the province of Québec, Canada. All of the Québec Sites are currently being used for Bitcoin Mining operations.
ScrubgrassThe Company’s HPC data center development site located in Kennerdell, Pennsylvania, U.S. Scrubgrass also contains a waste-to-energy facility and is currently being used for Bitcoin Mining operations.
SECThe U.S. Securities and Exchange Commission.
Secured contracted capacityElectrical capacity for which the Company has executed a binding agreement, such as an ESA, with a utility or power provider, but which has not yet been energized or delivered.
Secured Gross Data Center CapacityThe total amount of gross power capacity that is subject to electric supply agreements with utilities, including both power capacity currently available on site and power capacity that utilities have agreed to deliver at a future date.
Secured Growth CapacityGross power capacity that is not currently available on site but for which the Company has executed an electric supply agreement with a utility, whereby the utility agrees to provide that power capacity at a specified future date.
SharonThe Company’s HPC data center development site located in Sharon, Pennsylvania, U.S. Sharon is currently being used for Bitcoin Mining operations.
StrongholdStronghold Digital Mining, Inc.
Stronghold AcquisitionThe Company’s acquisition of Stronghold on March 14, 2025.
SubstationAn electrical facility that transforms voltage from high to low, or the reverse, to facilitate the transmission and distribution of electricity between the grid and end users.
TurnkeyA contractual arrangement under which a third-party contractor is responsible for the complete design, procurement, and construction of a facility, delivering it to the owner in a condition ready for operation.
U.S. GAAPAccounting principles generally accepted in the United States of America.
U.S. SitesCollectively, Panther Creek, Scrubgrass, Sharon, and Moses Lake.
Waste-to-energyA method of power generation that uses waste materials, such as coal refuse, as fuel to generate electricity, thus simultaneously remediating environmental damage associated with the waste material.

v

GENERAL MATTERS

In this Annual Report on Form 10-K for the year ended December 31, 2025 (referred to herein as this “Annual Report”) “we”, “us”, “our”, “Bitfarms” and the “Company” refer to Bitfarms Ltd. and its consolidated subsidiaries, unless the context requires otherwise. Following the completion of the U.S. Redomiciliation such references shall be to Keel Infrastructure Corp. and its consolidated subsidiaries (including Bitfarms Ltd.), unless the context requires otherwise.

Words importing the singular, where the context requires, include the plural and vice versa and words importing any gender include all genders.

Bitfarms and the associated Bitfarms logo are registered trademarks of Bitfarms Ltd. or its subsidiaries. All other trademarks and brand names used herein are the property of their respective owners.

Unless we indicate otherwise: (i) all dollar amounts are expressed in U.S. dollars; and (ii) all references to “US$” or “$” are to U.S. dollars and all references to “C$” are to Canadian dollars.

Note that use of the word “including” in this Annual Report means “including, without limitation.”

Unless we indicate otherwise, all information in this Annual Report is stated as of March 27, 2026.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This Annual Report on Form 10-K contains statements that are forward-looking and as such are not historical facts. These statements constitute projections, forecasts and forward-looking statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995, Section 27A of the U.S. Securities Act of 1933 (as amended, the “Securities Act”), Section 21E of the U.S. Securities Exchange Act of 1934 (as amended, the “Exchange Act”) and forward-looking information within the meaning of applicable Canadian securities legislation (collectively, “forward-looking statements”). Such forward-looking statements include, but are not limited to, statements under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” regarding our financial position, business strategy and the plans and objectives of management for future operations, statements about our objectives, plans, goals, aspirations, strategies, financial condition, results of operations, cash flows, performance, prospects, opportunities, statements about the U.S. Redomiciliation and legal and regulatory matters.

These forward-looking statements relate to future events or future performance. All statements other than statements of historical fact may be forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as “seek”, “anticipate”, “plan”, “continue”, “estimate”, “expect”, “may”, “will”, “project”, “predict”, “potential”, “targeting”, “intend”, “could”, “might”, “should”, “believe”, “future”, “continue” or similar expressions or the negatives thereof.

By their very nature, forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements and such forward-looking statements included in this Annual Report should not be unduly relied upon. These statements speak only as of the date of this Annual Report.

The forward-looking statements in this document are based on what we currently believe are reasonable assumptions, including the material assumptions set out under “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations”, such documents are available under our SEDAR+ profile at www.sedarplus.ca or in the United States through EDGAR at the website of the SEC at www.sec.gov.

Inherent in forward-looking statements are risks, uncertainties and other factors beyond our ability to predict or control.

Factors that may cause actual results to differ materially from current expectations may include, but are not limited to, risks and uncertainties that are discussed in greater detail in Part I, Item 1A “Risk Factors” and Part II, Item 7A “Quantitative and Qualitative Disclosures About Market Risk” of this Annual Report on Form 10-K.

vi

Although we believe that the plans, intentions, expectations, assumptions and strategies reflected in our forward-looking statements are reasonable, these statements relate to future events or our future financial performance, and involve known and unknown risks, uncertainties and other factors which are, in some cases, beyond our control. If one or more of these risks or uncertainties occur, or if our underlying assumptions prove to be incorrect, actual results may vary significantly from those implied or projected by the forward-looking statements. In addition, we operate in a highly competitive and rapidly changing environment. New risks and uncertainties emerge from time to time, and it is not possible for us to predict all risks and uncertainties that could have an impact on the forward-looking statements contained in this Annual Report on Form 10-K. No forward-looking statement is a guarantee of future results. These statements are inherently uncertain and investors are cautioned not to unduly rely upon these statements. You should read this Annual Report on Form 10-K and the documents that we reference in this Form 10-K completely and with the understanding that our actual future results may be materially different from any future results expressed or implied by these forward-looking statements.

The forward-looking statements in this Annual Report on Form 10-K represent our views as of the date of this Form 10-K. We anticipate that subsequent events and developments may cause our views to change. However, while we may elect to update these forward-looking statements at some point in the future, we have no current intention of doing so except to the extent required by applicable law. Therefore, these forward-looking statements do not represent our views as of any date other than the date of this Annual Report on Form 10-K.

SUMMARY OF RISK FACTORS

Below is a summary of the principal factors that make an investment in our securities speculative or risky. This summary does not address all of the risks we face. Additional discussion of the risks summarized in this risk factor summary, and other risks that we face, can be found below and should be carefully considered, together with other information included in this Annual Report on Form 10-K.

Risks Related to Our Business and Operations

●our limited operating history and history of operating losses, which make it difficult to evaluate our business and prospects;
●our evolving business model and strategy, including our strategic transformation from Bitcoin Mining to HPC Infrastructure, which may not be successful;
●our dependence on reliable and economical sources of power, including regulated electricity rates in Québec, Pennsylvania, and Washington;
●our reliance on a limited number of third-party suppliers and manufacturers, including those in foreign jurisdictions, exposing us to supply chain disruptions, trade restrictions, and tariff risks;
●delays, cost overruns, and other risks associated with the continued development of our existing and planned facilities;
●intense competition from other Bitcoin Mining companies and established HPC data center operators, some of which may have greater resources and experience;
●the potential inadequacy of our insurance coverage to protect against all losses;

Risks Related to HPC Infrastructure

●our increased focus on developing HPC and AI data centers may not become profitable and may divert resources from our Bitcoin Mining operations;
●the capital-intensive nature of constructing HPC data centers and our potential inability to secure financing for such efforts;

vii

●significant competition for suitable data center sites and regulatory constraints that could adversely impact our development pipeline;
●our dependence on significant customers for our HPC data centers, and the risk of customer default or failure to make timely payments;
●the rapidly evolving regulatory landscape surrounding HPC, AI, and Bitcoin Mining, which may negatively impact our expansion efforts;

Risks Related to Bitcoin and Digital Assets

●the high volatility of Bitcoin prices, which has significantly affected and will continue to affect the profitability of our operations;
●periodic Bitcoin halving events that reduce Mining rewards and could render our Mining operations unprofitable;
●increases in cryptocurrency Network Difficulty and global computing power that could reduce our Mining revenues;
●our reliance on a single third-party Mining Pool operator, subjecting us to concentration risk;
●fraud or failure of Bitcoin exchanges, custodians, and other trading venues that could adversely impact Bitcoin prices and our business;

Risks Related to Regulation, Tax, and Compliance

●our requirement to obtain and comply with numerous government permits and approvals across multiple jurisdictions;
●extensive environmental, energy, and climate-related regulation that could result in significant additional costs or liabilities;
●political uncertainty in the U.S. and internationally, including potential regulatory and policy changes affecting the cryptocurrency and data center industries;
●cybersecurity threats and hacking attacks that could compromise our systems and data;
●the potential classification of Bitfarms as a passive foreign investment company, which could result in adverse tax consequences for U.S. holders;

Risks Related to Our Capital Needs, Corporate Structure, and Securities

●the need for additional capital in the future, with no assurance that financing will be available on acceptable terms;
●risks that our hedging activities may not be effective and could result in significant losses;
●counterparty risk with respect to the capped call transactions entered into in connection with the Convertible Notes;
●potential dilution to shareholders from future issuances of capital stock, conversion of Convertible Notes, or exercise of options and warrants;
●risks related to the U.S. Redomiciliation, including the possibility that anticipated benefits may not be realized;
●the market price of our common shares has fluctuated significantly and may continue to do so; and
●our current intention not to pay cash dividends on our common shares.

viii

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.