CAPITAL EXPENDITURE AND 2026 CAPEX GUIDANCE

As of March 31, 2026, a total of $1.3 billion of construction capital costs and other project-related costs have been capitalized, of which $1.1 billion is part of the total Capex estimate of $2.93 billion per the Company’s Technical Report. The Company continues to target a total Capex range of $1.3 billion to $1.6 billion for Thacker Pass Phase 1 for fiscal year 2026.

The table below summarizes Capex during the quarter ended March 31, 2026, cumulative Capex to March 31, 2026, as well as the Company’s 2026 Capex guidance.

(US$)For the quarter ended March 31, 2026Cumulative to March 31, 2026Fiscal Year 2026 Capex Guidance
Thacker Pass Phase 1 construction costs included in the total $2.93 billion Capex estimate(1)(2)$275.5 million$1,138.1 million$1.2 - $1.5 billion
Other capitalized development costs for Thacker Pass(3)$8.3 million$101.4 million$30 - $40 million
Capitalized interest, including the Orion Note and DOE Loan$10.7 million$37.7 million$45 - $55 million
Total$294.5 million$1,277.2 million$1.3 - $1.6 billion

Capex Notes:

(1)

Thacker Pass Phase 1 construction costs cumulative to March 31, 2026 and those estimated for fiscal year 2026 do not include $14.1 million and $8.0 million, respectively, of community contributions that are required to be expensed under U.S. GAAP, though these were included in the $2.93 billion Capex estimate per the Company’s Technical Report.

(2)

Thacker Pass Phase 1 construction costs as of March 31, 2026, and those estimated for 2026, include actual tariffs incurred (through March 31, 2026) and estimated tariff exposure, primarily for equipment and construction materials sourced from Canada, China, India, UAE, Turkey and the European Union. The Company has been working toward limiting the effect of any potential tariffs on its construction supply chain, with approximately 75% of the total capital project cost structure related to labor, contractors and other services not expected to be directly affected by any potential tariffs. The Company continues to closely monitor potential tariff exposure; however, changes in tariffs and trade restrictions can be announced with little or no advance notice.

(3)

Other capitalized development costs are required to be capitalized under U.S. GAAP, though these were not included in $2.93 billion Capex estimate per the Company’s Technical Report.

MATERIAL RELATIONSHIPS AND RELATED AGREEMENTS

DOE ATVM Loan Program

The DOE and the Company’s subsidiary, LN, executed the DOE Loan on October 28, 2024 for a construction facility with a maximum borrowing of $1.97 billion plus up to $289.6 million of capitalized interest for a total of $2.26 billion, provided under the Advanced Technology Vehicles Manufacturing (“ATVM”) Loan Program, to fund eligible construction costs of Thacker Pass, over the period from the first advance through no later than November 30, 2028. The DOE Loan agreement was amended on December 20, 2024 to accommodate the formation of Lithium Nevada Ventures, a JV with GM to own a 100% interest in LN, which owns Thacker Pass.

On October 7, 2025, the Company and the DOE entered into an omnibus waiver, consent and amendment (as amended the “OWCA”) for certain amendments to the Company’s DOE Loan. As part of the OWCA, the DOE Loan’s expected total loan amount decreased to $2.23 billion due to estimated capitalized interest during construction decreasing to $256 million, while the DOE Loan’s principal remained the same at $1.97 billion.

On January 30, 2026, as required under the OWCA:

The Company issued to the DOE the LAC Warrant to purchase up to 18,268,687 common shares, which was equal to 5% of the Company’s outstanding total shares as of the Issuance Date, at an exercise price of $0.01 per share, exercisable for ten years from the Issuance Date, subject to customary anti-dilution adjustments and other terms set forth in the LAC Warrant.

The JV issued to the DOE the JV Warrant to purchase 8,656,509,695 non-voting units of the JV, which was equal to a 5% economic interest in the JV as of the Issuance Date, at an exercise price of $0.0001 per unit, exercisable for ten years from the Issuance Date, subject to customary anti-dilution adjustments and other terms set forth in the JV Warrant.

The JV, the Company, 1339480 B.C. Ltd., LAC US Corp. (the “LAC JV Member”), GM and the DOE, entered into a Put, Call and Exchange Agreement (the “Put, Call and Exchange Agreement”), under which the DOE has the right to require GM to either purchase the JV Warrant (or cause the JV to do so) at a mutually agreed price or, failing agreement, exchange the JV Warrant for the Company’s common shares based on a defined warrant conversion rate. In addition, following substantial completion of Thacker Pass, GM has a call right to trigger the same sale or exchange mechanics if pricing cannot be agreed within specified timeframes.

As of May 13, 2026, the LAC Warrant and the JV Warrant have not been exercised.

Periodic repayments of principal and interest commence January 20, 2029. The DOE Loan has a maturity date of July 20, 2048. The Company may prepay the loan at any time, subject to certain conditions, by paying principal plus accrued interest on outstanding advances.

The Company received its first advance on the DOE Loan of $435.0 million on October 20, 2025 and its second advance on the DOE Loan of $432.0 million on February 24, 2026.

General Motors Equity Investment, Joint Venture and Offtake

On October 15, 2024, the Company entered into an investment agreement (the “Investment Agreement”) with GM to establish a JV for the purpose of funding, developing, constructing and operating Thacker Pass (“JV Transaction”). Prior to closing the JV Transaction on December 23, 2024, the Company transferred its interest and certain other assets into Lithium Nevada Ventures. In connection with the JV Transaction, the Company also closed an amendment to the DOE Loan on December 20, 2024 to accommodate changes relating to the JV Transaction.

Under the terms of the Investment Agreement, GM acquired a 38% asset-level ownership stake in Thacker Pass for $625.0 million in total cash and letters of credit, including $430.0 million of direct cash funding to the JV to support the construction of Phase 1 and a $195.0 million letter of credit facility (“LC Facility”) that can be used as collateral to support reserve account requirements under the DOE Loan. On August 5, 2025, the $195.0 million LC Facility was released by GM to LN.

Pursuant to an offtake agreement, GM is required to purchase lithium production from Thacker Pass Phase 1, equal to 20% of GM’s specific lithium requirements, up to 100% of Phase 1 production volume (“Phase 1 Offtake Agreement”). Concurrently with closing of the DOE Loan, the Phase 1 Offtake Agreement was extended to 20 years. As part of the JV Transaction, GM also entered into an additional 20-year offtake agreement for up to 38% of production volumes from Phase 2 of Thacker Pass and retained its right of first offer on the remaining balance of Phase 2 volumes (“Phase 2 Offtake Agreement” and, together with the Phase 1 Offtake Agreement, the “Offtake Agreements”).

On October 7, 2025, in connection with the entry into the OWCA, the Company and GM agreed to amend the Offtake Agreement as follows: (i) the delivery dates for the “Annual Purchase Forecast” and “Annual Production Forecast” were accelerated by two months; (ii) the forecast period for the first five years of Phase 1 was extended from two years to three years, with the second and third years remaining non-binding; (iii) the JV is required to prioritize GM’s volume requirements; (iv) for the first five years of Phase 1, the JV may enter into firm volume commitments with third parties, subject to a cap based on the difference between the Annual Production Forecast and GM’s Annual Purchase Forecast, and the cap will be 100% of the difference in the first year, 80% in the second year, and 60% in the third year, (v) GM’s Annual Purchase Forecast was capped at 20% year-over-year growth during the aforementioned period; (vi) after the first five years, (a) the forecast period reverts to two years, with the second year being non-binding and including no cap on GM’s Annual Purchase Forecast, and (b) third-party commitments are capped at 100% of the difference between forecasts in the first year and 50% in the second year of such forecasts; and (vii) if GM relinquishes volumes in non-binding forecast periods but later demonstrates a need for those volumes and incurs higher costs as a result of third-party purchases, GM would be entitled to a “profit true-up” equal to the volume procured multiplied by the difference between the third-party pricing and the implied JV pricing.

In the event that the DOE exercises the JV Warrant in full, the JV economic interests will be (prior to funding of the additional $120 million DOE Loan reserve accounts as required within 12 months of the OWCA) 59% held by Lithium Americas, which will continue to be the manager of the Project, 36% held by GM and 5% held by the DOE, with voting interest in the JV remaining 62% for Lithium Americas and 38% for GM. The DOE has been granted the right to have an appointed representative as an observer at the JV Board meetings for so long as the DOE holds the JV Warrant or non-voting units in the JV. The DOE and GM have certain rights under the Put, Call and Exchange Agreement, which may result in an adjustment to the ownership of the JV.

Orion Resource Partners

On April 1, 2025 (the “Orion Closing Date”), the Company closed the strategic investment of $250.0 million from fund entities managed by Orion Resource Partners LP (collectively, “Orion”), for the development and construction of Thacker Pass.

Orion purchased senior unsecured convertible notes with an aggregate principal amount of $195.0 million (the “Notes”) and entered into a production payment agreement (“PPA”) whereby Orion paid the Company $25.0 million in exchange for payments corresponding to the minerals processed and gross revenue generated by Thacker Pass (together, the Notes and PPA represent an aggregate initial investment of $220.0 million). Orion has committed to purchase an additional $30.0 million in aggregate principal amount of Notes within two years of the Orion Closing Date (the “Delayed Draw Notes”), subject to the satisfaction of certain conditions precedent, upon request by the Company.

The Notes will mature on April 1, 2030 and accrue interest payable quarterly in arrears at an annual rate of 9.875%. Interest is payable in cash or by inclusion of such interest in the principal amount at the option of the Company. The Notes are convertible at the option of the holder at any time into the Company’s common shares prior to the maturity at an initial conversion price of $3.78 per share, subject to certain adjustments. In October 2025, Orion elected to convert a total of $97.5 million in accordance with the terms of the Notes. As a result, the Company issued an aggregate total of 25.8 million common shares of the Company to Orion. Following the conversions, total future interest payable under the Notes has been reduced pro rata.

Under the PPA, Orion is entitled to fixed and variable production payments with respect to the first 41,500 tonnes of lithium processed at Thacker Pass each year, subject to certain adjustments.

Common Shares Offering

On January 26, 2026, the Company completed the November 2025 ATM Program. The Company issued and sold an aggregate total 43.3 million common shares at an average price of $5.78 per share pursuant to the November 2025 ATM Program, for aggregate net proceeds of $246.7 million after sales agent’s commission and other expenses.

On March 19, 2026, the Company entered into an ATM equity program, pursuant to which the Company may sell its common shares, no par value, up to a maximum aggregate offering price of $250 million (the “March 2026 ATM Program”). As of March 31, 2026, the Company did not issue or sell any common shares nor receive any net proceeds pursuant to the March 2026 ATM Program. Subsequent to March 31, 2026, the Company issued and sold an aggregate total of 2.3 million common shares at an average price of $5.20 per share pursuant to the March 2026 ATM Program, for aggregate net proceeds of $11.2 million after sales agent commission and other expenses.

Department of War Grant

In August 2024, the Company received approval for an $11.8 million grant from the U.S. Department of War (previously known as the Department of Defense) to support an upgrade of the local power infrastructure and to help build a transloading facility. At March 31, 2026, $6.2 million of the grant remained available and cumulative eligible costs of $5.6 million had been incurred.