Skip to main content

NOVAGOLD RESOURCES INC

For the period ended Nov 30, 2023. Filed Jan 24, 2024.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2023 · Filed Jan 24, 2024

NG$6.40+5.4%Stored close · as of Nov 6, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Item 2. Properties

Item 2.Properties

The Company has adopted the mining disclosure standards ofSubpart 229.1300 of Regulation S-K–* Disclosure by Registrants Engaged in Mining Operations* (“S-K 1300”). The Company is subject to and required to disclose mineral resources and mineral reserves in accordance with S-K 1300. While the S-K 1300 rules are similar to National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) rules in Canada, they are not identical and therefore two reports have been produced for the Donlin Gold project. The information inItem 2, Properties, below is common to both reports and contains pertinent information required under S-K 1300.

Donlin Gold Technical Report (NI 43-101)

The Company retained Wood Canada Limited (“Wood”), an unaffiliated third-party firm comprising mining experts, to update content in its previously filed “Donlin Creek Gold Project, Alaska, USA, NI 43-101 Technical Report on the Second Updated Feasibility Study,” effective November 18, 2011, and amended January 20, 2012 (“2011 Mining Study”). Wood’s Qualified Persons (“QPs”) completed an exercise to verify which content in the 2011 Mining Study remains current, and what was required to update the report content with the latest information. Updated content includes operating costs, capital costs, tax rates, long term gold price, and the economic analysis. Additionally, work done on the property since 2011 with respect to exploration, drilling, permitting, and minor mine design changes as a result of recent permitting activities are summarized in the updated content. A data verification exercise was completed by each Wood QP co-authoring the report. This included a September 2020 site visit by two of the report QPs; review of the geologic data, geologic model, and resource model; review of metallurgical test work; review of designs for mining, processing, and infrastructure, including minor design updates; update of capital and operating cost estimates utilizing a combination of cost indices and vendor quotations; and an updated economic analysis. Canadian NI 43-101 Definitions and CIM Definition Standards for Mineral Resources and Mineral Reserves (“CIM Definition Standards”), adopted by CIM Council on May 10, 2014 apply for this exercise.

The Wood review determined that the report updating exercise resulted in no material change to the Mineral Resources or Mineral Reserves. On August 31, 2021, the Company voluntarily filed an updated NI 43-101 technical report for the Donlin Gold project in Alaska, USA, and titled “NI 43-101 Technical Report on the Donlin Gold Project, Alaska, USA,” with an effective date of June 1, 2021 (“2021 Technical Report”) reflecting the results of the above exercise. The 2021 Technical Report was prepared by Wood. The 2021 Technical Report is available on the Company’s website, on EDGAR at www.sec.govand on SEDAR+ at www.sedarplus.ca.

Donlin Gold Technical Report Summary (S-K 1300)

The Company is a registrant with the SEC and is reporting its exploration results, Mineral Resources, and Mineral Reserves using the mining disclosure standards of S-K 1300. The Company requested that Wood prepare a Technical Report Summary of the Donlin Gold project, Alaska, USA using the standards of S-K 1300 and it is titled “S-K 1300 Technical Report Summary on the Donlin Gold Project, Alaska, USA” (“S-K 1300 Report”), current as of November 30, 2021, with a report date of November 30, 2021. Wood prepared the S-K 1300 Report from the 2011 Mining Study of the Donlin deposits that was completed to at least pre-feasibility level, as defined by S-K 1300, at the time of the study. Material aspects of the 2011 Mining Study were updated by Wood in 2020 and made current. As part of the update process, Wood’s subject matter experts completed an exercise to verify and update the content of the 2011 Mining Study with the latest information under the supervision of Wood’s independent QP co-authors of the S-K 1300 Report. Updated content includes operating costs, capital costs, taxes, forecast long term gold price and the economic analysis. Additionally, work done since 2011 on the property with respect to exploration, drilling, permitting and minor project design changes as a result of recent permitting activities are summarized in the S-K 1300 Report. A data verification exercise was completed by each Wood QP co-authoring the S-K 1300 Report. Wood QPs verified that the updated content of the 2011 Mining Study met at least pre-feasibility level of study as defined in S-K 1300, and it supports the disclosure of exploration results, Mineral Resources, and Mineral Reserves using S-K 1300 standards. The S-K 1300 Report is available on the Company’s website and on EDGAR atwww.sec.gov.

Results of the Donlin Gold Technical Report (NI 43-101) and Donlin Gold Technical Report Summary (S-K 1300)

Wood reviewed the geologic and resource models that supported the 2011 Mining Study, including comparing them to data from recent drilling programs, and determined that they continue to be adequate and suitable to be used for a Mineral Resource estimation. Using updated cost inputs from the first calendar quarter of 2020, a gold price of $1,500 per ounce, and the geologic and resource models utilized in support of the 2011 Mining Study, the contents within an updated optimized pit shell did not show a material change to the Mineral Resources stated in the 2011 Mining Study. Therefore, the Mineral Resources were considered current as of November 30, 2021 and are unchanged as of November 30, 2023. They continue to have an effective date of July 11, 2011.

Similarly, using updated cost inputs, a gold price of $1,200 per ounce, and the geologic and resource models utilized in support of the 2011 Mining Study with appropriate modifying factors applied for Mineral Reserve estimation, the previous Mineral Reserve ultimate pit was contained within an updated optimized pit shell. Therefore, the Mineral Reserves remained current as of November 30, 2021 and are unchanged. Because the Mineral Reserves are supported by an updated economic analysis they have an effective date of April 27, 2021.

Outside of verifying the Mineral Resource and Mineral Reserve estimates, the primary efforts in the 2021 Technical Report and the S-K 1300 Report were financial and permitting updates. This includes updates to estimated capital costs, operating costs, reclamation and closure costs, royalties, taxes, and economic analysis, as well as current status of the permits. Updated capital costs are based on first calendar quarter 2020 pricing (cost indices and current commodity pricing and equipment quotes) applied to the engineering designs and material take-offs from the 2011 Mining Study, except for minor changes made during permitting in the operations water treatment plant and the natural gas pipeline. As a result of the content updates, the total initial capital cost estimate is $7,402 million, which is an increase of 10.8% or $723 million compared to the 2011 Mining Study total initial capital cost estimate. Likewise, the total sustaining capital estimate is $1,723 million, which is an increase of 14.6% or $219 million compared to the 2011 Mining Study total sustaining capital estimate. The 2011 Mining Study operating costs were updated to first calendar quarter 2020 by updating key cost drivers like energy, labor, consumables, and freight. No material changes to project designs, schedules, or productivities were made; consequently, the manning schedules and consumables remain unchanged. The updated estimated Life of Mine (LOM) operating costs total $19,289 million, which is $5.90/t mined, $38.21/t processed, or $635/oz gold sold.

The economic evaluation of the Donlin Gold project in both the 2021 Technical Report and the S-K 1300 Report was updated using the following inputs:

●A production plan based on the 2011 Mining Study of 53,500 t/d open pit gold mine with ore processing by means of flotation, pressure oxidation, and cyanidation. The pit designs and Mineral Reserves were based on the Measured and Indicated Mineral Resource estimates that were verified as remaining current. Annual LOM gold production averages 1.13 million ounces per year over a production life of 27 years, including 1.46 million ounces per year for the first five full years of production.
●$1,500/oz gold price
●Current land and royalty agreements
●Initial and sustaining capital costs, and operating costs updated to first calendar quarter 2020
●Tax payments in accordance with the Tax Cuts and Jobs Act (“TCJA”) enacted in December 2017 and effective January 1, 2018
●$292 million LOM contributions for reclamation, closure, and financial assurance
●Financing has been assumed on a 100%, all equity, stand-alone basis
●Escalation/inflation has been excluded
●No salvage is assumed at the end of operations

Based on the economic evaluation, the Donlin Gold project generates positive before and after-tax economic results. Total after-tax cash flow is $13,145 million, after-tax NPV at a 5% discount rate is $3,040 million, and the after-tax internal rate of return is 9.2%. After-tax payback is achieved 7.3 years following the start of production.

The following descriptions summarize selected information about the Company’s 50% interest in the Donlin Gold project located in Alaska, USA. Except for subsequent events or as otherwise noted, the disclosure in this Annual Report on Form 10-K of a scientific or technical nature for the Donlin Gold project is based on both the 2021 Technical Report and S-K 1300 Report, as of November 30, 2021. The S-K 1300 Report meets at least a pre-feasibility level. The 2021 Technical Report and the S-K 1300 Report do not incorporate the latest Donlin Gold optimization work on the geologic modeling concepts or other optimization work since these assessments are still underway.

The 2021 Technical Report was filed on EDGAR and SEDAR+ on August 31, 2021. The S-K 1300 Report was filed on EDGAR on January 26, 2022. The 2021 Technical Report and S-K 1300 Report were prepared by Wood.

The 2021 Technical Report has been filed with securities regulatory authorities in each province of Canada and the S-K 1300 Report has been filed with the SEC. Portions of the following information are based on assumptions, qualifications and procedures that are not fully described herein. Reference should be made to the full text of the 2021 Technical Report which is available for review on SEDAR+ at www.sedarplus.ca and the S-K 1300 Report which is available for review on EDGAR atwww.sec.gov.

Paul Chilson, P.E., a Qualified Person and an employee of the Company, has approved the mineral reserves and mineral resources included in this Annual Report on Form 10-K as of November 30, 2023 and reviewed the reserves and resources in the S-K 1300 Report and confirmed that the reserves and resources remain current as of November 30, 2023.

Donlin Gold Project, Alaska, USA

The Donlin Gold project is a development-stage gold project held by Donlin Gold, a limited liability company that is owned 50% by the Company’s wholly-owned subsidiary, NOVAGOLD Resources Alaska Inc., and 50% by Barrick’s wholly-owned subsidiary, Barrick Gold U.S. Inc. The Company’s book value of its investment in the Donlin Gold project is $3.1 million as of November 30, 2023.

The Company entered into the limited liability company agreement with Barrick (“LLC Agreement”) dated December 1, 2007, which provided for the creation of Donlin Gold, that is jointly owned by the Company and Barrick on a 50/50 basis. Pursuant to the LLC Agreement, the Company agreed to reimburse Barrick out of future mine production cash flow for a portion of Barrick’s prior expenditures on the Donlin Gold project. As of November 30, 2023, the promissory note, including accrued interest, amounted to approximately $136.7 million. Funding for the project is currently shared by both parties on a 50/50 basis.

Except for events subsequent to the reports, or as otherwise stated or implied, the scientific and technical information regarding the Donlin Gold project in this Annual Report on Form 10-K is based on both the 2021 Technical Report and the S-K 1300 Report.

Property Description and Location

The Donlin Gold deposits are situated approximately 62°North latitude and 158°West longitude, which is 450 km west of Anchorage and 250 km northeast of Bethel up the Kuskokwim River. The closest village is the community of Crooked Creek, approximately 20 km to the south, on the Kuskokwim River.

The resource areas are within T. 23 N., R. 49. W., Seward Meridian, Kuskokwim and Mt. McKinley Recording Districts, Crooked Creek Mining District, Iditarod A-5 USGS 1:63,360 topography map. The mineralization is centered on approximately 540222.50 east and 6878534.36 north, using the NAD 83 datum.

The Donlin Gold property is located in the Kuskokwim region of southwestern Alaska on private, Alaska Native-owned mineral and surface land and Alaska state mining claims. The property is under lease (the Calista Lease) for subsurface rights and some surface rights from Calista and surface rights (the SUA) from TKC, two Alaska Native corporations. Calista is one of 13 regional Alaska Native corporations established as part of the Alaska Native Claims Settlement Act of 1971 (ANCSA) and under ANCSA has title to the subsurface estate and some surface rights in the region. TKC was formed in 1977 when the ANCSA village corporations of Lower Kalskag, Upper Kalskag, Aniak, Chuathbaluk, Napaimute, Crooked Creek, Red Devil, Georgetown, Sleetmute and Stony River, which are located along the middle region of the Kuskokwim River, merged. Under ANCSA, TKC has title to extensive surface estate in the region, including most of the project lands. The property hosts a gold deposit currently estimated at 33.8 million ounces of proven and probable mineral reserves averaging 2.09 grams per tonne. The Company believes that significant exploration potential remains in the Donlin Gold district, with prospects to increase mine life and/or justify future production expansions. SeeMineral Reserve and Mineral Resource Estimate, below.

Other lands required for offsite infrastructure, such as the Jungjuk port site, the road from the port site to the mine site, and natural gas pipeline are categorized as Native, State of Alaska conveyed, or BLM lands. Rights-of-way are required from other Alaska Native corporations, the State of Alaska and BLM for the road and pipeline alignments that cross Native corporation, state, and federal lands.

Permits and Litigation

Donlin Gold obtained the necessary permits and certifications that allowed for the exploration, associated at least pre-feasibility study level test work, environmental monitoring, and Environmental Impact Study (EIS) baseline data collection efforts. The current status of these permits is in line with the termination of the baseline data collection effort, temporary closure of the camp in May 2015, and the seasonal reopening of the site for the geological drill program from July to November 2017, the geotechnical drill program in 2019, 2022, and 2023 for the Alaska Dam Safety certificate applications, and the latest geological drill programs in 2020, 2021, and 2022. The active permits include Alaska Department of Natural Resources (ADNR) temporary use of water; ADNR Application for Permit to Mine in Alaska (approval for the 2020, 2021, 2022, and 2023 drill programs), the Corps individual 404 and nationwide 26 permits; Alaska Department of Environmental Conservation (ADEC) authorizations (landfill, septic system, multisector stormwater general permit – sector G, owners requested limit [air]); and Federal Aviation Administration approval (Landing Area). Other permits were either put on hold, closed, or allowed to expire.

On August 7, 2012, we announced that Donlin Gold commenced permitting of the project by submitting a draft Plan of Operations and Section 404 Clean Water Act (CWA) draft permit application to federal and state regulators. The Section 404 permit application initiated the environmental review process under the National Environmental Policy Act (NEPA) which involves preparation of an EIS. The Corps selected AECOM, formerly URS, an independent contractor, to prepare the EIS. The Notice of Intent for the EIS was published in the Federal Register on December 14, 2012, and the NEPA public scoping process was completed on March 29, 2013. During the remainder of 2013 and through 2014 and 2015, Donlin Gold worked to address the remaining data needs for the draft EIS. Donlin Gold also continued to provide application materials and maintained ongoing dialogue with the key permitting agencies. The Corps addressed the cooperating agency comments on the preliminary draft and filed the Notice of Availability for public release of the draft EIS in the Federal Register in November 2015. After the filing of the draft EIS, the Corps issued a schedule for public meetings on the Donlin Gold draft EIS in the Yukon-Kuskokwim (Y-K) region and Anchorage, Alaska. The Corps conducted, and at the end of May 2016 completed, a six-month public comment period for the draft EIS, including 17 public comment meetings in communities across the Y-K region and in Anchorage. The Corps received comments from federal and state agencies, local and tribal governments, Alaska Native organizations, businesses, special interest groups/NGOs, and individuals.

On April 27, 2018, the Notice of Availability of the Donlin Gold final EIS was published in theFederal Register. On August 13, 2018, the Corps and the BLM issued a joint Federal Record of Decision (ROD) for the Donlin Gold project. Along with the ROD, the Corps issued a combined permit under CWA Section 404 and Section 10 of the Rivers and Harbors Act. Additionally, the BLM issued the Offer to Lease for the ROW for those portions of the natural gas pipeline that would cross federal lands. The Pipeline and Hazardous Materials Safety Administration previously issued a special permit for the natural gas pipeline on June 5, 2018.

Several major State of Alaska permits were also issued and advanced during 2018 through 2023. After a public notice and comment period, ADEC issued a Certificate of Reasonable Assurance under CWA Section 401 on August 10, 2018, indicating that the CWA 404 permit complies with the State’s water quality standards. The Alaska Pollutant Discharge Elimination System (APDES) water discharge permit was issued by ADEC on May 24, 2018 and became effective on July 1, 2018. Donlin Gold submitted its application to ADEC for the regularly scheduled re-issuance of its APDES permit, which originally was to expire in January 2024 is administratively extended pending renewal by ADEC. The State of Alaska Department of Fish and Game (ADFG) issued Title 16 Fish Habitat permits for the mine area and transportation corridor on August 30, 2018. The new air quality permit was issued by ADEC on July 1, 2023. The final approvals of the Donlin Gold Reclamation Plan and the Waste Management Permit were issued by ADNR and ADEC, respectively on January 18, 2019. On September 18, 2023, Donlin Gold submitted timely applications to ADEC and ADNR for renewal of the approval and permit. On October 17, 2023, ADEC administratively extended the Waste Management Permit pending renewal. The Reclamation Plan approval, which was also to expire in January 2024, is administratively extended to January 2025. ADNR issued the easement, land leases, land use permits, and material site authorizations for the proposed transportation facilities, and easement for the fiber optic cable on State lands on January 2, 2020. On January 17, 2020, ADNR’s State Pipeline Coordinator Services (SPCS) issued the final State ROW authorization for the natural gas pipeline. On June 29, 2021, ADNR’s Division of Mining Land and Water issued 12 final Water Rights for the mine site and transportation corridor. On November 1, 2021, ADFG issued two Special Area Permits required for pipeline facilities located within the Susitna Flats State Game Refuge (“Refuge”). One permit authorizes the compressor station, and the other permit authorizes the section of the pipeline ROW in the Refuge. On November 1, 2022, ADNR finalized approval of the proposed re-location plan for public easements in the mine site and transportation facility areas.

The Donlin Gold camp re-opened in February to continue geotechnical and hydrological fieldwork to collect additional data for the Alaska Dam Safety certificate applications process, with field work completed in July. The preliminary design packages are expected to be submitted to the ADNR in the first half of 2024. Issuance of the certificates is anticipated in 2026.

On June 3, 2020, Earthjustice representing Orutsararmiut Native Council (ONC), ten Y-K villages, and the Alaska Community Action on Toxics filed a formal appeal with the ADEC Commissioner of the State’s water quality certification under Section 401 of the Clean Water Act (the “401 Certification”). The appeal process consisted of an Administrative Hearing in front of an Administrative Law Judge (ALJ) appointed by the ADEC Commissioner. On April 12, 2021, the ALJ issued his opinion for the Commissioner’s consideration recommending the 401 Certification be vacated. The Commissioner issued his decision to uphold the 401 Certification on May 27, 2021. The decision was appealed on June 28, 2021, in Alaska Superior Court by Earthjustice, representing ONC. On September 27, 2021, Donlin Gold filed a motion requesting a short term stay in the case to allow the State to fully consider additional technical materials on mercury and temperature; the State indicated to the Court that they did not oppose the motion. On October 22, 2021, Donlin Gold submitted to ADEC expert technical reports on mercury and temperature. On November 22, 2021, ADEC filed an additional motion asking to remand the 401 certification back to ADEC to determine how the additional information affects the certification. Earthjustice did not oppose the motion although had comments on the remand process. On December 29, 2021, the Court granted the remand request, dismissed the case without prejudice, and left in place the existing certification. On May 13, 2022, the ADEC Water Division Director reaffirmed the 401 certification. On June 13, 2022, Earthjustice appealed the elements of the decision related to temperature to the Commissioner and requested an adjudicatory hearing with an ALJ. On July 14, 2022, the Commissioner granted the request for the hearing and a new ALJ was assigned. On September 14, 2022, Earthjustice filed their initial brief. Donlin Gold and ADEC filed response briefs on October 14, 2022. Earthjustice filed their final reply brief on October 21, 2022. On August 18, 2023, the Commissioner reaffirmed ADEC’s issuance of the 401 Certification. The suspension of the previously filed Alaska Superior Court case was then lifted and Earthjustice submitted its opening brief to the Superior Court on January 5, 2024. Claims related to mercury were not included in Earthjustice’s Alaska Superior Court complaint. The ADEC and Donlin Gold response briefs are due on February 5, 2024. A decision is expected later in 2024.

On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three Y-K villages, filed an appeal of the State pipeline ROW authorization in Alaska Superior Court. An appeal was also filed by a second party, Robert Fithian, the owner of an outdoor guiding business located near the proposed Donlin Gold pipeline route, on September 20, 2021. The two appeals were consolidated into a single case before the Alaska Superior Court based in Anchorage, Alaska. On April 12, 2023 and July 3, 2023, the Alaska Superior Court affirmed ADNR’s issuance of the ROW lease in the Earthjustice case and Robert Fithian case, respectively. The decision in the Earthjustice case was appealed to the Alaska Supreme Court. Earthjustice’s opening brief was submitted on September 22, 2023. The State of Alaska, Calista, and Donlin Gold reply briefs were submitted to the Supreme Court on January 3, 2024. Mr. Fithian did not appeal to the Alaska Supreme Court.

On May 25, 2022, Earthjustice, representing ONC and five Y-K villages, filed an appeal of the final Water Rights in Alaska Superior Court. The appellants filed their initial brief on November 21, 2022. On April 25, 2022, the ADNR Commissioner denied the appeal; however, Earthjustice, ONC and five villages appealed the Commissioner’s decision in Alaska Superior Court on May 25, 2022. The briefing process was completed, and oral arguments were held on July 19, 2023. On September 1, 2023, the Alaska Superior Court affirmed ADNR’s decision on Donlin Gold’s water rights permits, following unsuccessful appeal by Earthjustice to the ADNR Commissioner. On October 2, 2023, Earthjustice appealed the Superior Court decision to the Alaska Supreme Court. Earthjustice submitted its opening brief to the Alaska Supreme Court on January 4, 2024.

In September 2022, 13 tribes sent letters to the Corps and the U.S. Environmental Protection Agency (EPA). The letter to the Corps requests that it consider requiring a supplemental environmental impact statement (EIS) on the Donlin Gold project and revoke the Clean Water Act Section 404 permit (the “404 permit”) in light of what the tribes consider “new information” since the final EIS was issued in 2018. Additionally, the EPA letter requested that it initiate a Clean Water Act Section 404(c) veto process for the Donlin Gold project. In early January 2023, Donlin Gold and Calista both submitted responses to the Corps on why the requests to prepare a supplemental EIS or revoke the 404 permit should not be granted. In January 2023, Donlin Gold also provided a response to the EPA describing why the agency should not initiate a 404(c) process. To date, neither the Corps nor EPA has responded to the tribes’ letters.

On April 6, 2023, Earthjustice with ONC and six Y-K villages filed suit against the U.S. government in Anchorage Federal District Court. The lawsuit asks the Court to invalidate the Donlin Gold JROD, including the 404 permit issued by the Corps and ROW lease for the portions of the pipeline on Federal lands issued by the Bureau of Land Management of the U.S. Department of Interior. The U.S. Department of Justice (DOJ) is defending the issuance of the permits by those Federal agencies. The State of Alaska, Donlin Gold and Calista have been granted intervenor status in this case. DOJ is finalizing compilation of the Administrative Record for the court. The briefing schedule was agreed upon in the fourth quarter and will extend through the first half of 2024.

Thirteen of the 56 village councils in the Calista Region (Native Village of Kasigluk, ONC, Native Village of Eek, Tuluksak Native Community, Tununak Council, Native Village of Nunapitchuk, Chuloonawick Tribal Council, Native Village of Kwigillingok, Native Village of Kongiganak, Chefornak Traditional Council, Chevak Native Village, Native Village of Napakiak and Quinhagak) have adopted resolutions opposing development of the Donlin Gold project.

Mineral Tenure

The Calista Lease between Calista and Donlin Gold, includes subsurface (mineral) rights leased from Calista. Calista also owns the corresponding surface estate on a portion of these lands, the rights to which are also included in the Calista Lease. The Calista Lease provides Donlin Gold with rights to approximately 19,988 hectares of Calista-owned land. The Calista Lease was restated on February 11, 2011, to reflect all assignments and amendments made between its original execution on May 1, 1995 and February 11, 2011. The Calista Lease was amended once again effective June 6, 2014 (the “2014 Amendment”). The 2014 Amendment did not affect the lands subject to the Calista Lease as restated on February 11, 2011.

On June 9, 2014, the Company announced that Donlin Gold and TKC reached an updated long-term Surface Use Agreement (SUA) for the Donlin Gold project. The SUA with TKC grants non-exclusive surface use rights to Donlin Gold for mining activities. TKC owns and contributed to the SUA the corresponding surface estate over most of Calista’s subsurface estate included in the Calista Lease as well as some additional surface estate. The SUA with TKC provides Donlin Gold with rights to approximately 16,923 hectares of TKC-owned land.

Lyman Resources in Alaska, Inc. (Lyman Resources) has an existing placer mining lease covering approximately 1,040 hectares (partially covering six sections) within the Calista Lease area. The Lyman family also has title to approximately 5.7 hectares of surface estate within the Snow Gulch area. The Calista Lease grants priority to extraction of the lode mineralization in the event of a conflict of use between lode and placer mining operations, provided that a two-year notice period is provided to Lyman Resources. Lyman Resources, the Lyman family, and Donlin Gold executed a Surface Lease and Assignment of Mining Lease effective May 9, 2012, leasing the Lyman surface estate and assigning the Lyman placer lease within the Calista Lease area to Donlin for Project mining use (the “Lyman Lease”).

In addition to the leased land, Donlin Gold holds 493 State of Alaska mining claims comprising approximately 29,008 hectares in the Kuskokwim and Mt. McKinley Recording Districts. The mining claims abut and largely surround northern and western boundaries of the lands subject to the Calista Lease and TKC SUA. The mining claims are located on lands that are owned by the State of Alaska (409) and on State-selected lands from the BLM (84). All claims are approximately either 16.2 hectares or 64.8 hectares in size.

The terms for the Calista Lease and TKC SUA include various royalty and other payment provisions and considerations such as shareholder employment and contracting opportunities. The Lyman Lease provides for rent and certain other payments.

Royalty Terms of the Calista Lease include:

●Annual advance minimum royalty (variable) to 2030;
●All advance minimum payments are recoverable as a credit against the net smelter return royalty and net proceeds payment;
●Net smelter return of 1.5% for the earlier of the first five years following commencement of commercial production or until initial capital payback;
●Conversion to a 4.5% net smelter return after the earlier of five years or initial capital payback; and
●Net proceeds royalty of 8% of the net proceeds realized by Donlin Gold LLC commencing with the first quarter in which net proceeds are first realized.

Payment Terms of the TKC SUA include:

●Annual advance minimum payment (variable per milestones);
●All advance minimum payments are recoverable as a credit against the milled tonnage fee and net proceeds payment;
●Milled tonnage fee of $0.40 per tonne processed for the first 10 years of production;
●Conversion of the milled tonnage fee to $0.50 per tonne processed for all production after 10 years;
●Net proceeds payment of 3% of the net proceeds realized by Donlin Gold LLC commencing with the first quarter in which net proceeds are first realized.

The term of the Calista Lease is to April 30, 2031 and extends automatically year to year thereafter, so long as either mining or processing operations are carried out on or with respect to the property in good faith on a continuous basis in such year, or Donlin Gold pays to Calista an advanced minimum royalty of $3.0 million (subject to adjustment for increases in the Consumer Price Index) for such year. The TKC SUA remains in effect through April 30, 2031, and on a year-to-year basis thereafter, so long as the Calista Mining Lease remains in effect. The Lyman Lease has an initial term of 20 years but shall be extended while Donlin Gold conducts operations on the property.

Additional estimated costs associated with various landowner and lease agreements, not already covered in initial capital or G&A operating costs, average approximately $8.6 million per year during the six pre-production years and $2.5 million per year during the 27 operating years. Annual rent, labor expenditures and filings are required to maintain Alaska State mining claims on State land. Mining license tax payments may also apply.

Accessibility and Climate

The Kuskokwim River is a regional transportation route and is serviced by commercial barge lines. A 25-kilometer winter road, designated as an Alaska State Highway route and transportation corridor, accesses the property from the barge landing at the village of Crooked Creek. The Donlin Gold project currently has an all-season, soft-sided camp. An adjacent 1,500-meter airstrip is capable of handling aircraft as large as L-100 Hercules (approximate cargo capacity of 19,050 kilograms), allowing efficient shipment of personnel, some heavy equipment, and supplies. The Donlin Gold project can be reached directly by charter air facilities out of Anchorage and Aniak, 80 kilometers to the west.

The project area is one of low topographic relief on the western flank of the Kuskokwim Mountains. Elevations range from 150 meters to 640 meters. Ridges are well rounded and easily accessible by all-terrain vehicle. Hillsides are forested with black spruce, tamarack, alder, birch and larch. Soft muskeg and discontinuous permafrost are common in poorly drained areas at lower elevations. The area has a relatively dry interior continental climate with typically less than 500 millimeters total annual precipitation. Summer temperatures are relatively warm and may exceed 30°C. Minimum temperatures may fall to well below -42°C during the cold winter months.

Exploration History

Approximately 1,678 exploration and development drill holes totaling 367,886 meters, were completed from 1988 through 2007 in at least six separately managed campaigns. Another 108 core holes totaling 33,425 meters were added in 2008 to explore near-pit expansions and satellite deposits, and for facility-related condemnation and geotechnical studies. In 2010, six core holes totaling 2,090 meters were drilled for additional pit slope geotechnical drilling. In 2017, 16 core holes totaling 7,040 meters were drilled; in 2020, 85 core holes totaling 23,361 meters were drilled; in 2021, 79 core holes totaling 24,264 meters were drilled; and in 2022, 141 core holes totaling 42,331 meters were drilled; and in 2023, 42 core holes totaling 1,840 meters for geotechnical and permafrost studies and 13 RC holes totaling 1,279 meters were drilled for pump tests and the installation of ground water monitoring instrumentation.

Approximately 1,396 holes, totaling 339,733 meters, supported the resource model used in the 2011 Mining Study. The remaining holes were either drilled after the completion of the 2011 Mining Study (2017, 2020, 2021, and 2022 drill programs) or were utilized for other purposes, such as district exploration, carbonate resource, facilities condemnation, hydrology, geotechnical, and infrastructure engineering.

YearCompanyWork PerformedResults
1909 to 1956Various prospectors and placer minersGold discovered in 1909. Placer mining by hand, underground, and hydraulic methods.Total placer gold production of approximately 30,000 ounces.
1970s to 2015Robert Lyman and heirsResumed sluice mining in Donlin Gold area and placer mined Snow Gulch.First year of mining Snow Gulch produced best results, with 800 ounces of gold recovered. Donlin Gold has obtained an agreement with the Lyman family to consolidate the land package around the proposed mine.
1974, 1975Resource Associates of Alaska (RAA)Regional mineral potential evaluation for Calista. Soil grid and three bulldozer trenches dug in Snow Gulch area.Soil, rock, and vein samples have anomalous gold values. Trench rock sample results range from 2 to 20 grams per tonne gold.
1984 to 1987Calista CorporationMinor work. Geologists from various mining companies, including Cominco and Kennecott, visit the property.
YearCompanyWork PerformedResults
1986Lyman ResourcesAuger drilling for placer evaluation finds abundant gray, sulfide rich clay near Quartz Gulch.Assays of cuttings average over 7 grams per tonne gold. Initial discovery of Far Side (“Carolyn”) prospect.
1987Calista CorporationRock sampling of ridge tops and auger drill sampling of Far Side prospect.Anomalous gold values from auger holes: best result = 9.7 grams per tonne gold.
1988 to 1989Western Gold Exploration and Mining Co.Airborne geophysics, geological mapping, and soil sampling over most of the project area. Total of 13,525 meters of D9 Cat trenching at all prospects. Over 15,000 soil, rock chip, and auger samples collected. Drilling included 3,106 feet of AX core drilling, 404 meters in 239 auger holes, and 10,423 meters of RC drilling (125 holes). First metallurgical tests and petrographic work.Initial work identified eight prospects with encouraging geology (Snow, Dome, Quartz, Carolyn, Queen, Upper Lewis, Lower Lewis, and Rochelieu). Drilling at most of these prospects led to identification of the Lewis areas as having the best bulk-mineable potential. Mineral resource estimate completed.
1993Teck Exploration Ltd.D-9 Cat trenching (1,400 meters) and two 500-meter soil lines in Lewis area. Petrographic, fluid inclusion, and metallurgical work.Identified new mineralized areas, updated Mineral resource estimate.
1995 to 2000Placer Dome87,383 meters of core, 11,909 meters of RC drilling and 8,493 meters of trenching. Environmental monitoring and assessment.Drilled the American Creek magnetic anomaly (ACMA), discovered the ACMA deposit. Numerous mineral resource estimation iterations.
2001 to 2002Donlin Creek Joint Venture (Placer Dome /NOVAGOLD)46,495 meters of core, 38,022 meters of RC drilling, 89.5 meters of geotechnical drilling, and 268 meters of water monitoring holes.Filed a preliminary assessment report on the project. Updated resource estimate.
2003 to 2005Donlin Creek Joint Venture (Barrick/NOVAGOLD)25,448 meters of core and 5,979 meters of RC drilling. Calcium carbonate exploration drilling; IP lines for facility condemnation studies.Infill drilled throughout the resource area. Discovered a calcium carbonate resource. Poor quality IP data.
2006Donlin Creek Joint Venture92,804 meters of core drilling to support mineral resource classification conversion, slope stability, metallurgy, waste rock, carbonate exploration, facilities and port road studies.Geological model and mineral resource update.
2007Donlin Gold Joint VentureCore drilling totaled 75,257 meters and included resource delineation, geotechnical and engineering, and carbonate exploration. 13 RC holes for monitor wells and pit pump tests totaled 1,043 meters.Improved pit slope parameters, positive hydrogeological results. Carbonate exploration was negative. Updated mineral resource estimate. Completed feasibility study with positive results.
2008Donlin Gold LLC108 core holes totaling 33,425 meters for exploration and facility related geotechnical and condemnation studies. Updated resource models. Metallurgical test work: flotation variability and CN leach. 54 test pits and 37 auger holes were also completed for overburden characterization.Resource expansion indicated for East ACMA. CN leach resource potential indicated for the main resource area, Snow, and Dome prospects. Facility sites successfully condemned. Updated resource estimates utilizing applicable data through 2007.
YearCompanyWork PerformedResults
2009Donlin Gold LLC19 geotechnical core holes totaling 950 meters in facility sites and to address hydrology.
2010Donlin Gold LLCSix geotechnical core holes totaling 2,090 meters to evaluate slope stability of expanded pit. Also drilled 90 auger holes totaling 585 meters and dug 59 test pits to further evaluate overburden conditions and gravel supplies within tailings storage facility (TSF) area.Pit slope stability of new pit design remained acceptable. Construction suitability of surficial materials in TSF is evaluated.
2017Donlin Gold LLC16 core holes totaling 7,040 meters to test targeted mineralized zones, collect structural data related to mineralization, and collect geotechnical data.Results not included in resource model used in the 2011 Mining Study
2019Donlin Gold LLC30 geotechnical core holes totaling 1,060 meters were drilled as part of a site investigation program in support of detailed dam design.Results not included in resource model used in the 2011 Mining Study
2020Donlin Gold LLC85 core holes totaling 23,361 meters in both the ACMA and Lewis deposits to validate recent geologic modeling concepts and test for extensions of high-grade zones.Results not included in resource model used in the 2011 Mining Study
2021Donlin Gold LLC79 core holes totaling 24,264 meters in both the ACMA and Lewis deposits to validate recent geologic modeling concepts and test for extensions of high-grade zones.Results not included in resource model used in the 2011 Mining Study
2022Donlin Gold LLC141 core holes totaling 42,331 meters in both the ACMA and Lewis deposits and in the Divide domain overlapping ACMA and Lewis.Results not included in resource model used in the 2011 Mining Study
2023Donlin Gold LLC42 core holes totaling 1,840 meters and 13 RC holes totaling 1,279 meters were drilled as part of a site investigation program in support of detailed dam design and hydrogeologic studies.Results not included in resource model used in the 2011 Mining Study

Geology

Regional Geology

The Kuskokwim region of southwestern Alaska is predominately underlain by rocks of the Upper Cretaceous Kuskokwim Group that filled a subsided northeast-trending strike-slip basin between a series of amalgamated terranes. Intermediate composition volcano-plutonic complexes intrude and overlie Kuskokwim Group rocks throughout the region.

Local Geology

The Donlin Gold deposits lie between two regional, northeast-trending, right lateral fault systems: the Denali-Farewell fault system to the south and the Iditarod-Nixon Fork fault system to the north. Undivided Kuskokwim Group sedimentary rocks and granite porphyry complexes are the main rock units.

Property Geology

Greywacke is dominant in the northern part of the area (“northern resource area” comprising Lewis, Queen, Rochelieu, and Akivik), while shale-rich units are common in the southern part of the area (“southern resource area” comprising South Lewis and ACMA).

Gold deposits are associated with an extensive Late Cretaceous–Early Tertiary gold–arsenic–antimony–mercury hydrothermal system. Gold-bearing zones exhibit strong structural and host rock control along north–northeast-trending fracture zones and are best developed where those zones intersect relatively competent host rocks. Mineralized material is most abundant in intrusive dikes and sills, but sedimentary rocks are also mineralized within strong fracture zones.

Geotechnical and Hydrology

A number of geotechnical and hydrological studies have been completed in support of at least pre-feasibility and environmental reports for Donlin Gold.

Rowland Engineering Consultants performed the geotechnical assessments for the engineering to support design of the port site, airstrip, plant site and interconnecting roads. BGC, Inc (BGC). performed geotechnical analyses for the design of the pit, waste rock facility (WRF), and tailings storage facility (TSF).

The site-wide surface water and groundwater models developed by BGC, are based on extensive drill data and climatic information for the area. The groundwater model is currently being updated based on the field work completed in 2023. BGC, CEMI, Hatch Ltd., and SRK, Inc. provided hydrologic studies, design criteria and associated test work for the water treatment plant requirements during construction, operations, and closure. Lorax Environmental performed water quality modeling for the post closure pit lake.

Exploration Potential

The mineral resource defined in the S-K 1300 Report is confined to a portion of the property. We believe there is considerable potential to increase the mineral resources at the Donlin Gold project. Numerous other targets have been identified along the 8-kilometer mineralized gold trend and are defined by surface sampling and various historical drill holes containing significant gold values.

Exploration potential in the vicinity of the open pit design in the S-K 1300 Report includes extensions along strike to the East ACMA, Lewis, and Crooked Creek areas. Mineralization remains open at depth under the current pit limits. Mineralization also remains open to the north of the planned pit and has been tested by shallow trenching and soil sampling, with limited drilling undertaken to date.

Exploration potential at the Donlin Gold project also exists outside the areas that have been the subject of the mine design in the S-K 1300 Report. Gold mineralization is associated with an overall north–northeasterly-trending high level dike/sill complex that has been outlined in the regional aero-magnetics as a magnetic low. The zone, approximately 8 kilometers long, and 4 kilometers wide, consists of a northern, dike-dominated area, and a southern, more sill-dominated area.

Mineralization

Southeast-dipping north-northeast-oriented fracture zones are the primary control on gold-bearing vein distribution within the north-northeast mineralized corridors. Composite vein zones or mineralized corridors range up to 30 meters in width and extend for hundreds of meters along strike. Intrusive rocks and to a lesser extent competent massive greywacke are the most favored host rocks, and act as a secondary control on the mineralization. Gold distribution in the deposit closely mimics the intrusive rocks, which contain about 74% of the mineral resource identified in the S-K 1300 Report. Structural zones in competent sedimentary units account for the remaining 26%.

Gold-bearing sulfides occur in both veins and disseminated zones in mafic igneous bodies, rhyodacite dikes and sills, and sedimentary rocks. Quartz-carbonate-sulfide (pyrite, stibnite, and arsenopyrite) veins are the primary mineralized features, but gold also occurs in thin, discontinuous sulfide fracture fillings.

Minor Elements and Deleterious Materials

The most abundant minor elements associated with gold-bearing material are iron, arsenic, antimony, and sulfur. They are contained primarily in the mineral suite associated with hydrothermal deposition of gold, including pyrite, arsenopyrite, realgar, native arsenic, and stibnite. Minor hydrothermal pyrrhotite, marcasite and syngenetic or sedimentary pyrite, also account for some of the iron and sulfur.

Three elements that have processing significance are mercury, chlorine, and fluorine. Graphitic carbon and carbonate minerals also would negatively affect the metallurgical process.

Metallurgy

Sufficient metallurgical test work was completed under the direction of Barrick personnel to support the S-K 1300 Report. Gold is mainly carried by arsenopyrite. Variation is observed in processing behavior between intrusive rocks and sedimentary rocks, but less so between the geographical sources.

Process testing generated development of the following conceptual flowsheet:

●conventional crushing and grinding;
●concentration by flotation;
●pressure oxidation of the concentrate in an autoclave;
●carbon-in-leach (“CIL”) cyanidation of the oxidized concentrate;
●carbon strip and regeneration circuits;
●gold electrowinning; and
●refining and production of doré bars.

This processing concept incorporates proven commercial unit operations.

Mineral Reserve and Mineral Resource Estimates

The mineral reserves for the Donlin Gold project were classified using criteria appropriate under the mining disclosure definitions and standards of NI 43-101 and S-K 1300 with an effective date of April 27, 2021 and are current as of November 30, 2023. The mineral reserves are summarized in the table below.

Proven and Probable Mineral Reserve Estimate, Effective Date April 27, 2021 and remain current as of November 30, 2023, based on $1,200 per ounce gold price

Tonnes (thousands) · Contained Gold (thousands of ounces)
Reserve Category100%Attributable to NOVAGOLD 50%Gold Grade (grams/tonne)100%Attributable to NOVAGOLD 50%
Proven7,6833,8422.32573287
Probable497,128248,5642.0833,27616,638
Proven and probable504,811252,4062.0933,84916,925
Notes:
(1)Mineral reserves are reported within the pre-feasibility pit designs, and supported by a mine schedule, featuring variable throughput rates, stockpiling and cut-off optimization. The point of reference for Mineral Reserves estimates is where the reserves are delivered to the mill. The pit designs are contained within an optimized pit shell based on the following economic and technical parameters: Metal price for gold of $1,200 per ounce; reference mining cost of $2.16 per tonne incremented $0.0033 per tonne per meter with depth from the 220 meter elevation (equates to an average mining cost of $2.64 per tonne), fixed processing cost of $13.78/t processed; sustaining capital of $1.54/t processed; general and administrative cost of $3.66/t processed; stockpile rehandle costs of $0.24/t processed assuming that 45% of mill feed is rehandled; variable metallurgical recoveries by rock type, ranging from 86.7% in shale to 94.2% in intrusive rocks in the Akivik domain; refining and freight charges of $1.21/oz Au; royalty considerations of 4.5% NSR and $0.50/t processed; and variable pit slope angles, ranging from 23° to 43°. See “Section 12: Mineral Reserve Estimates” of the S-K 1300 Report.
(2)Mineral reserves are reported using an optimized block value (BV) based on the following equation: BV = Gold grade * Recovery – royalties & refining costs – process operating costs – G&A cost reported in $ per tonne processed. Assuming an average gold recovery of 89.5% the marginal gold cut-off grade would be approximately 0.57 grams per tonne, or the gold grade that would equate to a $0.001 BV cut-off at these same values.
(3)The life of mine strip ratio is 5.48:1. The assumed life-of-mine throughput rate is 53,500 tonnes per day.
(4)Rounding may result in apparent summation differences between tonnes, grade and contained metal content.
(5)Mineral reserves are reported on a 100% ownership basis and a 50% ownership basis. The 50% basis is attributable to NOVAGOLD through their 50% ownership interest in the joint venture that owns the mineral rights and manages the Donlin Gold project. Tonnage and grade measurements are in metric units. Contained gold ounces are reported as troy ounces.

Mineral reserves and resources have been estimated using a life-of-mine long-term gold price assumption of $1,200 per ounce. Mineral resources are based on a Whittle™ pit optimized for all measured, indicated, and inferred blocks assuming a gold selling price of $1,200 per ounce. Operating and capital costs are estimated over the life-of-mine.

Mineral resources were classified using criteria appropriate under the mining disclosure standards of S-K 1300 by application of the NSR-based cut-off that incorporated mining and recovery parameters, and constraint of the mineral resources to a pit shell based on commodity prices. The mineral resources (exclusive of mineral reserves) are summarized in the table below.

Mineral Resources Estimate (exclusive of reserves), Effective Date July 11, 2011 and remain current as of November 30, 2023, based on $1,200 per ounce gold price

Tonnes (thousands) · Contained Gold (thousands of ounces)
Resource Category100%Attributable to NOVAGOLD 50%Gold Grade (grams/tonne)100%Attributable to NOVAGOLD 50%
Measured8694352.236231
Indicated69,40234,7012.445,4352,718
Measured and indicated70,27135,1362.435,4972,749
Inferred92,21646,1082.025,9932,997
Notes:
(1)Mineral resources are reported exclusive of mineral reserves. Mineral resources are reported on a 100% ownership basis and a 50% ownership basis. The 50% basis is attributable to NOVAGOLD through their 50% ownership interest in the joint venture that owns the mineral rights and manages the Donlin Gold project property.
(2)Mineral resources that are not mineral reserves do not have demonstrated economic viability.
(3)The cut-off date for the sample database used in the resource estimate is November 1, 2009. However, more recent drilling data was used to validate the resource model as remaining current.
(4)Mineral resources are reported in-place (point of reference) and contained within a conceptual measured, indicated and inferred optimized pit shell using the following assumptions: gold price of $1,200 per ounce; variable process cost based on 2.1874 * (sulfur grade) + 10.65; administration cost of $2.29 per tonne processed; refining, freight & marketing (selling costs) of $1.85 per ounce recovered; stockpile re-handle costs of $0.20 per tonne processed assuming that 45% of mill feed is re-handled; variable royalty rate, based on royalty of 4.5% * (Gold price – selling cost), and a variable metallurgical recovery depending on the host rock type ranging from 86 to 94%. Assuming an average recovery of 89.5% and average sulfur grade of 1.07%, the marginal gold cut-off grade is 0.47 g/t. These technical and economic parameters are those that were used in the 2011 Mining Study to establish reasonable prospects of eventual economic extraction. Based on the QP’s review of the estimate, there would be no material change to the Mineral Resources if a gold price of $1,500/oz was used and other economic parameters were updated to the 2020 parameters used in the Mineral Reserve estimate. Therefore the 2011 Mineral Resource statement is considered current and is presented unchanged. See “Section 11: Mineral Resource Estimates” of the S-K 1300 Report.
(5)Rounding may result in apparent summation differences between tonnes, grade and contained metal content.
(6)Tonnage and grade measurements are in metric units. Contained gold ounces are reported as troy ounces.

Financial model parameters

The estimated mine life is 27 years based on a nominal processing rate of 53,500 tonnes per day. Annual gold production over the projected mine life averages 1.13 million ounces per year, including 1.46 million ounces per year for the first five full years of production. The total initial capital cost estimate is approximately $7,402 million. The project’s estimated after-tax net present value at a 5% discount rate (“NPV 5%”) is $3,040 million using the base case gold price of $1,500 per ounce. The internal rate of return (IRR) at the same gold price is 9.2%.

Base Case Project Sensitivity to Gold Price

Gold price ($ per ounce)After-tax cash flow ($ million)After-tax NPV 5% ($ million)After-tax IRR (%)Payback (years)
1,2006,5562025.310.3
1,3008,7731,1616.89.2
1,40010,9742,1098.18.1
1,50013,1453,0409.27.3
1,60015,3083,96710.46.7
1,70017,4554,88711.46.2
1,80019,1255,69612.45.9

Summary of Key Evaluation Metrics (Base Case at $1,500 per ounce gold)

Total tonnes mined (million)3,270
Ore tonnes treated (million)505
Strip ratio (waste tonnes per ore tonne)5.5 to 1
Gold ounces recovered (million)30.4
Gold recovery (%)89.8%
$ million
Net revenue45,519
Total operating costs(19,289)
Operating cash flow before tax26,230
Income and mining taxes(3,668)
Operating cash flow after tax22,562
Initial capital(7,402)
Sustaining capital(1,723)
Closure costs - trust fund(292)
Total costs(32,374)
Net after-tax cash flow13,145
Payback period (years)7.3
Operation life (years)27
After-tax NPV 5% ($ million)3,040
After-tax IRR9.2%

Operating Cost Estimates

$ million$ per tonne processed$ per tonne mined$ per gold ounce sold
Mine operations8,43016.702.59278
Processing operations6,91613.702.12228
Administration1,7623.490.5458
Land and royalty payments2,1824.320.6772
19,28938.215.90635

Capital Cost Estimates

Initial capital costs are estimated at $7,402 million and sustaining capital costs are estimated at $1,723 million over the LOM.

Planned Mining Operations

The Donlin Gold project will be mined by a conventional truck-and-shovel operation. Initial pioneering and pit development will be undertaken to remove overburden, develop mine access roads suitable for large mining equipment, and “face-up” the initial pit for the large shovel and mining equipment.

Primary loading units for both bulk and selective mining in ore and waste will be large electric-hydraulic shovels, with large front-end loaders as secondary units. Large 360 tonne capacity haul trucks will be used for transporting both ore and waste out of the pit.

Blast hole drilling will be performed by medium-sized rotary and down-the-hole hammer drills with various hole diameters depending on bench height and desired mining selectivity. Reverse circulation (RC) drilling is planned for detailed geologic definition and grade control.

Support equipment will be used for road, bench, dump maintenance, and miscellaneous projects.

Planned Processing Operations

The Donlin Gold project ore will be processed by crushing and grinding, sulfide flotation concentration, concentrate treatment by pressure oxidation (POX) in an autoclave, carbon-in-leach (CIL) cyanide leaching of the oxidized concentrate, electrowinning, and refining to produce doré bars on site.

Due to gold being associated with sulfide mineralization, primarily arsenopyrite and pyrite, the ore is considered refractory and requires POX pre-treatment to liberate the gold prior to CIL leaching. Sulfide flotation concentration is required prior to POX to concentrate the sulfide content to a level sufficient to fuel the POX operation.

Concentrate is recovered from the primary rougher flotation followed by regrinding of the tailings prior to secondary rougher flotation. The secondary rougher concentrate is processed through a cleaner scavenger circuit producing a concentrate which is combined with the primary rougher concentrate for treatment by POX. The final tailings from the secondary rougher flotation tailings is thickened, and due to their neutralizing potential, is then utilized to modify the pH of the POX discharge solution prior to being transported to the TSF.

The oxidized concentrate from the POX operation would then be cyanide leached in a conventional CIL circuit to produce a pregnant (gold-bearing) solution. Gold from the solution is adsorbed onto activated carbon, which is later stripped (gold desorbed from carbon) in an elution circuit. The pregnant solution after elution is fed through electrowinning (EW) cells, where cathodes are plated with gold-bearing materials, which are periodically removed, dried in a retort, and melted in an induction furnace to produce doré bars.

Tailings from the CIL circuit would be treated in a cyanide detoxification process using SO2/air technology prior to being recombined with the flotation tailings and transported to the TSF.

Mercury naturally occurs in the Donlin Gold project ores and mercury abatement controls will be installed in six areas of the process facilities including POX, hot cure, EW, retort, refinery furnace, and carbon regeneration kiln. In these control systems, mercury will be collected for off-site shipment and management. Chemicals will be added to tailings to limit the potential for mercury releases from the TSF.

Proposed Production Plan and Schedule

Based on the S-K 1300 Report, the operating mine life is estimated to be 27 years with the nominal processing rate of 53,500 tonnes per day. Commercial gold production is expected after a period of approximately 6 years for basic and detailed engineering, and construction. In addition, the Donlin Gold board must approve a construction program and budget before construction of the Donlin Gold project can begin. The timing of the initiation of the required engineering work, of the Donlin Gold board’s approval of a construction program and budget, market conditions, and receipt of all required governmental permits and approvals will determine whether and when construction of the Donlin Gold project will begin.

Preproduction covers the first 15 months of the mine plan, when mining activities will focus on providing sufficient ore exposure for plant start-up. Ore mined during preproduction will be stockpiled and rehandled to the process during operations. Average mine production increases progressively in the initial years until the peak rate of 425,000 tonnes per day is reached in Year 6.

Proposed Waste Rock Facility (WRF)

Waste rock from open pit mining will be placed in an ex-pit WRF in the American Creek Valley, east of the pit area, or in a backfill dump in the ACMA pit. The ultimate footprint of the WRF covers an area of approximately 9 square kilometers. Approximately 2,232 million tonnes of waste rock and overburden will be placed in the WRF, and 425 million tonnes will be placed in the ACMA pit backfill dump. Approximately 91 million tonnes of waste rock will be used for construction purposes, and 17 million tonnes of overburden will be stockpiled and used later for reclamation purposes.

The potential magnitude of flow in the American Creek drainage, as well as discharge from springs in the valley floors, warrants the construction of an engineered rock drain system below the waste rock facility, including connecting secondary rock (finger) drains in the smaller contributing drainages.

Waste rock will be characterized by its potential for acid generation and assigned reactivity categories. Non-acid-generating (NAG) rock will be placed directly in the WRF, along with less reactive potentially acid-generating (PAG) rock, PAG5. Some of the more reactive PAG rock, PAG6, will be encapsulated in cells in the WRF to prevent water infiltration through them. The most reactive PAG rock, PAG7, will be backfilled in the ACMA pit beneath the ultimate pit lake water level.

Concurrent reclamation of the waste rock facility will be undertaken during operations.

Proposed Tailings Storage Facility (TSF)

The TSF in the Anaconda Creek basin will be a fully lined impoundment with a cross valley dam downstream (“main dam”) in the valley. The tailings dam will be constructed of compacted rock fill using the downstream method with a composite liner on the upstream face. The tailings impoundment footprint will be lined with a linear low-density polyethylene liner over a layer of broadly graded silty sand and gravel acting as low permeability bedding material and providing secondary containment. Material for construction will be sourced from the plant site and fuel farm during initial construction and from the open pit for the later raises during operations.

Water Diversion Dams

Water dams are required during the construction period and initial years of operation to protect the lined upstream face of the tailings-starter dam from a significant flood event, to provide a reliable source of fresh water during operation of the process plant, and to minimize runoff into the TSF.

Current and Planned On-Site Infrastructure

Current site infrastructure comprises an all-season, soft-sided camp with facilities consisting of kitchen, living quarters, equipment shop, drill shack and other buildings required for support of year-round exploration activities.

There is sufficient area within the project area to host an open pit mining operation, including the proposed open pit, waste rock facility, TSF and process facilities (primary and pebble crushers, coarse ore conveyor and coarse ore stockpile, concentrator, flotation, water treatment plants, POX, oxygen plant, boiler house, utility corridors, leach, refinery, cyanide destruct, and access walkways). Other planned site infrastructure is comprised of access roads, airstrip, accommodation camp, fuel tank farm, dual-fueled power plant, truck shop, truck wash, workshops and vehicle repair facilities, assay laboratory, administration facilities and change rooms. Donlin Gold has secured the surface rights for the areas that may host these facilities.

In nearby villages, Crooked Creek has approximately 105 residents and Aniak has a population of approximately 500. The workforce for the project would be sourced from the local area, from Alaskan regional centers and from other sources as required.

The project is a greenfield site. The on-site infrastructure for the project includes three main development sites in remote locations: the mine and plant site area (including the power plant), the permanent camp, and the airstrip. The plant site, power plant and fuel tank farm will be on a ridge above the proposed TSF. The layout of the plant site was designed to take maximum advantage of the natural topography. The layout also provides for efficient movement of equipment and material products around the site.

Planned Off-site Infrastructure

The off-site infrastructure for the project includes three main development sites in remote locations: the Jungjuk Port site and mine access road, the natural gas pipeline, and the Bethel Port facilities. The Jungjuk Port site is situated upriver from Bethel on the Kuskokwim River near the mouth of Jungjuk Creek. A port-to-mine access road (Jungjuk Road), approximately 30 miles (48 kilometers) long, will traverse varied terrain from the Jungjuk Port site to the mine site. A spur road, approximately 3 miles (4.8 kilometers) long, will serve the proposed project airstrip. The primary purpose of the Jungjuk Road is to transport freight and diesel from the Jungjuk Port site to the mine site, mostly by conventional highway tractors, tankers, and trailers. The natural gas pipeline is described under the Power heading below. The proposed Bethel Port will be situated near the town of Bethel, a community of approximately 6,080 residents, that is the main existing port on the Kuskokwim River and is an administrative and transportation hub for the 56 villages in the Y-K region. The existing Port of Bethel is the northernmost medium-draft port in the United States and is served by ocean-going barges. The proposed port would serve as a trans-shipment point from ocean barges to river barges to supply the project during the summer ice-free period.

Power

Natural gas will be delivered to site by an approximately 507-kilometer, 356-millimeter (14 inch) diameter pipeline to supply an on-site power generation facility. The S-K 1300 Report contemplates that the electric power for the site will be generated from a dual-fueled (natural gas and diesel), reciprocating engine power plant with a steam turbine utilizing waste heat recovery from the engines. The power plant consists of two equal halves, each consisting of six reciprocating engines, and a separate steam turbine. The total generation facility is nominally rated at 182 MW initially and will increase to 215 MW after four years with the addition of two more generators (one in each half) to allow for N+2 redundancy, thus allowing planned maintenance and predicted outages without cutting back production.

Operating costs are based on importing liquefied natural gas (LNG) by ship to Anchorage and total delivery cost to site which includes regasification of the LNG and delivery from Anchorage to the Donlin Gold project via the pipeline.

The pipeline would commence at the west end of the Beluga Gas Field, approximately 48 kilometers northwest of Anchorage at a tie-in near Beluga located in the Matanuska-Susitna Borough and would run to the mine site. The pipeline would receive booster compression supplied by one compressor station. No additional compression along the pipeline route would be required. The pipeline would have capacity to transport approximately 2 million cubic meters per day of natural gas.

Water

Water requirements for the proposed project have been summarized in a Water Resources Management Plan, which has been subject to review by state and federal agencies. Water primarily will be sourced from the two drainages (American and Anaconda Creeks) within the mine footprint and pit dewatering. In some years, the water supply from these sources may not be able to meet the makeup water requirements for the plant. In these circumstances, additional water will be obtained primarily from a proposed reservoir in Snow Gulch.

The source of water supply for the construction camp and, later, the plant site potable water systems is an array of eight deep wells south of Omega Gulch, near Crooked Creek. Water supply will be pumped to freshwater storage tanks and will be treated prior to consumption.

Markets

The marketing plan is for the owners of Donlin Gold to take in-kind their respective shares of the gold production, which they can then sell for their own benefit. Under the LLC Agreement, the manager shall give the members prompt notice in advance of the delivery date upon which their respective shares of gold production will be available.

Since there are a large number of available gold purchasers, the members should not be dependent upon the sale of gold to any one customer. Gold can be sold to various gold bullion dealers or smelters on a competitive basis at spot prices.

It is expected that selling contracts for NOVAGOLD’s share of the gold production will be typical of, and consistent with, standard industry practice, and be similar to contracts for the supply of doré elsewhere in the world.

Taxation

The S-K 1300 Report contemplates that the following taxes may be levied on the project:

●Federal income tax – 21%.
●Alaska state income tax – 9.4% of net income.
●Alaska state mining license tax – 7% of taxable mining income. There is a tax holiday applied for the first 3.5 years from the start of production.

Income tax becomes payable after deductions for capital allowances.

Financial results

The total initial capital cost estimate for the Donlin Gold project is approximately $7,402 million. The project’s estimated after-tax NPV at a 5% discount rate is $3,040 million with an IRR after-tax at 9.2% using the base case gold price of $1,500 per ounce. The undiscounted break-even gold price is $930 per ounce and at a 5% discount rate is $1,180 per ounce. In the S-K 1300 Report, the overall economic viability of the project was evaluated by both discounted and undiscounted cash flow analyses, based on the engineering studies and cost estimates discussed in the S-K 1300 Report.

Assumptions in the model comprised:

●Costs prior to project Year -6, the start of basic and detailed engineering, are considered sunk. For discounted cash flow (or NPV) purposes, the model commences in Year -6. Estimates were prepared for all the individual elements of cash revenue and cash expenditures for ongoing operations.
●Estimated cash flows from revenue are based on a gold price of $1,500 per ounce. The pit has been optimized at a gold price of $1,200 per ounce.
●Gold recovery is estimated to average 89.8% over the LOM based on work and testing performed for at least pre-feasibility study purposes.
●Doré refining and shipping charges were estimated at $1.21 per ounce based on escalating to 2020 the actual refining charges for Barrick’s Goldstrike operations and a quotation for transportation and insurance costs from the Donlin Gold project site to a U.S.-based refinery utilized in 2011. In addition, 0.1% of gold produced from the mine is deducted as a cost of refining.
●The current hydrometallurgical process selection renders any contained silver into a greater refractory state, which provides less than 10% silver recovery through standard metal leaching. As a consequence, silver is not included in the Mineral Resource and Mineral Reserve estimates, and no silver credit has been applied to the project.
●To fund the $1,361 million reclamation and closure costs, the Project provides $412 million at closure by contributing to a Trust Fund commencing in Year -5 and continuing through the end of operations with annual contributions of $7.8 million. In addition to the Trust Fund, financial assurance in the form of letters of credit and/or surety bonds is required to construct and operate the mine. Per the Donlin Gold Project Reclamation Plan Approval from ADNR, financial assurance in the amount of approximately $322 million must be submitted in a form and substance approved by ADNR. The cost to maintain this financial assurance is assumed to be 0.4% of the total assured amount, annually. This equates to approximately $1.3 million per year, paid from the start of construction through the end of operations.
●No salvage is assumed at the end of operations.

Current Activities

For information on current activities, see sectionItem 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, below.

Change in Mineral Resources and Reserves from 2022 to 2023

There were no changes in reported mineral resources and reserves reported for the years ended November 30, 2021, 2022, and 2023. Paul Chilson, P.E., a Qualified Person and an employee of the Company, has reviewed the mineral reserves and mineral resources and material assumptions included in this Annual Report on Form 10-K and confirmed that they remain current as of November 30, 2023.

Mineral Resource and Reserve Internal Controls

The Company has internal controls for reviewing and documenting the information supporting the mineral resource and mineral reserve estimates, describing the methods used, and ensuring the validity of the estimates. These internal control processes were not materially impacted by the adoption of S-K 1300 in 2021. Information that is used in the mineral resource and mineral reserve estimation process was reviewed and approved by appropriate qualified persons that prepared the content of the NI 43-101 and S-K 1300 reports for the Donlin Gold project. The mineral resources and mineral reserves are subject to our internal review process on an annual basis, which includes review by NOVAGOLD’s Qualified Person based in our corporate office in Salt Lake City, Utah, USA.

Sample collection, preparation, analysis and security for all Donlin Gold core drill programs are in line with industry-standard methods for gold deposits.

●Drill programs included insertion of blank, duplicate and SRM samples,
●Quality Assurance/Quality Control program results do not indicate any problems with the analytical programs,
●Data is subject to validation, which includes checks on surveys, collar coordinates, lithology data, and assay data. The checks are appropriate, and consistent with industry standards,
●Independent data audits have been conducted and indicate that the sample collection and database entry procedures are acceptable,
●All core has been catalogued and stored in designated areas.

Mineral resources and mineral reserves are estimates that are imprecise and depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis, which may prove to be unreliable. SeeRisk Factors–* *“The quantities for our mineral resources and mineral reserves are estimates based on interpretation and assumptions and may yield less mineral production under actual conditions than is currently estimated.”