Contents

Proven and Probable Reserves

All of our reserves are located on land (i) we own or control, or (ii) that is owned or controlled by business entities established with our joint venture partners, in which the Company owns its pro-rata share of the capital stock, membership units, or interests. The risks that could affect title to our property are included above in Item 1A, Risk Factors.

A “mineral reserve” is an estimate of tonnage and grade or quality of indicated and measured mineral resources that, in the opinion of the qualified person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a measured or indicated mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. The term “economically viable,” as used in the definition of reserve, means that the qualified person has analytically determined that extraction of the mineral reserve is economically viable under reasonable investment and market assumptions.

The term “proven reserves” means the economically mineable part of a measured mineral resource and can only result from conversion of a measured mineral resource. The term “probable reserves” means reserves for which quantity and grade are computed from information similar to that used for proven reserves, but the sites for sampling are farther apart or are otherwise less closely spaced. The degree of assurance, although lower than that for proven reserves, is high enough to assume continuity between points of observation. Proven and probable reserves include gold, copper, silver, lead, zinc or molybdenum attributable to Newmont’s ownership or economic interest.

Proven and probable reserves are based on extensive drilling, sampling, mine modeling and metallurgical testing from which we determined economic feasibility. The reference point for mineral reserves is the point of delivery to the process plant. Metal price assumptions, adjusted for our exchange rate assumption, are based on considering such factors as market forecasts, industry consensus and management estimates. The price sensitivity of reserves depends upon several factors including grade, metallurgical recovery, operating cost, waste-to-ore ratio and ore type. Metallurgical recovery rates vary depending on the metallurgical properties of each deposit and the production process used. The reserve tables below list the average metallurgical recovery rate for each deposit, which takes into account the relevant processing methods. The cut-off grade, or lowest grade of mineralization considered economic to process, varies between deposits depending upon prevailing economic conditions, mineability of the deposit, by-products, amenability of the ore to gold, copper, silver, lead, zinc or molybdenum extraction and type of milling or leaching facilities available. Reserve estimates may have non-material differences in comparison to our joint venture partners due to differences in classification and rounding methodology.

The proven and probable reserve figures presented herein are estimates based on information available at the time of calculation. No assurance can be given that the indicated levels of recovery of gold, copper, silver, lead, zinc and molybdenum will be realized. Ounces of gold or silver or pounds of copper, lead, zinc or molybdenum included in the proven and probable reserves are those contained prior to losses during metallurgical treatment. Reserve estimates may require revision based on actual production. Market fluctuations in the price of gold, copper, silver, lead, zinc and molybdenum, as well as increased production costs or reduced metallurgical recovery rates, could render certain proven and probable reserves containing higher cost reserves uneconomic to exploit and might result in a reduction of reserves.

We had attributable proven and probable gold reserves of 135.9 million ounces at December 31, 2023. For 2023 and 2022, reserves were estimated at a gold price assumption of $1,400, except as noted below for sites acquired through the Newcrest transaction, which have used more conservative price assumptions. We estimate that our 2023 reserves would increase by 5% (7.1 million ounces), or decline by 6% (8.3 million ounces), if the gold price assumption increased or decreased $100 per ounce, respectively, with all other assumptions remaining constant.

We publish reserves annually, and will recalculate reserves at December 31, 2024, taking into account metal prices, changes, if any, to future production and capital costs, divestments and depletion as well as any acquisitions and additions during 2024.

The Company has internal controls for reviewing and documenting the information supporting the mineral reserve and mineral resource estimates, describing the methods used, and ensuring the validity of the estimates. Information that is utilized to compile mineral reserves and resources is prepared and certified by appropriately qualified persons at the mine site level and is subject to our internal review process which includes review by the Newmont-designated site and the Qualified Person (“QP”) based in our corporate office in Denver, Colorado. Additionally, all material sites are audited every three years and the non-material sites on a four-year cycle by subject matter experts for compliance to internal standards and guidelines as well as regulatory requirements. The QP presents the mineral reserve and mineral resource information to the Audit Committee and the Disclosure Committee on an annual basis for further review.

The following tables detail gold proven and probable reserves reflecting only those reserves attributable to Newmont’s ownership or economic interest at December 31, 2023 and 2022:

Gold Reserves at December 31, 2023 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)Tonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)Tonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)MetallurgicalRecovery (3)
CC&V Open Pit100%38,8000.425007,8000.3510046,6000.4060058%
CC&V Leach Pads (4)100%———28,3000.7470028,3000.7470056%
Total CC&V, United States (5)38,8000.4250036,1000.6680075,0000.531,30057%
Musselwhite, Canada (6)100%3,2006.787003,8006.308007,0006.521,50096%
Porcupine Underground (7)100%1,4007.063001,6008.344003,0007.7570094%
Porcupine Open Pit (8)100%3,2001.4310026,6001.541,30029,7001.531,50093%
Total Porcupine, Canada4,5003.1450028,2001.931,70032,7002.102,20093%
Éléonore, Canada (9)100%2,1005.083006,8005.471,2008,9005.381,50092%
Red Chris Open Pit70%———30,2000.3730030,2000.3730053%
Red Chris Underground70%———171,7000.643,500171,7000.643,50070%
Total Red Chris, Canada (10)(33)———201,9000.603,900201,9000.603,90068%
Brucejack, Canada (11)(33)100%———11,5008.443,10011,5008.443,10096%
Peñasquito, Mexico (12)(31)100%123,7000.572,200167,3000.442,400291,0000.504,60059%
Merian, Suriname (13)75%29,6001.191,10074,4001.152,800104,0001.163,90093%
Cerro Negro, Argentina (14)100%1,90011.817007,30010.752,5009,20010.973,20094%
Yanacocha Open Pit (15)100%21,7000.80600107,0000.752,600128,6000.763,20056%
Yanacocha Underground (16)100%———12,3006.062,40012,3006.062,40097%
Total Yanacocha, Peru21,7000.80600119,2001.305,000140,9001.225,50073%
Pueblo Viejo Open Pit40%25,8002.281,90050,8002.083,40076,6002.155,30082%
Pueblo Viejo Stockpiles (17)40%———39,7002.122,70039,7002.122,70083%
Total Pueblo Viejo, Dominican Republic (18)25,8002.281,90090,5002.106,100116,3002.148,00082%
NuevaUnión, Chile (19)(30)50%———341,1000.475,100341,1000.475,10066%
Norte Abierto, Chile (20)(30)50%———598,8000.6011,600598,8000.6011,60074%
Boddington Open Pit100%215,3000.674,600192,6000.643,900407,9000.668,60085%
Boddington Stockpiles (17)100%2,0000.72—70,0000.431,00072,0000.441,00080%
Total Boddington, Australia (10)217,3000.674,700262,6000.584,900479,9000.629,60084%
Tanami, Australia (21)100%9,9005.581,80016,6005.713,10026,6005.664,80098%
Cadia, Australia (22)(31)(33)100%———1,102,3000.4214,7001,102,3000.4214,70081%
Lihir Open Pits100%———159,9002.7614,200159,9002.7614,20078%
Lihir Stockpiles (17)100%———57,2001.833,40057,2001.833,40078%
Total Lihir, Papua NewGuinea (23)(31)(33)———217,1002.5117,500217,1002.5117,50078%
Wafi-Golpu, Papua New Guinea (10)(30)(33)50%———194,5000.825,100194,5000.825,10068%
Ahafo South Open Pit (24)100%5,2002.7650035,5001.681,90040,7001.822,40090%
Ahafo South Underground (25)100%8,3003.1380014,3002.351,10022,6002.641,90094%
Ahafo South Stockpiles (17)(26)100%23,4001.01800———23,4001.0180091%
Total Ahafo South, Ghana36,9001.732,10049,8001.883,00086,7001.825,10092%
Ahafo North, Ghana (27)100%26,0002.382,00027,1002.432,10053,1002.414,10091%
Akyem Open Pit100%13,0001.526005,9001.6130019,0001.5590090%
Akyem Stockpiles (17)100%6,7000.78200———6,7000.7820090%
Total Akyem, Ghana (28)19,7001.278005,9001.6130025,6001.351,10090%
NGM Open Pit38.5%———154,7001.015,000154,7001.015,00077%
NGM Stockpiles (17)38.5%15,1002.011,00014,0002.441,10029,1002.222,10069%
NGM Underground38.5%5,10011.581,90035,1008.199,30040,2008.6211,10087%
Total NGM, United States (29)20,2004.422,900203,9002.3515,400224,1002.5418,30082%
Total Gold581,4001.2222,8003,766,8000.94113,2004,348,1000.97135,90080%
Gold Reserves at December 31, 2022 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)Tonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)Tonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)MetallurgicalRecovery (3)
CC&V Open Pit100%49,3000.3962012,0000.3112061,4000.3774057%
CC&V Leach Pads (4)100%———32,6000.7882032,6000.7882056%
Total CC&V, United States49,3000.3962044,6000.6694094,0000.521,56056%
Musselwhite, Canada100%3,4005.485907,0005.891,32010,4005.761,92096%
Porcupine Underground100%1,8008.505007008.471902,5008.4969092%
Porcupine Open Pit100%2,6001.6013031,9001.441,48034,5001.461,61093%
Total Porcupine, Canada4,4004.4463032,6001.591,67037,0001.932,30093%
Éléonore, Canada100%1,9005.113107,4005.251,2609,4005.221,57092%
Peñasquito, Mexico100%104,5000.581,960212,0000.513,450316,5000.535,41069%
Merian, Suriname75%31,0001.161,15073,8001.162,750104,8001.163,90093%
Cerro Negro, Argentina100%1,6009.465007,80010.132,5309,40010.023,03095%
Yanacocha Open Pits100%27,5000.71630119,0000.722,750146,5000.723,38057%
Yanacocha Underground100%———12,3006.062,40012,3006.062,40097%
Total Yanacocha, Peru (31)27,5000.71630131,3001.225,140158,8001.135,78073%
Pueblo Viejo Open Pit40%23,5002.291,73055,0002.153,80078,5002.195,53090%
Pueblo Viejo Stockpiles (17)40%———38,2002.172,67038,2002.172,67090%
Total Pueblo Viejo, Dominican Republic (18)(31)23,5002.291,73093,1002.166,470116,6002.198,20090%
NuevaUnión, Chile (19)(30)50%———341,1000.475,110341,1000.475,11066%
Norte Abierto, Chile (20)(30)50%———598,8000.6011,620598,8000.6011,62074%
Boddington Open Pit100%237,4000.685,190209,3000.644,300446,7000.669,49085%
Boddington Stockpiles (17)100%2,0000.715076,2000.431,04078,3000.431,09080%
Total Boddington, Australia239,4000.685,240285,5000.585,350524,9000.6310,58084%
Tanami, Australia100%11,3005.051,84021,6005.493,82033,0005.345,66098%
Ahafo South Open Pit100%9,0002.4270038,6001.672,07047,6001.812,77090%
Ahafo South Underground100%9,3003.681,10013,3002.621,13022,6003.062,23094%
Ahafo South Stockpiles (17)100%22,1000.91640———22,1000.9164090%
Total Ahafo South, Ghana40,4001.892,45051,9001.923,20092,3001.905,65092%
Ahafo North, Ghana100%———50,1002.373,82050,1002.373,82091%
Akyem Open Pit100%14,3001.567208,0001.8247022,3001.661,19091%
Akyem Stockpiles (17)100%11,9000.71270———11,9000.7127092%
Total Akyem, Ghana26,2001.189908,0001.8247034,2001.331,46091%
NGM Open Pit38.5%8,3001.73460151,1000.964,650159,4001.005,11076%
NGM Stockpiles (17)38.5%10,1002.0567015,0002.511,21025,1002.321,88079%
NGM Underground38.5%13,7009.724,29027,5008.267,32041,3008.7511,61088%
Total NGM, United States (29)32,1005.245,410193,7002.1213,180225,8002.5618,59084%
Total Gold596,7001.2524,0502,160,4001.0472,1002,757,1001.0996,14083%

(1)Gold reserves, at sites in which Newmont is the operator for 2023 and 2022, were estimated at a gold price of $1,400 per ounce, unless otherwise noted. Reserves provided by other operators may use pricing that differs. Amounts presented may not recalculate in total due to rounding.

(2)Tonnages include allowances for losses resulting from mining methods. Tonnages are rounded to the nearest 100,000.

(3)Ounces are estimates of metal contained in ore tonnages and do not include allowances for processing losses. Metallurgical recovery rates represent the estimated amount of metal to be recovered through metallurgical extraction processes. Ounces may not recalculate as they are rounded to the nearest 100,000 in 2023 and nearest 10,000 in 2022.

(4)Leach pad material is the material on leach pads at the end of the year from which gold remains to be recovered. In-process reserves are reported separately where ounces exceed 100,000 and are greater than 5% of the total site-reported reserves.

(5)Cut-off grade utilized in 2023 reserves not less than 0.10 gram per tonne.

(6)Cut-off grade utilized in 2023 reserves not less than 3.80 gram per tonne.

(7)Cut-off grade utilized in 2023 reserves not less than 4.89 gram per tonne.

(8)Cut-off grade utilized in 2023 reserves not less than 0.64 gram per tonne.

(9)Cut-off grade utilized in 2023 reserves not less than 4.11 gram per tonne.

(10)Gold cut-off grade varies with level of copper credits.

(11)Gold cut-off grade varies with level of silver credits.

(12)Gold cut-off grade varies with level of silver, lead, and zinc credits.

(13)Cut-off grade utilized in 2023 reserves not less than 0.29 gram per tonne.

(14)Cut-off grade utilized in 2023 reserves not less than 4.30 gram per tonne.

(15)Gold cut-off grades utilized in 2023 reserves were as follows: oxide leach material not less than 0.14 gram per tonne and refractory mill material not less than 1.23 gram per tonne.

(16)Gold cut-off grades utilized in 2023 were as follows: oxide mill material not less than 3.37 gram per tonne and refractory mill material varies with level of copper and silver credits.

(17)Stockpiles are comprised primarily of material that has been set aside to allow processing of higher grade material in the mills. Stockpiles increase or decrease depending on current mine plans. Stockpile reserves are reported separately where ounces exceed 100,000 and are greater than 5% of the total site-reported reserves.

(18)The Pueblo Viejo mine, which is 40% owned by Newmont, is accounted for as an equity method investment. Reserve estimates provided by Barrick, the operator of Pueblo Viejo.

(19)Project is currently undeveloped. Reserve estimates provided by the NuevaUnión joint venture.

(20)Project is currently undeveloped. Reserve estimates provided by the Norte Abierto joint venture.

(21)Cut-off grade utilized in 2023 reserves not less than 2.40 gram per tonne.

(22)Gold cut-off grade varies with level of copper, silver, and molybdenum credits.

(23)Cut-off grade utilized in 2023 reserves not less than 1.20 gram per tonne.

(24)Cut-off grade utilized in 2023 reserves not less than 0.63 gram per tonne.

(25)Cut-off grade utilized in 2023 reserves not less than 2.20 gram per tonne.

(26)Cut-off grade utilized in 2023 reserves not less than 0.56 gram per tonne.

(27)Cut-off grade utilized in 2023 reserves not less than 0.58 gram per tonne.

(28)Cut-off grade utilized in 2023 reserves not less than 0.52 gram per tonne.

(29)Reserve estimates provided by Barrick, the operator of the NGM joint venture.

(30)Currently included in Corporate and Other in Note 4 to the Consolidated Financial Statements.

(31)Amounts presented herein have been rounded to the nearest 100,000 in 2023 and nearest 10,000 in 2022 for ounces and 100,000 for tonnes and therefore may not agree to the respective Technical Report Summaries provided for certain properties as provided under exhibit 96.

(32)In 2022, the Company increased its ownership interest in Yanacocha to 100% by acquiring Buenaventura’s 43.65% noncontrolling interest and Sumitomo's 5% noncontrolling interest. Refer to Note 1 to the Consolidated Financial Statements for further information.

(33)Sites acquired through the Newcrest transaction. Refer to Note 3 to the Consolidated Financial Statements for further information. Gold reserves at sites acquired through the Newcrest transaction were estimated at a gold price of $1,300 per ounce, with the exception of Lihir, for which gold reserves were estimated using Newmont's price assumptions, and certain legacy estimates, which have applied older, more conservative price assumptions.

The following tables detail copper proven and probable reserves reflecting only those reserves attributable to Newmont’s ownership or economic interest at December 31, 2023 and 2022:

Copper Reserves at December 31, 2023 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(Cu %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Cu %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Cu %)Pounds (3)(millions)MetallurgicalRecovery (3)
Red Chris Open Pit70%——%—30,2000.43%30030,2000.43%30080%
Red Chris Underground70%——%—171,7000.52%2,000171,7000.52%2,00084%
Total Red Chris, Canada (4)(14)——%—201,9000.51%2,300201,9000.51%2,30084%
Yanacocha, Peru (5)100%——%—111,1000.63%1,500111,1000.63%1,50083%
NuevaUnión, Chile (6)(11)50%——%—1,118,0000.40%9,8001,118,0000.40%9,80088%
Norte Abierto, Chile (7)(11)50%——%—598,8000.22%2,900598,8000.22%2,90087%
Boddington Open Pit100%215,3000.09%400192,6000.11%400407,9000.10%90082%
Boddington Stockpiles (8)100%2,0000.15%—70,0000.09%10072,0000.09%10073%
Total Boddington, Australia (4)217,3000.09%400262,6000.10%600479,9000.10%1,00080%
Cadia, Australia (9)(12)(14)100%——%—1,102,3000.29%7,1001,102,3000.29%7,10086%
Wafi-Golpu, Papua New Guinea (4)(11)(14)50%——%—194,5001.20%5,100194,5001.20%5,10095%
NGM, United States (10)38.5%3,7000.16%—82,4000.17%30086,1000.17%30065%
Total Copper221,0000.09%5003,671,5000.37%29,7003,892,5000.35%30,10088%
Copper Reserves at December 31, 2022 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(Cu %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Cu %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Cu %)Pounds (3)(millions)MetallurgicalRecovery (3)
Yanacocha Open Pits and Underground, Peru (13)100%——%—111,1000.63%1,530111,1000.63%1,53083%
NuevaUnión, Chile (6)(11)50%——%—1,118,0000.40%9,8001,118,0000.40%9,80088%
Norte Abierto, Chile (7)(11)50%——%—598,8000.22%2,890598,8000.22%2,89087%
Boddington Open Pit100%237,4000.10%510209,3000.11%500446,7000.10%1,01082%
Boddington Stockpiles (8)100%2,0000.13%1076,2000.09%15078,3000.09%15074%
Total Boddington, Australia239,4000.10%520285,5000.10%640524,9000.10%1,16081%
NGM, United States (10)38.5%7,0000.16%3081,7000.16%30088,7000.16%32065%
Total Copper246,4000.10%5402,195,2000.31%15,1602,441,5000.29%15,71086%

(1)Copper reserves, at sites in which Newmont is the operator, for 2023 and 2022 were estimated at a copper price of $3.50 per pound, unless otherwise noted. Reserves provided by other operators may use pricing that differs. Amounts presented may not recalculate in total due to rounding.

(3)Pounds are estimates of metal contained in ore tonnages and do not include allowances for processing losses. Metallurgical recovery rates represent the estimated amount of metal to be recovered through metallurgical extraction processes. Pounds may not recalculate as they are rounded to the nearest 100 million for 2023 and nearest 10 million for 2022.

(4)Copper cut-off grade varies with level of gold credits.

(5)Reserve estimates relate to the undeveloped Yanacocha Sulfides project. Copper cut-off grade varies with level of gold and silver credits.

(6)Project is currently undeveloped. Reserve estimates provided by the NuevaUnión joint venture.

(7)Project is currently undeveloped. Reserve estimates provided by the Norte Abierto joint venture.

(8)Stockpiles are comprised primarily of material that has been set aside to allow processing of higher grade material in the mills. Stockpiles increase or decrease depending on current mine plans. Stockpiles are reported separately where pounds exceed 100 million and are greater than 5% of the total site reported reserves.

(9)Copper cut-off grade varies with level of gold, silver, and molybdenum credits.

(10)Reserve estimates provided by Barrick, the operator of the NGM joint venture.

(11)Currently included in Corporate and Other in Note 4 to the Consolidated Financial Statements.

(12)Amounts presented herein have been rounded to the nearest 100 million for pounds and 100,000 for tonnes and therefore may not agree to the respective Technical Report Summaries provided for certain properties as provided under exhibit 96.

(13)In 2022, the Company increased its ownership interest in Yanacocha to 100% by acquiring Buenaventura’s 43.65% noncontrolling interest and Sumitomo's 5% noncontrolling interest. Refer to Note 1 to the Consolidated Financial Statements for further information.

(14)Sites acquired through the Newcrest transaction. Refer to Note 3 to the Consolidated Financial Statements for further information. Copper reserves at sites acquired through the Newcrest transaction were estimated at a copper price of $3.00 per pound, with the exception of certain legacy estimates, which have applied older, more conservative price assumptions.

The following tables detail silver proven and probable reserves reflecting only those reserves attributable to Newmont’s ownership or economic interest at December 31, 2023 and 2022:

Silver Reserves at December 31, 2023 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)Tonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)Tonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)MetallurgicalRecovery (3)
Brucejack, Canada (4)(17)100%———11,50034.7112,80011,50034.7112,80085%
Peñasquito Open Pits100%121,70037.98148,600142,80030.31139,200264,50033.84287,80080%
Peñasquito Stockpiles (5)100%2,00033.972,20024,50028.7922,70026,50029.1824,90080%
Total Peñasquito, Mexico (6)(15)123,70037.91150,800167,30030.09161,800291,00033.42312,60080%
Cerro Negro, Argentina (4)100%1,90085.485,2007,30069.2316,3009,20072.5821,50075%
Yanacocha Open Pits and Underground (7)100%———93,40019.8959,80093,40019.8959,80054%
Yanacocha Stockpiles and Leach Pads (5)(8)100%———86,0009.0725,10086,0009.0725,10013%
Total Yanacocha, Peru———179,50014.7084,800179,50014.7084,80042%
Pueblo Viejo Open Pits40%25,80013.1510,90050,80012.3120,10076,60012.5931,00074%
Pueblo Viejo Stockpiles (5)40%———39,70014.4818,50039,70014.4818,50070%
Total Pueblo Viejo, Dominican Republic (9)25,80013.1510,90090,50013.2638,600116,30013.2449,50073%
NuevaUnión, Chile (10)(14)50%———1,118,0001.3147,2001,118,0001.3147,20066%
Norte Abierto, Chile (11)(14)50%———598,8001.5229,300598,8001.5229,30074%
Cadia, Australia (12)(15)(17)100%———1,102,3000.6824,0001,102,3000.6824,00067%
NGM, United States (13)38.5%2,4007.9760060,8006.9313,60063,2006.9714,20038%
Total Silver153,90033.87167,6003,335,9004.00428,4003,489,8005.31596,00070%
Silver Reserves at December 31, 2022 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)Tonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)Tonnage (2)(000 tonnes)Grade(g/tonne)Ounces (3)(000)MetallurgicalRecovery (3)
Peñasquito Open Pits100%103,90038.00126,990184,50033.04196,020288,50034.82323,00086%
Peñasquito Stockpiles (5)100%50037.8866027,50025.3322,39028,00025.5723,05086%
Total Peñasquito, Mexico104,50038.00127,640212,00032.04218,410316,50034.00346,05086%
Cerro Negro, Argentina100%1,60074.723,9407,80062.3115,5509,40064.4719,49075%
Yanacocha Open Pits and Underground100%———93,40019.9059,76093,40019.9059,76054%
Yanacocha Stockpiles and Leach Pads (5)(8)100%2,80031.482,82093,6008.0424,19096,4008.7127,01013%
Total Yanacocha, Peru (16)2,80031.482,820187,00013.9683,950189,80014.2286,77041%
Pueblo Viejo Open Pits40%23,50012.949,78055,00012.8422,68078,50012.8732,46065%
Pueblo Viejo Stockpiles (5)40%———38,20015.1018,52038,20015.1018,52065%
Total Pueblo Viejo, Dominican Republic (9)(15)23,50012.949,78093,10013.7641,200116,60013.6050,98065%
NuevaUnión, Chile (10)(14)50%———1,118,0001.3147,1701,118,0001.3147,17066%
Norte Abierto, Chile (11)(14)50%———598,8001.5229,340598,8001.5229,34074%
NGM, United States (13)38.5%5,3007.461,28060,1006.2412,06065,5006.3413,34038%
Total Silver137,80032.84145,4602,276,9006.12447,6802,414,6007.64593,14074%

(1)Silver reserves, at sites in which Newmont is the operator, for 2023 and 2022 were estimated at a silver price of $20.00 per ounce, unless otherwise noted. Reserves provided by other operators may use pricing that differs. Amounts presented may not recalculate in total due to rounding.

(3)Ounces are estimates of metal contained in ore tonnages and do not include allowances for processing losses. Metallurgical recovery rates represent the estimated amount of metal to be recovered through metallurgical extraction processes. Ounces may not recalculate as they are rounded to the nearest 100,000 for 2023 and nearest 10,000 for 2022.

(4)Silver cut-off grade varies with gold credits.

(5)Stockpiles are comprised primarily of material that has been set aside to allow processing of higher grade material in the mills. Stockpiles increase or decrease depending on current mine plans. Stockpile reserves are reported separately where ounces exceed 100,000 and are greater than 5% of the total site-reported reserves.

(6)Silver cut-off grade varies with gold, lead, and zinc credits.

(7)Silver cut-off grade varies with gold and copper credits.

(8)Leach pad material is the material on leach pads at the end of the year from which silver remains to be recovered. In-process reserves are reported separately where ounces exceed 100,000 and are greater than 5% of the total site-reported reserves.

(9)The Pueblo Viejo mine, which is 40% owned by Newmont, is accounted for as an equity method investment. Reserve estimates provided by Barrick, the operator of Pueblo Viejo.

(10)Project is currently undeveloped. Reserve estimates provided by the NuevaUnión joint venture.

(11)Project is currently undeveloped. Reserve estimates provided by the Norte Abierto joint venture.

(12)Silver cut-off grade varies with gold, copper, and molybdenum credits.

(13)Reserve estimates provided by Barrick, the operator of the NGM joint venture.

(14)Currently included in Corporate and Other in Note 4 to the Consolidated Financial Statements.

(15)Amounts presented herein have been rounded to the nearest 100,000 in 2023 and nearest 10,000 in 2022 for ounces and 100,000 for tonnes and therefore may not agree to the respective Technical Report Summaries provided for certain properties as provided under exhibit 96.

(16)In 2022, the Company increased its ownership interest in Yanacocha to 100% by acquiring Buenaventura’s 43.65% noncontrolling interest and Sumitomo's 5% noncontrolling interest. Refer to Note 1 to the Consolidated Financial Statements for further information.

(17)Sites acquired through the Newcrest transaction. Refer to Note 3 to the Consolidated Financial Statements for further information. Silver reserves at sites acquired through the Newcrest transaction were estimated at a silver price of $18.00 per ounce.

The following tables detail lead proven and probable reserves reflecting only those reserves attributable to Newmont’s ownership or economic interest at December 31, 2023 and 2022:

Lead Reserves at December 31, 2023 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(Pb %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Pb %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Pb %)Pounds (3)(millions)MetallurgicalRecovery (3)
Peñasquito Open Pits, Mexico (4)(6)100%121,7000.37%1,000142,8000.28%900264,5000.32%1,90073%
Peñasquito Stockpiles, Mexico (4)(5)(6)100%2,0000.32%—24,5000.38%20026,5000.37%20073%
Total Lead123,7000.37%1,000167,3000.30%1,100291,0000.33%2,10073%
Lead Reserves at December 31, 2022 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(Pb %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Pb %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Pb %)Pounds (3)(millions)MetallurgicalRecovery (3)
Peñasquito Open Pits, Mexico100%103,9000.36%830184,5000.31%1,270288,5000.33%2,09072%
Peñasquito Stockpiles, Mexico (5)100%5000.16%—27,5000.33%20028,0000.33%20072%
Total Lead104,5000.36%830212,0000.31%1,470316,5000.33%2,30072%

(1)Lead reserves for 2023 and 2022 were estimated at a lead price of $1.00 per pound. Amounts presented may not recalculate in total due to rounding.

(3)Pounds are estimates of metal contained in ore tonnages and do not include allowances for processing losses. Metallurgical recovery rates represent the estimated amount of metal to be recovered through metallurgical extraction processes. Pounds may not recalculate as they are rounded to the nearest 100 million in 2023 and nearest 10 million in 2022.

(4)Lead cut-off grade varies with level of gold, silver, and zinc credits.

(5)Stockpiles are comprised primarily of material that has been set aside to allow processing of higher grade material in the mills. Stockpiles increase or decrease depending on current mine plans. Stockpile reserves are reported separately where pounds exceed 100 million and are greater than 5% of the total site-reported reserves.

(6)Amounts presented herein have been rounded to the nearest 100 million for pounds and 100,000 for tonnes and therefore may not agree to the respective Technical Report Summaries provided for certain properties as provided under exhibit 96.

The following tables detail zinc proven and probable reserves reflecting only those reserves attributable to Newmont’s ownership or economic interest at December 31, 2023 and 2022:

Zinc Reserves at December 31, 2023 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(Zn %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Zn %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Zn %)Pounds (3)(millions)MetallurgicalRecovery (3)
Peñasquito Open Pits, Mexico (4)(6)100%121,7000.95%2,500142,8000.66%2,100264,5000.79%4,60082%
Peñasquito Stockpiles, Mexico (4)(5)(6)100%2,0000.66%—24,5000.52%30026,5000.53%30082%
Total Zinc123,7000.94%2,600167,3000.63%2,300291,0000.77%4,90082%
Zinc Reserves at December 31, 2022 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(Zn %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Zn %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Zn %)Pounds (3)(millions)MetallurgicalRecovery (3)
Peñasquito Open Pits, Mexico100%103,9000.94%2,160184,5000.76%3,080288,5000.82%5,24081%
Peñasquito Stockpiles, Mexico (5)100%5000.95%1027,5000.46%28028,0000.47%29081%
Total Zinc104,5000.94%2,180212,0000.72%3,360316,5000.79%5,54081%

(1)Zinc reserves for 2023 and 2022 were estimated at a zinc price of $1.20 per pound. Amounts presented may not recalculate in total due to rounding.

(3)Pounds are estimates of metal contained in ore tonnages and do not include allowances for processing losses. Metallurgical recovery rates represent the estimated amount of metal to be recovered through metallurgical extraction processes. Pounds may not recalculate as they are rounded to the nearest 100 million in 2023 and nearest 10 million in 2022.

(4)Zinc cut-off grade varies with level of gold, silver, and lead credits.

(5)Stockpiles are comprised primarily of material that has been set aside to allow processing of higher grade material in the mills. Stockpiles increase or decrease depending on current mine plans. Stockpile reserves are reported separately where pounds exceed 100 million and are greater than 5% of the total site-reported reserves.

(6)Amounts presented herein have been rounded to the nearest 100 million for pounds and 100,000 for tonnes and therefore may not agree to the respective Technical Report Summaries provided for certain properties as provided under exhibit 96.

The following tables detail molybdenum proven and probable reserves reflecting only those reserves attributable to Newmont’s ownership or economic interest at December 31, 2023 and 2022:

Molybdenum Reserves at December 31, 2023 (1)
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(Mo %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Mo %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Mo %)Pounds (3)(millions)MetallurgicalRecovery (3)
NuevaUnión, Chile (4)(5)50%——%—776,9000.02%300776,9000.02%30048%
Cadia, Australia (6)(7)(8)100%——%—1,085,1000.01%2001,085,1000.01%20072%
Total Molybdenum——%—1,862,0000.01%5001,862,0000.01%50055%
Molybdenum Reserves at December 31, 2022
Proven Reserves · Probable Reserves · Proven and Probable Reserves
Deposits/DistrictsNewmontShareTonnage (2)(000 tonnes)Grade(Mo %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Mo %)Pounds (3)(millions)Tonnage (2)(000 tonnes)Grade(Mo %)Pounds (3)(millions)MetallurgicalRecovery (3)
NuevaUnión, Chile (4)(5)50%——%—776,9000.02%270776,9000.02%27048%
Total Molybdenum——%—776,9000.02%270776,9000.02%27048%

(1)Molybdenum reserves, at sites in which Newmont is the operator, for 2023 were estimated at a molybdenum price of $8.00 per pound. Reserves for NuevaUnión are estimated based on a molybdenum price set by NuevaUnión joint venture. Amounts presented may not recalculate in total due to rounding.

(3)Pounds are estimates of metal contained in ore tonnages and do not include allowances for processing losses. Metallurgical recovery rates represent the estimated amount of metal to be recovered through metallurgical extraction processes. Pounds may not recalculate as they are rounded to the nearest 100 million in 2023 and nearest 10 million in 2022.

(4)Project is currently undeveloped. Reserve estimates provided by the NuevaUnión joint venture.

(5)Currently included in Corporate and Other in Note 4 to the Consolidated Financial Statements.

(6)Molybdenum cut-off grade varies with level of gold, silver, and copper credits.

(7)Amounts presented herein have been rounded to the nearest 100 million for pounds and 100,000 for tonnes and therefore may not agree to the respective Technical Report Summaries provided for certain properties as provided under exhibit 96.

(8)Site acquired through the Newcrest transaction. Refer to Note 3 to the Consolidated Financial Statements for further information.

ContentsView on SEC.gov