Production and Development Properties
Newmont’s properties are described below and unless otherwise noted are in the production stage and are operated by Newmont. All key permits have either been obtained by Newmont or approval is expected to be received in the normal course of business. Production and other operating statistics are presented below in the Operating Statistics section for each site. In addition, Newmont holds investment interests in Canada, Mexico, Chile, Argentina and various other locations. The Company maintains its corporate headquarters in Denver, Colorado U.S. and has various regional offices.
Refer to Item 1A, Risk Factors, for risks related to our properties.
Cripple Creek & Victor, U.S. (100% owned) CC&V, located next to the town of Victor and the city of Cripple Creek, Colorado, is an open pit operation. The CC&V operation comprises two state mining leases, three surface parcels, 154 mineral parcels, 1,753 patented mining claims and 13 unpatented lode claims encompassing a total area of 12,985 acres (5,255 hectares). CC&V is an epithermal alkalic deposit with heap leaching facilities. The available mining fleet consists of two hydraulic shovels, two loaders, and 21 haul trucks, each with a 250-tonne payload. CC&V’s gross property, plant and mine development at December 31, 2023 was $1,132. CC&V reported 1.3 million ounces of gold reserves at December 31, 2023.
Musselwhite, Canada. (100% owned) Musselwhite, located approximately 265 miles (430 kilometers) north of Thunder Bay, Ontario, is an underground operation. The Musselwhite operation comprises 940 mining claims and 338 mining leases, issued under the Ontario Mining Act, encompassing an area of 13,366 acres (5,409 hectares). The mining leases expire between 2025 and 2033. Musselwhite is an iron formation hosted gold deposit. Process facilities include a conventional mill, which consists of a crushing and grinding circuit, carbon-in-pulp and carbon-in-leach plants, elution circuits and an electrowinning plant where the gold is recovered and smelted to produce doré. The available mining fleet consists of 11 underground loaders and 14 haul trucks, each with a 45-tonne payload. Musselwhite’s gross property, plant and mine development at December 31, 2023 was $1,276. Musselwhite reported 1.5 million ounces of gold reserves at December 31, 2023.
Porcupine, Canada. (100% owned) Porcupine consists of the Hollinger open pit and Hoyle Pond underground operations, located in the city of Timmins, Ontario, as well as the Borden underground operation, located near the town of Chapleau, Ontario. The Porcupine operation is comprised of 699 mining claims, 1,105 mining patents, and 157 mining leases, issued under the Ontario Mining Act, encompassing an area of 98,138 acres (39,715 hectares). The Borden operations is comprised of 488 mining cell claims, 530 surface and mining patents, and 35 surface and mining leases encompassing an area of 245,232 acres (99,241 acres). Mineralization at Hollinger and Hoyle, in Timmins, comprises multiple generations of quartz-carbonate-tourmaline albite veins, associated pyrite alteration envelopes, and disseminated pyrite mineralization. Mineralization at Borden consists of a shear zone containing quartz-vein hosted sulfides within a high-grade metamorphic greenstone package. Process facilities, located in the city of Timmins, include a conventional mill, which consists of a crushing and grinding circuit, carbon-in-pulp and carbon-in-leach plants, Knelson concentrators, Acacia reactor, elution circuits and an electrowinning plant where the gold is recovered and smelted to produce doré. The available mining fleet consists of three hydraulic shovels, six loaders, 21 underground loaders, and 27 haul trucks, with payloads ranging from 30 to 137 tonnes. Porcupine’s gross property, plant and mine development at December 31, 2023 was $1,830. Porcupine reported 2.2 million ounces of gold reserves at December 31, 2023.
Éléonore, Canada.(100% owned) Éléonore, located approximately 510 miles (825 kilometers) north of Montreal in Eeyou Istchee/James Bay in Northern Quebec, is an underground operation. The Éléonore operation is comprised of 368 mining claims and one mining lease, issued under the Quebec Mining Act, encompassing 48,210 acres (19,511 hectares). Éléonore is a clastic sediment-hosted stockwork-disseminated gold deposit. Process facilities include a conventional mill which consists of a crushing and grinding circuit, flotation circuit, carbon-in-pulp circuits and an electrowinning plant where the gold is recovered and smelted to produce doré. The available fleet consists of 15 underground loaders, and 11 haul trucks, each with 45 to 60-tonne payloads. Éléonore’s gross property, plant and mine development at December 31, 2023 was $1,208. Éléonore reported 1.5 million ounces of gold reserves at December 31, 2023.
Red Chris, Canada.(70% owned) Red Chris is 70% owned by Newcrest Red Chris Mining Limited, a Newmont subsidiary, and 30% owned by Red Chris Development Company Ltd., an Imperial Metals subsidiary, and is accounted for under proportionate consolidation. Red Chris is located in northwest British Columbia, Canada, approximately 11 miles (18 kilometers) southeast of the Iskut village, 50 miles (80 kilometers) south of Dease Lake, and 7 miles (12 kilometers) east of the Stewart-Cassiar Highway 37. The Red Chris operation is comprised of five mining leases which cover 12,703 acres (5,141 hectares) and 75 mineral claims, encompassing an area of approximately 47,140 acres (19,077 hectares). The mining leases expire in 2042. Red Chris is a copper-gold open pit mining operation. Newmont is conducting a feasibility study on a potential underground block cave mine, and has commenced an exploration decline. Gold and copper porphyry-style mineralization consists of vein, disseminated and breccia sulfides. The main sulfide mineral assemblage is pyrite-chalcopyrite-bornite. Ore from the mine is fed to a primary crusher with crushed ore conveyed to a coarse ore stockpile. From there ore is reclaimed and fed to a conventional SAG mill–ball mill–pebble crushing comminution circuit which in turn feeds a flotation circuit. Flotation concentrate is dewatered and loaded into trucks for transportation off-site. The processing facilities are housed in a single process building. Additional to crushing and processing are waste rock storage facilities, a tailings storage facility, water treatment facilities, and waste treatment facilities. The available fleet consists of three face shovels, five drills, 23 trucks (dump and water trucks), three graders, five excavators, nine loaders, and five dozers. Red Chris’s gross property, plant and mine development at December 31, 2023 was $1,671. Red Chris reported 3.9 million ounces of gold reserves and 2,300 million pounds of copper reserves at December 31, 2023.
Brucejack, Canada.(100% owned) Brucejack, located in western British Columbia, approximately 40 miles (65 kilometers) north of Stewart and 28 miles (45 kilometers) southwest of the Stewart-Cassiar Highway 37, is an underground operation. The Brucejack operation comprises four mining leases and six core mineral claims which cover 8,169 acres (3,306 hectares) and 337 mineral claims covering 298,795 acres (120,918 hectares). The mining leases expire in 2045. Brucejack is a deformed, porphyry-related transitional to intermediate sulphidation epithermal high-grade gold-silver deposit. Gold is hosted in quartz-calcite vein stockworks, sheeted veins and veinlets and can also be associated with arsenian pyrite. Process facilities include a mill building containing process equipment, including a rock bin, SAG mill-ball mill circuit followed by conventional flotation, concentrate dewatering, concentrate load-out and tailings dewater operations, a water treatment plant, a paste backfill plant, and a metallurgical laboratory. The mining fleet includes a fleet of load-haul-dump vehicles, trucks for material loading and transport to surface, excavators, bolters, shotcrete sprayers, long-hole drills, and cable bolters. Brucejack’s gross property, plant and mine development at December 31, 2023 was $2,910. Brucejack reported 3.1 million ounces of gold reserves at December 31, 2023.
Peñasquito, Mexico. (100% owned) Peñasquito is an open pit operation located in the northeast corner of Zacatecas State, approximately 125 miles (200 kilometers) northeast of the city of Zacatecas and is accessible by paved roads with a private airport close to the site. The property began production in 2009, with commercial production being achieved in 2010. Goldcorp acquired its ownership in the mine in 2006 when it acquired Glamis. In 2019, Newmont acquired Goldcorp, obtaining full ownership interest in Peñasquito. Peñasquito consists of the Peñasco and Chile Colorado open pit mines. Peñasquito is comprised of 20 mining concessions for operations comprising 113,231 acres (45,823 hectares) and 60 mining concessions for exploration of 107,456 acres (43,486 hectares). Surface rights in the vicinity of the Peñasco and Chile Colorado open pits are held by three ejidos: Ejido Cedros, Ejido Mazapil and Ejido Cerro Gordo. Peñasquito has signed land use agreements with each ejidos, valid through 2035 and 2036, and the relevant private owners.
In August 2020, the Company and Cedros General Assembly ratified the definitive agreement that was reached on April 22, 2020 and resolved all outstanding disputes between Peñasquito and the San Juan de Cedros community (Cedros). In addition, easements have been granted in association with the La Pardita-Cedros Highway and the El Salero-Peñasquito powerline. All necessary permits have been granted.
In July 2007, Goldcorp and Wheaton Precious Metals Corp. (then Silver Wheaton Corp.) entered into a silver streaming agreement. The Company is obligated to sell 25% of silver production from the Peñasquito mine to Wheaton Precious Metals
Corporation at the lesser of market price or a fixed contract price, subject to an annual inflation adjustment of up to 1.65%. Refer to Note 5 to the Consolidated Financial Statements for further information.
A 2% net smelter return royalty is owed to Royal Gold Inc. from both the Chile Colorado and Peñasco open pits of the Peñasquito mine. Since January 1, 2014, the Mexican Government levies a 7.5% mining royalty that is imposed on earnings before interest, taxes, depreciation, and amortization. There is also a 0.5% environmental erosion fee payable on precious metal production, based on revenues. In December 2016, the State of Zacatecas in Mexico approved new environmental taxes(“Ecological Taxes”)that became effective January 1, 2017. The Ecological Taxes are calculated based on a predetermined formula and the volume of carbon emissions, as well as other environmental variables, at Peñasquito. The Company's payment of the Ecological Taxes primarily relates to the volume of carbon emissions at Peñasquito from fixed and mobile sources.
The mineralization at Peñasquito contains gold, silver, lead and zinc. Deposits currently mined within the Peñasquito operations are considered to be examples of breccia pipes developed as a result of intrusion-related hydrothermal activity.
Process facilities include a sulfide processing plant, comprising three stages of flotation: carbon, lead, and zinc. The carbon pre-flotation circuit was added in 2018 ahead of lead flotation to remove organic carbon associated with sedimentary ores. In the lead and zinc flotation, the slurry is conditioned with reagents to activate the desired minerals and produce lead and zinc concentrates. The tailings from the leach circuit undergoes cyanide destruction and combines with final flotation tailings for final deposition in the tailings storage facility.
The available mining fleet consists of five rope shovels, three hydraulic shovels, four loaders, and 82 haul trucks, each with a 312-tonne payload. The fleet is supported by 9 blast hole production drills, as well as track dozers, rubber tire dozers, excavators, and graders.
In January 2011, Peñasquito entered into a 20-year power delivery agreement with a subsidiary of InterGen Servicios Mexico (now Saavi Energia) where Peñasquito agreed to purchase electrical power from a gas-fired electricity generating facility located near San Luis de la Paz, Guanajuato, Mexico. The agreement commenced in August 2015. Power is also supplied by the Mexican Electricity Federal Commission (Comision Federal de Electricidad) at its central power grid through the El Salero-Peñasquito powerline.
Peñasquito’s gross property, plant and mine development at December 31, 2023 was $5,644.
As of December 31, 2023 and 2022, Peñasquito reported 4.6 million and 5.4 million ounces of gold reserves, respectively, 313 million ounces and 346 million of silver reserves, respectively, 2,100 million and 2,300 million pounds of lead reserves, respectively, and 4,900 million and 5,540 million pounds of zinc reserves, respectively. These changes represent a decrease of approximately 15% in gold reserves, a decrease of approximately 10% in silver reserves, a decrease of approximately 9% in lead reserves, and a decrease of approximately 12% in zinc reserves in 2023 compared to 2022. The overall reduction in gold reserves is primarily due to depletion, resource model updates, and other modifying factors, including mill recovery and geotechnical considerations.
As of December 31, 2023 and 2022, Peñasquito reported 1.5 million and 3.7 million ounces of gold resources, respectively, 175 million ounces and 314 million of silver resources, respectively, 1,100 million and 2,070 million pounds of lead resources, respectively, and 2,900 million and 4,740 million pounds of zinc resources, respectively. These changes represent a decrease of approximately 59% in gold resources, a decrease of approximately 44% in silver resources, a decrease of approximately 47% in lead resources, and a decrease of approximately 39% in zinc resources in 2023 compared to 2022. The overall decrease in gold resources is primarily due to resource model and cost updates.
Merian, Suriname.(75% owned) Merian is owned 75% by Newmont Suriname, LLC (“Newmont Suriname”) (formerly known as Suriname Gold Company LLC and 100% indirectly owned by Newmont Corporation) and 25% by Staatsolie Maatschappij Suriname N.V. (“Staatsolie,” a company wholly owned by the Republic of Suriname). Merian is located in Suriname, approximately 40 miles (66 kilometers) south of the town of Moengo and 19 miles (30 kilometers) north of the Nassau Mountains, close to the French Guiana border. The Merian operation is comprised of one Right of Exploitation and five Rights of Exploration encompassing an area of 41,484 acres (16,788 hectares). All of the gold mineralization at Merian is closely associated with quartz veining within siltstone and sandstone formations. The operation currently includes the Merian 2 open pit, the Merian 1 open pit, the Maraba open pit, and the Kupari open pit. The available mining fleet consists of three shovels, three mining excavators, and 36 haul trucks, each with 150-tonne payload. Merian includes processing facilities that utilize a conventional gold mill, primary crusher and processing plant, consisting of a comminution plant, including gravity and cyanide leach processes, with recovery by carbon-in-leach, elution, electrowinning and induction furnace smelting to produce a gold doré product. Merian’s gross property, plant and mine development at December 31, 2023 was $1,290. Merian reported 3.9 million attributable ounces of gold reserves at December 31, 2023.
Cerro Negro, Argentina. (100% owned) Cerro Negro is located in southern Argentina about 250 miles (400 kilometers) southwest of the coastal city of Comodoro Rivadavia. The mineral tenure consists of ten mining property titles encompassing 53,246 acres (21,548 hectares), and three exploration licenses, encompassing 13,193 acres (5,339 hectares). We also own lands in the Cerro
Negro mine area, totaling approximately 27,429 acres (11,100 hectares), which overlie the Bajo Negro and Vein Zone deposits and adjacent prospects. Cerro Negro consists of the Eureka, Mariana Central, Mariana Norte, Emilia, and San Marcos operating underground mines and the Baja Negro and Silica Cap underground mines, which are currently in development. Deposits within the Cerro Negro mine operations are low sulfidation, epithermal gold/silver vein deposits. Cerro Negro’s available underground mining fleet consists of 8 underground loaders, 12 underground haul trucks and eight surface haul trucks, each with 30 to 40-tonne payloads and additional auxiliary equipment as required. The processing plant facilities consist of a crushing plant, a grinding circuit, agitated leaching, counter-current decantation, solution clarification, Merril Crowe zinc precipitation and smelting to produce gold and silver doré bars that are shipped to a refinery for further processing. Cerro Negro’s gross property, plant and mine development at December 31, 2023 was $2,110. Cerro Negro reported 3.2 million ounces of gold reserves at December 31, 2023.
Brownfield exploration and development for new reserves is ongoing, including the development of the Eastern district.
Pueblo Viejo, Dominican Republic. (40% owned) Pueblo Viejo is a joint venture with Barrick, where Barrick is the operator who holds the remaining 60% interest. Commercial production was achieved in January 2013 and the Pueblo Viejo Mine completed its ramp-up to full design capacity in 2014. In March 2006, Barrick acquired the Pueblo Viejo mine as a result of their acquisition of Placer Dome Inc and subsequently sold 40% to Goldcorp. Newmont obtained the 40% ownership of Pueblo Viejo when Newmont acquired Goldcorp in 2019. We report our interest in Pueblo Viejo on an equity method basis. The Pueblo Viejo mine is an open pit conventional truck and shovel mining operation located approximately 60 miles (100 kilometers) northwest of Santo Domingo, Dominican Republic. The Pueblo Viejo mine is situated on the Montenegro Fiscal Reserve, an area specially designated by Presidential Decree for the leasing of minerals and mine development, which covers an area of approximately 19,756 acres (7,995 hectares) in aggregate. The property is accessible year-round by paved road from Santo Domingo.
A special lease agreement (“SLA”) between the Dominican State and Pueblo Viejo governs the development and operation of the Pueblo Viejo mine. The SLA provides the right to operate the Pueblo Viejo mine for a 25-year period commencing on February 26, 2008, with one extension by right for 25 years and a second 25-year extension by mutual agreement of the parties, allowing a possible total term of 75 years. Pueblo Viejo pays the Dominican Republic government a net smelter return royalty of 3.2% based on gross revenues for gold and silver, a net profits interest of 28.75% based on an adjusted taxable cash flow, a corporate income tax of 25% based on adjusted net income, a withholding tax on interest paid on loans and on payments abroad, and other general tax obligations which include a graduated minimum tax.
The Pueblo Viejo deposits are located in two major areas, the Monte Negro pit and the Moore pit, and consists of high sulfidation or acid sulfate epithermal gold, silver, copper and zinc mineralization. Process facilities include a conventional mill which consists of a crushing and grinding circuit, autoclaves, and a carbon-in-leach circuit. The plant expansion project is nearing completion and adds a new crusher, SAG mill, carbon-in-leach circuit and a flotation circuit. The tailings storage facility continues to advance. The plant expansion and tailings storage facility are designed to extend its life to 2040 and beyond. In 2013, Pueblo Viejo commissioned a combined cycle reciprocating engine power plant, together with a transmission line connecting the plant to the mine site. The power plant is located near the port city of San Pedro de Macoris and will provide the long-term power supply for the Pueblo Viejo mine. In 2019, Pueblo Viejo signed a 10-year natural gas supply contract with AES Andres DR, S.A. in the Dominican Republic who also completed a new gas pipeline to the facility.
The available mining fleet consists of three shovels, five front loaders, 46 haul trucks, each with an average payload of 177 tonnes, and seven drills.
The Company's attributable portion of Pueblo Viejo’s gross property, plant and mine development is $3,096 at December 31, 2023. We report our 40% interest in Pueblo Viejo on an equity method basis under U.S. GAAP and as a result our attributable portion of Pueblo Viejo's gross property, plant and mine development is included in the carrying value of our equity method investment at December 31, 2023.
As of December 31, 2023 and 2022, Pueblo Viejo reported 8.0 million and 8.2 million ounces of attributable gold reserves, respectively, and 49.5 million and 51.0 million ounces of attributable silver reserves, respectively. These changes represent a decrease of approximately 2% in attributable gold reserves and a decrease of approximately 3% in attributable silver reserves in 2023 compared to 2022. The decrease in gold reserves is primarily due to depletion.
As of December 31, 2023 and 2022, Pueblo Viejo reported 2.3 million and 2.1 million attributable ounces of gold resources, respectively and 12.3 million and 11.7 million attributable ounces of silver reserves. These changes represent an increase of approximately 8% in attributable gold resources and an increase of approximately 5% in attributable silver resources in 2023 compared to 2022. The increase to resources is primarily due to positive revisions as a result of technical changes.
Yanacocha, Peru. (100% owned) In 2022, the Company completed the acquisition of Compañia de Minas Buenaventura S.A.A.'s (“Buenaventura”) 43.65% noncontrolling interest and Summit Global Management II VB's, a subsidiary of Sumitomo ("Sumitomo"), 5% noncontrolling interest in Yanacocha. At December 31, 2023, the Company holds 100% ownership interest in Yanacocha. Refer to Note 1 to the Consolidated Financial Statements for further information.
Yanacocha is located approximately 375 miles (604 kilometers) north of Lima and 30 miles (48 kilometers) north of the city of Cajamarca. Yanacocha is comprised of 18 mining concessions encompassing 245,526 acres (99,361 hectares).
Yanacocha is an epithermal type deposit of high sulfidation hosted in volcanic rock formations. Gold is associated with iron-oxides and pyrite, which is placed on leach pads. Yanacocha consists of the following open pit mines: the La Quinua Complex, the Yanacocha Complex, the Carachugo Complex, and Maqui Maqui. Yanacocha has four leach pads (La Quinua, Yanacocha, Carachugo and Maqui Maqui), with leaching operations at La Quinua and Carachugo. Yanacocha also has three gold processing plants (Pampa Larga, Yanacocha Norte and La Quinua), one limestone processing facility (China Linda) and one mill (Yanacocha Gold Mill). The La Quinua Complex mined material from the La Quinua Sur and the Tapado Oeste Layback and finished mining operations in 2021. The Yanacocha Complex mined material from the Yanacocha Layback and Yanacocha Pinos, which has had limited mining operations in recent years, finished mining operations in 2022. The Maqui Maqui operations mined material from multiple mines that are no longer in operation. The Yanacocha Gold Mill ceased current operations in February 2021 and has been placed into care and maintenance. It will be repurposed for use as part of the Yanacocha Sulfides project. The Carachugo leach pad processes oxide material from Quecher Main. Yanacocha’s available mining fleet consists of two shovels, four excavators, and 25 haul trucks, each with 233-tonne payload. Yanacocha’s gross property, plant and mine development at December 31, 2023 was $5,876. Yanacocha reported 5.5 million ounces of gold reserves at December 31, 2023.
Boddington and Tanami, Australia. Newmont’s Boddington and Tanami operations in Australia take place on land that falls under the custodianship of Aboriginal people. Aboriginal land rights in Australia, which recognize the traditional rights and customs of Aboriginal people, are governed by the Commonwealth Native Title Act and certain other Acts specific to individual states and territories. The Commonwealth Native Title Act was enacted in 1993 following a decision in the High Court of Australia, which held that Aboriginal people, who have maintained a continuing connection with their land according to their traditional laws and customs, may hold certain rights which should be recognized under Australian common law. In the Northern Territory, where the Tanami operation is located, the Aboriginal Land Rights Act (“ALRA”) was introduced in 1976, which established an Aboriginal Land rights regime. Under the ALRA, approximately 50% of the land in the Northern Territory was granted as Aboriginal freehold land.
Newmont has existing agreements with the Traditional Owners of the land utilized by our Tanami and Boddington operations. Any future agreements would depend on a determination of native title, which is likely to take many years. If successful, a native title determination could give rights to compensation claims in the future. Throughout Australia, new exploratory and mining tenements may require native title agreements to be entered into and will be subject to a negotiation process, which often gives rise to compensation payments and heritage survey protocols. Newmont does not consider that native title claims or determined areas where rights have been established are an impediment to the operation of existing mines.
In Australia, various ad valorem royalties and taxes are paid to state and territorial governments, typically based on a percentage of gross revenues or earnings. Aboriginal groups have negotiated compensation/royalty payments as a condition to granting access to areas where native title rights are determined or where they own the land.
Boddington, Australia. (100% owned) Boddington is located 81 miles (130 kilometers) southeast of Perth in Western Australia and is accessible primarily by paved road. Boddington has been wholly owned since June 2009 when Newmont acquired the final 33.33% interest from AngloGold Ashanti Australia Limited. The Boddington project area comprises 52,506 acres (21,249 hectares) of mining tenure leased from the State of Western Australia, of which 26,910 acres (10,890 hectares) is subleased from the South 32 Worsley Joint Venturers ("Worsley JV"). The total project area is comprised of multiple leases that expire between 2025 and 2043. Royalties are paid to the state government at 2.5% for gold and 5% for copper based on revenue. Shipping and treatment and refining costs are allowable deductions from revenue for royalty calculations for copper. Newmont owns 74,474 acres (30,139 hectares) of rural freehold property, some of which overlaps existing mining tenure. The majority of its current operational area is located on its freehold property.
The subleases from the Worsley JV expire immediately prior to the expiry of the relevant mining leases. Newmont holds rights to renew the subleases. The mining leases are renewable upon application to the State of Western Australia by the Worsley JV. As these mining leases are in their third term, renewal of these mining leases is at the discretion of the State. The subleases do not confer an express right to require the Worsley JV to seek application to renew the mining leases. Newmont is entitled to all gold and other non-bauxite mineralization conferred by the mining leases. The Worsley JV retains the rights to bauxite mineralization. The relationship between the Worsley JV bauxite operations and the Boddington gold operations are regulated through a cross-operation agreement. This agreement confers priority on the bauxite operations such that the bauxite/alumina mining operations of the Worsley JV will take priority over the gold mining operations and Newmont is required to take reasonable measures to conserve bauxite including by mining and stockpiling bauxite on behalf of the Worsley JV.
Boddington consists of greenstone diorite hosted mineralization and exploration activities continue to develop the known reserve. The mine operates two pits (North and South Pits), utilizing two electric rope shovels, a diesel powered face shovel and an electric hydraulic shovel as its prime ex-pit material movers with a fleet of 41 production autonomous haulage trucks. Boddington has a current capacity to mine approximately 150,000 to 200,000 tonnes of material per day. The milling plant includes a three-stage crushing facility (two primary crushers, six secondary crushers and four high-pressure grinding rolls), four ball mills, a flotation circuit and a carbon-in-leach circuit. The flotation circuit process recovers gold-copper concentrate before the material is then processed by a traditional carbon-in-leach circuit where the remaining gold is recovered to produce doré. Mining operations consist of two open pit operations located adjacent to each other.
Power for the operation is sourced through the local power grid under a long-term power purchase agreement with Bluewaters Power. The power supply contract with Bluewaters expires in 2026 and includes an option to extend.
Boddington’s gross property, plant and mine development at December 31, 2023 was $4,750.
As of December 31, 2023 and 2022, Boddington reported 9.6 million and 10.6 million ounces of gold reserves, respectively, and 1,000 million and 1,160 million pounds of copper reserves, respectively. These changes represent a decrease of approximately 9% in gold reserves and a decrease of approximately 14% in copper reserves in 2023 compared to 2022. The overall reduction in gold reserves is primarily due to depletion.
As of December 31, 2023 and 2022, Boddington reported 4.7 million and 4.6 million ounces of gold resources, respectively, and 700 million and 660 million pounds of copper resources, respectively. The gold resources remained consistent and the copper resources increased approximately 6% in 2023 compared to 2022.
Tanami, Australia.(100% owned) Tanami is located in the Northern Territory approximately 342 miles (550 kilometers) northwest of Alice Springs. The underground mining infrastructure and operation is located at Dead Bullock Soak (“DBS”). The processing infrastructure is located 25 miles (40 kilometers) to the east of the mining operations at the Granites. Ore is transported by road train from DBS underground to the processing facility at the Granites.
The Newmont Tanami Operations are comprised of exploration licenses encompassing a total area of 1,510,806 acres (611,402 hectares) including 648,157 acres (262,300 hectares) relating to the Tobruk and Monza Joint Ventures entered into with Prodigy Gold, for which Newmont is the operator, and 11,025 acres (4,462 hectares) of mineral leases granted pursuant to the Northern Territory Mineral Titles Act. Additionally, Newmont operates through exploration and mining agreements with the Central Land Council who represent Traditional Owners, the Warlpiri people.
Tanami consists of sediment hosted sheeted quartz vein mineralization. Tanami, as an underground mining operation, has a fleet of ten underground loaders and 23 haul trucks, each with 60 to 65-tonne payloads. Processing plant facilities currently consist of a crushing plant, a grinding circuit, a gravity circuit, carbon in pulp tanks and a conventional tailings disposal facility. Tanami’s gross property, plant and mine development at December 31, 2023 was $2,995. Tanami reported 4.8 million ounces of gold reserves at December 31, 2023.
Brownfield exploration and development for new reserves is ongoing with the main focus being underground ore definition drilling of the Auron, Federation and Liberator ore bodies as well as exploration of the Oberon deposit.
Cadia, Australia. (100% owned) Cadia is located approximately 16 miles (25 kilometers) south-southwest of the town of Orange in New South Wales ("NSW") and is accessible primarily by paved roads and through the Orange airport located approximately 8 miles (13 kilometers) northeast of the Cadia Operations. The Cadia Operations consist of six granted mining leases and five granted exploration licenses through NSW encompassing a total area of 53,128 acres (21,500 hectares). Newmont predominantly owns all properties covered by the mining leases and a number of properties in the surrounding area. The main mining lease expires in October 2038 but can be renewed. Newcrest acquired the Cadia mine in 1991. Newmont obtained the 100% ownership of Cadia when Newmont acquired Newcrest in 2023. Cadia consists of the Cadia East, Cadia Extended, and Ridgeway deposits which consist of alkalic porphyry gold-copper style mineralization and the Big Cadia deposit which is a skarn-style occurrence.
The NSW government levies a royalty rate of 4% for gold, silver, copper, and molybdenum based on revenue. Treatment costs, depreciation, realization, and administration costs are allowable deductions from revenue for royalty calculations.
Cadia operates two adjacent concentrators, Concentrator 1 and Concentrator 2, currently treating ore from Cadia East mine. Both concentrators have undergone throughput upgrades, including operational improvements, over the years. Water supply at Cadia is sourced from the Cadiangullong Dam, Upper Rodds Creek Dam, Flyers Creek Weir, Cadia Creek Weir, Orange Sewage Treatment Plant treated effluent, Blayney Sewage Treatment Plant treated effluent, on-site groundwater bores, Belubula River, Cadia Extended open pit (a completed and backfilled extension of the Cadia Hill open pit) and site runoff. Cadia sources all of its power from the National Electricity Market. Cadia is currently under an electricity supply agreement and holds a power purchase agreement.
Production mining is an underground panel cave mining from Cadia East with underground crushing and conveyor to surface. The processing plant infrastructure includes high pressure grinding rolls, SAG mills, ball mills, flotation, coarse ore flotation, gravity concentrator and a molybdenum plant to produce copper and gold concentrate, gold doré and molybdenum concentrate.
The available fleet consists of 33 underground production loaders with an average 18.4 tonne payload. Cadia’s gross property, plant and mine development at December 31, 2023 was $5,355.
As of December 31, 2023, Cadia reported 14.7 million ounces of gold reserves, 7,100 million pounds of copper reserves, 24 million ounces of silver reserves, and 200 million pounds of molybdenum reserves.
As of December 31, 2023, Cadia reported 20.6 million ounces of gold resources, 10,300 million pounds of copper resources, 39 million ounces of silver resources, and 200 million pounds of molybdenum resources.
Telfer, Australia. (100% owned) Telfer, located in the East Pilbara region in Western Australia, approximately 280 miles (450 km) southwest of Port Hedland, is an open pit and underground operation. The operations comprise 30 mining leases and four general purpose leases which cover 67,368 acres (27,263 hectares). The main mining leases expire in 2024. Gold and copper mineralization is contained within narrow high grade reefs, pod-like mineralized bodies, sheeted vein sets and low grade stockworks hosted by Proterozoic sedimentary rocks. Copper mineralization is also contained within chalcopyrite, chalcocite and bornite sulfide species. Process facilities include two processing trains, each comprised of a SAG and ball milling circuit, a flash flotation circuit, gravity recovery circuits, a copper-pyrite flotation circuits, a carbon-in-leach plant, counter-current decantation circuit, concentrate dewatering and load out, tailings dewatering, carbon recovery and elution circuit and supplementary dump leach. Gold recovered from the gravity circuit and gold eluted from carbon-in-leach and dump leach carbon are recovered via electrowinning and smelting in the gold room to produce doré. The underground mining mobile fleet comprises of seven underground loaders and six trucks each with a 50-tonne payload. Telfer underground also comprises of an underground crusher and hoisting system capable of hoisting 900t/hr to the surface. The open pit mining fleet comprises 31 haul trucks and three excavators. Telfer’s gross property, plant and mine development at December 31, 2023 was $345. Telfer reported no gold reserves at December 31, 2023.
Lihir, Papua New Guinea. (100% owned) Lihir is an open pit mine located near the town of Londolovit on Lihir Island, approximately 560 miles (900 kilometers) northeast of Port Moresby, the national capital. Access to Lihir Island is through the Kunaye airport located approximately 4 miles (7 kilometers) north of the mine. Newcrest acquired the Lihir mine in 2010. Newmont obtained the 100% ownership of Lihir when Newmont acquired Newcrest in 2023.The Lihir deposit is considered to be an example of an epithermal gold deposit. Lihir Island is part of a 155 mile (250-kilometers) long, northwest-trending, alkalic volcanic island chain that sits within an area where several micro-plates (Solomon Sea Plate, South Bismarck Plate and North Bismarck Plate) developed between the converging Australian and South Pacific plates. Lihir Island comprises two Plio–Pleistocene volcanic blocks, Londolovit Block and Wurtol Wedge and three Pleistocene volcanic edifices, Huniho, Kinami, and Luise.
Lihir consists of a granted Special Mining Lease, two granted Mining Leases, one granted Exploration License, five granted Leases for Mining Purposes, and three Mining Easements held in the name of Lihir Gold. The total area under license is approximately 63,506 acres (25,700 hectares). Lihir is situated on land held variously under customary, State of PNG, and private ownership, including under State of PNG lease. The bulk of the land that is or will be affected by development, operations and closure of the Lihir Operations is customary owned. Newmont has been granted rights to undertake mining and processing of gold and related activities, through negotiations with the state and local government, and landowners in the area. Environment Permits for water extraction and waste disposal are in place to support mining operations. The Londolovit River is the main source of water for the process plant and surrounding area.
A 2% royalty is payable to the State on the realized prices of all gold and silver bullion sold. In addition, a production levy of 0.5% is also payable to the PNG Mineral Resource Authority on the gross income from the sale of the minerals (i.e., excluding the offsets of treatment and refining charges, payable terms and freight) and other income derived from or in connection with the mining operations.
Operations at Lihir are conducted using a fleet of seven shovels and 49 haul trucks, with payload ranging from 85 to 135-tonnes. The process plant consists of crushing and grinding followed by partial flotation, pressure oxidation, and recovery of gold from washed oxidized slurry using conventional cyanidation. For tailings management, Lihir utilizes deep-sea tailings placement in a suitable deep-ocean location. The plant has undergone a number of alterations and expansions since first commissioning in 1997.
Lihir’s gross property, plant and mine development at December 31, 2023 was $2,645.
As of December 31, 2023, Lihir reported 17.5 million ounces of gold reserves. As of December 31, 2023, Lihir reported 20.2 million ounces of gold resources.
Ahafo and Akyem, Ghana. All of Newmont’s operations in Africa are located in Ghana. In December 2003, Ghana’s Parliament unanimously ratified an Investment Agreement (“IA”) between Newmont and the government of Ghana. The IA established a fixed fiscal and legal regime, including fixed royalty and tax rates, for the life of any Newmont project in Ghana. In December 2015, Ghana’s Parliament ratified the Revised Investment Agreements (“Ghana Investment Agreements” or “Revised IAs”). Currently, the maximum corporate income tax rate remains at 32.5% and royalties are paid on a sliding scale system that is based on average monthly gold prices. The rates range from 3% to 5% of revenues (plus an additional 0.6% for any production from forest reserve areas). The government of Ghana is also entitled to receive 10% of a project’s net cash flow after reaching specific production milestones by receiving 1/9th of the total amount paid as dividends to Newmont parent. When the average quoted gold price exceeds $1,300 per ounce within a calendar year, an advance payment on these amounts of 0.6% of total revenues is required. The Ghana Investment Agreements also contain commitments with respect to job training for local Ghanaians, community development, purchasing of local goods and services and environmental protection.
The Ghana Investment Agreements also include a change in tax stabilization from life of mine to 15 years from commercial production for each mine. In October 2017, the government of Ghana approved Newmont’s request to extend the stability period of the Revised IAs at the Ahafo operations for five years to December 31, 2025. The extension was approved based on Newmont’s commitment to invest at least $300 for the Subika Underground and Ahafo Mill Expansion projects. This commitment was completed during the fourth quarter of 2018.
The Ahafo and Akyem mines operate using electrical power generated by the Volta River Authority along with supplemental power generation capacity built by Newmont.
Ahafo, Ghana. (100% owned) Our current Ahafo operation ("Ahafo South") is located near Kenyasi in the Ahafo Region of Ghana, approximately 180 miles (290 kilometers) northwest of the national capital city of Accra, and is largely accessible by paved roads. In 2002, Newmont acquired 50% of Ahafo South as a result of the merger with Normandy. In 2003, Newmont purchased the remaining interest from Moydow Mines International Inc. (“Moydow”), thereby making it a wholly owned subsidiary. The Ahafo South mine commenced commercial production in 2006 and currently operates a mill, two pits and an underground operation. In July 2021, the Board of Directors approved full funding for the Ahafo North project which will expand our existing footprint in Ghana with four open pit mines and a stand-alone mill located approximately 30 kilometers from our current Ahafo South operations.
The Ahafo South operations are comprised of three mining leases issued under the Ghanaian Mining Act encompassing a total area of approximately 137,000 acres (55,000 hectares) with current mine take area of approximately 13,200 acres (5,300 hectares) that has been fully compensated and approximately 10,700 acres (4,300 hectares) of mining area that has not been fully compensated (e.g. payment would be necessary to move people from their land). The mining leases grant the exclusive rights to work, develop and produce gold in the lease area, including the processing, storing and transportation of mineral and materials. The mining leases require Ahafo South to respect or perform certain financial and statutory reporting obligations and expire in 2031 and are renewable subject to certain conditions. Ahafo South pays a royalty of 2% on net smelter returns to Franco-Nevada for all gold ounces recovered from areas previously owned by Moydow and a sliding scale royalty based on the average monthly gold price up to 5% on gold production to the government of Ghana.
The Ahafo South mine is composed of three orogenic gold deposits that have oxide and primary mineralization. Gold occurs primarily in pyrite and secondarily as native gold in quartz veins. Ahafo South has two active open pits, Subika and Awonsu. Subika added an underground operation, which reached commercial production in November 2018, and Awonsu completed a layback in November 2019. The available mining fleet for surface mining consists of three shovels and 36 haul trucks, each with 141-tonne payload. The available mining fleet for underground mining consists of eight underground loaders and 13 haul trucks, with payload ranging from 55 to 57-tonnes. The daily production rate is approximately 88,000 tonnes. The original processing plant was commissioned in 2006. The Ahafo Mill Expansion, which was completed in October 2019, expanded the plant capacity to process approximately 11 million tonnes per year. The current processing plant consists of two crushing plants, two grinding circuits, carbon-in-leach circuits, elution circuit, counter current decantation circuit, a tailings disposal facility, a reverse osmosis water treatment plant, and an analytical laboratory managed by a third party.
Ahafo South’s gross property, plant and mine development at December 31, 2023 was $2,849.
As of December 31, 2023 and 2022, Ahafo South reported 5.1 million and 5.7 million ounces of gold reserves, respectively. This change represents a decrease of approximately 10% in gold reserves in 2023 compared to 2022. The overall reduction in gold reserves is primarily due to depletion.
As of December 31, 2023 and 2022, Ahafo South reported 5.1 million and 5.2 million ounces of gold resources, respectively. The gold resources remained consistent.
Akyem, Ghana. (100% owned) Akyem, located in Birim North District of the Eastern Region of Ghana, approximately 80 miles (125 kilometers) northwest of the national capital city of Accra, is an open pit mining operation comprised of two mining leases issued under the Ghanaian Mining Act, encompassing an area of approximately 16,000 acres (6,000 hectares). The Akyem mine is an orogenic gold deposit that has oxide and primary mineralization. Process facilities include a crushing plant, a SAG and ball milling circuit, carbon-in-leach circuit, elution circuit and bullion smelting facilities. The available mining fleet consists of four excavators made up of two front end shovels and two backhoe excavators and twenty-one 145-tonne payload haul trucks. Akyem’s gross property, plant and mine development at December 31, 2023 was $1,748. Akyem reported 1.1 million ounces of gold reserves at December 31, 2023.
NGM, Nevada, U.S. (38.5% owned) NGM is located in Elko, Nevada. On July 1, 2019, Newmont and Barrick consummated the Nevada JV Agreement, which combined the Company’s Nevada mining operations with Barrick’s Nevada mining operations resulting in the establishment of NGM, a joint venture with Barrick, who is the operator, and which is accounted for by the Company under proportionate consolidation. NGM operations are primarily accessible by paved road and are comprised of 180,921 acres (73,217 hectares) in aggregate including Cortez 53,999 acres (21,853 hectares), Carlin 58,255 acres (23,575 hectares), Turquoise Ridge 26,679 acres (10,797 hectares), Phoenix 17,900 acres (7,244 hectares), and Long Canyon 24,088 acres (9,748 hectares).
All sites at NGM contain open pit operations while Cortez, Carlin, and Turquoise Ridge also include underground operations. At Cortez, mineralization is sedimentary rock-hosted and consists of submicron to micrometer-sized gold particles and gold in solid solution in pyrite. Refractory ore is transported to Carlin for processing. Phoenix is a skarn-hosted polymetallic massive sulfide replacement deposit. The Phoenix mill produces a gravity gold concentrate and a copper/gold flotation concentrate and recovers additional gold from cyanide leaching of the flotation tails. Carlin, Turquoise Ridge, and Long Canyon are a sediment-hosted disseminated gold deposit. Additionally, at Long Canyon, oxide ore with suitable cyanide solubility is treated on a heap leach pad. Gold recovered from the leach pad is transferred as gold-bearing carbon to Carlin for refining and shipment.
In Nevada, mining taxes are assessed on up to 5% of net proceeds of a mine. During 2021, the Nevada legislature enacted a new excise tax which is assessed up to 1.1% of gross revenues.
NGM owns, or controls through leases, fee ownership, and unpatented mining claims, all of the minerals and surface area within the boundaries of the present Nevada mining operations. The long-term leases extend for at least the anticipated mine life of those deposits. With respect to a significant portion of the Gold Quarry mine at Carlin, NGM pays a net smelter royalty equivalent to 16.2% of the mineral production. NGM wholly-owns or controls the remainder of the Gold Quarry mineral rights, in some cases subject to additional royalties. With respect to certain smaller deposits in Nevada, NGM is obligated to pay royalties on production to third parties that vary from 1% to 8% of production.
Each site has its own process facilities which include: an oxide mill, which consists of a crushing and grinding circuit and carbon-in-leach circuit, and two heap leach pads at Cortez; an autoclave, two roasters, an oxide mill/flotation circuit and four heap leach pads at Carlin; the Sage autoclave, an oxide mill, and three heap leach pads at Turquoise Ridge; a flotation mill, a carbon-in-leach plant, a copper leach pad and a solvent extraction electrowinning (“SX/EW”) plant at Phoenix; and a heap leach pad at Long Canyon. NGM has a current capacity across all sites to mine approximately 340,000 tonnes of material per day. The milling facilities were commissioned over a range of years beginning in the 1990’s. They undergo routine maintenance each year with process improvements implemented as the projects are identified and approved. Power is either purchased in the open market or supplied by the power plants owned and operated by NGM.
The NGM operations include, in aggregate, an open pit mining fleet consisting of 28 shovels and 162 haul trucks with an average payload of 263 tonnes, and an underground mining fleet consisting of 59 underground loaders and 88 haul trucks, with an average payload of 35 tonnes.
Newmont’s share of NGM’s gross property, plant and mine development at December 31, 2023 was $8,491.
As of December 31, 2023 and 2022, NGM reported 18.3 million and 18.6 million attributable ounces of gold reserves, respectively, 300 million and 320 million pounds of copper reserves, respectively, and 14.2 million and 13.3 million ounces of silver reserves, respectively. These changes represent a decrease of approximately 2% in gold reserves, a decrease of approximately 6% in copper reserves, and an increase of approximately 6% in silver reserves in 2023 compared to 2022. The decrease in gold reserves is primarily due to mining depletion.
As of December 31, 2023 and 2022, NGM reported 17.3 million and 19.2 million attributable ounces of gold resources, respectively, 600 million and 420 million attributable pounds of copper resources, respectively, and 19.9 million and 18.1 million attributable ounces of silver resources, respectively. These changes represent a decrease of approximately 10% in gold resources, an increase of approximately 43% in copper resources, and an increase of approximately 10% in silver resources in 2023 compared to 2022. The decrease in gold resources is primarily due to negative net revisions.