ATLANTIC CITY ELECTRIC CO

For the period ended Dec 31, 2025. Filed Feb 12, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 12, 2026

EXC$45.65+0.1%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits
Contents

2. Regulatory Matters

  1. Regulatory Matters (All Registrants)

The following matters below discuss the status of material regulatory and legislative proceedings of the Registrants.

Distribution Base Rate Case Proceedings

The following tables show the completed and pending distribution base rate case proceedings in 2025.

Completed Distribution Base Rate Case Proceedings

Registrant/Jurisdiction · Filing Date · Service · Requested Revenue Requirement Increase · Approved Revenue Requirement Increase · Approved ROE · Approval Date · Rate Effective Date
ComEd - IllinoisJanuary 17, 2023Electric$1,487$1,0458.905%December 19, 2024January 1, 2024
April 26, 2024 (amended on September 11, 2024)Electric$624$6239.89%October 31, 2024January 1, 2025
PECO - PennsylvaniaMarch 28, 2024Electric$464$354N/ADecember 12, 2024January 1, 2025
Natural Gas$111$78
BGE - MarylandFebruary 17, 2023Electric$313$1799.50%December 14, 2023January 1, 2024
Natural Gas$289$2299.45%
Pepco - District of ColumbiaApril 13, 2023 (amended February 27, 2024)Electric$186$1239.50%November 26, 2024January 1, 2025
Pepco - MarylandMay 16, 2023 (amended February 23, 2024)Electric$111$459.50%June 10, 2024April 1, 2024
DPL - MarylandMay 19, 2022Electric$38$299.60%December 14, 2022January 1, 2023
DPL - DelawareDecember 15, 2022 (amended September 29, 2023)Electric$39$289.60%April 18, 2024July 15, 2023
September 20, 2024 (amended September 5, 2025)Natural Gas$37$229.60%December 17, 2025January 1, 2026
ACE - New JerseyFebruary 15, 2023 (amended August 21, 2023)Electric$92$459.60%November 17, 2023December 1, 2023
November 21, 2024Electric$109$549.60%November 21, 2025December 1, 2025

Pending Distribution Base Rate Case Proceedings

Registrant/JurisdictionFiling DateServiceRequested Revenue Requirement IncreaseRequested ROEExpected Approval Timing
Pepco - MarylandOctober 14, 2025Electric$13310.50%Third quarter of 2026
DPL - Delaware(a)December 9, 2025Electric$4510.50%Third quarter of 2027

(a)DPL can implement interim rates on July 9, 2026, subject to refund.

ComEd Distribution Base Rate Case Proceedings

The ICC approved ComEd's four-year MRP for the period January 1, 2024 through December 31, 2027. The MRP was originally approved by the ICC on December 14, 2023 and was subsequently amended on January 10, 2024, April 18, 2024 and December 19, 2024. The December 19, 2024 order provided a total revenue requirement increase of $1.045 billion inclusive of rate increases of approximately $752 million in 2024, $80 million in 2025, $102 million in 2026, and $111 million in 2027.

On March 20, 2025, ComEd filed its annual revenue balancing reconciliation for 2024. This reconciliation, which is a component of revenue decoupling, reflected a revenue reduction of $55 million, effective January 1, 2026.

On December 18, 2025, the ICC approved ComEd's 2024 MRP Reconciliation reflecting a revenue increase of $243 million, including the tax benefit of NOLCs. While NOLCs are included in the MRP Reconciliation per the final order, the impacts of the NOLCs will not be reflected in the financial statements until the PLR is received from the IRS. See Note 11 — Income Taxes for additional information on NOLCs. On January 20, 2026, the Illinois Attorney General filed an Application for Rehearing of the December 18 order, which focuses solely on NOLCs. On February 5, 2026, the ICC denied the Illinois Attorney General's Application for Rehearing.

On October 31, 2024, the Delivery Reconciliation Amount for 2023 defined in Rider Delivery Service Pricing Reconciliation (Rider DSPR) was approved. Rider DSPR allows for the reconciliation of the revenue requirement in effect in the final years in which formula rates were determined and until such time as new rates were established under ComEd's approved MRP. The 2024 order reconciled the delivery service rates in effect in 2023 with the actual delivery service costs incurred in 2023. The reconciliation revenue requirement provides for a weighted average debt and equity return on distribution rate base of 7.02%, inclusive of an allowed ROE of 9.89%, reflecting the monthly yields on 30-year treasury bonds plus 580 basis points.

PECO Distribution Base Rate Case Proceedings

On December 12, 2024, the PAPUC issued their Opinions and Orders which approved the non-unanimous partial settlements with limited modifications for both the electric and natural gas base rate cases, and denied the Weather Normalization Adjustment requested in the natural gas base rate case.

PECO’s approved annual electric revenue requirement increase of $354 million is partially offset by a one-time credit of $64 million in 2025. In addition, the PAPUC approved the recovery of storm damage costs incurred by PECO in January 2024, up to $23 million, subject to review for reasonableness and prudency in PECO’s next distribution rate case.

BGE Distribution Base Rate Case Proceedings

In February 2023, BGE filed its three-year cumulative multi-year plan for January 1, 2024 through December 31, 2026 to the MDPSC, which was approved in December 2023 and went into effect on January 1, 2024. The MDSPC awarded BGE electric revenue requirement increases of $41 million, $113 million, and $25 million with an approved ROE of 9.50% in 2024, 2025, and 2026, respectively, and natural gas revenue requirement increases of $126 million, $62 million, and $41 million with an approved ROE of 9.45% in 2024, 2025, and 2026, respectively. The requested revenue requirement increases will be used to recover capital investments designed to increase the resilience of the electric and gas distribution systems and support Maryland's climate and regulatory initiatives.

The MDPSC also approved a portion of the requested 2021 and 2022 reconciliation amounts, which were recovered through separate electric and gas riders between March 2024 and February 2025. As such, the reconciliation amounts are not included in the approved revenue increases. The 2021 reconciliation amounts are $13 million and $7 million for electric and gas, respectively, and the 2022 reconciliation amounts are $39 million and $15 million for electric and gas, respectively. In April 2024, BGE filed with the MDPSC its request for recovery of the 2023 reconciliation amounts of $79 million and $73 million for electric and gas, respectively, with supporting testimony and schedules. In December 2025, the MDPSC authorized BGE to recover $31 million and $46 million for electric and gas, respectively, beginning in February 2026 and extending through December 2027, in the reconciliation rider. In addition to the amounts approved in the reconciliation rider, the MDPSC provided for additional regulatory assets related to minor storms of $24 million (to be recovered over 5 years) and the Baltimore City conduit of $4 million (to be reviewed along with a cost-benefit analysis in BGE’s next rate case).

Pepco District of Columbia Distribution Base Rate Case Proceedings

On April 13, 2023, Pepco filed an electric base rate case with the DCPSC (amended February 27, 2024) requesting a total revenue requirement increase of $186 million and an ROE of 10.50%. The DCPSC issued an order approving the two-year cumulative multi-year plan on November 26, 2024, which included a total revenue requirement increase of $123 million with an ROE of 9.50% effective January 1, 2025 through December 31, 2026. The DCPSC awarded Pepco electric incremental revenue requirement increases of $99 million and $24 million for 2025 and 2026, respectively.

Pepco Maryland Distribution Base Rate Case Proceedings

On May 16, 2023, Pepco filed an electric base rate case with the MDPSC (amended February 23, 2024) requesting a total revenue requirement increase of $111 million (before offsets) and an ROE of 10.50%. The MDPSC issued an order on June 10, 2024 awarding Pepco a one-year multi-year plan for April 1, 2024 through March 31, 2025 which included an incremental revenue requirement increase of $45 million and an ROE of 9.50%. The MDPSC did not adopt the requested revenue requirement increases of $80 million (before offsets), $51 million, and $14 million as filed for 2025, 2026, and the 2027 nine-month extension period, respectively. The MDPSC also approved the requested reconciliation amounts for the 12-month periods ending March 31, 2022, and March 31, 2023, which will be recovered through a rider between August 2024 through March 2026. As such, the reconciliation amounts are not included in the approved revenue requirement increases. The reconciliation amounts are $1 million and $7 million, for the 12-month periods ending March 31, 2022, and March 31, 2023, respectively. In July 2024, Pepco filed its request with the MDPSC, for which it is awaiting approval, for recovery of the reconciliation amounts of $31 million for the 12-month period ended March 31, 2024, with supporting testimony and schedules.

DPL Maryland Distribution Base Rate Case Proceedings

On May 19, 2022, DPL filed an electric base rate case with the MDPSC requesting a total revenue requirement increase of $38 million based on an ROE of 10.25%. On December 14, 2022, the MDPSC issued an order awarding DPL a total revenue requirement increase of $29 million with an ROE of 9.60%. The order reflects a three-year cumulative multi-year plan for January 1, 2023 through December 31, 2025, with rates remaining in effect subsequent to the multi-year plan period. The MDPSC awarded DPL electric incremental revenue requirement increases of $17 million, $6 million, and $6 million for 2023, 2024, and 2025, respectively.

DPL Delaware Distribution Base Rate Case Proceedings

On December 15, 2022, DPL filed an electric base rate case with the DEPSC (amended September 29, 2023) requesting a total revenue requirement increase of $39 million and an ROE of 10.50%. On April 18, 2024, the DEPSC issued an order awarding DPL a total revenue requirement increase of $28 million with an ROE of 9.60%, effective July 15, 2023. As part of the approved order, the DEPSC approved the Significant Storm Expense Rate Rider (Rider SSER) which will allow DPL to recover expenses associated with qualified storms. A qualified storm will be an individual storm for which DPL incurs expenses between $5 million and $15 million. The Rider SSER allows DPL to recover significant storm damage expenses for the previous 12-month period over a future 24-month period. For individual storm events for which DPL incurs expenses of more than $15 million, the future recovery period will be evaluated on a case-by-case basis and the unamortized balance will earn a return at DPL's authorized long-term cost of debt. The Rider SSER will have an annual true-up filing, subject to DEPSC review and approval.

ACE New Jersey Distribution Base Rate Case Proceedings

On February 15, 2023, ACE filed an electric base rate case with the NJBPU (amended August 21, 2023) requesting a total revenue requirement increase of $92 million, before NJ sales and use tax, and an ROE of 10.50%. On November 17, 2023, the NJBPU issued an order awarding ACE electric revenue requirement increases, before NJ sales and use tax, of $36 million and $9 million effective December 1, 2023 and February 1, 2024, respectively, with an ROE of 9.60%.

On November 21, 2024, ACE filed an electric base rate case with the NJBPU requesting a total revenue requirement increase of $109 million, before NJ sales and use tax, and an ROE of 10.70%. On November 21, 2025, the NJBPU issued an order awarding ACE an electric revenue requirement increase, before NJ sales and use tax, of $54 million effective December 1, 2025, with an ROE of 9.60%. In addition, the NJBPU approved the recovery through a regulatory asset of work stoppage costs that were incurred by ACE in 2023 of $38 million.

Transmission Formula Rates

The Utility Registrants' transmission rates are each established based on a FERC-approved formula. ComEd, BGE, Pepco, DPL, and ACE are required to file an annual update to the FERC-approved formula on or before May 15, and PECO is required to file on or before May 31, with the resulting rates effective on June 1 of the same year. The annual update for ComEd is based on prior year actual costs and current year projected capital additions (initial year revenue requirement). The update for ComEd also reconciles any differences between the revenue requirement in effect beginning June 1 of the prior year and actual costs incurred for that year (annual reconciliation). The annual update for PECO is based on prior year actual costs and current year projected capital additions, accumulated depreciation, and accumulated deferred income taxes. The annual update for BGE, Pepco, DPL, and ACE is based on prior year actual costs and current year projected capital additions, accumulated depreciation, depreciation and amortization expense, and accumulated deferred income taxes. The update for PECO, BGE, Pepco, DPL, and ACE also reconciles any differences between the actual costs and actual revenues for the calendar year (annual reconciliation).

For 2025, the following increases/(decreases) were included in the Utility Registrants' electric transmission formula rate updates:

Registrant(a)Initial Revenue Requirement Increase (Decrease)Annual Reconciliation Increase (Decrease)Total Revenue Requirement Increase (Decrease)(b)Allowed Return on Rate Base(c)Allowed ROE(d)
ComEd$78$49$1278.13%11.50%
PECO$9$13$227.54%10.35%
BGE$21$21$35(e)7.53%10.50%
Pepco$35$16$517.71%10.50%
DPL$32$(9)$237.48%10.50%
ACE$(11)$(46)$(57)7.16%10.50%

(a)All rates are effective June 1, 2025 - May 31, 2026, subject to review by interested parties pursuant to review protocols of each Utility Registrants' tariffs.

(b)For the Utility Registrants, except for PECO, while the transmission filings reflect the tax benefit of NOLCs, the impacts of the NOLCs will not be reflected in the financial statements until the PLR is received from the IRS. See Note 11 — Income Taxes for additional information on NOLCs.

(c)Represents the weighted average debt and equity return on transmission rate base.

(d)The rate of return on common equity for each Utility Registrant includes a 50-basis-point incentive adder for being a member of an RTO.

(e)The increase in BGE's transmission revenue requirement includes a $7 million reduction related to a FERC-approved dedicated facilities charge to recover the costs of providing transmission service to specifically designated load by BGE.

Other State Regulatory Matters

Illinois Regulatory Matters

CEJA (Exelon and ComEd). On September 15, 2021, the Governor of Illinois signed into law CEJA. CEJA includes, among other features, (1) procurement of CMCs from qualifying nuclear-powered generating facilities,

(2) a requirement to file a general rate case or a new four-year MRP no later than January 20, 2023 to establish rates effective after ComEd’s existing performance-based distribution formula rate sunsets, (3) requirements that ComEd and the ICC initiate and conduct various regulatory proceedings on subjects including ethics, spending, grid investments, and performance metrics.

ComEd Electric Distribution Rates

Beginning in 2024, ComEd recovers from retail customers, subject to certain exceptions, the costs it incurs to provide electric delivery services either through its electric distribution rate or other recovery mechanisms authorized by CEJA. On January 17, 2023, ComEd filed a petition with the ICC seeking approval of a MRP for 2024-2027. The MRP supports a multi-year grid plan (2024-2027 Grid Plan), also filed on January 17, covering planned investments on the electric distribution system within ComEd’s service area through 2027. Costs incurred during each year of the MRP are subject to ICC review and the plan’s revenue requirement for each year will be reconciled with the actual costs that the ICC determines are prudently and reasonably incurred for that year. The reconciliation is subject to adjustment for certain costs, including a limitation on recovery of costs that are more than 105% of certain costs in the previously approved MRP revenue requirement, absent a modification of the rate plan itself. Thus, for example, the rate adjustments necessary to reconcile 2024 revenues to ComEd’s actual 2024 costs incurred would take effect in January 2026 after the ICC’s review during 2025.

On December 14, 2023, the ICC issued a final order. The ICC rejected ComEd’s 2024-2027 Grid Plan as non-compliant with certain requirements of CEJA and required ComEd to file a revised 2024-2027 Grid Plan. In the absence of an approved 2024-2027 Grid Plan, the ICC set ComEd’s forecast revenue requirements for 2024-2027 based on ComEd's approved year-end 2022 rate base. This resulted in a total cumulative revenue requirement increase of $501 million, a $986 million total revenue reduction from the requested cumulative revenue requirement increase but remained subject to annual reconciliation in accordance with CEJA. The final order approved the process and formulas associated with the MRP reconciliation mechanisms. The ICC's December 2023 order also denied ComEd's ability to earn a return on its pension asset.

On December 22, 2023, ComEd filed an application for rehearing on several findings in the final order including the use of the 2022 year-end rate base to establish forecast revenue requirements for 2024-2027, ROE, pension asset return, and capital structure. On January 10, 2024, ComEd’s application for rehearing was denied on all issues except for the order’s use of the 2022 year-end rate base. On April 18, 2024, the ICC issued its final order on rehearing, which approved the use of the forecasted year-end 2023 rate base that resulted in increased revenue requirements for 2024-2027. These revenue requirements determined during the rehearing process established base revenue requirements until the ICC approved the Refiled 2024-2027 Grid Plan on December 19, 2024.

On January 10, 2024, ComEd filed an appeal in the Illinois Appellate Court of the issues on which rehearing was denied, including but not limited to the allowed ROE,50% equity ratio, and denial of a return on ComEd’s pension asset. There is no deadline by when the appellate court must rule. On March 13, 2024, ComEd filed its Refiled 2024-2027 Grid Plan with supporting testimony and schedules with the ICC and subsequently on March 15, 2024, ComEd also filed a petition to adjust its MRP to authorize increased rates consistent with the Refiled 2024-2027 Grid Plan. On December 19, 2024, the ICC approved the Refiled 2024-2027 Grid Plan and adjusted the approved MRP with rates effective on January 1, 2025. The final approved MRP, as adjusted, which reflects the Refiled Grid Plan, resulted in a total cumulative revenue requirement increase of $1.045 billion over the 2024-2027 plan years and remains subject to annual reconciliations in accordance with CEJA. ComEd filed timely requests for rehearing and an appeal of the MRP order, again limited to the issues on which rehearing of the December 2023 order was denied, including the allowed ROE,50% equity ratio, and denial of a return on ComEd's pension asset.

On January 16, 2026, ComEd filed a multi-year integrated grid plan (2028-2031 Grid Plan), seeking approval for planned investments on the electric distribution system within ComEd's service area in 2028-2031. The ICC must issue an order by December 15, 2026.

Carbon Mitigation Credit

CEJA establishes decarbonization requirements for Illinois as well as programs to support the retention and development of emissions-free sources of electricity. ComEd is required to purchase CMCs from participating nuclear power generating facilities between June 1, 2022 and May 31, 2027. The price to be paid for each CMC was established through a competitive bidding process that included consumer-protection measures that capped the maximum acceptable bid amount and a formula that reduces CMC prices by an energy price index, the base residual auction capacity price in the ComEd zone of PJM, and the monetized value of any federal tax credit or other subsidy if applicable. On October 31, 2025, the seller provided notification to ComEd and the IPA that it has reflected on its 2024 federal tax return $804 million of nuclear production tax credits associated with its participating nuclear power generating facilities. These amounts will be collected from the seller through an adjustment to the CMC price to be paid by ComEd and returned to customers in 2026. As of December 31, 2025, Exelon and ComEd's Consolidated Balance Sheets reflect these amounts as a receivable from the seller with an offsetting balance within the Carbon mitigation credit regulatory liability. These adjustments had no net impact on Exelon and ComEd’s Consolidated Statements of Operations and Comprehensive Income. The consumer protection measures contained in CEJA will result in net payments to ComEd ratepayers if the energy index, the capacity price and applicable federal tax credits or subsidy exceed the CMC contract price. Beginning with the June 2022 monthly billing period, ComEd began issuing credits and/or charges to its retail customers under its CMC rider, the Rider Carbon-Free Resource Adjustment (Rider CFRA). A regulatory asset or liability is recorded for the difference between ComEd's costs associated with the procurement of CMCs from participating nuclear power generating facilities and revenues received from customers. The balance of the liability as of December 31, 2025 is $670 million.

On February 2, 2024, ComEd filed a petition with the ICC to initiate the reconciliation proceeding for the costs incurred in connection with the procurement of CMC’s during the delivery year beginning June 1, 2022 and extending through May 31, 2023. While both Staff and the Administrative Law Judge's proposed order supported ComEd’s proposed reconciliation adjustment, on September 4, 2025, the ICC issued its final order rejecting the proposed reconciliation adjustment. Specifically, the order disallowed portions of the administrative costs as well as a portion of ComEd's interest costs on the balance of credit extended to customers under the applicable tariff that were not yet funded by payments from the generator. The CMC costs themselves were not disallowed. The order resulted in an immaterial impact to the financial statements and on October 3, 2025 ComEd filed its Application for Rehearing. On October 16, 2025, the ICC denied ComEd's Application. On October 17, 2025, ComEd filed its appeal with the Illinois Appellate Court for review of the ICC's order and its denial of rehearing.

Energy Efficiency

CEJA extends ComEd’s current cumulative annual energy efficiency MWh savings goals through 2040, adds expanded electrification measures to those goals, increases low-income commitments, and adds a new performance adjustment to the energy efficiency formula rate. ComEd expects its annual spend to increase through 2040 to achieve these energy efficiency MWh savings goals, which is deferred as a separate regulatory asset that is recovered through the energy efficiency formula rate over the weighted average useful life, as approved by the ICC, of the related energy efficiency measures.

Energy Efficiency Formula Rate (Exelon and ComEd). FEJA allows ComEd to defer energy efficiency costs (except for any voltage optimization costs which are recovered through electric distribution rates) as a separate regulatory asset that is recovered through the energy efficiency formula rate over the weighted average useful life, as approved by the ICC, of the related energy efficiency measures. ComEd earns a return on the energy efficiency regulatory asset at a rate equal to a weighted average cost of capital, which is based on a year-end capital structure and a statutorily-based formula based on long-term treasury debt. The ROE that ComEd earns on its energy efficiency regulatory asset is subject to a maximum downward or upward adjustment of 200 basis points if ComEd’s cumulative persisting annual MWh savings falls short of or exceeds specified percentage benchmarks of its annual incremental savings goal. ComEd is required to file an update to its energy efficiency formula rate on or before June 1 st each year, with resulting rates effective in January of the following year. The annual update is based on projected rate year energy efficiency costs, PJM capacity revenues, and the projected year-end regulatory asset balance less any related deferred income taxes (initial year revenue requirement). The update also reconciles any differences between the revenue requirement in effect for the prior year and actual costs incurred from the year (annual reconciliation). The approved energy efficiency formula rate also provides for revenue decoupling provisions.

During 2025, the ICC approved the following total increases in ComEd's requested energy efficiency revenue requirement:

Filing DateRequested Revenue Requirement IncreaseApproved Revenue Requirement Increase(a)Approved ROEApproval DateRate Effective Date
May 23, 2025$19$1910.21%November 19, 2025January 1, 2026

(a)ComEd's 2026 approved revenue requirement reflects an increase of $24 million for the initial year revenue requirement for 2026 and a decrease of $5 million related to the annual reconciliation for 2024. The revenue requirement for 2025 provides for a weighted average debt and equity return on the energy efficiency regulatory asset and rate base of 7.23% inclusive of an allowed ROE of 10.21%, reflecting the monthly average yields for 30-year treasury bonds plus 580 basis points. The revenue requirement for the 2024 reconciliation year provides for a weighted average debt and equity return on the energy efficiency regulatory asset and rate base of 7.50% inclusive of an allowed ROE of 10.75%, which includes an upward performance adjustment that increased the ROE. The performance adjustment can either increase or decrease the ROE based upon the achievement of energy efficiency savings goals. See table below for ComEd's regulatory assets associated with its energy efficiency formula rate.

Maryland Regulatory Matters

Maryland Revenue Decoupling (Exelon, BGE, PHI, Pepco, and DPL). In 1998, the MDPSC approved natural gas monthly rate adjustments for BGE and in 2007, the MDPSC approved electric monthly rate adjustments for BGE and BSAs for Pepco and DPL, all of which are decoupling mechanisms. As a result of the decoupling mechanisms, certain Operating revenues from electric and natural gas distribution at BGE and Operating revenues from electric distribution at Pepco Maryland (see also District of Columbia Revenue Decoupling below for Pepco District of Columbia) and DPL are not intended to be impacted by abnormal weather or usage per customer. For BGE, Pepco, and DPL, the decoupling mechanism eliminates the impacts of abnormal weather or customer usage by recognizing revenues based on an authorized distribution amount per customer by customer class. Operating revenues from electric and natural gas distribution at BGE and Operating revenues from electric distribution at Pepco Maryland and DPL are, however, impacted by changes in the number of customers.

EmPOWER Maryland Cost Recovery (Exelon, BGE, PHI, Pepco and DPL). On December 29, 2023, the MDPSC issued an order authorizing the next three-year program cycle for EmPOWER Maryland and approved various proposals by the program administrators to implement new energy efficiency programs for the 2024-2026 program cycle, as well as continue operating core programs. Historically, BGE, Pepco, and DPL deferred most of their energy efficiency program costs to a regulatory asset and either deferred most of their demand response program costs to a regulatory asset or capitalized them. Beginning in 2024, BGE, Pepco, and DPL began deferring less energy efficiency and demand response program costs and beginning January 1, 2026, program costs are no longer being deferred. Additionally, as part of the order, the MDPSC directed BGE, Pepco, and DPL to extend the amortization of unamortized costs as of December 31, 2023 from 5 to 7 years to mitigate customer bill impacts.

Next Generation Energy Act (Exelon, BGE, PHI, Pepco, and DPL). On May 20, 2025, the Governor of Maryland signed into law legislation that addresses several matters pertaining to electric and gas utilities, including affirming that the MDPSC may approve the use of multi-year rate plans that demonstrate customer benefits, among other things. It also prohibits utilities from filing after January 1, 2025, for the reconciliation of actuals costs and revenues to amounts approved within the multi-year plans. In the second quarter of 2025, BGE derecognized Regulatory assets of $10 million and Regulatory liabilities of $3 million for multi-year plan reconciliations that are no longer eligible to be filed. DPL also derecognized Regulatory liabilities of $0.4 million during the second quarter of 2025 for multi-year reconciliations ineligible to be filed. Multi-year plan reconciliations filed prior to January 1, 2025, remain lawful and will be resolved in their respective proceedings.

Summer and Winter Rate Mitigation (Exelon, BGE, PHI, Pepco, and DPL). As part of the passing of the Next Generation Energy Act by the Maryland General Assembly, the MDPSC issued an order on June 26, 2025, to implement the Legislative Energy Relief Refund program under which bill credits were distributed to residential customers based on their consumption of electricity supply that was subject to the renewable energy portfolio standard. On July 24, 2025, the MDPSC issued an order accepting BGE, Pepco, and DPL's proposal for the implementation of the program. As a result, BGE, Pepco, and DPL received $49 million, $21 million, and $8 million, respectively, from the MDPSC on August 6, 2025. These amounts were used to reduce residential customer account receivable balances within the third quarter of 2025. Additional disbursements from the state of

Maryland were received by BGE, Pepco, and DPL on February 3, 2026 for approximately $49 million, $21 million, and $8 million, respectively. These amounts will also be used to reduce residential customer receivables in the first quarter of 2026.

District of Columbia Regulatory Matters

District of Columbia Revenue Decoupling (Exelon, PHI, and Pepco). In 2009, the DCPSC approved a BSA, which is a decoupling mechanism. As a result of the decoupling mechanism, Operating revenues from electric distribution at Pepco District of Columbia (see also Maryland Revenue Decoupling above for Pepco Maryland) are not intended to be impacted by abnormal weather or usage per customer. The decoupling mechanism initially approved eliminated the impacts of abnormal weather or customer usage by recognizing revenues based on an authorized distribution amount per customer by customer class. Prior to 2025, operating revenues from electric distribution at Pepco District of Columbia were, impacted by changes in the number of customers. Beginning in 2025, based on modifications approved by the DCPSC, Pepco District of Columbia began recognizing revenues on an authorized distribution amount per customer class basis, and operating revenues from electric distribution have no longer been impacted by changes in the number of customers.

New Jersey Regulatory Matters

Conservation Incentive Program (CIP) (Exelon, PHI, and ACE). On September 25, 2020, ACE filed an application with the NJBPU as required to seek approval to implement a portfolio of energy efficiency programs pursuant to New Jersey’s clean energy legislation. The filing included a request to implement a CIP that would eliminate the favorable and unfavorable impacts of weather and customer usage patterns on distribution revenues for most customers. The CIP compares current distribution revenues by customer class to approved target revenues established in ACE’s most recent distribution base rate case. The CIP is calculated annually and recovery is subject to certain conditions, including an earnings test and ceilings on customer rate increases.

On April 27, 2021, the NJBPU approved the settlement filed by ACE and the third parties to the proceeding. The approved settlement addresses all material aspects of ACE’s filing, including ACE’s ability to implement the CIP prospectively effective July 1, 2021. As a result of this decoupling mechanism, operating revenues are no longer intended to be impacted by abnormal weather or usage for most customers. Starting in the third quarter of 2021, ACE began recording alternative revenue program revenues for its best estimate of the distribution revenue impacts resulting from future changes in CIP rates that it believes are probable of approval by the NJBPU in accordance with this mechanism.

Termination of Energy Procurement Provisions of PPAs (Exelon, PHI, and ACE). On December 22, 2021, ACE filed a petition with the NJBPU to terminate the provisions in the PPAs to purchase electricity from two coal-powered generation facilities located in the state of New Jersey. The petition was approved by the NJBPU on March 23, 2022. Upon closing of the transaction on March 31, 2022, ACE recognized a liability of $203 million for the contract termination fee and recognized a corresponding regulatory asset of $203 million. The liability has been paid in full as of December 31, 2024.

For the year ended December 31, 2024, ACE paid $49 million of the liability, which is recorded in Changes in Other assets and liabilities in Exelon's, PHI's, and ACE's Consolidated Statements of Cash Flows.

ACE Infrastructure Investment Program Filings (Exelon, PHI, and ACE). On October 31, 2022, ACE filed with the NJBPU an IIP, called “Powering the Future”, proposing to seek recovery through a new component of ACE’s rider mechanism, totaling $379 million, over the four-year period of July 1, 2023, to June 30, 2027. The new IIP will allow ACE to invest in projects that are designed to enhance the reliability, resiliency, and safety of the service ACE provides to its customers. On June 15, 2023, ACE entered into a settlement agreement with other parties, which allows for a recovery totaling $93 million of reliability related capital investments from July 1, 2023, through June 30, 2027. ACE will have the option of seeking approval from the NJBPU to extend the end date of the IIP beyond June 30, 2027, if ACE determines an extension is necessary. On June 29, 2023, the NJBPU adopted the settlement agreement and issued an order approving the program.

Advanced Metering Infrastructure Filing (Exelon, PHI, and ACE). On August 26, 2020, ACE filed an application with the NJBPU as required to seek approval to deploy a smart energy network in alignment with New Jersey’s Energy Master Plan and Clean Energy Act. The proposal consisted of estimated costs totaling $220 million with deployment taking place over a 3-year implementation period from approximately 2021 to 2024 that involved the installation of an integrated system of smart meters for all customers accompanied by the requisite communications facilities and data management systems.

On July 14, 2021, the NJBPU approved the settlement filed by ACE and the third parties to the proceeding. The approved settlement addressed all material aspects of ACE's smart energy network deployment plan, including cost recovery of the investment costs, incremental Operating and maintenance expenses, and the unrecovered balance of existing infrastructure through future distribution rates.

New Jersey Clean Energy Legislation (Exelon, PHI, and ACE). On May 23, 2018, New Jersey enacted legislation that established and modified New Jersey’s clean energy and energy efficiency programs and solar and RPS. On the same day, New Jersey enacted legislation that established a ZEC program that provides compensation for nuclear plants that demonstrate to the NJBPU that they meet certain requirements. Under the legislation, the NJBPU will issue ZECs to the qualifying nuclear power plants and the electric distribution utilities in New Jersey, including ACE, will be required to purchase those ZECs. ACE began collecting from retail distribution customers, through a non-bypassable charge, all costs associated with the procurement of the ZECs effective April 18, 2019.

Summer Rate Mitigation (Exelon and ACE). In response to significant increases in electric supply costs, on April 23, 2025, the NJBPU issued an order directing the State's electric public utilities to file petitions proposing distribution side measures to mitigate residential customer bill impacts during summer months. As a result, on June 18, 2025, the NJBPU approved a stipulation of settlement for ACE to issue a bill credit of $30 per residential customer for the months of July and August 2025, which was deferred to Regulatory assets. The amounts will subsequently be collected from September 2025 through February 2026 at a flat rate of $10 per residential customer. The bill credit and subsequent collections will not be subject to carrying costs. As of December 31, 2025, the Regulatory asset has a remaining balance of $10 million.

Residential Universal Bill Credit (Exelon and ACE). In an effort to further reduce the burden of increased electric supply costs, on August 13, 2025, the NJBPU issued an order to establish the RUBC, which was funded by the NJBPU. The program provided a $50 bill credit per eligible residential customer for the months of September and October 2025. ACE received $51 million from the NJBPU on September 25, 2025, which was recognized as a Regulatory liability. ACE subsequently issued all bill credits to residential customers in September and October. As of December 31, 2025, there isno Regulatory liability remaining.

Other Federal Regulatory Matters

FERC Audit (Exelon and ComEd). The Utility Registrants are subject to periodic audits and investigations by FERC. FERC’s Division of Audits and Accounting initiated a nonpublic audit of ComEd in April 2021 evaluating ComEd’s compliance with (1) approved terms, rates and conditions of its federally regulated service; (2) accounting requirements of the Uniform System of Accounts; (3) reporting requirements of the FERC Form 1; and (4) the requirements for record retention. The audit period extended back to January 1, 2017.

On July 27, 2023, FERC published a final audit report which included, among other things, findings and recommendations related to ComEd's methodology regarding the allocation of certain overhead costs to capitalized construction costs under FERC regulations, including a suggestion that refunds may be due to customers for amounts collected in previous years. On July 30, 2024, ComEd reached an agreement in principle on the contested overhead allocation finding. As a result of the settlement process, ComEd recorded a charge for the probable disallowance of $70 million of certain currently capitalized construction costs to operating expenses, which are not expected to be recovered in future rates. The existing loss estimate was reflected in Exelon and ComEd's financial statements as of December 31, 2024. ComEd and FERC staff jointly filed the settlement agreement with FERC for approval on February 11, 2025. The settlement was approved by FERC on April 4, 2025.

Regulatory Assets and Liabilities

Regulatory assets represent incurred costs that have been deferred because of their probable future recovery from customers through regulated rates. Regulatory liabilities represent the excess recovery of costs or accrued credits that have been deferred because it is probable such amounts will be returned to customers through future regulated rates or represent billings in advance of expenditures for approved regulatory programs.

The following tables provide information about the regulatory assets and liabilities of the Registrants at December 31, 2025 and 2024:

December 31, 2025ExelonComEdPECOBGEPHIPepcoDPLACE
Regulatory assets
AMI programs - deployment costs$49$—$—$8$41$6$8$27
AMI programs - legacy meters644—15919733
Asset retirement obligations193129222814941
COVID-1945——243421—
Deferred income taxes1,167—1,154—1313——
Deferred storm costs182—7581268117
Distributed generation rebates246246——————
Electric distribution formula rate annual reconciliations2020——————
Electric distribution formula rate significant one-time events7373——————
Electric energy and natural gas costs20543—5211067376
Energy efficiency and demand response programs686——32735917868113
Energy efficiency costs2,0182,018——————
Fair value of long-term debt426———338———
Fair value of PHI's unamortized energy contracts21———21———
MGP remediation costs3102831413————
Multi-year plan reconciliations11671—261919——
Pension and OPEB2,603———————
Pension and OPEB - merger related371———————
Removal costs967——340627139140348
Renewable energy131131——————
Transmission formula rate annual reconciliations611714426188—
Under-recovered credit loss expense152152——————
Under-recovered revenue decoupling107——396830—38
Universal service fund charge under-recovery - Electric32—32—————
Work stoppage costs37———37——37
Zero emission credit4141——————
Other250543658107391232
Total regulatory assets10,5733,2821,3479791,908587286652
Less: current portion1,359595721753521827293
Total noncurrent regulatory assets$9,214$2,687$1,275$804$1,556$405$214$559
December 31, 2025ExelonComEdPECOBGEPHIPepcoDPLACE
Regulatory liabilities
Carbon mitigation credit$670$670$—$—$—$—$—$—
Decommissioning the Regulatory Agreement Units4,7554,313442—————
Dedicated facilities charge155——155————
Deferred income taxes2,4471,419—427601241232128
Electric energy and natural gas costs155—1132517——17
Energy efficiency and demand response programs16—16—————
Fiber Refund————————
Multi-year plan reconciliations13———1367—
Over-recovered credit loss expense5———5——5
Over-recovered revenue decoupling8——17—7—
Removal costs2,0701,960——11020882
Renewable portfolio standards costs1,6111,611——————
Transmission formula rate annual reconciliations31——427—720
Other20836181445141713
Total regulatory liabilities12,14410,009589626825281358185
Less: current portion1,12884614031103134248
Total noncurrent regulatory liabilities$11,016$9,163$449$595$722$268$316$137
December 31, 2024ExelonComEdPECOBGEPHIPepcoDPLACE
Regulatory assets
AMI programs - deployment costs$82$—$—$29$53$11$13$29
AMI programs - legacy meters9013—473301033
Asset retirement obligations173112232612831
Carbon mitigation credit179179——————
COVID-19593—452493—
Deferred income taxes937—925—1212——
Deferred storm costs125—2373298120
Distributed generation rebate171171——————
Electric distribution formula rate annual reconciliations554554——————
Electric distribution formula rate significant one-time events9898——————
Electric energy and natural gas costs108——3870182032
Energy efficiency and demand response programs652—103293131747267
Energy efficiency costs1,8901,890——————
Fair value of long-term debt457———362———
Fair value of PHI's unamortized energy contracts26———26———
MGP remediation costs3072751814————
Multi-year plan reconciliations17081—662323——
Pension and OPEB2,382———————
Pension and OPEB - merger related503———————
Removal costs869——261608127127356
Renewable energy131131——————
Transmission formula rate annual reconciliations114201530493712—
Under-recovered credit loss expense147126——21——21
Under-recovered revenue decoupling188——989060—30
Universal service fund charge under-recovery - Electric19—19—————
Zero emission credit44——————
Other215643523100461414
Total regulatory assets10,6503,7211,0689951,893603275603
Less: current portion1,9401,1596520732315760101
Total noncurrent regulatory assets$8,710$2,562$1,003$788$1,570$446$215$502
December 31, 2024ExelonComEdPECOBGEPHIPepcoDPLACE
Regulatory liabilities
Decommissioning the Regulatory Agreement Units$4,027$3,780$247$—$—$—$—$—
Dedicated facilities charge143——143————
Deferred income taxes2,7561,607—484665285247133
Electric energy and natural gas costs1081281—1587—
Energy efficiency and demand response programs1—1—————
Fiber Refund16—16—————
Multi-year plan reconciliations9———9—9—
Over-recovered revenue decoupling2———2—2—
Removal costs1,9581,841—111062086—
Renewable portfolio standards costs1,3691,369——————
Transmission formula rate annual reconciliations14———14——14
Other206930105214169
Total regulatory liabilities10,6098,618375648863327367156
Less: current portion4111971221269174210
Total noncurrent regulatory liabilities$10,198$8,421$253$636$794$310$325$146

Descriptions of the regulatory assets and liabilities included in the tables above are summarized below, including their recovery and amortization periods.

Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
AMI programs - deployment costsRepresents installation and ongoing incremental costs of new smart meters, including implementation costs at Pepco and DPL of dynamic pricing for energy usage resulting from smart meters.BGE - 2026Pepco - 2029DPL - 2030ACE - 2045BGE, Pepco, DPL - YesACE - Yes, on incremental costs of new smart meters
AMI programs - legacy metersRepresents early retirement costs of legacy meters.ComEd - 2028BGE - 2026Pepco - 2029DPL - 2030ACE - 2045ComEd, Pepco (District of Columbia), DPL (Delaware), ACE - YesBGE, Pepco (Maryland), DPL (Maryland) - No
Asset retirement obligationsRepresents future legally required removal costs associated with existing AROs.Over the life of the related assets.Yes, once the removal activities have been performed
Carbon mitigation creditRepresents CMC procurement costs and credits as well as reasonable costs ComEd has incurred to implement and comply with the CMC procurement process.2026No
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
COVID-19Represents incremental credit losses and direct costs related to COVID-19 incurred primarily in 2020 at the Utility Registrants, partially offset by a decrease in travel costs at BGE, Pepco and DPL. Direct costs consisted primarily of costs to acquire personal protective equipment, costs for cleaning supplies and services, and costs to hire healthcare professionals to monitor the health of employees. This also includes under-recovered amounts due to COVID-19 that were previously deferred under Pepco’s revenue decoupling program.ComEd - 2025BGE - 2028PECO - 2025Pepco (District of Columbia) - $37 million - 2034Pepco (Maryland) - $5 million - 2029DPL (Delaware) - $1 million - 2028ComEd, BGE, and Pepco - YesPECO and DPL (Delaware) - No
Decommissioning the Regulatory Agreement UnitsRepresents estimated excess funds at the end of decommissioning the Regulatory Agreement Units. See below regarding Decommissioning the Regulatory Agreement Units for additional information.Not currently being refunded.No
Dedicated facilities chargeRepresents the timing difference between the recovery of certain transmission-related assets and their depreciable life.Depreciable life of the related assets.Yes
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Deferred income taxesRepresents deferred income taxes that are recoverable or refundable through customer rates, primarily associated with accelerated depreciation, the equity component of AFUDC, and the effects of income tax rate changes, including those resulting from the TCJA.Amounts are recoverable over the period in which the related deferred income taxes reverse, which is generally based on the expected life of the underlying assets. For TCJA, generally refunded over the remaining depreciable life of the underlying assets, except in certain jurisdictions where the commissions have approved a shorter refund period for certain assets not subject to IRS normalization rules.No
Deferred storm costsFor Pepco, DPL, ACE, PECO and BGE, amounts represent total incremental storm restoration costs incurred due to major storm events recoverable from customers in the Maryland, New Jersey jurisdictions and Pennsylvania.Pepco (Maryland) - $8 million to be determined in pending multi-year plan filed with MDPSC.DPL - 2027ACE - $2 million - 2026; $15 million - 2028PECO - $75 million to be determined in the next distribution rate case filed with the PAPUC. BGE - $34 million - 2028; $47 million to be determined in the next multi-year plan filed with MDPSC.Pepco, DPL, BGE - YesACE, PECO - No
Distributed generation rebatesRepresents ComEd's costs recovered through the distributed generation rebate adjustment tariff and the reconciliation of the difference of the revenue requirement in effect for the prior year and the revenue requirement based on actual prior year costs. Deferred distributed generation rebate costs are recovered over a 15-year period.2039Yes
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Electric distribution formula rate annual reconciliationsRepresents under/(over)-recoveries related to electric distribution service costs recoverable through ComEd's performance-based formula rate, which was updated annually with rates effective on January 1st.2026Yes
Electric distribution formula rate significant one-time eventsRepresents deferred distribution service costs related to ComEd's significant one-time events (e.g., storm costs), which are recovered over 5 years from date of the event.2029Yes
Electric energy and natural gas costsRepresents under (over)-recoveries related to energy and gas supply related costs recoverable (refundable) under approved rate riders.2026DPL (Delaware), ACE - YesComEd, PECO, BGE, Pepco, DPL (Maryland) - No
Energy efficiency and demand response programsIncludes under (over)-recoveries of costs incurred related to energy efficiency programs and demand response programs and recoverable costs associated with customer direct load control and energy efficiency and conservation programs that are being recovered from customers.PECO - 2025 BGE - 2030Pepco, DPL - 2030ACE - 2032BGE, Pepco (Maryland), DPL (Maryland) - See above regarding EmPOWER Maryland Cost Recovery for additional informationPepco (District of Columbia) - NoDPL (Delaware), ACE - YesPECO - Yes on capital investment recovered through this mechanism
Energy efficiency costsRepresents ComEd's costs recovered through the energy efficiency formula rate tariff and the reconciliation of the difference of the revenue requirement in effect for the prior year and the revenue requirement based on actual prior year costs. Deferred energy efficiency costs are recovered over the weighted average useful life of the related energy measure.2038Yes
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Fair value of long-term debtRepresents the difference between the carrying value and fair value of long-term debt of BGE, recorded at Exelon, and PHI of $88 million and $338 million, respectively, as of December 31, 2025, and $95 million and $362 million, respectively, as of December 31, 2024, as of the 2016 PHI and 2012 Constellation merger dates.Exelon - 2036PHI - 2045No
Fair value of PHI’s unamortized energy contractsRepresents the regulatory assets recorded at Exelon and PHI offsetting the fair value adjustment related to Pepco's, DPL's, and ACE's electricity and natural gas energy supply contracts recorded at PHI as of the PHI merger date.2036No
Fiber RefundRepresents revenues collected from Constellation and BSC for their use of PECO's fiber assets before the end of 2021.2025No
MGP remediation costsRepresents environmental remediation costs for MGP sites recorded at ComEd, PECO, and BGE.ComEd and PECO - Over the expected remediation period. See Note 16 — Commitments and Contingencies for additional information. BGE - 10 years from when the remediation spend occurs.ComEd and PECO - NoBGE - Yes
Multi-year plan reconciliationsRepresents under (over)-recoveries related to electric and gas distribution multi-year plans.ComEd - 2028BGE - 2027Pepco (Maryland) - $1 million related to 2023 reconciliation - 2026. $18 million related to 2024 reconciliation - to be determined in a future MDPSC order.Pepco (District of Columbia) - $6 million related to 2025 reconciliation - to be determined in a future DCPSC order.DPL (Maryland) - $7 million related to 2024 reconciliation.ComEd - YesBGE - NoPepco (Maryland) - NoPepco (District of Columbia) - YesDPL (Maryland) - Yes
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Pension and OPEBPrimarily reflects the Utility Registrants' and PHI's portion of deferred costs, including unamortized actuarial losses (gains) and prior service costs (credits), associated with Exelon's pension and OPEB plans, which are recovered through customer rates once amortized through net periodic benefit cost. Also, includes the Utility Registrants' and PHI's non–service cost components capitalized in Property, plant and equipment, net on their Consolidated Balance Sheets.The deferred costs are amortized over the plan participants' average remaining service periods subject to applicable pension and OPEB cost recognition policies. See Note 12 — Retirement Benefits for additional information. The capitalized non–service cost components are amortized over the lives of the underlying assets.No
Pension and OPEB - merger relatedThe deferred costs established at the date of the 2012 Constellation and 2016 PHI mergers are amortized over the plan participants' average remaining service periods subject to applicable pension and OPEB cost recognition policies. The costs are recovered through customer rates once amortized through net periodic benefit cost. See Note 12 — Retirement Benefits for additional information. The capitalized non–service cost components are amortized over the lives of the underlying assets.Legacy BGE - 2038Legacy PHI - 2032No
Removal costsFor BGE, Pepco, DPL, and ACE, the regulatory asset represents costs incurred to remove property, plant and equipment in excess of amounts received from customers through depreciation rates. For ComEd, BGE, Pepco, and DPL, the regulatory liability represents amounts received from customers through depreciation rates to cover the future non–legally required cost to remove property, plant and equipment, which reduces rate base for ratemaking purposes.BGE, Pepco, DPL, and ACE - Asset is generally recovered over the life of the underlying assets.ComEd, BGE, Pepco, DPL, and ACE - Liability is reduced as costs are incurred.Yes
Renewable energyRepresents the change in fair value of ComEd‘s 20-year floating-to-fixed long-term renewable energy swap contracts.2032No
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Renewable portfolio standards costsRepresents an overcollection of funds from both ComEd customers and alternative retail electricity suppliers to be spent on future renewable energy procurements.$1,535 million to be determined in pending ICC annual reconciliation for the Renewable Energy Adjustment rider.$76 million to be determined based on the LTRRPP developed by the IPA.No
Transmission formula rate annual reconciliationsRepresents under (over)-recoveries related to transmission service costs recoverable through the Utility Registrants’ FERC formula rates, which are updated annually with rates effective each June 1st.2027Yes
Under (over) -recovered revenue decouplingRepresents electric and / or gas distribution costs recoverable from or refundable to customers under decoupling mechanisms.BGE - 2026Pepco (Maryland) - $4 million - 2026Pepco (District of Columbia) - $26 million - 2028DPL - 2025ACE - 2026BGE, Pepco, DPL, ACE - No
Line ItemDescriptionEnd Date of Remaining Recovery/Refund PeriodReturn
Under (over) -recovered credit loss expenseFor ComEd and ACE, amounts represent the difference between annual credit loss expense and revenues collected in rates through ICC and NJBPU-approved riders. The difference between net credit loss expense and revenues collected through the rider each calendar year for ComEd is recovered over a twelve-month period beginning in June of the following calendar year. ACE intends to recover from or refund to customers June through May of each respective year, subject to approval of the NJBPU.ComEd - 2026ACE - To be determined in the annual Societal Benefits Rider filing with NJBPU.No
Universal service fund charge under-recovery - ElectricRepresents under-recovery of electric supply and distribution revenue shortfalls net of base rate recovery related to PECO’s Universal Service programs, which are designed to provide affordable bills for electric service to low-income, residential customers based on individual household needs.PECO - To be determined in the annual adjustment and reconciliation as approved by the PAPUC.No
Work stoppage costsRepresents work stoppage costs incurred by ACE.2030No
Zero emission creditRepresents ZEC procurement costs and any reasonable costs ComEd has incurred to implement and comply with the ZEC procurement process.Over 9 months starting with the September billing period and ending with the following May billing period.No

Decommissioning the Regulatory Agreement Units

The regulatory agreements with the ICC and PAPUC dictate obligations related to the shortfall or excess of NDT funds necessary for decommissioning the former ComEd units on a unit-by-unit basis and the former PECO units in total.

For the former PECO units, given the symmetric settlement provisions that allow for continued recovery of decommissioning costs from PECO customers in the event of a shortfall and the obligation for Constellation to ultimately return excess funds to PECO customers (on an aggregate basis for all seven units), decommissioning-related activities result in an adjustment to the Receivable related to Regulatory Agreement Units and an equal adjustment to the regulatory liabilities or regulatory assets at PECO.

For the former ComEd units, given no further recovery from ComEd customers is permitted and Constellation retains an obligation to ultimately return excess funds to ComEd customers (on a unit-by-unit basis), to the extent excess funds are expected for each unit, decommissioning-related activities result in an adjustment to the Receivable related to Regulatory Agreement Units and an equal adjustment to the regulatory liabilities at ComEd. However, given the asymmetric settlement provision that does not allow for continued recovery from ComEd customers in the event of a shortfall, recognition of a regulatory asset at ComEd is not permissible.

Capitalized Ratemaking Amounts Not Recognized

The following table presents authorized amounts capitalized for ratemaking purposes related to earnings on shareholders’ investment that are not recognized for financial reporting purposes in the Registrants' Consolidated Balance Sheets. These amounts will be recognized as revenues in the related Consolidated Statements of Operations and Comprehensive Income in the periods they are billable to the Utility Registrants' customers. PECO hadno related amounts at December 31, 2025 and December 31, 2024

ExelonComEd(a)BGE(b)PHIPepco(c)DPL(d)ACE(e)
December 31, 2025$98$12$47$39$22$1$16
December 31, 2024$117$46$16$55$40$1$14

(a)For the year ended December 31, 2025, reflects ComEd's unrecognized equity returns earned for ratemaking purposes on its electric distribution rates and distributed generation regulatory assets. For the year ended December 31, 2024, reflects ComEd's unrecognized equity returns earned for ratemaking purposes on its electric distribution rates and formula rates regulatory assets.

(b)BGE's amount capitalized for ratemaking purposes primarily relates to earnings on shareholders' investment on AMI programs and investments in rate base included in the multi-year plan reconciliations.

(c)Pepco's authorized amounts capitalized for ratemaking purposes relate to earnings on shareholders' investment on AMI programs, Energy efficiency and demand response programs, COVID-19 costs, investments in rate base and revenues included in the multi-year plan reconciliations, and a portion of Pepco District of Columbia's revenue decoupling.

(d)DPL's authorized amounts capitalized for ratemaking purposes relate to earnings on shareholders' investment on AMI programs and Energy efficiency and demand response programs.

(e)ACE's authorized amounts capitalized for ratemaking purposes primarily relate to earnings on shareholders' investment on AMI programs.