ALLIANCE RESOURCE PARTNERS LP
For the period ended Dec 31, 2025. Filed Feb 26, 2026.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Feb 26, 2026
Extracted filing text, with the paragraph anchors used by the comparison.
See the whole filing, with its images and exhibitsContents
Item 2. Properties
COAL MINERAL RESOURCES AND RESERVES
Overview of Coal Properties
Our coal properties are located in the Illinois Basin and the Appalachia Basin. Our Illinois Basin properties are located in western Kentucky, southern Illinois, and southern Indiana. Our Appalachian properties are located in eastern Kentucky, western Maryland, western Pennsylvania, and northern West Virginia. Mining operations on our coal properties consist of underground mines that produce bituminous coal that is sold to customers principally for electric power generation (thermal) and the production of steel (metallurgical). In addition to our coal mining operations, we also hold coal mineral interests that we lease/sublease to our operations or hold for lease/sublease to our operations or others. For a detailed overview of our coal mining operations and our coal royalty activities, please see “Item 1. Business—Coal Mining Operations” and “Item 1. Business—Mineral Interest Activities”, respectively.
Evaluation and Review of Coal Mineral Resources and Reserves
Numerous uncertainties are inherent in estimating coal mineral resources and reserves, and the estimates are subject to change as additional information becomes available or circumstances change. Significant factors and assumptions related to the uncertainty in estimating coal mineral reserves and resources include:
| ● | geological and mining conditions, which may not be fully identified by available exploration data and/or differ from our experiences in areas where we currently mine; |
| ● | the percentage of coal in the ground ultimately recoverable; |
| ● | historical production from the area compared with production from other producing areas; |
| ● | the assumed effects of regulation and taxes by governmental agencies; |
| ● | future improvements in mining technology; and |
| ● | assumptions concerning future coal prices, operating costs, capital expenditures, severance and excise taxes, and development and reclamation costs. |
Each of the factors which impacts reserve and resource estimation may vary considerably from the assumptions used in making the estimation and, as a result, the estimates in this report may not accurately reflect the actual coal reserves and resources. Actual production, revenues, and expenditures with respect to the coal reserves will likely vary from the assumptions used in these estimates, and these variances may be material. Government regulations and other pressures may result in the closure of coal-fired electric generating plants earlier than assumed. Such changes would reduce the economic viability of our mining operations and could have a material adverse impact on our operations and financial results.
Under SEC rules, a mineral resource is a concentration or occurrence of a material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A mineral resource is a reasonable estimate of mineralization, considering relevant factors such as cut-off grade, likely mining dimensions, location or continuity that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. A mineral reserve is an estimate of tonnage and grade or quality of indicated and measured mineral resources that, in the opinion of the qualified person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a measured or indicated mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted.
The coal mineral resource and reserve estimates included in this Annual Report on Form 10-K were prepared by an independent, qualified engineering firm, RESPEC. We provided RESPEC with property control, mine plans, production, revenue, costs, capital, and other information considered by RESPEC in making their estimates. As part of our internal controls, our geologists and engineers review the integrity, accuracy, and timeliness of the data provided to RESPEC that they considered in calculating their coal mineral resource and reserve estimates. We also review the geologic data, mining assumptions, and methodology used by RESPEC to estimate our coal mineral resources and reserves. Our geologists and engineers also meet with RESPEC periodically during the year to discuss the assumptions and methods used in the coal mineral resource and reserve estimation process.
RESPEC, an independent third-party engineering firm, does not have an interest in any of our properties and is not employed on a contingent basis. RESPEC prepared the initial TRS for each of our material mining properties. The TRSs will be updated when there are material changes to the coal mineral reserve or resource estimates. The most recent TRSs for our material mining operations are included as exhibits to our Annual Report on Form 10-K.
Summary of Coal Mineral Resources and Reserves
Coal Mineral Resources
Most of our coal properties designated as mineral resources are of thickness, quality, and mineability similar to our mineral reserves, and all are proximal to existing infrastructure such as power, water, transportation, facilities, etc. However, we have not completed pre-feasibility or feasibility studies with respect to our coal properties designated as mineral resources, as is required to convert the mineral resources into mineral reserves. There is no certainty that all or any part of the mineral resources will be converted into mineral reserves.
The following table sets forth our coal mineral resources, exclusive of coal mineral reserves, at December 31, 2025:
| | | | | | | | | | | | | | | | | | | | | | | | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| | | Heat | | | | | | | | | | | | | | | | | | | | | |
| · · Content (Btus · · Pounds SO2 per MMBtu · · Resource Classification · · Ownership · · · | |||||||||||||||||||||||
| Resources (tons in millions) | | per pound) | | <1.2 | | 1.2-2.5 | | >2.5 | | Measured | | Indicated | | Combined | | Inferred | | Owned | | Leased | | Total | |
| | | | | | | | | | (1) | | | | | | | | | | |||||
| Illinois Basin | | | | | | | | | | | | | | | | | | | | | | | |
| Dotiki (KY) | 12,100 | — | 2.4 | 73.6 | 51.2 | 24.8 | 76.0 | — | 27.5 | 48.5 | 76.0 | | |||||||||||
| Henderson/Union (KY) (2) | 11,400 | — | 3.0 | 412.2 | 128.7 | 229.5 | 358.2 | 57.0 | 74.7 | 340.5 | 415.2 | | |||||||||||
| River View (KY) (2) | 11,400 | | — | | — | | 0.4 | | 0.3 | | — | | 0.3 | | 0.1 | | 0.1 | | 0.3 | | 0.4 | | |
| Sebree South (KY) | 11,750 | — | — | 43.0 | 22.1 | 16.8 | 38.9 | 4.1 | 0.2 | 42.8 | 43.0 | | |||||||||||
| Warrior (KY) | | 12,300 | | — | | — | | 8.2 | | 6.7 | | 0.9 | | 7.6 | | 0.6 | | 1.2 | | 7.0 | | 8.2 | |
| Gibson South (IN) | | 11,500 | | — | | — | | 4.0 | | 2.2 | | 1.8 | | 4.0 | | — | | 2.3 | | 1.7 | | 4.0 | |
| Hamilton County (IL) | | 11,650 | | 4.9 | 35.4 | 389.3 | 212.3 | | 214.5 | 426.8 | 2.8 | 36.0 | 393.6 | 429.6 | | ||||||||
| Region Total | | | 4.9 | | 40.8 | | 930.7 | | 423.5 | | 488.3 | | 911.8 | | 64.6 | | 142.0 | | 834.4 | | 976.4 | | |
| | | | | | | | | | | | | | | | | | | | | | | | |
| Appalachian Basin | | | | | | | | | | | | | | | | | | | | | | | |
| Mountain View (WV) | 13,200 | — | 0.4 | 8.3 | 4.1 | 4.3 | 8.4 | 0.3 | 1.8 | 6.9 | 8.7 | | |||||||||||
| MC Mining (KY) | | 12,800 | | 1.5 | | — | | — | | 1.4 | | 0.1 | | 1.5 | | — | | — | | 1.5 | | 1.5 | |
| Tunnel Ridge (WV) | | 12,600 | | — | — | 0.9 | — | — | — | 0.9 | 0.9 | — | 0.9 | | |||||||||
| Penn Ridge (PA) | 12,500 | — | — | 78.0 | 21.9 | 53.3 | 75.2 | 2.8 | 78.0 | — | 78.0 | | |||||||||||
| Region Total | | | 1.5 | | 0.4 | | 87.2 | | 27.4 | | 57.7 | | 85.1 | | 4.0 | | 80.7 | | 8.4 | | 89.1 | | |
| | | | | | | | | | | | | | | | | | | | | | | | |
| Total | | | 6.4 | | 41.2 | | 1,017.9 | | 450.9 | | 546.0 | | 996.9 | | 68.6 | | 222.7 | | 842.8 | | 1,065.5 | | |
| | | | | | | | | | | | | | | | | | | | | | | | |
| % of Total | | | | 0.6% | | 3.9% | | 95.5% | | 42.3% | | 51.2% | | 93.6% | | 6.4% | | 20.9% | | 79.1% | | 100.0% | |
| (1) | Combined resources are defined as measured plus indicated resources. |
| (2) | As with our Henderson County mine, River View (KY) has geographic overlap with Henderson/Union (KY) and there is potential for further development of our resources from the existing facilities. See Individual Property Disclosures for more detail. |
On December 31, 2025, we had approximately 1.066 billion tons of coal mineral resources. Tonnages are reported on a clean recoverable basis with average long-term pricing based on available third-party forecasts and historical pricing adjusted for quality at the end of 2025 in a range from approximately $46 to $59 per short ton in the Illinois Basin and from approximately $64 to $117 per short ton in the Appalachian Basin, which are the prices used by RESPEC to verify the amount of coal mineral resources. Coal sales prices vary based on coal quality, access to transportation, and other factors at each location. All resources are classified as underground mineable in the exploration stage.
Coal Mineral Reserves
Reserves at our active operations are currently in production and meet the other requirements to be considered reserves as defined by the SEC. There is no certainty that all our mineral reserves remain economically viable as fluctuations in pricing and costs occur within the coal industry.
The following table sets forth coal mineral reserve information, exclusive of the coal mineral resources, at December 31, 2025:
| | | | | | | | | | | | | | | | | | | | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| | | Heat | | | | | | | | | | | | | | | | | |
| · · Content (Btus · · Pounds SO2 per MMBtu · · Classification · · Ownership · · · | |||||||||||||||||||
| Reserves (tons in millions) | | per pound) | | <1.2 | | 1.2-2.5 | | >2.5 | | Proven | | Probable | | Owned | | Leased | | Total | |
| | | | | | | | | | | | | | | | |||||
| Illinois Basin Operations | | | | | | | | | | | | | | | | | | | |
| Warrior (KY) | 12,300 | — | — | 36.4 | 25.6 | 10.8 | 7.9 | 28.5 | 36.4 | | |||||||||
| River View (KY) | 11,400 | — | — | 287.9 | 173.4 | 114.5 | 53.3 | | 234.6 | 287.9 | | ||||||||
| Hamilton County (IL) | 11,650 | — | — | 104.9 | 48.7 | 56.2 | 7.8 | | 97.1 | 104.9 | | ||||||||
| Gibson South (IN) | 11,500 | 0.1 | 3.9 | 28.2 | 25.1 | 7.1 | 7.0 | 25.2 | 32.2 | | |||||||||
| Region Total | | | 0.1 | | 3.9 | | 457.4 | | 272.8 | | 188.6 | | 76.0 | | 385.4 | | 461.4 | | |
| | | | | | | | | | | | | | | | | | | | |
| Appalachian Basin Operations | | | | | | | | | | | | | | | | | | | |
| MC Mining (KY) | 12,800 | 6.1 | 1.4 | — | 6.9 | 0.6 | — | 7.5 | 7.5 | | |||||||||
| Mountain View (WV) | 13,200 | — | 5.9 | 2.6 | 8.1 | 0.4 | — | 8.5 | 8.5 | | |||||||||
| Tunnel Ridge (WV) | 12,600 | — | — | 109.1 | 59.9 | 49.2 | 12.9 | 96.2 | 109.1 | | |||||||||
| Region Total | | | 6.1 | | 7.3 | | 111.7 | | 74.9 | | 50.2 | | 12.9 | | 112.2 | | 125.1 | | |
| | | | | | | | | | | | | | | | | | | | |
| Total | | | 6.2 | | 11.2 | | 569.1 | | 347.7 | | 238.8 | | 88.9 | | 497.6 | | 586.5 | | |
| | | | | | | | | | | | | | | | | | | | |
| % of Total | | | | 1.1% | | 1.9% | | 97.0% | | 59.3% | | 40.7% | | 15.2% | | 84.8% | | 100.0% | |
On December 31, 2025, we had approximately 586.5 million tons of coal mineral reserves. Tonnages are reported on a clean recoverable basis with average long-term pricing based on available third-party forecasts and historical pricing adjusted for quality at the end of 2025 in a range from approximately $46 to $59 per short ton in the Illinois Basin and from approximately $64 to $117 per short ton in the Appalachian Basin, which are the prices used by RESPEC to verify the amount of coal mineral reserves. Coal sales prices vary based on coal quality, access to transportation, and other factors at each location. All reserves are classified as underground mineable in the development or production stage.
Mining Operations
The following table sets forth production and other data about our mining operations:
| | | | | | | | | | | | | | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| · · · · Tons Produced · · · · | |||||||||||||
| Operations · · Location · · 2025 · · 2024 · · 2023 · · Transportation · · Equipment | |||||||||||||
| · · · (in millions) · · · · · | |||||||||||||
| Illinois Basin Operations | | | | | | | | | | | | | |
| Warrior | Kentucky | 4.5 | 4.4 | 4.4 | CSX, NS, PAL, truck, barge | CM | | ||||||
| River View | Kentucky | 9.6 | 9.3 | 9.9 | Truck, barge | CM | | ||||||
| Hamilton County | Illinois | 6.5 | 4.8 | 5.6 | CSX, EVW, NS, barge | LW, CM | | ||||||
| Gibson South | Indiana | 5.5 | 5.7 | 5.3 | CSX, NS, truck, barge | CM | | ||||||
| Region Total | | | 26.1 | 24.2 | 25.2 | | | | | | |||
| | | | | | | | | | | | | | |
| Appalachian Basin Operations | | | | | | | | | | | | ||
| MC Mining/Excel | Kentucky | 0.7 | 0.9 | 1.2 | CSX, truck, barge | CM | | ||||||
| Mountain View | West Virginia | 1.2 | 1.1 | 0.8 | CSX, truck | LW, CM | | ||||||
| Tunnel Ridge | West Virginia | 5.2 | 6.0 | 7.7 | CSX, NS, barge | LW, CM | | ||||||
| Region Total | | | 7.1 | 8.0 | 9.7 | | | | | | |||
| | | | | | | | | | | | | | |
| TOTAL | | | 33.2 | 32.2 | 34.9 | | | | | | |||
| CSX | - | CSX Railroad |
|---|---|---|
| EVW | - | Evansville Western Railroad |
| NS | - | Norfolk Southern Railroad |
| PAL | - | Paducah & Louisville Railroad |
| CM | - | Continuous Miner |
| LW | - | Longwall |
Individual Property Disclosures
We consider the following properties to be material based on multiple factors including, but not limited to, the property’s contribution to our overall business and financial condition. Please seeCoal Mineral Resources andCoal Mineral Reserves above for information about the coal mineral resources and reserves held by these material properties. In addition to the following information, TRSs for these material properties with additional information are included as exhibits to this Annual Report on Form 10-K.
Henderson/Union Resources
The Henderson/Union Resources are located in Henderson and Union counties, Kentucky at 37°44'30"N, -87°46'07"W and we currently have control in over 1,600 tracts encompassing over 127,000 acres. The property is controlled through both fee ownership and leases of the coal. The coal mineral resources are controlled by Alliance Resource Properties. The base leases are with private owners and WKY CoalPlay or its subsidiaries, which are related parties. See “Item 8. Financial Statements and Supplementary Data—Note 21 – Related-Party Transactions” for more information about our WKY CoalPlay transactions. These base leases generally provide for a term that can be extended until exhaustion of the leased coal. Local infrastructure is as follows:
Major Roads: Interstate 69 and US-60,
Town: Morganfield,
Docks: River View, Hamilton 1, UC Processing, on the Ohio River,
Water: Local municipalities and mine sources,
Electricity: Kentucky Utilities (KU),
The potential underground mine(s) would utilize room-and-pillar methods operating a heavy media, float/sink style preparation plant. Exploration continues as needed to fulfill possible permitting and development requirements. Multiple access points are available for development. Access is available from the active River View complex, which began production in 2009. All equipment, facilities, infrastructure, and underground development are in good working order and maintained to industry standards. Access at the Hamilton and UC Coal, LLC sites are considered “brownfield” developments. Though some facilities and permitting are in place, significant upgrades to existing infrastructure and new construction would be needed to bring them into good working order that meets industry standards. The property associated with Henderson/Union has no book value as of December 31, 2025 but does have outstanding advanced royalties with WKY CoalPlay or its subsidiaries. See “Item 8. Financial Statements and Supplementary Data—Note 21 – Related-Party Transactions” for more information about advanced royalties that Henderson/Union has with WKY CoalPlay.
Though there is geographic overlap between the Henderson/Union and River View properties, the resources and reserves of each are associated with different coal seams or, if in the same seam, are separated by existing mine works or geologic features into distinct areas. There is no overlap in the resource / reserve estimation.
The Henderson/Union property contains resources in the WKY11, WKY7, and WKY6 seams. Island Creek operated mines in the area and controlled a portion of the property. Under a joint venture, Texas Gas Service also controlled a large interest in the mineral rights. Lastly, Peabody and Patriot operated mines in the area and controlled a portion of the reserves. We consolidated control of the property through multiple transactions from 2005 through 2015. Island Creek operated the Ohio #11 mine. Peabody and later Patriot operated the Camp complex and Highland #11 mine to the southeast and east. The WKY11 seam was mined at these locations. No mining has occurred on the property in the WKY7 or WKY6 seams.
In general, all drilling has shown highly consistent coal seams of mineable thickness and quality for the high-sulfur thermal utility market.
Our credit facility is secured by, among other things, liens against certain Henderson/Union surface properties and coal leases. Documentation of such liens is of record in the Offices of the Henderson and Union County Clerks. Please read “Item 8. Financial Statements and Supplementary Data—Note 12 – Long-term Debt” for more information on our credit facility.
The KYDNR, DMP is responsible for the review and issuance of all permits relative to coal mining and reclamation activities, and financial assurance of comprehensive environmental protection performance standards related to surface and underground coal mining operations. In addition to state mining and reclamation laws, operators must comply with various federal laws relevant to mining.
Henderson/Union contains coal resources in three seams ranging in depths from about 100 to 750 feet. The table below summarizes mineral resources as of December 31, 2025, using a cut off thickness of 4.00 feet:
| | | | | | | | | | | | | | | | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| · · · · · · Quality, Washed, Dry Basis · · % Recovery · | |||||||||||||||
| Resources · · Tons (in millions) · · Thickness (ft) · · % Ash · · % Sulfur · · Btu · · lbs. SO2 · · In-Seam | |||||||||||||||
| · · · · · · · · | |||||||||||||||
| Henderson/Union | | | | | | | | | | | | | | | |
| Measured Mineral Resources | 128.7 | 4.72 | 7.71 | 2.88 | 13,328 | 4.31 | 85.71 | | |||||||
| Indicated Mineral Resources | | 229.5 | | 4.62 | | 8.00 | | 2.74 | | 13,307 | | 4.12 | | 87.34 | |
| Combined Mineral Resources | | 358.2 | | 4.66 | | 7.90 | | 2.79 | | 13,315 | | 4.19 | | 86.75 | |
| Inferred Mineral Resources | 57.0 | 4.47 | 7.96 | 2.56 | 13,350 | 3.83 | 90.67 | | |||||||
River View Complex
The River View complex is located in Union County, Kentucky at 37°45'37"N, -87°56'42"W and currently has approximately 93,200 underground acres permitted. The complex is composed of the River View and Henderson County mines along with shared preparation, loadout, and other ancillary facilities. The mineral is controlled through both fee ownership and leases of the coal. The coal mineral reserves are leased or held for lease to the River View complex almost exclusively by Alliance Resource Properties. The River View complex either owns or controls the surface properties upon which its facilities are located including the preparation plant, refuse areas, mine offices, conveyor systems, shafts, and slopes. The base leases are with private owners and generally provide for a term that can be extended until exhaustion of the leased coal. Local infrastructure is as follows:
Major Roads: Interstate 69 and US-60,
Town: Morganfield,
Docks: River View on the Ohio River,
Water: Union and Henderson County water districts and mine sources,
Electricity: Kentucky Utilities (KU),
The underground mines are currently in production using room-and-pillar methods utilizing a heavy media, float/sink style preparation plant. Exploration continues as needed to fulfill mining and permitting requirements. The complex began production in 2009. All equipment, facilities, infrastructure, and underground development are in good working order and maintained to industry standards. Total book value of the property and any associated plant and equipment for the River View complex as of December 31, 2025 was $387.4 million.
Though there is geographic overlap between the River View complex and the Henderson/Union properties, the reserves and resources of each are associated with different coal seams or, if in the same seam, are separated by existing mine works or geologic features into distinct areas. There is no overlap in the resource / reserve estimation.
Island Creek operated mines in the area and controlled a portion of the property. Under a joint venture, Texas Gas Service also controlled a large interest in the mineral rights. Lastly, Peabody and Patriot operated mines in the area and controlled a smaller portion of the reserves. We consolidated control of the property through multiple transactions from 2005 through 2015. Island Creek operated the Ohio #11 and Uniontown #9 mines to the west of River View. Island Creek also operated the Hamilton #1 and #2 mines to the southwest. Peabody and later Patriot operated the Camp mines and Highland mines adjacent to the complex. Both the WKY9 and WKY11 seams were mined at these locations. In general, all drilling has shown highly consistent coal seams of mineable thickness and quality for the high-sulfur thermal utility market.
Our credit facility is secured by, among other things, liens against certain River View complex surface properties and coal leases. Documentation of such liens is of record in the Office of the Union County Clerk. Please read “Item 8. Financial Statements and Supplementary Data—Note 12 – Long-term Debt” for more information on our credit facility.
Accounts receivable generated from the sale of coal mined from this property are collateral for our accounts receivable securitization facility, evidenced by financing statements of record in the Office of the Union County Clerk. Please read “Item 8. Financial Statements and Supplementary Data—Note 12 – Long-term Debt” for more information on our accounts receivable securitization facility.
The KYDNR, DMP is responsible for review and issuance of all permits relative to coal mining and reclamation activities, and financial assurance of comprehensive environmental protection performance standards related to surface and underground coal mining operations. In addition to state mining and reclamation laws, operators must comply with various federal laws relevant to mining. All applicable permits for underground mining, coal preparation and related facilities, and other incidental activities have been obtained and remain in good standing.
The River View complex extracts coal underground from the WKY11 and WKY9 seams with depths ranging from 200 to 500 feet across the reserve. The table below summarizes mineral reserves as of December 31, 2025 using a cut off thickness of 4.00 feet:
| · · · · · · · · · · · · · · · | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| · · · · · · Quality, Washed, Dry Basis · · % Recovery · | ||||||||||||||
| Reserves | | Tons (in millions) | | Thickness (ft) | | % Ash | | % Sulfur | | Btu | | lbs. SO2 | | In-Seam |
| · · · · · · · · | ||||||||||||||
| River View Complex · · · · · · · · · · · · · · · | ||||||||||||||
| Proven Mineral Reserves | 173.4 | 4.72 | 8.17 | 3.20 | 13,183 | 4.86 | 87.53 | | ||||||
| Probable Mineral Reserves | 114.5 | 4.54 | 8.08 | 3.18 | 13,164 | 4.84 | 86.97 | | ||||||
| Total Mineral Reserves | | 287.9 | | 4.65 | 8.13 | | 3.19 | | 13,175 | | 4.85 | | 87.31 | |
Resources associated with the River View complex are included in the Coal Mineral Resources table above.
The River View complex had 303.5 million tons of coal mineral reserves at the end of 2024. The year over year reconciliation is as follows:
| | | | |
|---|---|---|---|
| River View Complex Yearly Reserve Reconciliation | | (in millions) | |
| Tons as of December 31, 2024 | 303.5 | ||
| Production | | (9.6) | |
| Mine Plan Adjustment | | (5.8) | |
| Normal Course Adjustments | | (0.2) | |
| Tons as of December 31, 2025 | | 287.9 | |
Hamilton Mine
Hamilton, a longwall mine located in Hamilton County, Illinois at 38°10'12"N, -88°36'47"W, currently has approximately 23,270 underground acres permitted. The mineral is controlled through both fee ownership and leases of the coal. The coal mineral reserves and resources are leased or held for lease to Hamilton by Alliance WOR Properties, a subsidiary of Alliance Resource Properties. Hamilton either owns or controls the surface properties upon which its facilities are located including the preparation plant, refuse areas, mine offices, conveyor systems, shafts and slopes. The underlying base coal leases are with private owners and are comprised of a large number of leases originally taken by AMAX Coal Company and Old Ben in the mid to late 1970’s and early 1980’s, leases acquired by Consolidation Coal Company in the late 1980’s, and subsequent leases taken directly by White Oak Resources, LLC or affiliated companies and/or Alliance WOR Properties. Local infrastructure is as follows:
Major Roads: Interstate 64,
Railroads: CSX and EVW,
Towns: McLeansboro and Mt. Vernon,
Docks: Mount Vernon on the Ohio River,
Water: Hamilton County Water District and mine sources,
Electricity: Wayne-White Electric Co-op (WWEC),
The underground mine is currently in production using longwall and room-and-pillar methods utilizing a heavy media, float/sink style preparation plant. Exploration continues as needed to fulfill mining and permitting requirements. The mine began production in 2014. All equipment, facilities, infrastructure, and underground development are in good working order and maintained to industry standards. Total book value of the property and any associated plant and equipment for Hamilton as of December 31, 2025 was $377.3 million.
There were no previous operations on the Hamilton reserves property prior to our predecessor, White Oak Resources LLC, who began construction of the mine in 2011. In general, all drilling has shown highly consistent coal seams of mineable thickness and quality for the high-sulfur thermal utility market for the Herrin and Springfield seams.
Our credit facility is secured by, among other things, liens against certain Hamilton surface properties, coal leases and owned coal. Documentation of such liens is of record in the Office of the Hamilton County Clerk. Please read “Item 8. Financial Statements and Supplementary Data—Note 12 – Long-term Debt” for more information on our credit facility.
The Illinois Department of Natural Resources, Land Reclamation Division is responsible for review and issuance of all permits relative to coal mining and reclamation activities, and financial assurance of comprehensive environmental protection performance standards related to surface and underground coal mining operations. In addition to state mining and reclamation laws, operators must comply with various federal laws relevant to mining. All applicable permits for underground mining, coal preparation and related facilities and other incidental activities have been obtained and remain in good standing.
Hamilton extracts coal underground from the Herrin (Illinois No.6) seam with depths ranging from 900 to 1100 feet across the reserve. The table below summarizes mineral reserves as of December 31, 2025 using a cut off thickness of 4.00 feet:
| · · · · · · · · · · · · · · · | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| · · · · · · Quality, Washed, Dry Basis · · % Recovery · | ||||||||||||||
| Reserves | | Tons (in millions) | | Thickness (ft) | | % Ash | | % Sulfur | | Btu | | lbs. SO2 | | In-Seam |
| · · · · · · · · | ||||||||||||||
| Hamilton County · · · · · · · · · · · · · · · | ||||||||||||||
| Proven Mineral Reserves | 48.7 | 6.67 | 8.07 | 2.88 | 13,386 | 4.31 | 87.01 | | ||||||
| Probable Mineral Reserves | 56.2 | 6.49 | 7.95 | 2.89 | 13,377 | 4.32 | 87.32 | | ||||||
| Total Mineral Reserves | | 104.9 | | 6.57 | 8.01 | | 2.89 | | 13,381 | | 4.32 | | 87.18 | |
Resources associated with Hamilton County are included in the Coal Mineral Resources table above.
The Hamilton mine had 113.8 million tons of coal mineral reserves at the end of 2024. The year over year reconciliation is as follows:
| | | | |
|---|---|---|---|
| Hamilton County Yearly Reserve Reconciliation | | (in millions) | |
| Tons as of December 31, 2024 | 113.8 | ||
| Production | | (6.5) | |
| Mineral Acquisition / Deletion | | (3.1) | |
| Normal Course Adjustments | | 0.7 | |
| Tons as of December 31, 2025 | | 104.9 | |
Gibson South Mine
Gibson South is located in Gibson County, Indiana at 38°18'22"N, 87°42'30"W and currently has approximately 41,640 underground acres permitted. The mineral is controlled through both fee ownership and leases of the coal. Leases generally have an initial term with automatic extensions for as long as mining operations are conducted within a described area. Local infrastructure is as follows:
Major Roads: Interstates 69 and 64,
Railroads: CSX and NS,
Town: Princeton,
Docks: Mount Vernon on the Ohio River,
Water: Gibson Water, Inc. and well water,
Electricity: Western Indiana Energy REMC,
The underground mine is currently in production using room-and-pillar methods utilizing a heavy media, float/sink style preparation plant. Exploration continues as needed to fulfill mining and permitting requirements. The mine began production in 2014. All equipment, facilities, infrastructure, and underground development are in good working order and maintained to industry standards. Total book value of the property and any associated plant and equipment for Gibson South as of December 31, 2025 was $108.9 million.
In November 1997, pursuant to (a) Assignment of Underground Coal Leases, (b) Partial Assignment of Underground Coal Leases and (c) Special Corporate Warranty Deed, Old Ben conveyed to MAPCO Land & Development Corporation various coal leases and fee coal interests within a large property boundary located in Gibson County, Indiana. MAPCO Land & Development Corporation changed its name to MAPCO Coal Land & Development Corporation, and MAPCO Coal Land & Development Corporation merged into Alliance Properties effective August 4, 1999.
After the original Old Ben acquisition, Alliance Properties and Gibson continued to acquire additional coal leases and fee coal interests in the area. In addition, beginning in or around 2006, the leases originally acquired from Old Ben began to expire by their terms, and Alliance Properties/Gibson began a program of either amending the expiring leases or entering into new, direct leases with the coal owners. Alliance Properties merged into Gibson on February 19, 2018.
The King’s Mine operated to the east and the Wabash Mine operated to the west of the reserve area. In general, all drilling has shown a highly consistent coal seam of mineable thickness and quality for the high-sulfur domestic thermal utility market and low/medium sulfur export market.
Our credit facility is secured by, among other things, liens against certain Gibson surface properties, coal leases and owned coal. Documentation of such liens is of record in the Office of the Recorder of Gibson County, Indiana. Please read “Item 8. Financial Statements and Supplementary Data—Note 12 – Long-term Debt” for more information on our credit facility.
Accounts receivable generated from the sale of coal mined from this property are collateral for our accounts receivable securitization facility, evidenced by financing statements of record in the Office of the Recorder of Gibson County, Indiana. Please read “Item 8. Financial Statements and Supplementary Data—Note 12 – Long-term Debt” for more information on our accounts receivable securitization facility.
The Indiana Department of Natural Resources, Division of Reclamation is responsible for oversight of active coal mining and reclamation activities, and financial assurance of comprehensive environmental protection performance standards related to surface and underground coal mining operations. In addition to state mining and reclamation laws, operators must comply with various federal laws relevant to mining. All applicable permits for underground mining, coal preparation, and related facilities and other incidental activities have been obtained and remain in good standing.
Gibson South extracts coal underground from the Springfield (Indiana No.5) seam with depths ranging from 450 to 650 feet across the reserve. The table below summarizes mineral reserves as of December 31, 2025 using a cut off thickness of 4.00 feet:
| · · · · · · · · · · · · · · · | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| · · · · · · Quality, Washed, Dry Basis · · % Recovery · | ||||||||||||||
| Reserves | | Tons (in millions) | | Thickness (ft) | | % Ash | | % Sulfur | | Btu | | lbs. SO2 | | In-Seam |
| · · · · · · · · | ||||||||||||||
| Gibson South · · · · · · · · · · · · · · · | ||||||||||||||
| Proven Mineral Reserves | 25.1 | 5.80 | 7.28 | 2.15 | 13,438 | 3.19 | 94.39 | | ||||||
| Probable Mineral Reserves | 7.1 | 5.38 | 8.41 | 2.75 | 13,256 | 4.16 | 91.49 | | ||||||
| Total Mineral Reserves | | 32.2 | | 5.71 | 7.53 | | 2.28 | | 13,398 | | 3.40 | | 93.75 | |
Resources associated with Gibson South are included in the Coal Mineral Resources table above.
The Gibson South mine had 40.0 million tons of coal mineral reserves at the end of 2024. The year over year reconciliation is as follows:
| | | | |
|---|---|---|---|
| Gibson South Yearly Reserve Reconciliation | | (in millions) | |
| Tons as of December 31, 2024 | 40.0 | ||
| Production | | (5.5) | |
| Mineral Acquisition / Deletion | | 2.3 | |
| Mine Plan Adjustment | | (4.4) | |
| Normal Course Adjustments | | (0.2) | |
| Tons as of December 31, 2025 | | 32.2 | |
Tunnel Ridge Mine
Tunnel Ridge, located at 40°09'17" N, -80°39'26"W, is an underground longwall mine in the Pittsburgh No. 8 seam and currently has approximately 23,870 underground acres permitted. The mineral is controlled through both fee ownership and leases of the coal. The coal mined and to be mined by Tunnel Ridge is leased from Alliance Resource Properties and third parties. Prior to January 29, 2026, certain of the coal mined and to be mined by Tunnel Ridge had been leased from the Craft Foundations. On January 29, 2026, Alliance Resource Properties purchased all of the ownership interests in these coal reserves together with surface rights from the Craft Foundations. Please read “Item 8. Financial Statements and Supplemental Data— Note 12 – Long-term Debt and —Note 21 – Related-Party Transactions” for additional information on related-party leases and transactions. Tunnel Ridge either owns or controls the surface properties upon which its facilities are located, including the preparation plant, refuse areas, mine offices, conveyor systems, shafts and slopes. Local infrastructure is as follows:
Major Roads: Interstate 70,
Airport: Pittsburgh International Airport (PIT),
Town: Wheeling,
Docks: Tunnel Ridge on the Ohio River,
Water: Municipal water districts and mine sources,
Electricity: American Electric Power (AEP), West Penn Power (WPP),
The underground mine is currently in production using longwall and room-and-pillar methods utilizing a heavy media, float/sink style preparation plant. Exploration continues as needed to fulfill mining and permitting requirements. The mine began production in 2010. All equipment, facilities, infrastructure, and underground development are in good working
order and maintained to industry standards. Total book value of the property and any associated plant and equipment for Tunnel Ridge as of December 31, 2025 was $330.9 million.
Valley Camp operated mines on the property prior to Tunnel Ridge’s operations. In general, all drilling has shown a highly consistent coal seam of mineable thickness and quality for the high-sulfur thermal utility market.
Our credit facility is secured by, among other things, liens against certain Tunnel Ridge surface properties, coal leases and owned coal. Documentation of such liens is of record in the Office of the County Commission of Ohio County, West Virginia and the Office of the Recorder of Deeds of Washington County, Pennsylvania. Please read “Item 8. Financial Statements and Supplementary Data—Note 12 – Long-term Debt” for more information on our credit facility.
Accounts receivable generated from the sale of coal mined from this property are collateral for our accounts receivable securitization facility, evidenced by financing statements of record in the Office of the County Commission of Ohio County, West Virginia and the Office of the Recorder of Deeds of Washington County, Pennsylvania. Please read “Item 8. Financial Statements and Supplementary Data—Note 12 – Long-term Debt” for more information on our accounts receivable securitization facility.
Tunnel Ridge is located on the West Virginia / Pennsylvania State boundary, operating in each state. As such, regulatory requirements must be met pertaining to mining facilities located in each state.
For operations in West Virginia, the WVDEP is the regulatory authority over mining activities. Within the WVDEP, the Division of Mining and Reclamation is responsible for review and issuance of all permits relative to coal mining and reclamation activities, and financial assurance of comprehensive environmental protection performance standards related to surface and underground coal mining operations.
For operations in Pennsylvania, the PADEP is the regulatory authority over mining activities. Within the PADEP, the Bureau of District Mining Operations is responsible for review and issuance of all permits relative to coal mining and reclamation activities, and financial assurance of comprehensive environmental protection performance standards related to surface and underground coal mining operations.
In addition to state mining and reclamation laws, operators must comply with various federal laws relevant to mining. All applicable permits for underground mining, coal preparation, and related facilities and other incidental activities have been obtained and remain in good standing.
Tunnel Ridge extracts coal underground from the Pittsburgh No.8 seam with depths ranging from 300 to 975 feet across the reserve. The table below summarizes mineral reserves as of December 31, 2025 using a cut off thickness of 4.00 feet:
| · · · · · · · · · · · · · · · | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| · · · · · · Quality, Washed, Dry Basis · · % Recovery · | ||||||||||||||
| Reserves | | Tons (in millions) | | Thickness (ft) | | % Ash | | % Sulfur | | Btu | | lbs. SO2 | | In-Seam |
| · · · · · · · · | ||||||||||||||
| Tunnel Ridge · · · · · · · · · · · · · · · | ||||||||||||||
| Proven Mineral Reserves | 59.9 | 7.28 | 9.38 | 3.55 | 13,546 | 5.23 | 68.38 | | ||||||
| Probable Mineral Reserves | 49.2 | 7.51 | 9.14 | 3.39 | 13,562 | 4.99 | 70.88 | | ||||||
| Total Mineral Reserves | | 109.1 | | 7.38 | 9.27 | | 3.48 | | 13,553 | | 5.12 | | 69.51 | |
Resources associated with Tunnel Ridge are included in the Coal Mineral Resources table above.
The Tunnel Ridge mine had 111.0 million tons of coal mineral reserves at the end of 2024. The year over year reconciliation is as follows:
| | | | |
|---|---|---|---|
| Tunnel Ridge Yearly Reserve Reconciliation | | (in millions) | |
| Tons as of December 31, 2024 | 111.0 | ||
| Production | | (5.2) | |
| Mine Plan Adjustment | | 3.7 | |
| Normal Course Adjustments | | (0.4) | |
| Tons as of December 31, 2025 | | 109.1 | |
OIL & GAS RESERVES
Summary of Oil & Gas Reserves
Our mineral interests are primarily located in three basins, which also represent our areas of focus for future development. These include the Permian (Delaware and Midland), Anadarko (SCOOP/STACK) and Williston (Bakken) Basins. At December 31, 2025, we had 51,233 developed and undeveloped net acres held at a weighted average royalty of 17.0%. Our net acres standardized to 1/8th royalty equate to 69,880 net royalty acres, including 3,962 net royalty acres owned through our equity interest in AllDale III.
The following table presents our estimated net proved oil & gas reserves, including our share of reserves attributable to our equity interest in AllDale III, as of December 31, 2025 based on the reserve report prepared by our internal engineering team and reserve information provided by AllDale III. The reserve report and reserve information have been prepared in accordance with the rules and regulations of the SEC. All of our proved reserves are located in the continental United States.
| | | | | | | | | | | | | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| · · As of December 31, 2025 | ||||||||||||
| · · Crude Oil · · Natural Gas · · Natural Gas Liquids · · Total | ||||||||||||
| · · (MBbl) · · (MMcf) · · (MBbl) · · (MBOE) (2) | ||||||||||||
| | | | | | | | | | | | | |
| Estimated proved developed reserves | | | 9,159 | | | 60,732 | | | 7,754 | | | 27,034 |
| Estimated proved undeveloped reserves | | | 1,438 | | | 5,324 | | | 766 | | | 3,091 |
| Total estimated proved reserves (1) | | | 10,597 | | | 66,056 | | | 8,520 | | | 30,125 |
| (1) | Proved reserves of approximately 2,037 MBOE were attributable to noncontrolling interests as of December 31, 2025. |
| (2) | Natural gas reserve volumes are converted to BOE based on a 6:1 ratio: 6 Mcf of natural gas converts to one BOE. |
Estimates of reserves as of December 31, 2025 were prepared using product prices equal to the unweighted arithmetic average of the first-day-of-the-month market price for each month in the period from January through December 2025. The average realized product prices weighted by production over the remaining lives of the properties are $64.89/Bbl for oil, $1.40/Mcf of natural gas and $18.29 per barrel of NGL. These prices are adjusted for energy content, associated average differential and transportation deducts by producing area to arrive at the net realized prices by product. For 2025, NGL prices averaged approximately 33% of the posted oil prices during the course of the year with an additional $3.38/Bbl deducted for transportation costs.
The following table summarizes our changes in proved undeveloped reserves (in MBOE):
| | | | | |
|---|---|---|---|---|
| Beginning balance, January 1, 2025 | | | 2,832 | |
| Acquisitions of proved undeveloped reserves | | | 135 | |
| Transfers of PUDs to estimated proved developed | | | (815) | |
| Extensions and discoveries | | | 1,492 | |
| Revisions of previous estimates | | | (553) | |
| Ending balance, December 31, 2025 | | | 3,091 | |
During the year ended December 31, 2025, PUD reserves were increased as a result of the acquisition of oil & gas mineral interests during the year primarily from the Elk Range Acquisition discussed in more detail in “Item 8. Financial Statements and Supplementary Data—Note 4 – Acquisitions.”
During the year ended December 31, 2025, PUD reserves were reduced as a result of conversion to proved developed reserves primarily in the Permian and Anadarko basins as the result of well completions during the year.
Extensions and discoveries contributed to an increase in PUD reserves during the year ended December 31, 2025 primarily as the result of permitting activities in the Permian Basin.
Revisions of previous estimates resulted in a decline due primarily to revisions to quantity estimates.
As a mineral interest owner we have no transparency into or control over the operators’ investments and operational progress to convert PUDs to proved developed producing reserves nor do we have insight into the operators’ drilling plans. Since we do not have insight into the operators’ drilling plans, we use active drilling permits as evidence of economic viability and intention to expend capital to develop reserves within five years as there is generally a statutory two-year timeframe associated with permits. We do not incur capital expenditures or lease operating expenses in connection with the development of our PUDs, which costs are borne entirely by the operators. As a result, during the year ended December 31, 2025, we did not have any expenditures to convert PUDs to proved developed producing reserves. PUDs that have not been developed within two years of permitting are reviewed and removed from proved reserves as necessary. Because we remove PUDs from proved reserves that have not been developed within two years of initial classification as proved reserves, we have no material PUDs that are not expected to be developed within five years of initial classification as proved reserves. Our average permit to first sales timeframe is 381 days. For our 2025 reserve reporting, we had scheduled all PUD locations to be drilled within a two year timeframe using the average historical development pacing on our acreage in the individual basins in which we own mineral interests. As of December 31, 2025, approximately 10.26% of our total proved reserves were classified as PUDs.
Evaluation and Review of Reserves
Numerous uncertainties are inherent in estimating reserve volumes and values, and the estimates are subject to change as additional information becomes available. The reserves actually recovered and the timing of production of the reserves may vary significantly from the original estimates.
Under SEC rules, proved reserves are those quantities of oil & gas, which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be economically producible–from a given date forward, from known reservoirs and under existing economic conditions, operating methods and government regulations–prior to the time at which contracts providing the right to operate expire, unless evidence indicates that renewal is reasonably certain, regardless of whether deterministic or probabilistic methods are used for the estimation. If deterministic methods are used, the SEC has defined reasonable certainty for proved reserves as a “high degree of confidence that the quantities will be recovered.” All of our proved reserves as of December 31, 2025 were estimated using a deterministic method. The estimation of reserves involves two distinct determinations. The first determination results in the estimation of the quantities of recoverable oil & gas and the second determination results in the estimation of the uncertainty associated with those estimated quantities in accordance with the definitions established under SEC rules. The process of estimating the quantities of recoverable oil & gas reserves relies on the use of certain generally accepted analytical procedures. These analytical procedures fall into three broad categories or methods:
| (1) | performance-based methods, |
| (2) | volumetric-based methods and |
| (3) | analogy. |
These methods may be used singularly or in combination by the reserve evaluator in the process of estimating the quantities of reserves. The proved reserves for our properties were estimated by performance methods, analogy or a combination of both methods. Performance methods include, but may not be limited to, decline curve analysis, which utilize extrapolations of available historical production data. The analogy method was used where there were inadequate historical performance data to establish a definitive trend and where the use of production performance data as a basis for the reserve estimates was considered to be inappropriate.
To estimate economically recoverable proved reserves and related future net cash flows, our engineering team considered many factors and assumptions, including the use of reservoir parameters derived from geological, geophysical and engineering data which cannot be measured directly, economic criteria based on current costs and the SEC pricing requirements and forecasts of future production rates. To establish reasonable certainty with respect to our estimated proved reserves, the technologies and economic data used in the estimation of our proved reserves included production and well test data, downhole completion information, geologic data, electrical logs, and radioactivity logs.
Non-producing reserve estimates, for both developed and undeveloped properties, are based on regional type curve methodologies by reservoir or productive bench. These methods provide a relatively high degree of accuracy for predicting proved developed non-producing and undeveloped reserves for our properties, due to the mature nature of properties targeted for development and an abundance of historical production data on which we base statistical average type forecasts.
New drills on our acreage include planned drills, wells currently drilling, and/or permitted wells. For each new drill, a reserve category of proved developed non-producing or PUD is assigned based on whether the location has been spud or permitted. Generally, we recognize a location as a PUD when it has been permitted by the operator and a PUD becomes a proved developed non-producing reserve when the operator has spud that well to begin drilling operations.
Drill scheduling is determined by historical development pacing on our acreage in each basin and it is assumed that future pacing will mirror that of the historical pace. This projection is then adjusted to take into account anticipated commodity prices and other industry economic factors which tend to either reduce or increase future development pacing. First, known completed locations are developed in chronological order based on state filings or publicly sourced completion data. The development schedule for these locations estimates the turn-in-line rate of these locations due to production data lag. Second, spud locations with unknown completion status are scheduled based on the historical spud to completion time within each basin. Third, permitted locations, without development timing, are scheduled in chronological order by filing date.
Excluding our share of proved reserves held by AllDale III, our 2025 year-end estimate of proved reserves were prepared by our internal engineering team. Our engineering team works to ensure the integrity, accuracy, and timeliness of the data used to calculate our estimated proved reserves. Our proved reserve estimates, with the exception of AllDale III, which comprise 3.3% of our total proved reserves, were audited by CGA. Our engineering team met with CGA periodically during the period covered by the above referenced reserve report to discuss the assumptions and methods used in the reserve estimation process. Our engineering team provided historical information to CGA for our properties, such as oil & gas production, well test data, and realized commodity prices. Our engineering team also provided ownership interest information with respect to our properties. Our internal petroleum engineer, primarily responsible for overseeing the petroleum reserves preparation, has over 20 years of engineering and operations experience in the oil & gas sector and a Bachelor of Science in Petroleum Engineering.
The preparation of our proved reserve estimates are completed in accordance with our internal control procedures. These procedures, which are intended to ensure reliability of reserve estimations, include the following:
| ● | review and verification of historical data, which is based on actual production as reported by the operators; |
| ● | verification of property ownership by our land department; |
| ● | review of all our reported proved reserves semi-annually including the review of all significant reserve changes and proved undeveloped reserves additions by our internal petroleum engineer; |
| ● | internally prepared reserve estimates compared to reserves audit by CGA; |
| ● | review of changes in reserves semi-annually by our internal petroleum engineer and by senior management; and |
| ● | no employee’s compensation is tied to the amount of reserves booked. |
CGA, an independent third-party petroleum engineering firm, does not own an interest in any of our properties and is not employed on a contingent basis. When compared on a well-by-well basis, some of our estimates are greater and some are less than the CGA estimates. CGA is satisfied with our methods and procedures used to prepare the December 31, 2025 reserve estimates and future revenue, and noted nothing of an unusual nature that would cause CGA to take exception with the estimates, in the aggregate, prepared by us. CGA’s audit report with the respect to our proved reserve estimates as of December 31, 2025 is included as an exhibit to this Annual Report on Form 10-K.
CGA was founded in 1961 and performs consulting petroleum engineering services under Texas Board of Professional Engineers Registration No. F-693. Within CGA, the technical person primarily responsible for auditing the estimates meets or exceed the education, training, and experience requirements set forth in the Standards Pertaining to the Estimating and Auditing of Oil and Gas Reserves Information promulgated by the Society of Petroleum Engineers and is proficient in judiciously applying industry-standard practices to engineering and geoscience evaluations as well as applying SEC and other industry reserves definitions and guidelines.
Acreage Concentration
Below is a chart reflecting our gross, net mineral and net royalty acreage associated with our mineral interests in each of our primary basins as of December 31, 2025.
| | | | | | | | | | | | | | | | | | | | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| · · Developed Acreage · · Undeveloped Acreage · | |||||||||||||||||||
| · · Gross · · Net Mineral · · Net Royalty · · Gross · · Net Mineral · · Net Royalty · | |||||||||||||||||||
| Basin | | | | | | | | | | | | | | | | | | | |
| Permian Basin | | | 459,462 | | | 13,484 | | | 18,157 | | | 486,516 | | | 14,278 | | | 19,222 | |
| Anadarko Basin | | | 153,083 | | | 5,516 | | | 7,813 | | | 322,902 | | | 11,635 | | | 16,497 | |
| Williston Basin | | | 129,807 | | | 2,145 | | | 2,841 | | | 108,083 | | | 1,786 | | | 2,371 | |
| Other | | | 21,867 | | | 798 | | | 1,030 | | | 43,598 | | | 1,591 | | | 1,949 | |
| Total | | | 764,219 | | | 21,943 | | | 29,841 | | | 961,099 | | | 29,290 | | | 40,039 | |
The 51,233 developed and undeveloped net mineral acres in the table above represent the number of acres that are owned for the mineral rights under a given tract of land, whereas the 69,880 developed and undeveloped net royalty acres are our net mineral acres normalized to 1/8th royalty leasing terms. As an example, if 100 net mineral acres were leased for a 25% royalty, this would be equivalent to 200 net royalty acres, normalized to 1/8th royalty (100 x .25/.125 = 200).
Our royalty interests are predominately perpetual mineral interests. As a mineral interest owner, we generally hold our acreage in perpetuity and not through a lease. As a result, our undeveloped acreage is not generally subject to expiration. Our royalty interests do include a small portion that come in the form of overriding royalites (ORRI) that are subject to lease terminations once the wells on that lease cease to produce oil & gas in commercial quantities. As a result, we do have limited long-dated lease expiration exposure; however, nearly all of these ORRIs are part of leases with proved developed producing reserves and ongoing development that we believe will be sufficient to maintain these leases for decades.
Oil & Gas Production Prices and Production Costs
For the year ended December 31, 2025, 44.5% of our production and 75.2% of our oil & gas revenues were related to oil production and sales, respectively. The following table sets forth information regarding production of oil & gas including our equity investment in AllDale III and certain price and cost information for each of the periods indicated:
| | | | | | | | | | | |
|---|---|---|---|---|---|---|---|---|---|---|
| · · Year Ended December 31, | ||||||||||
| · · 2025 · · 2024 · · 2023 | ||||||||||
| Production: | | | | | | | | | | |
| Oil (MBbls) | | | 1,677 | | | 1,543 | | | 1,462 | |
| Natural gas (MMcf) | | | 7,097 | | | 6,758 | | | 6,161 | |
| Natural gas liquids (MBbls) | | | 908 | | | 850 | | | 726 | |
| BOE (MBbls) | | | | | | | | | | |
| Permian Basin | | | 3,034 | | | 2,755 | | | 2,496 | |
| Anadarko Basin | | | 415 | | | 413 | | | 409 | |
| Williston Basin | | | 174 | | | 226 | | | 170 | |
| Other | | | 145 | | | 126 | | | 140 | |
| Total BOE | | | 3,768 | | | 3,520 | | | 3,215 | |
| Average Realized Prices: | | | | | | | | | | |
| Oil (per Bbl) | | $64.12 | | $75.03 | | $77.40 | | |||
| Natural gas (per Mcf) | | $2.22 | | $1.43 | | $2.03 | | |||
| Natural gas liquids (per Bbl) | | $21.74 | | $20.44 | | $23.15 | | |||
| BOE (MBbls) | | $37.96 | | $40.58 | | $44.32 | | |||
| Unit cost per BOE: | | | | | | | | | | |
| Production and ad valorem taxes | | $3.87 | | $4.29 | | $4.37 | | |||
Productive Wells
As of December 31, 2025, our productive wells were as follows:
| | | | | | | | | | | | | | | | | | | | | | | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Productive Wells | ||||||||||||||||||||||
| Horizontal · · Vertical | ||||||||||||||||||||||
| Oil · · Gas · · Oil · · Gas | ||||||||||||||||||||||
| Gross · · Net · · Gross · · Net · · Gross · · Net · · Gross · · Net | ||||||||||||||||||||||
| | | | | | | | | | | | | | | | | | | | | | | |
| | 11,916 | | | 37 | | | 1,207 | | | 4 | | | 5,272 | | | 21 | | | 534 | | | 2 |
Productive wells consist of producing wells and wells capable of production, including natural gas wells awaiting pipeline connections to commence deliveries and oil wells awaiting connection to production facilities. We do not own any material working interests in any wells and therefore use our net revenue interest to determine our net wells.
Drilling Results
As a holder of mineral interests, we generally do not receive information as to whether wells drilled on the acreage associated with our mineral interests are classified as exploratory or as developmental wells. We are not aware of any dry holes drilled on the acreage associated with our mineral interests during the year ended December 31, 2025. Based on our net revenue interests, 4, 9 and 10 net wells were drilled on our interests during the years ended December 31, 2025, 2024 and 2023, respectively.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.