Purchased Components and Raw Materials
Our products require a wide variety of components and materials. Although we have multiple sources of supply for most of our materials requirements, certain components and raw materials are supplied by sole source vendors, and our ability to perform certain contracts depends on their timely performance. In the past, these required raw materials and various purchased components generally have been available in sufficient quantities. However, we do have some risk of shortages of materials or components due to reliance on sole or limited sources of supply; and supplies of components and materials are periodically impacted by supply chain disruptions, as well as complications due to current or future trade policies. Where feasible, we engineer and qualify substitute products to avoid short-term supply issues; however, we are subject to the same supply chain risks as other electronics manufacturers. An unanticipated delay in delivery by our suppliers could result in the inability to deliver our products on-time and to meet the expectations of our customers. Additionally, we have experienced, and could continue to experience, an increase in the costs of doing business, including increasing raw material prices and transportation costs, which have and could continue to have an adverse impact on our business, results of operations, financial condition and cash flows. See also Item 1A, “Risk Factors.”
Our A&D segment purchases supplies from a wide array of vendors. In most instances, multiple vendors of raw materials are screened during a qualification process to ensure that there will not be an interruption of supply should one of them underperform or discontinue operations. Nonetheless, in some situations, there is a risk of shortages due to reliance on a limited number of suppliers or because of price fluctuations due to the nature of the raw materials. For example, aerospace-grade titanium, an important raw material for our A&D segment subsidiaries, may at times be in short supply.
Our USG segment manufactures electronic instrumentation through a network of regional contract manufacturers under long-term contracts. In general, USG purchases the same kinds of component parts as do other electronic products manufacturers, and these electronic components can be subject to supply chain constraints. USG purchases only a limited amount of raw materials, although some USG products require helium, which may at times be in short supply.
Our Test segment is a vertically integrated supplier of electro-magnetic (EM) shielding, RF absorbing products and EMC/EMP/Tempest filters, producing most of its critical RF components itself. This segment purchases significant quantities of raw materials such as polyurethane foam, polystyrene beads, steel, aluminum, copper, nickel and wood. Accordingly, it is subject to price fluctuations in the worldwide raw materials markets. While ETS-Lindgren has long-term contracts with a number of its suppliers, performance of these contracts is vulnerable to the risks described in Item 1A.