Q1 2025 OPERATING AND FINANCIAL HIGHLIGHTS

As of March 31, 2025, the Company had approximately $446.9 million in cash and restricted cash.

During the quarter ended March 31, 2025, $78.2 million of construction capital costs and other project-related costs were capitalized.

Subsequent to Q1 2025 on April 1, 2025, the Company closed the previously announced strategic investment of $250 million from fund entities managed by Orion Resource Partners LP (collectively, “Orion”), for the development and construction of Phase 1 of Thacker Pass (“Orion Investment”). With the Orion Investment, Lithium Americas has achieved fully funded status for the development of Phase 1 of Thacker Pass at the project and corporate level for the duration of construction.

Contemporaneously with closing the Orion Investment on April 1, 2025, the JV Partners announced the final investment decision (“FID”) for construction of Phase 1 of Thacker Pass. On declaring FID, GM and Lithium Americas contributed $100 million and $191.6 million in cash to the JV, respectively.

The Company currently expects to make the first draw on the previously announced $2.26 billion loan from the Department of Energy (“DOE” / the “DOE Loan”) sometime in the third quarter of 2025 (“Q3 2025”).

Completion of Phase 1 of Thacker Pass is targeted for late 2027. Project engineering and procurement continue in line with the project schedule to support construction.

o

Major construction has begun at Thacker Pass, with earthworks almost complete and permanent concrete placement in the processing plant area commenced in early May 2025.

o

As of March 31, 2025, detailed engineering is currently over 60% design complete and expected to increase to over 90% design complete by year end 2025. The higher level of detailed engineering at the early stages of construction helps de-risks execution in terms of project schedule and cost.

o

In April 2025, fabrication of the structural steel to be used to build the facilities at Thacker Pass commenced. First steel installation is targeted to commence in September 2025.

o

Manufacturing of all long-lead equipment awarded continues to advance with expected delivery in line with the project schedule.

During Q1 2025, the first modular housing units were installed at the workforce hub, the Company’s all-inclusive housing facility for construction workers in Winnemucca (the “Workforce Hub” or “WFH”). First occupancy of the Workforce Hub is targeted for the second half of 2025.

The Company recently submitted a Plan of Operations to the Bureau of Land Management (“BLM”) to build a limestone quarry named Western Quarry, approximately one hour drive from Thacker Pass via national and state highways. Western Quarry is being planned as a source of local, lower cost limestone, a reagent used in the Thacker Pass processing flowsheet to produce battery-quality lithium carbonate.

MATERIAL RELATIONSHIPS AND RELATED AGREEMENTS

DOE ATVM Loan Program

On October 28, 2024, the Company closed the $2.26 billion DOE Loan from the U.S. DOE Loan Programs Office (“LPO”) under the Advanced Technology Vehicles Manufacturing (“ATVM”) Loan Program, for financing the construction of Phase 1 processing facilities at Thacker Pass. The $2.26 billion DOE Loan includes principal of $1.97 billion and capitalized interest during construction, which is estimated to be $290 million over a three-year period. The DOE Loan has a 24-year maturity (from the date of first draw on the DOE Loan) with interest rates fixed from the date of each monthly advance for the term of the loan at applicable U.S. Treasury rates, without any additional credit spread. Other key terms include customary covenants and events of default for a project finance loan facility and customary conditions precedent to loan effectiveness and advances for a project finance loan facility.

The Company currently expects to make the first draw on the DOE Loan sometime in Q3 2025. Conditions precedent to first draw include project finance model bring down.

General Motors Equity Investment, Joint Venture and Offtake

Prior to the Separation, on January 30, 2023, Old LAC had entered into a purchase agreement with GM, pursuant to which GM agreed to make a $650 million equity investment (the “2023 Transaction”), the proceeds of which were to be used for the construction and development of Thacker Pass. The 2023 Transaction was comprised of two tranches, a first tranche investment of $320 million (“Tranche 1 Investment”) and a second tranche investment of up to $330 million (the “Tranche 2 Investment”). Tranche 1 closed and the Phase 1 offtake agreement was executed on February 16, 2023, when GM subscribed for 15,002,000 subscription receipts of Old LAC, which were automatically converted into 15,002,000 units, comprising 15,002,000 shares and 11,891,000 warrants of Old LAC, which became 15,002,000 common shares of the Company post-Separation. The subscription proceeds were paid to Old LAC, and the remaining unspent proceeds were distributed to the Company on October 3, 2023, pursuant to the Arrangement.

On October 3, 2023, pursuant to the Separation, the full amount of the remaining unspent proceeds of Tranche 1 Investment were included in the net assets distributed by Old LAC to the Company.

As the Separation was completed before the closing of the Tranche 2 Investment, the agreement for the Tranche 2 Investment in Old LAC was terminated and replaced by a corresponding subscription agreement between GM and the Company whereby the proceeds of the Tranche 2 Investment were to be received by the Company.

On October 15, 2024, the Company entered into an investment agreement (the “Investment Agreement”) with GM to establish a JV with GM for the purpose of funding, developing, constructing and operating Thacker Pass (the “JV Transaction”). Prior to closing the JV Transaction on December 20, 2024, the Company transferred its interest and certain other assets into Lithium Nevada Ventures. In connection with the JV Transaction, the Company also closed an amendment to the DOE Loan to accommodate changes relating to the JV Transaction.

Under the terms of the Investment Agreement, GM acquired a 38% asset-level ownership stake in Thacker Pass for $625 million in total cash and letters of credit, including $430 million of direct cash funding to the JV to support the construction of Phase 1 and a $195 million LC Facility that can be used as collateral to support reserve account requirements under the DOE Loan. The key terms of the JV Transaction are summarized below:

Lithium Americas has a 62% interest in Thacker Pass and will manage the Project (the “Manager”) on behalf of the JV Partners.

GM has a 38% interest in Thacker Pass and has committed $625 million in cash and letters of credit to the JV:

o

$330 million cash was contributed to the JV upon closing of the JV on December 20, 2024;

o

$100 million cash was contributed to the JV at FID for Phase 1 on April 1, 2025; and

$195 million LC Facility to be posted by GM prior to first draw on the DOE Loan.

Lithium Americas has contributed $330 million of cash to the JV for its 62% ownership in the Project:

o

$138 million was contributed to the JV upon closing of the JV on December 20, 2024; and

o

$191.6 million was contributed to the JV at FID for Phase 1 on April 1, 2025.

The LC Facility provided by GM to the JV as part of its consideration for its equity interest will have no interest and a maturity consistent with DOE Loan requirement that will be withdrawn once replaced with cash that is generated by Thacker Pass.

A Board of Directors was established at the JV level to oversee the JV and approve the Project’s budgets and business plans, and implement policies to align with GM’s vendor requirements, including GM’s Human Rights Policy.

As part of the Investment Arrangement, the agreement to supply GM with lithium carbonate production from Thacker Pass (the “Offtake Agreement”) was assigned by Old LAC to the Company. GM agreed to extend its existing Offtake Agreement for up to 100% of production volumes from Phase 1 of Thacker Pass to 20 years to support the maturity of the DOE Loan. On closing of the JV Transaction, GM also entered into an additional 20-year offtake agreement for up to 38% of Phase 2 production volumes and will retain its existing right of first offer on the remaining Phase 2 production volumes.

The Company and GM terminated the Tranche 2 Investment subscription agreement concurrent with the execution of the JV Investment Agreement.

Orion Resource Partners

Subsequent to Q1 2025 on April 1, 2025, the Company closed the strategic investment of $250 million from fund entities managed by Orion, for the development and construction of Phase 1 of Thacker Pass (“Orion Investment”), previously announced on March 6, 2025. Orion has purchased Notes in the aggregate principal amount of $195 million and paid the Company $25 million for a Production Payment Agreement (“PPA”) for payments corresponding to the minerals produced and gross revenue generated by Thacker Pass. Orion also committed to purchase an additional $30 million in aggregate principal amount Notes within two years (the “Delayed Draw Notes”), subject to the satisfaction of certain conditions precedent, upon request by the Company.

The Notes will mature on April 1, 2030 and bear an initial conversion price of $3.78 per share, which represents a 43% premium to Lithium Americas’ 5-day VWAP on the New York Stock Exchange ended on March 5, 2025. Lithium Americas will initially pay interest on the Notes in-kind or in cash at a rate of 9.875% per annum until the maturity of the Notes. Under the terms of the PPA, Orion will receive fixed payments of $128 per tonne ($152 per tonne assuming draw of the Delayed Draw Notes) of the total lithium produced each year at Thacker Pass for a period of 72 quarters after first production. Orion will receive additional variable payments of 0.96% of total gross revenue (1.14% of total gross revenue assuming draw of the Delayed Draw Notes) for the life of the mine. Both fixed and variable payments will only apply to the first 41,500 tonnes of lithium produced each year and are subject to certain adjustments relating to total Phase 1 project costs. The production payments are also subject to certain adjustments related to the tonnage of battery-grade lithium carbonate equivalent sold. The variable payments are also subject to certain adjustments related to the future price of lithium.

Lithium Americas has granted Orion the right to designate an Independent Engineer and an Independent Environmental and Social Consultant to a newly established technical committee of the Company’s management team to monitor development.