Skip to main content

Chemours Co

For the period ended Mar 31, 2025. Filed May 6, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 6, 2025

CC$13.48+1.5%Stored close · as of Nov 10, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Notes to the Interim Consolidated Financial Statements (Unaudited)

sentation

The Chemours Company (“Chemours”, or the “Company”) is a leading, global provider of performance chemicals that are key inputs in end-products and processes in a variety of industries. The Company delivers customized solutions with a wide range of industrial and specialty chemical products for markets, including coatings, plastics, refrigeration and air conditioning, transportation, semiconductor and consumer electronics, general industrial, and oil and gas. The Company’s principal products include refrigerants, titanium dioxide (“TiO 2”) pigment and industrial fluoropolymer resins. Chemours manages and reports its operating results through itsthree principal reportable segments: Thermal & Specialized Solutions, Titanium Technologies, and Advanced Performance Materials. The Thermal & Specialized Solutions segment is a leading, global provider of refrigerants, thermal management solutions, propellants, blowing agents, and specialty solvents. The Titanium Technologies segment is a leading, global provider of TiO 2 pigment, a premium white pigment used to deliver whiteness, brightness, opacity, durability, efficiency and protection across a variety of applications. The Advanced Performance Materials segment is a leading, global provider of high-end polymers and advanced materials that deliver unique attributes, including low friction coefficients, extreme temperature resistance, weather resistance, ultraviolet and chemical resistance, and electrical insulation. The Other Non-Reportable Segment includes the Performance Chemicals and Intermediates business.

Unless the context otherwise requires, references herein to “The Chemours Company”, “Chemours”, “the Company”, “our Company”, “we”, “us”, and “our” refer to The Chemours Company and its consolidated subsidiaries. References herein to “EID” refer to EIDP, Inc., formerly known as EID, which is Chemours’ former parent company and is now a subsidiary of Corteva. References herein to "DuPont" refer to DuPont de Nemours, Inc.

The accompanying interim consolidated financial statements have been prepared in accordance with U.S. generally accepted accounting principles (“GAAP”). In the opinion of management, all adjustments (consisting of normal, recurring adjustments) considered necessary for a fair statement of the Company’s results for interim periods have been included. The notes that follow are an integral part of the Company’s interim consolidated financial statements. The Company’s results for interim periods should not be considered indicative of its results for a full year, and the year-end consolidated balance sheet does not include all of the disclosures required by GAAP. As such, these interim consolidated financial statements should be read in conjunction with the Consolidated Financial Statements and notes thereto included in the Company's Annual Report on Form 10-K for the year ended December 31, 2024.

Revision of Previously Issued Consolidated Financial Statements and Interim Unaudited Condensed Consolidated Financial Statements

As previously disclosed in the Company’s Form 10-K for the year ended December 31, 2024, certain prior period amounts on the consolidated statements of income were revised to correct for immaterial errors that the Company identified during the financial close process for the fourth quarter of 2024 impacting previously issued financial statements beginning as of January 1, 2022, and subsequent quarterly reporting periods through September 30, 2024. Specifically, the Company identified errors related to the income statement presentation of byproduct revenue sales, which were incorrectly accounted for as a contra cost of goods sold as well as the income statement presentation of certain ore sales associated with the Company's Kuan Yin, Taiwan facility, which were incorrectly accounted for on a net basis within other income, net. The Company assessed the materiality of these errors on prior period consolidated financial statements in accordance with the Securities and Exchange Commission ("SEC") Staff Accounting Bulletin No. 99, "Materiality", codified in ASC 250, Accounting Changes and Error Corrections("ASC 250"). Based on this assessment, management concluded that the error corrections were not material to any previously presented interim or annual financial statements. However, in order to correctly present these amounts management determined it was appropriate to revise all previously issued and impacted financial statements.

During the financial close process for the first quarter of 2025, the Company identified additional immaterial errors related primarily to the timing of cost of goods sold recognition, including U.S. rail freight and certain raw material inventory. These errors impact previously issued financial statements beginning as of January 1, 2023, and subsequent quarterly and annual reporting periods through December 31, 2024. The Company assessed the materiality of these errors, as well as all other previously identified immaterial errors which impact previously issued financial statements beginning as of January 1, 2023, and subsequent quarterly and annual reporting periods through December 31, 2024. This includes the previously disclosed error related to the timing of insurance proceeds recognition within selling, general and administrative expenses and certain other immaterial errors which also primarily impact the timing of cost of goods sold recognition. The Company assessed the materiality of these errors on current and prior period consolidated financial statements in accordance with ASC 250. Based on this assessment, management concluded that the amounts are not material to any previously presented interim or annual financial statements. However, the aggregate impact of all adjustments would be material to results for the three months ended March 31, 2025 and as such, in order to correctly present these amounts management determined it was appropriate to revise all previously issued and impacted financial statements.

The following tables present the effect of these revisions for each of the applicable periods and impacted financial statements. The Company intends to correct these financial statements through revisions in subsequently filed quarterly and annual reports on Form 10-Q and Form 10-K where applicable. Individual quarters may not sum to year-to-date amounts due to rounding. The Company has also revised impacted amounts within the accompanying notes to the unaudited condensed consolidated financial statements, as applicable.

Revised Consolidated Statements of Operations

As reported · Adjustments · As revised
Cost of goods sold$4,772$4$4,776
Gross profit$1,306$(4)$1,302
Selling, general and administrative expense$1,290$(4)$1,286
Total other operating expenses$1,551$(4)$1,547
As reported · Adjustments · As revised
Net sales$1,350$12$1,362
Cost of goods sold$1,064$14$1,078
Gross profit$286$(2)$284
Selling, general and administrative expense$142$(5)$137
Total other operating expenses$174$(5)$169
Income (loss) before income taxes$67$3$70
Provision for (benefit from) income taxes$15$1$16
Net income (loss)$52$2$54
Net income (loss) attributable to Chemours$52$2$54
Per share data
Basic earnings (loss) per share of common stock$0.35$0.01$0.36
Diluted earnings (loss) per share of common stock$0.34$0.02$0.36
As reported · Adjustments · As revised
Net sales$1,538$16$1,554
Cost of goods sold$1,232$14$1,246
Gross profit$306$2$308
Selling, general and administrative expense$139$15$154
Total other operating expenses$168$15$183
Income (loss) before income taxes$82$(13)$69
Provision for (benefit from) income taxes$12$(3)$9
Net income (loss)$70$(10)$60
Net income (loss) attributable to Chemours$70$(10)$60
Per share data
Basic earnings (loss) per share of common stock$0.47$(0.07)$0.40
Diluted earnings (loss) per share of common stock$0.46$(0.07)$0.39
As reported · Adjustments · As revised
Net sales$2,887$28$2,915
Cost of goods sold$2,294$29$2,323
Gross profit$593$(1)$592
Selling, general and administrative expense$281$11$292
Total other operating expenses$341$11$352
Other income, net$2$1$3
Income (loss) before income taxes$149$(11)$138
Provision for (benefit from) income taxes$28$(3)$25
Net income (loss)$121$(8)$113
Net income (loss) attributable to Chemours$121$(8)$113
Per share data
Basic earnings (loss) per share of common stock$0.81$(0.05)$0.76
Diluted earnings (loss) per share of common stock$0.81$(0.06)$0.75
As reported · Adjustments · As revised
Net sales$1,501$7$1,508
Cost of goods sold$1,215$7$1,222
Gross profit$286$—$286
Selling, general and administrative expense$135$2$137
Total other operating expenses$265$2$267
Interest expense$(69)$1$(68)
Other income, net$7$(1)$6
Income (loss) before income taxes$(30)$(2)$(32)
Provision for (benefit from) income taxes$(3)$3$—
Net income (loss)$(27)$(5)$(32)
Net income (loss) attributable to Chemours$(27)$(5)$(32)
Per share data
Basic earnings (loss) per share of common stock$(0.18)$(0.04)$(0.22)
Diluted earnings (loss) per share of common stock$(0.18)$(0.04)$(0.22)
As reported · Adjustments · As revised
Net sales$4,388$35$4,423
Cost of goods sold$3,510$36$3,546
Gross profit$878$(1)$877
Selling, general and administrative expense$416$12$428
Total other operating expenses$607$12$619
Interest expense$(197)$1$(196)
Income (loss) before income taxes$118$(12)$106
Provision for (benefit from) income taxes$24$1$25
Net income (loss)$94$(13)$81
Net income (loss) attributable to Chemours$94$(13)$81
Per share data
Basic earnings (loss) per share of common stock$0.63$(0.09)$0.54
Diluted earnings (loss) per share of common stock$0.63$(0.09)$0.54
As reported · Adjustments · As revised
Cost of goods sold$4,631$9$4,640
Gross profit$1,151$(9)$1,142
Selling, general and administrative expense$585$13$598
Total other operating expenses$810$13$823
Interest expense$(264)$1$(263)
Income (loss) before income taxes$127$(21)$106
Provision for (benefit from) income taxes$41$(5)$36
Net income (loss)$86$(16)$70
Net income (loss) attributable to Chemours$86$(16)$70
Per share data
Basic earnings (loss) per share of common stock$0.58$(0.11)$0.47
Diluted earnings (loss) per share of common stock$0.57$(0.10)$0.47

Revised Consolidated Statements of Comprehensive (Loss) Income

As reported · Adjustments · As revised
Net income$52$2$54
Comprehensive income$52$2$54
Comprehensive income attributable to Chemours$52$2$54
As reported · Adjustments · As revised
Net income$70$(10)$60
Comprehensive loss$(3)$(10)$(13)
Comprehensive loss attributable to Chemours$(3)$(10)$(13)
As reported · Adjustments · As revised
Net income$121$(8)$113
Comprehensive income$48$(8)$40
Comprehensive income attributable to Chemours$48$(8)$40
As reported · Adjustments · As revised
Net loss$(27)$(5)$(32)
Comprehensive loss$(33)$(5)$(38)
Comprehensive loss attributable to Chemours$(33)$(5)$(38)
As reported · Adjustments · As revised
Net income$94$(13)$81
Comprehensive income$15$(13)$2
Comprehensive income attributable to Chemours$15$(13)$2
As reported · Adjustments · As revised
Net income$86$(16)$70
Comprehensive loss$(7)$(16)$(23)
Comprehensive loss attributable to Chemours$(7)$(16)$(23)

Revised Consolidated Balance Sheets

As reported · Adjustments · As revised
Accounts and notes receivable, net$610$12$622
Inventories$1,352$(3)$1,349
Total current assets$3,835$9$3,844
Accumulated depreciation$(6,196)$(9)$(6,205)
Property, plant and equipment, net$3,216$(9)$3,207
Other assets$677$2$679
Total assets$8,251$2$8,253
Long-term debt, net$3,987$2$3,989
Other liabilities$328$1$329
Total liabilities$7,512$3$7,515
Retained earnings$1,782$(1)$1,781
Total Chemours stockholders' equity$737$(1)$736
Total equity$739$(1)$738
Total liabilities and equity$8,251$2$8,253
As reported · Adjustments · As revised
Accounts and notes receivable, net$792$21$813
Inventories$1,391$(8)$1,383
Total current assets$3,597$13$3,610
Accumulated depreciation$(6,260)$(9)$(6,269)
Property, plant and equipment, net$3,209$(9)$3,200
Other assets$650$1$651
Total assets$7,978$5$7,983
Accounts payable$963$1$964
Total current liabilities$2,231$1$2,232
Long-term debt, net$3,968$2$3,970
Other liabilities$331$1$332
Total liabilities$7,224$4$7,228
Retained earnings$1,797$1$1,798
Total Chemours stockholders' equity$752$1$753
Total equity$754$1$755
Total liabilities and equity$7,978$5$7,983
As reported · Adjustments · As revised
Accounts and notes receivable, net$896$10$906
Inventories$1,368$(9)$1,359
Total current assets$2,937$1$2,938
Accumulated depreciation$(6,283)$(8)$(6,291)
Property, plant and equipment, net$3,157$(8)$3,149
Other assets$630$4$634
Total assets$7,249$(3)$7,246
Accounts payable$938$3$941
Total current liabilities$1,557$3$1,560
Long-term debt, net$3,951$2$3,953
Other liabilities$327$1$328
Total liabilities$6,524$6$6,530
Retained earnings$1,828$(9)$1,819
Total Chemours stockholders' equity$723$(9)$714
Total equity$725$(9)$716
Total liabilities and equity$7,249$(3)$7,246
As reported · Adjustments · As revised
Inventories$1,438$(4)$1,434
Total current assets$3,080$(4)$3,076
Accumulated depreciation$(6,372)$(3)$(6,375)
Property, plant and equipment, net$3,173$(3)$3,170
Other assets$667$1$668
Total assets$7,463$(6)$7,457
Accounts payable$1,069$9$1,078
Total current liabilities$1,777$9$1,786
Operating lease liabilities$196$(2)$194
Other liabilities$354$1$355
Total liabilities$6,804$8$6,812
Retained earnings$1,763$(14)$1,749
Total Chemours stockholders' equity$657$(14)$643
Total equity$659$(14)$645
Total liabilities and equity$7,463$(6)$7,457
As reported · Adjustments · As revised
Inventories$1,472$(9)$1,463
Total current assets$3,026$(9)$3,017
Other assets$797$7$804
Total assets$7,515$(2)$7,513
Accounts payable$1,142$14$1,156
Total current liabilities$1,803$14$1,817
Other liabilities$368$1$369
Total liabilities$6,910$15$6,925
Retained earnings$1,718$(17)$1,701
Total Chemours stockholders' equity$604$(17)$587
Total equity$605$(17)$588
Total liabilities and equity$7,515$(2)$7,513

Revised Consolidated Statements of Stockholders' Equity

As reported · Adjustments · As revised
Retained earnings at 1/1/2023$2,170$(1)$2,169
Retained earnings at 12/31/2023$1,782$(1)$1,781
As reported · Adjustments · As revised
Retained earnings at 1/1/2024$1,782$(1)$1,781
Net income$52$2$54
Retained earnings at 3/31/2024$1,797$1$1,798
As reported · Adjustments · As revised
Retained earnings at 4/1/2024$1,797$1$1,798
Net income$70$(10)$60
Retained earnings at 6/30/2024$1,828$(9)$1,819
As reported · Adjustments · As revised
Retained earnings at 1/1/2024$1,782$(1)$1,781
Net income$121$(8)$113
Retained earnings at 6/30/2024$1,828$(9)$1,819
As reported · Adjustments · As revised
Retained earnings at 7/1/2024$1,828$(9)$1,819
Net loss$(27)$(5)$(32)
Retained earnings at 9/30/2024$1,763$(14)$1,749
As reported · Adjustments · As revised
Retained earnings at 1/1/2024$1,782$(1)$1,781
Net income$94$(13)$81
Retained earnings at 9/30/2024$1,763$(14)$1,749
As reported · Adjustments · As revised
Retained earnings at 1/1/2024$1,782$(1)$1,781
Net income$86$(16)$70
Retained earnings at 12/31/2024$1,718$(17)$1,701

Revised Consolidated Statements of Cash Flows

As reported · Adjustments · As revised
Cash flows from operating activities:
Depreciation and amortization$307$2$309
Decrease (increase) in operating assets:
Accounts and notes receivable, net$(10)$(4)$(14)
Inventories and other current operating assets$58$3$61
(Decrease) increase in operating liabilities:
Accounts payable$(72)$(2)$(74)
Other non-current operating liabilities$2$1$3
Cash provided by (used for) operating activities$556$—$556
As reported · Adjustments · As revised
Net income$52$2$54
Cash flows from operating activities:
Deferred tax (benefit) provision$(1)$1$—
Decrease (increase) in operating assets:
Accounts and notes receivable, net$(177)$(9)$(186)
Inventories and other current operating assets$(34)$5$(29)
(Decrease) increase in operating liabilities:
Accounts payable$(157)$1$(156)
Cash provided by (used for) operating activities$(290)$—$(290)
As reported · Adjustments · As revised
Net income$121$(8)$113
Cash flows from operating activities:
Deferred tax (benefit) provision$(12)$(3)$(15)
Decrease (increase) in operating assets:
Accounts and notes receivable, net$(289)$2$(287)
Inventories and other current operating assets$(15)$6$(9)
(Decrease) increase in operating liabilities:
Accounts payable$(178)$3$(175)
Cash provided by (used for) operating activities$(910)$—$(910)
As reported · Adjustments · As revised
Net income$94$(13)$81
Cash flows from operating activities:
Depreciation and amortization$223$(5)$218
Deferred tax (benefit) provision$(34)$1$(33)
Other operating charges and credits, net$(9)$(3)$(12)
Decrease (increase) in operating assets:
Accounts and notes receivable, net$(348)$12$(336)
Inventories and other current operating assets$(91)$1$(90)
(Decrease) increase in operating liabilities:
Accounts payable$(95)$9$(86)
Other non-current operating liabilities$4$(2)$2
Cash provided by (used for) operating activities$(771)$—$(771)
As reported · Adjustments · As revised
Net income$86$(16)$70
Cash flows from operating activities:
Depreciation and amortization$301$(9)$292
Deferred tax (benefit) provision$(27)$(5)$(32)
Decrease (increase) in operating assets:
Accounts and notes receivable, net$(152)$13$(139)
Inventories and other current operating assets$(146)$6$(140)
(Decrease) increase in operating liabilities:
Accounts payable$(9)$13$4
Other non-current operating liabilities$13$(2)$11
Cash provided by (used for) operating activities$(633)$—$(633)

Liquidity

The Company believes it has sufficient liquidity, through future cash flows from operations, unrestricted cash on hand and availability under its revolving credit facility to timely settle its current liabilities through at least the end of May 2026, however, an adverse resolution of one or more legal or environmental matters could have a material adverse effect on the Company's liquidity.

As disclosed in "Note 16 – Commitments and Contingent Liabilities", the Company and certain of its subsidiaries are subject to various lawsuits, claims, assessments, government investigations, regulatory proceedings and other legal proceedings with respect to product liability, intellectual property, personal injury, commercial, contractual, employment, regulatory, environmental, anti-trust, and other such matters that arise in the ordinary course of business in multiple jurisdictions. The Company’s ability to timely settle its long term liabilities in the event such liabilities become current as a result of an adverse resolution of a legal matter will depend on its ability to generate sufficient future operating cash flows, resolve legal and environmental matters under acceptable terms and conditions and refinance its revolving credit facility and other long term debt on acceptable terms and conditions. Accordingly, there are risks and uncertainties with respect to the Company's ability to achieve its liquidity objectives.

At March 31, 2025, the Company has $464 of unrestricted cash and cash equivalents, of which $291 is maintained at foreign subsidiaries. The Company anticipates generating additional positive cash flows from operations in 2025. The Company has $1,673 of current liabilities as of March 31, 2025. Without giving effect to Amendment No. 3 (the “Amendment”) to the Company’s Second Amended and Restated Credit Agreement, dated as of August 18, 2023 (the “Credit Agreement”), which the Company entered into on May 2, 2025, the Company had $623 of availability under its revolving credit facility at March 31, 2025. After the consummation of the transactions contemplated by the Amendment, the Company’s revolving commitments are comprised of $780 in revolving commitments terminating on May 2, 2030 and $220 in revolving commitments terminating on October 7, 2026; in each case, subject to springing maturity provisions. Refer to “Item 5 – Other Information” of this Quarterly Report on Form 10-Q for further details of the Amendment.

Note 2. Recent Accounting Pronouncements

Accounting Guidance Issued and Not Yet Adopted

Improvements to Income Tax Disclosures

In December 2023, the Financial Accounting Standards Board ("FASB") issued ASU 2023-09, Income Taxes (Topic 740): Improvements to Income Tax Disclosures, which requires enhanced disclosure around the effective tax rate reconciliation, along with incremental disclosure around income taxes paid and certain income statement-related disclosures. The guidance will be effective prospectively for fiscal years beginning after December 15, 2024, with early adoption permitted. The Company plans to adopt the guidance and include the required enhanced disclosures in its consolidated financial statements beginning in the year ending December 31, 2025.

Disaggregation of Income Statement Expenses

In November 2024, the FASB issued ASU 2024-03, Income Statement - Reporting Comprehensive Income - Expense Disaggregation Disclosures, which requires more detailed disclosures of certain categories of expenses such as inventory purchases, employee compensation and depreciation that are components of existing expense captions presented on the face of the income statement. The guidance will be effective for fiscal years beginning after December 15, 2026, and interim periods within fiscal years beginning after December 15, 2027. Companies have the option to apply the guidance on a retrospective or prospective basis, and early adoption is permitted. The Company is currently evaluating the impact the adoption of this standard will have on its consolidated financial statements.

Recently Adopted Accounting Guidance

Joint Venture Formations

In August 2023, the FASB issued ASU 2023-05, Business Combinations - Joint Venture Formations, which requires joint ventures to initially measure its assets and liabilities at fair value on the formation date. The guidance will be effective prospectively to all joint ventures formed on or after January 1, 2025, with early adoption permitted. The Company adopted this guidance effective January 1, 2025 and will apply the provisions of ASU 2023-05 to joint ventures formed on or after January 1, 2025.

Note 3. Net Sales

As described further in "Note 1 – Background, Description of the Business and Basis of Presentation", certain prior period amounts reflected in the tables below have been revised to correct for immaterial errors pertaining to income statement presentation of byproduct revenue sales and certain ore sales related to the Company's Kuan Yin, Taiwan facility.

Disaggregation of Net Sales

The following table sets forth a disaggregation of the Company’s net sales by geographic region and segment for thethree months ended March 31, 2025 and 2024.

Three Months Ended March 31,
20252024
Net sales by geographic region (1)
North America:
Thermal & Specialized Solutions$233$271
Titanium Technologies267246
Advanced Performance Materials111124
Other Non-Reportable Segment89
Total North America619650
Asia Pacific:
Thermal & Specialized Solutions5339
Titanium Technologies105147
Advanced Performance Materials115105
Other Non-Reportable Segment23
Total Asia Pacific275294
Europe, the Middle East, and Africa:
Thermal & Specialized Solutions9892
Titanium Technologies142124
Advanced Performance Materials5663
Other Non-Reportable Segment12
Total Europe, the Middle East, and Africa297281
Latin America (2):
Thermal & Specialized Solutions8252
Titanium Technologies8374
Advanced Performance Materials1211
Other Non-Reportable Segment——
Total Latin America177137
Total net sales$1,368$1,362

(1)

Net sales are attributed to countries based on customer location.

(2)

Latin America includes Mexico.

The following table sets forth a disaggregation of the Company’s net sales by product group and segment for thethree months ended March 31, 2025 and 2024. Certain prior period amounts have been recast in order to conform with the current presentation of Thermal & Specialized Solutions net sales disaggregation.

Three Months Ended March 31,
20252024
Net sales by product group and segment
OpteonTM refrigerants$279$200
FreonTM refrigerants97173
Foam, propellants, and other9081
Total Thermal & Specialized Solutions466454
Titanium dioxide and other minerals597591
Total Titanium Technologies597591
Advanced materials178190
Performance solutions116113
Total Advanced Performance Materials294303
Performance chemicals and intermediates1114
Total Other Non-Reportable Segment1114
Total net sales$1,368$1,362

Substantially all of the Company’s net sales are derived from goods and services transferred at a point in time.

Contract Balances

The Company’s assets and liabilities from contracts with customers constitute accounts receivable - trade, deferred revenue, and customer rebates. An amount for accounts receivable - trade is recorded when the right to consideration under a contract becomes unconditional. An amount for deferred revenue is recorded when consideration is received prior to the conclusion that a contract exists, or when a customer transfers consideration prior to the Company satisfying its performance obligations under a contract. Customer rebates represent an expected refund liability to a customer based on a contract. In contracts with customers where a rebate is offered, it is generally applied retroactively based on the achievement of a certain sales threshold. As revenue is recognized, the Company estimates whether or not the sales threshold will be achieved to determine the amount of variable consideration to include in the transaction price.

The following table sets forth the Company’s contract balances from contracts with customers at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Contract assets:
Accounts receivable - trade, net (Note 7)$704$619
Contract liabilities:
Deferred revenue$6$11
Customer rebates (Note 13)4070

Changes in the Company’s deferred revenue balances resulting from additions for advance payments and deductions for amounts recognized in net sales during the three months ended March 31, 2025 and 2024 were not significant. For the three months ended March 31, 2025 and 2024, the amount of net sales recognized from performance obligations satisfied in prior periods (e.g., due to changes in transaction price) were not significant.

There were no material contract asset balances or capitalized costs associated with obtaining or fulfilling customer contracts as of March 31, 2025 and December 31, 2024.

Remaining Performance Obligations

Certain of the Company’s master services agreements or other arrangements contain take-or-pay clauses, whereby customers are required to purchase a fixed minimum quantity of product during a specified period, or pay the Company for such orders, even if not requested by the customer. The Company considers these take-or-pay clauses to be an enforceable contract, and as such, the legally-enforceable minimum amounts under such an arrangement are considered to be outstanding performance obligations on contracts with an original expected duration greater than one year. At March 31, 2025, Chemours had $233 of remaining performance obligations. The Company expects to recognize approximately 34% of its remaining performance obligations as revenue in 2025, approximately 34% as revenue in 2026, and approximately 32% as revenue in 2027. The Company applies the allowable practical expedient and does not include remaining performance obligations that have original expected durations ofone year or less, or amounts for variable consideration allocated to wholly-unsatisfied performance obligations or wholly-unsatisfied distinct goods that form part of a single performance obligation, if any. Amounts for contract renewals that are not yet exercised by March 31, 2025 are also excluded.

Note 4. Restructuring, Asset-related, and Other Charges

The following table sets forth the components of the Company’s restructuring, asset-related, and other charges by segment for thethree months ended March 31, 2025 and 2024.

Thermal & Specialized SolutionsTitanium TechnologiesAdvanced Performance MaterialsOther Non-Reportable SegmentCorporateTotal
Employee separation charges
SPS CapstoneTM Exit$—$—$13$—$—$13
Total employee separation charges——13——13
Decommissioning and other charges:
SPS CapstoneTM Exit——2——2
2024 Restructuring Program——1——1
Titanium Technologies Transformation Plan—5———5
Total decommissioning and other charges—53——8
Total restructuring and other charges—516——21
Asset-related charges:
SPS CapstoneTM Exit——12——12
Total asset-related charges——12——12
Total restructuring, asset-related, and other charges$—$5$28$—$—$33
Thermal & Specialized SolutionsTitanium TechnologiesAdvanced Performance MaterialsOther Non-Reportable SegmentCorporateTotal
Employee separation charges:$—$—$—$—$—$—
Decommissioning and other charges:
Titanium Technologies Transformation Plan—4———4
Total restructuring and other charges—4———4
Asset-related charges:——————
Total restructuring, asset-related, and other charges$—$4$—$—$—$4

Surface Protection Solutions ("SPS") Capstone TM Exit

In January 2025, management approved a restructuring plan within the Advanced Performance Materials business to exit its SPS Capstone TM business and begin the shutdown process for the underlying manufacturing asset across the Washington Works and Chambers Works sites, as well as the Villers St. Paul site pending local regulatory approval. This action was taken due to regulatory changes and uncertainty that have caused reduced demand and market deselection of telomer-based chemistries, making SPS economic unfavorable going forward.

As a result, during the three months ended March 31, 2025, the Company recorded charges of $27, consisting of non-cash asset-related charges of $12, employee separation charges of $13 and decommissioning and other charges of $2. The associated severance payments began in the first quarter of 2025 and are expected to be substantially completed by the second half of 2025. The $12 of asset related charges primarily includes $11 of non-cash accelerated depreciation related to the SPS Capstone TM manufacturing assets remaining useful life. The Company also expects to incur additional asset-related charges of $13 in the second quarter of 2025, along with decommissioning and other charges of $10 related to retention, external spending to support site closure activities, deconstruction and ongoing decommissioning expenses. These charges will be recognized as period costs as incurred.

2024 Restructuring Program

In the third quarter of 2024, management initiated certain transformation initiatives principally within the Advanced Performance Materials business and certain Corporate functions to capture operational and commercial synergies and cost optimization. As part of these efforts, during the third quarter of 2024, the Company initiated additional cost savings programs that were largely attributable to further aligning the cost structure of the Company’s businesses and corporate functions with its financial objectives.

During the three months ended March 31, 2025, the Company recorded charges of $1 related to the 2024 Restructuring Program. Through March 31, 2025, the Company has recorded total charges of $52, consisting of non-cash asset-related charges of $27, employee separation charges of $20 and other charges of $5. The associated severance payments began in the third quarter of 2024 and are expected to be substantially completed by the second half of 2025. The Company also expects to incur decommissioning and other charges of approximately $3 through 2026 which will be recognized as period costs as incurred.

Titanium Technologies Transformation Plan

On July 27, 2023, the Company announced the closure of its manufacturing site in Kuan Yin, Taiwan effective August 1, 2023, following the Company’s Board of Dire ctors approval on July 26, 2023. The Company began shutting down production and started decommissioning the plant during the third quarter of 2023 and fully completed the shut-down during the fourth quarter of 2023. Decommissioning activities were completed in the second quarter of 2024 and dismantling and removal activities were completed in the first quarter of 2025.

As a result, during the three months ended March 31, 2025, the Company recorded decommissioning and other charges of $5. Through March 31, 2025, the Company has recorded total charges of approximately $134, consisting ofasset-related impairments of $78, employee separation costs of $14, contract termination costs of $14 and decommissioning and other charges of $28. The associated severance payments began in the fourth quarter 2023 and were substantially completed in the first quarter of 2025.

As part of the Titanium Technologies Transformation Plan, following the plant closure, the segment also initiated an organizational redesign to further align its cost structure with its financial objectives. As a result, cumulative employee separation charges of $6 were recorded through March 31, 2025. The employee separation and related payments were substantially completed in the fourth quarter of 2024.

The following table sets forth the change in the Company’s employee separation-related liabilities associated with its restructuring programs for thethree months ended March 31, 2025.

SPS CapstoneTM Exit2024 RestructuringProgramTitanium Technologies Transformation PlanTotal
Balance at December 31, 2024$—$12$1$13
Charges to income13——13
Payments—(2)(1)(3)
Balance at March 31, 2025$13$10$—$23

There were no other significant outstanding liabilities related to the Company’s decommissioning and other restructuring-related charges at March 31, 2025 and December 31, 2024.

Note 5. Other Income, Net

The following table sets forth the components of the Company’s other income, net for thethree months ended March 31, 2025 and 2024.

Three Months Ended March 31,
20252024
Leasing, contract services, and miscellaneous income$3$(2)
Royalty income (1)22
Gain on sales of assets and businesses, net13
Exchange (losses) gains, net (2)(3)1
Non-operating pension and other post-retirement employee benefit income (3)21
Total other income, net$5$5

(1)

Royalty income is primarily from technology licensing.

(2)

Exchange (losses) gains, net includes gains and losses on the Company’s foreign currency forward contracts that have not been designated as a cash flow hedge.

(3)

Non-operating pension and other post-retirement employee benefit income represents the non-service component of net periodic pension income.

Note 6. Earnings Per Share of Common Stock

The following table sets forth the reconciliations of the numerators and denominators of the Company’s basic and diluted earnings per share (“EPS”) calculations for thethree months ended March 31, 2025 and 2024.

Three Months Ended March 31,
20252024
Numerator:
Net (loss) income attributable to Chemours$(4)$54
Denominator:
Weighted-average number of common shares outstanding - basic149,918,386149,035,200
Dilutive effect of the Company’s employee compensation plans (1)—1,015,169
Weighted-average number of common shares outstanding - diluted149,918,386150,050,369
Basic (loss) earnings per share of common stock (2)$(0.03)$0.36
Diluted (loss) earnings per share of common stock (1) (2)(0.03)0.36

(1)

In periods where the Company incurs a net loss, the impact of potentially dilutive securities is excluded from the calculation of EPS, as their inclusion would have an anti-dilutive effect. As such, with respect to the measure of diluted EPS, the impact of 491,194 potentially dilutive securities is excluded from the calculation for the three months ended March 31, 2025.

(2)

Figures may not recalculate exactly due to rounding. Basic and diluted earnings per share are calculated based on unrounded numbers.

The following table sets forth the average number of stock options and performance stock options that were out of the money and, therefore, were not included in the Company’s diluted EPS calculations for thethree months ended March 31, 2025 and 2024.

Three Months Ended March 31,
20252024
Average number of stock options2,800,2401,356,452

Note 7. Accounts and Notes Receivable, Net

The following table sets forth the components of the Company’s accounts and notes receivable, net at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Accounts receivable - trade, net (1)$704$619
VAT, GST, and other taxes (2)123114
Other receivables (3)3137
Total accounts and notes receivable, net$858$770

(1)

Accounts receivable - trade, net includes trade notes receivable of $4 and $1 and is net of allowances for doubtful accounts of $1 and $2 at March 31, 2025 and December 31, 2024, respectively. Such allowances are equal to the estimated uncollectible amounts.

(2)

Value added tax (“VAT”) and goods and services tax (“GST”) for various jurisdictions.

(3)

Other receivables consist of derivative instruments, advances, and other deposits including receivables under the terms of the MOU. For details of the MOU, see“Note 16 – Commitments and Contingent Liabilities”.

Accounts and notes receivable are carried at amounts that approximate fair value. Bad debt expense amounted to less than $1 and $1 for thethree months ended March 31, 2025 and 2024, respectively.

Customer Vendor Financing Facilities

The Company participates in several financing facilities maintained by its customers. These facilities allow the Company to monetize certain of

its receivables prior to their due date. The Company receives a discounted amount from the financial institution which varies depending on the

timing of the payment from the financing institution in relation to the invoice due date from the customer. The Company classifies cash received

from the financial institutions as an operating cash flow.

Note 8. Inventories

The following table sets forth the components of the Company’s inventories at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Finished products$953$889
Semi-finished products288271
Raw materials, stores, and supplies680679
Inventories before LIFO adjustment1,9211,839
Less: Adjustment of inventories to LIFO basis(371)(376)
Total inventories$1,550$1,463

Inventory values, before last-in, first-out (“LIFO”) adjustment are generally determined by the average cost method, which approximates current cost. Inventories are valued under the LIFO method at the Company’s U.S. locations, which comprised $919 and $900 (or 48% and 49%, respectively) of inventories before the LIFO adjustments at March 31, 2025 and December 31, 2024, respectively. The Company’s inventories held in international locations are valued under the average cost method.

Note 9. Property, Plant, and Equipment, Net

The following table sets forth the components of the Company’s property, plant, and equipment, net at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Equipment$7,981$7,911
Buildings1,1351,133
Construction-in-progress385404
Land8788
Mineral rights3636
Property, plant, and equipment9,6249,572
Less: Accumulated depreciation(6,493)(6,389)
Total property, plant, and equipment, net$3,131$3,183

Property, plant, and equipment, net included gross assets under finance leases of $98 and $97 at March 31, 2025 and December 31, 2024.

Depreciation expense amounted to $88 and $71 for thethree months ended March 31, 2025 and 2024, respectively.

The Company had previously committed to selling the land of its manufacturing site in Kuan Yin, Republic of China, following the announcement of its closure on July 27, 2023, as part of the Titanium Technologies Transformation Plan. The land was not available for immediate sale pending the removal of an environmental pollution mark from the land titles and the completion of dismantling, removal, and remediation activities at the decommissioned site. Subsequent to the date of these financial statements, in April 2025, following completion of dismantling and removal activities and substantially completing the remediation efforts, the Department of Environmental Protection in Taiwan lifted the environmental pollution mark from all land titles of the Company's manufacturing site. Consequently, the Company determined that in April 2025, the land was available for immediate sale and all other criteria were met for the land to now qualify for held for sale classification. The Company will classify the related carrying value of land of $25 as held for sale beginning in April 2025, until the land sale is completed.

Note 10. Investments in Affiliates

The Company engages in transactions with its equity method investees in the ordinary course of business. Net sales to the Company’s equity method investees amounted to $29 and $30 for thethree months ended March 31, 2025 and 2024, respectively. Purchases from the Company’s equity method investees amounted to $65 and $57 for thethree months ended March 31, 2025 and 2024, respectively. The Company did not receive dividends from its equity method investees for the three months ended March 31, 2025 and 2024, respectively.

Note 11. Other Assets

The following table sets forth the components of the Company’s other assets at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Capitalized repair and maintenance costs$271$315
Pension assets (1)10597
Deferred income taxes313296
Miscellaneous (2)9396
Total other assets$782$804

(1)

Pension assets represents the funded status of certain of the Company's long-term employee benefit plans.

(2)

Miscellaneous includes corresponding income tax benefits related to uncertain tax positions on transfer pricing.

Note 12. Accounts Payable

The following table sets forth the components of the Company’s accounts payable at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Trade payables$978$1,134
VAT and other payables2822
Total accounts payable$1,006$1,156

Supplier Financing

The Company maintains supply chain finance programs with several financial institutions. The programs allow its suppliers to sell their receivables to one of the participating financial institutions at the discretion of both parties on terms that are negotiated between the supplier and the respective financial institution. Pursuant to their agreement with a financial institution, certain suppliers may elect to be paid early at their discretion. The key terms of the supplier invoice, including the amounts due and scheduled payment dates, are not impacted by its suppliers’ decisions to sell their receivables under the programs. For its supplier financing program obligations classified as accounts payable, the Company agrees to pay the financial institution on those sold invoices on the original invoice due date. The Company also maintains a supplier finance program whose obligations are classified as short-term debt based on an extension of payment terms past the original invoice due date. There are no assets pledged or other forms of guarantees associated with these programs. The Company or the financial institution may terminate the program upon at least 30 days' notice.

The outstanding payment obligations at March 31, 2025 and December 31, 2024 were $106 and $180, respectively. At March 31, 2025 and December 31, 2024, $96 and $162 are in Accounts Payable in the Interim Consolidated Balance Sheets, while $10 and $18 are included in Short-term and current maturities of long-term debt in the Interim Consolidated Balance Sheets.

Note 13. Other Accrued Liabilities

The following table sets forth the components of the Company’s other accrued liabilities at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Accrued litigation (1)$97$112
Asset retirement obligations (2)98
Income taxes2422
Customer rebates4070
Accrued interest5318
Operating lease liabilities6153
Miscellaneous (3)117110
Total other accrued liabilities$401$393

(1)

At March 31, 2025 and December 31, 2024, accrued litigation includes $68 for settlements with the State of Ohio and the State of Delaware. At December 31, 2024, accrued litigation also includes an accrual related to the Ohio MDL of $14. Refer to “Note 16 – Commitments and Contingent Liabilities" for further details.

(2)

Represents the current portion of asset retirement obligations (see “Note 15 – Other Liabilities”).

(3)

Miscellaneous primarily includes accruals related to utility expenses, property taxes, a workers compensation indemnification liability and other miscellaneous expenses.

Note 14. Debt

The following table sets forth the components of the Company’s debt at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Senior secured term loans:
Tranche B-3 U.S. dollar term loan due August 2028$1,054$1,056
Tranche B-3 euro term loan due August 2028(€415 million at March 31, 2025 and December 31, 2024)447432
Senior unsecured notes:
5.375% due May 2027495495
5.750% due November 2028783783
4.625% due November 2029620620
8.000% due January 2033600600
Finance lease liabilities4346
Financing obligation (1)9090
Supplier financing obligation (2)1018
Other511
Total debt principal4,1474,151
Less: Unamortized issue discounts(18)(19)
Less: Unamortized debt issuance costs(22)(24)
Less: Short-term and current maturities of long-term debt(43)(54)
Total long-term debt, net$4,064$4,054

(1)

At March 31, 2025 and December 31, 2024, financing obligation relates to the financed portion of the Company’s research and development facility located in the Science, Technology, and Advanced Research Campus of the University of Delaware in Newark, Delaware (“Chemours Discovery Hub”).

(2)

At March 31, 2025 and December 31, 2024, supplier financing obligation relates to a supplier financing program whose obligations, based on their characteristics, are classified within short-term debt and current maturities of long-term debt. Refer to "Note 12 – Accounts Payable" for further details.

Senior Secured Credit Facilities

On August 18, 2023, the Company entered into the Credit Agreement, which provides for a $900 senior secured revolving credit facility (the “Revolving Credit Facility”) andfive-year senior secured term loans (the "Senior Secured Term Loan Facility", collectively, the “Senior Secured Credit Facilities”).

On May 2, 2025, the Company entered into the Amendment among the Company, certain subsidiaries of the Company, the lenders from time to time party thereto and JPMorgan Chase Bank, N.A., as administrative agent (the “Administrative Agent”), which amends the Credit Agreement. The Amendment increased the total net leverage ratio thresholds governing the applicable rate for the Company’s revolving commitments existing immediate prior to the consummation of the transaction contemplated by the Amendment to May 2, 2030, increased the maximum senior secured net leverage ratio quarterly maintenance test through the fiscal quarter ended September 30, 2026, extended the termination date of certain revolving commitments and increased the aggregate revolving commitments available to $1,000. Refer to “Item 5 – Other Information” of this Quarterly Report on Form 10-Q for further details of the Amendment.

The Senior Secured Term Loan Facility provides for a Tranche B-3 class of term loans, denominated in U.S. dollars, in an aggregate principal amount of $1,070 (the “Dollar Term Loan”) and a class of Tranche B-3 class term loans, denominated in euros, in an aggregate principal amount of €415 million (the “Euro Term Loan”) (collectively, the “Term Loans”). Following the first amendment to the Credit Agreement, which was entered into on November 29, 2024, the Dollar Term Loan bears a variable interest rate equal to, at the election of the Company, adjusted Term Secured Overnight Financing Rate ("SOFR") plus 3.00%, subject to an adjusted SOFR floor of 0.50%, or adjusted base rate, plus 2.00%, subject to a base rate floor of 1.00%. Following the second amendment to the Credit Agreement, which was entered into on December 13, 2024, the Euro Term Loan bears a variable interest rate equal to adjusted Euro Interbank Offered Rate ("EURIBOR") plus 3.25%, subject to an adjusted EURIBOR floor of 0.0%. The Term Loans will mature on August 18, 2028, and are subject to acceleration in certain circumstances.

No borrowings were outstanding under the Revolving Credit Facility at March 31, 2025 and December 31, 2024. The Company made term loan repayments of $3 during each of the three months ended March 31, 2025 and 2024. Chemours also had $52 and $47 in letters of credit issued and outstanding under the Revolving Credit Facility at March 31, 2025 and December 31, 2024, respectively. At March 31, 2025, the effective interest rates on the Dollar Term Loan and the Euro Term Loan were 7.3% and 5.6%, respectively. Also, at March 31, 2025, commitment fees on the Revolving Credit Facility were assessed at a rate of 0.25% per annum.

Accounts Receivable Securitization Facility

The Company, through a wholly-owned special purpose entity (“SPE”), maintains an amended and restated receivables purchase agreement dated March 9, 2020, which was amended on March 5, 2021 and further amended on November 24, 2021 and March 23, 2023 (the “Amended Purchase Agreement”). Pursuant to the Amended Purchase Agreement, the Company does not maintain effective control over the transferred receivables and therefore accounts for these transfers as sales of receivables.

On March 28, 2025, the Company entered into an amendment (the “Fourth Amendment”) to its Amended Purchase Agreement to extend the maturity date from March 31, 2025 to March 31, 2028 and decrease the facility limit from $175 to $165.

Cash received from collections of sold receivables is used to fund additional purchases of receivables at 100% of face value on a revolving basis, not to exceed the facility limit, which is the aggregate purchase limit. During thethree months ended March 31, 2025 and 2024, the Company received $325 and $285, respectively, of cash collections on receivables sold under the Amended Purchase Agreement, following which it sold and derecognized $353 and $325, respectively, of incremental accounts receivable. The Company maintains continuing involvement as it acts as the servicer for the sold receivables and guarantees payment to the bank. As collateral against the sold receivables, the SPE maintains a certain level of unsold receivables, which amounted to $134 and $112 at March 31, 2025 and December 31, 2024, respectively. The Company incurred $1 of fees associated with the Securitization Facility during each of thethree months ended March 31, 2025 and 2024, respectively. Costs associated with the sales of receivables are reflected in the Company’s consolidated statements of operations for the periods in which the sales occur.

Other

In the third quarter of 2024, the Company entered into a financing arrangement, by which an external financing company funded certain of the Company's annual insurance premiums for $21. During the three months ended March 31, 2025, the Company made principal payments of $5 to the financing company, and the remaining $5 is to be repaid within the next twelve months.

Maturities

The Company has required quarterly principal payments related to the Dollar Term Loan equivalent to 1.00% per annum through June 2028, with the balance due at maturity. Also, on an annual basis, the Company is required to make additional principal payments depending on leverage levels, as defined in the Credit Agreement, equivalent to up to 50% of excess cash flows based on certain leverage targets with step-downs to 25% and 0% as actual leverage decreases to below a 3.50 to 1.00 leverage target. The Company is not required to make additional principal payments in 2025.

The following table sets forth the Company’s debt principal maturities for the next five years and thereafter.

Senior Debt · Finance Lease Liabilities · Financing Obligation · Supplier Financing Obligation · Other · Total
2025$8$13$5$10$5$41
202611117——29
202750687——521
20282,25497——2,270
202962047——631
Thereafter6004123——727
Total payments3,999491561054,219
Less: Imputed interest—(6)(66)——(72)
Total principal maturities on debt$3,999$43$90$10$5$4,147

Debt Fair Value

The following table sets forth the estimated fair values of the Company’s senior debt issues, which are based on quotes received from third-party brokers, and are classified as Level 2 financial instruments in the fair value hierarchy.

March 31, 2025 · December 31, 2024
CarryingValue · Fair Value · CarryingValue · Fair Value
Senior secured term loans:
Tranche B-3 U.S. dollar term loan due August 2028$1,054$1,053$1,056$1,065
Tranche B-3 euro term loan due August 2028(€415 million at March 31, 2025 and December 31, 2024)447448432439
Senior unsecured notes:
5.375% due May 2027495482495477
5.750% due November 2028783723783728
4.625% due November 2029620530620538
8.000% due January 2033600563600587
Total senior debt principal3,999$3,7993,986$3,834
Less: Unamortized issue discounts(18)(19)
Less: Unamortized debt issuance costs(22)(24)
Total senior debt, net$3,959$3,943

Note 15. Other Liabilities

The following table sets forth the components of the Company’s other liabilities at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Employee-related costs (1)$65$65
Accrued litigation (2)9596
Asset retirement obligations (3)9393
Miscellaneous (4)116115
Total other liabilities$369$369

(1)

Employee-related costs primarily represents liabilities associated with the Company’s long-term employee benefit plans.

(2)

Represents the long-term portion of accrued litigation (see “Note 16 – Commitments and Contingent Liabilities”).

(3)

Represents the long-term portion of asset retirement obligations, which totaled $102 and $101 when combined with the current portion at March 31, 2025 and December 31, 2024, respectively (see “Note 13 – Other Accrued Liabilities”). During the three months ended March 31, 2025, liabilities incurred during the period, reduction in estimated cash outflows, liabilities settled in the current period and accretion expense were not material.

(4)

Miscellaneous primarily includes accrued indemnification liabilities of $24 and $25 at March 31, 2025 and December 31, 2024, respectively. Miscellaneous also includes long-term income tax liabilities from uncertain tax positions.

Note 16. Commitments and Contingent Liabilities

Litigation Overview

The Company and certain of its subsidiaries, from time to time, are subject to various lawsuits, claims, assessments, government investigations, regulatory proceedings and other legal proceedings with respect to product liability, intellectual property, personal injury, commercial, contractual, employment, regulatory, environmental, anti-trust, and other such matters that arise in the ordinary course of business in multiple jurisdictions. Any determination in such a proceeding that the Company’s operations or activities are not, or were not, in compliance with applicable laws or regulations could result in the imposition of fines, civil or criminal penalties, and equitable remedies, including disgorgement, temporary or permanent suspension of operations or debarment or injunctive relief. In addition, Chemours, by virtue of its status as a subsidiary of EID prior to its separation on July 1, 2015 ("the Separation"), is subject to or required under the Separation-related agreements executed prior to the Separation to indemnify EID against various pending legal proceedings. The Company vigorously defends such lawsuits, claims, assessments, government investigations and other legal proceedings, whether raised against itself or under its indemnity obligation. Disputes between Chemours and EID may arise regarding indemnification matters, including disputes based on matters of law or contract interpretation. Should such disputes arise, they could materially adversely affect the Company.

When making determinations about recording liabilities related to legal proceedings or unasserted claims that are probable of assertion, the Company complies with the requirements of ASC 450, Contingencies, and related guidance. If the potential loss from any claim or legal proceeding is considered probable and the amount can be reasonably estimated, the Company accrues a liability for the estimated loss. Where there is an estimated range of probable loss and an amount within the range of loss appears at the time to be a better estimate than any other amount within the range, the Company accrues a liability for that specific amount. When no amount within an estimated range of probable loss is a better estimate than any other amount, the Company accrues a liability for the minimum amount in the range. When a material loss contingency is reasonably possible, but not probable, the Company does not accrue a liability, but instead discloses the nature of the matter and an estimate of the loss or range of loss, to the extent such estimate can be made. Significant judgment is required in both the determination of probability and whether a loss or range of loss is reasonably estimable. The Company’s judgments are subjective based on the status of the legal or regulatory proceedings, the merits of the Company’s defenses and consultation with in-house and outside legal counsel. Because of substantial uncertainties related to these matters, accruals are based on the best information available each period, including, among others, mediation, settlement discussions or agreements. As a matter progresses, the Company may receive information, through plaintiff demands, through discovery, in the form of reports of purported experts, or in the context of settlement or mediation discussions that purport to quantify an amount of alleged damages, but with which the Company may not agree. Furthermore, settlement discussions are complex and often involve potential amounts, scope and terms, which can be monetary and non-monetary, that one or more parties may not consider reasonable under the circumstances or indicative of the merits or potential outcome of any court proceeding with respect to the underlying claims. Such information may or may not lead the Company to determine that it is able to make a reasonable estimate as to a probable loss or range of loss in connection with a matter. As additional information becomes available, the Company reassesses the potential liability related to pending claims and litigation and may revise its estimates accordingly. Due to the inherent uncertainties of the legal and regulatory process in the multiple jurisdictions in the United States and internationally, management’s judgments may be materially different than the actual outcomes. The Company's ability to assess outcomes and make reasonable estimates of potential losses is further influenced by the fact that a resolution of one or more matters may impact the resolution of other similar matters in terms of timing, amount of liability, or both. Legal costs such as outside counsel fees and expenses are charged to expense in the period services are rendered.

Unless otherwise stated, the Company is unable to reasonably estimate the possible loss or a range of loss for the matters described below, potentially based on one or more of the following reasons: actual or potential plaintiffs have not claimed an amount of monetary damages or the amounts are unsupportable or exaggerated, the matters are in early stages, there is uncertainty as to the outcome of pending appeals or motions, there are significant factual issues to be resolved, the proceedings involve multiple defendants or potential defendants whose share of any potential responsibility has not been determined. Because litigation is subject to significant uncertainties, and adverse rulings, judgments or other outcomes could occur in the future, it is reasonably possible that the Company could incur losses substantially in excess of accrued liabilities or with respect to matters for which no liability has been accrued because losses are not currently probable and reasonably estimable.

Management believes the Company’s accounting treatment and disclosure for the matters discussed below are appropriate based on the facts and circumstances for each matter, which are discussed in further detail below.

The following table sets forth the components of the Company’s accrued litigation at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Asbestos$61$61
PFAS (1):
PFOA (2)2440
Other PFAS matters (3)8181
All other matters2626
Total accrued litigation$192$208

(1)

The Company is a named defendant and/or cost-sharing and defending DuPont, Corteva, and EID (together, the “DuPont Indemnitees”) in litigation related to the production and use of per- and polyfluoroalkyl substances (“PFAS”), including perfluorooctanoic acids and its salts, including the ammonium salt (“PFOA”); hexafluoropropylene oxide dimer acid (“HFPO Dimer Acid”, sometimes referred to as “GenX” or “C3 Dimer Acid”) and other compounds; and products that are manufactured or use such compounds, including Aqueous Film Forming Foam (“AFFF”).

(2)

PFOA includes matters under the "PFOA" section within this “Note 16 – Commitments and Contingent Liabilities”.

(3)

Other PFAS matters includes matters under the "PFAS" section within this “Note 16 – Commitments and Contingent Liabilities”.

The following table sets forth the current and long-term components of the Company’s accrued litigation and their balance sheet locations at March 31, 2025 and December 31, 2024.

Balance Sheet LocationMarch 31, 2025December 31, 2024
Accrued Litigation:
Current accrued litigationOther accrued liabilities (Note 13)$97$112
Long-term accrued litigationOther liabilities (Note 15)9596
Total accrued litigation$192$208

Memorandum of Understanding (the “MOU”) with DuPont, Corteva and EID

In January 2021, Chemours, DuPont, Corteva, and EID, a subsidiary of Corteva, entered into a binding MOU, reflecting the parties’ agreement to share potential future legacy liabilities relating to per- and polyfluoroalkyl substances (“PFAS”) arising out of pre-July 1, 2015 conduct (i.e., “Indemnifiable Losses”, as defined in the separation agreement, dated as of June 26, 2015, as amended, between EID and Chemours (the “Separation Agreement”)) until the earlier to occur of: (i) December 31, 2040; (ii) the day on which the aggregate amount of Qualified Spend is equal to $4,000; or, (iii) a termination in accordance with the terms of the MOU (e.g., non-performance of the escrow funding requirements pursuant to the MOU by any party). As defined in the MOU, Qualified Spend includes:

All Indemnifiable Losses (as defined in the Separation Agreement), including punitive damages, to the extent relating to, arising out of, by reason of, or otherwise in connection with PFAS Liabilities as defined in the MOU (including any mutually agreed-upon settlements);

Any costs or amounts to abate, remediate, financially assure, defend, settle, or otherwise pay for all pre-July 1, 2015 PFAS Liabilities or exposure, regardless of when those liabilities are manifested; includes Natural Resources Damages claims associated with PFAS Liabilities;

Fines and/or penalties from governmental agencies for legacy EID PFAS emissions or discharges prior to the spin-off; and,

Site-Related GenX Claims as defined in the MOU.

The parties have agreed that, during the term of the cost-sharing arrangement, Chemours will bear half of the cost of such future potential legacy PFAS liabilities, and DuPont and Corteva will collectively bear the other half of the cost of such future potential legacy PFAS liabilities up to an aggregate $4,000, of which approximately $2,000 is available after consideration of the funding of the payment to the State of Ohio and supplemental payment to the State of Delaware. Any recoveries of Qualified Spend from DuPont and/or Corteva under the cost-sharing arrangement will be recognized as an offset to the Company’s cost of goods sold or selling, general, and administrative expense, as applicable, when realizable. Any Qualified Spend incurred by DuPont and/or Corteva under the cost-sharing arrangement will be recognized in the Company’s cost of goods sold or selling, general, and administrative expense, as applicable, when the amounts of such costs are probable and estimable or expensed as incurred with respect to period costs, such as legal expenses. During thethree months ended March 31, 2025 and 2024, the Company incurred expenditures subject to reimbursement of cost-sharing as Qualified Spend under the MOU of approximately $43 and $23, respectively, excluding litigation-related settlements.

After the term of this arrangement, Chemours’ indemnification obligations under the Separation Agreement would continue unchanged, subject in each case to certain exceptions set out in the MOU. Pursuant to the terms of the MOU, the parties have agreed to release certain claims regarding Chemours’ Delaware lawsuit and confidential arbitration (concerning the indemnification of specified liabilities that EID assigned to Chemours in its spin-off), including that Chemours has released any claim set forth in the complaint filed in the Delaware lawsuit, any other similar claims arising out of or resulting from the facts recited by Chemours in the complaint or the process and manner in which EID structured or conducted the spin-off, and any other claims that challenge the spin-off or the assumption of Chemours Liabilities (as defined in the Separation Agreement) by Chemours and the allocation thereof, subject in each case to certain exceptions set out in the MOU. The parties have further agreed not to bring any future, additional claims regarding the Separation Agreement or the MOU outside of arbitration.

As part of the MOU, the parties established an escrow account to support and manage the payments for potential future PFAS liabilities. The MOU provides that: (i) no later than each of September 30, 2021 and September 30, 2022, Chemours shall deposit $100 into an escrow account and DuPont and Corteva shall together deposit $100 in the aggregate into an escrow account, and (ii) no later than September 30 of each subsequent year through and including 2028, Chemours shall deposit $50 into an escrow account and DuPont and Corteva shall together deposit $50 in the aggregate into an escrow account. Subject to the terms and conditions set forth in the MOU, each party may be permitted to defer funding in any year. Additionally, if on December 31, 2028, the balance of the escrow account (including interest) is less than $700, Chemours will make 50% of the deposits and DuPont and Corteva together will make 50% of the deposits necessary to restore the balance of the escrow account to $700. Such payments will be made in a series of five consecutive annual equal installments commencing on September 30, 2029 pursuant to the escrow account replenishment terms as set forth in the MOU. Any funds that remain in escrow at termination of the MOU will revert to the party that deposited them. As such, future payments made by the Company into the escrow account will remain an asset of Chemours, and such payments will be reflected as a transfer to restricted cash and restricted cash equivalents on its consolidated balance sheets. No withdrawals are permitted from the escrow account before January 2026, except for funding mutually agreed-upon third-party settlements in excess of $125. Starting in January 2026, withdrawals may be made from the escrow account to fund Qualified Spend if the parties’ aggregate Qualified Spend in that particular year is greater than $200. Starting in January 2031, the amounts in the escrow account can be used to fund any Qualified Spend. Future payments from the escrow account for potential future PFAS liabilities will be reflected on the Company’s consolidated statement of cash flows at that point in time.

In September 2023, the parties entered into a supplemental agreement to the MOU, whereby the parties agreed to (i) release the funds held in escrow to fund, in part, the Water District Settlement Fund (discussed further below), (ii) waive the escrow funding obligation of each party due no later than September 30, 2023, and (iii) with respect to the escrow funding obligation due no later than September 30, 2024, waive the obligation of each of the parties under certain conditions as agreed to by the parties. The parties agreed to fund the payments due by September 30, 2024, and the Company funded $50 into the escrow account on September 30, 2024. As such, at March 31, 2025 and December 31, 2024, the Company had $50 deposited into the escrow account, respectively, which is recognized as restricted cash and restricted cash equivalents on its consolidated balance sheets.

The parties have also sought insurance coverage for certain claims relating to PFAS matters, including claims in the AFFF MDL (as defined below). In July 2024, a $45 settlement agreement was reached amongst the parties with one of the insurance carriers. Per agreement with the parties, the Company received approximately $23 of the settlement as it was allocated amongst the parties in accordance with the percentage contribution in the Public Water System Class Action Settlement. In April 2025, two Demands for Arbitration were sent to additional noticed insurance carriers.

The parties will cooperate in good faith to enter into additional agreements reflecting the terms set forth in the MOU.

Asbestos

In the Separation, EID assigned its asbestos docket to Chemours. At both March 31, 2025 and December 31, 2024, there were approximately 800 lawsuits pending against EID alleging personal injury from exposure to asbestos, respectively. These cases are pending in state and federal court in numerous jurisdictions in the U.S. and are individually set for trial. A small number of cases are pending outside of the U.S. Most of the actions were brought by contractors who worked at sites between the 1950s and the 1990s. A small number of cases involve similar allegations by EID employees or household members of contractors or EID employees. Finally, certain lawsuits allege personal injury as a result of exposure to EID products.

With limited exception, the Company previously rejected EID’s demand for indemnity and defense of asbestos and product liability matters arising from an EID subsidiary, Sporting Goods Properties, Inc., (“SGPI”). EID brought an arbitration proceeding on this issue and in November 2024, the Company and EID reached an agreement in principle and adjourned the arbitration. We finalized the settlement agreement in March 2025. Per the terms of the agreement in principle, the Company assumed approximately 20 current SGPI asbestos cases as well as all future SGPI asbestos and product liability claims. The agreement also includes that the Company is entitled to insurance recoveries where applicable under certain existing insurance policies as well as potential cost sharing between the parties for certain cases.

At March 31, 2025 and December 31, 2024, Chemours had accruals of $61 related to these matters, respectively. Asbestos reserves recorded include estimated losses for current claims as well as an estimate of losses for future claims, except for the SGPI asbestos and product liability claims. Because of the limited history of SGPI asbestos and product liability claims, the Company has concluded that it is not able to reasonably estimate probable losses for future claims for these matters at this time.

Benzene

In the Separation, EID assigned its benzene docket to Chemours. At March 31, 2025 and December 31, 2024, there were 22 cases pending against EID alleging benzene-related illnesses. These cases consist of premises matters involving contractors and deceased former employees who claim exposure to benzene while working at EID sites primarily in the 1960s through the 1980s, and product liability claims based on alleged exposure to benzene found in trace amounts in aromatic hydrocarbon solvents used to manufacture EID products such as paints, thinners, and reducers.

Management believes that a loss is reasonably possible as to the docket as a whole; however, given the evaluation of each benzene matter is highly fact-driven and impacted by disease, exposure, and other factors, a range of such losses cannot be reasonably estimated at this time.

In May 2021, the Company and EID filed suit in Delaware state court against multiple insurance companies for breach of their contractual obligations to indemnify Chemours and EID against liabilities, costs and losses relating to benzene litigation which are covered under liability insurance policies purchased by EID during the period 1967 to 1986. EID and Chemours are seeking payment of all costs and settlement amounts for past and future benzene cases falling under those policies. The outcome of this matter is not expected to have a material impact on Chemours’ results of operations or financial position. Over the course of the litigation, settlements have been negotiated with all of the insurers and Chemours and EID established a joint escrow account. In December 2024, Chemours and EID agreed to a 50/50 distribution of then-available escrow account funds with Chemours receiving $20, representing a release of previously recorded restricted cash.

PFOA

Chemours does not, and has never, used “PFOA” (collectively, perfluorooctanoic acids and its salts, including the ammonium salt) as a polymerization aid nor sold it as a commercial product. Prior to the Separation, the performance chemicals segment of EID made PFOA at its Fayetteville Works site in Fayetteville, North Carolina (“Fayetteville”) and used PFOA as a polymerization aid in the manufacture of fluoropolymers and fluoroelastomers at certain sites, including: Washington Works, Parkersburg, West Virginia; Chambers Works, Deepwater, New Jersey ("Chambers Works"); Dordrecht Works, Netherlands; Changshu Works, China; and, Shimizu, Japan. These sites are now owned and/or operated by Chemours.

At March 31, 2025 and December 31, 2024, Chemours maintained an accrual of $24 and $40, respectively, related to PFOA matters under the Leach Settlement (discussed below), EID’s obligations under agreements with the U.S. Environmental Protection Agency (the “EPA”), and voluntary commitments to the New Jersey Department of Environmental Protection (the “NJ DEP”). These obligations and voluntary commitments include surveying, sampling, and testing drinking water in and around certain Company sites, and offering treatment or an alternative supply of drinking water if tests indicate the presence of PFOA in drinking water at or greater than the applicable levels. The Company will continue to work with EPA, NJ DEP and other authorities regarding the extent of work that may be required with respect to these matters.

Leach Settlement

In 2004, EID settled a class action captioned Leach v. DuPont, filed in West Virginia state court, alleging that approximately 80,000 residents living near the Washington Works facility had suffered, or may suffer, deleterious health effects from exposure to PFOA in drinking water. Among the settlement terms, EID funded a series of health studies by an independent science panel of experts (“C8 Science Panel”) to evaluate available scientific evidence on whether any probable link exists, as defined in the settlement agreement, between exposure to PFOA and disease.

The C8 Science Panel found probable links, as defined in the settlement agreement, between exposure to PFOA and pregnancy-induced hypertension, including preeclampsia, kidney cancer, testicular cancer, thyroid disease, ulcerative colitis, and diagnosed high cholesterol. Under the terms of the settlement, EID is obligated to fund up to $235 for a medical monitoring program for eligible class members and pay the administrative costs associated with the program, including class counsel fees. The court-appointed Director of Medical Monitoring implemented the program, and testing is ongoing with associated payments to service providers disbursed from an escrow account which the Company replenishes pursuant to the settlement agreement. Through March 31, 2025, approximately $2 has been disbursed from escrow related to medical monitoring. While it is reasonably possible that the Company will incur additional costs related to the medical monitoring program, such costs cannot be reasonably estimated due to uncertainties surrounding the level of participation by eligible class members and the scope of testing.

In addition, under the Leach settlement agreement, EID must continue to provide water treatment designed to reduce the level of PFOA in water tosix area water districts and private well users. At Separation, this obligation was assigned to Chemours and is included in the $24 and $40 accrued at March 31, 2025 and December 31, 2024, respectively.

PFOA Leach Class Personal Injury

Further, under the Leach settlement, class members may pursue personal injury claims against EID only for those diseases for which the C8 Science Panel determined a probable link exists. Approximately 3,500 lawsuits were subsequently filed in various federal and state courts in Ohio and West Virginia and consolidated in multi-district litigation (“MDL”) in Ohio federal court. These were resolved in March 2017 when EID entered into an agreement settling all MDL cases and claims, including all filed and unfiled personal injury cases and claims that were part of the plaintiffs’ counsel’s claims inventory, as well as cases tried to a jury verdict (the “First MDL Settlement”) for $670.7 in cash, with half paid by Chemours, and half paid by EID.

Concurrently with the First MDL Settlement, EID and Chemours agreed to a limited sharing of potential future PFOA costs (i.e. “Indemnifiable Losses”, as defined in the Separation Agreement between EID and Chemours) for a period offive years. The cost-sharing agreement entered concurrently with the First MDL Settlement has been superseded by the binding MOU addressing certain PFAS matters and costs. For more information on this matter refer to “Memorandum of Understanding (the “MOU”) with DuPont, Corteva and EID” within this “Note 16 – Commitments and Contingent Liabilities”.

While all MDL lawsuits were dismissed or resolved through the First MDL Settlement, the First MDL Settlement did not resolve PFOA personal injury claims of plaintiffs who did not have cases or claims in the MDL or personal injury claims based on diseases first diagnosed after February 11, 2017. Approximately 96 plaintiffs filed matters after the First MDL Settlement. In January 2021, EID and Chemours entered into settlement agreements with counsel representing these plaintiffs, providing for a settlement of all but one of the 96 then filed and pending cases, as well as additional pre-suit claims, under which those cases and claims of settling plaintiffs were resolved for approximately $83 (the “Second MDL Settlement”). Chemours contributed approximately $29, and DuPont and Corteva each contributed approximately $27 to the Second MDL Settlement.

The single matter not included in the Second MDL Settlement was a testicular cancer case tried in March 2020 to a verdict of $40 in compensatory and emotional distress damages and $10 in loss of consortium damages. The jury found that EID’s conduct did not warrant punitive damages. In March 2021, the trial court issued post-trial rulings which reduced the consortium damages to $0.25. The Company paid its share from the verdict in this matter in November 2023 after all of EID’s appeals process from United States Court of Appeals to the United States Supreme Court were denied.

In December 2022, the Judicial Panel on Multi-District Litigation ("JPML") declined to close the Ohio MDL. Trial was scheduled to start in September 2024 for two plaintiffs, with a second trial scheduled to start in March 2025 for two plaintiffs. Prior to the start of the first trial in September, EID and Chemours entered into an agreement in principle with counsel representing MDL plaintiffs providing for settlement for all 45 filed and pending cases in the MDL as well as 29 additional pre-suit claims, under which those cases and claims of settling plaintiffs would be resolved and the MDL closed for $58.5, with Chemours contributing $29.25 and DuPont and Corteva contributing together contributing $29.25. The parties finalized and executed the term sheet as of November 13, 2024 on terms consistent with the above-referenced agreement in principle. In December 2024, the plaintiffs filed an unopposed motion to terminate the MDL. In February 2025, the court entered an order granting the motion and suggesting dissolution of the MDL to the JPML and the JPML closed the MDL. In December 2024, the first payment under the term sheet became payable and Chemours paid its share of $14.75. In March 2025, the second and final payment under the term sheet became payable and Chemours paid its share of the final payment of $14.5.

PFAS

EID and Chemours have received governmental and regulatory inquiries and have been named in other litigations, including class actions, brought by individuals, municipalities, businesses, and water districts alleging exposure to and/or contamination from PFAS, including PFOA. Many actions include an allegation of fraudulent transfer in the spin-off that created Chemours. Chemours has declined EID’s requests for indemnity for fraudulent transfer claims.

Chemours has responded to letters and inquiries from governmental law enforcement entities regarding PFAS, including in January 2020, a letter informing it that the U.S. Department of Justice, Consumer Protection Branch, and the United States Attorney’s Office for the Eastern District of Pennsylvania are considering whether to open a criminal investigation under the Federal Food, Drug, and Cosmetic Act and asking that it retain its documents regarding PFAS and food contact applications. In July 2020, Chemours received a grand jury subpoena for documents. The Company is presently unable to predict the duration, scope, or result of any potential governmental, criminal, or civil proceeding that may result, the imposition of fines and penalties, and/or other remedies. The Company is also unable to develop a reasonable estimate of a possible loss or range of losses, if any.

For information regarding the Company’s ongoing litigation and environmental remediation matters at Fayetteville, refer to “Fayetteville Works, Fayetteville, North Carolina” under the “Environmental Overview” within this “Note 16 – Commitments and Contingent Liabilities”.

Aqueous Film Forming Foam Matters

Chemours does not manufacture or sell, and has never, manufactured nor sold aqueous film forming foam (“AFFF”). Numerous defendants, including EID and Chemours, have been named in approximately 6,900 matters, involving AFFF, which is used to extinguish hydrocarbon-based (i.e., Class B) fires and subject to U.S. military specifications. Most matters have been transferred to or filed directly into a multi-district litigation (“AFFF MDL”) in South Carolina federal court or identified by a party for transfer. The matters pending in the AFFF MDL allege damages as a result of contamination, in most cases due to migration from military installations or airports, or personal injury from exposure to AFFF. Plaintiffs seek to recover damages for investigating, monitoring, remediating, treating, and otherwise responding to the contamination. Others have claims for personal injury, property diminution, and punitive damages.

In March 2021, ten water provider cases within the AFFF MDL were approved by the court for purposes of commencing initial discovery (Tier One discovery) and in October 2021, the court approved three of these cases for additional discovery (Tier Two discovery). In September 2022, a water provider action filed by the City of Stuart, Florida was selected for the first bellwether trial. The court encouraged all parties to discuss resolution of the water provider category of cases, and in October 2022 appointed a mediator to facilitate discussions among and between the parties. Chemours, Corteva/EID and DuPont, together, entered into U.S. public water system class action settlement agreement in June 2023, as further discussed below. Prior to the public water system class action suit settlement, in May 2023, the Plaintiffs filed, and the court granted, a motion to sever all claims against Chemours and EID from the first bellwether trial for the water provider cases. There are currently approximately 900 water provider cases in the AFFF MDL, of which approximately 40 such matters that had been filed as of the Settlement Agreement have submitted opt-outs per below discussion.

For non-water provider cases in the AFFF MDL (approximately 6,000), the parties are now proceeding with discovery in certain personal injury cases, with Tier One discovery completed in June 2024. In July 2024, the parties jointly submitted to the Court a list of proposed Group A and Group B plaintiffs for purposes of staggering Tier 2 discovery. Tier 2 discovery for Group A cases was completed in December 2024 and Tier 2 discovery for Group B cases must be completed in September 2025. An initial Tier 2 Group A trial date has been set for October 2025. Also, as of April 2025, the parties are proceeding with product identification discovery on a selection of 12 real property cases, with fact discovery set to be completed in November 2025.

In February 2025, the court issued an order seeking a process for expert reports and Daubert briefing on the general causation on liver and thyroid cancers. The Court plans to hold a “Science Day” in June 2025 to address the claimed association of these diseases with exposure to an AFFF source. Further, the Court has also established a case management process for reviewing and listing diseases claimed to be associated with exposure to an AFFF source as well a protocol for dismissing personal injury claims for unlisted diseases. Plaintiffs asserting these unlisted claims were required to dismiss their unlisted personal injury claims without prejudice by September 10, 2024 or produce medical records and expert reports on general and specific causation for the alleged disease.

There are other AFFF lawsuits pending outside the AFFF MDL that have not been designated by a party for inclusion in the MDL. These matters identifying EID and/or Chemours as a defendant are:

Valero Refining (“Valero”) has five pending state court lawsuits filed commencing in June 2019 regarding its Tennessee, Texas, Oklahoma, California, and Louisiana facilities. These lawsuits allege that several defendants that designed, manufactured, marketed, and/or sold AFFF or PFAS incorporated into AFFF have caused Valero to incur damages and costs including remediation, AFFF disposal, and replacement. Valero also alleges fraudulent transfer.

In New York state court, four individuals filed a lawsuit in September 2019 against numerous defendants including Chemours. The lawsuit alleges personal injury resulting from exposure to AFFF in Long Island drinking water and violation of New York Uniform Fraudulent Conveyance Act. Plaintiffs seek compensatory and punitive damages and medical monitoring.

Since February 2023, two lawsuits have been filed in Illinois state court against numerous defendants, including EID, which also allege personal injury from occupational exposure, including from AFFF-related materials/products, and seeks compensatory damages and punitive damages. Chemours is not a named defendant in either of these lawsuits.

In Ontario, Canada, three lawsuits were filed by two parties in December 2022 against DuPont de Nemours, Inc. and another defendant, seeking contribution and indemnification, interest, and costs in connection with three underlying actions filed by property owners in Canada, and a related third-party action filed by some defendants in one of the matters. The plaintiffs in the underlying actions allege PFAS contamination of their respective properties from the use of firefighting foam. Chemours is not a named defendant in any of these matters but has agreed to defend pursuant to the MOU. These lawsuits against DuPont were noticed for discontinuance by two of the filing parties.

In July 2024, a civil claim was filed in Virginia state court against multiple defendants, including Chemours, alleging that plaintiff was exposed to PFAS substances through products that defendants manufactured, designed, marketed, sold, supplied, or distributed, such as turn out gear and AFFF. Plaintiffs seek both compensatory and punitive damages. Chemours has not yet been served in this matter.

In September 2024, a matter was filed in New Jersey state court against EID, DuPont, Chemours and other defendants alleging personal injury due to exposure to AFFF-related PFAS in drinking water. This matter was transferred to the AFFF MDL.

In British Columbia, Canada, a civil claim was filed in the Supreme Court of British Columbia in December 2023 against multiple defendants, including Chemours, seeking to certify the action as a class proceeding. The complaint identifies the class as individuals with certain diagnosed conditions after using or being exposed to AFFF containing PFAS under certain conditions and seeks compensatory and punitive damages.

Also in the British Columbia court, in June 2024, a civil claim was filed by His Majesty the King in Right of the Province of British Columbia against multiple defendants, including Chemours, seeking to certify the action as a class proceeding. The complaint identifies the class as all provincial and territorial governments that have incurred expenditures relating to alleged PFAS contamination, including from AFFF, of its water resources as well as municipalities, regional districts, and other governance authorities and persons responsible for drinking water systems. The complaint seeks compensatory and punitive damages.

In July 2024, a civil claim was filed in the Superior Court of Quebec, District of Montreal, against multiple defendants, including Chemours, seeking to certify the action as a class proceeding. The complaint identifies the class as all natural and legal persons in Quebec who own, operate, or supply water through a drinking water disbursement system intended for human consumption, and whose water source is located near sites where PFAS and PFAS-containing products, such as AFFF, were allegedly manufactured, used, transported, processed or sold by defendants. The claim seeks compensatory and punitive damages.

In August 2024, a claim was filed in the Manitoba Court of King's Bench (Winnipeg Centre) by the Muskoday First Nation against multiple defendants, including Chemours, seeking to certify the action as a class proceeding. The complaint identifies the class as Indian Bands as defined under Canadian law. Plaintiff alleges that “any water, fish, and game they obtain from the reserve is contaminated with PFAS” by PFAS and PFAS-containing products, such as AFFF, that were allegedly manufactured, used, transported, processed, or sold by defendants near their water sources. The claim seeks compensatory and punitive damages.

In August 2024, a civil claim was filed in the Superior Court of Ontario against multiple defendants, including Chemours, seeking to certify the action as a class proceeding. The complaint identifies the class as all persons in Canada who own property with a well and whose well contains PFAS. Plaintiff alleges that their well as the wells of class members were contaminated by PFAS and PFAS-containing products, such as AFFF, that were allegedly manufactured, used, transported, processed, or sold by defendants near their water sources. The claim seeks compensatory and punitive damages.

In September 2024, a civil claim was filed in the Supreme Court of British Columbia in Canada against multiple defendants, including Chemours, seeking to certify the action as a class proceeding. The complaint identifies the class as all persons in Canada who currently own property with a well, and whose well water contains PFAS. Plaintiff alleges that their well, and the wells of class members, were contaminated by PFAS and PFAS-containing products, such as AFFF, that were allegedly manufactured, used, transported, processed, or sold by defendants near their water sources. The claim seeks compensatory and punitive damages.

United States Public Water System Class Action Suit Settlement and Related Opt-Outs

On June 1, 2023, Chemours, Corteva/EID, and DuPont, together, entered into a binding agreement in principle to comprehensively resolve all drinking water claims related to PFAS of a defined class of U.S. public water systems that serve the vast majority of the United States population arising out of the AFFF MDL, that was finalized by a definitive agreement on June 30, 2023 (the "Settlement Agreement"), subject to approval by the United States District Court for the District of South Carolina (the “Court”). A preliminary approval of the Settlement Agreement by the Court was granted on August 22, 2023.

Under the Settlement Agreement, Chemours, Corteva and DuPont collectively established and contributed a total of $1,185 to a qualified settlement fund (“Water District Settlement Fund”). Contribution rates were consistent with the MOU, with Chemours (together with its subsidiaries) contributing 50%, and DuPont and Corteva collectively (together with their subsidiaries) contributing the remaining 50%. The settlement amounts were funded in full and deposited into the Water District Settlement Fund. On September 6, 2023, Chemours deposited $592 into the Water District Settlement Fund, which was recognized as restricted cash and restricted cash equivalents on its consolidated balance sheet at December 31, 2023. In exchange for the payment to the Water District Settlement Fund, Chemours, Corteva and DuPont (together with their subsidiaries) will receive a release of the claims from the Class (as defined below), upon entry into final judgment by the Court in accordance with the Settlement Agreement. The agreement was entered into solely by way of compromise and settlement and is not in any way an admission of liability or fault by Chemours or the other parties.

The class represented in the Settlement Agreement is composed of all Public Water Systems, as defined in 42 U.S.C. § 300f, with a current detection of PFAS or that are currently required to monitor for PFAS under the Environmental Protection Agency’s Fifth Unregulated Contaminant Monitoring Rule or other applicable federal or state law (the “Class”). The following systems are excluded from the settlement class: water systems owned and operated by a State or the United States government; small systems that have not detected the presence of PFAS and are not currently required to monitor for it under federal or state requirements; and water systems in the lower Cape Fear River Basin of North Carolina (which are included only if they so request). PFAS, as defined in the Settlement Agreement, includes PFOA and HFPO Dimer Acid among a broad range of fluorinated organic substances. While it is reasonably possible that the excluded systems or claims could result in additional future lawsuits, claims, assessments or proceedings, it is not possible to predict the outcome of any such matters, and as such, the Company is unable to develop an estimate of a possible loss or range of losses, if any, at this time.

The Settlement Agreement does not resolve claims of Public Water Systems that are not included in the settlement as described above, or of Public Water Systems that requested exclusion from the Class (“opt out”) pursuant to the process established by the Court. It also does not resolve potential future claims of Public Water Systems that have not detected and do not detect any PFAS contamination, but where such contamination first occurs in the future. The Settlement Agreement also does not resolve certain claims not related to drinking water, such as certain specified separate alleged claims relating to stormwater or wastewater treatment, or other alleged types of claims such as for personal injury or for natural resource damages claimed by state attorneys general, that remain outstanding in the AFFF MDL or other courts. Matters related to claims from other public water systems, state natural resources damages and other PFAS matters are further described below.

As part of the preliminary approval of the Settlement Agreement in August 2023, notice of the Settlement Agreement has been provided to class members and such members had until November 11, 2023 to object to the settlement or December 4, 2023 to submit a request for exclusion, indicating they wish to opt-out of the settlement class. A Final Fairness Hearing on the Settlement Agreement occurred on December 14, 2023.

On January 3, 2024, the Court-appointed Notice Administrator for the settlement submitted a declaration regarding objections to the settlement and opt-outs, and on February 6, 2024, it submitted an updated report to the Court regarding its further review of the submitted opt-outs. The Notice Administrator identified that, based on his then February 2024 review as done in accordance with the Court's guidance, opt-outs had been received from approximately 1,000 of the 14,167 listed potential Class members. In addition to those opt-outs, the Notice Administrator stated that he also received requests for exclusion from approximately 300 additional entities that were not on the list of Class members. The Court issued an order providing that the deadline for entities to withdraw a previously submitted opt-out was March 1, 2024, which was subsequently extended to March 15, 2024 by the Court. The Notice Administrator’s determinations are not dispositive of the validity of opt-outs, which may be subject to judicial review and the Notice Administrator also continues to review the opt-outs for whether they were proper or duplicative.

Chemours, Corteva and DuPont deny the allegations in the underlying litigation and reserve all legal and factual defenses against such claims if they were litigated to conclusion. On February 8, 2024, the Court issued an opinion and order granting the plaintiffs’ motion for final approval of the settlement, and on February 26, 2024, the Court entered a final order and judgment. On March 11, 2024, one public water system filed a notice of appeal from the district court’s judgment, and such appeal was dismissed in April 2024. No additional appeals were filed during the appeal period, and accordingly the court's approval is a final judgment in accordance with the Settlement Agreement. The Settling Defendants confirmed to the escrow agent in May 2024 that the Effective Date has occurred under the Settlement Agreement and Chemours no longer maintains its reversionary interest to the underlying restricted funds within the Water District Settlement Fund.

With respect to the submitted opt-outs, for those entities that have filed claims and/or lawsuit against numerous defendants, including Chemours, EID, Corteva, DuPont, either prior or subsequent to the Settlement Agreement, approximately 40 of such opt-out entities are in the U.S. District Court of South Carolina Multi-district litigation and approximately 90 of such opt-out entities are named plaintiffs in other various federal, state or local courts (see Other Public Water System Matters below). The Company’s assessment of its potential liability with respect to the opt-outs considers numerous factors, many of which are not yet determinable. Many of these lawsuits and claims involve highly complex issues related to causation, scientific evidence and alleged actual damages and other substantial uncertainties.

Other than a single opt-out matter, for which the Company is engaged in discussions with the opt-out entity and maintains an immaterial accrual, the Company has not accrued for any potential losses with respect to the opt-out population as of March 31, 2025 and December 31, 2024, as such losses are not probable or estimable. Additional future lawsuits, claims, assessments or proceedings, including for those identified in the Other Public Water Systems Matters below, could be brought or maintained either by entities that submitted opt-outs, or by entities asserting claims that are expressly excluded from the releases in the Settlement Agreement. However, it is not possible to predict the outcome of any such matter due to various reasons including, among others, legal and factual defenses against such claims including factors noted above, timing when such claims could be resolved in court, and the number of defendants in any of those claims. While management believes that it is reasonably possible that the Company could incur losses related to the matters, which could be material to the results of operations, financial position, or cash flows, the Company is unable to develop a reasonable estimate of a possible loss or range of losses, if any, at this time.

Other Public Water System Matters

In addition to the matters described in the AFFF MDL, as well as the matters described in "Litigation and Other matters related to Fayetteville” within this “Note 16 – Commitments and Contingent Liabilities”, other public water systems have filed lawsuits against Chemours, Corteva/EID, and DuPont including the following:

In New York federal court, 23 Long Island water suppliers that have filed lawsuits since August 2019 against several defendants including EID and Chemours alleging PFAS, PFOA, and perfluorooctanesulfonic acid (“PFOS”) contamination through releases from industrial and manufacturing facilities and business locations where PFAS-contaminated water was used for irrigation and sites where consumer products were disposed. Claims vary between matters but include claims of personal injury alleging various disease conditions, product liability, negligence, nuisance, trespass and fraudulent transfer. All matters are seeking compensatory and punitive damages and, in certain cases, medical monitoring, declaratory and/or injunctive relief. In January 2022, Chemours filed a third-party claim for indemnity in connection with one of the Long Island water supplier matters. One of the water suppliers filed to opt out of the Public Water System Class Action Settlement.

In New York and New Jersey federal courts, lawsuits were filed by Suez Water in December 2020 against several defendants, including EID and Chemours, alleging damages from PFAS releases into the environment, including PFOA and PFOS, that impacted water sources that the utilities use to provide water, as well as products liability, negligence, nuisance, and trespass. Defendants filed motions to dismiss the complaints in both matters. The motion was denied in the Suez Water New Jersey lawsuit in October 2021. In January 2022, the court granted defendants’ motion to dismiss in the Suez New York lawsuit without prejudice and the plaintiff filed a second amended complaint in February 2022. Following the filing of the second amended complaint in the Suez New York lawsuit, the defendants filed a motion to dismiss. In March 2023, the court granted in part defendants’ motion to dismiss the second amended complaint, dismissing all claims against Chemours with prejudice, and finding a claim for design defect could be maintained against EID. Suez filed to opt out these matters from the Public Water System Class Action Settlement. In March 2024, the stays in these matters were lifted and discovery is proceeding.

In Georgia and Alabama courts, lawsuits were filed beginning in 2017 against numerous carpet manufacturers, certain municipal defendants, and suppliers and former suppliers, including EID and Chemours. The lawsuits include a matter filed by the Water Works and Sewer Board of the Town of Centre, Alabama alleging negligence, nuisance, and trespass in the release of PFAS, including PFOA, into a river leading to the town’s water source. The Town of Centre filed to opt out of the Public Water System Class Action Settlement, and this matter was expected to proceed to trial in March 2025, but was delayed and is pending a new trial date, which is currently not expected to be before November 2025.

Also, in Alabama, a purported class action was filed in July 2022 in Alabama federal court by the Utilities Board of Tuskegee on behalf of certain drinking water utilities against 3M, EID, Corteva and the Company alleging contamination of drinking water. The complaints allege negligence, public nuisance, private nuisance and trespass. The plaintiffs seek injunctive relief as well as compensatory and punitive damages. In April 2023, Shelby County, Alabama and Talladega County, Alabama, filed suit in Alabama state court against numerous carpet manufacturers located near Dalton Georgia, suppliers, EID, Chemours, and other defendants to be named later. The complaint alleges negligence, nuisance and trespass in the release by the carpet mills of PFAS compounds, including PFOA, into the water sources used by the Counties to provide drinking water. The Counties seek compensatory and punitive damages as well as injunctive relief to remove PFAS from the water supply and prevent alleged ongoing contamination. In May 2023, the matter was removed to federal court and later remanded to state court. In August 2023, the Water Works and Sewer Board of the City of Gadsden, Alabama also filed suit in Alabama state court against the Company, DuPont, Corteva and other suppliers to carpet mills in Dalton Georgia, as well as against various landfill and waste companies. The complaint alleges negligence, nuisance, and trespass in the release of PFAS compounds, including PFOA, reaching the town’s water source. Gadsden seeks compensatory damages as well as expenses, potential lost profits, punitive damages and injunctive release. These matters were stayed in September 2023 pending final approval of the Public Water System Class Action Settlement. Shelby County, Talladega County, City of Gadsden and the Utilities Board of Tuskegee as well as other water utilities that may be within the class, filed to opt out of the Public Water System Class Action Settlement and the matters are now proceeding. In January 2025, 3M removed each of the Shelby and Talladega Counties matters to federal court and also sought transfer to the AFFF MDL. Plaintiffs’ filed a motion to remand, which is pending, as is the decision on transfer of the matter to the AFFF MDL. In November 2024, the Court dismissed the Utilities Board of Tuskegee matter without prejudice. Also in November 2024, the Alabama Supreme Court accepted Defendants’ mandamus petition seeking a writ to dismiss the Gadsden case on the grounds that all injuries have been redressed and that the claims are time barred. In March 2025, the Alabama Supreme Court granted the mandamus and directed the case against DuPont and the other supplier defendants to be dismissed on failure to timely file within the statute of limitations.

In March 2024, the Municipal Utilities Board of the City of Albertville, Alabama filed suit in Alabama state court against certain defendants, including Chemours and EID. The complaint alleges negligence, nuisance, trespass and seeks compensatory damages, real property damages, as well as past and future expenses, potential lost profits, and punitive damages. The plaintiffs also seek injunctive relief. Albertville filed to opt out of the Public Water System Class Action Settlement.

In April 2024, the Board of Water and Sewer Commissioners of the City of Mobile, Alabama filed suit in Alabama state court against certain defendants, including Chemours, DuPont and Corteva. The complaint alleges negligence, nuisance, trespass and wantonness through disposal of construction materials made with PFAS allegedly supplied by defendants, to the local landfill, which allegedly resulted in the release of PFAS compounds reaching the town’s water source. Mobile seeks compensatory damages as well as expenses, potential lost profits, punitive damages, and attorneys’ fees. Mobile also seeks an injunction requiring defendants to remove PFAS from the water supply. Mobile filed to opt out of the Public Water Class Action Settlement. In October 2024, the Court dismissed Plaintiff’s complaint in its entirety for failure to state a claim as well as lack of standing.

In Georgia, a lawsuit was filed by the City of Rome against numerous carpet manufacturers, certain municipal defendants, and suppliers and former suppliers, including EID and Chemours, alleging negligence, nuisance, and trespass in the release of PFAS, including PFOA, into a river leading to the town’s water source. In June 2023, Chemours, DuPont and Corteva entered into a confidential settlement with the City of Rome and its claims against these parties related to this matter have been released and the matter dismissed.

In Georgia, a putative class action was filed in 2019 on behalf of customers of the Rome, Georgia water division and the Floyd County, Georgia water department against the City of Dalton, Georgia, numerous carpet manufacturers located in Dalton, Georgia, Chemours and EID, alleging negligence, nuisance and other claims related to the release of perfluorinated compounds, including PFOA, into a river leading to their water sources (“Rome ratepayer matter”). In November 2022, EID and Chemours were added as defendants in a purported class action filed on behalf of residents of Summerville, Georgia and Chattooga County, Georgia in Federal Court (“Summerville ratepayer matter”). Plaintiffs seek various statutory violations as well as negligence and nuisance and seek remedies, injunctive relief, personal injury and property damages, as well as punitive damages. These matters are pending in court. Floyd County, City of Rome and Summerville filed to opt out of the Public Water System Class Action Settlement. In December 2024, the court in the Rome ratepayer matter ruled that the putative class did not have standing to seek injunctive relief and granted summary judgment for Defendants on that count. The court has stayed rulings on the pending motions in this matter to allow the parties to mediate the remaining claims for alleged damages related to rate increases during the first half of 2025.

Additionally in Georgia state court, in January 2024, certain landowners of property in Gordon County, Georgia, filed suit against the City of Calhoun, numerous carpet manufacturers operating in Calhoun, and carpet mill suppliers, including 3M, EID and Chemours. The complaint alleges that the carpet manufacturers sent PFAS containing wastewater to the Calhoun Water Pollution Control Plant for many years. It further alleges Calhoun spread the treated sludge containing PFAS from the Calhoun Water Pollution Control Plant on plaintiffs' land until 2023. Plaintiffs allege negligence and nuisance, and seek compensatory damages, including diminution of property value, and punitive damages, as well as an injunctive order to remediate the property. Calhoun filed to opt out of the Public Water System Class Action Settlement. In May 2024, a separate lawsuit was filed in Georgia state court on behalf of multiple plaintiffs located in Calhoun, Georgia, alleging that defendants, including Chemours and EID, manufacture chemicals used in carpet manufacturing processes which have been discharged in wastewater to the Calhoun Water Pollution Control Plant. Plaintiffs allege and seek damages for PFAS contamination of their properties due to sewage sludge dumped in close proximity to their properties by Defendant City of Calhoun. The lawsuit alleges negligence, failure to warn, nuisance, wanton conduct and punitive damages, public nuisance, abatement of public nuisance, and trespass. The Defendant City of Calhoun filed cross claims against numerous carpet manufacturers, and carpet mill suppliers, including EID and Chemours in both of these actions. The cross claims allege that the carpet manufacturers and suppliers knew PFAS containing wastewater sent to the Calhoun Water Pollution Control Plant and would not be removed by Calhoun’s treatment systems. The City of Calhoun alleges negligence, nuisance, and statutory violations. Calhoun seek compensatory and punitive damages as well as injunctive relief ordering abatement, remediation, and attorneys’ fees. Chemours and EID moved to dismiss the plaintiff's claims as well as the City of Calhoun's cross claims in the actions. In October 2024, the Court denied the motions to dismiss the plaintiffs’ claims but dismissed the City of Calhoun’s cross claims.

In June 2024, the City of Columbia, South Carolina (“City of Columbia”) filed suit in South Carolina state court against multiple defendants, including Chemours, EID, and DuPont, who are alleged to be responsible for the release of PFAS into the City of Columbia’s water supply as suppliers to the metal finishing, paper finishing, plastics coating, textile, and aerospace industries. The complaint alleges that a variety of industrial operations have discharged PFAS into the Broad River and the Saluda River, which are the source of the City of Columbia’s drinking water, and that PFAS have been detected at high levels in these rivers and in Lake Murray (a Saluda River impoundment). The City of Columbia seeks compensatory and punitive damages. In January 2025, the Joint Municipal Water and Sewer Commission (“Joint Municipal”), Saluda County Water and Sewer Authority (“Saluda County”), and the Town of Lexington, South Carolina (“Lexington”), all of which also rely upon Lake Murray as a source of drinking water, also filed suit in South Carolina state court against multiple defendants, including Chemours, EID, and DuPont, regarding alleged discharges and seeking compensatory and punitive damages. The City of Columbia, Joint Municipal, Saluda County and Lexington each filed to opt out of the Public Water Class Action Settlement.

In July 2024, the Town of Lyerly, Georgia (“Lyerly”) filed suit in Georgia state court against multiple defendants, who are alleged to be responsible for the release of PFAS to the water supply from carpet mill operations or as suppliers to those carpet mills. The complaint alleges negligence, nuisance, trespass and regulatory violations. Lyerly seeks compensatory damages for past and future expenses as well punitive damages and attorneys’ fees. Lyerly has filed to opt out of the Public Water System Class Action Settlement.

In July 2024, the Town of Pine Hill, Alabama (“Pine Hill”) filed suit in Alabama state court against multiple defendants, including, the Company, DuPont, and Corteva, who are alleged to be responsible for the release of PFAS to the water supply through paper mill operations or as suppliers to paper mills. The complaint alleges negligence, nuisance, trespass, wantonness and punitive damages. Pine Hill seeks injunctive relief, compensatory damages for property damages, potential lost profits and past and future expense as well punitive damages and attorneys’ fees. The Town of Pine Hill has filed to opt out of the Public Water System Class Action Settlement.

In August 2024, the City of Irondale, Alabama (“Irondale”) filed a lawsuit in Alabama state court against multiple defendants, including Chemours. Plaintiff alleges that defendants have manufactured, supplied, and/or sold products containing PFAS that have contaminated plaintiff's water systems. Irondale disclaims any claims or causes of actions relating to AFFF and has opted out of the Public Drinking Water Settlement.

In January 2025, Berkeley County, South Carolina (“Berkeley”) filed suit in South Carolina state court against several defendants, including Chemours. Berkeley alleges that defendants have manufactured, sold, used, and/or caused discharge of PFAS into Lake Moultrie and Lake Marion, which Berkeley uses for its drinking water intake through a water supply contract with South Carolina Public Service Authority. Berkeley disclaims any claims or causes of actions relating to AFFF and has opted out of the Public Drinking Water Settlement. The complaint seeks compensatory and punitive damages.

In January 2025, the Town of Whitmire, South Carolina (“Whitmire”) filed suit in South Carolina state court filed suit in South state court against several defendants, including Chemours. Whitmire alleges that defendants have manufactured, sold, used, and/or caused discharge of PFAS into the Enoree River, which Whitmire uses for its drinking water intake. Whitmire disclaims any claims or causes of actions relating to AFFF and has opted out of the Public Drinking Water Settlement. The complaint seeks damages.

In January 2025, the Town of Cheraw, South Carolina (“Cheraw”) filed suit in South Carolina state court against several defendants, including Chemours. Cheraw alleges that defendants discharged PFAS-containing wastewater and land-applied sludge that have contaminated Cheraw’s drinking water systems. Cheraw disclaims any claims or causes of actions relating to AFFF and has opted out of the Public Drinking Water Settlement. The complaint seeks damages.

In January 2025, the City of Georgetown, South Carolina (“Georgetown”) filed suit in South state court against several defendants, including Chemours. Georgetown alleges that defendants have discharged PFAS that have contaminated Georgetown’s drinking water and cannot be removed by Georgetown’s legacy water treatment technology. Georgetown disclaims any claims or causes of actions relating to AFFF and has opted out of the Public Drinking Water Settlement. The complaint seeks damages.

In January 2025, Georgetown County Water and Sewer District (“GCWSD”) filed suit in South state court against several defendants, including Chemours. GCWSD alleges that defendants have manufactured, sold, used, and/or caused discharge of PFAS into the Waccamaw River, which GCWSD uses for its drinking water intake. GCWSD further alleges that its current legacy water treatment technology is unable to remove PFAS from source water. GCWSD disclaims any claims or causes of actions relating to AFFF and has opted out of the Public Drinking Water Settlement. The complaint seeks damages.

In April 2025, the Water Works Board of the City of Opelika, Alabama (“Opelika”) filed suit in Alabama state court against 3M, the Company, DuPont, Corteva, Chromalloy Gas Turbine, Contitech, Duracell, Freudenberg-Nok, Henkel, Interface, Interfaceflor, JFA LLC, Kimberly-Clark, Kleen-Tex, Milliken, M+A Matting, Mountville Mills, Specialty Fabrics & Converting, Waste Away Group, Waste Management, West Point Foundry And Machine, Westpoint Home, Westrock Packaging Systems, and Fictitious Defendants A-Z, who are alleged to have released PFAS to the water supply, but whose identities are yet unknown. The complaint alleges negligence, nuisance, trespass, and wantonness through defendants’ manufacturing, use and/or landfilling of materials made with PFAS which allegedly resulted in the release of PFAS compounds reaching the town’s water source. Opelika seeks compensatory damages for past and future damages, an injunction to abate and/or remove PFAS from Opelika’s drinking water supply, as well as punitive damages, expenses, and attorneys’ fees. Opelika filed to opt out of the Public Water Class Action Settlement.

State Natural Resource Damages Matters

In addition to the State of New Jersey actions (as detailed below), a majority of the states and certain territories of the U.S., have filed lawsuits or are investigating claims against various defendants, including EID and Chemours, relating to the alleged contamination of state natural resources with PFAS compounds either from AFFF and/or other sources. These lawsuits seek damages including costs to investigate, clean up, restore, treat, monitor, or otherwise respond to contamination of natural resources and some include counts for fraudulent transfer. Chemours, Corteva/EID and DuPont, together under the MOU, are engaged with States and their counsel on certain of these cases. It is reasonably possible that these discussions could result in a loss, which could be material; however, at this time, the Company is unable to predict the duration, scope, or result of such discussions, and because of these uncertainties, the Company is also unable to develop a reasonable estimate of a possible loss or range of losses, if any.

In February 2018, the State of Ohio initiated litigation against EID regarding historical PFOA emissions from the Washington Works site. Chemours is an additional named defendant. Ohio alleges damage to natural resources and fraudulent transfer in the spin-off that created Chemours and seeks damages including remediation and other costs and punitive damages. On November 28, 2023, Chemours, DuPont, Corteva, and EID entered into a settlement agreement with the State of Ohio to settle claims, including environmental releases or sales of products containing PFAS or other known contaminants. Under the agreement, Chemours will pay $55 to the State of Ohio, which shall be used to support environmental restoration. Chemours' contribution is consistent with the 50% contribution rate under the MOU. This amount is included in Accrued Litigation.

On July 13, 2021, Chemours, DuPont, Corteva, and EID entered into a settlement agreement with the State of Delaware to settle such potential claims, including for environmental releases or sales of products containing PFAS or other known contaminants. Under the agreement, in January 2022, the companies paid a total amount of $50 to the State of Delaware, which shall be utilized to fund a Natural Resources and Sustainability Trust (the “Trust”) to be used for environmental restoration and enhancement of resources, sampling and analysis, community environmental justice and equity grants, and other natural resource needs. Chemours contributed $25 to the settlement and the remaining $25 was divided between DuPont and Corteva which shall be treated as Qualified Spend under the MOU. If the companies enter into a proportionally similar agreement to settle or resolve claims of another state for PFAS-related natural resource damages, for an amount greater than $50, the companies may be required to make one or more supplemental payment(s) directly to the Trust, with such payment(s) not to exceed $25 in the aggregate. Following entry of the settlement agreement with the State of Ohio and its payment and pursuant to the terms of the settlement agreement with the State of Delaware, the Companies will make a supplemental payment directly to the Trust in an amount equal to $25 in the aggregate. Chemours’ share of such supplemental payment is approximately $13, which is included in Accrued Litigation.

In December 2024, the State of Texas filed a Deceptive Trade Practices action in federal court against 3M Company, EID, DuPont and Corteva alleging that the companies engaged in deceptive trade practices by failing to disclose certain health risks and environmental harm related to PFAS. The lawsuit alleges that the EID defendants’ corporate restructurings were designed to avoid liability for these actions. The suit seeks injunctive relief and civil penalties. In January 2025, the case was removed to federal court.

Other PFAS Matters

In New York courts, EID has been named in approximately 40 lawsuits beginning in 2017, which are not part of the Leach class, brought by individual plaintiffs alleging negligence and other claims in the release of PFAS, including PFOA, into drinking water against current and former owners and suppliers of a manufacturing facility in Hoosick Falls, New York. Two additional lawsuits have been filed by a business seeking to recover its losses and by nearby property owners and residents in a putative class action. The lawsuit filed by the business was dismissed, but the claims by the individual business owner were allowed to proceed. In September 2022, the Court certified the class action, and EID filed a petition for review of the certification, which was denied in January 2023. Chemours and EID, entered into settlement agreements in principle to resolve all butseven of the pending lawsuits, including the class action suit, during the second quarter of 2023 and were substantially paid in the fourth quarter of 2023. In February 2024, the Company agreed to resolve all of the remaining individual cases and claims, includingsix of theseven pending lawsuits for $0.4. As of September 2024, these settlements have all been paid consistent with prior reserves in the matters. Upon completion and dismissal of the individual matters, the class action is the sole remaining lawsuit pending for these matters. In December 2024, the court scheduled the class action trial for July 2025.

In New Jersey federal court, lawsuits were filed against several defendants including EID and Chemours beginning in November 2019. The lawsuits includeten lawsuits alleging that defendants are responsible for PFAS contamination, including PFOA and PFOS, in groundwater and drinking water.

Duringthe second quarter of 2023, the companies resolved these claims. Eight lawsuits were also filed alleging exposure to PFAS and other chemicals, includingtwo lawsuits by parents on behalf of their adult children claiming pre-natal exposure, resulted in the children’s cognitive delays, neurological, genetic, and autoimmune conditions. Further, eleven additional lawsuits were filed in state court with similar allegations of personal injury, which have been removed to New Jersey federal court (and one of which was transferred to the AFFF MDL). In May 2024, a case alleging wrongful death from exposure to PFAS and other chemicals on behalf of two deceased residents of Salem County, NJ was filed naming Chemours in New Jersey state court. The case has also been removed to federal court. Plaintiffs seek certain damages including punitive damages.

Since January 2025, sixteen lawsuits have been filed in New Jersey, New York, Delaware and Illinois on behalf of multiple plaintiffs alleging, inter alia, personal injury related to exposure to PFAS. The complaints demand compensatory and punitive damages. The cases are in the process of being tagged to the AFFF MDL.

In Ohio federal court, a putative class action ("Hardwick") was filed in October 2018 against several defendants including 3M, EID and Chemours seeking class action status for U.S. residents having a detectable level of PFAS in their blood serum. The complaint seeks declaratory and injunctive relief, including the establishment of a “PFAS Science Panel”. In March 2022, the court granted in part and denied in part the plaintiff’s class certification and certified a class covering anyone subject to Ohio laws having minimal levels of PFOA plus at least one other PFAS in their blood. The court requested further briefing on whether the class should be extended to include other states that recognize the claims for relief filed in the action. The defendants, including EID and Chemours, jointly filed a petition to appeal the class certification decision and in September 2022 the petition was granted. During the fourth quarter of 2023, the Court dismissed the class action against 3M, EID, Chemours and the other defendants. In December, 2023, the plaintiff filed a petition for reconsideration and for rehearing en banc with the 6th Circuit. In January 2024, the 6th Circuit denied the request for rehearing. In March 2024, the case was dismissed. In June 2024, Hardwick refiled a putative national class action in federal court in Ohio against 3M, DuPont, and the Company. The refiled Hardwick suit seeks class status for all those in the United States who have 2 ppb or more of “C8 (PFOA and PFOS combined)” in their blood and who are subject to the laws of a state that recognizes medical monitoring. The complaint alleges negligence, battery and conspiracy and seeks equitable, declaratory, and injunctive relief including medical monitoring overseen by a court-appointed independent science panel. The complaint does not seek monetary damages or personal injury. In October 2024, defendants filed a motion to dismiss the matter.

In Delaware state court, a putative class action was filed in May 2019 against two electroplating companies, 3M and EID, and two other defendants added in an amended complaint, alleging responsibility for PFAS contamination, including PFOA and PFOS, in drinking water and the environment in the nearby community. In November 2023, a motion to amend the complaint was filed seeking to add Chemours as a defendant. The putative class of residents alleges negligence, nuisance, trespass, and other claims and seeks medical monitoring, personal injury and property damages, and punitive damages. The matter has been removed to federal court. In January 2025, the federal magistrate recommended that summary judgment be entered in favor of EID and two other defendants based on lack of any record connecting the PFAS contamination alleged with products sold by these defendants. In March 2025, the court accepted the magistrate’s recommendation and entered summary judgment as to EID and those other two defendants.

In South Carolina, a putative class action was filed in March 2022 in the state court against 3M, EID and the Company alleging PFAS contamination from a former textile plant located in Society Hill, South Carolina which allegedly used PFAS containing textile treatment chemicals supplied by the defendants. The lawsuit alleges negligence, trespass, strict liability and nuisance and seeks monetary damages, including property diminution, and injunctive relief, including water treatment and remediation, as well as punitive damages. The matter has been removed to federal court. In April 2024, EID and Chemours filed a third-party complaint against Huntsman, Ciba Specialty Chemicals, Galey & Lord, Nanotex and John Does alleging indemnification and contribution. In September 2024, Huntsman filed a counterclaim against EID and Chemours alleging indemnification and contribution. In August 2024, a complaint related to the same fabric mill was filed on behalf of an individual in South Carolina state court against 3M, EID, Chemours and other companies alleging personal injuries resulting from exposure to PFAS emissions from the former textile plant. The complaint alleged negligence, strict liability, products liability counts, and fraud and seek compensatory and punitive damages and costs. In August 2024, 3M removed the matter to federal court.

In April 2024, three defendants in a 2022 Massachusetts federal court putative class action alleging PFAS contamination and related in part to the Massachusetts Natural Fertilizer Company Site, The Newark Group, Seaman Paper Company and Otter Farm, Inc., filed cross claims against the Company, DuPont, Corteva, EID and other defendants, including John Doe defendants, for the sole purpose of pleading and protecting any claims for indemnity or contribution they may have against the cross claim defendants, if they are found liable in the underlying putative class action. In October 2024, the Court disallowed the cross claims which ends the matter as to the Company. In December 2024, The Newark Group moved for the court to reconsider its denial of the cross claims against the Company and others and argues that the Court misapplied the law on timeliness and proper joinder. In April 2025, the court denied the motion for reconsideration.

In February 2025, a second putative class action was filed in federal court in Massachusetts, this time against EID, Dupont De Nemours, Corteva, Ball Corporation, Rust-Oleum Corporation, New England Waste Systems d/b/a Casella Organics, Synagro Technologies, New England Fertilizer Company, NEFCO, and the Company. The complaint alleges Defendants are responsible for PFAS contamination from the Massachusetts Natural Fertilizer Company Site. As to the DuPont entities, Corteva and the Company, the complaint alleges medical monitoring, negligence, and breach of warranty for failure to warn and seeks compensatory and punitive damages as well as medical monitoring and other injunctive and declaratory relief.

In June 2024, a lawsuit was filed in Connecticut federal court on behalf of multiple firefighter unions and individual firefighters against multiple defendants, including Chemours, EID, and DuPont De Nemours, seeking to certify the action as a class proceeding. Plaintiffs allege that defendants manufactured, sold, or supplied chemicals containing PFAS which was allegedly found in turnout gear. Plaintiffs allege strict liability, negligence, failure to warn, negligent design and manufacture, medical monitoring, and statutory punitive damages.

In September 2024, a civil claim was filed in the Supreme Court of British Columbia in Canada against multiple defendants, including Chemours, seeking to certify the action as a class proceeding. The complaint identifies the class as all resident persons or entities in Canada who purchased carpeting treated with PFAS-containing products through a retailer or distributor before January 1, 2020 and had it installed in a building still owned by such persons or entities and who have not removed the carpeting. The complaint seeks compensatory and punitive damages.

In September 2023, a civil claim was filed in Virginia state court against multiple defendants, including Chemours, alleging breach of implied warranties, breach of express warranties, negligence, gross negligence, recklessness, and willful and wanton misconduct. Plaintiff alleges that defendants manufactured, designed, marketed, sold, supplied, or distributed PFAS, PFAS containing chemical feedstock, and PFAS-containing turnouts to firefighting training facilities and fire departments nationally, including Virginia where plaintiff’s husband was a firefighter. Plaintiff alleges that repeated and extensive exposure to PFAS resulted in her husband’s brain cancer. The complaint seeks compensatory and punitive damages.

In April 2024, a civil claim was filed in Virginia state court against multiple defendants, including Chemours, alleging breach of implied warranties, breach of express warranties, negligence, gross negligence, recklessness, and willful and wanton misconduct. Plaintiff alleges that Defendants manufactured, designed, marketed, sold, supplied, or distributed PFAS, PFAS containing chemical feedstock, and PFAS-containing turnouts to firefighting training facilities and fire departments nationally, including Virginia. The complaint seeks compensatory and punitive damages. Plaintiffs filed an amended complaint in March 2025, which was served on Chemours and EID in April 2025.

In August 2024, a putative national class action was filed in federal court in Minnesota against 3M, EID and Chemours related to PFAS in carpet. Violations of the federal Racketeer Influenced and Corrupt Organizations Act ("RICO") are alleged as well as violations of over 30 state statutes, including consumer fraud, deceptive trade practices, misrepresentation, and unfair competition laws. The complaint also includes product liability and nuisance claims. EID and Chemours filed a motion to dismiss.

In November 2024, Aladdin Manufacturing Corporation, Mohawk Industries, Inc. and Mohawk Carpet, LLC (hereinafter “Mohawk”), which are carpet manufacturers with operations in Georgia, sued carpet treatment chemical suppliers 3M, EID, Daikin and the Company in Georgia state court alleging fraud, misrepresentation, contractual and common law indemnity, negligence, nuisance, punitive damages and other claims related to future and past PFAS liabilities and attorney’s fees incurred by Mohawk. Mohawk alleges concealment and misrepresentation by the suppliers related to PFAS and the carpet treatment chemicals supplied. Mohawk further claims that it has been named as a defendant in at least 8 lawsuits brought by water suppliers downstream of its carpet manufacturing operations and has already paid over $100 in settlements of some of those matters. Mohawk seeks a declaratory judgment holding the suppliers responsible for its PFAS liabilities, including damages to Mohawk’s property interests, past, present, and future compensatory damages, including settlements already paid, attorneys’ fees and punitive damages. In January 2025, DuPont and the Company filed a counterclaim against Mohawk asserting contribution, indemnity, frivolous and abusive litigation, declaratory judgment, and punitive damages seeking damages, fees and expenses as well as a declaratory judgment that Plaintiffs must pay for, or reimburse Defendants for, any past or future judgments and settlement costs incurred in past, current, or future litigation arising out of Plaintiffs’ improper wastewater disposal practices.

In December 2024, the City of Dalton, Georgia, acting through its Board of Water, Light and Sinking Fund Commissioners, d/b/a Dalton Utilities (hereinafter “Dalton”) sued 3M, EID, Daikin, INV Performance Surfaces, Aladdin Manufacturing, Shaw Industries, unnamed DOES and the Company in federal court in Georgia. Dalton has received and treated waste from carpet and flooring manufacturers since the 1970s and alleges that Defendants have caused long-running contamination of Dalton’s wastewater treatment operations through the sale, use and disposal of PFAS. Dalton’s operations include Riverbend Land Application System (“LAS”) where treated wastewater is land-applied, as well as three wastewater treatment plants (collectively, the “POTW”). Dalton alleges that the Defendants sold and used PFAS containing carpet treatment chemicals while knowing the PFAS would not be removed by the POTW. Dalton further alleges that Defendants did not provide disclosures or warnings to Dalton or the public. CERCLA (as defined below) is asserted as the basis for cost recovery and for a declaration of Defendants’ joint and several liability for past and future response costs by the POTW and abatement of PFAS. Dalton also alleges negligence, nuisance, trespass, strict liability and violations of various state statutes and seeks compensatory and punitive damages and attorneys’ fees and costs. In April 2025, Dalton filed an amended complaint.

In December 2024, Murray County, Georgia sued 3M, Daikin, Invista, Shaw, Aladdin, Mohawk, INV Performance Surfaces, EID, Corteva and the Company in Georgia state court alleging PFAS contamination from disposal of carpet manufacturing wastes into its landfills. Murray County asserts Georgia statutory violations as well as common law torts, including negligence and nuisance, and seeks damages arising from PFAS contamination of its property. Murray County also seeks punitive damages, attorneys’ fees and costs.

In January 2025, Catoosa County, Georgia sued 3M, Daikin, Shaw, Aladdin, Mohawk, and EID in Georgia state court alleging PFAS related to carpet manufacturing was manufactured, used, and discharged by Defendants and exists at dangerous levels in its landfill, and in its surface water, leachate, groundwater, and methane gas. Catoosa County asserts Georgia statutory violations as well as common law torts, including negligence and nuisance, and seeks past and future compensatory and statutory damages for remediation, abatement, interference with use and enjoyment of property, and diminished property values. Catoosa County also seeks punitive damages, attorneys’ fees, and costs.

In January 2025, James and Pamela Stephens filed a lawsuit in Georgia state court against the City of Calhoun, 3M, INV Performance Surfaces, Daikin, Arrowstar, Aladdin, Mohawk, Shaw, Milliken, Mannington Mills, Dixie Group, Marquis Industries, EID and the Company. Plaintiffs assert that PFAS containing waste from defendant carpet manufacturers and suppliers was sent to Calhoun’s treatment facility and Calhoun disposed of its post treatment sludge on nearby and adjacent property which resulted in PFAS contamination to their historic home, property, creek and drinking water. Plaintiffs’ assertions include negligence, nuisance, and trespass, and they seek compensatory and punitive damages as well as abatement, removal of PFAS from their property, attorneys’ fees and costs.

In January 2025, Gordon County, Georgia sued 3M, Daikin, Shaw, Aladdin, Mohawk, INV Performance Surfaces, Corteva, EID and the Company in Georgia state court alleging PFAS related to carpet manufacturing was manufactured, used, and discharged by Defendants and exists at dangerous levels in its landfill, and in its storm water runoff, leachate, groundwater, and methane gas. Gordon County asserts Georgia statutory violations as well as common law torts, including negligence and nuisance, and seeks past and future compensatory and statutory damages for remediation, abatement, interference with use and enjoyment of property, and diminished property values. Gordon County also seeks punitive damages, attorneys’ fees, and costs.

In January 2025, 1001 Newark Ave. Associates, LLC filed a lawsuit in New Jersey federal court against General Spray Drying Services, Inc., Fabvan Sales Company (d/b/a Geral Spray Drying), EID, DuPont de Nemours, Corteva, Chemours and other defendants related to alleged contamination at a property in Elizabeth, NJ. The complaint alleges that General Spray’s processing operations resulted in discharges of other defendants’ PFAS and that these compounds have contaminated underlying soil and groundwater. The Complaint is brought under CERCLA and the New Jersey Spill Compensation and Control Act and seeks, inter alia, recovery of costs for the investigation and remediation of PFAS at the property and declaratory judgments relating thereto.

In February 2025, the Mayor and Aldermen of the City of Savannah, Georgia (“Savannah”) filed suit in Georgia state court against multiple defendants, including the Company, DuPont, Corteva, and EID, alleging that all caused or contributed to PFAS in Plaintiffs’ water supply that is used to produce drinking water. The complaint alleges negligence, nuisance, trespass, abatement of nuisance, failure to warn, statutory violations, and punitive damages. Savannah also seeks compensatory damages as well as attorneys’ fees, costs and punitive damages. Savannah also seeks a court order requiring defendants to abate and remove PFAS from the water supply. Savannah opted out of the Public Water System Class Action Settlement. In March 2025, the matter was removed to federal court and sought transfer to the AFFF MDL.

In January 2025, a civil claim was filed in Virginia state court against multiple defendants, including Chemours, by Johnny Oscar Moretz (“Moretz”) alleging breach of implied warranties, breach of express warranties, negligence, gross negligence, recklessness, and willful and wanton misconduct. Chemours and EID have not yet been served in this matter. Moretz alleges that the defendants manufactured, designed, marketed, sold, supplied, or distributed PFAS, PFAS containing chemical feedstock, and PFAS-containing turnouts to firefighting training facilities and fire departments nationally, including Virginia. The complaint seeks compensatory and punitive damages.

In April 2025, a civil claim was filed in Virginia state court against multiple defendants, including Chemours, by multiple plaintiffs alleging breach of implied warranties, breach of express warranties, negligence, gross negligence, recklessness, and willful and wanton misconduct. Plaintiffs allege that Defendants manufactured, designed, marketed, sold, supplied, or distributed PFAS, PFAS containing chemical feedstock, and PFAS-containing turnouts to firefighting training facilities and fire departments nationally, including Virginia. The complaint seeks compensatory and punitive damages.

In April 2025, the City and County of Butte-Silver Bow, Montana filed suit in Montana federal court against multiple defendants, including Chemours, relating to the alleged presence of PFAS in turnout gear. The complaint alleges violations of the federal Racketeer Influenced and Corrupt Organizations Act (RICO) as well as over 80 statutory and common law claims, including consumer fraud, deceptive trade practices, and unfair competition laws. The complaint also includes product liability claims.

In April 2025, Coosa River Basin Initiative, Raymond J. Perkins, Jr., and J. Perkins Farms, LLC filed suit against 3M, EID, Corteva, Dupont De Nemours, Inv Performance Surfaces, Daikin, Shaw, Aladdin, Mohawk, the City of Dalton, and the Company in federal court in Georgia alleging the Defendants caused PFAS contamination of the Dalton Land Application System thereby causing downstream PFAS contamination as well as damage to the plaintiffs property. The plaintiffs assert negligence, nuisance, abatement and punitive damages counts as well as various additional counts against certain other defendants, including federal and state violations. The plaintiffs seek injunctive and declaratory relief as well as any other relief the court deems just, proper and equitable.

In March 2025, a lawsuit was filed against EID, Corteva, DuPont and other defendants in Philadelphia County Court of Common Pleas on behalf of seven former major league baseball players. Plaintiffs allege that their injuries, including brain, testicular or thyroid cancer, were caused by exposure to PFAS via AstroTurf at Veterans Stadium. The lawsuit demands compensatory and punitive damages.

In the Netherlands, Chemours, along with DuPont and Corteva, received a civil summons filed before the Court of Rotterdam by four municipalities (Dordrecht, Papendrecht, Sliedrecht and Molenlanden) seeking liability declarations relating to the Dordrecht site’s operations and emissions. Chemours reviewed the summons and filed a statement of defense during the fourth quarter of 2021, and in September 2022 the court entered an interlocutory judgment denying in part certain aspects of such statement of defense. A hearing on the merits of the municipalities’ claims took place in March 2023. On September 27, 2023, the court entered a second interlocutory judgment, ruling, inter alia, that defendants were liable to the municipalities for (i) PFOA emissions during a certain time period and (ii) removal costs if deposited emissions on the municipalities land infringes their property rights by an objective standard. Any damages will be decided in a separate, subsequent proceeding. Chemours is in discussions with the municipalities to identify actions that may resolve their and other community concerns, including providing technical and financial support for activities. An initial estimate of this liability was included in Accrued Litigation at December 31, 2023 and was reclassified to Accrued Environmental Remediation as of December 31, 2024 based on the remediation plan to be implemented as part of the letter of intent ("LOI") described below.

In June 2024 the Company and the Municipalities signed a LOI that includes the implementation of a specific remediation plan for the restoration of restricted vegetable gardens in certain areas of those municipalities to be funded by Chemours, sampling and developing a program to address the Merwelanden recreational lake, and further settlement discussions, including a fund to cover certain other expenditures aimed at environmental-related activities. The LOI contemplates the possibility of settling the court dispute, although still subject to further discussions which are ongoing with the municipalities and there is no guarantee that these discussions will result in a settlement. Settlement discussions are complex and often involve potential amounts, scope and terms, which can be monetary and non-monetary. The Company does not consider these ongoing settlement discussions, including any amounts with respect to a potential fund that the municipalities put forward as part of such negotiations, to be indicative of the merits or potential outcome of any court proceeding with respect to the underlying claim. As such, as of March 31, 2025, the Company has not accrued for any amounts related to the fund mentioned above. Although the Company believes a loss is probable and could be material, it is not estimable at this time due to various reasons including, among others, that such discussions are in their early stages and have significant issues to be resolved.

Further, in the Netherlands, in September 2023, a Dutch criminal defense lawyer announced a criminal complaint with the support of a few thousand citizens against Chemours and its current and former directors for alleged unlawful emissions of PFOA and GenX in Dordrecht. This claim has been filed with the Office of the Public Prosecutor, which is proceeding with the investigation.

In May 2020, we were notified of an alleged criminal offense related to the Netherlands’ Environmental Management Act and the Working Conditions Decree, regarding the use of PFOA during the pre-spin time period of June 1, 2008 to December 31, 2012. The investigation was initiated in the first quarter of 2016 by a public prosecutor. We believe that we have complied with all relevant laws, and we are in contact with the prosecutor.

In addition to the above matters, the Company may engage in discussions or dispute resolutions with various parties regarding other claims, including third-party indemnity claims, and potential resolutions of such matters. In the three months ended March 31, 2025, the Company recorded an immaterial amount related to one or more of these matters.

New Jersey Department of Environmental Protection Directives and Litigation

In March 2019, NJ DEP issued two Directives and filed four lawsuits against Chemours and other defendants. The Directives are: (i) a state-wide PFAS Directive issued to EID, DowDuPont, DuPont Specialty Products USA (“DuPont SP USA”), Solvay S.A., 3M, and Chemours seeking a meeting to discuss future costs for PFAS-related costs incurred by NJ DEP and establishing a funding source for such costs by the Directive recipients, and information relating to historic and current use of certain PFAS compounds; and, (ii) a Pompton Lakes Natural Resources Damages (“NRD”) Directive to EID and Chemours demanding $0.1 to cover the cost of preparation of a natural resource damage assessment plan and access to related documents.

The lawsuits filed in New Jersey state courts by NJ DEP are: (i) in Salem County, against EID, 3M, and Chemours primarily alleging clean-up and removal costs and damages and natural resource damages under the Spill Act, the Water Pollution Control Act (“WPCA”), the Industrial Site Recovery Act (“ISRA”), and common law regarding past and present operations at Chambers Works, a site assigned to Chemours at Separation;(ii) in Middlesex County, against EID, DuPont SP USA, 3M, and Chemours primarily alleging clean-up and removal costs and damages and natural resource damages under the Spill Act, ISRA, WPCA, and common law regarding past and present operations at Parlin, an EID owned site; (iii) in Gloucester County, against EID and Chemours primarily alleging clean-up and removal costs and damages and natural resource damages under the Spill Act, WPCA, and common law regarding past operations at Repauno, a non-operating remediation site assigned to Chemours at Separation which has been sold; and, (iv) in Passaic County, against EID and Chemours primarily alleging clean-up and removal costs and damages and natural resource damages under the Spill Act, WPCA, and common law regarding past operations at Pompton Lakes, a non-operating remediation site assigned to Chemours at Separation. The alleged pollutants listed in the Salem County and Middlesex County matters above include PFAS. Each lawsuit also alleges fraudulent transfer.

In August 2020, a Second Amended Complaint was filed in each matter, adding fraudulent transfer and other claims against DuPont SP USA, Corteva, and DuPont. For the Salem County matter, NJ DEP added claims relating to failure to comply with state directives, including the state-wide PFAS Directive.

The matters were removed to federal court and consolidated for case management and pretrial purposes. In December 2021, the federal court entered a consolidated order granting, in part, and denying, in part, a motion to dismiss or strike parts of the Second Amended Complaints. In January 2022, NJ DEP filed a motion for a preliminary injunction requiring EID and Chemours to establish a remediation funding source (“RFS”) in the amount of $943 for the Chambers Works site, the majority of which is for non-PFAS remediation items. In March 2023, the four NJDEP lawsuits were referred to mediation by the federal court, with the proceedings in the matters stayed pending the mediation. In April 2024 NJDEP submitted to the court a letter declaring that the parties had reached an impasse in the mediation. A case management schedule was entered by the court in May 2024, with the Chambers Works and Pompton Lakes matter being active and the other two matters being administratively terminated without prejudice. In August 2024, Third Amended Complaints were filed in the Chambers Works and Pompton Lakes Works matters.

Discovery is ongoing in the Chambers Works matter, with trial to begin on May 19, 2025. The court has ordered that the trial will proceed initially through a series of “mini-trials”, per the following: Third Amended Complaint Spill Act (Count 1) (liability) and Brownfield and Contaminated Site Remediation Act (Count 4) against defendants EID and 3M; Spill Act (Count 1)(liability) and Brownfield and Contaminated Site Remediation Act (Count 4) against defendant Chemours; Water Pollution Act (Count 2)(liability) against defendants EID and Chemours; Fraudulent transfer (actual and constructive)(Counts 13-16) against all defendants except 3M); Industrial Site Recovery Act (Count 3)(against all defendants except 3M); the CRACO defense; and the Government contractor defense. Discovery has also been ongoing in the Pompton Lakes matter with future deadlines in such matter to be addressed in a future scheduling order. In the lead up to a trial date, the Company has had discussions with NJDEP regarding these matters, however, these discussions, including any amounts with respect to a potential RFS at a site, may not to be indicative of the merits of the Company’s position or the ultimate outcome of the matter, with respect to the underlying claims.

In June 2024, Carneys Point Township filed a motion to intervene in such matter seeking to bring counterclaims against both the State of New Jersey and defendants, including Chemours, related to natural resource damages, remediation funding sources, ISRA penalties, off-site remediation and lost property taxes. In November 2024, Carneys Point Township’s motion to intervene was denied and it is proceeding separately in its 2016 state court matter.

On February 28, 2025, NJDEP sent to Chemours a letter indicating that the agency had placed the Chambers Works facility under discretionary direct oversight status, applicable to both Chemours and EID. The letter included requirements similar to those at issue in the ongoing litigation, including establishing a remediation funding source and paying all NJDEP oversight costs. Defendants raised this matter with the Court and sought withdrawal of the February 2025 letter by NJDEP. While NJDEP recognized that the letter’s requirements are currently stayed, it has not withdrawn the letter. Chemours and EID have appealed the February 2025 letter in the New Jersey Superior Court.

EID requested that Chemours defend and indemnify it in these matters. Chemours has accepted the indemnity and defense of EID while reserving rights and declining EID’s demand as to matters involving other EID entities, as well as ISRA and fraudulent transfer, subject to the terms of the MOU.

PFOA and PFAS Summary

With the exception of the individual matters specifically noted otherwise above, management believes that it is reasonably possible that the Company could incur losses related to PFOA and/or PFAS matters in excess of amounts accrued, but any such losses, which could be material to results of operations, financial position, or cash flows are not estimable at this time due to various reasons, including, among others, that some matters are in their early stages and that there are significant factual issues to be resolved.

U.S. Smelter and Lead Refinery, Inc.

There are five lawsuits currently pending in Indiana federal court, including a putative class action, by area residents concerning the U.S. Smelter and Lead Refinery multi-party Superfund site in East Chicago, Indiana. Several of the lawsuits allege that Chemours is now responsible for EID environmental liabilities. The lawsuits include allegations for personal injury damages, property diminution, and other damages. At Separation, EID assigned Chemours its former plant site, which is located south of the residential portion of the Superfund area, and its responsibility for the environmental remediation at the Superfund site. Management believes a loss, which could be material, is reasonably possible, but not estimable at this time due to various reasons including, among others, that such matters are in their early stages and have significant factual issues to be resolved.

Securities Related Litigation and Requests for Information Arising From Audit Committee Internal Review, and Related Indemnification Agreements

The Audit Committee, with the assistance of independent counsel, conducted an internal review in the first quarter of 2024 arising from a report made to the Chemours Ethics Hotline, and its findings include that the Company’s then CEO, CFO and Controller violated the Chemours Code of Ethics for those positions. Chemours is cooperating with requests for information from the SEC and the United States Attorney’s Office for the Southern District of New York concerning the results of the Audit Committee Internal Review and the Company’s SEC filings and in June 2024 received a subpoena from the SEC. In March 2024, two putative class actions were filed in Delaware federal court against the Company and former officers of the Company alleging violations of Sections 10(b) and 20(a) of the Securities Exchange Act of 1934 and SEC Rule 10b-5. The complaints allege claims on behalf of proposed classes of purchasers of Chemours stock beginning February 10, 2023 and ending February 28, 2024 and seek compensatory damages and fees. In September 2024, an Amended Complaint was filed, and the Company and former officers filed a motion to dismiss the Amended Complaint in October 2024. In April 2024, June 2024, July 2024, August 2024 and October 2024, the Company received seven stockholder demands for inspection of books and records under Section 220 of the General Corporation Law of the State of Delaware and the common law (“Section 220 Demand”), including in its purpose the investigation of possible wrongdoing, mismanagement or breach of fiduciary duties by the Board of Directors and/or senior management in connection with the compensation of executive officers and oversight over the Company’s accounting practices. In April 2025, two stockholder derivative actions were filed in Delaware state court against the Company, former officers of the Company, and past and current members of the Board. The complaints allege, inter alia, claims of breach of fiduciary duty and unjust enrichment. In addition, the Company is aware of additional efforts by private law firms to solicit clients in regard to potential securities class action or derivative litigation. Management believes that it is not possible at this time to reasonably assess the outcome of these matters or to estimate the loss or range of loss, if any, as the matters are in their early stages with significant issues to be resolved, including, for certain matters, whether a claim will be made.

The Company has indemnification and expense advancement obligations pursuant to its bylaws and indemnification agreements with respect to certain current and former members of senior management and the Company’s directors. In connection with the Audit Committee Internal Review, and above litigation matters, the Company has received requests from former members of senior management under such indemnification agreements and its bylaws to provide advances of funds for legal fees and other expenses and expects additional requests in connection with the investigation and any future related litigation. The Company incurred $1 of costs for these indemnification agreement requests during the three months ended March 31, 2024. These costs have been recorded within Selling, general, and administrative expense. The Company has not recorded any material liabilities for these matters as of March 31, 2025 as it cannot estimate the ultimate outcome at this time.

Environmental Overview

Chemours, due to the terms of the Separation-related agreements with EID, is subject to contingencies pursuant to environmental laws and regulations that in the future may require further action to correct the effects on the environment of prior disposal practices or releases of chemical substances, which are attributable to EID’s activities before it spun-off Chemours. Much of this liability results from the Comprehensive Environmental Response Compensation and Liability Act (“CERCLA”, often referred to as “Superfund”), the Resource Conservation and Recovery Act, and similar federal, state, local, and foreign laws. These laws may require Chemours to undertake certain investigative, remediation, and restoration activities at sites where ownership was transferred to Chemours under the Separation-related agreements or at sites where EID-generated waste was disposed before the 2015 separation. The accrual also includes estimated costs related to a number of sites identified for which it is probable that environmental remediation will be required, but which are not currently the subject of enforcement activities.

Chemours accrues for remediation activities when it is probable that a liability has been incurred and a reasonable estimate of the liability can be made. Where the available information is sufficient to estimate the amount of liability, that estimate has been used. Where the available information is only sufficient to establish a range of probable liability, and no point within the range is more likely than any other, the lower end of the range has been used. Estimated liabilities are determined based on existing remediation laws and technologies and the Company’s planned remedial responses, which are derived from environmental studies, sampling, testing, and analyses. Inherent uncertainties exist in such evaluations, primarily due to unknown environmental conditions, changing governmental regulations regarding liability, and emerging remediation technologies. The Company, from time to time, may engage third parties to assist in obtaining and/or evaluating relevant data and assumptions when estimating its remediation liabilities. These liabilities are adjusted periodically as remediation efforts progress and as additional technological, regulatory, and legal information becomes available. Environmental liabilities and expenditures include claims for matters that are liabilities of EID and its subsidiaries, which Chemours may be required to indemnify pursuant to the Separation-related agreements. These accrued liabilities are undiscounted and do not include claims against third parties. Costs related to environmental remediation are charged to expense in the period that the associated liability is accrued.

The following table sets forth the Company’s environmental remediation liabilities at March 31, 2025 and December 31, 2024 for the six sites that are deemed the most significant during the periods presented, together with the aggregate liabilities for all other sites.

March 31, 2025December 31, 2024
Chambers Works, Deepwater, New Jersey$30$31
Dordrecht Works, Netherlands3028
Fayetteville Works, Fayetteville, North Carolina (1)344351
Pompton Lakes, New Jersey4141
Washington Works, West Virginia2425
All other sites9895
Total environmental remediation$567$571

(1)

For more information on this matter refer to “Fayetteville Works, Fayetteville, North Carolina” within this “Note 16 – Commitments and Contingent Liabilities”.

The following table sets forth the current and long-term components of the Company’s environmental remediation liabilities at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Current environmental remediation$100$115
Long-term environmental remediation467456
Total environmental remediation$567$571

Typically, the timeframe for a site to go through all phases of remediation (investigation and active clean-up) may take about 15 to 20 years, followed by several years of operation, maintenance, and monitoring (“OM&M”) activities. Remediation activities, including OM&M activities, vary substantially in duration and cost from site to site. These activities, and their associated costs, depend on the mix of unique site characteristics, evolving remediation technologies, and diverse regulatory requirements, as well as the presence or absence of other potentially responsible parties. In addition, for claims that Chemours may be required to indemnify EID pursuant to the Separation-related agreements, Chemours, through EID, has limited available information for certain sites or is in the early stages of discussions with regulators. For these sites in particular, there may be considerable variability between the clean-up activities that are currently being undertaken or planned and the ultimate actions that could be required. Therefore, considerable uncertainty exists with respect to environmental remediation costs and, under adverse changes in circumstances, management currently estimates the potential liabilities may range up to approximately $710 above the amount accrued at March 31, 2025. This estimate is not intended to reflect an assessment of Chemours’ maximum potential liability. As noted above, the estimated liabilities are determined based on existing remediation laws and technologies and the Company’s planned remedial responses, which are derived from environmental studies, sampling, testing, and analyses. Inherent uncertainties exist in such evaluations, primarily due to unknown environmental conditions, changing governmental regulations regarding liability, and emerging remediation technologies. Management will continue to evaluate as new or additional information becomes available in the determination of its environmental remediation liability.

In October 2021, EPA released its PFAS Strategic Roadmap, identifying a comprehensive approach to addressing PFAS. The PFAS Strategic Roadmap sets timelines by which EPA planned to take specific actions through 2024, including establishing a national primary drinking water regulation for PFOA and PFOS and taking Effluent Limitations Guidelines actions to regulate PFAS discharges from industrial categories among other actions. As provided under its roadmap, EPA also released its National PFAS Testing Strategy, under which the agency will identify and select certain PFAS compounds for which it will require manufacturers to conduct testing pursuant to the Toxic Substances Control Act (“TSCA”) section 4. Chemours has received various test orders and has formed consortia to jointly manage compliance with the test order requirements. Chemours expects to receive future test orders, however the timing of the remaining test orders is not determinable at this time. The timing of the draft Effluent Limitations Guidelines for PFAS manufacturers as announced in the PFAS Strategic Roadmap is uncertain. In April 2025, EPA outlined actions that it will be taking to address PFAS across its program offices, including with respect to the implementation of the TSCA testing strategy and developing Effluent Limitations Guidelines ("ELGs").

Also in October 2021, EPA published a final toxicity assessment for GenX compounds that decreased the draft reference dose for GenX compounds based on EPA’s review of new studies and analyses. On March 18, 2022, Chemours filed a petition to EPA requesting to withdraw and correct its toxicity assessment for GenX compounds, which was denied by EPA on June 14, 2022. The next day, on June 15, 2022, EPA released health advisories for four PFAS, including interim updated lifetime drinking water health advisories for PFOA and PFOS, and final health advisories for GenX compounds, including hexafluoropropylene oxide dimer acid (“HFPO Dimer Acid”), and another PFAS compound (PFBS). On July 13, 2022, the Company filed a Petition for Review of the GenX compounds health advisory, and the Third Circuit held argument on the petition in January 2024. In July 2024, the Third Circuit dismissed the Company’s petition for lack of subject matter jurisdiction, finding the health advisory was not a final agency action.

In March 2023, EPA proposed anational primary drinking water regulation ("NPDWR") to establish Maximum Contaminant Levels ("MCLs") for six PFAS, with PFOA and PFOS having MCLs as individual compounds (each proposed as 4 parts per trillion ("ppt")) and four other PFAS compounds, including HFPO Dimer Acid, having a hazard index approach limit on any mixture containing one or more of the compounds. The proposed PFAS NPDWR was subject to public comment until May 30, 2023, and on April 10, 2024 EPA issued its final rule, which included promulgating individual MCLs for PFOA and PFOS at 4ppt and individual MCLs for PFHxS, PFNA and HFPO Dimer Acid at 10ppt. In addition, EPA finalized a hazard index of 1 (unitless) as the MCL for any mixture of PFHxS, PFNA, HFPO Dimer Acid and PFBS. The final rule became effective 60 days from publication in the Federal Register and the compliance date for public water systems in the U.S. to meet the MCLs is five years from the publication date. In June 2024, Chemours, as well as other organizations including the American Water Works Association and the American Chemistry Council, filed petitions for review of the final rule in the U.S. Court of Appeals for the D.C. Circuit. This appeal is now being held in abeyance until May 2025 to allow EPA to review the underlying rule. Also in April 2024, EPA issued a final rule designating PFOA and PFOS as hazardous substances under CERCLA, which has also been challenged in the same appeals court. EPA has moved to hold this appeal also in abeyance to allow review of the underlying rule. Depending on the ultimate outcome of EPA’s actions, our estimated environmental remediation liabilities and accrued litigation could increase to meet any new drinking water standards, which could have a material adverse effect on our results of operations, financial condition, and cash flows.

As further discussed in the Other PFAS Matters section above, the Company and the municipalities of Dordrecht, Papendrecht, Sliedrecht and Molenlanden signed a Letter of Intent ("LOI") that includes the implementation of a specific remediation plan for the restoration of restricted vegetables in certain areas of those municipalities to be funded by Chemours, sampling and developing a program to address the Merwelanden recreational lake, and further settlement discussions. In the fourth quarter of 2024, the Company received comments from the Municipality of Dordrecht and the Province of South Holland on a Plan of Action for Vegetable Gardens ("Plan of Action") in the municipalities and approval for the pilot stage of the plan. The Plan of Action provides for replacement of soil impacted with PFOA above certain levels to remove RIVM documented consumption restriction as well as providing for alternative irrigation water, if necessary, as determined by PFOA levels. Accruals related to the Plan of Action of $25 and $24 are included in the environmental remediation balance as of March 31, 2025 and December 31, 2024, respectively. Further, The Dordrecht Works facility discharges, through outfalls at the site, wastewater and stormwater pursuant to permits issued by the applicable local authorities, including the DCMR Environmental Protection Agency (‘DCMR”). As the regulatory landscape has evolved in the Netherlands over the last years, there is increased focus on PFAS compounds discharged under the site’s permits, including compounds that were previously discharged at undetected levels, and the site has been ordered to meet certain limits for these discharges or be subject to conditional fines. The Company regularly carries out analyses of its wastewater to assess compliance with current emission limits as well as detect other contaminants as analysis methods develop. The Company identified the presence of certain compounds based upon new analysis methods and reported these to DCMR and in December 2023 submitted an application under normal permitting practice for a discharge requirement based on limited information for these compounds. The Company has continued to engage with regulatory authorities on the application, including providing additional data and information in November 2024. In January 2025, the Company submitted a revised permit application.

In December 2024, DCMR indicated an intention to impose a conditional fine of up to €3.7 million for one of the compounds, for which the Company has objected. The Company has responded to this intention, including that such intention is not consistent with normal permitting practice. In February 2025, DCMR responded to the Company indicating it will impose the conditional fine, after a grace period. In March 2025, DCMR adjusted the conditional fine to allow a grace period until July 2025 subject to certain conditions. Objections have been submitted against the adjustment. The Company has taken and continues to take actions to reduce discharges, and areevaluating DCMR's recent response and all available legal actions and recourse available to the Company. The Company has not recorded a liability for this matter at March 31, 2025 as the conditional fine is not effective at this time and will only be imposed after the grace period, if at that time, the Company fails to comply with the discharge limits for the compound. As of March 31, 2025, the Company does not believe the above matter will have a material impact on the Company's financial position, results of operations or cash flows.

The environmental remediation liabilities and accrued litigation, as applicable, recorded for Fayetteville, Washington Works, Parkersburg, West Virginia, Dordrecht Works, Netherlands and Chambers Works, Deepwater, New Jersey as of March 31, 2025 are based upon the existing Consent Orders, agreements and/or voluntary commitments with EPA, state and other local regulators and depending on the ultimate outcome of EPA’s actions, could require adjustment to meet any new drinking water standards. It is reasonably possible that additional costs could be incurred in connection with EPA’s actions, however, the Company cannot estimate the potential impact or additional cost at this time, due in part to the uncertainties of challenges to them, the, regulatory implementation site by site, where applicable, the current condition and the additional sampling required to determine the level of contamination at the site, possible method(s) of remediation that may be required, and determination of other potential responsible parties. Refer to “Fayetteville Works, Fayetteville, North Carolina” below for further detail on the impact of EPA’s final drinking water health advisory for GenX compounds, including HFPO Dimer Acid.

Chemours incurred environmental remediation expenses of $10 and $13 for thethree months ended March 31, 2025 and 2024, respectively, of which $4 and $7 for the three months ended March 31, 2025 and 2024, respectively, relate to Fayetteville (discussed further below).

Fayetteville has been in operation since the 1970s and is located next to the Cape Fear River southeast of the City of Fayetteville, North Carolina. HFPO Dimer Acid is manufactured at Fayetteville. The Company has operated the site since its Separation from EID in 2015.

While the Company believes that discharges from Fayetteville to the Cape Fear River, on-site surface water, groundwater, and air emissions have not impacted the safety of drinking water in North Carolina, the Company is cooperating with a variety of ongoing inquiries and investigations from federal, state, and local authorities, regulators, and other governmental entities including EPA.

Consent Order with North Carolina Department of Environmental Quality (“NC DEQ”)

In February 2019, the North Carolina Superior Court for Bladen County approved a Consent Order (“CO”) between NC DEQ, Cape Fear River Watch ("CFRW"), and the Company, resolving the State’s and CFRW’s lawsuits and other matters (including Notices of Violation (“NOVs”) issued by the State). Under the terms of the CO, Chemours paid $13 in March 2019 to cover a civil penalty and investigative costs and agreed to certain compliance measures (with stipulated penalties for failures to do so), including the following:

Install a thermal oxidizer (“TO”) to control all PFAS in process streams from certain processes at Fayetteville at an efficiency of 99.99%;

Develop, submit, and implement, subject to approval from NC DEQ and CFRW, a plan for interim actions that are economically and technologically feasible to achieve the maximum PFAS reduction from Fayetteville to the Cape Fear River within atwo-year period;

Develop and implement, subject to approval, a Corrective Action Plan (“CAP”) that complies with North Carolina’s groundwater standards and guidance provided by NC DEQ. At a minimum, the CAP must require Chemours to reduce the total loading of PFAS originating from Fayetteville to surface water by at least 75% from baseline, as defined by the CO; and,

Provide and properly maintain permanent drinking water supplies, including via whole-building filtration units and reverse osmosis (“RO”) units to qualifying surrounding properties with private drinking water wells.

In August 2020, NC DEQ, CFRW, and the Company reached agreement on the terms of an addendum to the CO (the “Addendum”), which includes procedures for implementing specified remedial measures for reducing PFAS loadings from Fayetteville to the Cape Fear River. The Addendum also includes stipulated financial penalties, inclusive of daily and weekly fines for untimeliness in meeting deadlines for construction, installation and other requirements, as well as intermittent performance-based fines for noncompliance in meeting PFAS loading reduction requirements and removal efficiency targets. In October 2020, the Addendum was approved by the North Carolina Superior Court for Bladen County.

The following table sets forth the on-site and off-site components of the Company’s accrued environmental remediation liabilities related to PFAS at Fayetteville at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
On-site remediation$185$188
Off-site groundwater remediation159163
Total Fayetteville environmental remediation$344$351

The following table sets forth the current and long-term components of the Company’s accrued environmental remediation liabilities related to PFAS at Fayetteville at March 31, 2025 and December 31, 2024.

March 31, 2025December 31, 2024
Current environmental remediation$59$68
Long-term environmental remediation285283
Total Fayetteville environmental remediation$344$351

Off-site replacement drinking water supplies

The CO requires the Company to provide permanent replacement drinking water supplies, including via connection to public water supply, whole building filtration units and/or RO units, to qualifying surrounding residents, businesses, schools, and public buildings with private drinking water wells. Qualifying surrounding properties with private drinking water wells that have tested for GenX above the state provisional health goal of 140 ppt, or any applicable health advisory, whichever is lower, may be eligible for public water or a whole building filtration system. NC DEQ provided notice that the June 2022 release of the final health advisory for GenX compounds by EPA constituted an applicable health advisory for determining eligibility for public water or whole house filtration system. Additionally, under the CO, qualifying surrounding properties with private drinking water wells that have tested above 10 ppt for other perfluorinated compounds (“Table 3 Compounds”) are eligible for three under-sink RO units. The Company provides bottled drinking water to a qualifying property when it becomes eligible for a replacement drinking water supply, and continues to provide delivery of bottled drinking water to the qualifying property until the eligible supply is established or installed. Under the terms of the CO, Chemours must make the offer to install a water treatment system to property owners in writing multiple times, and property owners have approximately one year to accept the Company’s offer before it expires. In September 2021, the Company entered into an agreement with Bladen County, North Carolina to fund public water system upgrades and connections associated with providing permanent replacement drinking water supplies under the CO.

Further, in addition to the surrounding counties, in November 2021, NC DEQ sent a notice to Chemours regarding PFAS contamination from the Cape Fear River of groundwater monitoring wells and water supply wells in New Hanover County and potentially three other downstream counties based on new sampling data by NC DEQ and its determination of Chemours’ obligations for such contamination. NC DEQ directed Chemours to submit for its review and approval a comprehensive groundwater contamination assessment in such counties, as well as an updated drinking water program to provide for sampling under the CO in such counties. In 2022, the Company submitted an interim drinking water plan and a separate assessment framework plan, which were subsequently updated and resubmitted, based on comments received from NC DEQ. In 2023, NC DEQ provided additional comments identifying additional actions regarding the groundwater assessment as well as the drinking water program, which the Company responded to.

The Company’s estimated liability for off-site replacement drinking water supplies is based on management’s assessment of the current facts and circumstances for this matter, including comments received from NC DEQ, which are subject to various assumptions that include, but are not limited to, the number of affected surrounding properties, response rates to the Company’s offer, the timing of expiration of offers made to the property owners, the type of water treatment systems selected (i.e., public water, whole building filtration, or RO units), the cost of the selected water treatment systems, and any related OM&M requirements, fines and penalties, and other charges contemplated by the CO. For off-site drinking water supplies, OM&M is accrued for 20 years on an undiscounted basis based on the Company’s current plans under the CO.

At March 31, 2025 and December 31, 2024, the Company had $137 and $141 of accrued liabilities, respectively, for off-site groundwater testing and water treatment system installations at qualifying third-party properties primarily in Bladen and Cumberland counties surrounding Fayetteville, which is expected to be disbursed over approximately 20 years. In addition, as of March 31, 2025 and December 31, 2024, the Company had $22 and 21, respectively, of accrued liabilities for the assessment and for sampling related to potential PFAS contamination of groundwater and supply of alternative drinking water in New Hanover and three other downstream counties. Off-site installation, maintenance, and monitoring cost estimates are based on management’s assessment of the current facts and circumstances for these matters, including comments received from NC DEQ, and could change as actual experience may differ from management's estimates or new information may become available.

The estimated liability was based on certain assumptions, which management believes are reasonable under the circumstances and include, but are not limited to, implementation of the soil and groundwater assessment, the source and cause of PFAS contamination for the four downstream counties, the estimated number of properties at which sampling is conducted and whether such property will qualify for an alternative drinking water supply, other potentially responsible parties and the method of long-term alternative water supply, if any. Further, management’s estimate of the ultimate liability for this matter is dependent upon NC DEQ approval of the proposed plans in response to various NC DEQ letters, obtaining additional information, implementation of EPA’s health advisories, additional feasibility and investigation work that has not yet been scoped or performed, and the estimated additional future cost of OM&M. The ultimate resolution of the matters could have a material adverse effect on the Company’s financial position, results of operations and cash flow.

On-site surface water and groundwater remediation

Abatement and remediation measures already taken by Chemours, including the capture and disposal of its operations process wastewater and other interim actions, have addressed and abated nearly all PFAS discharges from the Company’s continuing operations at Fayetteville. However, the Company continues to have active dialogue with NC DEQ and other stakeholders regarding the potential incremental remedies that are both economically and technologically feasible to achieve the CO and Addendum objectives related to the impact of site surface water and groundwater contamination from historical operations, during and subsequent to the optimization period of the groundwater treatment system and following installation of the barrier wall.

In 2019, the Company completed and submitted its Cape Fear River PFAS Loading Reduction Plan - Supplemental Information Report and its CAP to NC DEQ. The Supplemental Information Report provided information to support the evaluation of potential interim remedial options to reduce PFAS loadings to surface waters. The CAP described potential long-term remediation activities to address PFAS in groundwater and surface waters at the site, in accordance with the requirements of the CO and the North Carolina groundwater standards, and built upon the previous submissions to NC DEQ. The NC DEQ received comments on the CAP during a public comment period, and the Company is awaiting formal response to the CAP from NC DEQ. With respect to the CO, the Addendum was approved by the North Carolina Superior Court for Bladen County in October 2020 and establishes the procedure to implement specified remedial measures for reducing PFAS loadings from Fayetteville to the Cape Fear River, including construction of a barrier wall with a groundwater extraction system, which was completed in June 2023, followed by an engineers certification confirming that the barrier wall was constructed and documented to be in conformance with the approved design.

Based on the CO, the Addendum, the CAP, and management’s plans, which are based on current regulations and technology, the Company has accrued $185 and $188 at March 31, 2025 and December 31, 2024, respectively, related to the estimated cost of on-site remediation, based on the range of potential outcomes on current potential remedial options, and the projected amounts to be paid over a period of approximately 20 years. The final costs of any selected remediation will depend primarily on permit compliance requirements, ongoing dialogue with NC DEQ and other stakeholders regarding the potential incremental remedies that are both economically and technologically feasible to achieve the CO and Addendum objectives, and estimated future cost and time period of OM&M. Further, the final cost of the on-site groundwater treatment system depends on water treatment requirements and estimated treatment reagent and media usage. As such, cost estimates could change as actual experience may differ from management's estimates. Changes in estimates are recorded in results of operations in the period that the events and circumstances giving rise to such changes occur.

The Company’s estimated liability for the remediation activities that are probable and estimable is based on the CO, the Addendum, the CAP, and management’s assessment of the current facts and circumstances, which is subject to various assumptions including the transport pathways (being pathways by which PFAS reaches the Cape Fear River) that will require remedial actions, the types of interim and permanent site surface water and on-site remedies and treatment systems selected and implemented, the estimated cost of such potential remedies and treatment systems, any related OM&M requirements, and other charges contemplated by the CO and the Addendum.

The Company accrued 20 years of OM&M for Fayetteville environmental remediation systems based on the CO and Addendum, which includes estimated higher power consumption, ongoing monitoring, pretreatment, filtering supplies (principally carbon) and regular maintenance of the system over a 20-year period of estimated operation starting in 2023.

It is possible that issues relating to site discharges in various transport pathways, the selection of remediation alternatives to achieve PFAS loading reductions, or the operating effectiveness of the TO could result in further litigation and/or regulatory demands with regards to Fayetteville, including potential permit modifications or penalties under the CO and the Addendum. It is also possible that, as additional data is collected on the transport pathways and dialogue continues with NC DEQ and other stakeholders, the type or extent of remediation actions required to achieve the objectives committed to in the CO may change (increase or decrease) or remediation activities could be delayed. If such issues arise, or if the CO is further amended, an additional loss is reasonably possible, but not estimable at this time.

Litigation and Other matters related to Fayetteville

In February 2019, the Company received an NOV from EPA, alleging certain TSCA violations at Fayetteville. Matters raised in the NOV could have the potential to affect operations at Fayetteville. For this NOV, the Company responded to EPA in March 2019, asserting that the Company has not violated environmental laws. The Company is in discussions with EPA regarding PFAS-related allegations at its sites, including the February 2019 NOV, and as of March 31, 2025, management believes a loss is reasonably possible, but not estimable at this time.

Beginning in 2017, civil actions have been filed against EID and Chemours in North Carolina courts relating to discharges from Fayetteville. These actions include a consolidated action brought by four public water suppliers seeking damages and injunctive relief, a consolidated purported class action seeking medical monitoring, and property damage and/or other monetary and injunctive relief on behalf of the putative classes of property owners and residents in areas near or that draw drinking water from the Cape Fear River, andtwo actions encompassing approximately 2,600 private well owners seeking compensatory and punitive damages. Ruling on the Company’s motions in April 2019, the court dismissed the medical monitoring, injunctive demand, and many other alleged causes of actions in these lawsuits. In October 2023, the court certified the property damages class action. In December 2024, EID and Chemours filed a motion to decertify the class on the grounds, among others, that the class representatives are inadequate and not representative. In March 2023, one of the public water suppliers brought a complaint in Delaware Chancery Court against EID, Chemours, Corteva and DuPont alleging voidable transfer and other claims arising from the Chemours separation and DowDuPont merger and subsequent restructurings, asset transfers and separations; the matter is now stayed.

In addition to natural resource damages matter filed by the State of North Carolina (as discussed within the “PFAS” section of this “Note 16 – Commitments and Contingent Liabilities”), in September 2020, three additional lawsuits were filed in North Carolina state court against Chemours and EID, as well as other defendants. One of the lawsuits is a putative class action on behalf of residents who are served by the Cape Fear Public Water utility, alleges negligence, nuisance, and other claims related to the release of perfluorinated compounds from Fayetteville, and seeks compensatory and punitive damages and medical monitoring. The other two lawsuits were filed on behalf of individuals residing near Fayetteville and allege negligence, nuisance, and other claims related to the release of perfluorinated compounds. The individuals seek compensatory property damages, punitive damages, and, in some cases, medical monitoring. All three lawsuits allege fraudulent transfer against EID and other EID entities, but not against Chemours. In October 2020, the cases were removed to federal court and then thetwo lawsuits filed on behalf of individuals were remanded back to state court.

In March 2022, a lawsuit was filed on behalf of an individual residing near the Fayetteville site against Chemours, EID and other defendants alleging negligence, nuisance and other claims related to the discharges from the Fayetteville site. The individual seeks compensatory property damages, punitive damages and medical monitoring. The lawsuit also alleges fraudulent transfer against EID and other EID entities, but not against Chemours.

Also, in March 2022, Cumberland County, North Carolina filed suit in state court against Chemours, EID and other defendants related to discharges from the Fayetteville site alleging negligence, nuisance, trespass and fraudulent transfer. The lawsuit seeks damages as well as injunctive and equitable relief. In April 2024, the plaintiff filed a voluntary dismissal of the fraudulent transfer counts. In January 2025, the court informed the parties that trial will be scheduled for September 29, 2025.

In December 2022, Aqua North Carolina, Inc. filed suit in North Carolina state court alleging EID, DuPont, DowDuPont, Inc and the Company are responsible for polyfluorinated chemical contamination of the Cape Fear River, groundwater and other water sources used by Aqua North Carolina across the state to serve its water customers. The complaint alleges product liability, negligence, trespass, deceptive trade practices, unjust enrichment and fraudulent transfer. Plaintiff seeks equitable relief as well as compensatory and punitive damages. In February 2023, the matter was removed to federal court. In July 2024, the court dismissed the claims for products liability, deceptive trade practices and public nuisance.

As of March 31, 2025, lawsuits were filed in the Eastern District of North Carolina on behalf of 59 individuals residing near Fayetteville against Chemours, EID, Corteva and DuPont alleging personal injury, property damages and deceptive trade practices related to the discharges from Fayetteville. The individuals seek compensatory damages, equitable relief, attorney fees and punitive damages. In December 2023 and January 2024, amended complaints were filed in each case dropping fraudulent transfer claims. In September 2024, the court dismissed claims for deceptive trade practices, public nuisance, negligence per se and trespass to chattels.

It is possible that additional litigation may be filed against the Company and/or EID concerning the Fayetteville discharges. It is not possible at this point to predict the timing, course, or outcome of all governmental and regulatory inquiries and notices and litigation related to Fayetteville, and it is reasonably possible that these matters could have a material adverse effect on the Company’s financial position, results of operations, and cash flows. In addition, local communities, organizations, and federal and state regulatory agencies have raised questions concerning HFPO Dimer Acid and other perfluorinated and polyfluorinated compounds at certain other manufacturing sites operated by the Company. It is possible that additional developments similar to those described above and centering on Fayetteville could arise in other locations.

Other Environmental and Environmental-Related Matters

On October 31, 2024, the Company received a request from the Dutch ILT agency to amend the Company's F-gas reporting for certain years to reflect hydrofluorocarbons ("HFCs") produced and consumed or destroyed at the Dordrecht Works facility. In November 2024, the Company made minor amendments to its F-gas reporting for the above years and consulted with the Dutch ILT agency and EU Commission to address the Dutch ILT's assertion that certain compounds are subject to the F-gas quota system. In February 2025, the Company received an intention for the ILT to collect a penalty of €1 million based on the consideration that HFC-23 imported or acquired on the market and added to the production process rather than directly sent for destruction is quota consuming. The Company is reviewing the ILT intention andmet with the agency in April 2025 to review the matter and Dordrecht Works’ HFC-23 related operations. While the ultimate outcome of this matter is uncertain at this time, management believes that a loss is probable and has accrued €1 million related to this matter as of March 2025.

In addition, in the ordinary course of business, the Company may make certain commitments, including representations, warranties, and indemnities relating to current and past operations, including environmental remediation and other potential costs related to divested assets and businesses, and issue guarantees of third-party obligations. The Company accrues for these matters when it is probable that a liability has been incurred and the amount of the liability can be reasonably estimated.

In connection with the sale of the Mining Solutions business, the Company provided a limited indemnification with respect to environmental liabilities that may arise from activities prior to the closing date. Such indemnification would not exceed approximately $78 and will expire on December 1, 2026. No liabilities have been recorded at March 31, 2025 and December 31, 2024, respectively, with respect to this indemnification.

In December 2024, the West Virginia Rivers Coalition filed a complaint under the Clean Water Act in West Virginia federal court alleging past and ongoing exceedances of certain effluent discharge limits, including those for PFOA and HFPO Dimer Acid, under the NPDES permit held by the Chemours Washington Works facility. The complaint alleges CWA violations since December 2019 and seeks civil penalties of less than $0.1 per day for each violation, as well as injunctive relief. The complaint lists 199 separate violations, including daily and monthly reporting. In February 2025, the West Virginia Rivers Coalition filed a motion for preliminary injunction, asking the court to impose injunctive relief while the litigation continues. At this early stage of the litigation, management believes that a loss is reasonably possible but not estimable.

Note 17. Stock-based Compensation

The Company’s total stock-based compensation expense amounted to $5 and $1 for thethree months ended March 31, 2025 and 2024, respectively.

Stock Options

On March 3, 2025, Chemours granted approximately 1,954,000 non-qualified stock options to certain of its employees. These awards will vest over athree-year period and expire 10 years from the date of grant. The fair value of the Company’s stock options is based on the Black-Scholes valuation model.

The following table sets forth the assumptions used at the grant date to determine the fair value of the Company’s stock option awards granted during thethree months ended March 31, 2025.

Risk-free interest rate3.98%
Expected term (years)6.00
Volatility56.58%
Dividend yield7.22%
Fair value per stock option$4.17

The Company recorded $2 and $3 in stock-based compensation expense specific to its stock options for thethree months ended March 31, 2025 and 2024, respectively. At March 31, 2025, approximately 5,164,000 stock options remained outstanding.

Restricted Stock Units

During the three months ended March 31, 2025, Chemours granted approximately 684,000 restricted stock units(“RSUs”) to certain management and employees. These awards generally vest over athree-year period and, upon vesting, convertone-for-one to Chemours’ common stock. The fair value of all stock-settled RSUs is based on the market price of the underlying common stock at the grant date.

The Company recorded $3 and $1 in stock-based compensation expense specific to its RSUs for thethree months ended March 31, 2025 and 2024, respectively. At March 31, 2025, approximately 1,599,000 remained non-vested.

Performance Share Units

On March 3, 2025, Chemours granted approximately 224,000 performance share units (“PSUs”) to key senior management employees. Upon vesting, these awards convertone-for-one to Chemours’ common stock if specified performance goals, including certain market-based conditions, are met over the three-year performance period specified in the grant, subject to exceptions through the vesting period ofthree years. Each grantee is granted a target award of PSUs, and may earn between 0% and 200% of the target amount depending on the Company’s performance against stated performance goals.

A portion of the fair value of PSUs was estimated at the grant date based on the probability of satisfying the market-based conditions associated with the PSUs using a Monte Carlo valuation method, which assesses probabilities of various outcomes of market conditions. The other portion of the fair value of the PSUs is based on the fair market value of the Company’s stock at the grant date, regardless of whether the market-based conditions are satisfied.

The Company recorded stock-based compensation expense of less than $1 and a net reversal of stock-based compensation expense of $3 specific to its PSUs for thethree months ended March 31, 2025 and 2024, respectively, based on its assessment of Company performance relative to award-based financial objectives. At March 31, 2025, approximately 298,000 PSUs at 100% of the target amount remained non-vested.

Performance Stock Options

On March 3, 2025, the Company granted approximately 763,000 performance stock options ("PSOs") to certain of its key senior management employees. These awards have a strike price that is 10% above the closing stock value on the grant date and become exercisable when vested and this market condition is satisfied. These awards will vest over athree-year period and expire 10 years from the date of grant. The fair value of the Company's PSOs was estimated using a Monte Carlo valuation method.

The following table sets forth the assumptions used at the grant date to determine the fair value of the Company’s performance stock option awards granted during thethree months ended March 31, 2025.

Risk-free interest rate4.12%
Expected term (years)6.07
Volatility55.32%
Dividend yield7.22%
Fair value per performance stock option (1)$3.90

(1)

Represents the weighted-average fair value at each point of projected exercise under the Monte Carlo valuation method.

The Company recorded less than $1 in stock-based compensation expense specific to its PSOs for both thethree months ended March 31, 2025 and 2024, respectively.

Note 18. Accumulated Other Comprehensive Loss

The following table sets forth the changes and after-tax balances of the Company’s accumulated other comprehensive loss for thethree months ended March 31, 2025 and 2024.

Net Investment HedgeCash Flow HedgeCumulative Translation AdjustmentDefined Benefit PlansTotal
Balance at January 1, 2025$39$4$(354)$(56)$(367)
Other comprehensive (loss) income(23)(6)59(1)29
Balance at March 31, 2025$16$(2)$(295)$(57)$(338)
Balance at January 1, 2024$—$(8)$(174)$(92)$(274)
Other comprehensive income (loss)116(21)4—
Balance at March 31, 2024$11$(2)$(195)$(88)$(274)

Note 19. Financial Instruments

Objectives and Strategies for Holding Financial Instruments

In the ordinary course of business, Chemours enters into contractual arrangements to reduce its exposure to foreign currency risks. The Company has established a financial risk management program, which includes distinct risk management instruments: (i) foreign currency forward contracts, which are used to minimize the volatility in the Company’s earnings related to foreign exchange gains and losses resulting from remeasuring its monetary assets and liabilities that are denominated in non-functional currencies; (ii) foreign currency forward contracts, which are used to mitigate the risks associated with fluctuations in the euro against the U.S. dollar for forecasted U.S. dollar-denominated inventory purchases in certain of the Company’s international subsidiaries that use the euro as their functional currency; (iii) interest rate swaps, which are used to mitigate the volatility in the Company’s cash payments for interest due to fluctuations in variable interest rates, as is applicable to the portion of the Company’s senior secured term loan facility denominated in U.S. dollars; and, (iv) euro-denominated debt and cross-currency swaps, both of which are used to reduce the volatility in stockholders’ equity caused by changes in foreign currency exchange rates of the euro with respect to the U.S. dollar for certain of its international subsidiaries that use the euro as their functional currency. The Company’s financial risk management program reflects varying levels of exposure coverage and time horizons based on an assessment of risk. The program operates within Chemours’ financial risk management policies and guidelines, and the Company does not enter into derivative financial instruments for trading or speculative purposes.

Net Monetary Assets and Liabilities Hedge – Foreign Currency Forward Contracts

At March 31, 2025, the Company had 11 foreign currency forward contracts outstanding with an aggregate gross notional U.S. dollar equivalent of $185, and an average maturity ofone month. At December 31, 2024, the Company had 11 foreign currency forward contracts outstanding with an aggregate gross notional U.S. dollar equivalent of $196, and an average maturity ofone month. Chemours recognized net losses of $2 and $1 for the three months ended March 31, 2025 and 2024, inother income (expense), net.

Cash Flow Hedge – Foreign Currency Forward Contracts

At March 31, 2025, the Company had 185 foreign currency forward contracts outstanding under its cash flow hedge program with an aggregate notional U.S. dollar equivalent of $201, and an average maturity offive months. At December 31, 2024, the Company had 173 foreign currency forward contracts outstanding under its cash flow hedge program with an aggregate notional U.S. dollar equivalent of $178, and an average maturity offour months. Chemours recognized a pre-tax loss of $4 and a pre-tax gain of $4 for thethree months ended March 31, 2025 and 2024, respectively, within accumulated other comprehensive loss. For the three months ended March 31, 2025 and 2024, $2 of gain and less than $1 of loss was reclassified to the cost of goods sold from accumulated other comprehensive loss, respectively.

The Company expects to reclassify approximately $3 of net pre-tax gain, based on current foreign currency exchange rates, from accumulated other comprehensive loss to the cost of goods sold over the next 12 months.

Cash Flow Hedge – Interest Rate Swaps

At March 31, 2025 and December 31, 2024, the Company hadtwo interest rate swaps outstanding under its cash flow program with an aggregate notional U.S. dollar equivalent of $300; each of the interest rate swaps mature on October 31, 2026. Chemours recognized a pre-tax loss of $1 and a pre-tax gain of $4 for the three months ended March 31, 2025 and 2024, respectively, within accumulated other comprehensive loss. For thethree months ended March 31, 2025 and 2024, less than $1 of loss and less than $1 of gain were reclassified to interest expense, net from accumulated other comprehensive loss, respectively.

The Company expects to reclassify approximately $3 of net pre-tax loss from accumulated other comprehensive loss to interest expense, net over the next 12 months, based on the current market rate.

Net Investment Hedge – Foreign Currency Borrowings

The Company recognized a pre-tax loss of $15 and a pre-tax gain of $14 for thethree months ended March 31, 2025 and 2024, respectively, on its net investment hedge within accumulated other comprehensive loss. No amounts were reclassified from accumulated other comprehensive loss for the Company’s net investment hedges during thethree months ended March 31, 2025 and 2024.

Net Investment Hedge – Cross-Currency Swaps

The Company recognized a pre-tax loss of $16 for the three months ended March 31, 2025 on its cross-currency swap within accumulated other comprehensive loss. No amount was reclassified from accumulated other comprehensive loss for the Company's cross-currency swap for the three months ended March 31, 2025.

Fair Value of Derivative Instruments

The following table sets forth the fair value of the Company’s derivative assets and liabilities at March 31, 2025 and December 31, 2024.

Fair Value Using Level 2 Inputs
Balance Sheet LocationMarch 31, 2025December 31, 2024
Asset derivatives:
Foreign currency forward contracts not designated as a hedging instrumentAccounts and notes receivable, net (Note 7)$—$1
Foreign currency forward contractsdesignated as a cash flow hedgeAccounts and notes receivable, net (Note 7)27
Cross-currency swap designated as a net investment hedgeAccounts and notes receivable, net (Note 7)—5
Total asset derivatives$2$13
Liability derivatives:
Foreign currency forward contractsnot designated as a hedging instrumentOther accrued liabilities (Note 13)$—$1
Foreign currency forward contractsdesignated as a cash flow hedgeOther accrued liabilities (Note 13)2—
Interest rate swapsdesignated as a cash flow hedgeOther accrued liabilities (Note 13)33
Cross-currency swap designated as a net investment hedgeOther accrued liabilities (Note 13)11—
Total liability derivatives$16$4

The Company’s foreign currency forward contracts are classified as Level 2 financial instruments within the fair value hierarchy as the valuation inputs are based on quoted prices and market observable data of similar instruments. For derivative assets and liabilities, standard industry models are used to calculate the fair value of the various financial instruments based on significant observable market inputs, such as foreign exchange rates and implied volatilities obtained from various market sources. Market inputs are obtained from well-established and recognized vendors of market data, and are subjected to tolerance and/or quality checks.

Summary of Financial Instruments

The following table sets forth the pre-tax changes in fair value of the Company’s financial instruments for thethree months ended March 31, 2025 and 2024.

Accumulated
Other
Cost ofInterestOtherComprehensive
Three Months Ended March 31,Goods SoldExpense, NetIncome, NetLoss
Foreign currency forward contracts not designated as a hedging instrument$—$—$(2)$—
Foreign currency forward contracts designated as a cash flow hedge2——(4)
Interest rate swaps designated as a cash flow hedge———(1)
Euro-denominated debt designated as a net investment hedge———(15)
Cross-currency swap designated as a net investment hedge———(16)
Foreign currency forward contracts not designated as a hedging instrument$—$—$(1)$—
Foreign currency forward contracts designated as a cash flow hedge———4
Interest rate swaps designated as a cash flow hedge———4
Euro-denominated debt designated as a net investment hedge———14

Note 20. Long-term Employee Benefits

Chemours sponsors defined benefit pension plans for certain of its employees in various jurisdictions outside of the U.S. The Company’s net periodic pension cost is based on estimated values and the use of assumptions about the discount rate, expected return on plan assets, and the rate of future compensation increases received by its employees.

The following table sets forth the Company’s net periodic pension cost and amounts recognized in other comprehensive income (loss) for thethree months ended March 31, 2025 and 2024.

Three Months Ended March 31,
20252024
Service cost$(2)$(2)
Interest cost(3)(4)
Expected return on plan assets66
Amortization of actuarial loss(1)(2)
Settlement gain—1
Total net periodic pension cost$—$(1)
Net gain$—$3
Amortization of actuarial loss12
Recognition of settlement gain—(1)
Effect of foreign exchange rates(2)1
(Cost) benefit recognized in other comprehensive income(1)5
Total changes in plan assets and benefit obligations recognized in other comprehensive income$(1)$4

The Company made cash contributions of $4 to its defined benefit pension plans during each of thethree months ended March 31, 2025 and 2024, respectively. The Company expects to make additional cash contributions of $2 to its defined benefit pension plans during the remainder of 2025.

Note 21. Supplemental Cash Flow Information

The following table provides a reconciliation of cash and cash equivalents, as reported on the Company’s consolidated balance sheets, to cash, cash equivalents, restricted cash and restricted cash equivalents, as reported on the Company’s consolidated statements of cash flows.

March 31, 2025December 31, 2024
Cash and cash equivalents$464$713
Restricted cash and restricted cash equivalents (1)5050
Cash, cash equivalents, restricted cash and restricted cash equivalents$514$763

(1)

At March 31, 2025 and December 31, 2024, the restricted cash and restricted cash equivalent balance includes $50 of cash and cash equivalents deposited in an escrow account as per the terms of the MOU, which is classified as a noncurrent asset. See“Note 16 – Commitments and Contingent Liabilities” for further details.

Note 22. Segment Information

Chemours operates through itsthree principal reportable segments, which were organized based on their similar economic characteristics, the nature of products and production processes, end-use markets, channels of distribution, and regulatory environments: Thermal & Specialized Solutions, Titanium Technologies, and Advanced Performance Materials. Other non-reportable segment includes the Company’s Performance Chemicals and Intermediates business.

The Company's Chief Operating Decision Maker ("CODM"), which is the Company's President and Chief Executive Officer, is regularly provided adjusted earnings before interest, taxes, depreciation, and amortization ("Adjusted EBITDA") which is the primary measure of segment profitability, by segment and on a consolidated basis. The CODM uses Segment Adjusted EBITDA as the primary basis to measure segment performance relative to expectations set during the Company's annual budget process, which is where decisions regarding allocation of the Company's capital expenditures, employees and financial resources predominately occurs. This regular review of segment and consolidated Adjusted EBITDA, which takes place in monthly Business Operating Reviews (BORs), includes budget-to-actual and various period-over-period variances, which allows the CODM to modify resource allocation accordingly. Adjusted EBITDA is defined as income (loss) before income taxes, excluding the following:

interest expense, depreciation, and amortization;

non-operating pension and other post-retirement employee benefit costs, which represents the non-service cost component of net periodic pension costs;

exchange (gains) losses included in other income (expense), net;

restructuring, asset-related, and other charges;

(gains) losses on sales of assets and businesses; and,

other items not considered indicative of the Company’s ongoing operational performance and expected to occur infrequently, including certain litigation related and environmental charges and Qualified Spend reimbursable by DuPont and/or Corteva as part of the Company’s cost-sharing agreement under the terms of the MOU that were previously excluded from Adjusted EBITDA.

The following table sets forth certain summary financial information for the Company’s reportable segments for the periods presented.

Thermal & Specialized SolutionsTitanium TechnologiesAdvanced Performance Materials
Segment information from Interim Consolidated Statements of Operations:
Net sales to external customers (1)$466$597$294
Segment cost of goods sold312544250
Segment selling, general and administrative expense252833
Segment research and development expense7712
Add back: Depreciation and amortization (2)163135
Equity in earnings of affiliates2—6
Other segment items (3)(5)(1)(4)
Segment Adjusted EBITDA$141$50$32
Segment information from Interim Consolidated Balance Sheets:
Total assets$1,646$2,290$1,759
Investments in affiliates75—90
Segment information from Interim Consolidated Statements of Cash Flow:
Purchases of property, plant and equipment333713
Thermal & Specialized SolutionsTitanium TechnologiesAdvanced Performance Materials
Segment information from Interim Consolidated Statements of Operations:
Net sales to external customers (1)$454$591$303
Segment cost of goods sold277514252
Segment selling, general and administrative expense262838
Segment research and development expense8712
Add back: Depreciation and amortization (2)133121
Equity in earnings of affiliates2—10
Other segment items (3)44(18)
Segment Adjusted EBITDA$150$69$30
Segment information from Consolidated Balance Sheets:
Total assets$1,541$2,289$1,748
Investments in affiliates72—81
Segment information from Interim Consolidated Statements of Cash Flow:
Purchases of property, plant and equipment241954

(1)

Segment net sales to external customers are provided by product group in "Note 3 – Net Sales".

(2)

Segment depreciation and amortization expense is included as a component of cost of goods sold; selling, general, and administrative expense; and research and development expense in the amounts regularly provided to the CODM and are therefore added back to arrive at Segment Adjusted EBITDA.

(3)

Other segment items includes segment other (income) expense, net.

The following table sets forth a reconciliation for instances in which the above financial information for the Company's reportable segments does not sum to consolidated amounts.

Segment Total · Other Non-Reportable Segment · Corporate · Total Consolidated
Net sales to external customers$1,357$11$—$1,368
Depreciation and amortization$82$1$5$88
Purchases of property, plant, and equipment$83$1$—$84
Net sales to external customers$1,348$14$—$1,362
Depreciation and amortization$65$1$5$71
Purchases of property, plant, and equipment$97$2$3$102
Total Assets (1)
March 31, 2025$5,695$96$1,603$7,394
December 31, 2024$5,578$97$1,838$7,513

(1)

Corporate assets primarily includes cash and cash equivalents, property, plant and equipment associated with the Chemours Discovery Hub, pension assets and deferred tax assets.

The following table sets forth a reconciliation of Segment Adjusted EBITDA to the Company’s consolidated income before income taxes for thethree months ended March 31, 2025 and 2024.

Three Months Ended March 31,
20252024
Thermal & Specialized Solutions$141$150
Titanium Technologies5069
Advanced Performance Materials3230
Segment Adjusted EBITDA223249
Other non-reportable segment Adjusted EBITDA12
Corporate expenses (1)(57)(55)
Unallocated Items:
Interest expense, net(66)(63)
Depreciation and amortization(88)(71)
Non-operating pension and other post-retirement employee benefit income21
Exchange (losses) gains, net(3)1
Restructuring, asset-related, and other charges (2) (Note 4)(21)(4)
Gain on sales of assets and businesses, net13
Transaction costs (3)(1)(5)
Qualified spend recovery (4)97
Litigation-related charges—5
Income (loss) before income taxes$—$70

(1)

Includes corporate costs and certain legal and environmental expenses, and stock-based compensation expenses excluding unallocated items as listed above.

(2)

Accelerated depreciation charges of $11 incurred as part of the Company's decision to exit its SPS Capstone TM business are included within the "Depreciation and amortization" caption above, and therefore are not included as separate adjustment within this caption.

(3)

For the three months ended March 31, 2025 and 2024, transaction costs includes $1 and $5, respectively, of third-party costs related to the Titanium Technologies Transformation Plan, which were not allocated in the measurement of Titanium Technologies segment profitability used by the CODM.

(4)

Qualified spend recovery represents costs and expenses that were previously excluded from the determination of segment Adjusted EBITDA, reimbursable by DuPont and/or Corteva as part of the Company's cost-sharing agreement under the terms of the MOU. Terms of the MOU are discussed in further detail in "Note 16 – Commitments and Contingent Liabilities".

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.