Skip to main content

OGE ENERGY CORP

For the period ended Dec 31, 2024. Filed Feb 19, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Feb 19, 2025

OGE$50.66+0.0%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Item 2. Properties

OG&E owns and operates an interconnected electric generation, transmission and distribution system, located in Oklahoma and western Arkansas, which included 18 generating stations with an aggregate capability of 6,921 MWs at December 31, 2024. The following table presents information with respect to OG&E's electric generating facilities. Unless otherwise indicated, these electric generating facilities are located in Oklahoma.

Station & Unit · YearInstalled · Unit DesignType · FuelCapability · 2024CapacityFactor (A) · UnitCapability(MW) · StationCapability(MW)
Seminole11971Steam-TurbineGas9.0%500
21973Steam-TurbineGas15.8%513
31975Steam-TurbineGas28.8%5081,521
Muskogee41977Steam-TurbineGas23.0%498
51978Steam-TurbineGas37.7%491
61984Steam-TurbineCoal11.2%5211,510
Sooner11979Steam-TurbineCoal18.8%519
21980Steam-TurbineCoal20.0%5191,038
Horseshoe Lake5A(B)1971Combustion-TurbineGas/Jet Fuel6.0%33
5B(B)1971Combustion-TurbineGas/Jet Fuel3.9%31
81969Steam-TurbineGas14.3%377
92000Combustion-TurbineGas26.8%45
102000Combustion-TurbineGas9.2%46532
Redbud (C)12003Combined CycleGas45.2%156
22003Combined CycleGas41.2%154
32003Combined CycleGas40.6%154
42003Combined CycleGas48.5%155619
Mustang62018Combustion-TurbineGas—57
72018Combustion-TurbineGas0.2%56
82017Combustion-TurbineGas17.3%58
92018Combustion-TurbineGas21.6%57
102018Combustion-TurbineGas30.6%55
112018Combustion-TurbineGas30.7%58
122018Combustion-TurbineGas—57398
McClain (D)12001Combined CycleGas42.9%375375
Frontier11989Combined CycleGas66.4%126126
River Valley11991Steam-TurbineCoal/Gas22.1%161
21991Steam-TurbineCoal/Gas22.6%160321
Total Generating Capability (all stations, excluding renewable)6,440

(A)

2024 Capacity Factor = 2024 Net Actual Generation / (2024 Net Maximum Capacity (Nameplate Rating in MWs) x Period Hours (8,784 Hours)). Capacity Factors are impacted by events that reduce Net Actual Generation such as outages.

(B)

Represents units located at Tinker Air Force Base that are maintained by Horseshoe Lake.

(C)

Represents OG&E's 51 percent ownership interest in the Redbud Plant.

(D)

Represents OG&E's 77 percent ownership interest in the McClain Plant.

In 2024, OG&E retired Unit 7 located at the Horseshoe Lake station.

Renewable · 2024
Station · Year Installed · Location · Number ofUnits · Fuel Capability · Capacity Factor(A) · UnitCapability(MW) · StationCapability(MW)
Crossroads2011Canton, OK98Wind15.9%2.30228
Centennial2007Laverne, OK80Wind16.1%1.50120
OU Spirit2009Woodward, OK44Wind15.3%2.30101
Mustang2015Oklahoma City, OK90Solar21.0%< 0.12
Covington2018Covington, OK4Solar20.2%2.510
Choctaw Nation2020Durant, OK2Solar21.2%2.55
Chickasaw Nation2020Davis, OK2Solar23.9%2.55
Branch2021Branch, AR2Solar22.6%2.55
Durant 22022Durant, OK2Solar24.0%2.55
Total Generating Capability (renewable)481

(A)

2024 Capacity Factor = 2024 Net Actual Generation / (2024 Net Maximum Capacity (Nameplate Rating in MWs) x Period Hours (8,784 Hours)). Capacity Factors are impacted by events that reduce Net Actual Generation such as outages.

The following table presents certain operating data relating to the OG&E's electricity transmission and distribution assets at December 31, 2024.

OklahomaArkansas
Transmission system:
Substations557
Total capacity (million kV-amps)15.32.9
Structure miles - lines5,208347
Distribution system:
Substations35130
Total capacity (million kV-amps)11.01.0
Structure miles - overhead29,7272,810
Miles of underground conduit3,391290
Miles of underground conductors11,863761

During the three years ended December 31, 2024, both Registrants' gross property, plant and equipment (excluding construction work in progress) additions were $2.9 billion, and gross retirements were $521.6 million. These additions were provided by cash generated from operations, short-term borrowings (through a combination of bank borrowings and commercial paper), long-term borrowings and permanent financings. The additions during this three-year period amounted to 17.6 percent of gross property, plant and equipment (excluding construction work in progress) for both Registrants at December 31, 2024.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.