12. Joint Plant Construction Project Ownership

uction Project Ownership - MGE Energy and MGE

MGE has ownership interests in generation projects with other co-owners, some of which are under construction, as shown in the following table. Incurred costs are reflected in "Property, plant, and equipment, net" or "Construction work in progress" on the consolidated balance sheets.

ProjectOwnership InterestSourceShare of GenerationShare of Estimated Costs(a)Costs incurred as of September 30, 2024(a)Estimated Date of Commercial Operation
Paris(b)10%Solar/Battery20 MW/11 MW$61 million(d)$48.6 million2024 Solar2025 Battery
Darien(c)10%Solar/Battery25 MW/7.5 MW$63 million(d)$41.9 million2025 Solar 2026 Battery
Koshkonong(e)10%Solar/Battery30 MW/16.5 MW$104 million(d)$6.6 million2026 Solar2027 Battery
West Riverside3.5%Natural Gas25 MW$25 million$25.2 million(f)

(a)

(b)

Paris Solar-Battery Park is located in the Town of Paris in Kenosha County, Wisconsin.

(c)

Darien Solar Energy Center is located in Walworth and Rock Counties in southern Wisconsin.

(d)

Estimated costs are expected to exceed PSCW previously approved Certificate of Authority (CA) levels. Notifications are provided to the PSCW when costs increase above CA levels. MGE has and will continue to request recovery of the updates in its rate case proceedings.

(e)

Koshkonong Solar Energy Center is located in the Towns of Christiana and Deerfield in Dane County, Wisconsin.

(f)

In June 2024, MGE purchased an additional ownership interest in West Riverside, a natural gas-fired facility located in Beloit, WI, from WPL, operator and co-owner of the plant. West Riverside was placed in-service in 2020. MGE's interest in West Riverside increased to 6.9%.

MGEreceived specific approval to recover 100% AFUDC on Paris, Darien, and Koshkonong. During the three and nine months ended September 30, 2024, MGE recognized $1.9 million and $4.7 million, respectively, after tax, in AFUDC for these projects compared to $0.8 million and $1.9 million for the comparable periods in 2023.

Reven