5E Advanced Materials Inc
For the period ended Jun 30, 2024. Filed Sep 9, 2024.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2024 · Filed Sep 9, 2024
Extracted filing text, with the paragraph anchors used by the comparison.
See the whole filing, with its images and exhibitsContents
Business Overview
We are an exploration stage company focused on becoming a vertically integrated global leader and supplier of specialty boron and advanced boron derivative materials whose mission is to enable decarbonization, increase food security, and ensure domestic supply of critical materials. We hold 100% of the rights through ownership in the Project located in southern California, through our wholly owned subsidiary 5E Boron Americas. Our Project is underpinned by a mineral resource that includes boron and lithium, with the boron being contained in a conventional boron mineral known as colemanite. In 2022, our facility was designated as Critical Infrastructure by the Department of Homeland Security’s Cybersecurity and Infrastructure Security Agency. Our vision is to safely process boric acid and lithium carbonate through sustainable best practices to enable decarbonization, food security and domestic supply surety.
We hold 100% of the ownership rights in the Project through 5E Boron Americas. Through a multi-phased approach, we plan to develop the Project into a large-scale boron and lithium complex. The Project is based on a conventional colemanite deposit, which is a hydrated calcium borate mineral found in evaporite deposits, and we believe it is one of the largest known new conventional boron deposits globally. The deposit hosts a mineral resource from which we intend to extract and process into boric acid, boron advanced materials, lithium carbonate, and potentially other co-products on a commercial scale. These materials are scarce in resource, currently subject to supply risk as a large portion of their consumption in the United States is sourced from foreign producers and are essential for supporting critical industries. When the Project is successfully developed, we believe that we can become an important supplier helping to provide supply security for these materials in the United States. The importance of the Project and its mineral resource has been recognized by it being designated as Critical Infrastructure by the Department of Homeland Security’s Cybersecurity and Infrastructure Security Agency. The Project is also expected to serve as an important supply source of boric acid that we intend to process and develop into boron specialty and advanced materials over time.
Our Strengths
We believe the following key strengths will help us toward our goal of becoming an important supplier of boron specialty and advanced materials, complemented by lithium carbonate production capabilities:
Strategically Positioned to Benefit from Expected Substantial Demand Growth as Decarbonization Efforts Intensify and Future Facing Markets Develop. We are an exploration-stage company aiming to develop a materials resource of high-quality borates and other key materials, such as lithium, currently positioned as inputs into key technologies and industries that address climate change, support decarbonization, and support food and domestic security sectors. We believe factors such as government regulation and incentives and capital investments across industries will drive demand for end-use applications like solar and wind energy infrastructure, neodymium-ferro-boron magnets, lithium-ion batteries, and other critical material applications. We expect any such growth in demand to increase the need for borates and other advanced materials that we seek to produce. In addition, products with future facing applications, including in the semi-conductor, life sciences, aerospace, military and automotive markets, are also expected to drive demand growth. As a result of our broader focus on the boron specialty and advanced materials rather than specific end use applications, we believe we can be well-positioned to be an important domestic supplier to a number of different sectors benefiting from their expected growth.
Attractive Geographic Location with a Potential to Address Global Supply Challenges and National Security Concerns. Over the last three years, the United States has taken action to reinforce existing supply chains and access to critical materials, while working to secure the domestic supply. In February 2022, the Project was designated as Critical Infrastructure by the Department of Homeland Security’s Cybersecurity and Infrastructure Security Agency, which we believe is a testament to its potential importance as a U.S.-based source of boron, lithium and other materials. This designation supports our goal of playing an important role in providing critical materials domestically, while simultaneously addressing the currently challenged global supply chain. The global boron market is exposed to potential supply risks. There are currently only two major global suppliers (Eti Maden and Rio Tinto Borax) who together represent approximately 80-85% of total supply, with Eti Maden representing approximately 60% of global supply. Similarly, there are only a small number of domestic lithium carbonate suppliers today in the United States. The Project is located in Southern California and, if successfully commercialized, we expect it will have the ability to supply U.S. markets and industries with these two key materials, and thereby help reduce reliance on foreign sources. Our plans to develop U.S.-based downstream capabilities are similarly expected to allow us to onshore additional components of the overall boron supply chain that have historically been concentrated in Asia and other foreign regions.
Our Project is Based on one of the Largest Known New Conventional Boron Deposits in the World and Includes a Complementary Lithium Resource that has the Potential to Enable Us to Become an Important Participant in the U.S. Lithium Market. The Project deposit is a rare colemanite borate deposit, and we believe it is one of the largest known new deposits of colemanite globally. The Amended Initial Assessment Report estimates a combined 5.80 million short tons (“MST”) of Measured Mineral Resource plus Indicated Mineral Resource at the Project of boric acid (H 3 BO 3) and 141,000 short tons of lithium carbonate equivalent. The mineral resource estimate also identified 8.17 million short tons of Inferred Mineral Resource of boric acid (H 3 BO 3) and 166,000 short tons of lithium carbonate equivalent. Across the three mineral resource categories there is an estimated 13.97 million short tons of boric acid and 307,000 short tons of lithium carbonate equivalent using a 2% cut-off grade. We believe that the complementary lithium resource at the Project, if successfully developed, has the potential to enable us to become an important participant in the U.S. lithium market. We believe the size and quality of our Project resource also positions us to become a long-term supplier, if and when the site becomes operational.
We Believe Our Approach for Developing and Commercializing the Project, along with our Orientation towards Decarbonization-Enabling Materials and Industries can Position us Well to Focus On Sustainability Initiatives. We believe that the boron and lithium materials we plan on producing will support industries and applications that enable decarbonization and emission reduction, such as electric vehicles and green energy. These industries are important contributors to and supporters of the United Nations Sustainability Development Goals (“SDG’s”), which include accelerating a net-zero future, promoting sustainable infrastructure, improving global nutrition and health as well as promoting innovation. Further, we believe that our extraction techniques will help us create a set of infrastructure that is aligned with the industries we plan on supporting. Our method of in-situ extraction is expected to source water from our hydrology wells while providing for closed loop water recycling which we expect will help reduce overall water consumption and provide for efficient energy management. In-situ extraction is also traditionally associated with less above ground land disturbance than traditional resource extraction methods, while using fewer fossil fuels. Given our early stage of development, we believe we have a unique opportunity to develop and grow our business and a potential sustainability advantage, including building a diverse Board and leadership team as well as creating strong corporate governance policies, in each case focused on sustainability matters. Our focus will be to have a positive impact on the prosperity of local communities by supporting job creation, providing specialized training, targeting local procurement and investment, all of which are important given the local community near the Project is designated an economic development zone by the State of California.
Our Strategy
Our strategy is founded on leveraging our large mineral resource, related proposed infrastructure project, project development and advanced materials expertise to develop a vertically integrated business focused on boron specialty and advanced materials, complemented by lithium production capabilities. We intend to continue to thoughtfully develop our business over time in a systematic manner. In September 2023, the EPA provided us with authorization to commence step-rate testing, a process where water is injected into the ore body which seeks to establish the porosity and measure the fracture gradient of the ore body, which forms a base-line parameter for operation of the wellfield. During the next month, we initiated and completed step-rate testing and submitted our results to EPA. During November 2023, the EPA provided authorization, after reviewing our step-rate testing results, to begin in-situ mining operations pursuant to an Underground Injection Control permit and in January 2024, we began well-field injection with acid and began extracting valuable minerals from the Project in the form of a Pregnant Leach Solution (“PLS”). In April 2024, we commenced commercial operations of the SSF, began to process the PLS and ultimately produced our first batch of boric acid from the SSF. We plan to continue to run the SSF to refine our operations, more effectively optimize detail engineering of our proposed large-scale complex, estimate capital expenditures required to build our proposed large-scale complex and to produce boric acid for customer qualification. Upon successful customer qualification, we plan to deliver larger volumes of boric acid from the SSF to customer production facilities for product validation. Concurrently with the planning for the commencement of commercial operation of the SSF, we selected Fluor Corporation (“Fluor”) as our EPC service provider. The initial scope of Fluor’s work will be to lead FEL-2 which will directly feed into the upgrading of the Company’s current S-K 1300 technical document into a PFS, and ultimately to the construction of our proposed large-scale complex that we believe will provide us with the ability to commercially produce salable products including boric acid and lithium carbonate, while opportunistically developing downstream boron advanced material processing capabilities to extract greater value out of the boron supply chain.
Key elements of our strategy include:
Develop and Commercialize the Project to Produce an Economical and Secure Supply of Boron and Lithium and Focusing on a more Environmentally Friendly In-Situ Extraction Process as Compared to Traditional Mining. Our initial objective is to develop our Project’s boron and lithium resource and achieve a commercial extraction volume of borates, lithium and other co-products safely and profitably with an aim to rely on a more environmentally friendly in-situ extraction process as compared to traditional mining. The SSF, which commenced operations in April 2023, is expected to serve as a foundation for future design, engineering, and cost optimization of our planned large-scale complex as well as provide samples for customer qualification and offtake. If and when the large-scale complex is fully operational, we believe that we can have an opportunity to be a long-term supplier of boric acid and lithium carbonate, and the Project can serve as an important internal supply source for our development of downstream specialty and advanced materials.
Establish Competitive Market Positions in High Value, High Margin Markets for Boron Specialty and Advanced Materials and Lithium that Address Decarbonization, Food Security, and production of Domestic Supply. We are seeking to establish competitive market positions in high value in use, high margin, and high technology boron specialty and advanced materials and lithium markets. We believe that as a result of the global push to address climate change and achieve decarbonization, as well as increasing challenges related to food security and geopolitical instability, key sectors such as electric vehicle manufacturing, clean energy infrastructure, food and fertilizers, and domestic security, will experience significant growth in the future. As a result, these sectors are expected to require secure and substantial new supplies of key inputs such as boron and lithium to support their growth. Assuming the successful commercial completion of our large-scale complex, we believe we will have the opportunity to become one of the largest suppliers of boric acid and lithium carbonate in the domestic U.S. and international markets. Over time, we plan on developing downstream boron advanced materials capabilities to convert boric acid into boron advanced materials. These boron advanced materials may support higher technology applications across the fields of semi-conductors, life sciences, aerospace, military, energy and automotive markets and would allow us to extract greater value from our processes and supply chain. Downstream boron advanced materials capabilities may be developed over time through a combination of internal research and development, commercial partnerships or joint ventures with other organizations or research institutions, or via the acquisition of intellectual property related to processing and manufacturing.
Sign Offtake Agreements and Develop Commercial Partnerships to Expand High-Performance Boron and Lithium Product Capabilities and Embed Ourselves in Customer Supply Chains. As part of the commercialization plans for the Project, we plan on dedicating resources for marketing efforts to establish commercial offtake agreements for the sale of boric acid and lithium carbonate. We believe sales of these materials will support our strategy of achieving a durable revenue base, which can be used to fund subsequent incremental capacity plans and generate cash necessary for investments in downstream boron advanced materials capabilities. As we develop our downstream materials business, we plan to collaborate with customers and partners to support their development of high-performance applications in the areas of clean energy infrastructure, electric transportation, and high-grade fertilizers among other end uses. These commercial partnerships are expected to be an important element of embedding us within global supply chains and positioning us as an essential supplier of boron specialty and advanced materials. We intend to invest in research and development initiatives with an aim to support our customers’ product development and create intellectual property for us.
Corporate History and Reorganization
American Pacific Borates Limited, our former parent company, was incorporated in October 2016 under the laws of Western Australia for the purpose of acquiring the rights in the Project from Atlas Precious Metals, Inc. The acquisition of Fort Cady (California) Corporation was completed in May 2017 and ABR’s ordinary shares were subsequently admitted for official quotation on the ASX in July 2017.
We were incorporated in the State of Delaware on September 23, 2021, as a wholly owned subsidiary of ABR for the purposes of effecting the Reorganization (as defined herein).
We received all the issued and outstanding shares of ABR pursuant to a statutory Scheme of Arrangement under Part 5.1 of the Australian Corporations Act (“Scheme”). The Scheme was approved by ABR’s shareholders at a general meeting of shareholders held on December 2, 2021. Following shareholder approval, the Scheme was approved by the Federal Court of Australia on February 24, 2022.
After completion of the Scheme, we listed our Common Stock on Nasdaq under the symbol “FEAM” on March 15, 2022 and de-listed ABR from the ASX on March 8, 2022.
Pursuant to the Reorganization, we issued to the shareholders of ABR either one share of our Common Stock for every ten ordinary shares of ABR or one CDI for every one ordinary share of ABR, in each case, as held on the Scheme record date. Eligible shareholders of ABR (those whose residence at the record date of the Scheme is in Australia, New Zealand, Canada, Hong Kong, Ireland, Papua New Guinea, Singapore, Malaysia, Thailand, or the United States) received CDIs by default. In order to receive Common Stock, eligible shareholders were required to complete and submit an election form to ABR’s registry no later than 5:00 pm (AEDT) on March 2, 2022. Ineligible shareholders did not receive CDIs or shares of Common Stock but instead received the proceeds from the sale of the CDIs to which they would otherwise have been entitled by a broker appointed by ABR. The appointed broker sold the CDIs in accordance with the terms of a sale facility agreement and remitted the proceeds to ineligible shareholders. Additionally, we canceled each of the outstanding options to acquire ordinary shares of ABR and issued replacement options representing the right to acquire shares of our Common Stock on the basis of one replacement option for every ten existing ABR options held. We maintain an ASX listing for our CDIs, with each CDI representing 1/10th of a share of Common Stock. Holders of CDIs are able to trade their CDIs on the ASX and holders of shares of our Common Stock are able to trade their shares on Nasdaq.
Following completion of the Reorganization, ABR became a wholly owned subsidiary of 5E Advanced Materials, Inc.
SSF Update
The SSF is our smaller scale boron facility which serves as a foundation for future design, engineering, and cost optimization for our proposed large-scale complex as well as provide product for customer qualification and offtake. The SSF is an essential step in the overall Project development plan and is serving as our initial extraction and processing facility.
In September 2023, the EPA provided us with authorization to commence step-rate testing, a process where water is injected into the ore body which seeks to establish the porosity and measure the fracture gradient of the ore body. The outcome of the step-rate testing forms a base-line parameter for operation of the wellfield mining operations. Shortly after approval to conduct step-rate testing, we initiated and completed the testing and submitted our results to EPA. During November 2023, the EPA provided authorization to begin in-situ mining operations pursuant to an Underground Injection Control permit and in January 2024, we began well-field injection and began extracting valuable minerals from the Project in the form of a Pregnant Leach Solution (“PLS”). In April 2024, we commenced commercial operations of the SSF, began to process the PLS through crystallization, and achieved our first batch of boric acid from the SSF. Before year-end, we began our customer qualification program by shipping kilogram samples to interested customers. The SSF is designed to initially produce up to 2,000 short tons of boric acid annually and targets initial production of lithium carbonate, with optionality built in to scale up to a run rate of 9,000 short tons and commensurate increased lithium and bi-product production with an incremental capital investment. Our operations team is currently working towards our next production target of three short tons of boric acid per day while we optimize product quality and production rates. The initial high-quality run-of-mine head grade of boric acid provided validation of our initial operational assumptions which we hope will facilitate discussions with stakeholders around funding options for the Phase 1 of the commercial facility and securing commercial contracts for our future products. We plan to continue to run the SSF to refine our operations, more effectively optimize detail engineering of our proposed large-scale complex, estimate capital expenditures required to build our proposed large-scale complex and to produce boric acid for customer qualification. Upon successful customer qualification, we plan to deliver larger volumes of boric acid from the SSF to customer production facilities for product validation.
Fort Cady
Our Amended Initial Assessment Report added further definition to our large boron resource and established the existence of a lithium mineral resource that we believe could provide us with potential lithium carbonate production. Due to the current favorable market backdrop and growing importance of critical materials, we continue to focus primarily on further defining our boron and lithium resources, and to work towards developing a large-scale boron and lithium complex for the extraction of boric acid, lithium carbonate, and other valuable bi-products. A focus on boron and lithium extraction and related end markets is aligned with our mission to become a global leader in enabling industries addressing decarbonization, food security, and production of domestic supply and our focus on high value in use materials and applications.
The SSF is serving as a foundation for future design, engineering, and cost optimization for our proposed large-scale complex. We believe that the successful commissioning of the SSF in 2024 was an important step to obtaining critical information that will help enable us to optimize the efficiency, output and economic profile of our proposed large-scale complex. As such, we expect to incorporate value engineering and cost structure optimization into the continued technical and economic analysis of the proposed large-scale complex. During January 2024, we selected Fluor Corporation (“Fluor”) as the Company’s EPC services provider, and they have begun to progress plans for the proposed large-scale complex processing plant, including defining infrastructure and detailed engineering. The initial scope of Fluor will be to lead FEL-2 which will directly feed into the upgrading of the Company’s current S-K 1300 technical Initial Assessment Report into a PFS upon completion.
During the 2023 fiscal year, we released our Amended Initial Assessment Report, prepared in accordance with Regulation S-K 1300. We believe the report demonstrates a world-class resource, management’s firm understanding and direction for the business, and a phased approach to scale production, which can position the company to achieve profitability, generate cash flow, and reduce risk. The Amended Initial Assessment Report includes a revised mineral resource estimate for boric acid and lithium carbonate, estimates for capital costs and operating expenses, and a bottoms-up economic analysis based on a phased approach to scaling production. The financial model for the economic analysis includes preliminary market studies and independent pricing forecasts for boric acid and lithium carbonate. As part of our Amended Initial Assessment Report, we engaged two external EPC firms to assist management with our capital cost estimate, which we utilized as the basis to stage a formal process to request proposals for detail design of the proposed large-scale complex, which was ultimately awarded to Fluor in January 2024.
The Amended Initial Assessment Report outlines three phases for the larger-scale facility:
Phase 1 targets production of 90,000 short tons of boric acid and 1,100 short tons of lithium carbonate. Given the permitting hurdles and time to obtain final EPA approval and resource constraints in fiscal year 2024, we are now targeting to reach initial commercial production in the second half of calendar year 2026 or first half of calendar year 2027.
Phase 2 and Phase 3 target incremental production increases of 180,000 short tons of boric acid and 2,200 short tons of lithium carbonate in each phase.
Full operation includes 450,000 short tons of boric acid and 5,500 short tons of lithium carbonate per annum.
The initial capital cost estimate outlined in the technical report for Phase 1 is $288 million before contingency and owner’s cost. With owner’s cost and 25% contingency, Phase 1 capital is estimated at $373 million. With commercial operation of the SSF now underway, we will continue operating the facility to optimize costs, provide samples to future customers for qualification and offtake, and progress FEL-2 and ultimately FEL-3 engineering for the proposed large-scale complex. Completion of FEL-2 and FEL-3 engineering is expected to provide the necessary estimates to publish a final feasibility study and a construction decision for the proposed large-scale complex.
Competition
The mining industry is highly competitive. According to Global Market Insights, there were two major competitors in the borates industry, Rio Tinto Borates (“RTB”) and Eti Maden, the latter of which is owned by the Turkish government. If we are successful in bringing the Project into production, we would be competing with those two large competitors in the borates industry, one global mining conglomerate and one state-owned enterprise, each of which we believe are generally well-funded and established. We, therefore, may be at a significant disadvantage in the course of obtaining materials, supplies, labor and equipment from time to time. Additionally, we are, and expect to continue to be, an insignificant participant in the business of mining exploration and development for the foreseeable future. According to Global Market Insights, together they supplied approximately 85% of global boron production demand which has led to a global duopoly, with Eti Maden alone having supplied approximately 60% of the world’s recent demand.
Additionally, the lithium industry is highly competitive, and according to a Woods Mackenzie report, the market was dominated by Albemarle Corporation, Sociedad Quimica y Minera De Chile S.A., Jiangxi Gangfeng Lithium Co. Ltd., Tianqi Lithium Corp., and Livent Corporation, all of which we believe are generally well-funded and established.
When the Project is successfully developed and commercialized, the primary factors that we will be competing upon include, without limitation, the amount and quality of our material resource, the pricing of our products, and the quality of our customer support and service. Furthermore, prospective customers may consider additional factors such as the geographic location of our operations and the reputation of our business when compared to our competitors.
Customers
Because we have not yet begun production of mineral products, we currently do not have any binding supply agreements with customers. In June 2024, we began our customer qualification program with initial shipments of kilogram samples. We have multiple letters of intent to collaborate with various customers and are continuing to build our customer pipeline.
Governmental Regulation
We are subject to numerous and extensive federal, state and local laws, regulations, permits and other legal requirements applicable to the mining and mineral processing industry, including those pertaining to employee health and safety, air emissions, water usage, wastewater and stormwater discharges, air quality standards, greenhouse gas emissions, waste management, plant and wildlife protection, handling and disposal of hazardous and radioactive substances, remediation of soil and groundwater contamination, land use, reclamation and restoration of properties, the discharge of materials into the environment and groundwater quality and availability. Our business may be affected in varying degrees by government regulation such as restrictions on production, price controls, tax increases, expropriation of property, environmental and pollution controls or changes in conditions under which minerals may be marketed. An excess supply of certain minerals may exist from time to time due to lack of markets, restrictions on exports, and numerous factors beyond our control. These factors include market fluctuations and government regulations relating to prices, taxes, royalties, allowable production and importing and exporting minerals. These laws, regulations, permits and legal requirements have had, and will continue to have, a significant effect on our results of operations, earnings and competitive position.
Federal legislation and implementing regulations adopted and administered by the EPA, the Bureau of Land Management (the “BLM”), the Fish and Wildlife Service, including legislation such as the federal Clean Water Act (“CWA”), the Safe Drinking Water Act (the “SDWA”), the Clean Air Act, as amended (the “CAA”), the National Environmental Policy Act (the “NEPA”), CERCLA, and the Resource Conservation and Recovery Act (the “RCRA”), have a direct bearing on our proposed solution mining and processing operations. These federal initiatives are often administered and enforced through state agencies operating under parallel state statutes and regulations.
The CERCLA, and comparable state statutes, impose strict, joint and several liability on current and former owners and operators of sites and on persons who disposed of or arranged for the disposal of hazardous substances found at such sites. It is not uncommon for the government to file claims requiring clean-up actions, demands for reimbursement for government-incurred clean-up costs, or natural resource damages, or for neighboring landowners and other third parties to file claims for personal injury and property damage allegedly caused by hazardous substances released into the environment. The RCRA, and comparable state statutes, govern the disposal of solid waste and hazardous waste and authorize the imposition of substantial fines and penalties for noncompliance, as well as requirements for corrective actions. The CERCLA, RCRA, and comparable state statutes can impose liability for clean-up of sites and disposal of substances found on exploration, mining and processing sites long after activities on such sites have been completed.
The CAA restricts the emission of air pollutants from many sources, including processing activities. Any future processing operations by us may produce air emissions, including fugitive dust and other air pollutants from stationary equipment, storage facilities and the use of mobile sources such as trucks and heavy construction equipment, which are subject to review, monitoring and/or control requirements under the CAA and state air quality laws, as administered by the Mojave Desert Air Quality Management District (“MDAQCD”). New equipment and facilities are required to obtain permits before work and operations can begin. Once constructed or obtained, we may need to incur additional capital costs to ensure such facilities and equipment remain in compliance with applicable rules and regulations. In addition, permitting rules do impose limitations on our estimated production levels or result in additional capital expenditures in order to comply with the rules. We have received Authorization to Construct air permits for up to 270,000 tons of borates per year. We expect that we will need to modify these permits as engineering designs are finalized.
The CWA, and comparable state statutes, imposes restrictions and controls on the discharge of pollutants into waters of the United States. The discharge of pollutants into regulated waters is prohibited, except in accordance with the terms of a permit issued by the EPA or an analogous state agency. We received a Water Board Order from the Lahontan Regional Water Quality Control Board (the “LRWQCB”) in 1988 and remain in compliance with the permit conditions. The LRWQCB regulates surface activities, such as ponds, that have the potential to allow process solutions to leak into the subsurface.
The CWA regulates storm water from facilities and generally requires a storm water discharge permit. The Project is located within a closed basin; therefore, the stormwater regulations do not apply either during construction or operations. We have requested and received a Notice of Non-Applicability (“NONA”) from the LRWQCB. The CWA and comparable state statutes provide for civil, criminal and administrative penalties for unauthorized discharges of pollutants and impose liability on parties responsible for those discharges for the costs of cleaning up any environmental damage caused by the release and for natural resource damages resulting from the release.
The SDWA and the Underground Injection Control (“UIC”) program promulgated thereunder, regulate the drilling and operation of subsurface injection wells. The EPA directly administers the UIC program in California. The program requires that a Class III UIC Solution Mining Permit be obtained before drilling an injection-recovery well. We have obtained a Class III UIC Permit to construct and operate a borate solution mine, with approval and bonding for our injection-recovery and water monitoring wells. During November 2023, the EPA provided authorization to begin in-situ mining operations pursuant to our Class III UIC permit. We expect that the EPA will grant authorization for additional wells as requested subject to an increase of the reclamation bonding amount. Violation of the Class III UIC Permit conditions, the SDWA and related UIC regulations and/or contamination of groundwater by mining related activities may result in fines, penalties, and remediation costs, among other sanctions and liabilities under the SWDA and state analogs. In addition, third party claims may be filed by landowners and other parties claiming damages for alternative water supplies, property damages, and bodily injury.
The Federal Land Policy Management Act (the “FLPMA”) governs the way in which public lands administered by the U.S. Bureau of Land Management are managed. The General Mining Law of 1872 and the FLPMA authorize U.S. citizens to locate mining claims on federal lands open to mineral entry. Borates are a locatable mineral, and locatable mineral deposits within mining claims such as the Project may be developed, extracted and processed under a Plan of Operations approved by the BLM. The NEPA requires a review of all projects proposed to occur on public lands.
The NEPA and comparable state statute, California Environmental Quality Act (“CEQA”) requires federal agencies to integrate environmental considerations into their decision-making processes by evaluating the environmental impacts of their proposed actions, including issuance of permits to mining facilities, and assessing alternatives to those actions. The Barstow Office of the BLM issued a Record of Decision (“ROD”) for the Environmental Impact Statement (“EIS”) in 1994. The existing ROD does not have an expiration date, and minor modifications may be required in the future, but are not required to begin operating.
Solution mining does not meet the definition of a mine under the Federal Mine Safety and Health Act of 1977 (the “Mine Act”), as amended by the Mine Improvement and New Emergency Response Act of 2006 (the “MINER Act”). Solution mining and processing activities are covered by the regulations adopted by the California Occupational Safety and Health Administration (“CalOSHA”). Therefore, our proposed operations will need to comply with the CalOSHA regulations and standards, including development of Safe Operating Procedures and training of personnel. At this time, it is not possible to predict the full effect that new or proposed statutes, regulations and policies will have on our operating costs, but any expansion of existing regulations, or making such regulations more stringent may have a negative impact on the profitability of the operations.
When operational, the Project will be required to maintain a comprehensive safety program. Employees and contractors will be required to complete initial training, as well as attend annual refresher sessions, which cover potential hazards that may be present at the facility. Workers at the facility will be entitled to compensation for any work-related injuries. The State of California may consider changes in workers’ compensation laws from time-to-time. Our costs will vary based on the number of accidents that occur at the Project and the costs of addressing such claims. We are and will be required to maintain insurance under various state workers’ compensation programs under the statutory limits for the current and proposed operations at the Project and the offices in California.
We generally are required to mitigate long-term environmental impacts by stabilizing, contouring, re-sloping, and revegetating various portions of a site after well-field and processing operations are completed as well as plugging and abandoning injection recovery, water monitoring and exploration drilling holes. Comprehensive environmental protection and reclamation standards must be met during the course of, and upon completion of, mining activities, and any failure to meet such standards may subject us to fines, penalties or other sanctions. Reclamation efforts will be conducted in accordance with detailed plans, which are reviewed and approved by the EPA, BLM, LRWQCB, and San Bernardino County on a regular basis. We currently have reclamation obligations and we have arranged a surety bond and pledged certificates of deposits for reclamation with the State and Federal regulatory agencies. At this time, land disturbance certificate of deposits for approximately $311 thousand are in place with the County of San Bernardino and a surety bond is posted for $1.5 million held for EPA reclamation.
We may be required to obtain new permits and permit modifications, including air, UIC permit, construction and occupancy permits issued by the San Bernardino County, California government, to complete our development plans. To obtain, maintain and renew these and other environmental permits and perform any required monitoring activities, we may be required to conduct environmental studies and collect and present to governmental authorities data pertaining to the potential impact that the current development plan or future operations may have upon the environment.
Environmental, safety and other laws and regulations continue to evolve which may cause us to meet stricter standards and give rise to greater enforcement, result in increased fines and penalties for noncompliance, and result in a heightened degree of responsibility for us and our officers, directors and employees. Future laws, regulations, permits or legal requirements, as well as the interpretation or enforcement of existing requirements, may require substantial increases in capital or operating costs to achieve and maintain compliance or otherwise delay, limit or prohibit our development plans and future operations, or other restrictions upon, our development plans or future operations or result in the imposition of fines and penalties for failure to comply.
Complying with these regulations is complicated and requires significant attention and resources. Our employees have a significant amount of experience working with various federal, state and local authorities to address compliance with such laws, regulations and permits. However, we cannot be sure that at all times we have been or will be in compliance with such requirements. We expect to continue to incur significant sums for ongoing regulatory expenditures, including salaries, and the costs for monitoring, compliance, remediation, reporting, pollution control equipment and permitting. In addition, we plan to invest significant capital to develop infrastructure to ensure it operates in a safe and environmentally sustainable manner.
We are not aware of any probable government regulations that would materially impact us at this time, however there can be no assurance that regulations may not arise in the future that may have a negative effect on our results of operations, earnings and competitive position.
Dependence on Key Vendors, Suppliers and Global Supply Chain
Construction of an in-situ leaching mining operation and processing plant at the Project will require local resources of contractors, construction materials, energy resources, employees, and housing for employees. The Project has good access to Interstate-40 (“I-40”), which connects it to numerous sizable communities between Barstow and the greater Los Angeles area which we believe can offer access to transportation, construction materials, labor, and housing. The Project currently has limited electrical service sufficient for mine office and storage facilities on site but will require an upgrade for plant operations and wellfield facilities. The SSF is operated on liquid natural gas and we are currently exploring options for upgrading electrical services to the Project. An electrical transmission corridor operated by Southern Cal Edison (“SCE”) extends north-eastward through the eastern part of the Project. We currently have two water production wells in an aquifer within our permit boundary, but water is limited in the Mojave Desert. Currently no natural gas connects to the Project, but we are negotiating services with two suppliers in the region with multiple gas transmission pipeline located proximal to the Project.
Employees
As of June 30, 2024, we had 57 full-time employees and no part-time employees. We expect to significantly increase the number of employees with each phase of production at the Project.
We use the services of independent consultants and contractors to perform various professional services, including land acquisition, legal, environmental, accounting and tax services. In addition, we utilize the services of independent contractors to perform construction, geological, exploration and drilling operation services and independent third-party engineering firms assist with the design, engineering, and cost optimization of the proposed large-scale complex.
Intellectual Property
We have no material patents, trademarks, licenses, franchises, concessions or royalty agreements. We have entered into an Alternative Work Schedule agreement (the “AWS”) with certain non-exempt employees engaged with the operation of the SSF. The AWS is a contractual arrangement that provides for a work schedule that varies from the standard eight hours per day, five days per work week schedule in favor of a 12-hour alternating day and night shift plan that allow us to better operate the SSF 24-hours a day. Under the AWS, employees are entitled to overtime pay if they work beyond the established alternative workweek schedule. The AWS is terminable at our discretion at any point in time but requires two-thirds of affected employees to affirmatively vote for its termination.
Exploration
In July 2021, we purchased an additional three parcels of land adjacent to the Project, which we expect to become an exploration target to support proposed resource expansion drilling activities. An exploration target is a statement or estimate of the exploration potential of a mineral deposit in a defined geological setting where the statement or estimate, quoted as a range of tons and range of grade (or quality), relates to mineralization for which there has been insufficient exploration to estimate a mineral resource. The exploration target described relates to the southeastern area outside the existing resource boundary of the Project deposit.
Seasonality
We have no properties that are subject to material restrictions on its operations due to seasonality. However, we note that given the Project’s location in the Mojave Desert, the site may be impacted by extreme heat in the summer season. In addition, the desert terrain of the Project does not adequately absorb water and is subject to flash flooding in the instance of significant rain.
Corporate Office
Our principal executive offices are located at 9329 Mariposa Road, Suite 210, Hesperia, California. Our telephone number is +1 (442) 221-0225.