Consolidated Results of Operations

Total sales for the three and six months ended June 30, 2024 and 2023 were as follows:

Three Months EndedJune 30,Six Months EndedJune 30,
(in thousands)2024202320242023
Silver$112,692$79,489$198,925$161,022
Gold82,46962,924149,884138,010
Lead23,92821,65743,41147,059
Zinc32,49625,90357,46058,846
Less: Smelter and refining charges(9,282)(12,220)(22,296)(28,193)
Total metal sales242,303177,753427,384376,744
Environmental remediation services3,3543787,801887
Total sales$245,657$178,131$435,185$377,631

Environmental remediation services revenue is generated by performing remediation work in the historical Yukon Territory mining district on behalf of the Canadian government. The scope and estimated cost of all work is agreed to in advance by the Canadian government, and the expenses incurred are essentially passed through to the government for reimbursement with minimal margin generated by the Company in performing this work.

Total metal sales for the three and six months ended June 30, 2024 and 2023, and the approximate variances attributed to differences in metals prices, sales volumes and smelter terms, were as follows:

(in thousands)SilverGoldBase metalsLess: smelter and refining chargesTotal sales of products
Three months ended June 30, 2023$79,489$62,924$47,560$(12,220)$177,753
Variances - 2024 versus 2023:
Price24,64013,0469,909—47,595
Volume8,5636,499(1,045)50114,518
Smelter terms———2,4372,437
Three months ended June 30, 2024$112,692$82,469$56,424$(9,282)$242,303
(in thousands)SilverGoldBase metalsLess: smelter and refining chargesTotal sales of products
Six months ended June 30, 2023$161,022$138,010$105,905$(28,193)$376,744
Variances - 2024 versus 2023:
Price32,11319,4542,564—54,131
Volume5,790(7,580)(7,598)1,377(8,011)
Smelter terms———4,5204,520
Six months ended June 30, 2024$198,925$149,884$100,871$(22,296)$427,384

The fluctuations in sales for the three and six months ended June 30, 2024 compared to the same period in 2023 were primarily due to the following two reasons:

Higher average realized prices for precious and base metals during the three and six months ended June 30, 2024, compared to the same periods in 2023. The table below summarizes average spot prices and our average realized prices for the commodities we sell:

Three Months EndedJune 30, · Six Months EndedJune 30,
2024 · 2023 · 2024 · 2023
Silver –London PM Fix ($/ounce)$28.86$24.19$26.11$23.37
Realized price per ounce$29.77$23.67$27.37$23.12
Gold –London PM Fix ($/ounce)$2,338$1,978$2,205$1,933
Realized price per ounce$2,338$1,969$2,222$1,928
Lead –LME Final Cash Buyer ($/pound)$0.98$0.96$0.96$0.97
Realized price per pound$1.06$0.99$1.02$1.00
Zinc –LME Final Cash Buyer ($/pound)$1.29$1.15$1.20$1.29
Realized price per pound$1.51$1.13$1.30$1.26

Average realized prices typically differ from average market prices primarily because concentrate sales are generally recorded as revenues at the time of shipment at forward prices for the estimated month of settlement, which differ from average market prices. Due to the time elapsed between shipment of concentrates and final settlement with the customers, we must estimate the prices at which sales of our metals will be settled. Previously recorded sales are adjusted to estimated settlement metals prices each period through final settlement. We recorded net positive price adjustments to provisional settlements of $11.0 million and $14.5 million for the three and six months ended June 30, 2024, respectively, and $2.1 million and $4.2 million for the three and six months ended June 30, 2023, respectively. The price adjustments related to silver, gold, zinc and lead contained in our concentrate shipments were partially offset by gains and losses on forward contracts for those metals. See Note 8 of Notes to Condensed Consolidated Financial Statements (Unaudited)for more information. The gains and losses on these contracts are included in revenues and impact the realized prices for silver, gold, lead and zinc. Realized prices are calculated by dividing gross revenues for each metal (which include the price adjustments and gains and losses on the forward contracts discussed above) by the payable quantities of each metal included in concentrate, doré and carbon material shipped during the period.

Higher quantities of silver sold during the three and six months ended June 30, 2024, compared to the same periods in 2023, primarily due to higher and more consistent throughput at Keno Hill, as the site has continued ramp-up of production during the year. See The Greens Creek Segment, The Lucky Friday Segment, The Keno Hill Segment, and Casa Berardi Segment sections below for more information on metal production and sales volumes at each of our operating segments. Total metals production and sales volumes for each period are shown in the following table:

Three Months EndedJune 30, · Six Months EndedJune 30,
2024 · 2023 · 2024 · 2023
Silver -Ounces produced4,458,4843,832,5598,650,5827,873,528
Payable ounces sold3,785,2853,360,6947,267,1696,965,188
Gold -Ounces produced37,32435,25173,91674,822
Payable ounces sold35,27631,96167,46571,580
Lead -Tons produced13,58713,32325,68626,559
Payable tons sold11,33810,89521,35923,408
Zinc -Tons produced16,19117,28432,40233,079
Payable tons sold10,78111,47422,10223,333

The difference between what we report as “ounces/tons produced” and “payable ounces/tons sold” is attributable to the difference between the quantities of metals contained in the concentrates we produce versus the portion of those metals actually paid for by our customers according to the terms of our sales contracts. Differences can also arise from inventory changes incidental to shipping schedules, or variances in ore grades which impact the amount of metals contained in concentrates produced and sold.

Sales, total cost of sales, gross profit (loss), Cash Cost, After By-product Credits, per Ounce (“Cash Cost”) (non-GAAP) and AISC (non-GAAP) at our operating units for the three and six months ended June 30, 2024 and 2023 were as follows (in thousands, except for Cash Cost and AISC):

Silver · Gold and Other
Greens CreekLucky FridayKeno HillTotal Silver (2)Casa BerardiOther (3)Total Gold and Other
Three Months Ended June 30, 2024:
Sales$95,659$59,071$28,950$183,680$58,623$3,354$61,977
Total cost of sales(56,786)(37,523)(28,950)(123,259)(67,340)$(3,628)(70,968)
Gross profit (loss)$38,873$21,548$—$60,421$(8,717)$(274)$(8,991)
Cash Cost (1)$0.19$5.32$—$2.08$1,701$—$1,701
AISC (1)$5.40$12.74$—$12.54$1,825$—$1,825
Three Months Ended June 30, 2023:
Sales$95,891$42,648$1,581$140,120$36,946$1,065$38,011
Total cost of sales(63,054)(32,190)(1,581)(96,825)(42,576)(1,071)(43,647)
Gross profit (loss)$32,837$10,458$—$43,295$(5,630)$(6)$(5,636)
Cash Cost (1)$1.33$6.96$—$3.32$1,658$—$1,658
AISC (1)$5.34$14.24$—$11.63$2,147$—$2,147
Silver · Gold
Greens CreekLucky FridayKeno HillTotal Silver (2)Casa BerardiOther (3)Total Gold
Sales$192,969$94,411$39,797$327,177$100,207$7,801$108,008
Total cost of sales(126,643)(65,042)(39,797)(231,482)(125,600)(7,513)(133,113)
Gross profit$66,326$29,369$—$95,695$(25,393)$288$(25,105)
Cash Cost (1)$1.90$6.67$—$3.38$1,685$—$1,685
AISC (1)$6.33$14.50$—$12.81$1,861$—$1,861
Sales$194,502$91,758$1,581$287,841$87,944$1,84689,790
Total cost of sales(129,342)(66,724)(1,581)(197,647)(105,574)(1,803)(107,377)
Gross profit$65,160$25,034$—$90,194$(17,630)$43$(17,587)
Cash Cost (1)$1.23$5.64$—$2.70$1,725$—$1,725
AISC (1)$4.51$12.48$—$10.21$2,286$—$2,286

(1)

A reconciliation of these non-GAAP measures to total cost of sales, the most comparable GAAP measure, can be found below in Reconciliation of Total Cost of Sales (GAAP) to Cash Cost, Before By-product Credits and Cash Cost, After By-product Credits (non-GAAP) and All-In Sustaining Cost, Before By-product Credits and All-In Sustaining Cost, After By-product Credits (non-GAAP).

(2)

The calculation of AISC for our consolidated silver properties includes corporate costs for general and administrative expense and sustaining capital.

(3)

For the three and six months ended June 30, 2024, Other includes sales of $3.4 million and $7.8 million, respectively, and total cost of sales of $3.6 million and $7.5 million, from our environmental remediation services in the Yukon. For the three and six months ended June 30, 2023, Other includes sales and cost of sales of $1.1 million for the three months ended June 30, 2023 and sales and cost of sales of $1.8 million for the six months ended June 30, 2023, related to our environmental remediation services business and Nevada operations.

While revenue from zinc, lead and gold by-products is significant, we believe that identification of silver as the primary product of Greens Creek, Lucky Friday and Keno Hill is appropriate because:

silver has historically accounted for a higher proportion of revenue than any other metal and is expected to do so in the future;

we have historically presented the Greens Creek and Lucky Friday units as primary silver producers, based on the original analysis that justified putting the project into production, and the same analysis applies to the Keno Hill unit. Further we believe that consistency in disclosure is important to our investors regardless of the relationships of metals prices and production from year to year;

metallurgical treatment maximizes silver recovery;

the Greens Creek, Lucky Friday and Keno Hill deposits are massive sulfide deposits containing an unusually high proportion of silver; and

in most of their working areas, Greens Creek, Lucky Friday and Keno Hill utilize selective mining methods in which silver is the metal targeted for highest recovery.

Accordingly, we believe the identification of gold, lead and zinc as by-product credits at Greens Creek, Lucky Friday and Keno Hill is appropriate because of their lower economic value compared to silver and due to the fact that silver is the primary product we intend to produce at those locations. In addition, we have not consistently received sufficient revenue from any single by-product metal to warrant classification of such as a co-product.

We periodically review our revenues to ensure that reporting of primary products and by-products is appropriate. Because for Greens Creek, Lucky Friday and Keno Hill we consider zinc, lead and gold to be by-products of our silver production, the values of these metals offset operating costs within our calculations of Cash Cost, After By-product Credits, per Silver Ounce and AISC, After By-product Credits, per Silver Ounce.

We believe the identification of silver as a by-product credit is appropriate at Casa Berardi because of its lower economic value compared to gold and due to the fact that gold is the primary product we intend to produce there. In addition, we do not receive sufficient revenue from silver at the Casa Berardi to warrant classification of such as a co-product. Because we consider silver to be a by-product of our gold production at Casa Berardi, the value of silver offsets operating costs within our calculations of Cash Cost, After By-product Credits, per Gold Ounce and AISC, After By-product Credits, per Gold Ounce.

We reported a net income applicable to common stockholders of $27.7 million for the three months ended June 30, 2024, compared to a net loss applicable to common stockholders of $15.8 million in the comparable period in 2023. The following were the significant drivers of changes in net income applicable to common stockholders compared to 2023:

Consolidated gross profit increased by $13.8 million. See The Greens Creek Segment, The Lucky Friday Segment, The Keno Hill Segment, and The Casa Berardi Segment sections below for a discussion on the key drivers by operating unit.

Ramp-up and suspension costs decreased by $10.8 million as costs related to Keno Hill's ramp-up activities decreased by $7.6 million, in addition to the prior period containing costs related to the temporary suspension of operations at Casa Berardi for 20 days resulting from certain forest lands and access road closures due to forest fires.

Other operating income, net increased by $13.0 million primarily due to $17.8 million of insurance proceeds received during the quarter related to the Lucky Friday fire. Other operating income, net in the prior period included $5.9 million of insurance proceeds related to a coverage lawsuit.

Fair value adjustments, net increased by $7.6 million primarily due to $11.2 million in unrealized gains on our marketable equity securities portfolio compared to the comparable period in 2023. This was partially offset by unrealized losses on undesignated derivative contracts resulting from a $3.6 million negative movement when compared to the comparable period in 2023.

Net foreign exchange gain increased by $6.5 million to $2.7 million, compared to a loss of $3.9 million in the comparable period, reflecting the continued strengthening of the US dollar against the Canadian dollar, and related impact on the revaluation of our Canadian monetary assets and liabilities.

The positive movements mentioned above were partly offset by:

General and administrative expenses increased by $4.0 million, primarily related to non-recurring compensation costs associated with our former CEO's retirement.

Interest expense increased by $2.2 million reflecting higher amounts drawn on our revolving credit facility.

Income and mining tax expense increased by $3.9 million due to higher taxable income generated by our US tax group.

We reported a net income applicable to common stockholders of $21.8 million for the six months ended June 30, 2024, compared to a net loss applicable to common stockholders of $19.1 million in the comparable period in 2023. The following were the significant drivers of changes in net loss applicable to common stockholders compared to 2023:

Ramp-up and suspension costs decreased by $7.6 million as costs related to Keno Hill's ramp-up activities decreased by $4.9 million, in addition to the prior period containing costs related to the temporary suspension of operations at Casa Berardi for 20 days resulting from certain forest lands and access road closures due to forest fires.

Other operating income, net increased by $30.0 million primarily due to $35.2 million of insurance proceeds received during the period related to the Lucky Friday fire. Other operating income, net in the prior period included $5.9 million of insurance proceeds related to a coverage lawsuit.

Fair value adjustments, net increased by $2.5 million primarily due to $9.0 million of unrealized gains on our marketable equity securities portfolio compared to the comparable period in 2023. This was partially offset by unrealized losses on undesignated derivative contracts resulting from a $6.5 million negative movement when compared to the comparable period in 2023.

Net foreign exchange gain increased by $10.4 million to $6.7 million reflecting the continued strengthening of the US dollar against the Canadian dollar, and related impact on the revaluation of our Canadian monetary assets and liabilities.

The positive movements mentioned above were partly offset by:

General and administrative expenses increased by $3.1 million, primarily related to non-recurring compensation costs associated with our former CEO's retirement.

Interest expense increased by $4.7 million as higher amounts were drawn on our revolving credit facility.

Income and mining tax expense increased by $2.5 million due to higher taxable income generated by our US tax group.

Greens Creek

Dollars are in thousands (except per ounce and per ton amounts)Three Months EndedJune 30,Six Months EndedJune 30,
2024202320242023
Sales$95,659$95,891$192,969$194,502
Cost of sales and other direct production costs(45,470)(49,976)(100,884)(101,800)
Depreciation, depletion and amortization(11,316)(13,078)(25,759)(27,542)
Total cost of sales(56,786)(63,054)(126,643)(129,342)
Gross profit$38,873$32,837$66,326$65,160
Tons of ore milled225,746232,465457,934465,632
Production:
Silver (ounces)2,243,5512,355,6744,722,1455,128,533
Gold (ounces)14,13716,35128,72531,235
Lead (tons)4,5134,7269,3479,928
Zinc (tons)12,40013,25525,46225,737
Payable metal quantities sold:
Silver (ounces)1,576,9182,155,4193,667,3674,447,454
Gold (ounces)10,31213,00822,49825,654
Lead (tons)2,8903,7506,5607,906
Zinc (tons)7,5258,96017,08918,204
Ore grades:
Silver ounces per ton12.612.813.013.6
Gold ounces per ton0.090.100.090.09
Lead percent2.5%2.5%2.5%2.6%
Zinc percent6.2%6.5%6.2%6.2%
Total production cost per ton$218.09$194.94$215.46$196.77
Cash Cost, After By-product Credits, per Silver Ounce (1)$0.19$1.33$1.90$1.23
AISC, After By-Product Credits, per Silver Ounce (1)$5.40$5.34$6.33$4.51
Capital additions$11,704$8,828$20,531$15,486

(1)

A reconciliation of these non-GAAP measures to total cost of sales, the most comparable GAAP measure, can be found below in Reconciliation of Total Cost of Sales (GAAP) to Cash Cost, Before By-product Credits and Cash Cost, After By-product Credits (non-GAAP) and All-In Sustaining Cost, Before By-product Credits and All-In Sustaining Cost, After By-product Credits (non-GAAP).

The $6.0 million increase in gross profit for the three months ended June 30, 2024, compared to the same period in 2023 was primarily due to higher realized sales prices for all metals sold, partially offset by lower metals sales volumes. Capital additions increased by $2.9 million in the same period primarily due to primary ore access development.

The $1.2 million increase in gross profit for the six months ended June 30, 2024, compared to the same period in 2023 was primarily due to higher realized sales prices for all metals sold, partially offset by lower metals sales volumes. Capital additions increased by $5.0 million in the same period primarily due to primary ore access development.

The charts below illustrate the factors contributing to Cash Cost, After By-product Credits, per Silver Ounce for Greens Creek:

Three Months Ended June 30,Six Months Ended June 30,
2024202320242023
Cash Cost, Before By-product Credits, per Silver Ounce$25.83$25.20$25.46$23.36
By-product credits(25.64)(23.87)(23.56)(22.13)
Cash Cost, After By-product Credits, per Silver Ounce$0.19$1.33$1.90$1.23
Three Months Ended June 30,Six Months Ended June 30,
2024202320242023
AISC, Before By-product Credits, per Silver Ounce$31.04$29.21$29.89$26.64
By-product credits(25.64)(23.87)(23.56)(22.13)
AISC, After By-product Credits, per Silver Ounce$5.40$5.34$6.33$4.51

For the three months ended June 30, 2024, the decrease in Cash Cost, After By-product Credits, per Silver Ounce was primarily due to an increase in by-product credits, benefiting from higher realized gold and base metals prices, partly offset by higher production costs and lower ounces produced. For the same period, AISC, After By-product Credits, per Silver Ounce was consistent with the same period in 2023, as the benefit from higher by-product credits was offset by higher sustaining capital.

For the six months ended June 30, 2024, the increase in Cash Cost, After By-product Credits, per Silver Ounce was primarily due to higher production costs and lower ounces produced. In addition to the factors impacting Cash Cost per Silver Ounce, AISC, After By-product Credits, per Silver Ounce was also impacted by higher sustaining capital.

Lucky Friday

Dollars are in thousands (except per ounce and per ton amounts)Three Months EndedJune 30,Six Months EndedJune 30,
2024202320242023
Sales$59,071$42,648$94,411$91,758
Cost of sales and other direct production costs(26,815)(23,211)(46,423)(47,289)
Depreciation, depletion and amortization(10,708)(8,979)(18,619)(19,435)
Total cost of sales(37,523)(32,190)(65,042)(66,724)
Gross profit$21,548$10,458$29,369$25,034
Tons of ore milled107,44194,043193,675189,346
Production:
Silver (ounces)1,308,1551,286,6662,369,2202,549,130
Lead (tons)8,2298,18014,91816,214
Zinc (tons)3,3203,3386,1716,651
Payable metal quantities sold:
Silver (ounces)1,220,8501,134,6402,174,7412,440,652
Lead (tons)7,5997,12113,59115,479
Zinc (tons)2,9192,4664,5605,080
Ore grades:
Silver ounces per ton12.914.312.914.1
Lead percent8.1%9.1%8.2%9.0%
Zinc percent3.6%4.2%3.7%4.2%
Total production cost per ton$233.99$248.65$233.59$229.56
Cash Cost, After By-product Credits, per Silver Ounce (1)$5.32$6.96$6.67$5.64
AISC, After By-product Credits, per Silver Ounce (1)$12.74$14.24$14.50$12.48
Capital additions$10,818$16,317$25,806$31,024

(1)

A reconciliation of these non-GAAP measures to total cost of sales, the most comparable GAAP measure, can be found below in Reconciliation of Total Cost of Sales (GAAP) to Cash Cost, Before By-product Credits and Cash Cost, After By-product Credits (non-GAAP) and All-In Sustaining Cost, Before By-product Credits and All-In Sustaining Cost, After By-product Credits (non-GAAP).

During August 2023, mining was suspended while repairing an unused station in the #2 ventilation shaft, which is also the secondary egress. While under repair, a fire occurred causing damage to the station and shaft. The operation remained suspended due to a fire at the unused station. By early September, the fire had been extinguished, normal ventilation was reestablished and the workforce recalled. Following evaluation of alternatives, it was determined that in order to safely bring the mine back into production in the most rapid and cost-effective way, a new secondary egress needed to be developed to bypass the damaged portion of the #2 shaft. The new egress extends an existing ramp 1,600 feet, installed a 290-foot-long manway raise, and developed an 850-foot ventilation raise. This work resulted in operations being suspended for the remainder of 2023, with the mine restarting production on January 9, 2024, and ramping up to full production during March. The Company has property and business interruption insurance coverage with an underground sub-limit of $50.0 million, and through June 30, 2024, has received $35.2 million in property damage and business interruption insurance proceeds. There can be no assurance that we will succeed in receiving the full $50 million. The discussion of Lucky Friday's results below for the six months ended June 30, 2024 and 2023, have been impacted by the previously suspended operations.

Gross profit increased by $11.1 million for the three months ended June 30, 2024 compared to the same period in 2023, reflecting a combination of higher sales volumes for all metals and higher realized sales prices.

Gross profit increased by $4.3 million for the six months ended June 30, 2024, compared to the same period in 2023, reflecting higher realized prices for all metals produced, partly offset by lower sales volumes for all metals produced as the mine ramped up to full production following restart of operations on January 9, 2024.

Capital additions decreased by $5.5 million and $5.2 million for the three and six months ended June 30, 2024, respectively, compared to the same periods in 2023. There was lower development in the current period, in addition to the prior period including expenditures for the installation of a service hoist, coarse ore bunker and pre-production drilling.

The charts below illustrate the factors contributing to Cash Cost, After By-product Credits, Per Silver Ounce for Lucky Friday:

Three Months Ended June 30,Six Months Ended June 30,
2024202320242023
Cash Cost, Before By-product Credits, per Silver Ounce$22.27$22.30$23.08$21.67
By-product credits(16.95)(15.34)(16.41)(16.03)
Cash Cost, After By-product Credits, per Silver Ounce$5.32$6.96$6.67$5.64
Three Months Ended June 30,Six Months Ended June 30,
2024202320242023
AISC, Before By-product Credits, per Silver Ounce$29.69$29.58$30.91$28.51
By-product credits(16.95)(15.34)(16.41)(16.03)
AISC, After By-product Credits, per Silver Ounce$12.74$14.24$14.50$12.48

The decrease in Cash Cost, After By-product Credits, per Silver Ounce and AISC, After By-product Credits, per Silver Ounce for the three months ended June 30, 2024, compared to the same period in 2023 was primarily due to a combination of higher production and higher by-product credits, primarily resulting from an increase in base metals prices during the quarter.

The increase in Cash Cost, After By-product Credits, per Silver Ounce and AISC, After By-product Credits, per Silver Ounce for the six months ended June 30, 2024, compared to the same period in 2023 was primarily due to lower production and higher mining and milling costs.

Keno Hill

Dollars are in thousands (except per ounce and per ton amounts)Three Months EndedJune 30,Six Months EndedJune 30,
2024202320242023
Sales$28,950$1,581$39,797$1,581
Cost of sales and other direct production costs(24,221)(1,320)(31,466)(1,320)
Depreciation, depletion and amortization(4,729)(261)(8,331)(261)
Total cost of sales(28,950)(1,581)(39,797)(1,581)
Gross profit$—$—$—$—
Tons of ore milled36,97712,06462,14212,064
Production:
Silver (ounces)900,440184,2641,546,752184,264
Lead (tons)8454171,421417
Zinc (tons)471691769691
Payable metal quantities sold:
Silver (ounces)979,54365,6271,411,87465,627
Lead (tons)849241,20824
Zinc (tons)3374845348
Ore grades:
Silver ounces per ton25.120.2025.620.20
Lead percent2.4%2.5%2.4%2.5%
Zinc percent1.4%4.1%1.4%4.1%
Capital additions$14,533$3,505$24,879$20,625

We acquired our Keno Hill operations as part of the acquisition of Alexco Resource Corp. ("Alexco") on September 7, 2022, and have focused on development activities and began initial operation of the mill during the second quarter of 2023. The average throughput during the six months ended June 30, 2024, was 341 tons per day, with silver grades milled of 25.6 ounces per ton.

During the three months ended June 30, 2024, Keno Hill recorded sales and total cost of sales of $29.0 million related to concentrate produced and sold. The second quarter of 2024 had $1.8 million of site-specific ramp-up costs included in ramp-up and suspension costs, compared to $9.4 million in the second quarter of 2023. During the quarter, Keno Hill recorded capital additions of $14.5 million, related to various mine underground development projects, mobile equipment purchases and other projects including a surface backfill plant.

During the six months ended June 30, 2024, Keno Hill recorded sales and total cost of sales of $39.8 million related to concentrate produced and sold. The six months ended June 30, 2024 had $10.4 million of site-specific ramp up costs included in ramp-up and suspension costs, compared to $15.3 million in the same period of 2023. During the current year, Keno Hill recorded capital additions of $24.9 million, related to various mine underground development projects, a surface backfill plant and other mining equipment purchases.

Casa Berardi

Dollars are in thousands (except per ounce and per ton amounts)Three Months EndedJune 30,Six Months EndedJune 30,
2024202320242023
Sales$58,623$36,946$100,207$87,944
Cost of sales and other direct production costs(40,330)(32,304)(75,639)(81,266)
Depreciation, depletion and amortization(27,010)(10,272)(49,961)(24,308)
Total cost of sales(67,340)(42,576)(125,600)(105,574)
Gross loss$(8,717)$(5,630)$(25,393)$(17,630)
Tons of ore milled366,979318,704748,605747,858
Production:
Gold (ounces)23,18718,90145,19143,587
Silver (ounces)6,3385,95612,46511,601
Payable metal quantities sold:
Gold (ounces)24,96418,55544,96745,381
Silver (ounces)7,9744,89913,18711,345
Ore grades:
Gold ounces per ton0.070.070.070.07
Silver ounces per ton0.020.020.020.02
Total production cost per ton$107.84$97.69$102.07$103.58
Cash Cost, After By-product Credits, per Gold Ounce (1)$1,701$1,658$1,685$1,725
AISC, After By-product Credits, per Gold Ounce (1)$1,825$2,147$1,861$2,286
Capital additions$12,376$20,816$25,692$37,902

(1)

A reconciliation of these non-GAAP measures to total cost of sales, the most comparable GAAP measure, can be found below in Reconciliation of Total Cost of Sales (GAAP) to Cash Cost, Before By-product Credits and Cash Cost, After By-product Credits (non-GAAP) and All-In Sustaining Cost, Before By-product Credits and All-In Sustaining Cost, After By-product Credits (non-GAAP).

As part of the transition of the Casa Berardi mine from a combined underground and open pit operation to an open pit only operation, the lower margin east mine underground operations were closed in July 2023 and only the higher margin stopes of the west underground mine will be mined until they are exhausted. Following a recently completed stope-by-stope analysis this is expected to be at the end of 2024, at which time most underground activity, except for exploration is expected to cease. Following the halt to underground mining, Casa Berardi is expected to only produce gold from the 160 open pit, and at lower volumes than historic production levels with production expected to conclude no later than 2027. We forecast a gap in production from at least 2028 to at least 2030 when no ore will be mined and there will be no revenue. During this hiatus, our focus is expected to be on investing in infrastructure and equipment, and on permitting and stripping two expected new open pits, Principal and West Mine Crown Pillar. We expect to resume open pit mining at Casa Berardi no earlier than 2030, and anticipate that the mine will generate significant free cash flow at current gold prices.

Gross loss increased by $3.1 million to $8.7 million for the three months ended June 30, 2024, compared to a gross loss of $5.6 million in the same period in 2023. The increase in gross loss includes $1.2 million in product inventory net realizable value write downs attributable to higher depreciation, depletion and amortization expense, reflecting the accelerated amortization of the west underground mine and the cessation of capitalization of any underground mine development costs effective July 2023, in addition to higher mining and milling costs in the current period. Furthermore, the prior period contained $2.2 million of costs classified as suspension costs in relation to the mine's suspension of activities caused by road closures from the Quebec forest fires. These factors were partly offset by higher realized gold prices and gold ounces sold. Capital additions decreased by $8.4 million during the quarter, compared to the same period in 2023, primarily related to the cessation of capitalization of underground development.

Gross loss increased by $7.8 million to $25.4 million for the six months ended June 30, 2024, compared to a gross loss of $17.6 million in the same period in 2023. The increase in gross loss includes $6.3 million in product inventory net realizable value write downs attributable to higher depreciation, depletion and amortization expense, reflecting the accelerated amortization of the west underground mine, the purchase of mobile equipment fleet in June and early July 2023 and the cessation of capitalization of any underground mine development costs effective July 2023. As mentioned above, the prior period contained $2.2 million of costs classified as suspension costs in relation to the mine's suspension of activities caused by road closures from the Quebec forest fires. Capital additions decreased by $12.2 million during the six-month period ended June 30, 2024, compared to the same period in 2023, primarily related to the cessation of capitalization of underground development. The majority of capital additions for the current year have related to a tailings dam raise and paste backfill.

The charts below illustrate the factors contributing to Cash Cost, After By-product Credits, Per Gold Ounce for Casa Berardi:

Three Months Ended June 30,Six Months Ended June 30,
2024202320242023
Cash Cost, Before By-product Credits, per Gold Ounce$1,709$1,666$1,692$1,731
By-product credits(8)(8)(7)(6)
Cash Cost, After By-product Credits, per Gold Ounce$1,701$1,658$1,685$1,725
Three Months Ended June 30,Six Months Ended June 30,
2024202320242023
AISC, Before By-product Credits, per Gold Ounce$1,833$2,155$1,868$2,292
By-product credits(8)(8)(7)(6)
AISC, After By-product Credits, per Gold Ounce$1,825$2,147$1,861$2,286

The increase in Cash Cost After By-product Credits, per Gold Ounce, for the three months ended June 30, 2024, compared to the same period in 2023 was primarily due to higher mining and milling costs, partly offset by higher gold production. Lower AISC, After By-product Credits, per Gold Ounce reflected the continuing positive impact of no underground development and the prior period containing machinery and equipment expenditures related to surface operations.

The decrease in Cash Cost After By-product Credits, per Gold Ounce, for the six months ended June 30, 2024 was primarily related to lower production costs from the cessation of underground mining of the east mine during July 2023, in addition to higher production. Decreased sustaining capital for the six months ended June 30, 2024, reflecting no underground development and the prior period containing machinery and equipment expenditures related to surface operations positively impacted AISC, After By-product Credits, per Gold Ounce.

Corporate Matters

Income Taxes

During the three and six months ended June 30, 2024, an income and mining tax provision of $9.1 million and $10.9 million, respectively, resulted in an effective tax rate of 24.6% and 33.0%, respectively. This compares to an income and mining tax provision of $5.2 million and $8.4 million which resulted in an effective tax rate of -49.0% and -80.3%, for the three and six months ended June 30, 2023, respectively. The comparability of our income and mining tax provision and effective tax rate for the reported periods was impacted by multiple factors, primarily: (i) mining taxes; (ii) variations in our income before income taxes; (iii) geographic distribution of that income; (iv) foreign exchange rates including non-recognition of foreign exchange gains and losses; (v) percentage depletion; and (vi) the non-recognition of tax assets. The effective tax rate will fluctuate, sometimes significantly, period to period. The change in the effective tax rate during the three and six months ended June 30, 2024, compared to the comparable periods in 2023 is primarily related to the reported consolidated income (loss) as well as the losses incurred at our consolidated Alexco subsidiaries, and our Nevada subsidiaries, for which no tax benefit is recognized due to uncertainty surrounding our ability to utilize these future tax benefits.

Each reporting period we assess our deferred tax balances based on a review of long-range forecasts and quarterly activity. A valuation allowance is provided for deferred tax assets for which it is more likely than not the related tax benefits will not be realized. We analyze our deferred tax assets and, if it is determined that we will not realize all or a portion of our deferred tax assets, we record or increase a valuation allowance. Conversely, if it is determined we will ultimately more likely than not be able to realize all or a portion of the related benefits for which a valuation allowance has been provided, all or a portion of the related valuation allowance will be reduced. There are a number of factors that impact our ability to realize our deferred tax assets. Valuation allowances are provided on deferred tax assets in Nevada, Mexico, and certain Canadian jurisdictions. For additional information, please see risk factors Our accounting and other estimates may be imprecise and Our ability to recognize the benefits of deferred tax assets related to net operating loss carryforwards and other items is dependent on future cash flows and taxable incomein Item 1A - Risk Factors in our 2023 Form 10-K.

Reconciliation of Total Cost of Sales to Cash Cost, Before By-product Credits and Cash Cost, After By-product Credits (non-GAAP) and All-In Sustaining Cost, Before By-product Credits and All-In Sustaining Cost, After By-product Credits (non-GAAP)

The tables below present reconciliations between the most comparable GAAP measure of total cost of sales to the non-GAAP measures of (i) Cash Cost, Before By-product Credits, (ii) Cash Cost, After By-product Credits, (iii) AISC, Before By-product Credits and (iv) AISC, After By-product Credits for our operations and for the Company for the three and six months ended June 30, 2024 and 2023.

Cash Cost, After By-product Credits, per Ounce and AISC, After By-product Credits, per Ounce are measures developed by precious metals companies (including the Silver Institute and the World Gold Council) in an effort to provide a uniform standard for comparison purposes. There can be no assurance, however, that these non-GAAP measures as we report them are the same as those reported by other mining companies.

Cash Cost, After By-product Credits, per Ounce is an important operating statistic that we utilize to measure each mine's operating performance. We use AISC, After By-product Credits, per Ounce as a measure of our mines' net cash flow after costs for reclamation and sustaining capital. This is similar to the Cash Cost, After By-product Credits, per Ounce non-GAAP measure we report, but also includes reclamation and sustaining capital costs. Current GAAP measures used in the mining industry, such as cost of goods sold, do not capture all the expenditures incurred to discover, develop and sustain silver and gold production. Cash Cost, After By-product Credits, per Ounce and AISC, After By-product Credits, per Ounce also allow us to benchmark the performance of each of our mines versus those of our competitors. As a silver and gold mining company, we also use these statistics on an aggregate basis - aggregating the Greens Creek and Lucky Friday mines to compare our performance with that of other silver mining companies. Similarly, these statistics are useful in identifying acquisition and investment opportunities as they provide a common tool for measuring the financial performance of other mines with varying geologic, metallurgical and operating characteristics.

Cash Cost, Before By-product Credits and AISC, Before By-product Credits include all direct and indirect operating cash costs related directly to the physical activities of producing metals, including mining, processing and other plant costs, third-party refining expense, on-site general and administrative costs, royalties and mining production taxes. AISC, Before By-product Credits for each mine also includes reclamation and sustaining capital costs. AISC, Before By-product Credits for our consolidated silver properties also includes corporate costs for general and administrative expense and sustaining capital costs. By-product credits include revenues earned from all metals other than the primary metal produced at each unit. As depicted in the tables below, by-product credits comprise an essential element of our silver unit cost structure, distinguishing our silver operations due to the polymetallic nature of their orebodies.

In addition to the uses described above, Cash Cost, After By-product Credits, per Ounce and AISC, After By-product Credits, per Ounce provide management and investors an indication of operating cash flow, after consideration of the average price received from production. We also use these measurements for the comparative monitoring of performance of our mining operations period-to-period from a cash flow perspective.

Casa Berardi reports Cash Cost, After By-product Credits, per Gold Ounce and AISC, After By-product Credits, per Gold Ounce for the production of gold, their primary product, and by-product revenues earned from silver, which is a by-product at Casa Berardi. Only costs and ounces produced relating to units with the same primary product are combined to represent Cash Cost, After By-product Credits, per Ounce and AISC, After By-product Credits, per Ounce. Thus, the gold produced at Casa Berardi is not included as a by-product credit when calculating Cash Cost, After By-product Credits, per Silver Ounce and AISC, After By-product Credits, per Silver Ounce for the total of Greens Creek and Lucky Friday, our combined silver properties. Similarly, the silver produced at our other two units is not included as a by-product credit when calculating the gold metrics for Casa Berardi.

In thousands (except per ounce amounts)Three Months Ended June 30, 2024
Greens Creek · Lucky Friday · Keno Hill (6) · Corporate (2) · Total Silver
Total cost of sales$56,786$37,523$28,950$—$123,259
Depreciation, depletion and amortization(11,316)(10,708)(4,729)—(26,753)
Treatment costs6,0692,746——8,815
Change in product inventory7,296(115)——7,181
Reclamation and other costs(882)(311)——(1,193)
Exclusion of Keno Hill cash costs (6)——(24,221)—(24,221)
Cash Cost, Before By-product Credits (1)57,95329,135——87,088
Reclamation and other costs785183——968
Sustaining capital10,9119,517—1,03521,463
General and administrative———14,74014,740
AISC, Before By-product Credits (1)69,64938,835—15,775124,259
By-product credits:
Zinc(21,873)(6,706)——(28,579)
Gold(28,844)———(28,844)
Lead(6,818)(15,466)——(22,284)
Total By-product credits(57,535)(22,172)——(79,707)
Cash Cost, After By-product Credits$418$6,963$—$—$7,381
AISC, After By-product Credits$12,114$16,663$—$15,775$44,552
Ounces produced2,2441,3083,552
Cash Cost, Before By-product Credits, per Ounce$25.83$22.27$24.52
By-product credits per ounce(25.64)(16.95)(22.44)
Cash Cost, After By-product Credits, per Ounce$0.19$5.32$2.08
AISC, Before By-product Credits, per Ounce$31.04$29.69$34.98
By-product credits per ounce(25.64)(16.95)(22.44)
AISC, After By-product Credits, per Ounce$5.40$12.74$12.54
In thousands (except per ounce amounts)Three Months Ended June 30, 2024
Gold - Casa BerardiOther (4)Total Gold and Other
Total cost of sales$67,340$3,628$70,968
Depreciation, depletion and amortization(27,010)—(27,010)
Treatment costs52—52
Change in product inventory(550)—(550)
Reclamation and other costs(206)—(206)
Exclusion of Other costs—(3,628)(3,628)
Cash Cost, Before By-product Credits (1)39,626—39,626
Reclamation and other costs206—206
Sustaining capital2,667—2,667
AISC, Before By-product Credits (1)42,499—42,499
By-product credits:
Silver(183)—(183)
Total By-product credits(183)—(183)
Cash Cost, After By-product Credits$39,443$—$39,443
AISC, After By-product Credits$42,316$—$42,316
Divided by ounces produced23—23
Cash Cost, Before By-product Credits, per Ounce$1,709$—$1,709
By-product credits per ounce(8)—(8)
Cash Cost, After By-product Credits, per Ounce$1,701$—$1,701
AISC, Before By-product Credits, per Ounce$1,833$—$1,833
By-product credits per ounce(8)—(8)
AISC, After By-product Credits, per Ounce$1,825$—$1,825
In thousands (except per ounce amounts)Three Months Ended June 30, 2024
Total SilverTotal Gold and OtherTotal
Total cost of sales$123,259$70,968$194,227
Depreciation, depletion and amortization(26,753)(27,010)(53,763)
Treatment costs8,815528,867
Change in product inventory7,181(550)6,631
Reclamation and other costs(1,193)(206)(1,399)
Exclusion of Keno Hill cash costs (6)(24,221)—(24,221)
Exclusion of Other costs—(3,628)(3,628)
Cash Cost, Before By-product Credits (1)87,08839,626126,714
Reclamation and other costs9682061,174
Sustaining capital21,4632,66724,130
General and administrative14,740—14,740
AISC, Before By-product Credits (1)124,25942,499166,758
By-product credits:
Zinc(28,579)—(28,579)
Gold(28,844)—(28,844)
Lead(22,284)—(22,284)
Silver—(183)(183)
Total By-product credits(79,707)(183)(79,890)
Cash Cost, After By-product Credits$7,381$39,443$46,824
AISC, After By-product Credits$44,552$42,316$86,868
Divided by ounces produced3,55223
Cash Cost, Before By-product Credits, per Ounce$24.52$1,709
By-product credits per ounce(22.44)(8)
Cash Cost, After By-product Credits, per Ounce$2.08$1,701
AISC, Before By-product Credits, per Ounce$34.98$1,833
By-product credits per ounce(22.44)(8)
AISC, After By-product Credits, per Ounce$12.54$1,825
In thousands (except per ounce amounts)Three Months Ended June 30, 2023
Greens Creek · Lucky Friday · Keno Hill (6) · Corporate (2) · Total Silver
Total cost of sales$63,054$32,190$1,581$—$96,825
Depreciation, depletion and amortization(13,078)(8,979)(261)—(22,318)
Treatment costs10,3764,187113—14,676
Change in product inventory(1,242)1,546——304
Reclamation and other costs263(250)(1,433)—(1,420)
Cash Cost, Before By-product Credits (1)59,37328,694——88,067
Reclamation and other costs722285——1,007
Sustaining capital8,7149,081—68818,483
General and administrative———10,78310,783
AISC, Before By-product Credits (1)68,80938,060—11,471118,340
By-product credits:
Zinc(20,923)(5,448)——(26,371)
Gold(28,458)———(28,458)
Lead(6,860)(14,287)——(21,147)
Total By-product credits(56,241)(19,735)——(75,976)
Cash Cost, After By-product Credits$3,132$8,959$—$—$12,091
AISC, After By-product Credits$12,568$18,325$—$11,471$42,364
Divided by ounces produced2,3561,2873,643
Cash Cost, Before By-product Credits, per Ounce$25.20$22.30$24.18
By-product credits per ounce(23.87)(15.34)(20.86)
Cash Cost, After By-product Credits, per Ounce$1.33$6.96$3.32
AISC, Before By-product Credits, per Ounce$29.21$29.58$32.49
By-product credits per ounce(23.87)(15.34)(20.86)
AISC, After By-product Credits, per Ounce$5.34$14.24$11.63
In thousands (except per ounce amounts)Three Months Ended June 30, 2023 (5)
Gold - Casa Berardi · Other · Total Gold and Other
Total cost of sales$42,576$1,071$43,647
Depreciation, depletion and amortization(10,272)(127)(10,399)
Treatment costs351—351
Change in product inventory(951)—(951)
Reclamation and other costs(219)—(219)
Exclusion of Other costs—(944)(944)
Cash Cost, Before By-product Credits (1)31,485—31,485
Reclamation and other costs219—219
Sustaining capital9,025—9,025
AISC, Before By-product Credits (1)40,72940,729
By-product credits:
Silver(144)—(144)
Total By-product credits(144)—(144)
Cash Cost, After By-product Credits$31,341$—$31,341
AISC, After By-product Credits$40,585$—$40,585
Divided by ounces produced19—19
Cash Cost, Before By-product Credits, per Ounce$1,666$—$1,666
By-product credits per ounce(8)—(8)
Cash Cost, After By-product Credits, per Ounce$1,658$—$1,658
AISC, Before By-product Credits, per Ounce$2,155$—$2,155
By-product credits per ounce(8)—(8)
AISC, After By-product Credits, per Ounce$2,147$—$2,147
In thousands (except per ounce amounts)Three Months Ended June 30, 2023 (5)
Total SilverTotal Gold and OtherTotal
Total cost of sales$96,825$43,647$140,472
Depreciation, depletion and amortization(22,318)(10,399)(32,717)
Treatment costs14,67635115,027
Change in product inventory304(951)(647)
Reclamation and other costs(1,420)(219)(1,639)
Exclusion of Other costs—(944)(944)
Cash Cost, Before By-product Credits (1)88,06731,485119,552
Reclamation and other costs1,0072191,226
Sustaining capital18,4839,02527,508
General and administrative10,783—10,783
AISC, Before By-product Credits (1)118,34040,729159,069
By-product credits:
Zinc(26,371)—(26,371)
Gold(28,458)—(28,458)
Lead(21,147)—(21,147)
Silver—(144)(144)
Total By-product credits(75,976)(144)(76,120)
Cash Cost, After By-product Credits$12,091$31,341$43,432
AISC, After By-product Credits$42,364$40,585$82,949
Divided by ounces produced3,64319
Cash Cost, Before By-product Credits, per Ounce$24.18$1,666
By-product credits per ounce(20.86)(8)
Cash Cost, After By-product Credits, per Ounce$3.32$1,658
AISC, Before By-product Credits, per Ounce$32.49$2,155
By-product credits per ounce(20.86)(8)
AISC, After By-product Credits, per Ounce$11.63$2,147
In thousands (except per ounce amounts)Six Months Ended June 30, 2024
Greens Creek · Lucky Friday · Keno Hill (6) · Corporate (2) · Total Silver
Total cost of sales$126,643$65,042$39,797$—$231,482
Depreciation, depletion and amortization(25,759)(18,619)(8,331)—(52,709)
Treatment costs15,7935,969——21,762
Change in product inventory5,100496——5,596
Reclamation and other costs(1,537)(413)——(1,950)
Exclusion of Lucky Friday cash costs (3)—(3,634)——(3,634)
Exclusion of Keno Hill cash costs (6)——(31,466)—(31,466)
Cash Cost, Before By-product Credits (1)120,24048,841——169,081
Reclamation and other costs1,570405——1,975
Sustaining capital19,32721,568—1,10141,996
Exclusion of Lucky Friday sustaining costs (3)—(5,396)——(5,396)
General and administrative———25,95625,956
AISC, Before By-product Credits (1)141,13765,418—27,057233,612
By-product credits:
Zinc(42,079)(11,491)——(53,570)
Gold(55,395)———(55,395)
Lead(13,799)(27,187)——(40,986)
Exclusion of Lucky Friday by-product credits (3)—3,943——3,943
Total By-product credits(111,273)(34,735)——(146,008)
Cash Cost, After By-product Credits$8,967$14,106$—$—$23,073
AISC, After By-product Credits$29,864$30,683$—$27,057$87,604
Ounces produced4,7222,3697,091
Exclusion of Lucky Friday ounces produced (3)—(253)(253)
Divided by ounces produced4,7222,1166,838
Cash Cost, Before By-product Credits, per Ounce$25.46$23.08$24.73
By-product credits per ounce(23.56)(16.41)(21.35)
Cash Cost, After By-product Credits, per Ounce$1.90$6.67$3.38
AISC, Before By-product Credits, per Ounce$29.89$30.91$34.16
By-product credits per ounce(23.56)(16.41)(21.35)
AISC, After By-product Credits, per Ounce$6.33$14.50$12.81
In thousands (except per ounce amounts)Six Months Ended June 30, 2024
Casa BerardiOther (4)Total Gold
Total cost of sales$125,600$7,513$133,113
Depreciation, depletion and amortization(49,961)—(49,961)
Treatment costs76—76
Change in product inventory1,189—1,189
Reclamation and other costs(415)—(415)
Exclusion of Other costs—(7,513)(7,513)
Cash Cost, Before By-product Credits (1)76,489—76,489
Reclamation and other costs415—415
Sustaining capital7,528—7,528
AISC, Before By-product Credits (1)84,432—84,432
By-product credits:
Silver(326)—(326)
Total By-product credits(326)—(326)
Cash Cost, After By-product Credits$76,163$—$76,163
AISC, After By-product Credits$84,106$—$84,106
Divided by ounces produced45—45
Cash Cost, Before By-product Credits, per Ounce$1,692$—$1,692
By-product credits per ounce(7)—(7)
Cash Cost, After By-product Credits, per Ounce$1,685$—$1,685
AISC, Before By-product Credits, per Ounce$1,868$—$1,868
By-product credits per ounce(7)—(7)
AISC, After By-product Credits, per Ounce$1,861$—$1,861
In thousands (except per ounce amounts)Six Months Ended June 30, 2024
Total SilverTotal Gold and OtherTotal
Total cost of sales$231,482$133,113$364,595
Depreciation, depletion and amortization(52,709)(49,961)(102,670)
Treatment costs21,7627621,838
Change in product inventory5,5961,1896,785
Reclamation and other costs(1,950)(415)(2,365)
Exclusion of Lucky Friday cash costs (3)(3,634)—(3,634)
Exclusion of Keno Hill cash costs (6)(31,466)—(31,466)
Exclusion of Other costs—(7,513)(7,513)
Cash Cost, Before By-product Credits (1)169,08176,489245,570
Reclamation and other costs1,9754152,390
Sustaining capital41,9967,52849,524
Exclusion of Lucky Friday sustaining costs (3)(5,396)—(5,396)
General and administrative25,956—25,956
AISC, Before By-product Credits (1)233,61284,432318,044
By-product credits:
Zinc(53,570)—(53,570)
Gold(55,395)—(55,395)
Lead(40,986)—(40,986)
Silver—(326)(326)
Exclusion of Lucky Friday by-product credits (3)3,943—3,943
Total By-product credits(146,008)(326)(146,334)
Cash Cost, After By-product Credits$23,073$76,163$99,236
AISC, After By-product Credits$87,604$84,106$171,710
Ounces produced7,09145
Exclusion of Lucky Friday ounces produced (3)(253)—
Divided by ounces produced6,83845
Cash Cost, Before By-product Credits, per Ounce$24.73$1,692
By-product credits per ounce(21.35)(7)
Cash Cost, After By-product Credits, per Ounce$3.38$1,685
AISC, Before By-product Credits, per Ounce$34.16$1,868
By-product credits per ounce(21.35)(7)
AISC, After By-product Credits, per Ounce$12.81$1,861
In thousands (except per ounce amounts)Six Months Ended June 30, 2023
Greens Creek · Lucky Friday · Keno Hill(6) · Corporate (2) · Total Silver
Total cost of sales$129,342$66,724$1,581$—$197,647
Depreciation, depletion and amortization(27,542)(19,435)(261)—(47,238)
Treatment costs20,7459,464113—30,322
Change in product inventory(2,856)(863)——(3,719)
Reclamation and other costs134(658)——(524)
Exclusion of Keno Hill cash costs (6)——(1,433)—(1,433)
Cash Cost, Before By-product Credits (1)119,82355,232——175,055
Reclamation and other costs1,444570—2,014
Sustaining capital15,35516,865—59432,814
General and administrative———22,85322,853
AISC, Before By-product Credits (1)136,62272,667—23,447232,736
By-product credits:
Zinc(44,928)(12,264)——(57,192)
Gold(53,744)———(53,744)
Lead(14,802)(28,586)——(43,388)
Total By-product credits(113,474)(40,850)——(154,324)
Cash Cost, After By-product Credits$6,349$14,382$—$—$20,731
AISC, After By-product Credits$23,148$31,817$—$23,447$78,412
Divided by ounces produced5,1292,5497,678
Cash Cost, Before By-product Credits, per Ounce$23.36$21.67$22.80
By-product credits per ounce(22.13)(16.03)(20.10)
Cash Cost, After By-product Credits, per Ounce$1.23$5.64$2.70
AISC, Before By-product Credits, per Ounce$26.64$28.51$30.31
By-product credits per ounce(22.13)(16.03)(20.10)
AISC, After By-product Credits, per Ounce$4.51$12.48$10.21
In thousands (except per ounce amounts)Six Months Ended June 30, 2023
Casa BerardiOther (4)Total Gold
Total cost of sales$105,574$1,803$107,377
Depreciation, depletion and amortization(24,308)(174)(24,482)
Treatment costs818—818
Change in product inventory(3,368)—(3,368)
Reclamation and other costs(436)—(436)
Exclusion of Casa Berardi cash costs (7)(2,851)—(2,851)
Exclusion of Other costs—(1,629)(1,629)
Cash Cost, Before By-product Credits (1)75,429—75,429
Reclamation and other costs436—436
Sustaining capital24,041—24,041
AISC, Before By-product Credits (1)99,906—99,906
By-product credits:
Silver(271)—(271)
Total By-product credits(271)—(271)
Cash Cost, After By-product Credits$75,158$—$75,158
AISC, After By-product Credits$99,635$—$99,635
Divided by ounces produced44—44
Cash Cost, Before By-product Credits, per Ounce$1,731$—$1,731
By-product credits per ounce(6)—(6)
Cash Cost, After By-product Credits, per Ounce$1,725$—$1,725
AISC, Before By-product Credits, per Ounce$2,292$—$2,292
By-product credits per ounce(6)—(6)
AISC, After By-product Credits, per Ounce$2,286$—$2,286
In thousands (except per ounce amounts)Six Months Ended June 30, 2023
Total SilverTotal GoldTotal
Total cost of sales$197,647$107,377$305,024
Depreciation, depletion and amortization(47,238)(24,482)(71,720)
Treatment costs30,32281831,140
Change in product inventory(3,719)(3,368)(7,087)
Reclamation and other costs(524)(436)(960)
Exclusion of Keno Hill cash costs(1,433)—(1,433)
Exclusion of Casa Berardi cash costs (7)—(2,851)(2,851)
Exclusion of Other costs—(1,629)(1,629)
Cash Cost, Before By-product Credits (1)175,05575,429250,484
Reclamation and other costs2,0144362,450
Sustaining capital32,81424,04156,855
General and administrative22,853—22,853
AISC, Before By-product Credits (1)232,73699,906332,642
By-product credits:
Zinc(57,192)—(57,192)
Gold(53,744)—(53,744)
Lead(43,388)—(43,388)
Silver—(271)(271)
Total By-product credits(154,324)(271)(154,595)
Cash Cost, After By-product Credits$20,731$75,158$95,889
AISC, After By-product Credits$78,412$99,635$178,047
Divided by ounces produced7,67844
Cash Cost, Before By-product Credits, per Ounce$22.80$1,731
By-product credits per ounce(20.10)(6)
Cash Cost, After By-product Credits, per Ounce$2.70$1,725
AISC, Before By-product Credits, per Ounce$30.31$2,292
By-product credits per ounce(20.10)(6)
AISC, After By-product Credits, per Ounce$10.21$2,286

(1)

Includes all direct and indirect operating costs related to the physical activities of producing metals, including mining, processing and other plant costs, third-party refining and marketing expense, on-site general and administrative costs and royalties, before by-product revenues earned from all metals other than the primary metal produced at each operation. AISC, Before By-product Credits also includes reclamation and sustaining capital costs.

(2)

AISC, Before By-product Credits for our consolidated silver properties includes corporate costs for general and administrative expense and sustaining capital.

(3)

Lucky Friday operations were suspended in August 2023 following the underground fire in the #2 shaft secondary egress and resumed on January 9, 2024. The portion of cash costs, sustaining costs, by-product credits, and silver production incurred during the suspension period are excluded from the calculation of total cost of sales, Cash Cost, Before By-product Credits, Cash Cost, After By-product Credits, AISC, Before By-product Credits, and AISC, After By-product Credits.

(4)

Other includes $3.6 million and $7.5 million of total cost of sales for the three and six months ended June 30, 2024, respectively, related to our environmental remediation services business. For the three and six months ended June 30, 2023, Other includes total cost of sales of $1.1 million and $1.8 million, respectively, related to our environmental remediation services business and Nevada operations.

(5)

During the three months ended March 31, 2023, the Company completed the necessary studies to conclude usage of the F-160 pit as a tailings storage facility after mining is complete. As a result, a portion of the mining costs have been excluded from Cash Cost, Before By-product Credits and AISC, Before By-product Credits.

(6)

Keno Hill is in the ramp-up phase of production and is excluded from the calculation of Cash Cost, Before By-product Credits, Cash Cost, After By-product Credits, AISC, Before By-product Credits, and AISC, After By-product Credits.