OGE ENERGY CORP
For the period ended Mar 31, 2024. Filed May 1, 2024.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2024 · Filed May 1, 2024
Extracted filing text, with the paragraph anchors used by the comparison.
See the whole filing, with its images and exhibitsContents
Combined Notes to Condensed Financial Statements
COMBINED NOTES TO THE CONDENSED FINANCIAL STATEMENTS
Index of Combined Notes to Condensed Financial Statements
The Combined Notes to the Condensed Financial Statements are a combined presentation for OGE Energy and OG&E. The following table indicates the Registrant(s) to which each Note applies.
| OGE Energy | OG&E | |
| Note 1. Summary of Significant Accounting Policies | X | X |
|---|---|---|
| Note 2. Accounting Pronouncements | X | X |
| Note 3. Revenue Recognition | X | X |
| Note 4. Fair Value Measurements | X | X |
| Note 5. Stock-Based Compensation | X | X |
| Note 6. Income Taxes | X | X |
| Note 7. Common Equity | X | |
| Note 8. Long-Term Debt | X | X |
| Note 9. Short-Term Debt and Credit Facilities | X | X |
| Note 10. Retirement Plans and Postretirement Benefit Plans | X | X |
| Note 11. Report of Business Segments | X | |
| Note 12. Commitments and Contingencies | X | X |
| Note 13. Rate Matters and Regulation | X | X |
- Summary of Significant Accounting Policies
Organization
OGE Energy is a holding company whose primary investment provides electricity in Oklahoma and western Arkansas. OGE Energy's electric company operations are conducted through its wholly-owned subsidiary, OG&E, which generates, transmits, distributes and sells electric energy in Oklahoma and western Arkansas and are reported through OGE Energy's electric company business segment. OG&E's rates are subject to regulation by the OCC, the APSC and the FERC. OG&E was incorporated in 1902 under the laws of the Oklahoma Territory and is the largest electric company in Oklahoma, with a franchised service territory that includes Fort Smith, Arkansas and the surrounding communities. OG&E sold its retail natural gas business in 1928 and is no longer engaged in the natural gas distribution business.
The accounts of OGE Energy and its wholly-owned subsidiaries, including OG&E, are included in OGE Energy's condensed consolidated financial statements. All intercompany transactions and balances are eliminated in such consolidation.
Basis of Presentation
The condensed financial statements included herein have been prepared by the Registrants, without audit, pursuant to the rules and regulations of the Securities and Exchange Commission. Certain information and footnote disclosures normally included in financial statements prepared in accordance with GAAP have been condensed or omitted pursuant to such rules and regulations; however, the Registrants believe that the disclosures are adequate to prevent the information presented from being misleading.
In the opinion of management, all adjustments necessary to fairly present the financial position of the Registrants at March 31, 2024 and December 31, 2023, the results of the Registrants' operations for the three months ended March 31, 2024 and 2023 and the Registrants' cash flows for the three months ended March 31, 2024 and 2023 have been included and are of a normal, recurring nature except as otherwise disclosed. Management also has evaluated the impact of events occurring after March 31, 2024 up to the date of issuance of these condensed financial statements, and these statements contain all necessary adjustments and disclosures resulting from that evaluation.
Due to seasonal fluctuations and other factors, the Registrants' operating results for the three months ended March 31, 2024 are not necessarily indicative of the results that may be expected for the year ending December 31, 2024 or for any future period. The condensed financial statements and notes thereto should be read in conjunction with the audited financial statements and notes thereto included in the Registrants'2023 Form 10-K.
Accounting Records
The accounting records of OG&E are maintained in accordance with the Uniform System of Accounts prescribed by the FERC and adopted by the OCC and the APSC. Additionally, OG&E, as a regulated electric company, is subject to accounting principles for certain types of rate-regulated activities, which provide that certain incurred costs that would otherwise be charged to expense can be deferred as regulatory assets, based on the expected recovery from customers in future rates. Likewise, certain actual or anticipated credits that would otherwise reduce expense can be deferred as regulatory liabilities, based on the expected flowback to customers in future rates. Management's expected recovery of deferred costs and flowback of deferred credits generally results from specific decisions by regulators granting such ratemaking treatment.
OG&E records certain incurred costs and obligations as regulatory assets or liabilities if, based on regulatory orders or other available evidence, it is probable that the costs or obligations will be included in amounts allowable for recovery or refund in future rates. The following table presents a summary of OG&E's regulatory assets and liabilities.
| March 31, | December 31, | |
|---|---|---|
| (In millions) | 2024 | 2023 |
| REGULATORY ASSETS | ||
| Current: | ||
| Oklahoma Energy Efficiency Rider under recoveries (A) | $1.7 | $3.8 |
| Other (A) | 2.3 | 2.7 |
| Total current regulatory assets | $4.0 | $6.5 |
| Non-current: | ||
| Oklahoma deferred storm expenses | $254.9 | $261.1 |
| Pension tracker | 95.6 | 91.9 |
| Benefit obligations regulatory asset | 92.8 | 89.4 |
| Arkansas Winter Storm Uri costs | 69.2 | 71.0 |
| Sooner Dry Scrubbers | 17.0 | 17.2 |
| Arkansas deferred pension expenses | 12.4 | 12.7 |
| Oklahoma SAP S/4 HANA deferred expenses | 7.6 | 6.0 |
| Unamortized loss on reacquired debt | 7.0 | 7.2 |
| COVID-19 impacts | 6.4 | 6.8 |
| Frontier Plant deferred expenses | 3.2 | 3.6 |
| Other | 10.5 | 10.7 |
| Total non-current regulatory assets | $576.6 | $577.6 |
| REGULATORY LIABILITIES | ||
| Current: | ||
| Oklahoma fuel clause over recoveries | $19.9 | $15.6 |
| Arkansas fuel clause over recoveries | 16.6 | 4.9 |
| SPP cost tracker over recoveries (B) | 10.8 | 10.4 |
| Other (B) | 1.0 | 2.3 |
| Total current regulatory liabilities | $48.3 | $33.2 |
| Non-current: | ||
| Income taxes refundable to customers, net | $823.9 | $838.0 |
| Accrued removal obligations, net | 222.0 | 222.0 |
| Other | 1.5 | 1.6 |
| Total non-current regulatory liabilities | $1,047.4 | $1,061.6 |
(A)
Included in Other Current Assets in the condensed balance sheets.
(B)
Included in Other Current Liabilities in the condensed balance sheets.
Management continuously monitors the future recoverability of regulatory assets. When in management's judgment future recovery becomes impaired, the amount of the regulatory asset is adjusted, as appropriate. If OG&E were required to discontinue the application of accounting principles for certain types of rate-regulated activities for some or all of its operations, it could result in writing off the related regulatory assets or liabilities, which could have significant financial effects.
Allowance for Uncollectible Accounts Receivable
Customer balances are generally written off if not collected within six months after the final billing date. The allowance for uncollectible accounts receivable for OG&E is generally calculated by multiplying the last six months of electric revenue by the provision rate, which is based on a 12-month historical average of actual balances written off and is adjusted for current conditions and supportable forecasts as necessary. To the extent the historical collection rates, when incorporating forecasted conditions, are not representative of future collections, there could be an effect on the amount of uncollectible expense recognized. Also, a portion of the uncollectible provision related to fuel within the Oklahoma jurisdiction is being recovered through the fuel adjustment clause. The allowance for uncollectible accounts receivable is a reduction to Accounts Receivable in the condensed balance sheets and is included in Other Operation and Maintenance Expense in the condensed statements of income.
New business customers are required to provide a security deposit in the form of cash, bond or irrevocable letter of credit that is refunded when the account is closed. New residential customers whose outside credit scores indicate an elevated risk are required to provide a security deposit that is refunded based on customer protection rules defined by the OCC and the APSC. The payment behavior of all existing customers is continuously monitored, and, if the payment behavior indicates sufficient risk within the meaning of the applicable utility regulation, customers will be required to provide a security deposit.
Related Party Transactions
OGE Energy charges operating costs to OG&E based on several factors, and operating costs directly related to OG&E are assigned as such. Operating costs incurred for the benefit of OG&E are allocated either as overhead based primarily on labor costs or using the "Distrigas" method, which is a three-factor formula that uses an equal weighting of payroll, net operating revenues and gross property, plant and equipment. OGE Energy adopted this method as a result of a recommendation by the OCC Staff and believes this method provides a reasonable basis for allocating common expenses. OGE Energy charged operating costs to OG&E of $37.6 million during the three months ended March 31, 2023. As a result of OGE Energy's exit of its former midstream business and becoming primarily an electric company, all employees are directly employed by OG&E beginning in 2024.
Accumulated Other Comprehensive Income (Loss)
The following tables present changes in the components of accumulated other comprehensive income (loss) attributable to OGE Energy during thethree months ended March 31, 2024 and 2023. All amounts below are presented net of tax.
| (In millions) | Pension Plan and Restoration of Retirement Income Plan | Postretirement Benefit Plans | Total |
|---|---|---|---|
| Balance at December 31, 2023 | $(12.9) | $5.7 | $(7.2) |
| Amounts reclassified from accumulated other comprehensive income (loss) | 0.1 | (0.1) | — |
| Regulatory classification of certain pension costs | 3.9 | — | 3.9 |
| Balance at March 31, 2024 | $(8.9) | $5.6 | $(3.3) |
| (In millions) | Pension Plan and Restoration of Retirement Income Plan | Postretirement Benefit Plans | Total |
|---|---|---|---|
| Balance at December 31, 2022 | $(18.5) | $6.6 | $(11.9) |
| Amounts reclassified from accumulated other comprehensive income (loss) | 0.3 | (0.1) | 0.2 |
| Settlement cost | 0.9 | — | 0.9 |
| Balance at March 31, 2023 | $(17.3) | $6.5 | $(10.8) |
The following table presents significant amounts reclassified out of accumulated other comprehensive income (loss) attributable to OGE Energy by the respective line items in net income during thethree months ended March 31, 2024 and 2023.
| Details about Accumulated Other Comprehensive Income (Loss) Components · Amount Reclassified from Accumulated Other Comprehensive Income (Loss) · Affected Line Item in OGE Energy's Statements of Income | |||
|---|---|---|---|
| Three Months Ended | |||
| March 31, | |||
| (In millions) · 2024 · 2023 | |||
| Amortization of Pension Plan and Restoration of Retirement Income Plan items: | |||
| Actuarial losses | $(0.1) | $(0.3) | (A) |
| Prior service cost | (0.1) | (0.1) | (A) |
| Settlement cost | — | (1.1) | (A) |
| (0.2) | (1.5) | Income Before Taxes | |
| (0.1) | (0.3) | Income Tax Expense | |
| $(0.1) | $(1.2) | Net Income | |
| Amortization of postretirement benefit plans items: | |||
| Actuarial gains | $0.1 | $0.1 | (A) |
| 0.1 | 0.1 | Income Before Taxes | |
| — | — | Income Tax Expense | |
| $0.1 | $0.1 | Net Income | |
| Total reclassifications for the period, net of tax | $— | $(1.1) | Net Income |
(A)
These accumulated other comprehensive income (loss) components are included in the computation of net periodic benefit cost (see Note 10 for additional information).
Reclassifications
Certain prior year amounts have been reclassified to conform to current year presentation. The Registrants updated the March 31, 2023 presentation of removal costs related to long-lived assets within the condensed statements of cash flows to reflect the classification in the Registrants'2023 Form 10-K.
- Accounting Pronouncements
In November 2023, the Financial Accounting Standards Board issued ASU 2023-07, "Segment Reporting (Topic 280) Improvements to Reportable Segment Disclosures." The amendments in this update improve financial reporting by requiring disclosure of incremental segment information on an annual and interim basis. The standard is effective for fiscal years beginning after December 15, 2023 and interim periods within fiscal years beginning after December 15, 2024. Early adoption is permitted. The Registrants are currently evaluating the impact of adopting this standard on their financial statements.
In December 2023, the Financial Accounting Standards Board issued ASU 2023-09, "Income Taxes (Topic 740) Improvements to Income Tax Disclosures." The amendments in this update require public entities on an annual basis to (i) disclose specific categories in the rate reconciliation and (ii) provide additional information for reconciling items that meet a quantitative threshold. Further, the amendments require entities to disclose on an annual basis income taxes paid (net of refunds received) disaggregated by federal (national), state and foreign taxes and to disaggregate the information by jurisdiction based on a quantitative threshold. The standard is effective January 1, 2025, and early adoption is permitted. The Registrants are currently evaluating the impact of adopting this standard on their financial statements.
The Registrants believe that other recently adopted and recently issued accounting standards that are not yet effective do not appear to have a material impact on the Registrants' financial position, results of operations or cash flows upon adoption.
- Revenue Recognition
The following table presents OG&E's revenues from contracts with customers disaggregated by customer classification. OG&E's operating revenues disaggregated by customer classification can be found in "OG&E (Electric Company) Results of Operations" within "Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations."
| Three Months EndedMarch 31, | ||
|---|---|---|
| (In millions) | 2024 | 2023 |
| Residential | $221.4 | $205.5 |
| Commercial | 148.8 | 132.3 |
| Industrial | 53.0 | 53.3 |
| Oilfield | 49.7 | 48.1 |
| Public authorities and street light | 51.0 | 45.1 |
| System sales revenues | 523.9 | 484.3 |
| Provision for tax refund | — | 1.4 |
| Integrated market | 15.0 | 12.7 |
| Transmission | 35.6 | 35.2 |
| Other | 8.1 | 11.0 |
| Revenues from contracts with customers | $582.6 | $544.6 |
- Fair Value Measurements
The classification of the Registrants' fair value measurements requires judgment regarding the degree to which market data is observable or corroborated by observable market data. GAAP establishes a fair value hierarchy that prioritizes the inputs used to measure fair value based on observable and unobservable data. The hierarchy categorizes the inputs into three levels, with the highest priority given to quoted prices in active markets for identical unrestricted assets or liabilities (Level 1) and the lowest priority given to unobservable inputs (Level 3). Financial assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. The three levels defined in the fair value hierarchy are as follows:
Level 1 inputs are quoted prices in active markets for identical unrestricted assets or liabilities that are accessible at the measurement date.
Level 2 inputs are inputs other than quoted prices in active markets included within Level 1 that are either directly or indirectly observable at the reporting date for the asset or liability for substantially the full term of the asset or liability. Level 2 inputs include quoted prices for similar assets or liabilities in active markets and quoted prices for identical or similar assets or liabilities in markets that are not active.
Level 3 inputs are prices or valuation techniques for the asset or liability that require inputs that are both significant to the fair value measurement and unobservable (i.e., supported by little or no market activity). Unobservable inputs reflect the reporting entity's own assumptions about the assumptions that market participants would use in pricing the asset or liability (including assumptions about risk).
The Registrants hadno material financial instruments measured at fair value on a recurring basis at March 31, 2024 and December 31, 2023. The following table presents the carrying amount and fair value of the Registrants' financial instruments at March 31, 2024 and December 31, 2023, as well as the classification level within the fair value hierarchy.
| March 31,2024 · December 31,2023 | |||||
|---|---|---|---|---|---|
| (In millions) | Carrying Amount | Fair Value | Carrying Amount | Fair Value | Classification |
| Long-term Debt (including Long-term Debt due within one year): | |||||
| OGE Energy Term Loan | $49.9 | $50.0 | $49.9 | $50.0 | Level 2 |
| OG&E Senior Notes | $4,146.8 | $3,868.5 | $4,146.0 | $3,922.3 | Level 2 |
| OG&E Industrial Authority Bonds | $135.4 | $135.4 | $135.4 | $135.4 | Level 2 |
| OG&E Tinker Debt | $9.2 | $7.0 | $9.2 | $7.1 | Level 3 |
- Stock-Based Compensation
The following table presents the Registrants' pre-tax compensation expense and related income tax benefit for thethree months ended March 31, 2024 and 2023 related to performance units and restricted stock units for the Registrants' employees.
| OGE Energy · OG&E | ||||
|---|---|---|---|---|
| Three Months Ended · Three Months Ended | ||||
| March 31, | March 31, | |||
| (In millions) | 2024 | 2023 | 2024 | 2023 |
| Performance units | $2.2 | $2.2 | $2.2 | $0.5 |
| Restricted stock units | 1.0 | 0.8 | 1.0 | 0.1 |
| Total compensation expense | $3.2 | $3.0 | $3.2 | $0.6 |
| Income tax benefit | $0.8 | $0.7 | $0.8 | $0.1 |
During the three months ended March 31, 2024, OGE Energy issued 255,578 shares of new common stock pursuant to OGE Energy's Stock Incentive Plan to satisfy payouts of earned performance units and restricted stock unit grants to the Registrants' employees.
During the three months ended March 31, 2024, OGE Energy granted 275,499 performance units (based on total shareholder return over a three-year period) and 148,345 restricted stock units (three-year cliff vesting period) to the Registrants' employees at $35.86 and $32.74 fair value per share, respectively. As a result of OGE Energy's exit of its former midstream business and becoming primarily an electric company, all employees are directly employed by OG&E beginning in 2024.
- Income Taxes
OGE Energy files consolidated income tax returns in the U.S. federal jurisdiction and various state jurisdictions. OG&E is a part of the consolidated income tax return of OGE Energy. With few exceptions, the Registrants are no longer subject to U.S. federal tax or state and local examinations by tax authorities for years prior to 2020. Income taxes are generally allocated to each company in the affiliated group, including OG&E, based on its stand-alone taxable income or loss. Federal investment tax credits previously claimed on electric utility property have been deferred and will be amortized to income over the life of the related property. Oklahoma investment tax credits are also earned on investments at electric generating facilities which further reduce OG&E's effective tax rate.
- Common Equity
Automatic Dividend Reinvestment and Stock Purchase Plan
OGE Energy issued 4,900 new shares of common stock under its Automatic Dividend Reinvestment and Stock Purchase Plan during the three months ended March 31, 2024 and received proceeds of $0.2 million. OGE Energy may, from time to time, issue additional shares under its Automatic Dividend Reinvestment and Stock Purchase Plan to fund capital requirements or working capital needs. As of March 31, 2024, there were 4,797,244 shares of unissued common stock reserved for issuance under OGE Energy's Automatic Dividend Reinvestment and Stock Purchase Plan.
Earnings Per Share
Basic earnings per share is calculated by dividing net income attributable to OGE Energy by the weighted-average number of OGE Energy's common shares outstanding during the period. In the calculation of diluted earnings per share, weighted-average shares outstanding are increased for additional shares that would be outstanding if potentially dilutive securities were converted to common stock. Potentially dilutive securities for OGE Energy consist of performance units and restricted stock units. The following table presents the calculation of basic and diluted earnings per share for OGE Energy.
| Three Months Ended | ||
|---|---|---|
| March 31, | ||
| (In millions, except per share data) | 2024 | 2023 |
| Net income | $18.6 | $38.3 |
| Average common shares outstanding: | ||
| Basic average common shares outstanding | 200.4 | 200.2 |
| Effect of dilutive securities: | ||
| Contingently issuable shares (performance and restricted stock units) | 0.2 | 0.6 |
| Diluted average common shares outstanding | 200.6 | 200.8 |
| Basic earnings per average common share | $0.09 | $0.19 |
| Diluted earnings per average common share | $0.09 | $0.19 |
| Anti-dilutive shares excluded from earnings per share calculation | — | — |
- Long-Term Debt
At March 31, 2024, the Registrants were in compliance with all of their debt agreements.
OGE Energy has a $100.0 million floating rate unsecured three-year credit agreement, of which $50.0 million is considered a revolving loan and $50.0 million is considered a term loan. During thethree months ended March 31, 2024, the interest rate for the $50.0 million drawn on the term loan under this credit agreement was 6.375 percent. For additional information related to this credit agreement, see Note 9.
OG&E Industrial Authority Bonds
OG&E has tax-exempt pollution control bonds with optional redemption provisions that allow the holders to request repayment of the bonds on any business day. The following table presents information about these bonds, which can be tendered at the option of the holder during the next 12 months.
| Series · Date Due · Amount | |||||
|---|---|---|---|---|---|
| (In millions) | |||||
| 2.15% | - | 4.85% | Garfield Industrial Authority, January 1, 2025 | $47.0 | |
| 1.90% | - | 4.75% | Muskogee Industrial Authority, January 1, 2025 | 32.4 | |
| 2.15% | - | 4.85% | Muskogee Industrial Authority, June 1, 2027 | 56.0 | |
| Total (redeemable during next 12 months) | $135.4 | ||||
All of these bonds are subject to an optional tender at the request of the holders, at 100 percent of the principal amount, together with accrued and unpaid interest to the date of purchase. The bond holders, on any business day, can request repayment of the bond by delivering an irrevocable notice to the tender agent stating the principal amount of the bond, payment instructions for the purchase price and the business day the bond is to be purchased. The repayment option may only be exercised by the holder of a bond for the principal amount. When a tender notice has been received by the trustee, a third-party remarketing agent for the bonds will attempt to remarket any bonds tendered for purchase. This process occurs once per week. Since the original issuance of these series of bonds in 1995 and 1997, the remarketing agent has successfully remarketed all tendered bonds. If the remarketing agent is unable to remarket any such bonds, OG&E is obligated to repurchase such unremarketed bonds. As OG&E has both the intent and ability to refinance the bonds on a long-term basis and such ability is supported by an ability to consummate the refinancing, the bonds are classified as Long-Term Debt or Long-Term Debt Due within One Year, as appropriate, in the condensed balance sheets. OG&E believes that it has sufficient liquidity to meet these obligations.
- Short-Term Debt and Credit Facilities
The Registrants borrow on a short-term basis, as necessary, by the issuance of commercial paper and by borrowings under their revolving credit agreements. OGE Energy also borrows under term credit agreements maturing in one year or less, as necessary. The following table presents information regarding the Registrants' revolving credit agreements at March 31, 2024.
| Entity · AggregateCommitment · AmountOutstanding (A) · Weighted-AverageInterest Rate · Expiration | |||||
|---|---|---|---|---|---|
| (In millions) | |||||
| OGE Energy (B) | $550.0 | $516.6 | 5.68% | (F) | December 18, 2028 |
| OGE Energy (C) | 50.0 | — | —% | (F) | May 24, 2025 |
| OG&E (D)(E) | 550.0 | 239.5 | 5.64% | (F) | December 18, 2028 |
| Total | $1,150.0 | $756.1 | 5.68% | ||
(A)
Includes direct borrowings under the revolving credit agreements, commercial paper borrowings and letters of credit at March 31, 2024.
(B)
This bank facility is available to back up OGE Energy's commercial paper borrowings and to provide revolving credit borrowings. This bank facility can also be used as a letter of credit facility.
(C)
OGE Energy has a $100.0 million floating rate unsecured three-year credit agreement, of which $50.0 million is considered a revolving loan and $50.0 million is considered a term loan. The credit agreement, under certain circumstances, may be increased to a maximum commitment limit of $135.0 million and includes a maximum leverage ratio of 0.65 to 1.0. The other covenants under this credit agreement are substantially the same as OGE Energy's existing $550.0 million revolving credit agreement.
(D)
This bank facility is available to back up OG&E's commercial paper borrowings and to provide revolving credit borrowings. This bank facility can also be used as a letter of credit facility.
(E)
OG&E has an intercompany borrowing agreement with OGE Energy whereby OG&E has access to up to $450.0 million of OGE Energy's revolving credit amount. This agreement has a termination date of December 18, 2028. At March 31, 2024, there was $192.5 million in intercompany borrowings under this agreement.
(F)
Represents the weighted-average interest rate for the outstanding borrowings under the revolving credit agreements, commercial paper borrowings and letters of credit.
The Registrants' ability to access the commercial paper market could be adversely impacted by a credit ratings downgrade or major market disruptions. Pricing grids associated with the Registrants' credit facilities could cause annual fees and borrowing rates to increase if an adverse rating impact occurs. The impact of any future downgrade could include an increase in the costs of the Registrants' short-term borrowings, but a reduction in the Registrants' credit ratings would not result in any defaults or accelerations. Any future downgrade could also lead to higher long-term borrowing costs and, if below investment grade, would require the Registrants to post collateral or letters of credit.
OG&E must obtain regulatory approval from the FERC in order to borrow on a short-term basis. OG&E has the necessary regulatory approvals to incur up to $1.0 billion in short-term borrowings at any one time for a two-year period beginning January 1, 2023 and ending December 31, 2024.
- Retirement Plans and Postretirement Benefit Plans
Net Periodic Benefit Cost
The following tables present the net periodic benefit cost components, before consideration of capitalized amounts, of OGE Energy's Pension Plan, Restoration of Retirement Income Plan and postretirement benefit plans that are included in the condensed financial statements. Service cost is presented within Other Operation and Maintenance Expense, and the remaining net periodic benefit cost components as listed in the following tables are presented within Other Net Periodic Benefit Income in the statements of income. OG&E recovers specific amounts of pension and postretirement medical costs in rates approved in its Oklahoma rate reviews. In accordance with approved orders, OG&E defers the difference between actual pension and postretirement medical expenses and the amount approved in its last Oklahoma rate review as a regulatory asset or regulatory liability. These amounts have been recorded in the Pension tracker in the regulatory assets and liabilities table in Note 1 and within Other Net Periodic Benefit Income in the statements of income.
| Pension Plan · Restoration of RetirementIncome Plan | ||||
|---|---|---|---|---|
| Three Months Ended · Three Months Ended | ||||
| OGE Energy | March 31, | March 31, | ||
| (In millions) | 2024 | 2023 | 2024 | 2023 |
| Service cost | $1.4 | $1.4 | $0.2 | $0.3 |
| Interest cost | 3.8 | 4.0 | 0.1 | — |
| Expected return on plan assets | (3.7) | (4.0) | — | — |
| Amortization of net loss | 1.7 | 2.2 | — | — |
| Amortization of unrecognized prior service cost (A) | — | — | 0.1 | 0.1 |
| Settlement cost | — | 18.2 | — | — |
| Net periodic benefit cost | $3.2 | $21.8 | $0.4 | $0.4 |
(A)
Unamortized prior service cost is amortized on a straight-line basis over the average remaining service period to the first eligibility age of participants who are expected to receive a benefit and are active at the date of the plan amendment.
| Pension Plan · Restoration of RetirementIncome Plan | ||||
|---|---|---|---|---|
| Three Months Ended · Three Months Ended | ||||
| OG&E | March 31, | March 31, | ||
| (In millions) | 2024 | 2023 | 2024 | 2023 |
| Service cost | $1.4 | $1.1 | $— | $— |
| Interest cost | 3.3 | 3.1 | — | — |
| Expected return on plan assets | (3.2) | (3.2) | — | — |
| Amortization of net loss | 1.6 | 1.9 | — | — |
| Settlement cost | — | 17.2 | — | — |
| Total net periodic benefit cost | 3.1 | 20.1 | — | — |
| Plus: Amount allocated from OGE Energy | — | 1.6 | 0.4 | 0.4 |
| Net periodic benefit cost | $3.1 | $21.7 | $0.4 | $0.4 |
In addition to the net periodic benefit cost amounts recognized, as presented in the tables above, for the Pension and Restoration of Retirement Income Plans during the three months ended March 31, 2024 and 2023, the Registrants recognized the following:
| Three Months Ended | ||
|---|---|---|
| March 31, | ||
| (In millions) | 2024 | 2023 |
| Change in pension expense to maintain allowed recoverable amount in Oklahoma jurisdiction (A) | $3.3 | $20.2 |
| Deferral of pension expense related to pension settlement charges included in the above line item: | ||
| Oklahoma jurisdiction (A) | $— | $16.7 |
| Arkansas jurisdiction (A) | $— | $1.5 |
(A)
Included in the pension regulatory asset in each jurisdiction, as indicated in the regulatory assets and liabilities table in Note 1.
| OGE Energy · OG&E | ||||
|---|---|---|---|---|
| Postretirement Benefit Plans · Postretirement Benefit Plans | ||||
| Three Months Ended · Three Months Ended | ||||
| March 31, | March 31, | |||
| (In millions) | 2024 | 2023 | 2024 | 2023 |
| Service cost | $— | $— | $— | $— |
| Interest cost | 1.3 | 1.3 | 1.0 | 1.0 |
| Expected return on plan assets | (0.4) | (0.4) | (0.4) | (0.4) |
| Amortization of net gain | (0.1) | (0.1) | — | — |
| Total net periodic benefit cost | 0.8 | 0.8 | 0.6 | 0.6 |
| Plus: Amount allocated from OGE Energy | — | — | 0.1 | 0.1 |
| Net periodic benefit cost | $0.8 | $0.8 | $0.7 | $0.7 |
In addition to the net periodic benefit cost amounts recognized, as presented in the table above, for the postretirement benefit plans during the three months ended March 31, 2024 and 2023, the Registrants recognized the following:
| Three Months Ended | ||
|---|---|---|
| March 31, | ||
| (In millions) | 2024 | 2023 |
| Change in postretirement expense to maintain allowed recoverable amount in Oklahoma jurisdiction (A) | $1.1 | $1.1 |
(A)
Included in the pension regulatory asset, as indicated in the regulatory assets and liabilities table in Note 1.
The following table presents the amount of net periodic benefit cost capitalized and attributable to each of the Registrants for OGE Energy's Pension Plan and postretirement benefit plans for thethree months ended March 31, 2024 and 2023.
| OGE Energy · OG&E | ||||
|---|---|---|---|---|
| Three Months Ended · Three Months Ended | ||||
| March 31, | March 31, | |||
| (In millions) | 2024 | 2023 | 2024 | 2023 |
| Capitalized portion of net periodic pension benefit cost | $— | $0.6 | $0.6 | $0.5 |
| Capitalized portion of net periodic postretirement benefit cost | $— | $— | $— | $— |
Pension Plan Funding
In February 2024, OGE Energy made a $10.0 million contribution to its Pension Plan related to OG&E employees and has not determined whether it will need to make any additional contributions to the Pension Plan in 2024. The Registrants could be required to make additional contributions if the value of its pension trust and postretirement benefit plan trust assets are adversely impacted by a major market disruption in the future.
- Report of Business Segments
OGE Energy reports its operations primarily through asingle segment, captioned "electric company," which is engaged in the generation, transmission, distribution and sale of electric energy. The "other operations" caption primarily includes the operations of the holding company and other energy-related investments. Intersegment revenues are recorded at prices comparable to those of unaffiliated customers and are affected by regulatory considerations. The following tables present the results of OGE Energy's business segments for thethree months ended March 31, 2024 and 2023.
| Three Months Ended March 31, 2024 | Electric Company | OtherOperations | Eliminations | Total |
|---|---|---|---|---|
| (In millions) | ||||
| Operating revenues | $596.8 | $— | $— | $596.8 |
| Fuel, purchased power and direct transmission expense | 232.2 | — | — | 232.2 |
| Other operation and maintenance | 132.4 | — | — | 132.4 |
| Depreciation and amortization | 129.2 | — | — | 129.2 |
| Taxes other than income | 29.0 | — | — | 29.0 |
| Operating income | 74.0 | — | — | 74.0 |
| Other income | 6.6 | 1.5 | (1.7) | 6.4 |
| Interest expense | 51.4 | 10.5 | (1.7) | 60.2 |
| Income tax expense (benefit) | 4.0 | (2.4) | — | 1.6 |
| Net income (loss) | $25.2 | $(6.6) | $— | $18.6 |
| Total assets | $12,771.1 | $375.1 | $(228.2) | $12,918.0 |
| Three Months Ended March 31, 2023 | Electric Company | OtherOperations | Eliminations | Total |
|---|---|---|---|---|
| (In millions) | ||||
| Operating revenues | $557.2 | $— | $— | $557.2 |
| Fuel, purchased power and direct transmission expense | 200.6 | — | — | 200.6 |
| Other operation and maintenance | 131.5 | (1.1) | — | 130.4 |
| Depreciation and amortization | 121.2 | — | — | 121.2 |
| Taxes other than income | 27.1 | 1.4 | — | 28.5 |
| Operating income (loss) | 76.8 | (0.3) | — | 76.5 |
| Other income | 15.3 | 4.5 | (3.4) | 16.4 |
| Interest expense | 45.7 | 5.5 | (3.4) | 47.8 |
| Income tax expense | 6.6 | 0.2 | — | 6.8 |
| Net income (loss) | $39.8 | $(1.5) | $— | $38.3 |
| Total assets | $12,762.7 | $587.1 | $(559.5) | $12,790.3 |
- Commitments and Contingencies
Except as set forth below, in Note 13 and under "Environmental Laws and Regulations" in Item 2 of Part I and in Item 1 of Part II of this Form 10-Q, the circumstances set forth in Notes 13 and 14 to the financial statements included in the Registrants'2023 Form 10-K appropriately represent, in all material respects, the current status of the Registrants' material commitments and contingent liabilities.
Environmental Laws and Regulations
The activities of OG&E are subject to numerous stringent and complex federal, state and local laws and regulations governing environmental protection. These laws and regulations can change, restrict or otherwise impact the Registrants' business activities in many ways, including the handling or disposal of waste material, planning for future construction activities to avoid or mitigate harm to threatened or endangered species and requiring the installation and operation of emissions or pollution control equipment. Failure to comply with these laws and regulations could result in the assessment of administrative, civil and criminal penalties, the imposition of remedial requirements and the issuance of orders enjoining future operations. Management believes that all of the Registrants' operations are in substantial compliance with current federal, state and local environmental standards.
Environmental regulation can increase the cost of planning, design, initial installation and operation of OG&E's facilities. Management continues to evaluate its compliance with existing and proposed environmental legislation and regulations and implement appropriate environmental programs in a competitive market.
Other
In the normal course of business, the Registrants are confronted with issues or events that may result in a contingent liability. These generally relate to lawsuits or claims made by third parties, including governmental agencies. When appropriate, management consults with legal counsel and other experts to assess the claim. If, in management's opinion, the Registrants have incurred a probable loss as set forth by GAAP, an estimate is made of the loss, and the appropriate accounting entries are reflected in the condensed financial statements. If the assessment indicates that a potential loss is not probable but reasonably possible, the nature of the contingent matter, together with an estimate of the range of possible loss if determinable and material, would be disclosed. At the present time, based on currently available information, except as disclosed below, the Registrants believe that any reasonably possible losses in excess of accrued amounts arising out of pending or threatened lawsuits or claims would not be quantitatively material to their condensed financial statements and would not have a material adverse effect on their financial position, results of operations or cash flows.
In July 2023, OG&E was named, along with its contractor, as a defendant in a lawsuit filed by an apartment owner and its insurance companies seeking in excess of $60.0 million in damages related to a fire at an apartment building under construction in Oklahoma City. Several additional defendants have also been named. OG&E disputes the claims in the lawsuit and intends to vigorously defend this action. If OG&E was ultimately deemed liable for damages in connection with this incident, OG&E believes its existing insurance policies will cover its costs, in excess of a required retention (the amount of which is not material), to satisfy any liability it may have. Due to the uncertain and preliminary nature of this litigation, the outcome cannot be predicted, and OG&E is unable to provide a range of possible loss in this matter.
- Rate Matters and Regulation
Except as disclosed below, the circumstances set forth in Note 14 to the financial statements included in the Registrants'2023 Form 10-K appropriately represent, in all material respects, the current status of the Registrants' regulatory matters.
Completed Regulatory Matters
Integrated Resource Plans
OG&E has conducted technical conferences for stakeholder engagement on its draft triennial IRP and, on March 29, 2024, issued its final 2024 IRP to the OCC and APSC. This 2024 IRP identified capacity needs of 556,431 and 1,096 MWs in 2026, 2027 and 2028, respectively. The IRP assumes that Horseshoe Lake unit 7 will be retired in 2024, Tinker units 5A and 5B will be retired in 2025, and Horseshoe Lake unit 8 will be retired in 2027. The IRP also provides that OG&E will issue requests for proposals, beginning in the second quarter of 2024, for resources to meet the capacity needs identified in the IRP while maintaining affordability and reliability for OG&E’s customers.
APSC Proceedings
2023 Formula Rate Plan Filing
In October 2023, OG&E filed its final evaluation report under its Formula Rate Plan, and on January 30, 2024, OG&E and the APSC Staff filed an uncontested joint settlement agreement, which included an annual electric revenue increase of $3.5 million. On March 7, 2024, the APSC issued a final order approving the uncontested settlement agreement, and new rates became effective April 1, 2024.
OCC Proceedings
2022 Oklahoma Fuel Prudency
In June 2023, the Public Utility Division Staff filed their application initiating the review of the 2022 fuel adjustment clause and prudence review. The OCC issued an order on April 11, 2024 finding that OG&E's 2022 fuel costs and generation operations were prudent.
Pending Regulatory Matters
Various proceedings pending before state or federal regulatory agencies are described below. Unless stated otherwise, the Registrants cannot predict when the regulatory agency will act or what action the regulatory agency will take. The Registrants' financial results are dependent in part on timely and constructive decisions by the regulatory agencies that set OG&E's rates.
APSC Proceedings
Capacity Power Purchase Agreement Cost Recovery
On October 4, 2023, OG&E filed an application at the APSC seeking approval of a methodology for recovery of capacity costs associated with short-term power purchase agreements entered into to meet capacity needs in each of the years between 2023 and 2027. On December 29, 2023, the Administrative Law Judge issued an order authorizing OG&E to defer to a regulatory asset its capacity costs associated with short-term power purchase agreements for 2023, along with a carrying charge at the commission-approved customer deposit interest rate. The order requires OG&E and the parties to address treatment for any expenses beyond the calendar year 2023. The parties have agreed to a procedural schedule that involves additional rounds of testimony and a hearing in August 2024.
Arkansas 2024 Generation Construction Notice Filing
On January 19, 2024, OG&E filed an application seeking APSC approval to begin construction of 96 megawatts of combustion turbines at Tinker Air Force Base. A public hearing is scheduled for June 25, 2024, and a decision is expected by the end of August 2024.
FERC Proceedings
Order for Sponsored Transmission Upgrades within SPP
Under Attachment Z2 of the SPP Open Access Transmission Tariff, costs of participant-funded, or "sponsored," transmission upgrades may be recovered from other SPP customers whose transmission service depends on capacity enabled by the upgrade. The SPP Tariff required the SPP to charge for these upgrades beginning in 2008, but the SPP did not begin charging its customers for these upgrades until 2016 due to information system limitations. At that time, the SPP sought a waiver of a time limitation in its tariff that otherwise would have prevented it from waiting until 2016 to bill for the 2008 through 2015 period. The FERC granted the waiver, and the SPP then billed OG&E as a user for these Z2 charges while simultaneously crediting OG&E as a sponsor of Z2 transmission upgrades, resulting in OG&E being a net recipient of sponsored upgrade credits. The majority of these net credits were refunded to customers through OG&E's various rate riders that include SPP activity with the remaining amounts retained by OG&E.
Several companies that were net payers of Z2 charges sought rehearing of the FERC's 2016 order approving the waiver and then appealed it. While that appeal was pending, the FERC obtained a remand and then reversed itself and ruled that the SPP tariff provision that prohibited the 2008 through 2015 charges could not be waived. It ordered the SPP to develop a plan to refund the payments but not to implement the refunds until further ordered to do so. In response, in April 2019, OG&E filed a request for rehearing at the FERC. The next month, it also filed a Complaint at the FERC against the SPP contending that the SPP and not OG&E should bear the cost of any refunds resulting from the SPP's tariff violation and that SPP’s actions also violated its contracts with OG&E. In February 2020, the FERC denied OG&E's request for rehearing but did not consider SPP's refund plan. No date for payment of refunds was established. In August 2021, the U.S. Court of Appeals for the District of Columbia Circuit denied OG&E's petition for review of the FERC's order denying the waiver and requiring refunds. After denying rehearing of its ruling, the court of appeals returned the matter in November 2021 to the FERC for further proceedings in accordance with its opinion. The FERC has not acted on that remand.
If the FERC proceeds to order refunds in full, OG&E estimates it would be required to refund $13.0 million, which is net of amounts paid to other utilities for upgrades and would be subject to interest at the FERC-approved rate. The SPP has stated in filings with the FERC both before and after the court of appeals decision that there are considerable complexities in implementing the refunds that will have to be resolved before they can be paid. Payment of refunds would shift recovery of these upgrade credits to future periods. The SPP filed a report on January 4, 2022 confirming that administering refunds would be complex and could take years unless the SPP is allowed to make certain simplifying assumptions. The SPP also urged that all pending complaint proceedings, including OG&E's complaint and three similar complaints against the SPP, be resolved before any refund process is ordered to begin. OG&E and other parties filed responses to the SPP report, and the matter remains pending at the FERC. Of the $13.0 million, the Registrants would be impacted by $5.0 million in expense that initially benefited the Registrants in 2016, and OG&E customers would incur a net impact of $8.0 million in expense through rider mechanisms or the FERC formula rate. As of March 31, 2024, the Registrants have reserved $13.0 million plus estimated interest for a potential refund.
In November 2022, the FERC issued an order denying OG&E's complaint against the SPP. It also issued orders granting the other three complaints against the SPP in part but awarded no relief. All four complainants timely sought rehearing of these orders. On June 27, 2023, the FERC made final its orders granting in part complaints filed against the SPP by OG&E and three other project sponsors (or groups thereof) on claims arising from the SPP’s failure to implement Attachment Z2 so that project sponsors could be paid as required under the tariff, but awarding no relief. OG&E and the other complainants have appealed to the U.S. Court of Appeals for the Eighth Circuit, where the matter was briefed and oral arguments were heard on March 14, 2024. It will likely be decided in the summer of 2024.
In June 2020, the FERC approved, effective July 1, 2020, an SPP proposal to eliminate Attachment Z2 revenue crediting and replace it with a different rate mechanism that would provide project sponsors, such as OG&E, the same level of recovery. This elimination of the Attachment Z2 revenue crediting would only prospectively impact OG&E and its recovery of any future upgrade costs that it may incur as a project sponsor subsequent to July 2020. All of the existing projects that are eligible to receive revenue credits under Attachment Z2 will remain eligible, which includes the $13.0 million that is at issue in the remand from OG&E's appeal and in OG&E's complaint proceeding.
OCC Proceedings
Oklahoma Retail Electric Supplier Certified Territory Act Causes
As previously disclosed, several rural electric cooperative electricity suppliers filed complaints with the OCC alleging that OG&E, because it was providing service to large loads in another supplier's territory, had violated the Oklahoma Retail Electric Supplier Certified Territory Act. OG&E believes it is lawfully serving customers under specific exemptions under this act that allow it to serve customers having a load of one megawatt or greater. There were five complaint cases initiated at the OCC, and the OCC issued decisions on each of them. The OCC ruled in favor of the electric cooperatives in three of those cases under statutory interpretation and ruled in favor of OG&E in two of those cases under injunctive theory. All five of those cases were appealed to the Oklahoma Supreme Court.
On April 4, 2023, the Oklahoma Supreme Court issued its opinion which vacated the OCC's injunctions with respect to four of the cases and held that the Oklahoma Retail Electric Supplier Certified Territory Act does not limit the mechanism by which OG&E may provide service to large loads in another supplier's territory pursuant to the one megawatt exception. The one pending legal issue left for the Oklahoma Supreme Court to resolve is a statutory interpretation on how a supplier calculates "connected load for initial full operation" for purposes of the exemption under the act. If the Oklahoma Supreme Court ultimately were to find that the customers being served in this single case are not exempted from the Oklahoma Retail Electric Supplier Certified Territory Act, OG&E would have to evaluate the recoverability of some plant investments made to serve these customers and may also be required to reimburse the certified territory supplier in this case for an amount of lost revenue. Such amounts would not be expected to be material to the Registrants' results of operations.
2023 Oklahoma General Rate Review
On December 29, 2023, OG&E filed a general rate review in Oklahoma seeking a rate increase of $332.5 million and a 10.5 percent return on equity based on a common equity percentage of 53.50 percent. The rate review seeks recovery of $1.3 billion of net capital investment since the last general rate review. A hearing on the merits is scheduled for June 17, 2024.
SPP Proceedings
Resource Capacity Accreditation
In July 2022, the SPP Board of Directors approved a new unit accreditation methodology for conventional generation which requires submittal to and approval from the FERC prior to becoming effective. On March 2, 2023, the FERC rejected the SPP’s proposed capacity accreditation methodology for wind and solar generators. Following the FERC’s rejection, the SPP began an extensive review of both the methodology proposed for thermal resources which had not yet been submitted to the FERC, and the accreditation methodology for wind and solar generators. These methodologies were reviewed and approved by both the Regional State Committee and the SPP Board of Directors in late October 2023 and were submitted to the FERC for approval on February 23, 2024. If approved by the FERC, both methodologies are expected to be effective in 2026 and may contribute to OG&E’s incremental capacity needs.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.