Contents

Avista Utilities

Substantially all of Avista Utilities' properties are subject to the lien of Avista Corp.'s mortgage indenture.

Avista Utilities' electric properties, located in the states of Washington, Idaho, Montana and Oregon, include the following:

Generation Properties

PresentCapability(MW) (1)
Hydroelectric Generating Stations (River)
Washington:
Long Lake (Spokane)88.0
Little Falls (Spokane)48.0
Nine Mile (Spokane)40.6
Upper Falls (Spokane)10.2
Monroe Street (Spokane)15.0
Idaho:
Cabinet Gorge (Clark Fork) (2)273.0
Post Falls (Spokane)11.9
Montana:
Noxon Rapids (Clark Fork)562.4
Total Hydroelectric1,049.1
Thermal Generating Stations (cycle, fuel source)
Washington:
Kettle Falls GS (combined-cycle, wood waste) (3)53.5
Kettle Falls CT (combined-cycle, natural gas) (3)6.9
Northeast CT (simple-cycle, natural gas)64.8
Boulder Park GS (simple-cycle, natural gas)24.6
Idaho:
Rathdrum CT (simple-cycle, natural gas)166.5
Montana:
Colstrip Units 3 and 4 (simple-cycle, coal) (4)222.0
Oregon:
Coyote Springs 2 (combined-cycle, natural gas)322.0
Total Thermal860.3
Total Generation Properties1,909.4

(1)

Present capability is the maximum capacity of the plant under standard test conditions without exceeding specified limits of temperature, stress and environmental conditions.

(2)

For Cabinet Gorge, we have water rights permitting generation up to 265 MW. However, if natural stream flows will allow for generation above our water rights, we are able to generate above our water rights. If natural stream flows only allow for generation at or below 265 MW, we are limited to generation of 265 MW. The present capability disclosed above represents the capability based on maximum stream flow conditions when we are allowed to generate above our water rights.

(3)

These generating stations can operate as separate single-cycle plants or combined-cycle with the natural gas plant providing exhaust heat to the wood boiler to increase efficiency.

(4)

Jointly owned; data refers to our 15 percent interest. See “Item 7. Management’s Discussion and Analysis of Financial Condition – Colstrip” for information related to Colstrip Units 3 and 4.

Electric Distribution and Transmission Plant

Avista Utilities owns and operates approximately 19,700 miles of primary and secondary electric distribution lines providing service to retail customers. We have an electric transmission system of approximately 700 miles of 230 kV line and approximately 1,600 miles of 115 kV line. We also own an 11 percent interest in approximately 500 miles of a 500 kV line between Colstrip, Montana and Townsend, Montana. Our transmission and distribution systems also include numerous substations with transformers, switches, monitoring and metering devices and other equipment.

The 230 kV lines are the backbone of our transmission grid and are used to transmit power from generation resources, including Noxon Rapids, Cabinet Gorge and the Mid-Columbia hydroelectric projects, to the major load centers in our service area, as well as to transfer power between points of interconnection with adjoining electric transmission systems. These lines interconnect at various locations with the BPA, Grant County PUD, PacifiCorp, NorthWestern and Idaho Power Company and serve as points of delivery for power from generating facilities outside of our service area, including Colstrip, Coyote Springs 2 and the Lancaster Plant.

These lines also provide a means to optimize resources through short-term purchases and sales of power with entities within and outside of the Pacific Northwest.

The 115 kV lines provide for transmission of energy and the integration of smaller generation facilities with our service-area load centers, including the Spokane River hydroelectric projects, the Kettle Falls projects, Rathdrum CT, Boulder Park GS and the Northeast CT. These lines interconnect with the BPA, Chelan County PUD, the Grand Coulee Project Hydroelectric Authority, Grant County PUD, NorthWestern, PacifiCorp and Pend Oreille County PUD. Both the 115 kV and 230 kV interconnections with the BPA are used to transfer energy to facilitate service to each other’s customers that are connected through the other’s transmission system. We hold a long-term transmission agreement with the BPA that allows us to serve our native load customers that are connected through the BPA’s transmission system.

Natural Gas Plant

Avista Utilities has natural gas distribution mains of approximately 3,600 miles in Washington, 2,200 miles in Idaho and 2,400 miles in Oregon. We have natural gas transmission mains of approximately 75 miles in Washington and 15 miles in Oregon. Our natural gas system includes numerous regulator stations, service distribution lines, monitoring and metering devices, and other equipment.

We own a one-third interest in Jackson Prairie, an underground natural gas storage field located near Chehalis, Washington. See “Part 1 – Item 1. Business – Avista Utilities – Natural Gas Operations” for further discussion of Jackson Prairie.