Item 2. Properties
OG&E owns and operates an interconnected electric generation, transmission and distribution system, located in Oklahoma and western Arkansas, which included 17 generating stations with an aggregate capability of 7,116 MWs at December 31, 2023. The following table presents information with respect to OG&E's electric generating facilities. Unless otherwise indicated, these electric generating facilities are located in Oklahoma.
| Station & Unit · YearInstalled · Unit DesignType · FuelCapability · 2023CapacityFactor (A) · UnitCapability(MW) · StationCapability(MW) | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Seminole | 1 | 1971 | Steam-Turbine | Gas | 19.9% | 500 | |||
| 2 | 1973 | Steam-Turbine | Gas | 24.1% | 513 | ||||
| 3 | 1975 | Steam-Turbine | Gas | 20.5% | 509 | 1,522 | |||
| Muskogee | 4 | 1977 | Steam-Turbine | Gas | 14.8% | 489 | |||
| 5 | 1978 | Steam-Turbine | Gas | 10.9% | 488 | ||||
| 6 | 1984 | Steam-Turbine | Coal | 18.0% | 521 | 1,498 | |||
| Sooner | 1 | 1979 | Steam-Turbine | Coal | 12.1% | 519 | |||
| 2 | 1980 | Steam-Turbine | Coal | 11.8% | 519 | 1,038 | |||
| Horseshoe Lake | 5A | (B) | 1971 | Combustion-Turbine | Gas/Jet Fuel | 2.6% | 33 | ||
| 5B | (B) | 1971 | Combustion-Turbine | Gas/Jet Fuel | 4.8% | 31 | |||
| 7 | 1963 | Steam-Turbine | Gas | — | 211 | ||||
| 8 | 1969 | Steam-Turbine | Gas | 11.7% | 375 | ||||
| 9 | 2000 | Combustion-Turbine | Gas | 20.4% | 45 | ||||
| 10 | 2000 | Combustion-Turbine | Gas | 6.0% | 43 | 738 | |||
| Redbud (C) | 1 | 2003 | Combined Cycle | Gas | 37.2% | 157 | |||
| 2 | 2003 | Combined Cycle | Gas | 43.6% | 154 | ||||
| 3 | 2003 | Combined Cycle | Gas | 41.3% | 154 | ||||
| 4 | 2003 | Combined Cycle | Gas | 45.3% | 153 | 618 | |||
| Mustang | 6 | 2018 | Combustion-Turbine | Gas | 12.0% | 57 | |||
| 7 | 2018 | Combustion-Turbine | Gas | 14.5% | 56 | ||||
| 8 | 2017 | Combustion-Turbine | Gas | 18.6% | 58 | ||||
| 9 | 2018 | Combustion-Turbine | Gas | 21.9% | 57 | ||||
| 10 | 2018 | Combustion-Turbine | Gas | 13.0% | 57 | ||||
| 11 | 2018 | Combustion-Turbine | Gas | 21.6% | 58 | ||||
| 12 | 2018 | Combustion-Turbine | Gas | 2.0% | 57 | 400 | |||
| McClain (D) | 1 | 2001 | Combined Cycle | Gas | 52.2% | 373 | 373 | ||
| Frontier | 1 | 1989 | Combined Cycle | Gas | 57.0% | 126 | 126 | ||
| River Valley | 1 | 1991 | Steam-Turbine | Coal/Gas | 19.3% | 161 | |||
| 2 | 1991 | Steam-Turbine | Coal/Gas | 23.9% | 160 | 321 | |||
| Total Generating Capability (all stations, excluding renewable) | 6,634 | ||||||||
(A)
2023 Capacity Factor = 2023 Net Actual Generation / (2023 Net Maximum Capacity (Nameplate Rating in MWs) x Period Hours (8,760 Hours)). Capacity Factors are impacted by events that reduce Net Actual Generation such as outages.
(B)
Represents units located at Tinker Air Force Base that are maintained by Horseshoe Lake.
(C)
Represents OG&E's 51 percent ownership interest in the Redbud Plant.
(D)
Represents OG&E's 77 percent ownership interest in the McClain Plant.
In 2023, OG&E retired unit 6 located at the Horseshoe Lake station.
| Renewable · 2023 | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Station · Year Installed · Location · Number ofUnits · Fuel Capability · Capacity Factor(A) · UnitCapability(MW) · StationCapability(MW) | |||||||||
| Crossroads | 2011 | Canton, OK | 98 | Wind | 17.8% | 2.30 | 228 | ||
| Centennial | 2007 | Laverne, OK | 80 | Wind | 15.6% | 1.50 | 120 | ||
| OU Spirit | 2009 | Woodward, OK | 44 | Wind | 16.0% | 2.30 | 101 | ||
| Mustang | 2015 | Oklahoma City, OK | 90 | Solar | 20.8% | < 0.1 | 3 | ||
| Covington | 2018 | Covington, OK | 4 | Solar | 21.6% | 2.5 | 10 | ||
| Choctaw Nation | 2020 | Durant, OK | 2 | Solar | 22.2% | 2.5 | 5 | ||
| Chickasaw Nation | 2020 | Davis, OK | 2 | Solar | 24.4% | 2.5 | 5 | ||
| Branch | 2021 | Branch, AR | 2 | Solar | 22.6% | 2.5 | 5 | ||
| Durant 2 | 2022 | Durant, OK | 2 | Solar | 19.7% | 2.5 | 5 | ||
| Total Generating Capability (renewable) | 482 | ||||||||
(A)
2023 Capacity Factor = 2023 Net Actual Generation / (2023 Net Maximum Capacity (Nameplate Rating in MWs) x Period Hours (8,760 Hours)). Capacity Factors are impacted by events that reduce Net Actual Generation such as outages.
The following table presents certain operating data relating to the OG&E's electricity transmission and distribution assets at December 31, 2023.
| Oklahoma | Arkansas | |
|---|---|---|
| Transmission system: | ||
| Substations | 54 | 7 |
| Total capacity (million kV-amps) | 14.1 | 2.9 |
| Structure miles - lines | 5,208 | 347 |
| Distribution system: | ||
| Substations | 351 | 30 |
| Total capacity (million kV-amps) | 11.0 | 1.0 |
| Structure miles - overhead | 29,690 | 2,811 |
| Miles of underground conduit | 3,150 | 273 |
| Miles of underground conductors | 11,801 | 761 |
During the three years ended December 31, 2023, both Registrants' gross property, plant and equipment (excluding construction work in progress) additions were $2.7 billion, and gross retirements were $372.8 million. These additions were provided by cash generated from operations, short-term borrowings (through a combination of bank borrowings and commercial paper), long-term borrowings and permanent financings. The additions during this three-year period amounted to 17.0 percent of gross property, plant and equipment (excluding construction work in progress) for both Registrants at December 31, 2023.