Skip to main content

SSR MINING INC

For the period ended Mar 31, 2024. Filed May 8, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2024 · Filed May 8, 2024

SSRM$29.67+4.5%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

ÇÖPLER INCIDENT AND FIRST QUARTER 202 SUMMARY

Çöpler Incident

On February 13, 2024, SSR Mining Inc. and its subsidiaries (collectively, “SSR Mining,” or the “Company”) suspended all operations at its Çöpler property as a result of a significant slip on the heap leach pad (the “Çöpler Incident”).

Our primary focus at Çöpler continues to be the recovery and return of our five missing colleagues to their families. Currently, recovery efforts are targeted in the Sabırlı Valley, from which SSR Mining currently expects to complete the removal of all displaced heap leach material resulting from the Çöpler Incident into temporary storage locations by the end of the third quarter of 2024. Concurrently, containment efforts have been completed alongside the removal of the displaced material with the installation of grout curtains, coffer dams, buttresses, pumping systems and the ongoing installation of diversion channels in the Sabırlı Valley.

In parallel with the recovery and containment work, the Company is progressing a remediation plan following comprehensive consultation and evaluations with various Turkish government agencies, ministries, independent experts and external consultants. The remediation plan will be submitted for government approval in the second quarter of 2024 and will include, among other things, the construction of a permanent storage facility for the displaced heap leach material. Once constructed, the storage facility will be capable of containing the approximately 18 to 20 million tonnes of displaced material in an area referred to as the East Storage Facility. The remediation work is expected to cost between $250.0 to $300.0 million on a 100% basis, in addition to the approximately $25.0 million incurred to-date. The remediation efforts are expected to be implemented over a period of 24 to 36 months.

As part of the remediation work, the heap leach pad will be permanently closed and no further heap leach processing will take place at Çöpler. In order to restart operations, the Company will require the reinstatement of the Environmental Impact Assessment and necessary operating permits. At this time, we are not able to estimate or predict when and under what conditions we will resume operations at Çöpler.

For additional information on the Çöpler Incident, see the Company’s Annual Report on Form 10-K for the year ended December 31, 2023 filed on February 27, 2024 and the information provided herein.

FIRST QUARTER 2024 SUMMARY (dollars, except per share, per ounce and per pound amounts):(1)

Operating results: First quarter 2024 production was 101,873 gold equivalent ounces. Production from Marigold was 34,680 ounces and cost of sales of $1,331 per ounce sold and all-in sustaining costs (“AISC”) of $1,430 per ounce sold. At Seabee, production was 23,773 ounces and cost of sales of $859 per ounce sold and AISC of $1,416 per ounce sold. Puna produced 1,914,805 ounces of silver and cost of sales of $16.87 per ounce sold and AISC of $15.61 per ounce sold. An additional 21,827 ounces of gold were produced at Çöpler before the operation was suspended on February 13, 2024, following the Çöpler Incident.

Financial results: Attributable net loss in the first quarter of 2024 was $287.1 million, or $1.42 per diluted share, inclusive of the impairment of long-lived and other assets at Çöpler of $114.2 million and estimated future reclamation and remediation costs of approximately $250.0 million related to the Çöpler Incident, which represents the low end of the estimated preliminary cost range of $250.0 to $300.0 million. Adjusted attributable net income in the first quarter of 2024 was $22.5 million, or $0.11 per diluted share. In the first quarter of 2024, operating cash flow was $24.6 million and free cash flow was $(9.4) million.

Cash and liquidity position: As of March 31, 2024, SSR Mining had a cash and cash equivalent balance of $467.0 million. In addition, at the end of the first quarter 2024, the Company had available borrowings of $399.1 million under its revolving credit facility. As of March 31, 2024, the Company had no borrowings, exclusive ofde minimus letters of credit, outstanding under the revolving credit facility and was in compliance with its covenants.

(1)AISC, free cash flow, adjusted attributable net income (loss), and adjusted attributable net income (loss) per diluted share are non-GAAP financial measures. For explanations of these measures and reconciliations to the most comparable financial measure calculated under U.S. GAAP, please see the discussion under "Non-GAAP Financial Measures" in Part I, Item 2, Management’s Discussion and Analysis herein.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.