Key Trends and Uncertainties
During 2025 and beyond, we expect to face the following challenges at certain of our businesses. Management expects that improved operating performance at certain businesses, growth from new businesses, and global cost reduction initiatives may lessen or offset their impact. If these favorable effects do not occur, or if the challenges described below and elsewhere in this section impact us more significantly than we currently anticipate, or if volatile foreign currencies and commodities move more unfavorably, then these adverse factors (or other adverse factors unknown to us) may have a material impact on our operating margin, net income attributable to The AES Corporation, and cash flows. We continue to monitor our operations and address challenges as they arise. For the risk factors related to our business, see Item 1.—Businessand Item 1A.—Risk Factors of our 2024 Form 10-K.
Operational
Trade Restrictions and Supply Chain— In April 2022, the U.S. Department of Commerce (“Commerce”) initiated an investigation into whether imports into the U.S. of solar cells and panels from Cambodia, Malaysia, Thailand, and Vietnam (“Southeast Asia”) were circumventing antidumping and countervailing duty (“AD/CVD”) orders on solar cells and panels from China. In August 2023, Commerce rendered final affirmative findings of circumvention with respect to all four countries, which resulted in the imposition of AD and CVD duties on certain imported cells and panels from Southeast Asia. Commerce’s determination and related matters remain the subject of ongoing litigation.
In 2024, Commerce and the U.S. International Trade Commission (“USITC”) initiated new AD/CVD investigations on solar cells and panels imported from Southeast Asia. On April 18, 2025, Commerce rendered final affirmative AD/CVD determinations with respect to all four countries. The ITC’s final determination is expected to be announced May 20, 2025. A final affirmative determination by the ITC would result in the issuance of new AD/CVD orders in early June 2025. We do not expect a final affirmative AD/CVD determination by ITC to have a negative impact on our business.
48 | The AES Corporation | March 31, 2025 Form 10-Q
Separately, the U.S. maintains a global safeguard tariff (currently 14% ad valorem) on solar cells and modules pursuant to the Section 201 Safeguard Action on crystalline silicon photovoltaic products, which became effective in February 2018. On June 21, 2024, President Biden issued Proclamation 10779, revoking the exclusion of bifacial panels from safeguard relief previously proclaimed in Proclamation 10339, and reinstating the tariff on bifacial panels under the Section 201 Safeguard Action, subject to certain qualifications. These global tariffs are expected to expire in February 2026.
The U.S. also maintains Section 301 tariffs on certain Chinese made lithium-ion batteries and related components utilized for energy storage systems, with such tariff currently set at 7.5% and increasing to 25% effective January 1, 2026. There is also an ongoing AD/CVD investigation with respect to exports by China of natural and synthetic graphite used to make lithium-ion battery anode material. Any determinations or orders arising from such investigation could result in price increases.
Additionally, the Uyghur Forced Labor Prevention Act (“UFLPA”) seeks to block the import of products made with forced labor in certain areas of China, at any point in the supply chain, and may lead to certain suppliers being blocked from importing solar cells and panels into the U.S. While this has impacted the U.S. market, AES has managed this issue without significant impact to our projects. Further forced labor designations of entities under the UFLPA may impact our suppliers’ ability or willingness to meet their contractual agreements or to continue to supply cells or panels into the U.S. market on terms that we deem satisfactory.
The Trump Administration has threatened or imposed tariffs on a wide range of countries and products. On February 10, 2025, President Trump signed Executive Orders modifying existing Section 232 tariffs on steel and aluminum imports to expand their scope of applicability and imposing 25% tariffs on both products. At this time, we do not expect the modifications to tariffs on steel and aluminum to have a material impact on our business.
On February 1, 2025, President Trump issued an Executive Order declaring a national emergency under the International Emergency Economic Powers Act (“IEEPA”) and imposing a 10% additional tariff on imports from China, effective February 4, 2025. Effective March 4, 2025, this tariff was increased to 20%.
On April 2, 2025, President Trump issued an Executive Order pursuant to IEEPA imposing an indefinite, baseline reciprocal 10% tariff on almost all goods imported into the U.S., effective April 5, 2025, and individualized higher IEEPA tariffs (11% to 50%) starting April 9, 2025 on goods originating from 57 countries with trade surpluses with the U.S. On April 9, 2025, the U.S. government issued a further Executive Order increasing the IEEPA reciprocal tariff on China to 125% effective April 10, 2025. Concurrently, the U.S. government announced a temporary suspension of the country-specific reciprocal tariff measures targeting most U.S. trading partners for a 90-day period, or until July 9, 2025.
During the 90-day suspension, many countries have been seeking to reach bilateral trade agreements with the U.S. and the ultimate outcome of any reciprocal or other tariffs with these countries is uncertain.
We expect the tariffs on imports from China will increase overall costs for materials and parts that are imported to build and maintain renewable energy plants for the U.S. industry. However, AES has already shifted its supply chain outside of China for the vast majority of final products used to build and maintain renewable energy plants in the U.S. and we expect limited impact to projects scheduled to become operational in 2025 through 2027 due to the recently announced tariffs on China.
The impact of new tariffs, reciprocal tariffs, or Commerce investigations, the impact of any additional adverse Commerce determinations or other tariff disputes or litigation, the impact of the UFLPA, potential future disruptions to the renewable energy supply chain and their effect on AES’ U.S. project development and construction activities remain uncertain. AES will continue to monitor developments and take prudent steps towards maintaining a robust supply chain for our renewable energy projects. To that end, we have accelerated imports into the U.S. and increased our contracting for U.S. domestically manufactured solar panels, batteries, wind turbines, trackers, and other equipment, significantly mitigating the potential impacts from reciprocal tariffs or other tariffs.
More specifically, we have contracted and imported into the U.S. all of the solar panels that are necessary to complete our U.S. backlog of solar projects scheduled to finish construction and become operational in 2025. For our U.S backlog of solar projects scheduled to finish construction and become operational in 2026 or 2027, we have contracted for all of our panel supply needs, with the majority of such panels being manufactured in the U.S. and most of the remaining panels have already been imported into the U.S.
Additionally, we have contracted and imported into the U.S. all the batteries needed for our U.S. energy storage projects scheduled to be completed in 2025.
49 | The AES Corporation | March 31, 2025 Form 10-Q
For our backlog of storage projects scheduled to finish construction and become operational in 2026 or 2027, we have contracted for approximately 80% of our battery needs, with almost all of such batteries coming from U.S. or Korean suppliers. We are also well advanced in contracting U.S. domestically manufactured battery modules to support the remainder of our U.S. energy storage growth through 2027.
For our U.S. backlog of wind projects scheduled to be completed in 2025 through 2026, we have contracted and received delivery of all turbines, and for our 2027 backlog of U.S. wind projects, we are fully contracted with U.S. suppliers.
Operational Sensitivity to Dry Hydrological Conditions— Our hydroelectric generation facilities are sensitive to changes in the weather, particularly the level of water inflows into generation facilities. Dry hydrological conditions in Panama, Colombia, and Chile can present challenges for our businesses in these markets. Low inflows can result in low reservoir levels, reduced generation output, and subsequently possible increased prices for electricity. If our hydroelectric generation facilities cannot generate sufficient energy to meet contractual arrangements, we may need to purchase energy to fulfill our obligations, which could have an adverse impact on AES. As mitigation, AES has invested in thermal, wind, and solar generation assets, which have a complementary profile to hydroelectric plants. These plants are expected to have increased generation in low hydrology scenarios, offsetting possible impacts described from hydro assets.
According to the National Oceanic and Atmospheric Administration ("NOAA"), weather conditions are currently transitioning from weak La Niña conditions to ENSO-neutral. The ENSO forecast indicates a high probability (91%) for ENSO-neutral conditions forming March-May 2025, and these conditions are favored to continue through September-November 2025.
Inflows during the first quarter of the year have been relatively stable across the region, reflecting the influence of, and transition to, ENSO-neutral condition. In Panama, overall system inflows have been only slightly below historical average conditions, except for the Bayano reservoir, which registered above-average hydrology conditions. Higher hydrology may result in energy surpluses after covering the contracted hydro positions, available to be sold in the spot market.
In Colombia, hydrological conditions were generally aligned with seasonal expectations and historical average conditions, supporting steady flows into key reservoirs and reducing the risk of extreme droughts or floods typically associated with El Niño or La Niña.
In Chile, the primary driver for AES’ hydro assets is snowpack volumes and winter rains, mainly in the central regions. Over the first quarter of 2025, precipitation and snowpack accumulation was within the range of historical averages.
The exact behavior pattern and strength of weather transitions (from/to La Niña or El Niño) is unknown and therefore the impacts could vary from those described above, and may include impacts to our businesses beyond hydrology, including with respect to power generation from other renewable sources of energy and demand. Even if rainfall and water inflows remain in line with historical averages, in some cases, market prices and generation above or below the average could present due to a variety of factors related to demand, market dynamics, or regulatory impacts. Impacts may be material to our results of operations.
Macroeconomic and Political
During the past few years, some countries where our subsidiaries conduct business have experienced macroeconomic and political changes. In the event these trends continue, there could be an adverse impact on our businesses.
Inflation Reduction Act and U.S. Renewable Energy Tax Credits — The U.S. Inflation Reduction Act of 2022 (the “IRA”) includes provisions that benefit the U.S. clean energy industry, including increases, extensions, direct transfers, and/or new tax credits for onshore and offshore wind, solar, storage, and hydrogen projects. The extension of the solar investment tax credits ("ITCs") and production tax credits (“PTCs”), as well as higher credits available for projects that satisfy wage and apprenticeship requirements, has increased demand for our renewables products.
Our U.S. renewables business has a backlog of approximately 7.6 GW and a 53 GW pipeline that we intend to utilize to continue to grow our business, and these changes in tax policy are supportive of this strategy. We account for U.S. renewables projects according to U.S. GAAP, which, when partnering with tax-equity investors to monetize tax benefits, utilizes the HLBV method. This method recognizes the tax-credit value that is transferred to tax equity investors at the time of its creation, which for projects utilizing the investment tax credit begins in the quarter the
50 | The AES Corporation | March 31, 2025 Form 10-Q
project is placed in service. For projects utilizing the production tax credit, this value is recognized over 10 years as the facility produces energy.
The IRA also allows us to directly transfer investment tax credits to unrelated tax credit buyers. We account for the transfer proceeds as tax benefit throughout the year the renewables project is placed in service.
In 2024, we realized $1,313 million of earnings from Tax Attributes, comprised of $1,293 million from the Renewables SBU and $20 million from the Utilities SBU. In 2025, we expect an increase in Tax Attributes earned throughout the year by our U.S. renewables business in line with the growth in that business. For the three months ended March 31, 2025, we recognized $186 million in tax attributes.
The implementation of the IRA requires substantial guidance from the U.S. Department of Treasury and other government agencies. Some of the guidance and rulemaking enacted under the Biden Administration could be changed or modified by the Trump Administration, creating uncertainty with respect to implementation of the IRA. Also, the Trump Administration has issued Executive Orders that pause certain funding allocated to projects under the Infrastructure Investment and Jobs Act (IIJA) and the IRA during a 90-day review process. As they currently stand, these Executive Orders do not impact the tax credits under the IRA.
It remains uncertain whether Congress will modify or repeal the IRA in connection with the budget reconciliation process or otherwise. While we have taken significant measures to protect against the impact of changes to the IRA, including by implementing a program to ensure our backlog of U.S. renewables projects satisfy IRS safe harbor requirements for qualifying for the ITCs and PTCs, the impacts from any modifications or repeal of the IRA may be material to our results of operations.
Global Tax— The macroeconomic and political environments in the U.S. and in some countries where our subsidiaries conduct business have changed in recent years. This could result in significant impacts to future tax law. In the U.S., the IRA includes a 15% corporate alternative minimum tax (“CAMT”) based on adjusted financial statement income. In September 2024, the IRS released proposed regulations on the 15% CAMT. The impact to the Company in 2025 is not expected to be material.
The Netherlands, Bulgaria, and Vietnam adopted legislation to implement Pillar 2 effective as of January 1, 2024. We will continue to monitor the issuance of draft legislation in other non-EU countries where the Company operates that are considering Pillar 2 amendments and new interpretive guidance.
Inflation— In the markets in which we operate, there have been higher rates of inflation recently. While most of our contracts in our international businesses that are denominated in a currency other than the U.S. dollar are indexed to inflation, in general, our U.S.-based generation contracts are not indexed to inflation. If inflation continues to increase in our markets, it may increase our expenses that we may not be able to pass through to customers. It may also increase the costs of some of our development projects that could negatively impact their competitiveness. Our utility businesses do allow for recovering of operations and maintenance costs through the regulatory process, which may have timing impacts on recovery.
Interest Rates— In the U.S. and other markets in which we operate, there has been a rise in interest rates since 2021, and interest rates are expected to remain volatile in the near term.
As discussed in Item 3.—Quantitative and Qualitative Disclosures about Market Risk, although most of our existing corporate and subsidiary debt is at fixed rates, an increase in interest rates can have several impacts on our business. For any existing debt under floating rate structures and any future debt refinancings, rising interest rates will increase future financing costs. In most cases in which we have floating rate debt, our revenues serving this debt are indexed to inflation, which helps mitigate the impact of rising rates. For future debt refinancings, AES actively manages a hedging program to reduce uncertainty and exposure to future interest rates. For new business, higher interest rates increase the financing costs for new projects under development and which have not yet secured financing.
AES typically seeks to incorporate expected financing costs into our new PPA pricing such that we maintain our target investment returns, but higher financing costs may negatively impact our returns or the competitiveness of some of our development projects. Additionally, we typically seek to enter into interest rate hedges shortly after signing PPAs to mitigate the risk of rising interest rates prior to securing long-term financing.
Argentina — In July 2024, the Argentine government enacted Law 27,742, known as Ley Bases, declaring a one-year public emergency in administrative, economic, financial, and energy matters. It grants the President delegated powers and initiates broad state reforms to deregulate the economy, including labor reform, the Incentive Regime for Large Investments, modifications to non-income tax measures, and the privatization of state-owned
51 | The AES Corporation | March 31, 2025 Form 10-Q
energy companies. Additionally, the Ministry of Energy issued Resolution 150/2024, repealing certain regulations from previous years that involved excessive state and CAMMESA intervention in the Wholesale Electricity Market (“MEM”).
On January 28, 2025, the Energy Secretariat issued Resolution 21/2025 to reform the MEM and is intended to ensure secure energy supply and stable consumer costs.
On April 11, 2025, the Central Bank of Argentina started a new economic program supported by a $20 billion agreement with the International Monetary Fund. Of this amount, $15 billion will be available in 2025. The key points of the program include (a) a removal of exchange restrictions for individuals and (b) foreign shareholders can distribute profits starting from 2025 and deadlines for foreign trade payments are relaxed.
These changes may have a profound impact on the sector, influencing our operations and financial results. It is not yet possible to predict the impact of these regulations in our consolidated results of operations, cash flows, and financial condition.
Puerto Rico — As discussed in Item 7.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—Key Trends and Uncertainties of the 2024 Form 10-K, our subsidiaries in Puerto Rico have long-term PPAs with state-owned PREPA, which has been facing economic challenges that could result in a material adverse effect on our business in Puerto Rico. Despite the Title III protection, PREPA has been making substantially all of its payments to the generators in line with historical payment patterns.
The Puerto Rico Oversight, Management, and Economic Stability Act (“PROMESA”) was enacted to create a structure for exercising federal oversight over the fiscal affairs of U.S. territories and created procedures for adjusting debt accumulated by the Puerto Rico government and, potentially, other territories (“Title III”). PROMESA also expedites the approval of key energy projects and other critical projects in Puerto Rico.
PROMESA allowed for the establishment of an Oversight Board with broad powers of budgetary and financial control over Puerto Rico. The Oversight Board filed for bankruptcy on behalf of PREPA under Title III in July 2017. As a result of the bankruptcy filing, AES Ilumina’s non-recourse debt of $22 million continues to be in technical default and is classified as current as of March 31, 2025.
In 2022, a mediation commenced to resolve the PREPA Title III case. On March 19, 2025, the judge presiding over the case entered an order to permit the filing of an amended plan of adjustment and litigation of specific issues, including administrative expense claim by non-settling bondholders. The stay of plan confirmation and bondholder rights-related litigation was extended without a termination date, and the non-settling bondholders' motion to lift the stay was denied. The PROMESA oversight board filed an amended plan of adjustment and disclosure statement for PREPA on March 28, 2025. On April 25, 2025, the Oversight Board filed a status report seeking to extend the mediation period for six months through October 31, 2025.
Considering the information available as of the date hereof, management believes the carrying amount of our long-lived assets in Puerto Rico of $751 million is recoverable as of March 31, 2025.
Decarbonization Initiatives
Our strategy involves shifting towards clean energy platforms, including renewable energy, energy storage, LNG, and modernized grids. It is designed to position us for continued growth while reducing our carbon intensity and to be in support of our mission of accelerating the future of energy, together. We have made significant progress on our exit of coal generation, and by year-end 2025, we intend to have exited the substantial majority of our coal facilities that we owned in 2022. Due to a number of factors, including grid and market dynamics, we will continue to work towards exiting coal in the limited markets where we have coal generation. We currently anticipate these efforts will continue beyond 2027. We expect to further reduce the carbon intensity of our operations as we add more long-term contracted renewables to the grid each year.
In addition, initiatives have been announced by regulators, including in Chile, Puerto Rico, Bulgaria, and offtakers in recent years, with the intention of reducing GHG emissions generated by the energy industry. In parallel, the shift towards renewables has caused certain customers to migrate to other low-carbon energy solutions and this trend may continue.
Although we cannot currently estimate the financial impact of these decarbonization initiatives, new legislative or regulatory programs further restricting carbon emissions or other initiatives to voluntarily exit coal generation could require material capital expenditures, result in a reduction of the estimated useful life of certain coal facilities, or have other material adverse effects on our financial results.
52 | The AES Corporation | March 31, 2025 Form 10-Q
For further information about the risks associated with decarbonization initiatives, see Item 1A.—Risk Factors—Concerns about GHG emissions and the potential risks associated with climate change have led to increased regulation and other actions that could impact our businesses included in the 2024 Form 10-K.
Regulatory
FERC, RTOs, and Interconnection Prioritization— On February 11, 2025, FERC approved PJM's request for a one-time change in its interconnection process to expedite the interconnection of a limited number of high-capacity resources to support near-term resource adequacy and grid reliability. This change to PJM's interconnection process is not expected to impact the PJM projects already in our backlog since they have received interconnection approvals. However, it will likely create uncertainty and delays in the time for interconnection approvals for our development pipeline of renewables projects in PJM. Other RTOs are considering similar proposals to expedite interconnection approvals for certain high-capacity resources. See Item 1A.—Risk Factors - Our development projects are subject to substantial uncertainties included in the 2024 Form 10-K for further details.
U.S. Executive Orders — A recent Executive Order has required a review of all federal onshore wind leasing and federal permitting practices. In executing this order, the Department of Interior and other agencies have paused federal permitting for all wind projects on federal lands and private lands with a federal nexus. Our U.S. renewables projects are developed primarily on private land and are designed in a manner that minimizes the potential of a federal nexus. At this time, we do not expect this Order to have a significant impact on our business.
AES Maritza PPA Review— DG Comp is conducting a preliminary review of whether AES Maritza’s PPA with NEK is compliant with the European Union's State Aid rules. No formal investigation has been launched by DG Comp to date. AES Maritza has previously engaged in discussions with the DG Comp case team and the Government of Bulgaria (“GoB”) to attempt to reach a negotiated resolution of the DG Comp’s review (“PPA Discussions”). There are no active PPA Discussions at present but those discussions could resume at any time. The PPA continues to remain in place. However, there can be no assurance that, in the context of DG Comp’s preliminary review or any future PPA Discussions, the other parties will not seek a prompt termination of the PPA.
We do not believe termination of the PPA is justified. Nevertheless, the PPA Discussions involved a range of potential outcomes, including but not limited to the termination of the PPA and payment of some level of compensation to AES Maritza. Any negotiated resolution would be subject to mutually acceptable terms, lender consent, and DG Comp approval. At this time, we cannot predict whether and when the PPA Discussions might resume or the outcome of any such discussions. Nor can we predict how DG Comp might resolve its review if the PPA Discussions do not resume or if any such discussions fail to result in an agreement concerning the agency's review. AES Maritza believes that its PPA is legal and in compliance with all applicable laws, and it will take all actions necessary to protect its interests, whether through negotiated agreement or otherwise. However, there can be no assurance that this matter will be resolved favorably; if it is not, there could be a material adverse effect on the Company’s financial condition, results of operations, and cash flows. As of March 31, 2025, the carrying value of our long-lived assets at Maritza is $318 million.
AES Ohio Smart Grid Phase 2 Filing — In February 2024, AES Ohio filed a Smart Grid Phase 2 with the PUCO proposing a ten-year investment plan to begin after Smart Grid Phase 1 ends. On September 13, 2024, AES Ohio reached a settlement with the PUCO Staff and other parties on the pending Smart Grid Phase 2 Application. The Settlement will provide for a four-year plan to invest $241 million of capital and $19 million of operations and maintenance expense related to grid modernization, support of Distributed Energy Resources and Economic Development, and an enhanced Telecommunications network. These costs will be recovered through the existing Investment Infrastructure Rider. An evidentiary hearing was held on October 29, 2024, and we expect an order from PUCO by the second quarter of 2025, prior to the end of Smart Grid Phase 1.
AES Ohio Distribution Rate Case— On November 29, 2024, AES Ohio filed a new distribution rate case with the PUCO. The investments reflected in the distribution rate case include investments to enhance the safety, reliability, and resilience of the distribution system. Among other matters, the application requests: (i) an increase to its annual distribution revenue requirement of $235 million, which incorporates certain investments that are currently recovered through the Distribution Investment Rider; (ii) a return on equity of 10.95% and a cost of long-term debt of 4.49% on a distribution rate base of $1.3 billion and based on a capital structure of 53.87% equity and 46.13% long-term debt; and (iii) a date certain of September 30, 2024 and a test period of June 1, 2024 – May 31, 2025. The rate case application also includes a proposal for increased tree-trimming expenses. AES Ohio proposed an evidentiary
53 | The AES Corporation | March 31, 2025 Form 10-Q
hearing to be held beginning June 2, 2025; however, the PUCO has not yet established a procedural schedule for the proceeding.
AES Ohio Legislation— On April 30, 2025, the Ohio legislature passed new energy legislation (HB 15) that will be sent to the Governor for signature or veto. As passed by the state legislature, the legislation would allow Ohio's electric utilities to file three-year forecasted base distribution rate cases, which would replace electric security plans and associated recovery riders. Among other provisions, the legislation would also eliminate the Legacy Generation Resource Rider, which allows for recovery of net OVEC costs and revenues. As of March 31, 2025, AES Ohio's Legacy Generation Resource Rider regulatory asset balance was $9.7 million which we would continue to collect, in an amount based, among other things, on customer usage and rates through the effective date of the legislation, if signed by the Governor. Changes to the regulatory framework from this legislation, including not recovering any remaining regulatory asset balance amount or future net OVEC costs and revenue, could be material to our results of operations, financial condition, and cash flows.
Foreign Exchange Rates
We operate in multiple countries and as such are subject to volatility in exchange rates at varying degrees at the subsidiary level and between our functional currency, the USD, and currencies of the countries in which we operate.
The overall economic climate in Argentina has deteriorated, resulting in volatility and increased the risk that a further significant devaluation of the Argentine peso against the USD, similar to the devaluations experienced by the country in 2018, 2019, and 2023, may occur. A continued trend of peso devaluation could result in increased inflation, a deterioration of the country’s risk profile, and other adverse macroeconomic effects that could significantly impact our results of operations. For additional information, refer to Item 3.—Quantitative and Qualitative Disclosures About Market Risk.
Impairments and Realizability
Long-lived Assets and Current Assets Held-for-Sale — During the three months ended March 31, 2025, the Company recognized asset impairment expense of $49 million. See Note 16—Asset Impairment Expense included in Item 1.—Financial Statementsof this Form 10-Q for further information. After recognizing this impairment expense, the carrying value of long-lived assets and current assets held-for-sale that were assessed for impairment totaled $490 million at March 31, 2025.
Events or changes in circumstances that may necessitate recoverability tests and potential impairments of long-lived assets may include, but are not limited to, adverse changes in the regulatory environment, unfavorable changes in power prices or fuel costs, increased competition due to additional capacity in the grid, technological advancements, declining trends in demand, evolving industry expectations to transition away from fossil fuel sources for generation, or an expectation it is more likely than not the asset will be disposed of before the end of its estimated useful life.
Tax Asset Realizability— Certain AES Chilean businesses have recorded net deferred tax assets ("DTA") of $237 million relating primarily to net operating loss carryforwards, which are not subject to expiration. Their realization is dependent on generating sufficient taxable income. At this time, management believes it is more likely than not that all of the DTA will be realized; however, it could be reduced by way of valuation allowance in the near term if estimates of future taxable income are reduced.
Environmental
The Company is subject to numerous environmental laws and regulations in the jurisdictions in which it operates. The Company faces certain risks and uncertainties related to these environmental laws and regulations, including existing and potential GHG legislation or regulations, and actual or potential laws and regulations pertaining to water discharges, waste management (including disposal of coal combustion residuals) and certain air emissions, such as SO 2, NOx, particulate matter, mercury, and other hazardous air pollutants, and species and habitat protections. Such risks and uncertainties could result in increased capital expenditures or other compliance costs which could have a material adverse effect on certain of our U.S. or international subsidiaries and our consolidated results of operations. For further information about these risks, see Item 1A.—Risk Factors—Our operations are subject to significant government regulation and could be adversely affected by changes in the law or regulatory schemes; Several of our businesses are subject to potentially significant remediation expenses, enforcement initiatives, private party lawsuits and reputational risk associated with CCR; Our businesses are subject to stringent environmental laws, rules and regulations; and Concerns about GHG emissions and the
54 | The AES Corporation | March 31, 2025 Form 10-Q
potential risks associated with climate change have led to increased regulation and other actions that could impact our businesses included in the 2024 Form 10-K.
CSAPR — CSAPR addresses the “good neighbor” provision of the CAA, which prohibits sources within each state from emitting any air pollutant in an amount which will contribute significantly to any other state’s nonattainment, or interference with maintenance of, any NAAQS. The CSAPR required significant reductions in SO 2 and NOx emissions from power plants in many states in which subsidiaries of the Company operate. The Company is required to comply with the CSAPR in certain states, including Indiana and Maryland. The CSAPR is implemented, in part, through a market-based program under which compliance may be achievable through the acquisition and use of emissions allowances created by the EPA. The Company complies with CSAPR through operation of existing controls and purchases of allowances on the open market, as needed.
In October 2016, the EPA published a final rule to update the CSAPR to address the 2008 ozone NAAQS (“CSAPR Update Rule”). The CSAPR Update Rule found that NOx ozone season emissions in 22 states (including Indiana and Maryland) affected the ability of downwind states to attain and maintain the 2008 ozone NAAQS, and, accordingly, the EPA issued federal implementation plans that both updated existing CSAPR NOx ozone season emission budgets for electric generating units within these states and implemented these budgets through modifications to the CSAPR NOx ozone season allowance trading program. Implementation started in the 2017 ozone season (May-September 2017). Affected facilities receive fewer ozone season NOx allowances in 2017 and later, possibly resulting in the need to purchase additional allowances. Following legal challenges to the CSAPR Update Rule, on April 30, 2021, the EPA issued the Revised CSAPR Update Rule. The Revised CSAPR Update Rule required affected EGUs within certain states (including Indiana and Maryland) to participate in a new trading program, the CSAPR NOx Ozone Season Group 3 trading program. These affected EGUs received fewer NOx Ozone Season allowances beginning in 2021.
On June 5, 2023, the EPA published a final Federal Implementation Plan ("FIP") to address air quality impacts with respect to the 2015 Ozone NAAQS. The rule establishes a revised CSAPR NOx Ozone Season Group 3 trading program for 22 states, including Indiana and Maryland, and became effective during 2023. The FIP also includes enhancements to the revised Group 3 trading program, which include a dynamic budget setting process beginning in 2026, annual recalibration of the allowance bank to reflect changes to affected sources, a daily backstop emissions rate limit for certain coal-fired electric generating units beginning in 2024, and a secondary emissions limit prohibiting certain emissions associated with state assurance levels. It is too early to determine the impact of the final FIP, but it may result in the need to purchase additional allowances or make operational adjustments. On June 27, 2024, the U.S. Supreme Court issued an order granting a stay of the EPA’s 2023 FIP pending resolution of legal challenges to the FIP.
While the Company's additional CSAPR compliance costs to date have been immaterial, the future availability of and cost to purchase allowances to meet the emission reduction requirements is uncertain at this time, but it could be material.
Mercury and Air Toxics Standard — In April 2012, the EPA’s rule to establish maximum achievable control technology standards for hazardous air pollutants regulated under the CAA emitted from coal and oil-fired electric utilities, known as “MATS”, became effective and AES facilities implemented measures to comply, as applicable. In June 2015, the U.S. Supreme Court remanded MATS to the D.C. Circuit due to the EPA’s failure to consider costs before deciding to regulate power plants under Section 112 of the CAA and subsequently remanded MATS to the EPA without vacatur. On May 22, 2020, the EPA published a final finding that it is not “appropriate and necessary” to regulate hazardous air pollutant emissions from coal- and oil-fired electric generating units (“EGUs”) (reversing its prior 2016 finding), but that the EPA would not remove the source category from the CAA Section 112(c) list of source categories and would not change the MATS requirements. On March 6, 2023, the EPA published a final rule to revoke its May 2020 finding and reaffirm its 2016 finding that it is appropriate and necessary to regulate these emissions. On April 24, 2023, the EPA published a proposed rule, the MATS Risk and Technology Review (“RTR”) Rule to lower certain emissions limits and revise certain other aspects of MATS. On May 7, 2024, the EPA published a final rule to revise MATS for coal and oil-fired EGUs. The final rule became effective on July 8, 2024. The final rule lowers certain emissions limits and revises certain other aspects of MATS. The MATS RTR Rule is subject to legal challenges. On October 4, 2024, the U.S. Supreme Court denied emergency stay applications.
Further rulemakings and/or proceedings are possible; however, in the meantime, MATS remains in effect. We currently cannot predict the outcome of the regulatory or judicial process, or its impact, if any, on our MATS compliance planning or ultimate costs.
Climate Change Regulation — The final NSPS for CO 2 emissions from new, modified, and reconstructed
55 | The AES Corporation | March 31, 2025 Form 10-Q
fossil-fuel-fired power plants were published in the Federal Register on October 23, 2015. Several states and industry groups challenged the NSPS for CO 2 in the D.C. Circuit Court. On December 20, 2018, the EPA published proposed revisions to the final NSPS for new, modified, and reconstructed coal-fired electric utility steam generating units. The EPA proposed that the Best System of Emissions Reduction (“BSER”) for these units is highly efficient generation that would be equivalent to supercritical steam conditions for larger units and sub-critical steam conditions for smaller units, and not partial carbon capture and sequestration (“CCS”), which had been the BSER for these units in the 2015 final NSPS. The EPA did not include revisions for natural-gas combined cycle or simple cycle units in the December 20, 2018 proposal. Challenges to the GHG NSPS remain held in abeyance at this time. On May 23, 2023, the EPA published a proposed rule that would establish CO 2 emissions limits for certain new fossil-fuel fired stationary combustion turbines that commence construction or are modified after May 23, 2023. On May 9, 2024, the EPA published the final NSPS requiring carbon capture and sequestration for new and reconstructed baseload stationary combustion turbines, among other requirements. The EPA did not finalize revisions to the NSPS for newly constructed or reconstructed coal-fired electric utility steam generating units as proposed in 2018.
On July 8, 2019, the EPA published the final Affordable Clean Energy (“ACE”) Rule which would have established CO 2 emission rules for existing power plants under CAA Section 111(d) and would have replaced the EPA's 2015 Clean Power Plan Rule (“CPP”). However, on January 19, 2021, the D.C. Circuit vacated and remanded the ACE Rule. Subsequently, on June 30, 2022, the Supreme Court reversed the judgment of the D.C. Circuit Court and remanded for further proceedings consistent with its opinion holding that the “generation shifting” approach in the CPP exceeded the authority granted to the EPA by Congress under Section 111(d) of the CAA. As a result of the June 30, 2022 Supreme Court decision, on October 27, 2022, the D.C. Circuit issued a partial mandate, holding pending challenges to the ACE Rule in abeyance while the EPA developed a replacement rule. On May 23, 2023, the EPA published a proposed rule that would vacate the ACE Rule and proposed New Source Performance Standards (“NSPSs”) that would establish emissions guidelines in the form of CO 2 emissions limitations for certain existing electric generating units (“EGUs”) and would require states to develop State Plans that establish standards of performance for such EGUs that are at least as stringent as the EPA’s emissions guidelines. Depending on various EGU-specific factors, the bases of proposed emissions guidelines range from routine methods of operation to carbon capture and sequestration or co-firing low-GHG hydrogen starting in the 2030s. On May 9, 2024, the EPA published the final rule regulating GHGs from existing EGUs pursuant to Section 111(d) of the Clean Air Act and effective on July 8, 2024. Existing EGUs are those that were constructed prior to January 8, 2014. Depending on various EGU-specific factors, the bases of emissions guidelines for natural gas-fired units include the use of uniform fuels and routine methods of operation and maintenance and the bases of emissions guidelines for coal-fired units include 40% natural gas co-firing or carbon capture and sequestration with 90% capture of CO 2 depending on the date that coal operations cease. Specific standards for performance for EGUs will be established through a State Plan (or a Federal Plan if a state were to not submit an approvable plan). The May 2024 rule is subject to legal challenges. On October 16, 2024, the U.S. Supreme Court denied emergency stay applications. The impact of the rules, the results of further proceedings, and potential future greenhouse gas emissions regulations remain uncertain but could be material.
Waste Management — On October 19, 2015, an EPA rule regulating CCR under the Resource Conservation and Recovery Act as nonhazardous solid waste became effective. The rule established nationally applicable minimum criteria for the disposal of CCR in new and currently operating landfills and surface impoundments, including location restrictions, design and operating criteria, groundwater monitoring, corrective action and closure requirements, and post-closure care. The primary enforcement mechanisms under this regulation would be actions commenced by the states and private lawsuits. On December 16, 2016, the Water Infrastructure Improvements for the Nation Act ("WIIN Act") was signed into law. This includes provisions to implement the CCR rule through a state permitting program, or if the state chooses not to participate, a possible federal permit program. If this rule is finalized before Indiana or Puerto Rico establishes a state-level CCR permit program, AES CCR units in those locations could eventually be required to apply for a federal CCR permit from the EPA. The EPA has indicated that it will implement a phased approach to amending the CCR Rule, which is ongoing. On August 28, 2020, the EPA published final amendments to the CCR Rule titled "A Holistic Approach to Closure Part A: Deadline to Initiate Closure," that, among other amendments, required certain CCR units to cease waste receipt and initiate closure by April 11, 2021. The CCR Part A Rule also allowed for extensions of the April 11, 2021 deadline if the EPA determines certain criteria are met. Facilities seeking such an extension were required to submit a demonstration to the EPA by November 30, 2020. On January 11, 2022, the EPA released the first in a series of proposed determinations regarding CCR Part A Rule demonstrations and compliance-related letters notifying certain other facilities of their compliance obligations under the federal CCR regulations. The determinations and letters include interpretations regarding implementation of the CCR Rule. On April 8, 2022, petitions for review were filed challenging these EPA actions. The petitions are consolidated in Electric Energy, Inc. v. EPA. On June 28, 2024, the
56 | The AES Corporation | March 31, 2025 Form 10-Q
D.C. Circuit dismissed the challenges. It is too early to determine the direct or indirect impact of these letters or any determinations that may be made.
On May 18, 2023, the EPA published a proposed rule that would expand the scope of CCR units regulated by the CCR Rule to include inactive surface impoundments at inactive generating facilities as well as additional inactive and closed landfills and certain other accumulations of CCR. On May 8, 2024, the EPA published final revisions to the CCR rule which are effective on November 8, 2024. The final revisions expand the scope of CCR units regulated by the CCR rule to include legacy surface impoundments, inactive surface impoundments, and CCR management units. It is too early to determine the potential impact.
On February 20, 2020, the EPA published a proposed rule to establish a federal CCR permit program that would operate in states without approved CCR permit programs. If this rule is finalized before Indiana establishes a final state-level CCR permit program, AES Indiana could eventually be required to apply for a federal CCR permit from the EPA. On December 21, 2022, the Indiana Department of Environmental Management (“IDEM”) published in the Indiana Register a Second Notice of Comment Period for its proposed CCR rulemaking which would include regulation of CCR through a state permitting program. On August 7, 2024, in response to changes to Indiana statute, as well as comments received during the Second Notice of Comment Period, IDEM published a Continuation of the Second Notice of Comment Period for proposed amendments to the draft rule language for a State CCR Permitting Program.
The CCR rule, current or proposed amendments to or interpretations of the CCR rule, the results of groundwater monitoring data, or the outcome of CCR-related litigation could have a material impact on our business, financial condition, and results of operations. AES Indiana would seek recovery of any resulting expenditures; however, there is no guarantee we would be successful in this regard.
Cooling Water Intake— The Company's facilities are subject to a variety of rules governing water use and discharge. In particular, the Company's U.S. facilities are subject to the CWA Section 316(b) rule issued by the EPA effective in 2014 that seeks to protect fish and other aquatic organisms drawn into cooling water systems at power plants and other facilities. These standards require affected facilities to choose among seven BTA options to reduce fish impingement. In addition, certain facilities must conduct studies to assist permitting authorities to determine whether and what site-specific controls, if any, would be required to reduce entrainment of aquatic organisms. It is possible that this process, which includes permitting and public input, could result in the need to install closed-cycle cooling systems (closed-cycle cooling towers) or other technology. Finally, the standards require that new units added to an existing facility to increase generation capacity are required to reduce both impingement and entrainment. It is not yet possible to predict the total impacts of this final rule at this time, including any challenges to such final rule and the outcome of any such challenges. However, if additional capital expenditures are necessary, they could be material.
Certain AES Southland OTC units were required to be retired to provide interconnection capacity and/or emissions credits prior to startup of new (air cooled) generating units, and the remaining AES OTC generating units in California have been or will be shut down and permanently retired by the applicable OTC Policy compliance dates for the respective units. The SWRCB OTC Policy currently requires the shutdown and permanent retirement of the remaining OTC generating units at AES Huntington Beach, LLC and AES Alamitos, LLC by December 31, 2026, as extended in support of grid reliability. This extension compliance date is contingent upon the facilities participating in the Strategic Reserve established by AB 205.
Power plants are required to comply with the more stringent of state or federal requirements. At present, the California state requirements are more stringent and have earlier compliance dates than the federal EPA requirements, and are therefore applicable to the Company's California assets. The Company anticipates that compliance with CWA Section 316(b) regulations and associated costs could have a material impact on our consolidated financial condition or results of operations.
Water Discharges— In June 2015, the EPA and the U.S. Army Corps of Engineers ("the Agencies") published a rule defining federal jurisdiction over waters of the U.S., known as the "Waters of the U.S." (“WOTUS”) rule. WOTUS defines the geographic reach and authority of the Agencies to regulate streams, wetlands, and other water bodies under the CWA. There have been multiple Supreme Court decisions and dueling regulatory definitions over the past several years concerning the proper standard for how to properly determine whether a wetland or stream that is not navigable is considered a WOTUS. On May 25, 2023, the U.S. Supreme Court rendered a decision (“Decision”) in the case of Sackett v. Environmental Protection Agency, addressing the definition of WOTUS with regards to the CWA. This decision provides a clear standard that substantially restricts the Agencies' ability to regulate certain types of wetlands and streams. Specifically, under this decision, wetlands that do not have a continuous surface connection with traditional interstate navigable water are not federally jurisdictional.
57 | The AES Corporation | March 31, 2025 Form 10-Q
On September 8, 2023, the Agencies published final rule amendments in the Federal Register to amend the final “Revised Definition of ‘Waters of the United States’” rule. This final rule conforms the definition to the definition adopted in the Decision. The Agencies have amended key aspects of the regulatory text to conform the rule to the Decision. On March 12, 2025, the Agencies issued a joint guidance memorandum for implementing “continuous surface connection” consistent with the Decision and related issues. The Federal Register notice was published on March 24, 2025 outlining a process to gather recommendations for implementation of WOTUS. It is too early to determine whether the outcome of litigation or current or future revisions to rules interpreting federal jurisdiction over WOTUS may have a material impact on our business, financial condition, or results of operations.
In November 2015, the EPA published its final ELG rule to reduce toxic pollutants discharged into waters of the U.S. by steam-electric power plants through technology applications. These effluent limitations for existing and new sources include dry handling of fly ash, closed-loop or dry handling of bottom ash, and more stringent effluent limitations for flue gas desulfurization wastewater. AES Indiana Petersburg has installed a dry bottom ash handling system in response to the CCR rule and wastewater treatment systems in response to the NPDES permits in advance of the ELG compliance date. Other U.S. businesses already include dry handling of fly ash and bottom ash and do not generate flue gas desulfurization wastewater. Following the 2019 U.S. Court of Appeals vacatur and remand of portions of the 2015 ELG rule related to leachate and legacy water, on March 29, 2023, the EPA published a proposed rule revising the 2020 Reconsideration Rule. On May 9, 2024, the EPA published a final rule which became effective on July 8, 2024. The final rule established more stringent best available technology limits for flue gas desulfurization wastewater, bottom ash transport water, and combustion residual leachate and established a new set of definitions and new limits for combustion residual leachate and legacy wastewater. The May 2024 rule is subject to legal challenges. On October 10, 2024, the Eighth Circuit Court denied stay applications. It is too early to determine whether any outcome of litigation or current or future revisions to the ELG rule might have a material impact on our business, financial condition, and results of operations.
U.S. Executive Actions Affecting Environmental Regulations — On January 20, 2025, President Trump issued an Executive Order directing Agencies to, among other tasks, review regulations issued under the prior administration to determine whether they should be suspended, revised, or rescinded. President Trump also issued a Memorandum directing agencies to refrain from proposing or issuing any rules until the current administration has reviewed and approved those rules. In accordance with these and other Executive Orders, on March 12, 2025, the EPA released a list of environmental regulations that will be targeted for reconsideration and other deregulatory action. These and other actions, including other Executive Orders and directives from the administration, may have an impact on regulations and permitting processes that may affect our business, financial condition, or results of operations.