Skip to main content

VISTA GOLD CORP

For the period ended Dec 31, 2025. Filed Mar 11, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Mar 11, 2026

VGZ$2.82+2.5%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

ITEM 1. BUSINESS

In this annual report on Form 10-K, unless the context otherwise requires, the terms “we”, “us”, “our”, “Vista”, “Vista Gold”, or the “Company” refer to Vista Gold Corp. and its subsidiaries. References to AUD or A$ refer to Australian currency and USD or $ refer to United States currency, all in thousands,* *unless specified otherwise, except per share-related, per tonne, and per ounce amounts.

Overview

Vista Gold Corp. and its subsidiaries operate as a development-stage company in the gold mining industry. Vista does not currently generate cash flows from mining operations.

Our flagship asset is the Mt Todd Gold Project (“Mt Todd” or the “Project”), a development-stage gold deposit located in the Tier-1 jurisdiction of Northern Territory, Australia (the “NT”). Mt Todd offers a large gold mineral reserve, development optionality, expansion opportunities, exploration upside, advanced local infrastructure, community support, and demonstrated economic feasibility.

On July 29, 2025, the Company announced the results of a new Mt Todd feasibility study focused on developing a 15,000 tonnes per day (“tpd”), or 5.3 million tonnes per annum (“tpa”), operation (the “Mt Todd FS” or the “Study”). The Mt Todd FS significantly decreased the initial capital requirement, prioritized grade over tonnes, delivered stable gold production over the extended life of the project, and provided a fresh perspective for developing the Project using design and operating practices commonly employed by Australian gold operations.

The Mt Todd FS marks a significant shift in the strategy for Mt Todd, demonstrating the potential for near-term development of a smaller, lower capital cost project than previously evaluated. The Study incorporates the use of contract mining, third-party power generation, and other design and operating practices to reduce operational risks. The Mt Todd FS demonstrates the opportunity for Mt Todd to deliver attractive economic returns with stable gold production over a 30-year mine life. The Study does not assume any expansion of the planned mining/processing rate, but the 15,000 tpd design layout provides ample space for future expansion of the processing plant.

Feasibility Study Highlights

Average annual gold production of 153,000 ounces during years 1-15 and 146,000 over the 30-year life of mine

●Average ore grade of 1.04 grams gold per tonne (“g Au/t”) over the first 15 years of operations and 0.97 g Au/t over the life of mine
●Life of mine average gold recovery of 88.5% from 3-stage crush, single-stage sort, 2-stage grind, and carbon-in-leach (“CIL”) recovery circuit
●After-tax NPV5% of $1.1 billion, internal rate of return of 27.8%, and 2.7-year payback at a $2,500 per ounce gold price
●After-tax free cash flow at a $2,500 per ounce gold price of $1.6 billion for first 15 years of commercial operations
●Initial capital requirements of $425 million, a 59% reduction from the 2024 FS (as defined below)

-Capital Efficiency: $93 per ounce (initial capital : total ounces of gold produced)(3)

-Benefit to Cost Ratio of 2.5 (NPV5% : initial capital) (3)
●All-in Sustaining Cost (“AISC”) of $1,449 per ounce during years 1-15 and $1,499 per ounce during years 1-30(3)

Notes to investors:

(1)Proven and Probable Mineral Reserves are estimated in accordance with S-K 1300 (as defined below).
(2)See “Item 1. Business – Cautionary Note to Investors Regarding Estimates of Measured, Indicated and Inferred Resources and Proven and Probable Mineral Reserves” for additional information.
(3)Capital efficiency, benefit to cost ratio, and AISC per ounce are non-U.S. GAAP financial measures; see “Non-U.S. GAAP Financial Measures” for additional disclosure.

A technical report summary titled*“S-K 1300 Technical Report Summary – Mt Todd Gold Project – 15 ktpd Feasibility Study – Northern Territory, Australia”* with an effective date of July 29, 2025 and a filing date of September 11, 2025 (the “S-K 1300 Report”) for the Mt Todd FS was prepared in accordance with Item 1300 of Regulation S-K (“S-K 1300”) under the U.S. Securities Exchange Act of 1934, as amended (the “Exchange Act”) and filed on EDGAR at www.sec.gov on September 11, 2025.

A companion technical report titled “NI 43-101 Technical Report, Mt Todd Gold Project, 15 ktpd Feasibility Study, Northen Territory Australia” with an effective date of July 29, 2025 (the “NI 43-101 Report”) for Canadian purposes was prepared in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and filed on SEDAR+ at www.sedarplus.ca on September 11, 2025. The NI 43-101 Report is referenced herein for informational purposes only. The Mineral Resources and Mineral Reserves for the NI 43-101 Report are the same as the Mineral Resources and Mineral Reserves for the S-K1300 Report.

The Company previously completed a feasibility study for Mt Todd in 2022, with material project costs and economic returns updated in 2024 (the “2024 FS”). The 2024 FS evaluated the development of a 50,000 tpd, nominally 17.75 million tpa, operation.

In January 2026, the Company announced continued progress at its Mt Todd gold project and outlined the pathway to initiate detailed engineering and design in 2027. The Company would expect this milestone to initiate a period of approximately 27-months for design, construction, and commissioning.

Our focus for 2026 is on establishing the foundation for the successful execution of the Mt Todd project. Priorities include obtaining permit modifications to align existing approved permits with the Mt Todd FS; expanding corporate capability by building an Australia-based team to lead project development; and addressing recommendations presented in the Mt Todd FS that will provide key inputs for detailed engineering and design. On March 9, 2026, Vista closed a public offering for aggregate gross proceeds totaling $44,850 to fund these priorities and other general corporate purposes.

We have commenced efforts to obtain permit modifications and are actively engaged with consultants, regulators, and stakeholders. Some modifications have already been submitted, and programs to support other submissions have been planned and are expected to begin within the coming weeks. We anticipate the approval of these modifications will be achieved in 2027.

We are addressing recommendations presented in the Mt Todd FS. Recent drilling has provided core for selective metallurgical testing to confirm grind size, gold recoveries, and optimal selection and sizing of equipment in the process plant. A geotechnical review is also underway, with planned drilling around the Batman pit to assess the opportunity to steepen the west pit wall, reduce stripping, and potentially convert additional mineral resources to mineral reserves.

The Company continues to prioritize the efficient use of financial resources to advance Mt Todd. Our funding strategy is to maintain adequate liquidity while minimizing share dilution as we seek to preserve, enhance, and realize value from Mt Todd. The Company periodically raises funds in the capital markets and considers alternative strategies and possible corporate opportunities as ways to enhance its liquidity and deliver shareholder value.

Vista was originally incorporated on November 28, 1983 under the name “Granges Exploration Ltd.” It amalgamated with Pecos Resources Ltd. during June 1985 and continued as Granges Exploration Ltd. In June 1989, Granges Exploration Ltd. changed its name to Granges Inc. Granges Inc. amalgamated with Hycroft Resources & Development Corporation during May 1995 and continued as Granges Inc. Effective November 1996, Da Capo Resources Ltd. and Granges, Inc. amalgamated under the name “Vista Gold Corp.” and, effective December 1997, Vista continued from the Province of British Columbia to the Yukon Territory, Canada under theBusiness Corporations Act(Yukon Territory). On June 11, 2013, Vista continued from the Yukon Territory, Canada to the Province of British Columbia, Canada under theBusiness Corporations Act(British Columbia). The current addresses and telephone numbers of our offices are:

​​​
Executive Office​ ​ ​Registered and Records Office
8310 S Valley Hwy, Suite 3001200 Waterfront Centre – 200 Burrard Street
Englewood, Colorado, USA 80112Vancouver, British Columbia, Canada V7X 1T2
Telephone: (720) 981-1185Telephone: (604) 687-5744

Human Capital Management

As of December 31, 2025, we had 13 full-time employees and one part-time employee globally. In addition, we use consultants with specific skills to assist with various aspects of our corporate affairs, project evaluation, due diligence, corporate governance and property management. Since December 31, 2025, we have added four Australian employees and expect to add additional Australian employees throughout 2026.

The health and safety of our employees, contractors, and the communities in which we operate are high priorities in the way we manage our business. Oversight is provided by the Company’s board of directors (the “Board of Directors”) and the Board of Directors’ Health, Safety, Environment and Social Responsibility Committee. Management utilizes the principles set out in our Health & Safety Policy to administer health and safety programs. Employees and others entering our workplaces are provided with and required to use personal protective equipment appropriate for their duties. Each employee and visitor to our workplaces receives relevant orientation and is required to adhere to our established site health and safety protocols. In addition, we comply with relevant policies and regulations enacted by regulatory agencies in the jurisdictions where we operate. Our compensation programs include consideration of health and safety performance in determining incentive awards.

It is Vista’s priority to maintain a culture of ethical performance as a core value, as reflected in the Company’s Code of Business Conduct and Ethics and other related policies. Oversight is provided by the Board of Directors and, for specific areas of performance, by committees of the Board of Directors. Periodically, our employees are required to review the Code of Business Conduct and Ethics and acknowledge their understanding of the content and intent to comply. Our compensation programs include consideration of ethical performance in determining incentive awards.

Vista values the diversity and talents of its team, collectively working together in an inclusive environment to achieve corporate goals and personal professional development objectives. We cultivate a culture that is sensitive to the importance of diversity and inclusion in the workplace.

Our compensation programs are designed to align compensation of our employees with Vista’s corporate objectives and performance, and are designed to provide proper incentives to attract, retain and motivate employees to achieve superior results. The structure of our compensation programs balances competitive wages, benefits and incentive earnings for both short-term and long-term performance.

Environmental, Social, and Governance Responsibility

Vista is committed to implementing and continuing to improve business practices that are designed to minimize environmental impacts of our operating activities, support the people and communities within our areas of influence, and appropriately manage the business affairs of our organization. We believe part of being a good corporate citizen requires a dedicated focus on how we affect the environment and fulfill our responsibilities to stakeholders. We have worked closely with governmental entities in the NT and local groups, including the Jawoyn Association Aboriginal Corporation (the “Jawoyn Association”), as we strive towards an environmentally sound and socially responsible development plan.

Segment Information

We have one reportable segment, consisting of acquisition, exploration and evaluation activities which are focused on Australia. We reported no mining operating revenues during the years ended December 31, 2025 and 2024. Additional segment-level disclosure is provided in Note 11 – Segment Information. Geographic location of mineral properties and plant and equipment is provided in Note 3 – Mineral Properties and Note 4 – Plant and Equipment to our Consolidated Financial Statements under the section heading “Item 8. Financial Statements and Supplementary Data” below.

Reclamation

The Mt Todd site was not reclaimed by the predecessor owners when the mine closed in 2000. Reclamation obligations associated with this period and prior to Vista’s acquisition in 2006 are presently the responsibility of the NT Government. At such time as we provide notice to the NT Government that we intend to proceed with development, the Company will then assume these historical rehabilitation liabilities, currently stated by the NT Government at A$73 million. As a result, we would be required to mitigate long-term environmental impacts, including any of those existing prior to 2006, that are not otherwise mitigated during the life of mine, by stabilizing, contouring, re-sloping and re-vegetating various portions of the Project after mining and mineral processing operations are completed. Reclamation programs would be conducted in accordance with detailed plans, which would be finalized and reviewed by the appropriate regulatory agencies prior to initiating such programs.

Government Regulation

Our exploration and development activities and other property interests are subject to various national, state, territorial, provincial, and local laws and regulations in Australia and other jurisdictions, which govern prospecting, development, mining, mine safety, production, exports, taxes, labor standards, occupational health, waste disposal, protection of the environment, the use and disposal of hazardous substances, and other matters. We have obtained the major authorizations based on a 50,000 tpd technical report from 2018, and we have authorizations currently required to conduct our exploration, site management, and other programs. We believe we comply in all material respects with applicable mining, health, safety and environmental statutes and regulations in all the jurisdictions in which we operate.

Key Australian Environmental and Social Laws

Mineral projects in the NT are subject to Australian federal and NT laws and regulations regarding environmental matters and the use and disposal of hazardous wastes and materials. As with all mining projects, development and operation of Mt Todd is expected to have a variety of environmental and social impacts. We are required under Australian laws and regulations (federal and territorial) to acquire permits and other authorizations before Mt Todd can be developed and mined. In September 2014, the environmental impact statement (“EIS”) for Mt Todd was approved. The Environmental Protection Agency of the Northern Territory Government (“NT EPA”) advised that it had assessed the environmental impacts of the proposed gold mine at Mt Todd and authorized the Company to proceed with development, subject to the recommendations as outlined in the assessment report (the “Assessment Report”). The Assessment Report included a request for Vista to secure an authorization under the federal Environmental Protection and Biodiversity Conservation Act 1999 (“EPBC”) as it relates to the Gouldian Finch. In January 2018, the authorization required by the EPBC was approved by the Australia Department of the Environment and Energy. We must comply with the terms of our Authority Certificates under the Northern Territory Aboriginal Sacred Sites Act 1989 which deals with the handling of archeological material and sacred sites. We are also subject to statutory requirements under the NT Mining Management Act, which includes the requirement to have a mining authorization before the start of mining operations. The mining authorization is issued after the approval of the mining license. It is the legal document that makes the mining license and any additional conditions binding for the Project. The Mt Todd Mining Management Plan (“MMP”) and associated mining authorization were approved by the Northern Territory Department of Industry, Tourism and Trade in June 2021. As a result of recent changes to the Mining Management Act, all MMPs were converted to Deemed Environmental (Mining) Licenses (“DEML”) in July 2024, and companies have four years to convert the DEMLs to Environmental (Mining) Licenses (“EML”). In the interim period, the DEML provides the same rights and obligations in regard to the operating plans for Mt Todd as determined in the MMP. The Company is in the process of aligning the relevant approvals and authorizations discussed in this section with the plans and designs in the Mt Todd FS.

Environmental Regulation

Mt Todd is subject to various federal, territorial, and local laws and regulations governing protection of the environment. Such laws and regulations are continually changing and, in general, are becoming more restrictive. Our policy is to conduct business in a way that safeguards public health and the environment. We believe that our operations are conducted in material compliance with applicable laws and regulations.

Changes to current local, territorial, or federal laws and regulations in the jurisdictions where we have exploration and development activities could require additional capital expenditures and increase operating and/or reclamation costs. We are unable to predict what additional legislation, if any, might be proposed or enacted, or what additional regulatory requirements could impact the economics of Mt Todd.

During 2025, Mt Todd did not have any material non-compliance occurrences with any applicable environmental laws and regulations. See “Item 1. Business – Reclamation”, above.

Competition

We compete with other mining companies to acquire, explore, finance, and develop gold properties and to retain expert consultants required to complete our geological and project development studies. We also compete with other mining companies to hire mining engineers, geologists and other skilled personnel in the mining industry, and for exploration and development services. Some of these competing mining companies have substantially greater financial and technical resources than Vista. As a result, we may have difficulty acquiring attractive gold projects at reasonable prices, engaging skilled consultants with sufficient resources to support timely completion of work programs, and attracting and retaining qualified personnel.

Gold Price History

The price of gold is volatile and is affected by numerous factors, all of which are beyond our control, such as the sale or purchase of gold by various central banks and financial institutions, inflation, recession, fluctuation in the relative values of the U.S. dollar to foreign currencies, changes in global gold supply and demand, and political and economic conditions.

The following table presents the high, low and average London Fix prices in U.S. dollars per troy ounce of gold over the past five years and during 2026 through March 4, 2026:

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
Year​ ​ ​High​ ​ ​Low​ ​ ​Average​
2021​$1,943​$1,684​$1,799​
2022​$2,039​$1,629​$1,800​
2023​$2,078​$1,811​$1,941​
2024​$2,778​$1,985​$2,386​
2025​$4,481​$2,633​$3,447​
2026 (to March 4, 2026)​$5,508​$4,386​$4,904​

Data Source 2021 to 2024: www.lbma.org.uk/prices-and-data/precious-metal-prices#/

Data Source 2025 to 2026: www.kitco.com/price/fixes/kitco-fix

Available Information

We make available, without charge, on or through our website atwww.vistagold.com, our annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and any amendments to those reports filed or furnished pursuant to Sections 13(a) or 15(d) of the Exchange Act. Our website and the information contained therein or connected thereto are not intended to be, and are not, incorporated into this annual report on Form 10-K.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.