A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Feb 21, 2025

LNT$73.24-0.3%Stored close · as of Nov 10, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits
Contents

3. Property, Plant and Equipment

NOTE 3. PROPERTY, PLANT AND EQUIPMENT

At December 31, details of property, plant and equipment on the balance sheets were as follows (in millions):

Alliant EnergyIPLWPL
202420232024202320242023
Utility:
Electric plant:
Generation in service (a)(b)$11,156$9,180$5,924$5,025$5,232$4,155
Distribution in service7,8117,3144,3444,0913,4673,223
Other in service595567385356210211
Anticipated to be retired early (c)7841,629——7841,629
Total electric plant20,34618,69010,6539,4729,6939,218
Gas plant in service1,8631,791981951882840
Other plant in service (d)734653456411278242
Accumulated depreciation (c)(6,229)(5,924)(3,360)(3,180)(2,869)(2,744)
Net plant16,71415,2108,7307,6547,9847,556
Leased Sheboygan Falls Energy Facility, net (e)————7479
Leased land for solar generation, net1891725333136139
Construction work in progress1,2151,245548605667640
Other, net5756—1
Total utility18,12316,6349,3368,2988,8618,415
Non-utility and other:
Non-utility Generation, net (f)10368————
Corporate Services and other, net (g)475455————
Total non-utility and other578523————
Total property, plant and equipment$18,701$17,157$9,336$8,298$8,861$8,415

(a)Alliant Energy and WPL currently expect construction costs associated with WPL’s approximately 1,100 MW of new solar generation will exceed the construction cost estimates previously approved by the PSCW by approximately $205 million. In 2024, the PSCW issued orders approving deferral of, and the deferral of a return on, the incremental solar generation construction costs in 2024 and 2025. Alliant Energy and WPL concluded that there was not a probable disallowance of the higher rate base amounts as of December 31, 2024 given construction costs were reasonably and prudently incurred.

(b)In September 2024, the IUC approved IPL’s retail electric rate review for the October 2024 through September 2025 forward-looking Test Period, which allows IPL to recover construction costs associated with its 400 MW of new solar generation, including AFUDC and transmission upgrade costs among other costs, above the original cost target of $1,650/kilowatt up to $1,837.5/kilowatt. The costs up to the original cost target of $1,650/kilowatt will earn a return on common equity of 10.25%. The costs between $1,650/kilowatt and $1,837.5/kilowatt will earn a return on common equity that is the same as other assets without advance rate-making principles, without having to establish that such costs were reasonably and prudently incurred. Alliant Energy and IPL currently do not expect these construction costs will exceed $1,837.5/kilowatt.

(c)WPL previously received approval from MISO to retire the coal-fired Columbia Units 1 and 2, and Edgewater Unit 5. WPL currently plans to cease coal operations at Columbia Units 1 and 2 by the end of 2029, as well as evaluate the conversion of Columbia Unit 1 and/or Unit 2 to natural gas. Alliant Energy and WPL concluded that Columbia Units 1 and 2 met the criteria to be considered probable of abandonment as of December 31, 2024. As of December 31, 2024 and 2023, the net book value of Columbia Units 1 and 2 in aggregate was $413 million and $428 million, respectively. As of December 31, 2023, WPL anticipated retiring Edgewater Unit 5 by June 1, 2025, and Alliant Energy and WPL concluded that Edgewater Unit 5 met the criteria to be considered probable of abandonment. In May 2024, WPL announced updated plans to convert Edgewater Unit 5 to natural gas by 2028, subject to regulatory approvals. As a result, as of December 31, 2024, Alliant Energy and WPL concluded that Edgewater Unit 5 no longer meets the criteria to be considered probable of abandonment. WPL is currently allowed a full recovery of and a full return on these EGUs from both its retail and wholesale customers, and as a result, as of December 31, 2024, Alliant Energy and WPL concluded that no disallowance was probable.

(d)Includes IPL’s steam service assets, which are fully depreciated as of December 31, 2024. IPL’s steam customers are each under contract through 2025 for taking minimum quantities of annual steam usage, with certain conditions.

(e)Less accumulated amortization of $116 million and $112 million for WPL as of December 31, 2024 and 2023, respectively. Refer to Note 9 for discussion of WPL’s renewal of this lease in 2024. For Alliant Energy, the leased Sheboygan Falls Energy Facility is eliminated upon consolidation and is included in the “Non-utility Generation, net” line within Alliant Energy’s consolidated property, plant and equipment.

(f)Less accumulated depreciation of $78 million and $75 million for Alliant Energy as of December 31, 2024 and 2023, respectively.

(g)Less accumulated depreciation of $289 million and $275 million for Alliant Energy as of December 31, 2024 and 2023, respectively.

AFUDC - AFUDC represents costs to finance construction additions, including a return on equity component and cost of debt component as required by regulatory accounting. The concurrent credit for the amount of AFUDC capitalized is recorded as “Allowance for funds used during construction” in the income statements. The amount of AFUDC generated by equity and debt components was as follows (in millions):

Alliant EnergyIPLWPL
202420232022202420232022202420232022
Equity$54$74$44$31$15$8$23$59$36
Debt212616126392013
$75$100$60$43$21$11$32$79$49

Non-utility and Other - The non-utility and other property, plant and equipment recorded on Alliant Energy’s balance sheets include the following:

Non-utility Generation - The Sheboygan Falls Energy Facility was placed in service in 2005 and is depreciated using the straight-line method over a 35-year period.

Corporate Services and Other -Property, plant and equipment related to Corporate Services include computer software, and the corporate headquarters building located in Madison, Wisconsin. The majority of the software is amortized over a 5-year period. Other property, plant and equipment include Travero assets (a short-line rail freight service in Iowa; a Mississippi River barge, rail and truck freight terminal in Illinois; wind turbine blade recycling services; and a rail-served warehouse in Iowa). All Corporate Services and Other property, plant and equipment are depreciated using the straight-line method over periods ranging from 5 to 30 years.