A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2024 · Filed Aug 1, 2024

XEL$80.17+0.6%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Notes to Consolidated Financial Statements

Notes to Consolidated Financial Statements (UNAUDITED)

In the opinion of management, the accompanying unaudited consolidated financial statements contain all adjustments necessary to present fairly, in accordance with GAAP, the financial position of Xcel Energy as of June 30, 2024 and Dec. 31, 2023; the results of Xcel Energy’s operations, including the components of net income, comprehensive income and changes in stockholders’ equity for the three and six months ended June 30, 2024 and 2023; and Xcel Energy’s cash flows for the six months ended June 30, 2024 and 2023.

All adjustments are of a normal, recurring nature, except as otherwise disclosed. Management has also evaluated the impact of events occurring after June 30, 2024, up to the date of issuance of these consolidated financial statements. These statements contain all necessary adjustments and disclosures resulting from that evaluation. The Dec. 31, 2023 balance sheet information has been derived from the audited 2023 consolidated financial statements included in the Xcel Energy Inc. Annual Report on Form 10-K for the year ended Dec. 31, 2023.

Notes to the consolidated financial statements have been prepared pursuant to the rules and regulations of the SEC for Quarterly Reports on Form 10-Q. Certain information and note disclosures normally included in financial statements prepared in accordance with GAAP on an annual basis have been condensed or omitted pursuant to such rules and regulations. For further information, refer to the consolidated financial statements and notes thereto included in the Xcel Energy Inc. Annual Report on Form 10-K for the year ended Dec. 31, 2023, filed with the SEC on Feb. 21, 2024.

Due to the seasonality of Xcel Energy’s electric and natural gas sales, interim results are not necessarily an appropriate base from which to project annual results.

1. Summary of Significant Accounting Policies

The significant accounting policies set forth in Note 1 to the consolidated financial statements in the Xcel Energy Inc. Annual Report on Form 10-K for the year ended Dec. 31, 2023 appropriately represent, in all material respects, the current status of accounting policies and are incorporated herein by reference.

2. Accounting Pronouncements

Recently Issued

Segment Reporting—In November 2023, the FASB issued ASU 2023-07 – Segment Reporting (Topic 280) – Improvements to Reportable Segment Disclosures, which extends the existing requirements for annual disclosures to quarterly periods, and requires that both annual and quarterly disclosures present segment expenses using line items consistent with information regularly provided to the chief operating decision maker. The ASU is effective for annual periods beginning after Dec. 15, 2023 and quarterly periods beginning after Dec. 15, 2024, and Xcel Energy does not expect implementation of the new disclosure guidance to have a material impact to its consolidated financial statements.

Income Taxes—In December 2023, the FASB issued ASU 2023-09– Income Taxes (Topic 740) – Improvements to Income Tax Disclosures, with new disclosure requirements including presentation of prescribed line items in the effective tax rate reconciliation and disclosures regarding state and local tax payments. The ASU is effective for annual periods beginning after Dec. 15, 2024, and Xcel Energy does not expect implementation of the new disclosure guidance to have a material impact to its consolidated financial statements.

Climate-Related Disclosures— In March 2024, the SEC issued Final Rule 33-11275 – The Enhancement and Standardization of Climate-Related Disclosures for Investors. This rule requires registrants to provide standardized disclosures in Form 10-K related to climate-related risks, Scope 1 and 2 greenhouse gas emissions, as well as to include in a footnote to the consolidated financial statements the financial impact of severe weather events and other natural conditions. The rule requires implementation in phases between 2025 and 2033. In April 2024, the SEC announced that it would voluntarily stay its final climate disclosure rules pending judicial review. Xcel Energy does not expect implementation of the new guidance to have a material impact on the consolidated financial statements.

3. Selected Balance Sheet Data

(Millions of Dollars)June 30, 2024Dec. 31, 2023
Accounts receivable, net
Accounts receivable$1,244$1,443
Less allowance for bad debts(106)(128)
Accounts receivable, net$1,138$1,315
(Millions of Dollars)June 30, 2024Dec. 31, 2023
Inventories
Materials and supplies$394$377
Fuel181211
Natural gas47123
Total inventories$622$711
(Millions of Dollars)June 30, 2024Dec. 31, 2023
Property, plant and equipment, net
Electric plant$53,883$52,494
Natural gas plant9,3639,080
Common and other property3,2963,190
Plant to be retired (a)1,8902,055
Construction work in progress4,3552,873
Total property, plant and equipment72,78769,692
Less accumulated depreciation(19,300)(18,399)
Nuclear fuel3,4443,337
Less accumulated amortization(3,041)(2,988)
Property, plant and equipment, net$53,890$51,642

(a)Amounts include Sherco 1 and 3 and A.S. King for NSP-Minnesota; Comanche Units 2 and 3, Craig Units 1 and 2, Hayden Units 1 and 2 and coal generation assets at Pawnee pending facility gas conversion for PSCo; and Tolk Unit 1 and 2 and coal generation assets at Harrington pending facility gas conversion for SPS. Amounts are presented net of accumulated depreciation.

4. Borrowings and Other Financing Instruments

Short-Term Borrowings

Short-Term Debt— Xcel Energy Inc. and its utility subsidiaries meet their short-term liquidity requirements primarily through the issuance of commercial paper and borrowings under their credit facilities and term loan agreements.

Commercial paper and term loan borrowings outstanding for Xcel Energy:

(Amounts in Millions, Except Interest Rates)Three Months Ended June 30, 2024Year Ended Dec. 31, 2023
Borrowing limit$3,550$3,550
Amount outstanding at period end802785
Average amount outstanding449491
Maximum amount outstanding8021,241
Weighted average interest rate, computed on a daily basis5.54%5.12%
Weighted average interest rate at period end5.545.52

Letters of Credit — Xcel Energy Inc. and its utility subsidiaries use letters of credit, generally with terms ofone year, to provide financial guarantees for certain obligations. There was $43 million and $44 million of letters of credit outstanding under the credit facilities at June 30, 2024 and Dec. 31, 2023, respectively. Amounts approximate their fair value and are subject to fees.

Revolving Credit Facilities—In order to issue commercial paper, Xcel Energy Inc. and its utility subsidiaries must have revolving credit facilities equal to or greater than the commercial paper borrowing limits and cannot issue commercial paper exceeding available credit facility capacity. The lines of credit provide short-term financing in the form of notes payable to banks, letters of credit and back-up support for commercial paper borrowings.

As of June 30, 2024, Xcel Energy Inc. and its utility subsidiaries had the following committed revolving credit facilities available:

(Millions of Dollars)Credit Facility (a)Drawn (b)Available
Xcel Energy Inc.$1,500$802$698
PSCo70031669
NSP-Minnesota70012688
SPS500—500
NSP-Wisconsin150—150
Total$3,550$845$2,705

(a)Expires in September 2027.

(b)Includes outstanding commercial paper and letters of credit.

Xcel Energy Inc., NSP-Minnesota, PSCo, and SPS each have the right to request an extension of the credit facility termination date for two additional one-year periods. NSP-Wisconsin has the right to request an extension of the credit facility termination date for an additional one-year period. All extension requests are subject to majority bank group approval.

All credit facility bank borrowings, outstanding letters of credit and outstanding commercial paper reduce the available capacity of the credit facility. Xcel Energy Inc. and its utility subsidiaries hadno direct advances on the credit facilities outstanding as of June 30, 2024 and Dec. 31, 2023.

Bilateral Credit Agreement

In April 2024, NSP-Minnesota’s uncommitted bilateral credit agreement was renewed for an additionalone-year term. The credit agreement is limited in use to support letters of credit.

As of June 30, 2024, NSP-Minnesota had $70 million of outstanding letters of credit under the $75 million bilateral credit agreement.

Long-Term Borrowings and Other Financing Instruments

During the six months ended June 30, 2024, Xcel Energy Inc. and its utility subsidiaries issued the following:

Xcel Energy Inc. issued $800 million of 5.50% Senior Unsecured Notes due March 15, 2034.

NSP-Minnesota issued $700 million of 5.40% First Mortgage Bonds due March 15, 2054.

PSCo issued $450 million of 5.35% First Mortgage Bonds due May 15, 2034 and $750 million of 5.75% First Mortgage Bonds due May 15, 2054.

NSP-Wisconsin issued $400 million of 5.65% First Mortgage Bonds due June 15, 2054.

SPS issued $600 million of 6.00% First Mortgage Bonds due June 1, 2054.

ATM Equity Offering— In October 2023, Xcel Energy Inc. filed a prospectus supplement under which it may sell up to $2.5 billion of its common stock through an ATM program. In 2023, Xcel Energy Inc. issued 3.12 million shares of common stock ($188 million in net proceeds and $2 million in transaction fees paid). In the six months ended June 30, 2024,1.68 million shares ($93 million in net proceeds and $1 million in transaction fees paid) were issued under the ATM program. As of June 30, 2024, approximately $2.2 billion remained available for sale under the ATM program.

Equity through DRIP and Benefits Program—Xcel Energy issued $40 million and $61 million of equity through the DRIP and benefits programs during the six months ended June 30, 2024 and 2023, respectively. The programs allow shareholders to reinvest their dividends directly in Xcel Energy Inc. common stock.

5. Revenues

Revenue is classified by the type of goods/services rendered and market/customer type. Xcel Energy’s operating revenues consisted of the following:

(Millions of Dollars)ElectricNatural GasAll OtherTotal
Major revenue types
Revenue from contracts with customers:
Residential$801$191$—$992
C&I1,3359761,438
Other36—339
Total retail2,17228892,469
Wholesale137——137
Transmission148——148
Other1742—59
Total revenue from contracts with customers2,47433092,813
Alternative revenue and other185255215
Total revenues$2,659$355$14$3,028
(Millions of Dollars)ElectricNatural GasAll OtherTotal
Major revenue types
Revenue from contracts with customers:
Residential$748$216$15$979
C&I1,33712481,469
Other37—138
Total retail2,122340242,486
Wholesale174——174
Transmission157——157
Other432—36
Total revenue from contracts with customers2,457372242,853
Alternative revenue and other144214169
Total revenues$2,601$393$28$3,022
(Millions of Dollars)ElectricNatural GasAll OtherTotal
Major revenue types
Revenue from contracts with customers:
Residential$1,660$759$10$2,429
C&I2,611371152,997
Other70—575
Total retail4,3411,130305,501
Wholesale310——310
Transmission306——306
Other36101—137
Total revenue from contracts with customers4,9931,231306,254
Alternative revenue and other351657423
Total revenues$5,344$1,296$37$6,677
(Millions of Dollars)ElectricNatural GasAll OtherTotal
Major revenue types
Revenue from contracts with customers:
Residential$1,622$1,005$28$2,655
C&I2,690547203,257
Other73—275
Total retail4,3851,552505,987
Wholesale398——398
Transmission320——320
Other1380—93
Total revenue from contracts with customers5,1161,632506,798
Alternative revenue and other248497304
Total revenues$5,364$1,681$57$7,102

6. Income Taxes

Reconciliation between the statutory rate and ETR:

Three Months Ended June 30Six Months Ended June 30
2024202320242023
Federal statutory rate21.0%21.0%21.0%21.0%
State tax (net of federal tax effect)5.15.14.94.9
(Decreases) increases:
Wind PTCs (a)(60.3)(64.0)(36.8)(44.1)
Plant regulatory differences (b)(7.0)(6.3)(6.0)(5.8)
Other tax credits, net operating loss & tax credit allowances(1.3)(1.4)(0.8)(1.5)
Other, net1.41.60.70.5
Effective income tax rate(41.1)%(44.0)%(17.0)%(25.0)%

(a)Wind PTCs net of estimated transfer discounts are generally credited to customers (reduction to revenue) and do not materially impact net income.

(b)Plant regulatory differences primarily relate to the credit of excess deferred taxes to customers. Income tax benefits associated with the credit are offset by corresponding revenue reductions.

7. Earnings Per Share

Basic EPS was computed by dividing the earnings available to common shareholders by the average weighted number of common shares outstanding. Diluted EPS was computed by dividing the earnings available to common shareholders by the diluted weighted average number of common shares outstanding.

Diluted EPS reflects the potential dilution that could occur if securities or other agreements to issue common stock (i.e., common stock equivalents) were settled. The weighted average number of potentially dilutive shares outstanding used to calculate diluted EPS is calculated using the treasury stock method.

Common Stock Equivalents — Xcel Energy Inc. has common stock equivalents related to time-based equity compensation awards.

Stock equivalent units granted to Xcel Energy Inc.’s Board of Directors are included in common shares outstanding upon grant date as there is no further service, performance or market condition associated with these awards. Restricted stock issued to employees is included in common shares outstanding when granted.

Share-based compensation arrangements for which there is currently no dilutive impact to EPS include the following:

Equity awards subject to a performance condition; included in common shares outstanding when all necessary conditions have been satisfied by the end of the reporting period.

Liability awards subject to a performance condition; any portions settled in shares are included in common shares outstanding upon settlement.

Common shares outstanding used in the basic and diluted EPS computation:

Three Months Ended June 30Six Months Ended June 30
(Shares in Millions)2024202320242023
Basic557551556551
Diluted (a)557552556551

(a)Diluted common shares outstanding included common stock equivalents of 0.2 million and 0.3 million for the three months ended June 30, 2024 and 2023, respectively. Diluted common shares outstanding included common stock equivalents of 0.2 million for the six months ended June 30, 2024 and 2023.

8. Fair Value of Financial Assets and Liabilities

Fair Value Measurements

Accounting guidance for fair value measurements and disclosures provides a hierarchical framework for disclosing the observability of the inputs utilized in measuring assets and liabilities at fair value.

Level 1— Quoted prices are available in active markets for identical assets or liabilities as of the reporting date. The types of assets and liabilities included in Level 1 are actively traded instruments with observable actual trading prices.

Level 2— Pricing inputs are other than actual trading prices in active markets but are either directly or indirectly observable as of the reporting date. The types of assets and liabilities included in Level 2 are typically either comparable to actively traded securities or contracts or priced with models using highly observable inputs.

Level 3— Significant inputs to pricing have little or no observability as of the reporting date. The types of assets and liabilities included in Level 3 include those valued with models requiring significant judgment or estimation.

Specific valuation methods include:

Investments in equity securities and other funds — Equity securities are valued using quoted prices in active markets. The fair values for commingled funds are measured using NAVs. The investments in commingled funds may be redeemed for NAV with proper notice. Private equity commingled funds require approval of the fund for any unscheduled redemption, and such redemptions may be approved or denied by the fund at its sole discretion. Unscheduled distributions from real estate commingled funds may be redeemed with proper notice, however, withdrawals may be delayed or discounted as a result of fund illiquidity.

Investments in debt securities — Fair values for debt securities are determined by a third party pricing service using recent trades and observable spreads from benchmark interest rates for similar securities.

Interest rate derivatives — Fair values of interest rate derivatives are based on broker quotes that utilize current market interest rate forecasts.

Commodity derivatives — Methods used to measure the fair value of commodity derivative forwards and options utilize forward prices and volatilities, as well as pricing adjustments for specific delivery locations, and are generally assigned a Level 2 classification. When contracts relate to inactive delivery locations or extend to periods beyond those readily observable on active exchanges, the significance of the use of less observable inputs on a valuation is evaluated and may result in Level 3 classification.

Electric commodity derivatives held by NSP-Minnesota and SPS include transmission congestion instruments, generally referred to as FTRs. FTRs purchased from an RTO are financial instruments that entitle or obligate the holder to monthly revenues or charges based on transmission congestion across a given transmission path.

The values of these instruments are derived from, and designed to offset, the costs of transmission congestion. In addition to overall transmission load, congestion is also influenced by the operating schedules of power plants and the consumption of electricity pertinent to a given transmission path. Unplanned plant outages, scheduled plant maintenance, changes in the relative costs of fuels used in generation, weather and overall changes in demand for electricity can each impact the operating schedules of the power plants on the transmission grid and the value of these instruments.

FTRs are recognized at fair value and adjusted each period prior to settlement. Given the limited observability of certain variables underlying the reported auction values of FTRs, these fair value measurements have been assigned a Level 3 classification.

Net congestion costs, including the impact of FTR settlements, are shared through fuel and purchased energy cost recovery mechanisms. As such, the fair value of the unsettled instruments (i.e., derivative asset or liability) is offset/deferred as a regulatory asset or liability.

Non-Derivative Fair Value Measurements

Nuclear Decommissioning Fund

The NRC requires NSP-Minnesota to maintain a portfolio of investments to fund the costs of decommissioning its nuclear generating plants. Assets of the nuclear decommissioning fund are legally restricted for the purpose of decommissioning these facilities. The fund contains cash equivalents, debt securities, equity securities and other investments. NSP-Minnesota uses the MPUC approved asset allocation for the investment targets by asset class for the qualified trust.

NSP-Minnesota recognizes the costs of funding the decommissioning over the lives of the nuclear plants, assuming rate recovery of all costs. Realized and unrealized gains on fund investments over the life of the fund are deferred as an offset of NSP-Minnesota’s regulatory asset for nuclear decommissioning costs. Consequently, any realized and unrealized gains and losses on securities in the nuclear decommissioning fund are deferred as a component of the regulatory asset.

Unrealized gains for the nuclear decommissioning fund were $1.3 billion and $1.2 billion as of June 30, 2024 and Dec. 31, 2023, respectively, and unrealized losses were $40 million and $29 million as of June 30, 2024 and Dec. 31, 2023, respectively.

Non-derivative instruments with recurring fair value measurements in the nuclear decommissioning fund:

Fair Value
(Millions of Dollars)CostLevel 1Level 2Level 3NAVTotal
Nuclear decommissioning fund (a)
Cash equivalents$43$43$—$—$—$43
Commingled funds713———1,0361,036
Debt securities834—80114—815
Equity securities5171,4931——1,494
Total$2,107$1,536$802$14$1,036$3,388

(a)Reported in nuclear decommissioning fund and other investments on the consolidated balance sheets, which also includes $251 million of equity method investments and $152 million of rabbi trust assets and other miscellaneous investments.

Fair Value
(Millions of Dollars)CostLevel 1Level 2Level 3NAVTotal
Nuclear decommissioning fund (a)
Cash equivalents$41$41$—$—$—$41
Commingled funds721———1,0491,049
Debt securities784—7719—780
Equity securities5081,3392——1,341
Total$2,054$1,380$773$9$1,049$3,211

(a)Reported in nuclear decommissioning fund and other investments on the consolidated balance sheets, which also includes $244 million of equity investments in unconsolidated subsidiaries and $144 million of rabbi trust assets and other miscellaneous investments.

For the three and six months ended June 30, 2024 and 2023, there were no transfers of Level 3 investments between levels.

Contractual maturity dates of debt securities in the nuclear decommissioning fund as of June 30, 2024:

Final Contractual Maturity
(Millions of Dollars)Due in 1 Year or LessDue in 1 to 5 YearsDue in 5 to 10 YearsDue after 10 YearsTotal
Debt securities$5$289$266$255$815

Rabbi Trusts

Xcel Energy has established rabbi trusts to provide partial funding for future distributions of a deferred compensation plan. The fair value of assets held in the rabbi trusts were $94 million and $88 million at June 30, 2024 and Dec. 31, 2023, respectively, comprised of cash equivalents and mutual funds (level 1 valuation methods). Amounts are reported in nuclear decommissioning fund and other investments on the consolidated balance sheet.

Derivative Activities and Fair Value Measurements

Xcel Energy enters into derivative instruments, including forward contracts, futures, swaps and options, for trading purposes and to manage risk in connection with changes in interest rates, and utility commodity prices.

Interest Rate Derivatives— Xcel Energy enters into contracts that effectively fix the interest rate on a specified principal amount of a hypothetical future debt issuance. These financial swaps net settle based on changes in a specified benchmark interest rate, acting as a hedge of changes in market interest rates that will impact specified anticipated debt issuances. These derivative instruments are designated as cash flow hedges for accounting purposes, with changes in fair value prior to occurrence of the hedged transactions recorded as other comprehensive income.

As of June 30, 2024, accumulated other comprehensive loss related to interest rate derivatives included $1 million of net losses expected to be reclassified into earnings during the next 12 months as the hedged transactions impact earnings. As of June 30, 2024, Xcel Energy hadno unsettled interest swaps outstanding.

See Note 11 for the financial impact of qualifying interest rate cash flow hedges on Xcel Energy’s accumulated other comprehensive loss included in the consolidated statements of common stockholder’s equity and in the consolidated statements of comprehensive income.

Wholesale and Commodity Trading— Xcel Energy Inc.’s utility subsidiaries conduct various wholesale and commodity trading activities, including the purchase and sale of electric capacity, energy, energy-related instruments and natural gas-related instruments, including derivatives. Xcel Energy is allowed to conduct these activities within guidelines and limitations as approved by its risk management committee, comprised of management personnel not directly involved in the activities governed by this policy.

Results of derivative instrument transactions entered into for trading purposes are presented in the consolidated statements of income as electric revenues, net of any sharing with customers. These activities are not intended to mitigate commodity price risk associated with regulated electric and natural gas operations. Sharing of these margins is determined through state regulatory proceedings as well as the operation of the FERC-approved joint operating agreement.

Commodity Derivatives— Xcel Energy enters into derivative instruments to manage variability of future cash flows from changes in commodity prices in its electric and natural gas operations. This could include the purchase or sale of energy or energy-related products, natural gas to generate electric energy, natural gas for resale and FTRs.

The most significant derivative positions outstanding at June 30, 2024 and Dec. 31, 2023 for this purpose relate to FTR instruments administered by MISO and SPP. These instruments are intended to offset the impacts of transmission system congestion.

When Xcel Energy enters into derivative instruments that mitigate commodity price risk on behalf of electric and natural gas customers, the instruments are not typically designated as qualifying hedging transactions. The classification of unrealized losses or gains on these instruments as a regulatory asset or liability, if applicable, is based on approved regulatory recovery mechanisms.

As of June 30, 2024, Xcel Energy hadno commodity contracts designated as cash flow hedges.

Gross notional amounts of commodity forwards, options and FTRs:

(Amounts in Millions) (a)(b)June 30, 2024Dec. 31, 2023
Megawatt hours of electricity7548
Million British thermal units of natural gas7984

(a)Not reflective of net positions in the underlying commodities.

(b)Notional amounts for options included on a gross basis but weighted for the probability of exercise.

Consideration of Credit Risk and Concentrations— Xcel Energy continuously monitors the creditworthiness of counterparties to its interest rate derivatives and commodity derivative contracts prior to settlement and assesses each counterparty’s ability to perform on the transactions set forth in the contracts. Impact of credit risk was immaterial to the fair value of unsettled commodity derivatives presented on the consolidated balance sheets.

Xcel Energy’s utility subsidiaries’ most significant concentrations of credit risk with particular entities or industries are contracts with counterparties to their wholesale, trading and non-trading commodity activities.

As of June 30, 2024, four of Xcel Energy’sten most significant counterparties for these activities, comprising $41 million, or 21%, of this credit exposure, had investment grade credit ratings from S&P Global Ratings, Moody’s Investor Services or Fitch Ratings.

Five of theten most significant counterparties, comprising $64 million, or 33%, of this credit exposure, were not rated by these external ratings agencies, but based on Xcel Energy’s internal analysis, had credit quality consistent with investment grade.

One of these significant counterparties, comprising $60 million, or 31%, of this credit exposure, had credit quality less than investment grade, based on internal analysis. Eight of these significant counterparties are municipal or cooperative electric entities, RTOs or other utilities.

Credit Related Contingent Features — Contract provisions for derivative instruments that the utility subsidiaries enter, including those accounted for as normal purchase and normal sale contracts and therefore not reflected on the consolidated balance sheets, may require the posting of collateral or settlement of the contracts for various reasons, including if the applicable utility subsidiary’s credit ratings are downgraded below its investment grade credit rating by any of the major credit rating agencies.

As of June 30, 2024 and Dec. 31, 2023, there were $17 million and $12 million, respectively, of derivative liabilities with such underlying contract provisions, respectively.

Certain contracts also contain cross default provisions that may require the posting of collateral or settlement of the contracts if there was a failure under other financing arrangements related to payment terms or other covenants.

As of June 30, 2024 and Dec. 31, 2023, there were approximately $86 million and $88 million of derivative liabilities with such underlying contract provisions, respectively.

Certain derivative instruments are also subject to contract provisions that contain adequate assurance clauses. These provisions allow counterparties to seek performance assurance, including cash collateral, in the event that a given utility subsidiary’s ability to fulfill its contractual obligations is reasonably expected to be impaired.

Xcel Energy hadno collateral posted related to adequate assurance clauses in derivative contracts as of June 30, 2024 and Dec. 31, 2023.

Recurring Derivative Fair Value Measurements

Impact of derivative activity:

Pre-Tax Fair Value Gains (Losses) Recognized During the Period in:
(Millions of Dollars)Accumulated Other Comprehensive LossRegulatory Assets and Liabilities
Other derivative instruments:
Electric commodity$—$42
Natural gas commodity—(1)
Total$—$41
Derivatives designated as cash flow hedges:
Interest rate$29$—
Total$29$—
Other derivative instruments:
Electric commodity$—$41
Natural gas commodity—3
Total$—$44
Derivatives designated as cash flow hedges:
Interest rate$18$—
Total$18$—
Other derivative instruments:
Electric commodity$—$(19)
Total$—$(19)
Derivatives designated as cash flow hedges:
Interest rate$11$—
Total$11$—
Other derivative instruments:
Electric commodity$—$(111)
Natural gas commodity—3
Total$—$(108)
Pre-Tax (Gains) Losses Reclassified into Income During the Period from: · Pre-Tax Gains (Losses) Recognized During the Period in Income
(Millions of Dollars) · Accumulated Other Comprehensive Loss · Regulatory Assets and Liabilities
Derivatives designated as cash flow hedges:
Interest rate$1(a)$—$—
Total$1$—$—
Other derivative instruments:
Commodity trading$—$—$(14)(b)
Electric commodity—(15)(c)—
Total$—$(15)$(14)
Derivatives designated as cash flow hedges:
Interest rate$2(a)$—$—
Total$2$—$—
Other derivative instruments:
Commodity trading$—$—$(22)(b)
Electric commodity—(3)(c)—
Natural gas commodity——(14)(d)(e)
Total$—$(3)$(36)
Derivatives designated as cash flow hedges:
Interest rate$1(a)$—$—
Total$1$—$—
Other derivative instruments:
Commodity trading$—$—$(6)(b)
Electric commodity—11(c)—
Total$—$11$(6)
Derivatives designated as cash flow hedges:
Interest rate$3(a)$—$—
Total$3$—$—
Other derivative instruments:
Commodity trading$—$—$(6)(b)
Electric commodity—94(c)—
Natural gas commodity—10(d)(19)(d)(e)
Total$—$104$(25)

(a)Recorded to interest charges.

(b)Recorded to electric revenues. Presented amounts do not reflect non-derivative transactions or margin sharing with customers.

(c)Recorded to electric fuel and purchased power. These derivative settlement gains and losses are shared with electric customers through fuel and purchased energy cost-recovery mechanisms, and reclassified out of income as regulatory assets or liabilities, as appropriate. FTR settlements are shared with customers and do not have a material impact on net income. Presented amounts reflect changes in fair value between auction and settlement dates, but exclude the original auction fair value.

(d)Other than $2 million of 2024 losses recorded to electric fuel and purchased power, amounts are recorded to cost of natural gas sold and transported. Amounts are subject to cost-recovery mechanisms and reclassified out of income to a regulatory asset, as appropriate.

(e)Relates primarily to option premium amortization.

Xcel Energy hadno derivative instruments designated as fair value hedges during the six months ended June 30, 2024 and 2023.

Derivative assets and liabilities measured at fair value on a recurring basis were as follows:

June 30, 2024 · Dec. 31, 2023
Fair Value · Fair Value Total · Netting (a) · Total · Fair Value · Fair Value Total · Netting (a) · Total
(Millions of Dollars) · Level 1 · Level 2 · Level 3 · Level 1 · Level 2 · Level 3
Current derivative assets
Other derivative instruments:
Commodity trading$6$43$22$71$(51)$20$8$51$32$91$(59)$32
Electric commodity——211211(3)208——6262(7)55
Natural gas commodity—4—4—4—14—14—14
Total current derivative assets$6$47$233$286$(54)232$8$65$94$167$(66)101
PPAs (b)23
Current derivative instruments$234$104
Noncurrent derivative assets
Other derivative instruments:
Commodity trading$11$52$57$120$(36)$84$14$51$45$110$(34)$76
Total noncurrent derivative assets$11$52$57$120$(36)$84$14$51$45$110$(34)$76
June 30, 2024 · Dec. 31, 2023
Fair Value · Fair Value Total · Netting (a) · Total · Fair Value · Fair Value Total · Netting (a) · Total
(Millions of Dollars) · Level 1 · Level 2 · Level 3 · Level 1 · Level 2 · Level 3
Current derivative liabilities
Derivatives designated as cash flow hedges:
Interest rate$—$—$—$—$—$—$—$17$—$17$—$17
Other derivative instruments:
Commodity trading$6$77$6$89$(53)$36$6$86$5$97$(60)$37
Electric commodity——33(3)———77(7)—
Natural gas commodity—1—1—1—12—12—12
Total current derivative liabilities$6$78$9$93$(56)37$6$115$12$133$(67)66
PPAs (b)78
Current derivative instruments$44$74
Noncurrent derivative liabilities
Other derivative instruments:
Commodity trading$14$56$42$112$(40)$72$16$50$37$103$(39)$64
Total noncurrent derivative liabilities$14$56$42$112$(40)72$16$50$37$103$(39)64
PPAs (b)1922
Noncurrent derivative instruments$91$86

(a)Xcel Energy nets derivative instruments and related collateral on its consolidated balance sheets when supported by a legally enforceable master netting agreement. At June 30, 2024 and Dec. 31, 2023, derivative assets and liabilities includeno obligations to return cash collateral. At June 30, 2024 and Dec. 31, 2023, derivative assets and liabilities include rights to reclaim cash collateral of $5 million and $7 million, respectively. Counterparty netting amounts presented exclude settlement receivables and payables and non-derivative amounts that may be subject to the same master netting agreements.

(b)Xcel Energy currently applies the normal purchase exception to qualifying PPAs. Balance relates to specific contracts that were previously recognized at fair value prior to applying the normal purchase exception, and are being amortized over the remaining contract lives along with the offsetting regulatory assets and liabilities.

Changes in Level 3 commodity derivatives:

(Millions of Dollars)20242023
Balance at April 1$91$78
Purchases (a)174167
Settlements (a)(110)(47)
Net transactions recorded during the period:
Gains recognized in earnings (b)310
Net gains recognized as regulatory assets and liabilities (a)811
Balance at June 30$239$209
(Millions of Dollars)20242023
Balance at Jan. 1$90$235
Purchases (a)177172
Settlements (a)(161)(76)
Net transactions recorded during the period:
Gains (losses) recognized in earnings (b)3(2)
Net gains (losses) recognized as regulatory assets and liabilities (a)130(120)
Balance at June 30$239$209

(a)Relates primarily to NSP-Minnesota and SPS FTR instruments administered by MISO and SPP.

(b)Relates to commodity trading and is subject to substantial offsetting losses and gains on derivative instruments categorized as levels 1 and 2 in the income statement. See above tables for the income statement impact of derivative activity, including commodity trading gains and losses.

Fair Value of Long-Term Debt

As of June 30, 2024, other financial instruments for which the carrying amount did not equal fair value:

June 30, 2024Dec. 31, 2023
(Millions of Dollars)Carrying AmountFair ValueCarrying AmountFair Value
Long-term debt, including current portion$28,570$24,959$25,465$22,927

Fair value of Xcel Energy’s long-term debt is estimated based on recent trades and observable spreads from benchmark interest rates for similar securities. Fair value estimates are based on information available to management as of June 30, 2024 and Dec. 31, 2023, and given the observability of the inputs, fair values presented for long-term debt were assigned as Level 2.

9. Benefit Plans and Other Postretirement Benefits

Components of Net Periodic Benefit Cost (Credit)

2024202320242023
(Millions of Dollars) · Pension Benefits · Postretirement HealthCare Benefits
Service cost$19$18$1$—
Interest cost (a)384055
Expected return on plan assets (a)(51)(52)(5)(4)
Amortization of prior service credit (a)(1)———
Amortization of net loss (a)85—1
Settlement charge (b)56———
Net periodic benefit cost691112
Effects of regulation(40)7——
Net benefit cost recognized for financial reporting$29$18$1$2
2024202320242023
(Millions of Dollars) · Pension Benefits · Postretirement HealthCare Benefits
Service cost$38$37$1$—
Interest cost (a)76801011
Expected return on plan assets (a)(103)(105)(9)(9)
Amortization of prior service credit (a)(1)(1)——
Amortization of net loss (a)151111
Settlement charge (b)56———
Net periodic benefit cost812233
Effects of regulation(36)14——
Net benefit cost recognized for financial reporting$45$36$3$3

(a)The components of net periodic cost other than the service cost component are included in the line item “Other income, net” in the consolidated statements of income or capitalized on the consolidated balance sheets as a regulatory asset.

(b)A settlement charge is required when the amount of lump-sum distributions during the year is greater than the sum of the service and interest cost components of the annual net periodic pension cost. In the second quarter of 2024, as a result of lump-sum distributions during the 2024 plan year, Xcel Energy recorded a pension settlement charge of $56 million, of which $7 million was recognized in the consolidated statement of income after considering the effects of regulation.

In January 2024, contributions totaling $100 million were made across Xcel Energy’s pension plans. Xcel Energy does not expect additional pension contributions during 2024.

10. Commitments and Contingencies

Legal

Xcel Energy is involved in various litigation matters in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for losses probable of being incurred and subject to reasonable estimation.

Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories.

In such cases, there is considerable uncertainty regarding the timing or ultimate resolution, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, would have a material effect on Xcel Energy’s consolidated financial statements. Legal fees are generally expensed as incurred.

Gas Trading Litigation— e prime is a wholly owned subsidiary of Xcel Energy. e prime was in the business of natural gas trading and marketing but has not engaged in natural gas trading or marketing activities since 2003. Multiple lawsuits involving multiple plaintiffs seeking monetary damages were commenced against e prime and its affiliates, including Xcel Energy, between 2003 and 2009 alleging fraud and anticompetitive activities in conspiring to restrain the trade of natural gas and manipulate natural gas prices. Cases were all consolidated in the U.S. District Court in Nevada.

One case remains active which includes a multi-district litigation matter consisting of a Wisconsin purported class (Arandell Corp.). The Court issued a ruling in June 2022 granting plaintiffs’ class certification. In April 2023, the Seventh Circuit Court of Appeals heard the defendants’ appeal challenging whether the district court properly assessed class certification. A decision relating to class certification is expected imminently. Xcel Energy considers the reasonably possible loss associated with this litigation to be immaterial.

Comanche Unit 3 Litigation— In 2021, CORE filed a lawsuit in Denver County District Court, alleging PSCo breached ownership agreement terms by failing to operate Comanche Unit 3 in accordance with prudent utility practices. In April 2022, CORE filed a supplement to include damages related to a 2022 outage. Also in 2022, CORE sent notice of withdrawal from the ownership agreement based on the same alleged breaches.

In October 2023, the jury ruled that CORE may not withdraw as a joint owner of the facility but awarded CORE lost power damages of $26 million. PSCo recognized $35 million of losses for the verdict in 2023, including estimated interest and other costs. In early 2024, PSCo and CORE each filed appeals of the trial court’s decision to the Colorado Court of Appeals.

Marshall Wildfire Litigation—In December 2021, a wildfire ignited in Boulder County, Colorado (Marshall Fire), which burned over 6,000 acres and destroyed or damaged over 1,000 structures. On June 8, 2023, the Boulder County Sheriff’s Office released its Marshall Fire Investigative Summary and Review and its supporting documents (Sheriff’s Report). According to an October 2022 statement from the Colorado Insurance Commissioner, the Marshall Fire is estimated to have caused more than $2 billion in property losses.

According to the Sheriff’s Report, on Dec. 30, 2021, a fire ignited on a residential property in Boulder, Colorado, located in PSCo’s service territory, for reasons unrelated to PSCo’s power lines. According to the Sheriff’s Report, approximately one hour and 20 minutes after the first ignition, a second fire ignited just south of the Marshall Mesa Trailhead in unincorporated Boulder County, Colorado, also located in PSCo’s service territory. According to the Sheriff’s Report, the second ignition started approximately 80 to 110 feet away from PSCo’s power lines in the area.

The Sheriff’s Report states that the most probable cause of the second ignition was hot particles discharged from PSCo’s power lines after one of the power lines detached from its insulator in strong winds, and further states that it cannot be ruled out that the second ignition was caused by an underground coal fire. According to the Sheriff’s Report, no design, installation or maintenance defects or deficiencies were identified on PSCo’s electrical circuit in the area of the second ignition. PSCo disputes that its power lines caused the second ignition.

PSCo is aware of 307 complaints, most of which have also named Xcel Energy Inc. and Xcel Energy Services Inc. as additional defendants, relating to the Marshall Fire. The complaints are on behalf of at least 4,087 plaintiffs. The complaints generally allege that PSCo’s equipment ignited the Marshall Fire and assert various causes of action under Colorado law, including negligence, premises liability, trespass, nuisance, wrongful death, willful and wanton conduct, negligent infliction of emotional distress, loss of consortium and inverse condemnation. In addition to seeking compensatory damages, certain of the complaints also seek exemplary damages.

In September 2023, the Boulder County District Court Judge consolidated eight lawsuits that were pending at that time into a single action for pretrial purposes and has subsequently consolidated additional lawsuits that have been filed. At the case management conference in February 2024, a trial date was set for September 2025. Discovery is now underway.

Colorado courts do not apply strict liability in determining an electric utility company’s liability for fire-related damages. For inverse condemnation claims, Colorado courts assess whether a defendant acted with intent to take a plaintiff’sproperty or intentionally took an action which has the natural consequence of taking the property. For negligence claims, Colorado courts look to whether electric power companies have operated their system with a heightened duty of care consistent with the practical conduct of its business, and liability does not extend to occurrences that cannot be reasonably anticipated.

Colorado law does not impose joint and several liability in tort actions. Instead, under Colorado law, a defendant is liable for the degree or percentage of the negligence or fault attributable to that defendant, except where the defendant conspired with another defendant. A jury’s verdict in a Colorado civil case must be unanimous. Under Colorado law, in a civil action filed before Jan. 1, 2025, other than a medical malpractice action, the total award for noneconomic loss is capped at $0.6 million per defendant unless the court finds justification to exceed that amount by clear and convincing evidence, in which case the maximum doubles.

Colorado law caps punitive or exemplary damages to an amount equal to the amount of the actual damages awarded to the injured party, except the court may increase any award of punitive damages to a sum up to three times the amount of actual damages if the conduct that is the subject of the claim has continued during the pendency of the case or the defendant has acted in a willful and wanton manner during the action which further aggravated plaintiff’s damages.

In the event Xcel Energy Inc. or PSCo was found liable related to this litigation and were required to pay damages, such amounts could exceed our insurance coverage of approximately $500 million and have a material adverse effect on our financial condition, results of operations or cash flows. However, due to uncertainty as to the cause of the fire and the extent and magnitude of potential damages, Xcel Energy Inc. and PSCo are unable to estimate the amount or range of possible losses in connection with the Marshall Fire.

2024 Smokehouse Creek Fire Complex— On February 26, 2024, multiple wildfires began in the Texas Panhandle, including the Smokehouse Creek Fire and the 687 Reamer Fire, which burned into the perimeter of the Smokehouse Creek Fire (together, referred to herein as the “Smokehouse Creek Fire Complex”). The Texas A&M Forest Service issued incident reports that determined that the Smokehouse Creek Fire and the 687 Reamer Fire were caused by power lines owned by SPS after wooden poles near each fire origin failed. According to the Texas A&M Forest Service’s Incident Viewer and news reports, the Smokehouse Creek Fire Complex burned approximately 1,055,000 acres.

SPS is aware of approximately 21 complaints, most of which have also named Xcel Energy Services Inc. as an additional defendant, relating to the Smokehouse Creek Fire Complex, including one putative class action on behalf of persons or entities who owned rangelands or pastures that were damaged by the fire. The complaints generally allege that SPS’s equipment ignited the Smokehouse Creek Fire Complex and seek compensation for losses resulting from the fire, asserting various causes of action under Texas law. In addition to seeking compensatory damages, certain of the complaints also seek exemplary damages. SPS has also received approximately 141 claims for losses related to the Smokehouse Creek Fire Complex through its claims process and has reached final settlements on 43 of those claims. In July 2024, SPS reached a settlement of a complaint related to one of the two fatalities believed to be associated with the Smokehouse Creek Fire Complex.

Texas law does not apply strict liability in determining an electric utility company’s liability for fire-related damages. For negligence claims under Texas law, a public utility has a duty to exercise ordinary and reasonable care.

Potential liabilities related to the Smokehouse Creek Fire Complex depend on various factors, including the cause of the equipment failure and the extent and magnitude of potential damages, including damages to residential and commercial structures, personal property, vegetation, livestock and livestock feed (including replacement feed), personal injuries and any other damages, penalties, fines or restitution that may be imposed by courts or other governmental entities if SPS is found to have been negligent.

Based on the current state of the law and the facts and circumstances available as of the date of this filing, Xcel Energy believes it is probable that it will incur a loss in connection with the Smokehouse Creek Fire Complex and accordingly has accrued a$215 million estimated loss for the matter (before available insurance), presented in other current liabilities as of June 30, 2024.

The aggregate liability of $215 millionfor claims in connection with the Smokehouse Creek Fire Complex (before available insurance) corresponds to the lower end of the range of Xcel Energy’s reasonably estimable range of losses, and is subject to change based on additional information. This$215 million estimate does not include, among other things, amounts for (i) potential penalties or fines that may be imposed by governmental entities on Xcel Energy, (ii) exemplary or punitive damages, (iii) compensation claims by federal, state, county and local government entities or agencies, (iv) compensation claims for damage to trees, railroad lines, or oil and gas equipment, or (v) other amounts that are not reasonably estimable.

Xcel Energy remains unable to reasonably estimate any additional loss or the upper end of the range because there are a number of unknown facts and legal considerations that may impact the amount of any potential liability. In the event that SPS or Xcel Energy Services Inc. was found liable related to the litigation related to the Smokehouse Creek Fire Complex and was required to pay damages, such amounts could exceed our insurance coverage of approximately $500 million for the annual policy period and could have a material adverse effect on our financial condition, results of operations or cash flows.

The process for estimating losses associated with potential claims related to the Smokehouse Creek Fire Complex requires management to exercise significant judgment based on a number of assumptions and subjective factors, including the factors identified above and estimates based on currently available information and prior experience with wildfires. As more information becomes available, management estimates and assumptions regarding the potential financial impact of the Smokehouse Creek Fire Complex may change.

SPS records insurance recoveries when it is deemed probable that recovery will occur, and SPS can reasonably estimate the amount or range. SPS has recorded an insurance receivable for $215 million, presented within prepayments and other current assets as of June 30, 2024. While SPS plans to seek recovery of all insured losses, it is unable to predict the ultimate amount and timing of such insurance recoveries.

Rate Matters and Other

Xcel Energy’s operating subsidiaries are involved in various regulatory proceedings arising in the ordinary course of business. Until resolution, typically in the form of a rate order, uncertainties may exist regarding the ultimate rate treatment for certain activities and transactions. Amounts have been recognized for probable and reasonably estimable losses that may result. Unless otherwise disclosed, any reasonably possible range of loss in excess of any recognized amount is not expected to have a material effect on the consolidated financial statements.

Sherco —In 2018, NSP-Minnesota and SMMPA (Co-owner of Sherco Unit 3) reached a settlement with GE related to a 2011 incident, which damaged the turbine at Sherco Unit 3 and resulted in an extended outage. NSP-Minnesota notified the MPUC of its proposal to refund settlement proceeds to customers through the FCA.

In March 2019, the MPUC approved NSP-Minnesota’s settlement refund proposal. Additionally, the MPUC decided to withhold any decision as to NSP-Minnesota’s prudence in connection with the incident at Sherco Unit 3 until after conclusion of an appeal pending between GE and NSP-Minnesota’s insurers. In February 2020, the Minnesota Court of Appeals affirmed the district court’s judgment in favor of GE.

In January 2021, the OAG and DOC recommended that NSP-Minnesota refund approximately $17 million of replacement power costs previously recovered through the FCA. NSP-Minnesota responded that it acted prudently in connection with the Sherco Unit 3 outage, the MPUC has previously disallowed $22 million of related costs and no additional refund or disallowance is appropriate.

In July 2022, the MPUC referred the matter to the Office of Administrative Hearings to conduct a contested case on the prudence of the replacement power costs incurred by NSP-Minnesota. In 2023, NSP-Minnesota and various parties filed recommendations, including the DOC which recommended a $56 million customer refund. The Xcel Large Industrial customer group recommended a refund of $72 million.

In May 2024, the ALJ recommended a customer refund of $34 million (less a portion of the proceeds received from the settlement with GE). The ALJ indicated that consideration of the $22 million of previously disallowed costs was not in the scope of their recommendation. Xcel Energy has recorded an estimate for a customer refund in this matter. A final decision by the MPUC is expected in late 2024.

Minnesota 2023 Fuel Clause Adjustment — In March 2024, NSP-Minnesota filed its annual fuel clause adjustment true-up petition to the MPUC, with a proposed refund of $126 million for fuel over-recoveries in 2023. In April 2024, the DOC recommended the MPUC approve the non-nuclear aspects of the petition.

In May 2024, the DOC and Minnesota OAG filed comments relating to an outage at the Prairie Island generating station that lasted from October 2023 through February 2024. The DOC recommended that NSP-Minnesota refund $20 million of replacement power costs for 2023 as well as a future refund of replacement power costs for 2024 once those costs are known. The OAG recommended that NSP-Minnesota refund $18 million of replacement power costs for 2023 and did not address 2024.

In July 2024, NSP-Minnesota filed reply comments in the 2023 proceeding in support of its position that no customer refund for replacement power costs is warranted. A final decision by the MPUC is expected in late 2024.

Environmental

New and changing federal and state environmental mandates can create financial obligations for Xcel Energy, which are normally recovered through the regulated rate process.

Site Remediation

Various federal and state environmental laws impose liability where hazardous substances or other regulated materials have been released to the environment. Xcel Energy Inc.’s subsidiaries may sometimes pay all or a portion of the cost to remediate sites where past activities of their predecessors or other parties have caused environmental contamination.

Environmental contingencies could arise from various situations, including sites of former MGPs; and third-party sites, such as landfills, for which one or more of Xcel Energy Inc.’s subsidiaries are alleged to have sent wastes to that site.

MGP, Landfill and Disposal Sites

Xcel Energy is investigating, remediating or performing post-closure actions at 13 historical MGP, landfill or other disposal sites across its service territories, in addition to sites that are being addressed under current coal ash regulations (see below).

Xcel Energy has recognized approximately $20 million of costs/liabilities for resolution of these issues; however, the final outcomes and timing are unknown. In addition, there may be regulatory recovery, insurance recovery and/or recovery from other potentially responsible parties, offsetting a portion of costs incurred.

Water and Waste

Coal Ash Regulation— Xcel Energy is subject to the CCR Rule, which imposes requirements for handling, storage, treatment and disposal of coal ash and other solid waste.

In May 2024, final amendments to the CCR Rule were published. These include legacy CCR surface impoundments at inactive facilities and previously exempt areas where CCR was placed directly on land at CCR-regulated facilities, including areas of beneficial use.

As a specific requirement of the CCR Rule, utilities must complete facility evaluations and groundwater sampling around their subject landfills, surface impoundments and certain other areas where coal ash was placed on land, as well as perform corrective actions where offsite groundwater has been impacted.

If certain impacts to groundwater are detected, utilities may be required to perform additional groundwater investigations and/or perform corrective actions, typically beginning with an Assessment of Corrective Measures.

Investigation and/or corrective action related to groundwater impacts are currently underway at certain active and closed coal-fueled generating facilities at a current estimated cost of at least $40 million. In addition, Xcel Energy expects to incur $15 million for investigations through 2028 to perform required reporting and assess whether corrective actions are necessary. Asset retirement obligations have been recorded for each of these activities, and amounts are expected to be recoverable through regulatory mechanisms.

Xcel Energy has also identified coal ash that is expected to be required to be removed from certain closed coal-fueled generating facilities at estimated costs totaling approximately $100 million. Asset retirement obligations have been recorded, with the costs expected to be recoverable through regulatory mechanisms.

Xcel Energy continues to evaluate the 2024 updates to the CCR rule, the interpretations of those updates and how they will apply to specific sites. Assessment of the recent updates to the CCR Rule and corresponding site investigation activities may result in updates to estimated costs as well as identification of additional required corrective actions.

Clean Water Act Section 316(b) — The Federal Clean Water Act requires the EPA to regulate cooling water intake structures to assure they reflect the best technology available for minimizing impingement and entrainment of aquatic species.

Estimated capital expenditures of approximately $50 million may be required to comply with the requirements. Xcel Energy anticipates these costs will be recoverable through regulatory mechanisms.

Air

Clean Air Act NOx Allowance Allocations — In June 2023, the EPA published final regulations for ozone under the “Good Neighbor” provisions of the Clean Air Act. The final rule applies to generation facilities in Minnesota, Texas and Wisconsin, as well as other states outside of our service territory. The rule establishes an allowance trading program for NOx that will impact Xcel Energy fossil fuel-fired electric generating facilities. Subject facilities will have to secure additional allowances, install NOx controls and/or develop a strategy of operations that utilizes the existing allowance allocations. Guidelines are also established for allowance banking and emission limit backstops.

While the financial impacts of the final rule are uncertain and dependent on market forces and anticipated generation, Xcel Energy anticipates the annual costs could be significant, but would be recoverable through regulatory mechanisms.

SPS and NSP-Minnesota have joined other companies in litigation challenging the EPA’s disapproval of Texas and Minnesota state implementation plans. Currently, the regulation is under a judicial stay for both Texas and Minnesota. The regulation may become applicable in those states in the future. The rule took effect in NSP-Wisconsin in 2023 and has been managed without the additional need for allowances.

In February 2024, the EPA proposed to partially disapprove New Mexico’s state implementation plan and bring New Mexico into the federal Good Neighbor Plan. Xcel Energy continues to evaluate impacts to generation units at SPS.

In June 2024, the U.S. Supreme Court issued an order granting a stay of the final rule. We are assessing implementation of the stay order in Wisconsin.

Leases

Xcel Energy evaluates contracts that may contain leases, including PPAs and arrangements for the use of office space, land for solar developments and other facilities, vehicles and equipment. A contract contains a lease if it conveys the exclusive right to control the use of a specific asset.

Components of lease expense:

(Millions of Dollars)20242023
Operating leases
PPA capacity payments$57$61
Other operating leases (a)1112
Total operating lease expense (b)$68$73
Finance leases
Amortization of ROU assets$1$—
Interest expense on lease liability34
Total finance lease expense$4$4

(a)Includes short-term lease expense of $1 million and $3 million for 2024 and 2023, respectively.

(b)PPA capacity payments are included in electric fuel and purchased power on the consolidated statements of income. Expense for other operating leases is included in O&M expense and electric fuel and purchased power.

(Millions of Dollars)20242023
Operating leases
PPA capacity payments$115$121
Other operating leases (a)2224
Total operating lease expense (b)$137$145
Finance leases
Amortization of ROU assets$2$1
Interest expense on lease liability78
Total finance lease expense$9$9

(a)Includes short-term lease expense of $2 million and $5 million for 2024 and 2023, respectively.

(b)PPA capacity payments are included in electric fuel and purchased power on the consolidated statements of income. Expense for other operating leases is included in O&M expense and electric fuel and purchased power.

Commitments under operating and finance leases as of June 30, 2024:

(Millions of Dollars) · PPA OperatingLeases · Other OperatingLeases · Total OperatingLeases · Finance Leases (a)
Total minimum obligation$1,107$360$1,467$213
Interest component of obligation(135)(145)(280)(150)
Present value of minimum obligation$9722151,18763
Less current portion(226)(2)
Noncurrent operating and finance lease liabilities$961$61

(a)Excludes certain amounts related to Xcel Energy’s 50% ownership interest in WYCO.

Variable Interest Entities

Under certain PPAs, NSP-Minnesota, PSCo and SPS purchase power from IPPs for which the utility subsidiaries are required to reimburse fuel costs, or to participate in tolling arrangements under which the utility subsidiaries procure the natural gas required to produce the energy that they purchase. Xcel Energy has determined that certain IPPs are VIEs, however Xcel Energy is not subject to risk of loss from the operations of these entities, and no significant financial support is required other than contractual payments for energy and capacity.

In addition, certain solar PPAs provide an option to purchase emission allowances or sharing provisions related to production credits generated by the solar facility under contract. These specific PPAs create a variable interest in the IPP.

Xcel Energy evaluated each of these VIEs for possible consolidation, including review of qualitative factors such as the length and terms of the contract, control over O&M, control over dispatch of electricity, historical and estimated future fuel and electricity prices and financing activities. Xcel Energy concluded that these entities are not required to be consolidated in its consolidated financial statements because Xcel Energy does not have the power to direct the activities that most significantly impact the entities’ economic performance.

The utility subsidiaries had approximately 3,751 MW of capacity under long-term PPAs as of both June 30, 2024 and Dec. 31, 2023, with entities that have been determined to be variable interest entities. The PPAs have expiration dates through 2041.

Other

Guarantees and Bond Indemnifications — Xcel Energy Inc. and its subsidiaries provide guarantees and bond indemnities, which guarantee payment or performance. Xcel Energy Inc.’s exposure is based upon the net liability under the specified agreements or transactions. Most of the guarantees and bond indemnities issued by Xcel Energy Inc. and its subsidiaries have a stated maximum amount.

As of June 30, 2024 and Dec. 31, 2023, Xcel Energy hadno assets held as collateral related to their guarantees, bond indemnities and indemnification agreements. Guarantees and bond indemnities issued and outstanding for Xcel Energy were approximately $79 million and $75 million at June 30, 2024 and Dec. 31, 2023, respectively.

Other Indemnification Agreements— Xcel Energy Inc. and its subsidiaries provide indemnifications through various contracts. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, as well as breaches of representations and warranties, including corporate existence, transaction authorization and income tax matters with respect to assets sold.

Xcel Energy Inc.’s and its subsidiaries’ obligations under these agreements may be limited in terms of duration and amount. Maximum future payments under these indemnifications cannot be reasonably estimated as the dollar amounts are often not explicitly stated.

11. Other Comprehensive Loss

Changes in accumulated other comprehensive loss, net of tax:

Three Months Ended June 30, 2024Three Months Ended June 30, 2023
(Millions of Dollars)Gains and Losses on Cash Flow HedgesDefined Benefit Pension and Postretirement ItemsTotalGains and Losses on Cash Flow HedgesDefined Benefit Pension and Postretirement ItemsTotal
Accumulated other comprehensive loss at April 1$(30)$(41)$(71)$(58)$(39)$(97)
Other comprehensive gain before reclassifications———13—13
Losses reclassified from net accumulated other comprehensive loss:
Interest rate derivatives (a)———1—1
Amortization of net actuarial losses (b)—44—11
Net current period other comprehensive income—4414115
Accumulated other comprehensive loss at June 30$(30)$(37)$(67)$(44)$(38)$(82)
Six Months Ended June 30, 2024Six Months Ended June 30, 2023
(Millions of Dollars)Gains and Losses on Cash Flow HedgesDefined Benefit Pension and Postretirement ItemsTotalGains and Losses on Cash Flow HedgesDefined Benefit Pension and Postretirement ItemsTotal
Accumulated other comprehensive loss at Jan. 1$(53)$(41)$(94)$(54)$(39)$(93)
Other comprehensive gain before reclassifications22—228—8
Losses reclassified from net accumulated other comprehensive loss:
Interest rate derivatives (a)1—12—2
Amortization of net actuarial losses (b)—44—11
Net current period other comprehensive income2342710111
Accumulated other comprehensive loss at June 30$(30)$(37)$(67)$(44)$(38)$(82)

(a)Included in interest charges.

(b)Included in the computation of net periodic pension and postretirement benefit costs. See Note 9 for further information.

12. Segment Information

Xcel Energy evaluates performance by each utility subsidiary based on profit or loss generated from the product or service provided including the regulated electric utility operating results of NSP-Minnesota, NSP-Wisconsin, PSCo and SPS, as well as the regulated natural gas utility operating results of NSP-Minnesota, NSP-Wisconsin and PSCo.

These segments are managed separately because the revenue streams are dependent upon regulated rate recovery, which is separately determined for each segment.

Xcel Energy has the following reportable segments:

Regulated Electric — The regulated electric utility segment generates, transmits and distributes electricity in Minnesota, Wisconsin, Michigan, North Dakota, South Dakota, Colorado, Texas and New Mexico. In addition, this segment includes sales for resale and provides wholesale transmission service to various entities in the United States. The regulated electric utility segment also includes wholesale commodity and trading operations.

Regulated Natural Gas — The regulated natural gas utility segment transports, stores and distributes natural gas primarily in portions of Minnesota, Wisconsin, North Dakota, Michigan and Colorado.

Xcel Energy also presents All Other, which includes operating segments with revenues below the necessary quantitative thresholds. Those operating segments primarily include steam revenue, appliance repair services revenues/commissions, non-utility real estate activities, revenues associated with processing solid waste into refuse-derived fuel and investments in rental housing projects that qualify for low-income housing tax credits.

Xcel Energy had equity method investments of $251 million and $244 million as of June 30, 2024 and Dec. 31, 2023, respectively, included in the natural gas utility and all other segments.

Asset and capital expenditure information is not provided for Xcel Energy’s reportable segments. As an integrated electric and natural gas utility, Xcel Energy operates significant assets that are not dedicated to a specific business segment. Reporting assets and capital expenditures by business segment would require arbitrary and potentially misleading allocations, which may not necessarily reflect the assets that would be required for the operation of the business segments on a stand-alone basis.

Certain costs, such as common depreciation, common O&M expenses and interest expense are allocated based on cost causation allocators across each segment. In addition, a general allocator is used for certain general and administrative expenses, including office supplies, rent, property insurance and general advertising.

Xcel Energy’s segment information:

(Millions of Dollars)20242023
Regulated Electric
Total revenues$2,659$2,601
Net income353350
Regulated Natural Gas
Total revenues$355$393
Net income (loss)3(22)
All Other
Total revenues$14$28
Net loss(54)(40)
Consolidated Total
Total revenues$3,028$3,022
Net income302288
(Millions of Dollars)20242023
Regulated Electric
Operating revenues$5,344$5,364
Intersegment revenue1—
Total revenues$5,345$5,364
Net income711646
Regulated Natural Gas
Operating revenues$1,296$1,681
Intersegment revenue12
Total revenues$1,297$1,683
Net income161137
All Other
Total revenues$37$57
Net loss(82)(77)
Consolidated Total
Total revenues$6,679$7,104
Reconciling eliminations(2)(2)
Total operating revenues$6,677$7,102
Net income790706
ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.