ENTERGY ARKANSAS, LLC

For the period ended Jun 30, 2026. Filed Jul 31, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2026 · Filed Jul 31, 2026

ETR$111.71-0.1%Stored close · as of Nov 10, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Consolidated Statements of Comprehensive Income

ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
For the Three and Six Months Ended June 30, 2026 and 2025
(Unaudited)
Three Months EndedSix Months Ended
2026202520262025
(In Thousands)
Net Income$487,820$471,954$878,625$834,376
Other comprehensive income (loss)
Pension and other postretirement plan changes (net of tax expense (benefit) of ($617), ($1,411), $420, and ($3,695))(1,995)(4,602)1,916(8,331)
Other comprehensive income (loss)(1,995)(4,602)1,916(8,331)
Comprehensive Income485,825467,352880,541826,045
Preferred dividend requirements of subsidiaries and noncontrolling interests5,2134,02411,1025,686
Comprehensive Income Attributable to Entergy Corporation$480,612$463,328$869,439$820,359
See Notes to Financial Statements.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Six Months Ended June 30, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING ACTIVITIES
Consolidated net income$878,625$834,376
Adjustments to reconcile consolidated net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization1,326,1391,255,204
Deferred income taxes, tax credits, and non-current taxes accrued220,890231,274
Asset write-offs, impairments, and related charges18,059—
Changes in working capital:
Receivables(225,491)(275,045)
Fuel inventory(5,679)(4,852)
Accounts payable134,118(53,439)
Taxes accrued12,20111,230
Interest accrued45,50822,867
Deferred fuel costs(131,572)(263,205)
Customer advances - current740,977303,791
Other working capital accounts(118,766)(58,819)
Changes in provisions for estimated losses(23,610)(38,444)
Changes in other regulatory assets134,270174,523
Changes in other regulatory liabilities32,99220,040
Changes in customer advances - non-current135,29825,000
Changes in pension and other postretirement funded status(105,395)(104,968)
Other(346,811)(281,743)
Net cash flow provided by operating activities2,721,7531,797,790
INVESTING ACTIVITIES
Construction/capital expenditures(5,030,819)(3,668,326)
Allowance for equity funds used during construction102,08183,161
Nuclear fuel purchases(199,768)(129,124)
Payment for purchase of plant(263)(1,608)
Insurance proceeds received for property damages14,282—
Changes in securitization account2153,309
Payments to storm reserve escrow accounts(5,551)(6,808)
Receipts from storm reserve escrow accounts—43,789
Decrease (increase) in other investments65,548(1,659)
Litigation proceeds for reimbursement of spent nuclear fuel storage costs—3,546
Proceeds from nuclear decommissioning trust fund sales1,548,167713,102
Investment in nuclear decommissioning trust funds(1,586,838)(780,211)
Net cash flow used in investing activities(5,092,946)(3,740,829)
See Notes to Financial Statements.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Six Months Ended June 30, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
FINANCING ACTIVITIES
Proceeds from the issuance of:
Long-term debt4,625,8483,517,949
Treasury stock11,53424,539
Common stock1,017,171804,631
Retirement of long-term debt(1,864,866)(1,599,728)
Changes in commercial paper - net911,722(451,686)
Customer advances received for construction885,867732,454
Customer advances used for construction(436,221)(245,481)
Other(259,675)2,164
Dividends paid:
Common stock(585,899)(516,716)
Preferred stock(9,159)(9,159)
Net cash flow provided by financing activities4,296,3222,258,967
Net increase in cash and cash equivalents1,925,129315,928
Cash and cash equivalents at beginning of period1,928,916859,703
Cash and cash equivalents at end of period$3,854,045$1,175,631
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid (received) during the period for:
Interest - net of amount capitalized$683,997$647,900
Income taxes - net($2,301)$2,487
Noncash investing activities:
Accrued construction expenditures$1,002,641$576,992
See Notes to Financial Statements.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
June 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$118,189$45,895
Temporary cash investments3,735,8561,883,021
Total cash and cash equivalents3,854,0451,928,916
Accounts receivable:
Customer872,618735,734
Allowance for doubtful accounts(29,436)(32,324)
Other230,059242,402
Accrued unbilled revenues635,234524,420
Total accounts receivable1,708,4751,470,232
Deferred fuel costs192,00454,133
Fuel inventory - at average cost137,653131,974
Materials and supplies1,784,5441,710,395
Deferred nuclear refueling outage costs125,22086,497
Prepayments and other402,260424,704
TOTAL8,204,2015,806,851
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds6,722,3256,300,880
Non-utility property - at cost (less accumulated depreciation)479,919481,590
Storm reserve escrow accounts314,335308,784
Other128,794124,414
TOTAL7,645,3737,215,668
PROPERTY, PLANT, AND EQUIPMENT
Electric76,545,87174,750,917
Construction work in progress9,018,8536,020,008
Nuclear fuel809,430834,690
TOTAL PROPERTY, PLANT, AND EQUIPMENT86,374,15481,605,615
Less - accumulated depreciation and amortization29,250,71828,751,001
PROPERTY, PLANT, AND EQUIPMENT - NET57,123,43652,854,614
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets (includes securitization property of $208,212 as of June 30, 2026 and $216,107 as of December 31, 2025)4,871,7065,005,976
Deferred fuel costs172,201172,201
Goodwill367,582367,582
Accumulated deferred income taxes29,71915,540
Other588,400452,298
TOTAL6,029,6086,013,597
TOTAL ASSETS$79,002,618$71,890,730
See Notes to Financial Statements.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
June 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$1,510,174$2,375,140
Notes payable and commercial paper1,569,496657,774
Accounts payable2,716,2222,565,546
Customer deposits491,361479,796
Taxes accrued537,390525,189
Interest accrued331,165285,657
Deferred fuel costs20,86114,562
Pension and other postretirement liabilities61,36563,214
Customer advances1,470,056632,850
Other290,501223,240
TOTAL8,998,5917,822,968
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued5,875,6645,592,681
Accumulated deferred investment tax credits183,073187,173
Regulatory liability for income taxes - net1,034,7421,079,699
Other regulatory liabilities3,989,7883,911,839
Customer advances170,29835,000
Decommissioning and asset retirement cost liabilities5,063,5444,947,530
Accumulated provisions472,169495,779
Pension and other postretirement liabilities88,612113,930
Long-term debt (includes securitization bonds of $212,647 as of June 30, 2026 and $221,139 as of December 31, 2025)31,547,65227,902,021
Customer advances for construction2,086,3591,615,455
Other952,030953,078
TOTAL51,463,93146,834,185
Commitments and Contingencies
Subsidiaries’ preferred stock without sinking fund219,410219,410
EQUITY
Preferred stock, no par value, authorized 1,000,000 shares in 2026 and 2025; issued shares in 2026 and 2025 - none——
Common stock, $0.01 par value, authorized 998,000,000 shares in 2026 and 2025; issued 596,525,807 shares in 2026 and 583,203,774 shares in 20255,9655,832
Paid-in capital9,966,4908,979,387
Retained earnings12,980,06012,698,436
Accumulated other comprehensive loss(1,090)(3,006)
Less - treasury stock, at cost (129,894,309 shares in 2026 and 130,864,409 shares in 2025)4,722,3054,757,573
Total shareholders’ equity18,229,12016,923,076
Subsidiaries’ preferred stock without sinking fund and noncontrolling interests91,56691,091
TOTAL18,320,68617,014,167
TOTAL LIABILITIES AND EQUITY$79,002,618$71,890,730
See Notes to Financial Statements.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
For the Six Months Ended June 30, 2026
(Unaudited)
Shareholders’ Equity
Subsidiaries’ Preferred Stock and Noncontrolling InterestsCommonStockTreasuryStockPaid-inCapitalRetained EarningsAccumulated Other Comprehensive Income (Loss)Total
(In Thousands)
Balance at December 31, 2025$91,091$5,832($4,757,573)$8,979,387$12,698,436($3,006)$17,014,167
Consolidated net income (a)5,889———384,916—390,805
Other comprehensive income—————3,9113,911
Common stock issuances and sales under the at the market equity distribution program—46—349,672——349,718
Common stock issuance costs———(4,007)——(4,007)
Common stock issuances related to stock plans——31,953(49,959)——(18,006)
Common stock dividends declared————(292,867)—(292,867)
Distributions to noncontrolling interests(998)—————(998)
Preferred dividend requirements of subsidiaries (a)(4,580)—————(4,580)
Balance at March 31, 202691,4025,878(4,725,620)9,275,09312,790,48590517,438,143
Consolidated net income (a)5,213———482,607—487,820
Other comprehensive loss—————(1,995)(1,995)
Common stock issuances and sales under the at the market equity distribution program—21—127,364——127,385
Common stock issuances from settlement of equity forward sale agreements—66—556,664——556,730
Common stock issuance costs———(12,656)——(12,656)
Common stock issuances related to stock plans——3,31520,025——23,340
Common stock dividends declared————(293,032)—(293,032)
Distributions to noncontrolling interests(469)—————(469)
Preferred dividend requirements of subsidiaries (a)(4,580)—————(4,580)
Balance at June 30, 2026$91,566$5,965($4,722,305)$9,966,490$12,980,060($1,090)$18,320,686
See Notes to Financial Statements.
(a) Consolidated net income and preferred dividend requirements of subsidiaries for first quarter 2026 and second quarter 2026 each includes $4 million of preferred dividends on subsidiaries’ preferred stock without sinking fund that is not presented as equity.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
For the Six Months Ended June 30, 2025
(Unaudited)
Shareholders’ Equity
Subsidiaries' Preferred Stock and Noncontrolling InterestsCommonStockTreasuryStockPaid-inCapitalRetained EarningsAccumulated Other Comprehensive IncomeTotal
(In Thousands)
Balance at December 31, 2024$101,076$5,620($4,812,321)$7,833,525$12,014,315$42,769$15,184,984
Consolidated net income (a)1,662———360,760—362,422
Other comprehensive loss—————(3,729)(3,729)
Common stock issuances related to stock plans——43,398(40,777)——2,621
Common stock dividends declared————(258,249)—(258,249)
Distributions to noncontrolling interests(1,069)—————(1,069)
Preferred dividend requirements of subsidiaries (a)(4,580)—————(4,580)
Balance at March 31, 202597,0895,620(4,768,923)7,792,74812,116,82639,04015,282,400
Consolidated net income (a)4,024———467,930—471,954
Other comprehensive loss—————(4,602)(4,602)
Common stock issuances and sales under the at the market equity distribution program—155—813,716——813,871
Common stock issuance costs———(9,240)——(9,240)
Common stock issuances related to stock plans——2,70815,489——18,197
Common stock dividends declared————(258,467)—(258,467)
Distributions to noncontrolling interests(593)—————(593)
Preferred dividend requirements of subsidiaries (a)(4,580)—————(4,580)
Balance at June 30, 2025$95,940$5,775($4,766,215)$8,612,713$12,326,289$34,438$16,308,940
See Notes to Financial Statements.
(a) Consolidated net income and preferred dividend requirements of subsidiaries for first quarter 2025 and second quarter 2025 each includes $4 million of preferred dividends on subsidiaries’ preferred stock without sinking fund that is not presented as equity.

NOTES TO FINANCIAL STATEMENTS

(Unaudited)

NOTE 1. COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business. While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report. Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf-Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements, including the Unit Power Sales Agreement and the Availability Agreement.

Exclusivity Agreement with Major Vendor

See Note 8 to the financial statements in the Form 10-K for information regarding Entergy’s exclusivity agreement with a major vendor. The following is an update to that discussion.

As discussed in the Form 10-K, Entergy entered into an exclusivity agreement with a major vendor to manufacture power island equipment (PIE) and combustion turbines (CT) for combustion turbine generator set frames larger than 400 MWs. The agreement was amended in second quarter 2026, updating the minimum order commitment of PIE to 27 sets, with no change to the original commitment of a minimum order oftwo CTs. As of June 30, 2026,10 sets of PIE andtwo CT slots of the minimum commitment have been fulfilled.

Entergy Texas Build-to-Suit Lease Arrangement for the Legend Power Station

See Note 8 to the financial statements in the Form 10-K for information regarding the Entergy Texas build-to-suit lease arrangement for the Legend Power Station.

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Regulatory Assets and Regulatory Liabilities

See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets and regulatory liabilities in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries. The following are updates to that discussion.

Fuel and purchased power cost recovery

Energy Cost Recovery Rider

In March 2026, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01333 per kWh to $0.01508 per kWh. The primary reason for the rate increase was an under-recovered balance as a result of higher natural gas prices in 2025. Based on circumstances related to ANO 2’s refueling outage, Entergy Arkansas made an adjustment to projected energy costs to phase-in the rate increase gradually. The redetermined rate of $0.01508 per kWh became effective with the first billing cycle in April 2026 through the normal operation of the tariff.

As discussed in the Form 10-K, in June 2025 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings (for Entergy Louisiana’s gas operations). The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from January 2023 through June 2025. The LPSC staff issued its audit report in March 2026. The next step is for the LPSC to issue its final report, but there is no deadline or timing requirement associated with the issuance of the final report.

In February 2026, Entergy Louisiana, in its monthly filing to update its fuel adjustment clause, requested to defer approximately $141.9 million of fuel costs incurred in January 2026 that were primarily attributable to the effects of Winter Storm Fern, consistent with the LPSC’s general order approved at its February 2026 meeting permitting temporary modifications to the LPSC’s fuel adjustment clause general order. The filing proposed to defer the recovery of these fuel costs over a four-month period from March 2026 through June 2026 to mitigate the customer bill impacts of these fuel costs. In March 2026 the LPSC issued a special order delegating authority to the LPSC executive secretary to review and approve utility-specific requests for deferral of fuel costs from Winter Storm Fern, subject to audit as per the LPSC’s fuel clause general order. In April 2026 the LPSC executive secretary approved Entergy Louisiana’s request for deferral.

In April 2026 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2023 through 2025. Discovery is ongoing, and no audit report has been filed.

Retail Rate Proceedings

See Note 2 to the financial statements in the Form 10-K for information regarding retail rate proceedings involving the Utility operating companies. The following are updates to that discussion.

Filings with the APSC (Entergy Arkansas)

2026 Base Rate Case

In February 2026, Entergy Arkansas filed with the APSC a general change in rates, charges, and tariffs. The filing requested a base rate increase to recover a base rate revenue deficiency of $44.6 million and notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015. The primary drivers of the revenue deficiency were increased depreciation expense and the impact of net capital additions. Additionally, the filing requested a 9.90% return on common equity and increased depreciation rates as the result of a depreciation study. In March 2026 the APSC issued an order suspending the proposed rates and tariffs filed by Entergy Arkansas. In June 2026 the APSC established a procedural schedule with an evidentiary hearing scheduled to begin in November 2026, and in July 2026 a number of intervenors moved to modify the schedule to conduct additional discovery. Entergy Arkansas opposed the motion in part based on the voluminous discovery conducted to date.

In July 2026, Entergy Arkansas filed with the APSC its 2026 formula rate plan filing to set its formula rate for the 2027 calendar year. The filing contained an evaluation of Entergy Arkansas’s earnings and a netting adjustment for the 2025 historical year. The filing showed that Entergy Arkansas’s earned rate of return on common equity for the 2025 historical year was 8.8%, resulting in a $47.2 million formula rate plan revenue increase to produce a 9.65% earned rate of return on common equity. When combined with 2025 historical year formula rate plan revenues of $56.0 million, the total proposed revenue change for the 2025 historical year netting adjustment is a reduction of $8.8 million. By operation of the formula rate plan, Entergy Arkansas’s recovery of the revenue requirement is subject to afour percent annual revenue constraint. Entergy Arkansas’s revenue requirement in this filing did not exceed the constraint. In second quarter 2026, Entergy Arkansas recorded a regulatory liability of $8.8 million to reflect the amount of the 2025 historical year netting adjustment that it collected from customers during the 2025 rate effective period.

Generating Arkansas Jobs Act Rider

In March 2026, Entergy Arkansas filed its first annual update to the strategic investment recovery rider, requesting recovery of $110.4 million of financing costs during construction of generation and transmission strategic investments related to Ironwood Power Station, Jefferson Power Station, and the Arkansas Cypress Solar facility. The revised rates were requested to be effective with the first billing cycle of June 2026. In April 2026 the

APSC general staff filed testimony arguing that the APSC had not issued an order designating Ironwood Power Station as a strategic investment and that related costs should therefore be removed from the annual update. Also in April 2026, Entergy Arkansas filed testimony asserting that the APSC general staff’s position is contrary to the plain language of the statute, which includes an exception for facilities like Ironwood Power Station that were certified by the APSC within a certain timeframe. A hearing was held in April 2026. In June 2026 the APSC approved Entergy Arkansas’s annual update, and rates became effective June 4, 2026.

Production Tax Credit Tariffs

As discussed in Note 3 to the financial statements in the Form 10-K, in January 2026 the APSC opened a docket to investigate the sale of Entergy Arkansas’s nuclear production tax credits and the appropriate ratemaking treatment of production tax credits for all of Entergy Arkansas’s eligible resources, including how the proceeds of any sales should flow through to customers. For nuclear production tax credits, Entergy Arkansas proposed a nuclear production tax credit rider, which would provide for the immediate flow through to customers of the weighted average cost of capital return on the net proceeds of the monetized nuclear production tax credits. Recognizing that the timing and determination from the IRS is uncertain, the nuclear production tax credit rider also proposes that, if there is an unfavorable IRS determination, Entergy Arkansas would collect applicable costs from customers. As directed by the APSC, in February 2026, Entergy Arkansas submitted a compliance filing to the APSC verifying the status of the solar production tax credits. The filing also verified that the net proceeds from the sale of the nuclear production tax credits were recorded in FERC accounts that are accruing a return for customers’ benefit at a rate that is above the customer deposit rate. Subsequently, in March 2026, Entergy Arkansas filed testimony setting forth its proposal for the solar production tax credits. Specifically, Entergy Arkansas requested the same ratemaking treatment for all of the solar facilities that the APSC already approved for Walnut Bend (i.e., the total net monetized proceeds from production tax credits expected to be generated over the first ten years of a solar facility’s operation are estimated and then amortized over the expected useful life of the asset, which is typically 30 years). Additionally, consistent with prior orders for these resources, the regulatory liabilities associated with the net cash proceeds from monetized solar production tax credits will be included in Entergy Arkansas’s calculation of its weighted average cost of capital providing a return on the unamortized balance for the benefit of customers. Further, Entergy Arkansas proposes to flow the benefits of the solar production tax credits to customers through Entergy Arkansas’s formula rate plan, effective with the formula rate plan rates that will go into effect January 1, 2027. Entergy Arkansas’s proposal would result in the benefits of the production tax credits being passed through to customers, if approved, as reductions in revenue requirement evenly over the life of the assets, rather than only during the 10-year period in which the production tax credits are generated. In April 2026 the APSC general staff filed testimony proposing an amortization period of no more than 15 years for the monetized proceeds for the tax credits associated with the West Memphis Solar and Driver Solar facilities. An evidentiary hearing was held in July 2026, but was not completed. The APSC is to set a date to complete the hearing.

Special Rate Contract and Arkansas Cypress Solar

As discussed in the Form 10-K, in September 2025, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of the Arkansas Cypress Solar facility, a planned 600 MW solar photovoltaic array with a 350 MW battery energy storage system and associated transmission facilities interconnecting at Entergy Arkansas’s White Bluff substation. The estimated cost of the project is $1,602 million. In March 2026 the APSC approved the Arkansas Cypress Solar facility and Entergy Arkansas’s recovery of the costs of the facility through the Generating Arkansas Jobs Act rider. The APSC also ordered implementation of an independent monitor to oversee costs. In April 2026, Entergy Arkansas filed with the APSC its proposal for an independent monitor to oversee the reasonableness of costs. In April 2026 the APSC issued an order consolidating Entergy Arkansas’s cost independent monitor proposals for three pending resources, including the Arkansas Cypress Solar facility, into a single docket and directing parties with full intervention status to respond to the proposals and recommend independent monitor candidates. No alternative recommendations were made by the other parties. The facility is expected to be in service by the end of 2028.

Filings with the LPSC (Entergy Louisiana)

Resilience Plan Cost Recovery Rider

In December 2022, Entergy Louisiana filed an application with the LPSC seeking a public interest finding regarding Phase I of Entergy Louisiana’s Future Ready resilience plan and approval of a rider mechanism to recover the program’s costs. Phase I in the December 2022 application reflected the first five years of a ten-year resilience plan and included investment of approximately $5 billion, including hardening investment, transmission dead-end structures, enhanced vegetation management, and telecommunications improvement. In April 2024 the LPSC approved a framework which includes an initial five-year resilience plan providing for an investment of approximately $1.9 billion with cost recovery via a forward-looking rider with semi-annual true-ups. The plan is subject to specified reporting requirements and includes a performance review of the hardened assets. The LPSC order approving the framework does not include any restrictions on Entergy Louisiana’s ability to file applications for approval of additional investments in resilience.

In January 2025, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $40.4 million, or $38.9 million in incremental annual revenues from Entergy Louisiana’s first semi-annual filing in July 2024, for projects expected to be placed in service during the rate-effective period of March 2025 through August 2025. In February 2025 the LPSC staff reviewed the filed rider rates and identified no material issues.

In July 2025, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $50.2 million, or $9.8 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of September 2025 through February 2026. Additionally, Entergy Louisiana’s true-up filing included an under-recovery totaling $5.6 million to be implemented in the January 2026 semi-annual filing. In August 2025 the LPSC staff reviewed the filed rider rates and identified no material issues.

In January 2026, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $101.8 million, or $51.6 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of March 2026 through August 2026. Additionally, Entergy Louisiana’s true-up filing included an over-recovery totaling $16.6 million to be implemented in the July 2026 semi-annual filing. In February 2026 the LPSC staff reviewed the filed rider rates and identified no material issues.

In July 2026, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $114.2 million, or $12.4 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of September 2026 through February 2027. Additionally, Entergy Louisiana’s true-up filing included an under-recovery totaling $2.5 million to be implemented in the January 2027 semi-annual filing. The LPSC staff is reviewing the filed rider rates.

Vegetation Management Rider

In November 2025 the LPSC staff issued notice of its initiation of a rulemaking to implement a vegetation management pilot program for LPSC jurisdictional electric utilities. The pilot program would be voluntary and would allow utilities to establish a rider for distribution vegetation management for up to 100% of the utility’s prior calendar year vegetation management spending. The rider may not exceed 1% of a customer’s bill, and the utility would be required to maintain its prior calendar year level of spending on vegetation management as reflected in its base rates or formula rate plan. In February 2026 the LPSC staff filed a report and recommendation along with a proposed final rule providing for the adoption of the pilot program consistent with the terms outlined in the original notice. In March 2026 the LPSC voted to accept the LPSC staff’s recommendation and adopt the proposed pilot program as presented. In April 2026, Entergy Louisiana filed its vegetation management rider for the rate-effective period of May 2026 through December 2026, which included a revenue requirement of $20 million for incremental spending on distribution vegetation management above the prior calendar year level of spending on vegetation management.

2025 Formula Rate Plan Filing

In June 2026, Entergy Louisiana filed its formula rate plan evaluation report for its 2025 calendar year operations. Consistent with the global stipulated settlement agreement approved by the LPSC in August 2024, the filing reflected a 9.7% allowed return on common equity with a bandwidth of 40 basis points above and below the midpoint. For the test year 2025, the formula produced an earned return on equity of 9.63%, which falls within the established bandwidth and therefore results inno adjustment to base rider formula rate plan revenue.

Additional changes in formula rate plan revenue include: (1) the removal of approximately $73 million in annual customer credits associated with the global stipulated settlement agreement, which have been fully credited to customers in accordance with the agreement; (2) a reduction in customer credits through the tax adjustment mechanism, attributable to the return of Entergy Louisiana’s over-collection of income tax expense associated with Louisiana state tax law changes effective in 2025 and the expiration of certain ad valorem exemptions; (3) increases in transmission and distribution plant in service, as recognized through the transmission and distribution recovery mechanisms, including restoration costs from Winter Storm Fern, for which Entergy Louisiana does not intend to seek relief or exception to the formula rate plan; (4) increases to the additional capacity mechanism; and (5) the final phase-in of additional nuclear depreciation expense, in accordance with the global stipulated settlement agreement. See Note 2 to the financial statements in the Form 10-K for discussion of the global stipulated settlement agreement. Collectively, these factors contributed to a net increase of $222 million in formula rate plan revenue for the period. Subject to LPSC review, the resulting changes from the 2025 formula rate plan evaluation report will become effective for bills rendered during the first billing cycle of September 2026, subject to refund.

In June 2026, Entergy Louisiana submitted a motion requesting the LPSC approve a one-year extension of its current formula rate plan, with all material provisions left unchanged, including the allowed return on common equity of 9.7% with a bandwidth of 40 basis points above and below the midpoint. Entergy Louisiana has requested LPSC action on the proposed extension by August 2026.

River Bend Deregulated Asset Plan Filing

In September 2025, Entergy Louisiana filed an application seeking LPSC approval to recover from customers, prospectively, approximately $49 million in annual revenues associated with the Louisiana retail deregulated portion of River Bend. Costs associated with the deregulated portion of River Bend have historically been excluded from retail ratemaking as a result of a 1988 LPSC decision. Instead, Entergy Louisiana has been allowed by the LPSC to either recover 4.6 cents per kWh for the power generated from that portion of the plant, or sell the power into the applicable market (subject to certain restrictions). The filing presents evidence that River Bend is a cost-effective and prudent source of needed baseload supply with value to Entergy Louisiana customers and seeks to recover the previously excluded costs, on a prospective basis. In March 2026 the LPSC staff and certain intervenors filed direct testimony recommending that the LPSC deny Entergy Louisiana’s application. The LPSC staff’s testimony further recommends that, if the LPSC were to grant any relief, notwithstanding the LPSC staff’s recommendation, such relief should be limited to allowing only prospective capital additions at River Bend to be included in Entergy Louisiana’s customer rates. Entergy Louisiana’s rebuttal testimony is due in August 2026. A hearing is scheduled for January 2027.

Filings with the MPSC (Entergy Mississippi)

In February 2026, Entergy Mississippi submitted its formula rate plan 2026 test year filing and 2025 look-back filing showing Entergy Mississippi’s earned return on rate base for the historical 2025 calendar year to be within the formula rate plan bandwidth and projected earned return for the 2026 calendar year to also be within the formula rate plan bandwidth. The 2026 test year filing resulted in an earned return on rate base of 7.64% and reflectedno change in formula rate plan revenues. The 2025 look-back filing compared actual 2025 results to the approved benchmark return on rate base and reflectedno change in formula rate plan revenues, although Entergy Mississippi proposed to adjust interim rates by $293 thousand to reflect one outside-the-bandwidth change, a true-up of demand side management costs.

In June 2026, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation that confirmed the 2026 test year filing, with the exception of immaterial adjustments to certain operations and maintenance expenses. The formula rate plan reflected an earned return on rate base of 7.68% for calendar year 2026, resu lting inno change in formula rate plan revenues for 2026. Pursuant to the stipulation, Entergy Mississippi’s 2025 look-back filing reflected an earned return on rate base of 8.10%, which also resulted inno change in formula rate plan revenues for 2025. In addition, the stipulation included the recovery of the outside-the-bandwidth change discussed above as well as the ratemaking treatment of certain customer contributions, the mechanism for recovery of the benefits of nuclear production tax credits, and the realignment of the first project from the interim facilities rate adjustment to the formula rate plan. In June 2026 the MPSC approved the joint stipulation with rates effective in July 2026. See Note 10 to the financial statements herein for further discussion of the mechanism for recovery of the benefits of nuclear production tax credits included in the joint stipulation.

Filings with the City Council (Entergy New Orleans)

In April 2026, Entergy New Orleans submitted to the City Council its formula rate plan 2025 test year filing. The 2025 evaluation report produced an earned return on equity of 7.55% compared to the authorized return on equity of 9.35%. Without adjustments, this would result in an increase in rates of $16.6 million. The increase in rates is driven, in part, by an increase in plant in service, as well as the cost of known and measurable capital additions. The increase is also driven by a decrease in total revenues due to a decline in kWh sales. The filing is subject to a 75-day review and discovery period followed by a 25-day period to resolve any disputes among the parties.

In July 2026 the City Council’s advisors issued a report seeking a reduction in Entergy New Orleans’s requested formula rate plan revenues of approximately $4.4 million due to certain proposed cost realignments, imputation of revenues, and disallowances. The City Council’s advisors also recommended that Entergy New Orleans be permitted to collect $20 million over five years beginning in September 2026 to recover amounts that it might be required to pay Entergy Louisiana and Entergy Arkansas pursuant to a FERC order issued in June 2026, relating to an alleged MSS-4 replacement tariff (MSS-4R) violation. However, the FERC order is unclear on its face, and the specific amount of a payment, if any, is unknown. Requests for rehearing and clarification of the FERC order are pending. See “MSS-4 Replacement Tariff - Net Operating Loss Carryforward Proceeding” below for additional discussion of the FERC order. If any rate adjustments are not resolved, the City Council would set a procedural schedule to resolve such disputes. A response by Entergy New Orleans to the advisors’ report is due in August 2026. Resulting rates will be effective with the first billing cycle of September 2026 pursuant to the formula rate plan tariff.

In July 2026, Entergy New Orleans submitted a motion requesting the City Council approve a four-year extension of its current formula rate plan, with all material provisions left unchanged, including the authorized return on equity of 9.35% with a bandwidth of 50 basis points above and below the midpoint. Entergy New Orleans has requested City Council action on the proposed extension by August 2026.

Filings with the PUCT and Texas Cities (Entergy Texas)

Distribution Cost Recovery Factor (DCRF) Rider

In April 2026, Entergy Texas filed with the PUCT a request to amend its DCRF rider. The amended rider was designed to collect from Entergy Texas’s retail customers approximately $112.5 million annually, or $20.4 million in incremental annual revenues beyond Entergy Texas’s then-effective DCRF rider based on its capital invested in distribution between July 1, 2025 and December 31, 2025. In July 2026 the PUCT approved the DCRF rider, consistent with Entergy Texas’s as-filed request, and rates became effective for usage on and after July 8, 2026.

Transmission Cost Recovery Factor (TCRF) Rider

As discussed in the Form 10-K, in October 2025, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The amended rider was designed to collect from Entergy Texas’s retail customers approximately $30.3 million annually, or $20.6 million in incremental annual revenues beyond Entergy Texas’s then-effective TCRF rider based on its capital invested in transmission between July 1, 2024 and June 30, 2025 and changes in other transmission charges. In April 2026 the PUCT approved the TCRF rider, consistent with Entergy Texas’s as-filed request, and rates became effective for usage on and after April 6, 2026.

Generation Cost Recovery Rider

In March 2026, Entergy Texas filed an application to establish a generation cost recovery rider to begin recovering a return of and on its capital investment in the Orange County Advanced Power Station. The proposed generation cost recovery rider, which includes Entergy Texas’s capital invested in generation for the Orange County Advanced Power Station through December 31, 2025, is designed to collect approximately $150.4 million annually from Entergy Texas’s retail customers. By statute, the proposed generation cost recovery rider rates are to become effective when the Orange County Advanced Power Station is placed into service, which is expected in third quarter 2026. In July 2026 the ALJ with the State Office of Administrative Hearings approved aproposed procedural schedule that includes a hearing on the merits in September 2026 and provides for interim rates to become effective for usage on and after the Orange County Advanced Power Station in-service date, to the extent final rates are not in place by that time.

Capacity Cost Recovery Rider (CCRR)

In May 2026, Entergy Texas filed with the PUCT a request to establish a new CCRR. The proposed CCRR is designed to collect approximately $58 million annually from Entergy Texas’s retail customers based on Entergy Texas’s eligible capacity-related costs and revenues for the 12 months beginning June 1, 2026. The eligible capacity-related costs and revenues are associated with Entergy Texas’s participation in MISO’s annual planning resource auction. In July 2026 the PUCT approved the CCRR, consistent with Entergy Texas’s as-filed request, and rates became effective on July 10, 2026.

Entergy Arkansas Opportunity Sales Proceeding

See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Arkansas opportunity sales proceeding.

Complaints Against System Energy

See Note 2 to the financial statements in the Form 10-K for information regarding complaints against System Energy and the settlements approved by the FERC that resolved all significant aspects of these complaints.

Unit Power Sales Agreement

See Note 2 to the financial statements in the Form 10-K for discussion of the Unit Power Sales Agreement. The following is an update to that discussion.

Pension Costs Amendment Proceeding

As discussed in the Form 10-K, in October 2021, System Energy submitted to the FERC proposed amendments to the Unit Power Sales Agreement to include in rate base the prepaid and accrued pension costs associated with System Energy’s qualified pension plans. In November 2025 the FERC issued an order approving System Energy’s proposed prepaid and accrued pension recovery mechanism. System Energy has been utilizing this methodology in billings since December 1, 2022 and will continue to utilize it going forward. As a result of the FERC’s order, System Energy did not owe any refunds. In December 2025 the APSC filed a request for rehearing of the November 2025 order. In January 2026 the FERC denied the APSC’s rehearing request by operation of law. In May 2026 the FERC issued a follow-up substantive order denying the APSC’s rehearing and sustaining its finding that no refunds are owed.

MSS-4 Replacement Tariff - Net Operating Loss Carryforward Proceeding

See Note 2 to the financial statements in the Form 10-K for discussion of the MSS-4R net operating loss carryforward proceeding. The following is an update to that discussion.

As discussed in the Form 10-K, in October 2021 the LPSC filed a complaint with the FERC alleging that Entergy Services improperly excluded net operating loss carryforward accumulated deferred income taxes (NOLC ADIT) from MSS-4R rates in the period before March 20, 2021. The LPSC argued that sales from Entergy Louisiana to Entergy Texas and Entergy New Orleans were charged at rates lower than they otherwise should have been, and it accordingly seeks surcharges for the period prior to March 20, 2021. The FERC set the complaint for hearing procedures and subsequently the hearing for this complaint proceeding was consolidated with the hearing procedures for Entergy Services’ January 2021 NOLC ADIT filing.

Testimony was filed by parties in 2023, and the hearing before a FERC ALJ was concluded in February 2024. In June 2024, the FERC ALJ issued an initial decision addressing three major issues: (1) whether Entergy Services’ proposed prospective inclusion and allocation of NOLC ADIT in MSS-4R rates using a modified with-and-without methodology is just and reasonable; (2) whether Entergy Services correctly calculated excess and deficient accumulated deferred income taxes in accordance with the terms of a prior settlement; and (3) whether NOLC ADIT should have been included in MSS-4R rates prior to the effective date of the January 2021 MSS-4R filing.

With respect to issues (1) and (2), the presiding ALJ concluded that Entergy Services’ proposed methodology for allocating and including NOLC ADIT in MSS-4R rates was just and reasonable and that Entergy Services correctly performed the excess and deficient accumulated deferred income taxes calculations. With respect to issue (3), however, the presiding ALJ agreed with the LPSC that NOLC ADIT should have been included in MSS-4R rates since September 1, 2016, and as a result, the presiding ALJ ordered that Entergy Louisiana and Entergy Arkansas recalculate bills for the period of September 1, 2016 through November 11, 2023 with surcharges expected to be due to those operating companies from the purchasing operating companies, Entergy New Orleans, Entergy Texas, and Entergy Louisiana (for some Entergy Arkansas sales). The presiding ALJ also ordered Entergy Services to pay the interest owed to Entergy Louisiana on these surcharges.

The surcharge methodology that the presiding ALJ recommended in connection with issue (3) was not supported by any participant in the hearing. As part of their exceptions to the initial decision, all parties to the proceeding opposed the use of the ALJ’s methodology, except for the FERC trial staff, which took no position. During the hearing, the LPSC and the FERC trial staff advocated that the alleged tariff violation should be remedied by the application of Entergy Services’ January 2021 proposed methodology. All other parties, including the PUCT, the City Council, and Entergy Services, opposed any surcharges for the period prior to the March 20, 2021 effective date of the January 2021 filing.

Entergy Services disputed the presiding ALJ's rulings on issue (3) and filed exceptions to these rulings in July 2024. In June 2026 the FERC issued its opinion largely affirming the initial decision. Specifically, the FERC found the historic exclusion of NOLC ADIT from MSS-4R rates was a tariff violation and ordered Entergy Louisiana and Entergy Arkansas to provide refunds and/or surcharges, as appropriate, for the period from September 1, 2016 through November 12, 2023 for sales by Entergy Louisiana and for the period December 19, 2013 until May 13, 2024 for sales by Entergy Arkansas. The FERC also ordered the relevant operating company to pay interest on the amounts owed.

In July 2026, Entergy Services, along with the LPSC, the City Council, and the PUCT, filed for rehearing and clarification of the FERC’s order. Entergy Services continues to dispute that the NOLC ADIT should have been included in MSS-4R rates prior to the effective date of the tariff amendment filing. Moreover, because of ambiguity in the order and the pending rehearing and clarification requests, it is unclear whether Entergy Arkansas and Entergy Louisiana as sellers will receive surcharges or have to provide refunds. Specifically, there is a lack of clarity as to whether plant-related liability accumulated deferred income taxes must be included in calculating refunds/surcharges. Entergy Services also identified a lack of clarity regarding including the nuclear decommissioning liability deduction in the NOLC ADIT calculation. Depending on the guidance issued by the FERC in response to the request for rehearing and clarification of its June 2026 order, each of the affected Entergy operating companies could either receive material refunds or owe material surcharges. As such, any amounts payable or receivable between the Entergy operating companies that may result from the order are not reasonably estimable as of June 30, 2026.

MSS-4 Replacement Tariff – River Bend 70 Depreciation LPSC Complaint

In May 2026 the LPSC filed a complaint with the FERC alleging that Entergy Texas owes surcharges to Entergy Louisiana because the depreciation rates used in the MSS-4R for the River Bend 70 sales of capacity and energy were based on a directive of the PUCT for the period from September 1, 2016 to December 31, 2025. The LPSC quantifies the potential surcharge as $100 million, inclusive of interest. Entergy Services disputes that any surcharges are due from Entergy Texas to Entergy Louisiana. In June 2026, Entergy Services filed a motion to dismiss and answer to the complaint submitted by the LPSC.

Joint Targeted Interconnection Queue Cost Allocation Dispute

In April 2026, MISO submitted to the FERC an unexecuted agreement proposing to assign to Entergy Texas (in its capacity as the owner of the Legend Power Station) costs associated with the MISO and Southwest

Power Pool Joint Targeted Interconnection Queue. Entergy Texas estimates that MISO’s proposed cost assignment would result in total charges of approximately $112 million, paid over twenty years beginning in 2031. In May 2026, Entergy Texas filed a protest to the agreement, as well as a separate complaint at the FERC, arguing that the proposed cost allocation is not just and reasonable. In June 2026 the FERC issued a deficiency notice to MISO. In July 2026, MISO and Southwest Power Pool filed answers to the complaint, and MISO filed an answer to the deficiency letter. Protests and comments in response to MISO’s answer to the deficiency letter are due in August 2026.

Storm Cost Recovery Filings with Retail Regulators

See Note 2 to the financial statements in the Form 10-K for discussion regarding storm cost recovery filings.

NOTE 3. EQUITY (Entergy Corporation and Entergy Louisiana)

Common Stock

Earnings per Share

The following table presents Entergy’s basic and diluted earnings per share calculations for the three and six months ended June 30, 2026 and 2025, included on the consolidated income statements:

For the Three Months Ended June 30,
2026 · 2025
(Dollars In Thousands, Except Per Share Data; Shares in Millions)
$/share · $/share
Consolidated net income$487,820$471,954
Less: Preferred dividend requirements of subsidiaries and noncontrolling interests5,2134,024
Net income attributable to Entergy Corporation$482,607$467,930
Basic shares and earnings per average common share458.7$1.05439.2$1.07
Average dilutive effect of:
Stock options1.3—0.9—
Other equity plans1.1—1.2—
Equity forwards5.2(0.02)4.4(0.02)
Diluted shares and earnings per average common share466.3$1.03445.7$1.05
For the Six Months Ended June 30,
2026 · 2025
(Dollars In Thousands, Except Per Share Data; Shares in Millions)
$/share · $/share
Consolidated net income$878,625$834,376
Less: Preferred dividend requirements of subsidiaries and noncontrolling interests11,1025,686
Net income attributable to Entergy Corporation$867,523$828,690
Basic shares and earnings per average common share457.2$1.90434.8$1.91
Average dilutive effect of:
Stock options1.3(0.01)1.0—
Other equity plans1.1—1.3(0.01)
Equity forwards4.8(0.02)6.3(0.03)
Diluted shares and earnings per average common share464.4$1.87443.4$1.87

Earnings per share dilution resulting from stock options outstanding and other equity plans is determined under the treasury stock method. The calculation of diluted earnings per share excluded 366,136 stock options outstanding for the three months ended June 30, 2025 because their effect would have been antidilutive. The calculation of diluted earnings per share excluded 149,415 stock options outstanding for the six months ended June 30, 2026 and 305,113 stock options outstanding for the six months ended June 30, 2025 because their effect would have been antidilutive. Until settlement of the forward sale agreements discussed in Note 7 to the financial statements in the Form 10-K and below in “Equity Distribution Program” and “Equity Forward Sale Agreements”, earnings per share dilution resulting from the agreements, if any, is determined under the treasury stock method. Share dilution occurs when the average market price of Entergy Corporation’s common stock is higher than the average forward sales price. The calculation of diluted earnings per share excluded 2,423,880 shares for the three months ended June 30, 2025 and 1,304,889 shares for the six months ended June 30, 2025 under forward sale agreements outstanding because their effect would have been antidilutive.

Entergy’s stock options and other equity compensation plans are discussed in Note 5 to the financial statements herein and in Note 12 to the financial statements in the Form 10-K.

Dividends declared per common share were $0.64 for the three months ended June 30, 2026 and $0.60 for the three months ended June 30, 2025. Dividends declared per common share were $1.28 for the six months ended June 30, 2026 and $1.20 for the six months ended June 30, 2025.

Equity Distribution Program

See Note 7 to the financial statements in the Form 10-K for discussion of Entergy Corporation’s at the market equity distribution program. The following are updates to that discussion.

The aggregate number of shares of common stock sold under the equity distribution sales agreement and under any forward sale agreement may not exceed an aggregate gross sales price of $4.5 billion. As of June 30, 2026, an aggregate gross sales price of approximately $2.8 billion has been sold under the at the market equity distribution program.

During the six months ended June 30, 2026 and 2025, there wereno shares of common stock directly issued under the at the market equity distribution program.

During the six months ended June 30, 2026, Entergy Corporation physically settled its obligations under the following forward sale agreements:

Effective Date of Forward Sale AgreementsShares of Common Stock IssuedGross Sales PriceForward Sellers FeesForward Sale Price per ShareCash Proceeds at Settlement
(Dollars In Thousands, Except Per Share Data)
Forward sale agreements settled in February 2026:
September 20241,900,000$115,314$1,153
March 20252,713,790$232,216$2,322
Total4,613,790$75.05$346,243
Forward sale agreements settled in June 2026:
September 20241,169,070$70,952$710
September 2024888,756$57,702$577
Total2,057,826$61.28$126,098

Entergy Corporation incurred an aggregate amount of approximately $0.5 million of general issuance costs associated with the February 2026 settlement and an aggregate amount of approximately $0.3 million of general issuance costs associated with the June 2026 settlement. Entergy Corporation used the net proceeds for general corporate purposes including the repayment of commercial paper.

Equity Forward Sale Agreements

See Note 7 to the financial statements in the Form 10-K for discussion of Entergy Corporation’s equity forward sale agreements. The following are updates to that discussion.

In May 2026, Entergy Corporation marketed an equity offering of approximately 19.2 million shares of Entergy Corporation common stock. In lieu of issuing equity at the time of the offering, Entergy Corporation entered into forward sale agreements with several forward counterparties. No amounts have been or will be recorded on Entergy’s balance sheet with respect to the equity offering until settlements of the forward sale agreements occur. The forward sale agreements require Entergy Corporation to, at its election on or prior to April 30, 2028, either (1) physically settle the transactions by issuing the total of approximately 19.2 million shares of its common stock to the forward counterparties in exchange for net proceeds at the then-applicable forward sale price specified by the agreements (initially $110.74 per share) or (2) net settle the transactions in whole or in part through the delivery or receipt of cash or shares. The forward sale price is subject to adjustment on a daily basis based on a floating interest rate factor and will decrease by other fixed amounts specified in the agreements.

During the six months ended June 30, 2026, Entergy Corporation physically settled its obligations under the following forward sale agreements:

Effective Date of Forward Sale AgreementsShares of Common Stock IssuedGross Sales PriceForward Sellers FeesForward Sale Price per ShareCash Proceeds at Settlement
(Dollars In Thousands, Except Per Share Data)
Forward sale agreements settled in June 2026:
March 20256,650,417$555,310$10,829$81.87$545,902

Entergy Corporation incurred approximately $0.3 million of common stock issuance costs with the settlement. Entergy Corporation used the net proceeds for general corporate purposes including the repayment of commercial paper.

Until settlement of the forward sale agreements, earnings per share dilution resulting from the agreements, if any, will be determined under the treasury stock method. Share dilution occurs when the average market price of Entergy Corporation’s common stock is higher than the average forward sale price. If Entergy Corporation had elected to net share settle the forward sale agreements as of June 30, 2026, Entergy Corporation would have been required to deliver 3.8 million shares.

Treasury Stock

During the six months ended June 30, 2026, Entergy Corporation reissued 970,100 shares of its previously repurchased common stock to satisfy stock option exercises, vesting of shares of restricted stock, and other stock-based awards. Entergy Corporation did not repurchase any of its common stock during the six months ended June 30, 2026.

Retained Earnings

On July 31, 2026, Entergy Corporation’s Board of Directors declared a common stock dividend of $0.64 per share, payable on September 1, 2026 to holders of record as of August 13, 2026.

Comprehensive Income

Accumulated other comprehensive income (loss) is included in the equity section of the balance sheets of Entergy and Entergy Louisiana. The following table presents changes in accumulated other comprehensive income (loss) for Entergy for the three months ended June 30, 2026 and 2025:

Pension and Other Postretirement Plan Changes
20262025
(In Thousands)
Beginning balance, April 1,$905$39,040
Amounts reclassified from accumulated other comprehensive income (loss)(1,995)(4,602)
Net other comprehensive loss for the period(1,995)(4,602)
Ending balance, June 30,($1,090)$34,438

The following table presents changes in accumulated other comprehensive income (loss) for Entergy for the six months ended June 30, 2026 and 2025:

Pension and Other Postretirement Plan Changes
20262025
(In Thousands)
Beginning balance, January 1,($3,006)$42,769
Amounts reclassified from accumulated other comprehensive income (loss)1,916(8,331)
Net other comprehensive income (loss) for the period1,916(8,331)
Ending balance, June 30,($1,090)$34,438

The following table presents changes in accumulated other comprehensive income for Entergy Louisiana for the three months ended June 30, 2026 and 2025:

Pension and Other Postretirement Plan Changes
20262025
(In Thousands)
Beginning balance, April 1,$32,829$52,687
Amounts reclassified from accumulated other comprehensive income(1,088)(2,132)
Net other comprehensive loss for the period(1,088)(2,132)
Ending balance, June 30,$31,741$50,555

The following table presents changes in accumulated other comprehensive income for Entergy Louisiana for the six months ended June 30, 2026 and 2025:

Pension and Other Postretirement Plan Changes
20262025
(In Thousands)
Beginning balance, January 1,$33,916$53,658
Amounts reclassified from accumulated other comprehensive income(2,175)(3,103)
Net other comprehensive loss for the period(2,175)(3,103)
Ending balance, June 30,$31,741$50,555

Total reclassifications out of accumulated other comprehensive income (loss) (AOCI) for Entergy for the three months ended June 30, 2026 and 2025 are as follows:

Amounts reclassified from AOCI · Income Statement Location
2026 · 2025
(In Thousands)
Pension and other postretirement plan changes
Amortization of prior service credit$946$3,462(a)
Amortization of net gain1,6662,551(a)
Total amortization2,6126,013
Income taxes(617)(1,411)Income taxes
Total amortization (net of tax)$1,995$4,602
Total reclassifications for the period (net of tax)$1,995$4,602

(a)These accumulated other comprehensive income (loss) components are included in the computation of net periodic pension and other postretirement cost. See Note 6 to the financial statements herein for additional details.

Total reclassifications out of accumulated other comprehensive income (loss) (AOCI) for Entergy for the six months ended June 30, 2026 and 2025 are as follows:

Amounts reclassified from AOCI · Income Statement Location
2026 · 2025
(In Thousands)
Pension and other postretirement plan changes
Amortization of prior service credit$1,892$6,924(a)
Amortization of net gain (loss)(4,228)5,102(a)
Total amortization(2,336)12,026
Income taxes420(3,695)Income taxes
Total amortization (net of tax)($1,916)$8,331
Total reclassifications for the period (net of tax)($1,916)$8,331

(a)These accumulated other comprehensive income (loss) components are included in the computation of net periodic pension and other postretirement cost. See Note 6 to the financial statements herein for additional details.

Total reclassifications out of accumulated other comprehensive income (AOCI) for Entergy Louisiana for the three months ended June 30, 2026 and 2025 are as follows:

Amounts reclassified from AOCI · Income Statement Location
2026 · 2025
(In Thousands)
Pension and other postretirement plan changes
Amortization of prior service credit$308$1,136(a)
Amortization of net gain1,1491,719(a)
Total amortization1,4572,855
Income taxes(369)(723)Income taxes
Total amortization (net of tax)$1,088$2,132
Total reclassifications for the period (net of tax)$1,088$2,132

(a)These accumulated other comprehensive income components are included in the computation of net periodic pension and other postretirement cost. See Note 6 to the financial statements herein for additional details.

Total reclassifications out of accumulated other comprehensive income (AOCI) for Entergy Louisiana for the six months ended June 30, 2026 and 2025 are as follows:

Amounts reclassified from AOCI · Income Statement Location
2026 · 2025
(In Thousands)
Pension and other postretirement plan changes
Amortization of prior service credit$617$2,272(a)
Amortization of net gain2,2963,438(a)
Total amortization2,9135,710
Income taxes(738)(2,607)Income taxes
Total amortization (net of tax)$2,175$3,103
Total reclassifications for the period (net of tax)$2,175$3,103

(a)These accumulated other comprehensive income components are included in the computation of net periodic pension and other postretirement cost. See Note 6 to the financial statements herein for additional details.

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy Corporation has in place a credit facility that has a borrowing capacity of $3 billion and expires in June 2031. The facility includes fronting commitments for the issuance of letters of credit against $20 million of the total borrowing capacity of the credit facility. The commitment fee is currently 0.225% of the undrawn commitment amount. Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation. Although there wereno borrowings under the facility for the six months ended June 30, 2026, the estimated interest rate as of June 30, 2026 that would have been applied to outstanding borrowings under the facility was 5.14%. The following is a summary of the amounts outstanding and capacity available under the credit facility as of June 30, 2026:

CapacityBorrowingsLettersof CreditCapacityAvailable
(In Millions)
$3,000$—$3$2,997

Entergy Corporation’s credit facility includes a covenant requiring Entergy to maintain a consolidated debt ratio, as defined, of 65% or less of its total capitalization. Entergy is in compliance with this covenant. If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Registrant Subsidiaries (except Entergy New Orleans and System Energy) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the Entergy Corporation credit facility’s maturity date may occur.

Entergy Corporation has a commercial paper program with a Board-approved program limit of $2 billion. As of June 30, 2026, Entergy Corporation had $1,544 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2026 was 4.01%.

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each had credit facilities available as of June 30, 2026 as follows:

CompanyExpirationDateAmount ofFacilityInterest Rate (a)Amount Drawnas ofJune 30, 2026Letters of CreditOutstanding as of June 30, 2026
Entergy ArkansasApril 2028$25 million (b)5.59%$—$—
Entergy ArkansasJune 2031$300 million (c)4.77%$—$—
Entergy LouisianaJune 2031$400 million (c)4.89%$—$—
Entergy MississippiJune 2031$300 million (c)4.77%$—$—
Entergy New OrleansJune 2027$25 million (c)5.37%$—$—
Entergy TexasJune 2031$300 million (c)4.89%$—$1.1 million

(a)The interest rate is the estimated interest rate as of June 30, 2026 that would have been applied to outstanding borrowings under the facility.

(b)Borrowings under this Entergy Arkansas credit facility may be secured by a security interest in its accounts receivable at Entergy Arkansas’s option.

(c)The credit facility includes fronting commitments for the issuance of letters of credit against a portion of the borrowing capacity of the facility as follows: $5 million for Entergy Arkansas; $15 million for Entergy Louisiana; $5 million for Entergy Mississippi; $10 million for Entergy New Orleans; and $25 million for Entergy Texas.

The commitment fees on the credit facilities range from 0.075% to 0.375% of the undrawn commitment amount for Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas, and of the entire facility amount for Entergy New Orleans. Each of the credit facilities requires the Registrant Subsidiary borrower to maintain a debt ratio, as defined, of 65% or less of its total capitalization. Each Registrant Subsidiary is in compliance with this covenant.

In addition, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each has one or more uncommitted standby letter of credit facilities as a means to post collateral to support its obligations to MISO and for other purposes. The following is a summary of the uncommitted standby letter of credit facilities as of June 30, 2026:

CompanyAmount of Uncommitted FacilityLetter of Credit FeeLetters of CreditIssued as ofJune 30, 2026(a)
Entergy Arkansas$100 million0.78%$59.5 million
Entergy Arkansas$200 million0.50%$118.3 million
Entergy Louisiana$125 million0.78%$111.1 million
Entergy Louisiana$60 million0.50%$38.5 million (b)
Entergy Mississippi$65 million0.78%$64.3 million (c)
Entergy Mississippi$65 million0.50%$56.0 million
Entergy New Orleans$1 million1.625%$0.5 million
Entergy Texas$150 million1.25%$110.6 million
Entergy Texas$160 million1.05%$—

(a)As of June 30, 2026, letters of credit posted with MISO covered financial transmission rights exposure of $1.4 million for Entergy Arkansas; $1.3 million for Entergy Louisiana; $2.5 million for Entergy Mississippi; and $0.6 million for Entergy Texas. See Note 8 to the financial statements herein for discussion of financial transmission rights.

(b)As of June 30, 2026, the letters of credit issued for Entergy Louisiana under this facility include $37.0 million in MISO letters of credit and $1.5 million in non-MISO letters of credit outstanding.

(c)As of June 30, 2026, the letters of credit issued for Entergy Mississippi under this facility include $63.0 million in MISO letters of credit and $1.3 million in non-MISO letters of credit outstanding.

The short-term borrowings of the Registrant Subsidiaries are limited to amounts authorized by the FERC. Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy have FERC-authorized short-term borrowing limits effective through January 2027. The FERC-authorized short-term borrowing limit for Entergy Arkansas is effective through February 2028. In addition to borrowings from commercial banks, these companies may also borrow from the Entergy system money pool and from other internal short-term borrowing arrangements. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and the other internal borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings. Borrowings from internal and external short-term borrowings combined may not exceed the FERC-authorized limits. The following are the FERC-authorized limits for short-term borrowings and the outstanding short-term borrowings as of June 30, 2026 (aggregating both internal and external short-term borrowings) for the Registrant Subsidiaries:

AuthorizedBorrowings
(In Millions)
Entergy Arkansas$250$—
Entergy Louisiana$450$—
Entergy Mississippi$200$—
Entergy New Orleans$150$—
Entergy Texas$200$—
System Energy$200$46

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and System Energy)

See Note 17 to the financial statements in the Form 10-K for a discussion of the consolidation of the nuclear fuel company variable interest entities (VIEs). To finance the acquisition and ownership of nuclear fuel, the nuclear fuel company VIEs have credit facilities, three of which previously provided for the issuance of commercial paper until such provisions relating to commercial paper were terminated in June 2026. The following is a summary of the nuclear fuel company VIE credit facilities as of June 30, 2026:

CompanyExpirationDateAmountofFacilityWeighted- Average Interest Rate on BorrowingsAmountOutstanding as ofJune 30, 2026
(Dollars in Millions)
Entergy Arkansas VIEJune 2029$804.76%$40.7
Entergy Louisiana River Bend VIEJune 2029$1054.77%$28.6
Entergy Louisiana Waterford VIEJune 2029$1054.77%$27.7
System Energy VIEJune 2029$1204.81%$54.4

The commitment fees on the credit facilities are 0.100% of the undrawn commitment amount for the Entergy Arkansas, Entergy Louisiana, and System Energy nuclear fuel company VIEs. Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio, as defined, of 70% or less of its total capitalization. Each lessee is in compliance with this covenant.

The nuclear fuel company VIEs had notes payable that were included in debt on the respective balance sheets as of June 30, 2026 as follows:

CompanyDescriptionAmount
Entergy Arkansas VIE1.84% Series N due July 2026 (a)$90 million
Entergy Arkansas VIE5.54% Series O due May 2029$70 million
Entergy Louisiana River Bend VIE2.51% Series V due June 2027$70 million
Entergy Louisiana Waterford VIE5.94% Series J due September 2026$70 million
System Energy VIE2.05% Series K due September 2027$90 million
System Energy VIE5.28% Series L due January 2029$80 million

(a)Repaid at maturity

In July 2026, the Entergy Arkansas nuclear fuel company VIE issued $120 million of 5.28% intermediate term secured notes due July 2031. The Entergy Arkansas nuclear fuel company VIE used the proceeds to repay, at maturity, its $90 million of 1.84% Series N intermediate term secured notes and expects to use the remaining funds to purchase additional nuclear fuel.

In accordance with regulatory treatment, interest on the nuclear fuel company VIEs’ debt arrangements, which currently include their credit facilities and long-term notes payable, is reported in fuel expense.

As of June 30, 2026, Entergy Louisiana and System Energy each has obtained financing authorization from the FERC that extends through January 2027 for issuances by its nuclear fuel company VIEs. Entergy Arkansas has obtained financing authorization from the FERC that extends through February 2028 for issuances by its nuclear fuel company VIE.

Debt Issuances and Retirements

(Entergy Arkansas)

In January 2026, Entergy Arkansas issued $500 million of 4.95% Series mortgage bonds due January 2036 and $500 million of 5.75% Series mortgage bonds due January 2056. Entergy Arkansas used the proceeds, together with other funds, to repay, prior to maturity, its $600 million of 3.5% Series mortgage bonds due April 2026. Entergy Arkansas expects to use the remaining proceeds, together with other funds, to finance a portion of the construction of generation projects, including the Ironwood Power Station and the Arkansas Cypress Solar facility, and for general corporate purposes.

(Entergy Louisiana)

In January 2026, Entergy Louisiana redeemed, at maturity, $250 million of 4.44% Series mortgage bonds.

In February 2026, Entergy Louisiana issued $750 million of 4.90% Series mortgage bonds due April 2036 and $750 million of 5.65% Series mortgage bonds due April 2056. Entergy Louisiana expects to use the proceeds, together with other funds, to finance construction of the Franklin Farms Power Station Units 1 and 2 project, the Waterford 5 Power Station project, and the Westlake Power Station project, to support storm restoration costs related to Winter Storm Fern, and for general corporate purposes.

(Entergy Mississippi)

In March 2026, Entergy Mississippi issued $650 million of 5.05% Series mortgage bonds due April 2036. Entergy Mississippi expects to use the proceeds, together with other funds, to finance construction of the Traceview

Advanced Power Station and Vicksburg Advanced Power Station, to finance, on an interim basis, storm restoration costs related to Winter Storm Fern, and for general corporate purposes.

(Entergy New Orleans)

In May 2026, Entergy New Orleans issued $35 million of 5.91% Series mortgage bonds due June 2036 and $55 million of 6.65% Series mortgage bonds due June 2056. Entergy New Orleans used the proceeds to repay, at maturity, its $85 million of 4% Series mortgage bonds due June 2026 and for general corporate purposes.

(Entergy Texas)

In May 2026, Entergy Texas issued $425 million of 5.20% Series mortgage bonds due June 2036. Entergy Texas expects to use the proceeds, together with other funds, to finance construction of the Orange County Advanced Power Station and the Lone Star Power Station, to repay, on or at maturity, its $130 million of 1.50% Series mortgage bonds due September 2026, and for general corporate purposes.

Fair Value

The book value and the fair value of long-term debt for Entergy and the Registrant Subsidiaries as of June 30, 2026 were as follows:

Book Valueof Long-Term DebtFair Valueof Long-Term Debt (a)
(In Thousands)
Entergy$33,057,826$30,712,302
Entergy Arkansas$5,841,909$5,273,485
Entergy Louisiana$11,564,821$10,643,441
Entergy Mississippi$3,666,384$3,370,025
Entergy New Orleans$661,221$627,938
Entergy Texas$4,442,972$4,129,543
System Energy$1,188,885$1,187,778

(a)Fair values were classified as Level 2 in the fair value hierarchy discussed in Note 8 to the financial statements herein.

The book value and the fair value of long-term debt for Entergy and the Registrant Subsidiaries as of December 31, 2025 were as follows:

Book Valueof Long-Term DebtFair Valueof Long-Term Debt (a)
(In Thousands)
Entergy$30,277,161$28,208,822
Entergy Arkansas$5,423,604$4,931,734
Entergy Louisiana$10,366,835$9,510,545
Entergy Mississippi$3,021,324$2,755,286
Entergy New Orleans$656,849$621,670
Entergy Texas$4,030,188$3,780,405
System Energy$1,088,703$1,104,007

(a)Fair values were classified as Level 2 in the fair value hierarchy discussed in Note 8 to the financial statements herein.

NOTE 5. STOCK-BASED COMPENSATION (Entergy Corporation)

Entergy grants stock and stock-based awards, which are described more fully in Note 12 to the financial statements in the Form 10-K. Awards under Entergy’s plans generally vest over three years.

Stock Options

In January 2026 the Board approved and Entergy granted long-term incentive awards in the form of options on 298,829 shares of its common stock under the 2019 Omnibus Incentive Plan with a fair value of $20.81 per option. As of June 30, 2026, there were options on 3,000,194 shares of common stock outstanding with a weighted-average exercise price of $60.44. The intrinsic value, which has no effect on net income, of the outstanding stock options is calculated by the positive difference between the weighted-average exercise price of the stock options granted and Entergy Corporation’s common stock price as of June 30, 2026. The aggregate intrinsic value of the stock options outstanding as of June 30, 2026 was $153.9 million.

The following table includes financial information for stock options for the three and six months ended June 30, 2026 and 2025:

Three Months EndedSix Months Ended
2026202520262025
(In Millions)
Compensation expense included in Entergy’s consolidated net income$1.0$1.0$2.0$2.1
Tax benefit recognized in Entergy’s consolidated net income$0.2$0.2$0.4$0.5
Compensation cost capitalized as part of fixed assets and materials and supplies$0.5$0.5$1.0$1.0

Other Equity Awards

In January 2026 the Board approved and Entergy granted long-term incentive awards in the form of 461,708 restricted stock awards,20,954 restricted stock units, and 195,692 performance units under the 2019 Omnibus Incentive Plan. The restricted stock awards and restricted stock units were made effective on January 29, 2026, and were valued at $96.03 per share, which was the closing price of Entergy Corporation’s common stock on the grant date. Shares of restricted stock have the same dividend and voting rights as other common stock, are considered issued and outstanding shares of Entergy upon vesting, and are expensed ratably over the three-year vesting period. One-third of the restricted stock awards and accrued dividends will vest upon each anniversary of the grant date. The restricted stock units do not have voting rights and are not considered issued and outstanding shares of Entergy prior to vesting. One-third of the restricted stock units will vest upon each anniversary of the grant date and are paid in the form of shares of Entergy. Dividend equivalents accrue on the restricted stock units and are converted to additional restricted stock units, which are subject to the same vesting schedule as the underlying restricted stock units. The restricted stock units are expensed ratably over the three-year vesting period.

The performance units represent the value of, and are settled with, one share of Entergy Corporation common stock at the end of the three-year performance period, plus dividends accrued during the performance period on the number of performance units earned. For the 2026-2028 performance period, performance will be measured based eighty percent on relative total shareholder return, ten percent on an environmental stewardship achievement measure, andten percent on a reliability achievement measure. The performance units were granted on January 29, 2026 andeighty percent were valued at $118.24 per share based on various factors, primarily market conditions; and both theten percent for the environmental stewardship achievement and theten percent for the reliability achievement were valued at $96.03 per share, the closing price of Entergy Corporation’s common stock on the grant date. Performance units do not have voting rights and are not considered issued and outstanding shares of Entergy prior to vesting. Performance units are expensed ratably over the three-year vesting period, and compensation cost for the portion of the award based on the environmental stewardship achievement measure and the reliability achievement measure will be adjusted based on the number of units that ultimately vest. See Note 12 to the financial statements in the Form 10-K for a description of the Long-Term Performance Unit Program.

The following table includes financial information for other outstanding equity awards for the three and six months ended June 30, 2026 and 2025:

Three Months EndedSix Months Ended
2026202520262025
(In Millions)
Compensation expense included in Entergy’s consolidated net income$10.3$9.4$20.3$19.4
Tax benefit recognized in Entergy’s consolidated net income$2.5$2.3$5.0$4.8
Compensation cost capitalized as part of fixed assets and materials and supplies$5.7$4.7$10.8$9.5

NOTE 6. RETIREMENT AND OTHER POSTRETIREMENT BENEFITS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Components of Qualified Net Pension Cost

Entergy’s qualified net pension costs, including amounts capitalized, for the second quarters of 2026 and 2025, included the following components:

20262025
(In Thousands)
Service cost - benefits earned during the period$23,078$23,617
Interest cost on projected benefit obligation56,04759,680
Expected return on assets(76,536)(75,280)
Recognized net loss13,95613,309
Net pension cost$16,545$21,326

Entergy’s qualified net pension costs, including amounts capitalized, for the six months ended June 30, 2026 and 2025, included the following components:

20262025
(In Thousands)
Service cost - benefits earned during the period$46,156$47,234
Interest cost on projected benefit obligation112,094119,360
Expected return on assets(153,072)(150,560)
Recognized net loss27,91226,618
Net pension cost$33,090$42,652

The Registrant Subsidiaries’ qualified net pension costs, including amounts capitalized, for their current and former employees for the second quarters of 2026 and 2025, included the following components:

2026EntergyArkansasEntergyLouisianaEntergy MississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$4,363$5,320$1,296$265$1,011$1,326
Interest cost on projected benefit obligation12,79613,4113,4341,1912,6603,316
Expected return on assets(17,825)(18,908)(4,945)(1,669)(3,779)(4,684)
Recognized net loss4,7822,1598714644891,148
Net pension cost$4,116$1,982$656$251$381$1,106
2025EntergyArkansasEntergyLouisianaEntergy MississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$4,427$5,454$1,304$411$1,024$1,372
Interest cost on projected benefit obligation13,81414,7043,6991,6472,9733,585
Expected return on assets(17,676)(18,897)(4,949)(2,174)(3,889)(4,575)
Recognized net loss4,7912,2688224154541,114
Net pension cost$5,356$3,529$876$299$562$1,496

The Registrant Subsidiaries’ qualified net pension costs, including amounts capitalized, for their current and former employees for the six months ended June 30, 2026 and 2025, included the following components:

2026EntergyArkansasEntergyLouisianaEntergy MississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$8,726$10,640$2,592$530$2,022$2,652
Interest cost on projected benefit obligation25,59226,8226,8682,3825,3206,632
Expected return on assets(35,650)(37,816)(9,890)(3,338)(7,558)(9,368)
Recognized net loss9,5644,3181,7429289782,296
Net pension cost$8,232$3,964$1,312$502$762$2,212
2025EntergyArkansasEntergyLouisianaEntergy MississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$8,854$10,908$2,608$822$2,048$2,744
Interest cost on projected benefit obligation27,62829,4087,3983,2945,9467,170
Expected return on assets(35,352)(37,794)(9,898)(4,348)(7,778)(9,150)
Recognized net loss9,5824,5361,6448309082,228
Net pension cost$10,712$7,058$1,752$598$1,124$2,992

Non-Qualified Net Pension Cost

Entergy recognized $2.4 million and $2.5 million in pension cost for its non-qualified pension plans for the second quarters of 2026 and 2025, respectively. For the second quarters of 2026 and 2025, there wereno settlement charges related to the payment of lump sum benefits out of the plan. Entergy recognized $4.8 million and $5 million in pension cost for its non-qualified pension plans for the six months ended June 30, 2026 and 2025, respectively. For the six months ended June 30, 2026 and 2025, there wereno settlement charges related to the payment of lump sum benefits out of the plan.

The Registrant Subsidiaries recognized the following pension cost for their current and former employees for their non-qualified pension plans for the second quarters of 2026 and 2025:

EntergyArkansas · EntergyLouisiana · EntergyMississippi · EntergyNew Orleans · EntergyTexas
(In Thousands)
2026$13$61$62$34$123
2025$47$36$90$35$39

The Registrant Subsidiaries recognized the following pension cost for their current and former employees for their non-qualified pension plans for the six months ended June 30, 2026 and 2025:

EntergyArkansas · EntergyLouisiana · EntergyMississippi · EntergyNew Orleans · EntergyTexas
(In Thousands)
2026$26$122$101$69$246
2025$94$72$180$70$78

For the second quarters of 2026 and 2025, there wereno settlement charges for the Registrant Subsidiaries related to the payment of lump sum benefits out of the plan. For the six months ended June 30, 2026 and 2025, there wereno settlement charges for the Registrant Subsidiaries related to the payment of lump sum benefits out of the plan.

Components of Net Other Postretirement Benefits Cost (Income)

Entergy’s net other postretirement benefits income, including amounts capitalized, for the second quarters of 2026 and 2025 included the following components:

20262025
(In Thousands)
Service cost - benefits earned during the period$2,694$2,757
Interest cost on accumulated postretirement benefit obligation (APBO)9,5979,690
Expected return on assets(10,314)(10,209)
Amortization of prior service credit(1,585)(5,720)
Recognized net gain(2,877)(3,870)
Net other postretirement benefits income($2,485)($7,352)

Entergy’s net other postretirement benefits cost (income), including amounts capitalized, for the six months ended June 30, 2026 and 2025 included the following components:

20262025
(In Thousands)
Service cost - benefits earned during the period$5,388$5,514
Interest cost on APBO19,19419,380
Expected return on assets(20,628)(20,418)
Amortization of prior service credit(3,170)(11,440)
Recognized net (gain) loss1,803(7,740)
Net other postretirement benefits cost (income)$2,587($14,704)

The Registrant Subsidiaries’ net other postretirement benefits cost (income), including amounts capitalized, for their current and former employees for the second quarters of 2026 and 2025 included the following components:

2026EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$551$688$159$35$129$186
Interest cost on APBO1,7662,039487182495419
Expected return on assets(4,374)—(1,374)(1,258)(2,528)(722)
Amortization of prior service cost (credit)174(309)(85)—(604)9
Recognized net (gain) loss(475)(1,098)(73)(137)9745
Net other postretirement benefits cost (income)($2,358)$1,320($886)($1,178)($2,411)($63)
2025EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$572$671$162$52$159$174
Interest cost on APBO1,7752,012489249582394
Expected return on assets(4,225)—(1,328)(1,445)(2,452)(702)
Amortization of prior service cost (credit)524(1,136)(239)(229)(1,093)(73)
Recognized net (gain) loss(353)(1,811)(57)(27)153(7)
Net other postretirement benefits income($1,707)($264)($973)($1,400)($2,651)($214)

The Registrant Subsidiaries’ net other postretirement benefits cost (income), including amounts capitalized, for their current and former employees for the six months ended June 30, 2026 and 2025 included the following components:

2026EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$1,102$1,376$318$70$258$372
Interest cost on APBO3,5324,078974364990838
Expected return on assets(8,748)—(2,748)(2,516)(5,056)(1,444)
Amortization of prior service cost (credit)348(618)(170)—(1,208)18
Recognized net (gain) loss(950)(2,196)(146)(274)19490
Net other postretirement benefits cost (income)($4,716)$2,640($1,772)($2,356)($4,822)($126)
2025EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$1,144$1,342$324$104$318$348
Interest cost on APBO3,5504,0249784981,164788
Expected return on assets(8,450)—(2,656)(2,890)(4,904)(1,404)
Amortization of prior service cost (credit)1,048(2,272)(478)(458)(2,186)(146)
Recognized net (gain) loss(706)(3,622)(114)(54)306(14)
Net other postretirement benefits income($3,414)($528)($1,946)($2,800)($5,302)($428)

Reclassification out of Accumulated Other Comprehensive Income (Loss)

Entergy and Entergy Louisiana reclassified the following costs out of accumulated other comprehensive income (loss) (before taxes and including amounts capitalized) for the second quarters of 2026 and 2025:

2026QualifiedPensionCostsOtherPostretirementCostsNon-QualifiedPension CostsTotal
(In Thousands)
Entergy
Amortization of prior service credit (cost)$—$1,008($62)$946
Amortization of net gain (loss)(515)2,274(93)1,666
($515)$3,282($155)$2,612
Entergy Louisiana
Amortization of prior service credit$—$308$—$308
Amortization of net gain (loss)(86)1,236(1)1,149
($86)$1,544($1)$1,457
2025QualifiedPensionCostsOtherPostretirementCostsNon-QualifiedPension CostsTotal
(In Thousands)
Entergy
Amortization of prior service credit (cost)$—$3,493($31)$3,462
Amortization of net gain (loss)(411)3,070(108)2,551
($411)$6,563($139)$6,013
Entergy Louisiana
Amortization of prior service credit$—$1,136$—$1,136
Amortization of net gain (loss)(91)1,811(1)1,719
($91)$2,947($1)$2,855

Entergy and Entergy Louisiana reclassified the following costs out of accumulated other comprehensive income (loss) (before taxes and including amounts capitalized) for the six months ended June 30, 2026 and 2025:

2026QualifiedPensionCostsOtherPostretirementCostsNon-QualifiedPension CostsTotal
(In Thousands)
Entergy
Amortization of prior service credit (cost)$—$2,016($124)$1,892
Amortization of net loss(1,030)(3,009)(189)(4,228)
($1,030)($993)($313)($2,336)
Entergy Louisiana
Amortization of prior service credit (cost)$—$618($1)$617
Amortization of net gain (loss)(173)2,471(2)2,296
($173)$3,089($3)$2,913
2025QualifiedPensionCostsOtherPostretirementCostsNon-QualifiedPension CostsTotal
(In Thousands)
Entergy
Amortization of prior service credit (cost)$—$6,986($62)$6,924
Amortization of net gain (loss)(822)6,140(216)5,102
($822)$13,126($278)$12,026
Entergy Louisiana
Amortization of prior service credit$—$2,272$—$2,272
Amortization of net gain (loss)(182)3,622(2)3,438
($182)$5,894($2)$5,710

Accounting for Pension and Other Postretirement Benefits

In accordance with accounting standards, the other components of net benefit cost are required to be presented in the income statement separately from the service cost component and outside a subtotal of income from operations and are presented by Entergy in miscellaneous - net in other income. In addition, non-service benefit costs previously eligible for capitalization into property, plant, and equipment are being deferred to a regulatory asset/liability and will be amortized over the estimated lives of the respective assets.

Employer Contributions

Based on current assumptions, Entergy expects to contribute $200 million to its qualified pension plans in 2026. As of June 30, 2026, Entergy had contributed $85.1 million to its pension plans. Based on current assumptions, the Registrant Subsidiaries expect to contribute the following to qualified pension plans for their current and former employees in 2026:

EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Expected 2026 pension contributions$29,716$41,599$3,991$3,304$5,931$13,249
Pension contributions made through June 2026$12,073$16,351$2,026$1,552$2,604$5,626
Remaining estimated pension contributions to be made in 2026$17,643$25,248$1,965$1,752$3,327$7,623

NOTE 7. BUSINESS SEGMENT INFORMATION (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy has a single reportable segment, Utility, which includes the generation, transmission, distribution, and sale of electric power in portions of Arkansas, Mississippi, Texas, and Louisiana, including the City of New Orleans; and included operation of a small natural gas distribution business in portions of Louisiana through June 30, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana and Entergy New Orleans natural gas distribution businesses on July 1, 2025. Parent & Other includes the parent company, Entergy Corporation, and other business activity, including Entergy’s non-utility operations business, which is an operating segment that does not meet the quantitative thresholds for determining reportable segments.

The following table includes operating revenues and significant expense categories regularly provided to the chief operating decision maker for the Utility segment, a reconciliation of Utility operating revenues to Entergy’s consolidated operating revenues, and a reconciliation of Utility net income to consolidated net income and net income attributable to Entergy Corporation for the three and six months ended June 30, 2026 and 2025:

Three Months EndedSix Months Ended
2026202520262025
(In Thousands) · (In Thousands)
Utility operating revenues$3,513,488$3,315,723$6,683,761$6,145,320
Reconciliation of revenues:
Other revenues (a)10,15713,14427,53530,448
Elimination of intersegment revenues(7)(18)(32)(45)
Consolidated operating revenues3,523,6383,328,8496,711,2646,175,723
Less Utility expenses and other items:
Fuel, fuel-related expenses, and gas purchased for resale756,802631,7731,362,097970,756
Purchased power305,250372,842663,755714,926
Other operation and maintenance expenses758,723713,2961,421,1651,375,770
Other regulatory charges (credits) - net(15,360)(55,957)103,939(72,800)
Other Utility items (b)1,077,6971,051,5961,957,0442,063,453
Utility net income630,376602,1731,175,7611,093,215
Reconciliation of net income:
Other loss(72,537)(55,678)(156,360)(109,050)
Elimination of intersegment profit(70,019)(74,541)(140,776)(149,789)
Consolidated net income487,820471,954878,625834,376
Preferred dividend requirements of subsidiaries and noncontrolling interests (c)5,2134,02411,1025,686
Net income attributable to Entergy Corporation$482,607$467,930$867,523$828,690

(a)See Note 12 to the financial statements herein and Note 19 to the financial statements in the Form 10-K for discussion of other revenues.

(b)Other Utility items includes nuclear refueling outage expenses, decommissioning expenses, taxes other than income taxes, depreciation and amortization expenses, other income, interest expense, and income tax expense.

(c)Preferred dividend requirements of subsidiaries and noncontrolling interests is substantially derived from the Utility segment. See Note 6 to the financial statements in the Form 10-K for discussion of preferred stock and noncontrolling interests.

The following table presents segment financial information for Entergy’s single reportable segment, Utility, and a reconciliation to the corresponding consolidated amounts for Entergy Corporation for the three months ended June 30, 2026 and 2025:

UtilityParent & OtherEliminationsConsolidated
(In Thousands)
Depreciation, amortization, and decommissioning$607,131$571$—$607,702
Interest and investment income$243,168$2,558($70,818)$174,908
Interest expense$328,632$82,419($798)$410,253
Income taxes$148,924($17,246)$—$131,678
Depreciation, amortization, and decommissioning$577,386$1,766$—$579,152
Interest and investment income$160,248$2,146($74,975)$87,419
Interest expense$261,033$61,475($434)$322,074
Income taxes$152,836($14,437)$—$138,399

The following table presents segment financial information for Entergy’s single reportable segment, Utility, and a reconciliation to the corresponding consolidated amounts for Entergy Corporation for the six months ended June 30, 2026 and 2025:

UtilityParent & OtherEliminationsConsolidated
(In Thousands)
Depreciation, amortization, and decommissioning$1,204,493$2,156$—$1,206,649
Interest and investment income$526,847$5,976($142,105)$390,718
Interest expense$631,697$159,625($1,329)$789,993
Income taxes$260,328($40,860)$—$219,468
Total assets as of June 30, 2026$82,679,238$1,005,372($4,681,992)$79,002,618
Total expenditures for additions to long-lived assets$5,231,590($740)$—$5,230,850
Depreciation, amortization, and decommissioning$1,144,573$3,451$—$1,148,024
Interest and investment income$267,423$3,835($150,433)$120,825
Interest expense$528,164$124,344($643)$651,865
Income taxes$267,109($28,669)$—$238,440
Total assets as of December 31, 2025$75,726,104$773,056($4,608,430)$71,890,730
Total expenditures for additions to long-lived assets$3,798,452$606$—$3,799,058

Eliminations are primarily intersegment activity. All of Entergy’s goodwill is related to the Utility segment.

Registrant Subsidiaries

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each has one operating and reportable segment, an integrated utility business which includes the generation, transmission, and distribution of electric power; and included operation of a small natural gas distribution business at each of Entergy Louisiana and Entergy New Orleans through June 30, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana and Entergy New Orleans natural gas distribution businesses on July 1, 2025. System Energy has one operating and reportable segment, which is an electricity generation business. Each of the Registrant Subsidiaries’ operations are managed on an integrated basis by that company because of the substantial effect of cost-based rates and regulatory oversight on the business process, cost structures, and operating results. All segment financial information for the Registrant Subsidiaries is as reported on the respective financial statements for each of the Registrant Subsidiaries.

NOTE 8. RISK MANAGEMENT AND FAIR VALUES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Market Risk

In the normal course of business, Entergy is exposed to a number of market risks. Market risk is the potential loss that Entergy may incur as a result of changes in the market or fair value of a particular commodity or instrument. All financial and commodity-related instruments, including derivatives, are subject to market risk including commodity price risk, equity price, and interest rate risk. Entergy uses derivatives primarily to mitigate commodity price risk associated with the price of fuel and to mitigate interest rate exposure related to certain financing agreements.

The Utility has limited exposure to the effects of market risk because it operates primarily under cost-based rate regulation. To the extent approved by their retail regulators, the Utility operating companies use commodity and financial instruments to hedge the exposure to price volatility inherent in their purchased power, fuel, and gas purchased for resale costs, that are recovered from customers.

Derivatives

Entergy designates a significant portion of its derivative instruments as normal purchase/normal sale transactions due to their physical settlement provisions, including power purchase and sales agreements, fuel purchase agreements, and capacity contracts. Certain derivative instruments do not qualify for designation as normal purchase/normal sale transactions due to their financial settlement provisions. See further discussion below regarding the accounting for these derivative instruments.

In 2025, Entergy Texas entered into interest rate swaps, accounted for as derivatives, to manage interest rate risks associated with Entergy Texas’s build-to-suit lease arrangement for the Legend Power Station. See Note 8 to the financial statements in the Form 10-K for further discussion of the build-to-suit lease arrangement for the Legend Power Station. These interest rate swaps are not designated as hedging instruments. Interest will be calculated as the sum of the Secured Overnight Financing Rate plus the blended spreads per the build-to-suit lease arrangement, compounded monthly, with one cash settlement per year over the approximate two year construction period. The notional volume of the hedge was calculated based on the expected costs for the Legend Power Station at the time Entergy Texas entered into the interest rate swaps. Changes in the fair value of these interest rate swaps are recognized each period, with gains and losses deferred as a regulatory asset or liability. The interest rate swaps run through January 31, 2028. The total notional volume is up to $1.1 billion for Entergy Texas as of June 30, 2026. Credit support for the swaps are covered by master agreements that do not require Entergy Texas to provide collateral based on mark-to-market values.

Entergy manages fuel price volatility for Entergy Louisiana and Entergy Mississippi through the purchase of natural gas swaps that financially settle against either the average Henry Hub Gas Daily prices or the NYMEX Henry Hub. These swaps are marked-to-market through fuel expense with offsetting regulatory assets or liabilities. All benefits or costs of the program are recorded in fuel costs. The notional volumes of these swaps are based on a portion of projected annual exposure to gas price volatility for electric generation at Entergy Louisiana and Entergy Mississippi. The maximum length of time over which Entergy has executed natural gas swaps as of June 30, 2026 isnine months for Entergy Mississippi. The total volume of natural gas swaps outstanding as of June 30, 2026 is 9,124,250 MMBtu for Entergy and Entergy Mississippi. As of June 30, 2026, Entergy Louisiana hadno outstanding natural gas swaps. Credit support for these natural gas swaps is covered by master agreements that do not require Entergy to provide collateral based on mark-to-market value, but do carry adequate assurance language that may lead to requests for collateral. Prior to the sale of the Entergy New Orleans natural gas distribution business, Entergy also managed fuel price volatility related to projected winter purchases for gas distribution at Entergy New Orleans through the purchase of natural gas swaps. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy New Orleans and Entergy Louisiana natural gas distribution businesses on July 1, 2025.

During the second quarter 2026, Entergy participated in the annual financial transmission rights auction process for the MISO planning year of June 1, 2026 through May 31, 2027. Financial transmission rights are derivative instruments that represent economic hedges of future congestion charges that will be incurred in serving Entergy’s customer load. They are not designated as hedging instruments. Entergy initially records financial transmission rights at their estimated fair value and subsequently adjusts the carrying value to their estimated fair value at the end of each accounting period prior to settlement. Unrealized gains or losses on financial transmission rights held by the non-utility operations are included in operating revenues. The Utility operating companies recognize regulatory liabilities or assets for unrealized gains or losses on financial transmission rights. The total volume of financial transmission rights outstanding as of June 30, 2026 is 131,545 GWh for Entergy, including 34,807 GWh for Entergy Arkansas,54,548 GWh for Entergy Louisiana,16,033 GWh for Entergy Mississippi,5,533 GWh for Entergy New Orleans, and 20,171 GWh for Entergy Texas. Credit support for financial transmission rights held by the Utility operating companies is covered by cash and/or letters of credit issued by each Utility operating company as required by MISO. No cash was required to be posted for financial transmission rights exposure for the Utility operating companies as of June 30, 2026 and December 31, 2025. Letters of credit posted with MISO covered the financial transmission rights exposure for Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas as of June 30, 2026 and for Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas as of December 31, 2025. Credit support for financial transmission rights held by Entergy’s non-utility operations business may also be covered by cash and/or letters of credit. No cash or letters of credit were required to be posted for financial transmission rights exposure for the non-utility operations business as of June 30, 2026 and December 31, 2025.

The fair values of Entergy’s derivative instruments not designated as hedging instruments on the consolidated balance sheets as of June 30, 2026 and December 31, 2025 are shown in the table below. Certain investments, including those not designated as hedging instruments, are subject to master netting agreements and are presented in the balance sheet on a net basis in accordance with accounting guidance for derivatives and hedging.

InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)
(In Millions)
Assets:
Financial transmission rightsPrepayments and other$68($4)$64
Interest rate swapsPrepayments and other$1$—$1
Interest rate swapsOther deferred debits and other assets$8$—$8
Liabilities:
Natural gas swapsOther current liabilities$4$—$4
Assets:
Financial transmission rightsPrepayments and other$27$—$27
Interest rate swapsPrepayments and other$1$—$1
Liabilities:
Natural gas swapsOther current liabilities$5$—$5
Interest rate swapsOther non-current liabilities$3$—$3

(a)Represents the gross amounts of recognized assets/liabilities

(b)Represents the netting of fair value balances with the same counterparty

(c)Represents the net amounts of assets/liabilities presented on the Entergy Corporation and Subsidiaries’ Consolidated Balance Sheets

(d)Excludes letters of credit posted with MISO to cover financial transmission rights exposure in the amount of $6 million as of June 30, 2026 and $2 million as of December 31, 2025

The effects of Entergy’s derivative instruments not designated as hedging instruments on the consolidated income statements for the three months ended June 30, 2026 and 2025 are as follows:

Instrument · Income StatementLocation · Amount of gain (loss)recorded in the income statement
(In Millions)
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale(a)($1)
Financial transmission rightsPurchased power expense(b)$43
Interest rate swapsInterest expense(c)($5)
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale(a)$11
Financial transmission rightsPurchased power expense(b)$66

The effects of Entergy’s derivative instruments not designated as hedging instruments on the consolidated income statements for the six months ended June 30, 2026 and 2025 are as follows:

Instrument · Income StatementLocation · Amount of gain (loss)recorded in the income statement
(In Millions)
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale(a)$2
Financial transmission rightsPurchased power expense(b)$87
Interest rate swapsInterest expense(c)($9)
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale(a)($1)
Financial transmission rightsPurchased power expense(b)$114

(a)Due to regulatory treatment, the natural gas swaps are marked-to-market through fuel, fuel-related expenses, and gas purchased for resale and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as fuel expenses when the swaps are settled are recovered or refunded through fuel cost recovery mechanisms.

(b)Due to regulatory treatment, the changes in the estimated fair value of financial transmission rights for the Utility operating companies are recorded through purchased power expense and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as purchased power expense when the financial transmission rights for the Utility operating companies are settled are recovered or refunded through fuel cost recovery mechanisms.

(c)Due to regulatory treatment, the changes in the estimated fair value of the interest rate swaps for Entergy Texas are recorded through interest expense and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as interest expense when the interest rate swaps for Entergy Texas are settled are expected to be recovered in ratemaking relating to the Legend

Power Station. See Note 8 to the financial statements in the Form 10-K for discussion of the build-to-suit lease arrangement for the Legend Power Station.

The fair values of derivative instruments not designated as hedging instruments on the Registrant Subsidiaries’ balance sheets as of June 30, 2026 and December 31, 2025 are shown in the tables below. Certain investments, including those not designated as hedging instruments, are subject to master netting agreements and are presented in the balance sheet on a net basis in accordance with accounting guidance for derivatives and hedging.

InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)Registrant
(In Millions)
Assets:
Financial transmission rightsPrepayments and other$23.8$—$23.8Entergy Arkansas
Financial transmission rightsPrepayments and other$32.1$—$32.1Entergy Louisiana
Financial transmission rightsPrepayments and other$0.9($0.2)$0.7Entergy Mississippi
Financial transmission rightsPrepayments and other$4.0$—$4.0Entergy New Orleans
Financial transmission rightsPrepayments and other$6.9($3.8)$3.1Entergy Texas
Interest rate swapsPrepayments and other$1.1$—$1.1Entergy Texas
Interest rate swapsOther deferred debits and other assets$7.5$—$7.5Entergy Texas
Liabilities:
Natural gas swapsOther current liabilities$4.1$—$4.1Entergy Mississippi
InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)Registrant
(In Millions)
Assets:
Financial transmission rightsPrepayments and other$5.5$—$5.5Entergy Arkansas
Financial transmission rightsPrepayments and other$16.8($0.1)$16.7Entergy Louisiana
Financial transmission rightsPrepayments and other$0.4$—$0.4Entergy Mississippi
Financial transmission rightsPrepayments and other$1.8$—$1.8Entergy New Orleans
Financial transmission rightsPrepayments and other$2.3($0.2)$2.1Entergy Texas
Interest rate swapsPrepayments and other$0.5$—$0.5Entergy Texas
Liabilities:
Natural gas swapsOther current liabilities$5.3$—$5.3Entergy Mississippi
Interest rate swapsOther non-current liabilities$3.0$—$3.0Entergy Texas

(a)Represents the gross amounts of recognized assets/liabilities

(b)Represents the netting of fair value balances with the same counterparty

(c)Represents the net amounts of assets/liabilities presented on the Registrant Subsidiaries’ balance sheets

(d)Excludes letters of credit posted with MISO to cover financial transmission rights exposure in the amount of $1.4 million for Entergy Arkansas, $1.3 million for Entergy Louisiana, $2.5 million for Entergy Mississippi, and $0.6 million for Entergy Texas as of June 30, 2026 and in the amount of $0.1 million for Entergy Arkansas, $0.8 million for Entergy Louisiana, $0.8 million for Entergy Mississippi, and $0.1 million for Entergy Texas as of December 31, 2025

The effects of derivative instruments not designated as hedging instruments on the Registrant Subsidiaries’ income statements for the three months ended June 30, 2026 and 2025 are as follows:

InstrumentIncome Statement LocationAmount of gain(loss) recordedin the income statementRegistrant
(In Millions)
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale($0.8)(a)Entergy Mississippi
Financial transmission rightsPurchased power expense$8.9(b)Entergy Arkansas
Financial transmission rightsPurchased power expense$22.7(b)Entergy Louisiana
Financial transmission rightsPurchased power expense$3.4(b)Entergy Mississippi
Financial transmission rightsPurchased power expense$2.4(b)Entergy New Orleans
Financial transmission rightsPurchased power expense$5.1(b)Entergy Texas
Interest rate swapsInterest expense($4.9)(c)Entergy Texas
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale$11.4(a)Entergy Mississippi
Financial transmission rightsPurchased power expense$9.5(b)Entergy Arkansas
Financial transmission rightsPurchased power expense$42.0(b)Entergy Louisiana
Financial transmission rightsPurchased power expense$3.1(b)Entergy Mississippi
Financial transmission rightsPurchased power expense$8.8(b)Entergy New Orleans
Financial transmission rightsPurchased power expense$2.3(b)Entergy Texas

The effects of derivative instruments not designated as hedging instruments on the Registrant Subsidiaries’ income statements for the six months ended June 30, 2026 and 2025 are as follows:

InstrumentIncome Statement LocationAmount of gain(loss) recordedin the income statementRegistrant
(In Millions)
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale$2.2(a)Entergy Mississippi
Financial transmission rightsPurchased power expense$17.4(b)Entergy Arkansas
Financial transmission rightsPurchased power expense$48.2(b)Entergy Louisiana
Financial transmission rightsPurchased power expense$11.9(b)Entergy Mississippi
Financial transmission rightsPurchased power expense$1.3(b)Entergy New Orleans
Financial transmission rightsPurchased power expense$7.8(b)Entergy Texas
Interest rate swapsInterest expense($8.6)(c)Entergy Texas
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale($1.2)(a)Entergy Mississippi
Financial transmission rightsPurchased power expense$28.2(b)Entergy Arkansas
Financial transmission rightsPurchased power expense$64.1(b)Entergy Louisiana
Financial transmission rightsPurchased power expense$5.1(b)Entergy Mississippi
Financial transmission rightsPurchased power expense$11.1(b)Entergy New Orleans
Financial transmission rightsPurchased power expense$5.8(b)Entergy Texas

(a)Due to regulatory treatment, the natural gas swaps are marked-to-market through fuel, fuel-related expenses, and gas purchased for resale and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as fuel expenses when the swaps are settled are recovered or refunded through fuel cost recovery mechanisms.

(b)Due to regulatory treatment, the changes in the estimated fair value of financial transmission rights for the Utility operating companies are recorded through purchased power expense and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as purchased power expense when the financial transmission rights for the Utility operating companies are settled are recovered or refunded through fuel cost recovery mechanisms.

(c)Due to regulatory treatment, the changes in the estimated fair value of the interest rate swaps for Entergy Texas are recorded through interest expense and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as interest expense when the interest rate swaps for Entergy Texas are settled are expected to be recovered in ratemaking relating to the Legend Power Station. See Note 8 to the financial statements in the Form 10-K for discussion of the build-to-suit lease arrangement for the Legend Power Station.

Fair Values

The estimated fair values of Entergy’s financial instruments and derivatives are determined using historical prices, bid prices, market quotes, and financial modeling. Considerable judgment is required in developing the estimates of fair value. Therefore, estimates are not necessarily indicative of the amounts that Entergy could realize in a current market exchange. Gains or losses realized on financial instruments are reflected in future rates and therefore do not affect net income. Entergy considers the carrying amounts of most financial instruments classified as current assets and liabilities to be a reasonable estimate of their fair value because of the short maturity of these instruments.

Accounting standards define fair value as an exit price, or the price that would be received to sell an asset or the amount that would be paid to transfer a liability in an orderly transaction between knowledgeable market participants at the date of measurement. Entergy and the Registrant Subsidiaries use assumptions or market input data that market participants would use in pricing assets or liabilities at fair value. The inputs can be readily observable, corroborated by market data, or generally unobservable. Entergy and the Registrant Subsidiaries endeavor to use the best available information to determine fair value.

Accounting standards establish a fair value hierarchy that prioritizes the inputs used to measure fair value. The hierarchy establishes the highest priority for unadjusted market quotes in an active market for the identical asset or liability and the lowest priority for unobservable inputs.

The three levels of the fair value hierarchy are:

Level 1 - Level 1 inputs are unadjusted quoted prices in active markets for identical assets or liabilities that the entity has the ability to access at the measurement date. Active markets are those in which transactions for the asset or liability occur in sufficient frequency and volume to provide pricing information on an ongoing basis. Level 1 primarily consists of individually owned common stocks, cash equivalents (temporary cash investments, securitization recovery trust account, and escrow accounts), debt instruments, and gas swaps traded on exchanges with active markets. Cash equivalents includes all unrestricted highly liquid debt instruments with an original or remaining maturity of three months or less at the date of purchase.

Level 2 - Level 2 inputs are inputs other than quoted prices included in Level 1 that are, either directly or indirectly, observable for the asset or liability at the measurement date. Assets are valued based on prices derived by independent third parties that use inputs such as benchmark yields, reported trades, broker/dealer quotes, and issuer spreads. Prices are reviewed and can be challenged with the independent parties and/or overridden by Entergy if it is believed such would be more reflective of fair value. Level 2 inputs include the following:

–quoted prices for similar assets or liabilities in active markets;

–quoted prices for identical assets or liabilities in inactive markets;

–inputs other than quoted prices that are observable for the asset or liability; or

–inputs that are derived principally from or corroborated by observable market data by correlation or other means.

Level 2 consists primarily of individually-owned debt instruments, gas swaps, and interest rate swaps valued using observable inputs.

Level 3 - Level 3 inputs are pricing inputs that are generally less observable or unobservable from objective sources. These inputs are used with internally developed methodologies to produce management’s best estimate of fair value for the asset or liability. Level 3 consists primarily of financial transmission rights.

The values of financial transmission rights are based on unobservable inputs, including estimates of congestion costs in MISO between applicable generation and load pricing nodes based on the 50th percentile of historical prices. They are classified as Level 3 assets and liabilities. The valuations of these assets and liabilities are performed by the Office of Corporate Risk Oversight. The values are calculated internally and verified against the data published by MISO. Entergy’s Accounting group reviews these valuations for reasonableness, with the assistance of others within the organization with knowledge of the various inputs and assumptions used in the valuation. The Office of Corporate Risk Oversight reports to the Vice President and Treasurer. The Accounting group reports to the Chief Accounting Officer.

The following tables set forth, by level within the fair value hierarchy, Entergy’s assets and liabilities that are accounted for at fair value on a recurring basis as of June 30, 2026 and December 31, 2025. The assessment of the significance of a particular input to a fair value measurement requires judgment and may affect placement within the fair value hierarchy levels.

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$3,736$—$—$3,736
Decommissioning trust funds (a):
Equity securities100——100
Debt securities1,0381,428—2,466
Common trusts (b)4,156
Securitization recovery trust account1——1
Storm reserve escrow accounts314——314
Financial transmission rights——6464
Interest rate swaps—9—9
$5,189$1,437$64$10,846
Liabilities:
Natural gas swaps$4$—$—$4
$4$—$—$4
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$1,883$—$—$1,883
Decommissioning trust funds (a):
Equity securities51——51
Debt securities9051,297—2,202
Common trusts (b)4,048
Securitization recovery trust account1——1
Storm reserve escrow accounts309——309
Financial transmission rights——2727
Interest rate swaps—1—1
$3,149$1,298$27$8,522
Liabilities:
Natural gas swaps$5$—$—$5
Interest rate swaps—3—3
$5$3$—$8

(a)The decommissioning trust funds hold equity and fixed income securities. Equity securities are invested to approximate the returns of major market indices. Fixed income securities are held in various governmental and corporate securities. See Note 9 to the financial statements herein for additional information on the investment portfolios.

(b)Common trust funds are not publicly quoted and are valued by the fund administrators using net asset value as a practical expedient. Accordingly, these funds are not assigned a level in the fair value table. The fund administrator of these investments allows daily trading at the net asset value and trades settle at a later date.

The following table sets forth a reconciliation of changes in the net assets for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the three months ended June 30, 2026 and 2025:

20262025
(In Millions)
Balance as of April 1,$11$7
Issuances of financial transmission rights8149
Gains included as a regulatory liability/asset1558
Settlements(43)(66)
Balance as of June 30,$64$48

The following table sets forth a reconciliation of changes in the net assets for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the six months ended June 30, 2026 and 2025:

20262025
(In Millions)
Balance as of January 1,$27$20
Issuances of financial transmission rights8149
Gains included as a regulatory liability/asset4393
Settlements(87)(114)
Balance as of June 30,$64$48

The fair values of the Level 3 financial transmission rights are based on unobservable inputs calculated internally and verified against historical pricing data published by MISO.

The following tables set forth, by level within the fair value hierarchy, the Registrant Subsidiaries’ assets and liabilities that are accounted for at fair value on a recurring basis as of June 30, 2026 and December 31, 2025. The assessment of the significance of a particular input to a fair value measurement requires judgment and may affect placement within the fair value hierarchy levels.

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$504.8$—$—$504.8
Decommissioning trust funds (a):
Equity securities42.4——42.4
Debt securities340.1353.1—693.2
Common trusts (b)1,197.8
Financial transmission rights——23.823.8
$887.3$353.1$23.8$2,462.0
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$268.5$—$—$268.5
Decommissioning trust funds (a):
Equity securities20.0——20.0
Debt securities251.9362.1—614.0
Common trusts (b)1,182.3
Financial transmission rights——5.55.5
$540.4$362.1$5.5$2,090.3
2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$1,567.7$—$—$1,567.7
Decommissioning trust funds (a):
Equity securities53.5——53.5
Debt securities418.0675.0—1,093.0
Common trusts (b)1,797.9
Storm reserve escrow account239.2——239.2
Financial transmission rights——32.132.1
$2,278.4$675.0$32.1$4,783.4
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$776.7$—$—$776.7
Decommissioning trust funds (a):
Equity securities22.8——22.8
Debt securities373.2619.4—992.6
Common trusts (b)1,738.4
Storm reserve escrow account235.0——235.0
Financial transmission rights——16.716.7
$1,407.7$619.4$16.7$3,782.2

Entergy Mississippi

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$829.8$—$—$829.8
Financial transmission rights——0.70.7
$829.8$—$0.7$830.5
Liabilities:
Natural gas swaps$4.1$—$—$4.1
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$341.5$—$—$341.5
Financial transmission rights——0.40.4
$341.5$—$0.4$341.9
Liabilities:
Natural gas swaps$5.3$—$—$5.3

Entergy New Orleans

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$63.3$—$—$63.3
Storm reserve escrow account75.1——75.1
Financial transmission rights——4.04.0
$138.4$—$4.0$142.4
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$110.2$—$—$110.2
Storm reserve escrow account73.8——73.8
Financial transmission rights——1.81.8
$184.0$—$1.8$185.8

Entergy Texas

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$535.1$—$—$535.1
Securitization recovery trust account1.3——$1.3
Financial transmission rights——3.13.1
Interest rate swaps—8.6—8.6
$536.4$8.6$3.1$548.1
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$274.9$—$—$274.9
Securitization recovery trust account1.5——1.5
Financial transmission rights——2.12.1
Interest rate swaps—0.5—0.5
$276.4$0.5$2.1$279.0
Liabilities:
Interest rate swaps$—$3.0$—$3.0

System Energy

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Decommissioning trust funds (a):
Equity securities$4.4$—$—$4.4
Debt securities279.8399.8—679.6
Common trusts (b)1,160.5
$284.2$399.8$—$1,844.5
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Decommissioning trust funds (a):
Equity securities$8.6$—$—$8.6
Debt securities280.5314.5—595.0
Common trusts (b)1,127.1
$289.1$314.5$—$1,730.7

(a)The decommissioning trust funds hold equity and fixed income securities. Equity securities are invested to approximate the returns of major market indices. Fixed income securities are held in various governmental and corporate securities. See Note 9 to the financial statements herein for additional information on the investment portfolios.

(b)Common trust funds are not publicly quoted and are valued by the fund administrators using net asset value as a practical expedient. Accordingly, these funds are not assigned a level in the fair value table. The fund administrator of these investments allows daily trading at the net asset value and trades settle at a later date.

The following table sets forth a reconciliation of changes in the net assets (liabilities) for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the three months ended June 30, 2026.

Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
(In Millions)
Balance as of April 1, 2026$2.4$7.1$0.1$0.8$0.9
Issuances of financial transmission rights26.341.71.56.25.0
Gains (losses) included as a regulatory liability/asset4.06.02.5(0.6)2.3
Settlements(8.9)(22.7)(3.4)(2.4)(5.1)
Balance as of June 30, 2026$23.8$32.1$0.7$4.0$3.1

The following table sets forth a reconciliation of changes in the net assets (liabilities) for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the three months ended June 30, 2025.

Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
(In Millions)
Balance as of April 1, 2025$3.0$3.4($0.1)$0.4$0.4
Issuances of financial transmission rights11.828.71.53.04.0
Gains included as a regulatory liability/asset5.838.23.18.41.8
Settlements(9.5)(42.0)(3.1)(8.8)(2.3)
Balance as of June 30, 2025$11.1$28.3$1.4$3.0$3.9

The following table sets forth a reconciliation of changes in the net assets for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the six months ended June 30, 2026.

Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
(In Millions)
Balance as of January 1, 2026$5.5$16.7$0.4$1.8$2.1
Issuances of financial transmission rights26.341.71.56.15.0
Gains (losses) included as a regulatory liability/asset9.421.910.7(2.6)3.8
Settlements(17.4)(48.2)(11.9)(1.3)(7.8)
Balance as of June 30, 2026$23.8$32.1$0.7$4.0$3.1

The following table sets forth a reconciliation of changes in the net assets (liabilities) for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the six months ended June 30, 2025.

Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
(In Millions)
Balance as of January 1, 2025$8.6$8.6($0.5)$1.3$1.9
Issuances of financial transmission rights11.828.71.52.94.0
Gains included as a regulatory liability/asset18.955.15.59.93.8
Settlements(28.2)(64.1)(5.1)(11.1)(5.8)
Balance as of June 30, 2025$11.1$28.3$1.4$3.0$3.9

NOTE 9. DECOMMISSIONING TRUST FUNDS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and System Energy)

The NRC requires certain of the Utility operating companies and System Energy to maintain nuclear decommissioning trusts to fund the costs of decommissioning ANO 1 and 2, River Bend, Waterford 3, and Grand Gulf. Entergy’s nuclear decommissioning trust funds invest in equity securities, fixed-rate debt securities, and cash and cash equivalents.

Entergy records decommissioning trust funds on the balance sheet at their fair value. Because of the ability of the Registrant Subsidiaries to recover decommissioning costs in rates and in accordance with the regulatory treatment for decommissioning trust funds, for unrealized gains/(losses) on investment securities, the Registrant Subsidiaries record an offsetting amount in other regulatory liabilities/assets. For the 30% interest in River Bend formerly owned by Cajun, Entergy Louisiana records an offsetting amount in other long-term liabilities on the consolidated balance sheets of Entergy and Entergy Louisiana for the unrealized trust earnings not currently expected to be needed to decommission the plant. Generally, Entergy records gains and losses on its debt and equity securities using the specific identification method to determine the cost basis of its securities.

The unrealized gains/(losses) recognized during the three and six months ended June 30, 2026 on equity securities still held as of June 30, 2026 were $532 million and $351 million, respectively. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The available-for-sale debt securities held as of June 30, 2026 and December 31, 2025 are summarized as follows:

20262025
(In Millions)
Fair value$2,466$2,202
Unrealized gains$13$28
Unrealized losses$56$45

As of June 30, 2026 and December 31, 2025, there wereno deferred taxes on unrealized gains/(losses). The amortized cost of available-for-sale debt securities was $2,508 million as of June 30, 2026 and $2,219 million as of December 31, 2025. As of June 30, 2026, available-for-sale debt securities had an average coupon rate of approximately 4.25%, an average duration of approximately 6.20 years, and an average maturity of approximately 10.78 years.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of June 30, 2026 and December 31, 2025:

20262025
FairValueGrossUnrealizedLossesFairValueGrossUnrealizedLosses
(In Millions)
Less than 12 months$1,122$17$361$3
More than 12 months4603954942
Total$1,582$56$910$45
20262025
(In Millions)
Less than 1 year$14$31
1 year - 5 years736649
5 years - 10 years757645
10 years - 15 years195188
15 years - 20 years326218
20 years+438471
Total$2,466$2,202

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three and six months ended June 30, 2026 and 2025:

Three Months EndedSix Months Ended
2026202520262025
(In Millions)
Proceeds from disposition of securities$209$227$368$489
Realized gains$1$1$2$2
Realized losses$6$4$8$8

During the three and six months ended June 30, 2026 and 2025, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

Entergy Arkansas holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts. The available-for-sale debt securities held as of June 30, 2026 and December 31, 2025 are summarized as follows:

20262025
(In Millions)
Fair value$693.2$614.0
Unrealized gains$2.7$7.5
Unrealized losses$20.1$14.2

The amortized cost of available-for-sale debt securities was $710.7 million as of June 30, 2026 and $620.7 million as of December 31, 2025. As of June 30, 2026, the available-for-sale debt securities had an average coupon rate of approximately 3.87%, an average duration of approximately 6.29 years, and an average maturity of approximately 8.58 years.

The unrealized gains/(losses) recognized during the three and six months ended June 30, 2026 on equity securities still held as of June 30, 2026 were $153.5 million and $101.8 million, respectively. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of June 30, 2026 and December 31, 2025:

20262025
FairValueGrossUnrealizedLossesFairValueGrossUnrealizedLosses
(In Millions)
Less than 12 months$310.6$5.1$89.1$0.6
More than 12 months183.815.0211.113.6
Total$494.4$20.1$300.2$14.2
20262025
(In Millions)
Less than 1 year$12.3$27.7
1 year - 5 years195.9140.2
5 years - 10 years288.2256.8
10 years - 15 years56.169.1
15 years - 20 years97.161.4
20 years+43.658.8
Total$693.2$614.0

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three and six months ended June 30, 2026 and 2025:

Three Months EndedSix Months Ended
2026202520262025
(In Millions)
Proceeds from disposition of securities$7.2$—$11.0$—
Realized gains$0.1$—$0.1$—

During the three and six months ended June 30, 2026 and 2025, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

Entergy Louisiana holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts. The available-for-sale debt securities held as of June 30, 2026 and December 31, 2025 are summarized as follows:

20262025
(In Millions)
Fair value$1,093.0$992.6
Unrealized gains$7.6$13.0
Unrealized losses$14.4$15.0

The amortized cost of available-for-sale debt securities was $1,100 million as of June 30, 2026 and $994.6 million as of December 31, 2025. As of June 30, 2026, the available-for-sale debt securities had an average coupon rate of approximately 4.46%, an average duration of approximately 6.07 years, and an average maturity of approximately 11.94 years.

The unrealized gains/(losses) recognized during the three and six months ended June 30, 2026 on equity securities still held as of June 30, 2026 were $229.5 million and $150.3 million, respectively. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of June 30, 2026 and December 31, 2025:

20262025
FairValueGrossUnrealizedLossesFairValueGrossUnrealizedLosses
(In Millions)
Less than 12 months$437.4$5.3$179.8$1.6
More than 12 months150.09.1196.613.4
Total$587.4$14.4$376.4$15.0
20262025
(In Millions)
Less than 1 year$5.3$0.9
1 year - 5 years277.1259.0
5 years - 10 years297.4227.7
10 years - 15 years98.093.6
15 years - 20 years154.4110.9
20 years+260.8300.5
Total$1,093.0$992.6

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three and six months ended June 30, 2026 and 2025:

Three Months EndedSix Months Ended
2026202520262025
(In Millions)
Proceeds from disposition of securities$113.9$71.5$189.6$181.5
Realized gains$0.2$0.1$0.6$0.2
Realized losses$4.6$2.4$6.1$4.0

During the three and six months ended June 30, 2026 and 2025, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

System Energy

System Energy holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts. The available-for-sale debt securities held as of June 30, 2026 and December 31, 2025 are summarized as follows:

20262025
(In Millions)
Fair value$679.6$595.0
Unrealized gains$3.0$7.4
Unrealized losses$21.2$16.2

The amortized cost of available-for-sale debt securities was $697.8 million as of June 30, 2026 and $603.7 million as of December 31, 2025. As of June 30, 2026, the available-for-sale debt securities had an average coupon rate of approximately 4.29%, an average duration of approximately 6.33 years, and an average maturity of approximately 11.20 years.

The unrealized gains/(losses) recognized during the three and six months ended June 30, 2026 on equity securities still held as of June 30, 2026 were $148.6 million and $98.4 million, respectively. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of June 30, 2026 and December 31, 2025:

20262025
FairValueGrossUnrealizedLossesFairValueGrossUnrealizedLosses
(In Millions)
Less than 12 months$374.8$6.1$91.9$1.1
More than 12 months126.015.1141.715.1
Total$500.8$21.2$233.6$16.2
20262025
(In Millions)
Less than 1 year$8.4$2.2
1 year - 5 years262.6249.8
5 years - 10 years171.4160.3
10 years - 15 years40.925.5
15 years - 20 years74.146.2
20 years+122.2111.0
Total$679.6$595.0

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three and six months ended June 30, 2026 and 2025:

Three Months EndedSix Months Ended
2026202520262025
(In Millions)
Proceeds from disposition of securities$87.7$155.3$166.7$307.6
Realized gains$0.3$0.8$0.6$1.3
Realized losses$1.4$1.4$2.1$4.0

During the three and six months ended June 30, 2026 and 2025, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

NOTE 10. INCOME TAXES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See “Income Tax Audits” and “Other Tax Matters” in Note 3 to the financial statements in the Form 10-K for a discussion of income tax audits, the Tax Cuts and Jobs Act, the Inflation Reduction Act of 2022, and other income tax matters involving Entergy. The following are updates to that discussion.

Other Tax Matters

Inflation Reduction Act of 2022

In April 2026 the LPSC issued an order approving an agreement between Entergy Louisiana and the LPSC staff regarding the monetization of the 2025 nuclear production tax credits. The order allows Entergy Louisiana to retain the net proceeds of the monetized credits while the associated tax position remains uncertain. While retaining these proceeds, Entergy Louisiana will accrue carrying charges to its customers at its weighted average cost of capital. The order further provides that customers will be responsible for any associated costs should the IRS reduce some or all of the value of the nuclear production tax credits transferred to third parties. Once the IRS makes a final determination affirming the value of the credits or the audit period expires without a disallowance, Entergy Louisiana will commence flowing the net proceeds of the nuclear production tax credits, including carrying charges, to its customers. This treatment is consistent with the approach previously approved for the 2024 nuclear production tax credits, as discussed in Note 3 to the financial statements in the Form 10-K.

In June 2026, as part of Entergy Mississippi’s 2026 formula rate plan filing, the MPSC issued an order approving the joint stipulation between the Mississippi Public Utilities Staff and Entergy Mississippi that included, among other items, the mechanism for treatment of the monetization of past and future nuclear production tax credits. The order allows Entergy Mississippi to retain the net proceeds of the monetized credits while the associated tax position remains uncertain. While retaining these proceeds, Entergy Mississippi will accrue carrying charges at its average cost of debt, as determined by Entergy Mississippi’s debt rate in its current formula rate plan. The order further provides that Entergy Mississippi will be responsible for any associated costs should the IRS reduce some or all of the value of the nuclear production tax credits transferred to third parties. Once the IRS makes a final determination affirming the value of the credits or the audit period expires without a disallowance, Entergy Mississippi will commence flowing the net proceeds of the nuclear production tax credits, including carrying charges, to its customers in accordance with the return period to be determined by the MPSC. Carrying charges at Entergy Mississippi’s average cost of debt will only apply to the value of the credits that are allowed by the IRS. See Note 2 to the financial statements herein for discussion of Entergy Mississippi’s 2026 formula rate plan filing.

In second quarter 2026, Entergy Arkansas, Entergy Louisiana, and System Energy entered into agreements with third-party purchasers to transfer in the third and fourth quarters of 2026 certain nuclear and solar production tax credits for cash, including a reasonable discount, prior to the filing of Entergy’s 2025 federal income tax return. The monetized value of these credits, net of applicable expenses, is expected to be addressed in retail rates in accordance with applicable regulatory mechanisms.

Arkansas Corporate Income Tax Rate Change

In May 2026 the State of Arkansas enacted a corporate income tax rate reduction from 4.3% to 4.1%, effective January 1, 2027. As a result of the rate reduction, Entergy Arkansas recorded a regulatory liability for income taxes of approximately $16 million. The regulatory liability includes both the direct tax benefit and the associated tax gross-up required under the retail and wholesale ratemaking formulas.

Amortization of Tax Gross-up on Customer Advances

Amortization of tax gross-up on customer advances, including customer advances for construction, were $40.4 million for Entergy, $2.8 million for Entergy Arkansas, $27.9 million for Entergy Louisiana, $9.5 million for Entergy Mississippi, and $0.2 million for Entergy Texas for the three months ended June 30, 2026 and $9.1 million for Entergy, $0.2 million for Entergy Arkansas, $6.9 million for Entergy Louisiana, $1.6 million for Entergy Mississippi, and $0.4 million for Entergy Texas for the three months ended June 30, 2025. Amortization of tax gross-up on customer advances, including customer advances for construction, were $63.2 million for Entergy, $4.2 million for Entergy Arkansas, $42.5 million for Entergy Louisiana, $15.8 million for Entergy Mississippi, and $0.7 million for Entergy Texas for the six months ended June 30, 2026 and $24.6 million for Entergy, $1.3 million for Entergy Arkansas, $13.5 million for Entergy Louisiana, $7.6 million for Entergy Mississippi, and $2.2 million for Entergy Texas for the six months ended June 30, 2025. Amortization of tax gross-up on customer advances is included in miscellaneous – net in other income on the income statement.

NOTE 11. VARIABLE INTEREST ENTITIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See Note 17 to the financial statements in the Form 10-K for a discussion of variable interest entities (VIEs). See Note 4 to the financial statements herein for details of the nuclear fuel companies’ credit facilities, commercial paper borrowings, and long-term debt. See Note 6 to the financial statements in the Form 10-K for discussion of noncontrolling interests.

Restoration Law Trust I (the storm trust I), a trust consolidated by Entergy Louisiana, is a VIE and Entergy Louisiana is the primary beneficiary. As of June 30, 2026 and December 31, 2025, the primary asset held by the storm trust I was $2.6 billion and $2.7 billion, respectively, of outstanding Entergy Finance Company preferred membership interests, which is reflected as an investment in affiliate preferred membership interests on the consolidated balance sheets of Entergy Louisiana. The LURC’s 1% beneficial interest in the storm trust I is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Louisiana, with balances of $27.1 million as of June 30, 2026 and $27.1 million as of December 31, 2025.

Restoration Law Trust II (the storm trust II), a trust consolidated by Entergy Louisiana, is a VIE and Entergy Louisiana is the primary beneficiary. As of June 30, 2026 and December 31, 2025, the primary asset held by the storm trust II was $1.3 billion and $1.3 billion, respectively, of outstanding Entergy Finance Company preferred membership interests, which is reflected as an investment in affiliate preferred membership interests on the consolidated balance sheets of Entergy Louisiana. The LURC’s 1% beneficial interest in the storm trust II is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Louisiana, with balances of $13.3 million as of June 30, 2026 and $13.1 million as of December 31, 2025.

System Energy is considered to hold a variable interest in the lessor from which it leases an undivided interest in the Grand Gulf nuclear plant. System Energy is the lessee under this arrangement, which is described in more detail in Note 5 to the financial statements in the Form 10-K. System Energy made payments under this arrangement, including interest, of $8.6 million in each of the six months ended June 30, 2026 and the six months ended June 30, 2025.

AR Searcy Partnership, LLC is a tax equity partnership that qualifies as a VIE, which Entergy Arkansas is required to consolidate as it is the primary beneficiary. As of June 30, 2026, AR Searcy Partnership, LLC recorded assets equal to $123.4 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Arkansas’s ownership interest in the partnership was approximately $111.9 million. As of December 31, 2025, AR Searcy Partnership, LLC recorded assets equal to $124.4 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Arkansas’s ownership interest in the partnership was approximately $113.1 million. The tax equity investor’s ownership interest is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Arkansas.

MS Sunflower Partnership, LLC is a tax equity partnership that qualifies as a VIE, which Entergy Mississippi is required to consolidate as it is the primary beneficiary. As of June 30, 2026, MS Sunflower Partnership, LLC recorded assets equal to $149.8 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Mississippi’s ownership interest in the partnership was approximately $134.0 million. As of December 31, 2025, MS Sunflower Partnership, LLC recorded assets equal to $154.5 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Mississippi’s ownership interest in the partnership was approximately $134.9 million. The tax equity investor’s ownership interest is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Mississippi.

NOTE 12. REVENUE (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See Note 19 to the financial statements in the Form 10-K for a discussion of revenue recognition. Entergy’s total revenues for the three months ended June 30, 2026 and 2025 were as follows:

20262025
(In Thousands)
Utility:
Residential$1,154,074$1,091,035
Commercial822,850771,097
Industrial1,068,589945,901
Governmental73,82270,623
Total billed retail3,119,3352,878,656
Sales for resale (a)96,041146,457
Other electric revenues (b)289,968246,674
Revenues from contracts with customers3,505,3443,271,787
Other Utility revenues (c)8,1443,158
Electric revenues3,513,4883,274,945
Natural gas revenues—40,778
Other revenues (d)10,15013,126
Total operating revenues$3,523,638$3,328,849

Entergy’s total revenues for the six months ended June 30, 2026 and 2025 were as follows:

20262025
(In Thousands)
Utility:
Residential$2,303,510$2,204,340
Commercial1,570,9691,455,104
Industrial2,003,0341,720,020
Governmental141,482133,441
Total billed retail6,018,9955,512,905
Sales for resale (a)238,124198,330
Other electric revenues (b)408,966322,892
Revenues from contracts with customers6,666,0856,034,127
Other Utility revenues (c)17,676(1,316)
Electric revenues6,683,7616,032,811
Natural gas revenues—112,509
Other revenues (d)27,50330,403
Total operating revenues$6,711,264$6,175,723

The Utility operating companies’ total revenues for the three months ended June 30, 2026 and 2025 were as follows:

2026EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNewOrleansEntergyTexas
(In Thousands)
Residential$226,609$426,035$196,834$71,647$232,949
Commercial150,110321,904168,04156,309126,486
Industrial193,328627,31680,9976,837160,111
Governmental4,83224,28716,82219,5148,367
Total billed retail574,8791,399,542462,694154,307527,913
Sales for resale (a)40,25595,71634,44222,5745,153
Other electric revenues (b)76,621107,50558,34912,15936,676
Revenues from contracts with customers691,7551,602,763555,485189,040569,742
Other revenues (c)1,7313,5922,3971,508(1,085)
Electric revenues693,4861,606,355557,882190,548568,657
Natural gas revenues—————
Total operating revenues$693,486$1,606,355$557,882$190,548$568,657
2025EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNewOrleansEntergyTexas
(In Thousands)
Residential$212,265$408,293$172,575$73,279$224,623
Commercial141,468306,916147,05258,133117,528
Industrial174,555570,30353,6297,800139,614
Governmental4,91123,62214,54420,6566,890
Total billed retail533,1991,309,134387,800159,868488,655
Sales for resale (a)84,533109,24361,71310,0275,195
Other electric revenues (b)78,80875,87141,73913,77937,761
Revenues from contracts with customers696,5401,494,248491,252183,674531,611
Other revenues (c)1,1471,25662310730
Electric revenues697,6871,495,504491,875183,781531,641
Natural gas revenues—14,559—26,219—
Total operating revenues$697,687$1,510,063$491,875$210,000$531,641

The Utility operating companies’ total revenues for the six months ended June 30, 2026 and 2025 were as follows:

2026EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNewOrleansEntergyTexas
(In Thousands)
Residential$497,995$818,039$403,439$138,640$445,397
Commercial290,308606,452322,165107,248244,796
Industrial367,0881,162,030151,56812,956309,392
Governmental9,49145,88732,32537,18916,590
Total billed retail1,164,8822,632,408909,497296,0331,016,175
Sales for resale (a)77,560207,19192,42853,0979,309
Other electric revenues (b)93,147183,78276,5759,98148,166
Revenues from contracts with customers1,335,5893,023,3811,078,500359,1111,073,650
Other revenues (c)4,1947,0594,7663,088(1,461)
Electric revenues1,339,7833,030,4401,083,266362,1991,072,189
Natural gas revenues—————
Total operating revenues$1,339,783$3,030,440$1,083,266$362,199$1,072,189
2025EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNewOrleansEntergyTexas
(In Thousands)
Residential$486,871$786,531$358,883$138,969$433,086
Commercial273,085570,116282,925105,755223,223
Industrial323,6201,036,010100,97413,454245,962
Governmental9,13045,29028,23437,18513,602
Total billed retail1,092,7062,437,947771,016295,363915,873
Sales for resale (a)121,262220,79189,81013,9177,590
Other electric revenues (b)94,884113,86153,53813,21450,057
Revenues from contracts with customers1,308,8522,772,599914,364322,494973,520
Other revenues (c)2,346(5,149)1,22021260
Electric revenues1,311,1982,767,450915,584322,706973,580
Natural gas revenues—44,160—68,349—
Total operating revenues$1,311,198$2,811,610$915,584$391,055$973,580

(a)Sales for resale includes day-ahead sales of energy in a market administered by an ISO. These sales represent financially binding commitments for the sale of physical energy the next day. These sales are adjusted to actual power generated and delivered in the real time market. Given the short duration of these transactions, Entergy does not consider them to be derivatives subject to fair value adjustments and includes them as part of customer revenues.

(b)Other electric revenues consist primarily of the return on construction work in progress for certain utility plant investments, transmission and ancillary services provided to participants of an ISO-administered market, and unbilled revenue.

(c)Other Utility revenues include occasional sales of inventory, alternative revenue programs, provisions for revenue subject to refund, late fees, and amounts resulting from other operating activities.

(d)Other revenues include the sale of electric power and capacity to wholesale customers, day-ahead sales of energy in a market administered by an ISO, and operation and management services fees.

Electric Revenues

See Note 19 to the financial statements in the Form 10-K for a discussion of electric revenues. The following is an update to that discussion.

Most of Entergy’s contracts are on demand, with customer bills that vary each month based on an approved tariff and usage. Certain retail customers, primarily large industrial customers from various industries, have electric service agreements that include a fixed amount of consideration to be paid through the end of a contract term longer than one year. As of June 30, 2026, the amount of revenues related to this fixed consideration that Entergy expects to recognize over the remaining contract terms, extending through 2048, was $8,563 million for Entergy, including $4,740 million for Entergy Arkansas, $788 million for Entergy Louisiana, $2,570 million for Entergy Mississippi, and $465 million for Entergy Texas. These contracts also require variable payments based on the actual amount of energy service, which are recognized as revenue as Entergy has the right to bill the customer for services performed.

In the opinion of the management of Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy, the accompanying unaudited financial statements contain all adjustments (consisting primarily of normal recurring accruals and reclassification of previously reported amounts to conform to current classifications) necessary for a fair statement of the results for the interim periods presented. Entergy’s business is subject to seasonal fluctuations, however, with peak periods occurring typically during the first and third quarters. The results for the interim periods presented should not be used as a basis for estimating results of operations for a full year.

Part I, Item 3. Quantitative and Qualitative Disclosures About Market Risk

See the “Market and Credit Risk Sensitive Instruments” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis.

Part I, Item 4. Controls and Procedures

Disclosure Controls and Procedures

As of June 30, 2026, evaluations were performed under the supervision and with the participation of Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy (each individually a “Registrant” and collectively the “Registrants”) management, including their respective Principal Executive Officers (PEO) and Principal Financial Officers (PFO). The evaluations assessed the effectiveness of the Registrants’ disclosure controls and procedures. Based on the evaluations, each PEO and PFO has concluded that, as to the Registrant or Registrants for which they serve as PEO or PFO, the Registrant’s or Registrants’ disclosure controls and procedures are effective to ensure that information required to be disclosed by each Registrant in reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized, and reported within the time periods specified in Securities and Exchange Commission rules and forms; and that the Registrant’s or Registrants’ disclosure controls and procedures are also effective in reasonably assuring that such information is accumulated and communicated to the Registrant’s or Registrants’ management, including their respective PEOs and PFOs, as appropriate to allow timely decisions regarding required disclosure.

Changes in Internal Control over Financial Reporting

Under the supervision and with the participation of each Registrant’s management, including its respective PEO and PFO, each Registrant evaluated changes in internal control over financial reporting that occurred during the quarter ended June 30, 2026 and found no change that has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.

ENTERGY ARKANSAS, LLC AND SUBSIDIARIES

See the “Winter Storm Fern” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis for a discussion of Winter Storm Fern. Entergy Arkansas’s cost of mobilizing crews and restoring power was approximately $50 million, including approximately $40 million in capital costs and approximately $10 million in non-capital costs. Natural gas purchases for Entergy Arkansas were $74 million in January 2026 compared to $25 million in January 2025.

Net income decreased $13.8 million primarily due to higher other operation and maintenance expenses, higher interest expense, higher depreciation and amortization expenses, and higher taxes other than income taxes, partially offset by higher retail electric price.

Net income decreased $17.6 million primarily due to higher interest expense, higher other operation and maintenance expenses, higher depreciation and amortization expenses, higher taxes other than income taxes, and lower volume/weather, partially offset by higher retail electric price and higher other income.

Amount
(In Millions)
2025 operating revenues$697.7
Fuel, rider, and other revenues that do not significantly affect net income(37.1)
Volume/weather0.7
Retail electric price32.2
2026 operating revenues$693.5

Entergy Arkansas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The volume/weather variance is insignificant and primarily due to anincrease in industrial usage, substantially offset bythe effect of less favorable weather on residential sales. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the primary metals industry.

The retail electric price variance is primarily due to an increase in formula rate plan rates effective January 2026 and the implementation of the Generating Arkansas Jobs Act rider effective June 2026. See Note 2 to the financial statements in the Form 10-K for discussion of the 2025 formula rate plan filing. See Note 2 to the financial statements herein for discussion of the Generating Arkansas Jobs Act rider filing.

Total electric energy sales for Entergy Arkansas for the three months ended June 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential1,6721,674—
Commercial1,3961,393—
Industrial3,3153,0648
Governmental4349(12)
Total retail6,4266,1804
Sales for resale:
Associated companies187559(67)
Non-associated companies8681,893(54)
Total7,4818,632(13)

See Note 12 to the financial statements herein for additional discussion of Entergy Arkansas’s operating revenues.

Amount
(In Millions)
2025 operating revenues$1,311.2
Fuel, rider, and other revenues that do not significantly affect net income(15.3)
Retail electric price54.7
Volume/weather(10.8)
2026 operating revenues$1,339.8

Entergy Arkansas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to an increase in formula rate plan rates effective January 2026. See Note 2 to the financial statements in the Form 10-K for discussion of the 2025 formula rate plan filing.

The volume/weather variance is primarily due to the effect of less favorable weather on residential sales and a decrease in weather-adjusted residential usage, partially offset by an increase in industrial usage. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the primary metals industry.

Total electric energy sales for Entergy Arkansas for the six months ended June 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential3,6373,885(6)
Commercial2,6352,653(1)
Industrial6,3765,60614
Governmental8488(5)
Total retail12,73212,2324
Sales for resale:
Associated companies4241,096(61)
Non-associated companies1,4842,456(40)
Total14,64015,784(7)

See Note 12 to the financial statements herein for additional discussion of Entergy Arkansas’s operating revenues.

an increase of $10.5 million in power delivery expenses primarily due to higher vegetation maintenance costs;

an increase of $3.1 million in compensation and benefits costs primarily due tohigher healthcare claims activity and the timing of the recognition of prescription drug rebates; and

Depreciation and amortization expenses increased primarily due to additions to plant in service and an increase in FERC jurisdictional depreciation rates effective January 2026.

Other regulatory charges (credits) - net includes a regulatory charge of $8.8 million, recorded in second quarter 2026, to reflect the amount of the 2025 historical year netting adjustment to be returned to Entergy Arkansas’s customers during the 2027 rate effective period as included in the 2026 formula rate plan filing. See Note 2 to the financial statements herein for discussion of the 2026 formula rate plan filing. In addition, Entergy Arkansas records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Interest expense increased primarily due to the issuances of $500 million of 5.75% Series mortgage bonds and $500 million of 4.95% Series mortgage bonds, each in January 2026, and $4.1 million in carrying costs in second quarter 2026 on retained net proceeds from the monetization of nuclear production tax credits. The increase was partially offset by the repayment of $600 million of 3.5% Series mortgage bonds in February 2026.

an increase of $17.5 million in power delivery expenses primarily due to higher vegetation maintenance costs;

an increase of $6.7 million in compensation and benefits costs primarily due to higher healthcare claims activity, the timing of the recognition of prescription drug rebates, and a revision to estimated incentive-based compensation expense in 2025; and

The increase was partially offset by a decrease of $8.0 million in energy efficiency expenses primarily due to the timing of recovery from customers anda decrease of $5.6 million in insurance expense primarily due to higher nuclear insurance refunds.

Depreciation and amortization expenses increased primarily due to additions to plant in service and an increase in FERC jurisdictional depreciation rates effective January 2026.

Other regulatory charges (credits) - net includes a regulatory charge of $8.8 million, recorded in second quarter 2026, to reflect the amount of the 2025 historical year netting adjustment to be returned to Entergy Arkansas’s customers during the 2027 rate effective period as included in the 2026 formula rate plan filing. See Note 2 to the financial statements herein for discussion of the 2026 formula rate plan filing. In addition, Entergy Arkansas records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income increased primarily due to changes in decommissioning trust fund activity, including portfolio rebalancing of decommissioning trust funds in first quarter 2026.

the issuances of $500 million of 5.75% Series mortgage bonds and $500 million of 4.95% Series mortgage bonds, each in January 2026;

the issuance of $300 million of 5.45% Series mortgage bonds in May 2025; and

$8.0 million in carrying costs in 2026 on retained net proceeds from the monetization of nuclear production tax credits.

The increase was partially offset by the repayment of $600 million of 3.5% Series mortgage bonds in February 2026.

The effective income tax rates were 17.6% for the second quarter 2026 and 17.6% for the six months ended June 30, 2026. The differences in the effective income tax rates for the second quarter 2026 and the six months ended June 30, 2026 versus the federal statutory rate of 21% were primarily due to the amortization of excess accumulated deferred income taxes, certain book and tax differences related to utility plant items, and book and tax differences related to the allowance for equity funds used during construction, partially offset by the accrual for state income taxes.

The effective income tax rates were 20.6% for the second quarter 2025 and 20.8% for the six months ended June 30, 2025. The differences in the effective income tax rates for the second quarter 2025 and the six months ended June 30, 2025 versus the federal statutory rate of 21% were primarily due to the amortization of excess accumulated deferred income taxes as a result of tax rate changes and certain book and tax differences related to utility plant items, partially offset by the accrual for state income taxes.

20262025
(In Thousands)
Cash and cash equivalents at beginning of period$275,570$4,747
Net cash provided by (used in):
Operating activities413,957437,887
Investing activities(919,085)(493,179)
Financing activities738,274277,533
Net increase in cash and cash equivalents233,146222,241
Cash and cash equivalents at end of period$508,716$226,988

Net cash flow provided by operating activities decreased $23.9 million for the six months ended June 30, 2026 compared to the six months ended June 30, 2025 primarily due to higher fuel and purchased power payments and an increase of $30.3 million in spending on nuclear refueling outage costs in 2026 as compared to 2025, partially offset by higher collections from customers and the receipt of $81 million in advance payments related to customer agreements in 2026, including $66.8 million in customer advances and $14.2 million in tax gross-up on customer advances for construction. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery.

Net cash flow used in investing activities increased $425.9 million for the six months ended June 30, 2026 compared to the six months ended June 30, 2025 primarily due to:

an increase of $384.9 million in non-nuclear generation construction expenditures primarily due to higher spending on the Jefferson Power Station project, the Cypress Solar project, and the Ironwood Power Station project;

an increase of $72 million in nuclear construction expenditures primarily due to increased spending on various nuclear projects in 2026;

an increase of $28.1 million in net purchases as a result of fluctuations in nuclear fuel activity due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle; and

an increase of $21.3 million in distribution construction expenditures primarily due to a higher scope of work performed in 2026 as compared to 2025.

a decrease of $37 million in cash collateral posted to support Entergy Arkansas’s obligations to MISO in 2026;

money pool activity; and

a decrease of $23.3 million in capital expenditures related to storm restoration due to a lower scope of work in 2026 as compared to 2025.

Increases in Entergy Arkansas’s receivable from the money pool are a use of cash flow, and Entergy Arkansas’s receivable from the money pool increased $17.4 million for the six months ended June 30, 2026 compared to increasing by $49 million for the six months ended June 30, 2025. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Net cash flow provided by financing activities increased $460.7 million for the six months ended June 30, 2026 compared to the six months ended June 30, 2025 primarily due to:

the issuances of $500 million of 5.75% Series mortgage bonds and $500 million of 4.95% Series mortgage bonds, each in January 2026;

capital contributions of $200 million received from Entergy Corporation in 2026 in order to maintain Entergy Arkansas’s capital structure;

an increase of $143.1 million in net customer advances for construction related to transmission, distribution, and generator interconnection agreements;

net long-term borrowings of $27 million in 2026 compared to net repayments of $10.7 million in 2025 on the nuclear fuel company variable interest entity’s credit facility; and

money pool activity.

The increase was partially offset by the repayment of $600 million of 3.5% Series mortgage bonds in February 2026 and the issuance of $300 million of 5.45% Series mortgage bonds in May 2025.

Decreases in Entergy Arkansas’s payable to the money pool are a use of cash flow, and Entergy Arkansas’s payable to the money pool decreased $15.2 million for the six months ended June 30, 2025.

Entergy Arkansas’s debt to capital ratio is shown in the following table.

June 30, 2026December 31, 2025
Debt to capital53.7%53.7%
Effect of subtracting cash(2.3%)(1.3%)
Net debt to net capital (non-GAAP)51.4%52.4%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy Arkansas uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy Arkansas also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas’s financial condition because net debt indicates Entergy Arkansas’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Arkansas’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Following are updates to the current annual amounts of Entergy Arkansas’s planned construction and other capital investments through 2030.

20262027202820292030
(In Millions)
Planned construction and capital investments:
Generation$1,510$1,865$1,235$580$435
Transmission8013517520545
Distribution300310370510365
Utility Support6065705565
Total$1,950$2,375$1,850$1,350$910

In addition to routine capital spending to maintain operations, the capital plan for Entergy Arkansas includes investments in generation projects to modernize, decarbonize, expand, and diversify Entergy Arkansas’s portfolio, as well as to support customer growth, including Ironwood Power Station (formerly Lake Catherine Unit 5), Jefferson Power Station, and Arkansas Cypress Solar; investments in ANO 1 and 2; distribution and Utility support spending to improve reliability and customer experience; transmission spending to improve reliability while also supporting customer growth and renewables expansion; and other investments. The planned construction and capital investments amounts above exclude investments expected to be funded with customer advances for construction.

Entergy Arkansas’s receivables from or (payables to) the money pool were as follows:

June 30, 2026December 31, 2025June 30, 2025December 31, 2024
(In Thousands)
$39,135$21,715$49,019($15,190)

Entergy Arkansas has a credit facility in the amount of $300 million scheduled to expire in June 2031. Entergy Arkansas also has a $25 million credit facility scheduled to expire in April 2028. The $300 million credit facility includes fronting commitments for the issuance of letters of credit against $5 million of the borrowing capacity of the facility. As of June 30, 2026, there were no cash borrowings under either credit facility and no letters of credit outstanding under the $300 million credit facility. In addition, Entergy Arkansas is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO. As of June 30, 2026, $177.8 million in letters of credit were outstanding under Entergy Arkansas’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

The Entergy Arkansas nuclear fuel company variable interest entity has a credit facility in the amount of $80 million scheduled to expire in June 2029. As of June 30, 2026, there were $40.7 million in loans outstanding under the credit facility for the Entergy Arkansas nuclear fuel company variable interest entity. See Note 4 to the financial statements herein for discussion of the nuclear fuel company variable interest entity credit facility.

Jefferson Power Station

As discussed in the Form 10-K, in August 2025, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of Jefferson Power Station, an approximately 754 MW natural gas-fired combined cycle combustion turbine facility to be located in Jefferson County, Arkansas. The estimated cost of the project is $1,602 million. In January 2026 the APSC issued its order finding that Entergy Arkansas had demonstrated a need for the resource but had not met its burden with respect to supporting the prudence of the costs to construct the resource. The APSC acknowledged that the costs would be greater if Entergy Arkansas waited to pursue the resource. The APSC authorized Entergy Arkansas to proceed with Jefferson Power Station as a strategic investment with estimated costs set at a benchmark, which the APSC erroneously believed reflected the current cost estimate but was, in fact, $90 million below the cost presented. In its January 2026 order, the APSC also approved Entergy Arkansas’s recovery of the costs of constructing Jefferson Power Station through the Generating Arkansas Jobs Act rider. Additionally, in its January 2026 order, the APSC found that Entergy Arkansas should conduct all-source competitive solicitations for future generation additions, with limited exceptions where Entergy Arkansas believes that a specific solicitation should be restricted to a certain resource and provides a detailed explanation to the APSC supporting this belief, which the APSC later determined in its March 2026 order is a narrow exception. In February 2026, Entergy Arkansas filed for rehearing seeking to correct the benchmark. In March 2026 the APSC issued an order denying Entergy Arkansas’s petition and maintained the benchmark, although costs over the benchmark were not found to be disallowed. Also in its March 2026 order, the APSC ordered Entergy Arkansas to submit a draft of an all-source request for proposals within thirty days of the order, which Entergy Arkansas filed in April 2026. Also in March 2026, Entergy Arkansas filed with the APSC its proposal for an independent monitor to oversee the reasonableness of its construction costs, as required by the APSC order. In April 2026 the APSC issued an order consolidating Entergy Arkansas’s cost independent monitor proposals for three pending resources, including Jefferson Power Station, into a single docket and directing parties with full intervention status to respond to the proposals and recommend independent monitor candidates. No alternative recommendations were made by the other parties. Also as part of the APSC’s January 2026 order, Entergy Arkansas is required to file quarterly status reports on its evaluation of the White Bluff coal to gas conversion. Entergy Arkansas filed its second status report in July 2026, setting forth that it expects to provide the APSC a total cost estimate and project timeline for the White Bluff 1 conversion within the next 60 days as part of an application and/or a supplemental update. The facility is expected to be in service by the end of 2029.

Special Rate Contract and Arkansas Cypress Solar

As discussed in the Form 10-K, in September 2025, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of the Arkansas Cypress Solar facility, a planned 600 MW solar photovoltaic array with a 350 MW battery energy storage system and associated transmission facilities interconnecting at Entergy Arkansas’s White Bluff substation. The estimated cost of the project is $1,602 million. In March 2026 the APSC approved the Arkansas Cypress Solar facility and Entergy Arkansas’s recovery of the costs of the facility through the Generating Arkansas Jobs Act rider. The APSC also ordered implementation of an independent monitor to oversee costs. In April 2026, Entergy Arkansas filed with the APSC its proposal for an independent monitor to oversee the reasonableness of costs. In April 2026 the APSC issued an order consolidating Entergy Arkansas’s cost independent monitor proposals for three pending resources, including the Arkansas Cypress Solar facility, into a single docket and directing parties with full intervention status to respond to the proposals and recommend independent monitor candidates. No alternative recommendations were made by the other parties. The facility is expected to be in service by the end of 2028.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation and Fuel-Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

2026 Base Rate Case

In February 2026, Entergy Arkansas filed with the APSC a general change in rates, charges, and tariffs. The filing requested a base rate increase to recover a base rate revenue deficiency of $44.6 million and notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015. The primary drivers of the revenue deficiency were increased depreciation expense and the impact of net capital additions. Additionally, the filing requested a 9.90% return on common equity and increased depreciation rates as the result of a depreciation study. In March 2026 the APSC issued an order suspending the proposed rates and tariffs filed by Entergy Arkansas. In June 2026 the APSC established a procedural schedule with an evidentiary hearing scheduled to begin in November 2026, and in July 2026 a number of intervenors moved to modify the schedule to conduct additional discovery. Entergy Arkansas opposed the motion in part based on the voluminous discovery conducted to date.

In July 2026, Entergy Arkansas filed with the APSC its 2026 formula rate plan filing to set its formula rate for the 2027 calendar year. The filing contained an evaluation of Entergy Arkansas’s earnings and a netting adjustment for the 2025 historical year. The filing showed that Entergy Arkansas’s earned rate of return on common equity for the 2025 historical year was 8.8%, resulting in a $47.2 million formula rate plan revenue increase to produce a 9.65% earned rate of return on common equity. When combined with 2025 historical year formula rate plan revenues of $56.0 million, the total proposed revenue change for the 2025 historical year netting adjustment is a reduction of $8.8 million. By operation of the formula rate plan, Entergy Arkansas’s recovery of the revenue requirement is subject to a four percent annual revenue constraint. Entergy Arkansas’s revenue requirement in this filing did not exceed the constraint. In second quarter 2026, Entergy Arkansas recorded a regulatory liability of $8.8 million to reflect the amount of the 2025 historical year netting adjustment that it collected from customers during the 2025 rate effective period.

Generating Arkansas Jobs Act Rider

In March 2026, Entergy Arkansas filed its first annual update to the strategic investment recovery rider, requesting recovery of $110.4 million of financing costs during construction of generation and transmission strategic investments related to Ironwood Power Station, Jefferson Power Station, and the Arkansas Cypress Solar facility. The revised rates were requested to be effective with the first billing cycle of June 2026. In April 2026 the APSC general staff filed testimony arguing that the APSC had not issued an order designating Ironwood Power Station as a strategic investment and that related costs should therefore be removed from the annual update. Also in April 2026, Entergy Arkansas filed testimony asserting that the APSC general staff’s position is contrary to the plain language of the statute, which includes an exception for facilities like Ironwood Power Station that were certified by the APSC within a certain timeframe. A hearing was held in April 2026. In June 2026 the APSC approved Entergy Arkansas’s annual update, and rates became effective June 4, 2026.

Production Tax Credit Tariffs

As discussed in Note 3 to the financial statements in the Form 10-K, in January 2026 the APSC opened a docket to investigate the sale of Entergy Arkansas’s nuclear production tax credits and the appropriate ratemaking treatment of production tax credits for all of Entergy Arkansas’s eligible resources, including how the proceeds of any sales should flow through to customers. For nuclear production tax credits, Entergy Arkansas proposed a nuclear production tax credit rider, which would provide for the immediate flow through to customers of the weighted average cost of capital return on the net proceeds of the monetized nuclear production tax credits. Recognizing that the timing and determination from the IRS is uncertain, the nuclear production tax credit rider also proposes that, if there is an unfavorable IRS determination, Entergy Arkansas would collect applicable costs from customers. As directed by the APSC, in February 2026, Entergy Arkansas submitted a compliance filing to the APSC verifying the status of the solar production tax credits. The filing also verified that the net proceeds from the sale of the nuclear production tax credits were recorded in FERC accounts that are accruing a return for customers’ benefit at a rate that is above the customer deposit rate. Subsequently, in March 2026, Entergy Arkansas filed testimony setting forth its proposal for the solar production tax credits. Specifically, Entergy Arkansas requested the same ratemaking treatment for all of the solar facilities that the APSC already approved for Walnut Bend (i.e., the total net monetized proceeds from production tax credits expected to be generated over the first ten years of a solar facility’s operation are estimated and then amortized over the expected useful life of the asset, which is typically 30 years). Additionally, consistent with prior orders for these resources, the regulatory liabilities associated with the net cash proceeds from monetized solar production tax credits will be included in Entergy Arkansas’s calculation of its weighted average cost of capital providing a return on the unamortized balance for the benefit of customers. Further, Entergy Arkansas proposes to flow the benefits of the solar production tax credits to customers through Entergy Arkansas’s formula rate plan, effective with the formula rate plan rates that will go into effect January 1, 2027. Entergy Arkansas’s proposal would result in the benefits of the production tax credits being passed through to customers, if approved, as reductions in revenue requirement evenly over the life of the assets, rather than only during the 10-year period in which the production tax credits are generated. In April 2026 the APSC general staff filed testimony proposing an amortization period of no more than 15 years for the monetized proceeds for the tax credits associated with the West Memphis Solar and Driver Solar facilities. An evidentiary hearing was held in July 2026, but was not completed. The APSC is to set a date to complete the hearing.

Energy Cost Recovery Rider

In March 2026, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01333 per kWh to $0.01508 per kWh. The primary reason for the rate increase was an under-recovered balance as a result of higher natural gas prices in 2025. Based on circumstances related to ANO 2’s refueling outage, Entergy Arkansas made an adjustment to projected energy costs to phase-in the rate increase gradually. The redetermined rate of $0.01508 per kWh became effective with the first billing cycle in April 2026 through the normal operation of the tariff.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K and Note 2 to the financial statements herein and in the Form 10-K for a discussion of federal regulation.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Arkansas’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three and Six Months Ended June 30, 2026 and 2025
(Unaudited)
Three Months EndedSix Months Ended
2026202520262025
(In Thousands) · (In Thousands)
OPERATING REVENUES
Electric$693,486$697,687$1,339,783$1,311,198
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale66,251113,093129,147160,652
Purchased power71,33558,964145,824123,911
Nuclear refueling outage expenses13,05310,66823,74221,249
Other operation and maintenance201,322180,510373,941352,028
Decommissioning26,44524,98852,54949,610
Taxes other than income taxes41,04035,43082,54471,411
Depreciation and amortization122,679117,121243,369230,389
Other regulatory charges (credits) - net(7,111)(7,763)72,166(12,880)
TOTAL535,014533,0111,123,282996,370
OPERATING INCOME158,472164,676216,501314,828
OTHER INCOME
Allowance for equity funds used during construction4,9105,35510,0329,617
Interest and investment income11,32814,801119,15428,380
Miscellaneous - net166(3,547)1,532(6,325)
TOTAL16,40416,609130,71831,672
INTEREST EXPENSE
Interest expense73,62159,057148,180116,800
Allowance for borrowed funds used during construction(2,429)(2,642)(4,959)(4,695)
TOTAL71,19256,415143,221112,105
INCOME BEFORE INCOME TAXES103,684124,870203,998234,395
Income taxes18,26625,67735,87848,679
NET INCOME85,41899,193168,120185,716
Net income (loss) attributable to noncontrolling interest(117)(889)473(2,080)
EARNINGS APPLICABLE TO MEMBER'S EQUITY$85,535$100,082$167,647$187,796
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Six Months Ended June 30, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING ACTIVITIES
Net income$168,120$185,716
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization336,915324,540
Deferred income taxes, tax credits, and non-current taxes accrued69,95965,494
Changes in assets and liabilities:
Receivables(33,892)(63,276)
Fuel inventory(15,348)(14,868)
Accounts payable(690)43,551
Taxes accrued(32,357)(19,741)
Interest accrued19,87369
Deferred fuel costs(101,077)(33,234)
Other working capital accounts(33,560)(25,426)
Provisions for estimated losses(370)(2,436)
Other regulatory assets83,451(4,658)
Other regulatory liabilities51,00465,970
Customer advances - non-current66,800—
Pension and other postretirement funded status(19,801)(20,651)
Other assets and liabilities(145,070)(63,163)
Net cash flow provided by operating activities413,957437,887
INVESTING ACTIVITIES
Construction expenditures(881,053)(400,384)
Allowance for equity funds used during construction10,0329,617
Payment for purchase of plant(262)(1,608)
Nuclear fuel purchases(99,151)(73,283)
Proceeds from sale of nuclear fuel38,36940,601
Proceeds from nuclear decommissioning trust fund sales399,48551,462
Investment in nuclear decommissioning trust funds(406,062)(70,616)
Changes in money pool receivable - net(17,420)(49,019)
Other36,97751
Net cash flow used in investing activities(919,085)(493,179)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt1,267,608350,312
Retirement of long-term debt(854,811)(40,311)
Capital contributions from parent200,000—
Change in money pool payable - net—(15,190)
Customer advances received for construction203,55639,895
Customer advances used for construction(75,369)(54,838)
Other(2,710)(2,335)
Net cash flow provided by financing activities738,274277,533
Net increase in cash and cash equivalents233,146222,241
Cash and cash equivalents at beginning of period275,5704,747
Cash and cash equivalents at end of period$508,716$226,988
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$103,952$115,404
Noncash investing activities:
Accrued construction expenditures$140,749$77,169
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
June 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$3,892$7,048
Temporary cash investments504,824268,522
Total cash and cash equivalents508,716275,570
Accounts receivable:
Customer175,389164,296
Allowance for doubtful accounts(6,566)(7,303)
Associated companies68,69643,859
Other75,15287,029
Accrued unbilled revenues158,222130,950
Total accounts receivable470,893418,831
Deferred fuel costs128,78127,704
Fuel inventory - at average cost54,73039,382
Materials and supplies440,038430,662
Deferred nuclear refueling outage costs59,52336,718
Prepayments and other77,89498,975
TOTAL1,740,5751,327,842
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds1,933,4641,816,331
Other791793
TOTAL1,934,2551,817,124
UTILITY PLANT
Electric17,345,42417,022,476
Construction work in progress1,137,464621,218
Nuclear fuel255,255302,706
TOTAL UTILITY PLANT18,738,14317,946,400
Less - accumulated depreciation and amortization6,683,4106,585,693
UTILITY PLANT - NET12,054,73311,360,707
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets1,660,3971,743,848
Other248,445221,381
TOTAL1,908,8421,965,229
TOTAL ASSETS$17,638,405$16,470,902
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
June 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$90,000$690,000
Accounts payable:
Associated companies55,354103,411
Other403,430346,541
Customer deposits139,439136,587
Taxes accrued82,636114,993
Interest accrued59,58239,709
Other77,30956,083
TOTAL907,7501,487,324
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued1,901,7751,846,713
Accumulated deferred investment tax credits24,26724,868
Regulatory liability for income taxes - net437,792422,740
Other regulatory liabilities1,080,0121,044,060
Customer advances76,80010,000
Decommissioning1,836,9991,791,372
Accumulated provisions85,16985,539
Long-term debt5,751,9094,733,604
Other457,836314,495
TOTAL11,652,55910,273,391
Commitments and Contingencies
EQUITY
Member's equity5,067,0154,699,369
Noncontrolling interest11,08110,818
TOTAL5,078,0964,710,187
TOTAL LIABILITIES AND EQUITY$17,638,405$16,470,902
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
For the Six Months Ended June 30, 2026 and 2025
(Unaudited)
Noncontrolling InterestMember's EquityTotal
(In Thousands)
Balance at December 31, 2024$15,168$4,448,837$4,464,005
Net income (loss)(1,191)87,71486,523
Distributions to noncontrolling interest(181)—(181)
Balance at March 31, 202513,7964,536,5514,550,347
Net income (loss)(889)100,08299,193
Distributions to noncontrolling interest(275)—(275)
Balance at June 30, 2025$12,632$4,636,633$4,649,265
Balance at December 31, 2025$10,818$4,699,369$4,710,187
Net income59082,11182,701
Distributions to noncontrolling interest(79)—(79)
Balance at March 31, 202611,3294,781,4804,792,809
Net income (loss)(117)85,53585,418
Capital contribution from parent—200,000200,000
Distributions to noncontrolling interest(131)—(131)
Balance at June 30, 2026$11,081$5,067,015$5,078,096
See Notes to Financial Statements.

ENTERGY LOUISIANA, LLC AND SUBSIDIARIES

See the “Winter Storm Fern” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis for a discussion of Winter Storm Fern. Entergy Louisiana’s cost of mobilizing crews and restoring power was approximately $240 million, including approximately $205 million in capital costs and approximately $35 million in non-capital costs. Natural gas purchases for Entergy Louisiana were $256 million in January 2026 compared to $115 million in January 2025. See Note 2 to the financial statements herein and in the Form 10-K for discussion of fuel cost recovery at Entergy Louisiana. See Note 2 to the financial statements herein for discussion of restoration costs from Winter Storm Fern included in the 2025 formula rate plan filing.

Net income increased $12.6 million primarilydue to higher other income, higher retail electric price, higher revenues resulting from the return on construction work in progress for certain utility plant investments, and higher volume/weather. The increase was partially offset by higher interest expense, higher other operation and maintenance expenses, higher depreciation and amortization expenses, and higher taxes other than income taxes.

Net income increased $34.3 million primarilydue to higher other income, higher revenues resulting from the return on construction work in progress for certain utility plant investments, higher retail electric price, and higher volume/weather. The increase was partially offset by higher interest expense, higher other operation and maintenance expenses, higher depreciation and amortization expenses, and higher taxes other than income taxes.

Amount
(In Millions)
2025 operating revenues$1,510.1
Fuel, rider, and other revenues that do not significantly affect net income53.5
Return on construction work in progress for certain utility plant investments25.7
Retail electric price21.6
Volume/weather10.1
Effect of sale of natural gas distribution business(14.6)
2026 operating revenues$1,606.4

Entergy Louisiana’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The return on construction work in progress for certain utility plant investments variance represents the revenue related to the amortization of certain customer advances designed to provide a return on investment in construction work in progress for certain utility plant investments, which is recognized as the related costs are incurred.

The retail electric price variance is primarily due to anincrease in the resilience plan cost recovery rider effective March 2026. See Note 2 to the financial statements herein for discussion of the resilience plan cost recovery rider filing.

The volume/weather variance is primarily due to an increase in industrial usage and an increase in weather-adjusted residential usage, partially offset by the effect of less favorable weather on residential sales. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the chlor-alkali, petroleum refining, petrochemicals, and solar technology industries, and an increase in demand from co-generation customers.

The effect of sale of natural gas distribution business variance represents the decrease in operating revenues resulting from the absence of natural gas revenues following the sale of the natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana natural gas distribution business on July 1, 2025.

Total electric energy sales for Entergy Louisiana for the three months ended June 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential3,4903,583(3)
Commercial2,8512,886(1)
Industrial9,6599,1835
Governmental2052031
Total retail16,20515,8552
Sales for resale:
Associated companies1,5141,533(1)
Non-associated companies1751675
Total17,89417,5552

See Note 12 to the financial statements herein for additional discussion of Entergy Louisiana’s operating revenues.

Amount
(In Millions)
2025 operating revenues$2,811.6
Fuel, rider, and other revenues that do not significantly affect net income162.6
Return on construction work in progress for certain utility plant investments43.2
Retail electric price37.6
Volume/weather19.6
Effect of sale of natural gas distribution business(44.2)
2026 operating revenues$3,030.4

Entergy Louisiana’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The return on construction work in progress for certain utility plant investments variance represents the revenue related to the amortization of certain customer advances designed to provide a return on investment in construction work in progress for certain utility plant investments, which is recognized as the related costs are incurred.

The retail electric price variance is primarily due toincreases in the resilience plan cost recovery rider effective March 2025 and March 2026. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the resilience plan cost recovery rider filings.

The volume/weather variance is primarily due to an increase in industrial usage and an increase in weather-adjusted residential usage, partially offset by the effect of less favorable weather on residential sales. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the petroleum refining, solar technology, petrochemicals, and agricultural chemicals industries, and an increase in demand from co-generation customers.

The effect of sale of natural gas distribution business variance represents the decrease in operating revenues resulting from the absence of natural gas revenues following the sale of the natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana natural gas distribution business on July 1, 2025.

Total electric energy sales for Entergy Louisiana for the six months ended June 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential6,4366,753(5)
Commercial5,2845,318(1)
Industrial18,86117,7166
Governmental388398(3)
Total retail30,96930,1853
Sales for resale:
Associated companies2,9112,981(2)
Non-associated companies50739528
Total34,38733,5612

See Note 12 to the financial statements herein for additional discussion of Entergy Louisiana’s operating revenues.

an increase of $9.6 million in nuclear generation expenses primarily due to a higher scope of work performed in 2026 as compared to 2025;

an increase of $8.2 million in power delivery expenses primarily due toa higher scope of work performed in 2026 as compared to 2025 and higher vegetation maintenance costs; and

an increase of $3.6 million in compensation and benefits costs primarily due to higher healthcare claims activity and the timing of the recognition of prescription drug rebates.

Depreciation and amortization expenses increased primarily due to additions to plant in service, an increase in FERC jurisdictional depreciation rates effective January 2026, and an increase in nuclear depreciation rates effective September 2025 in accordance with the global stipulated settlement agreement approved by the LPSC in August 2024. See Note 2 to the financial statements in the Form 10-K for discussion of the global stipulated settlement agreement.

Entergy Louisiana records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

changes in decommissioning trust fund activity, including portfolio rebalancing of certain decommissioning trust funds in second quarter 2026;

an increase of $21 million in the amortization of tax gross-up on customer advances, including customer advances for construction;

an increase of $11.2 million on interest earned on money pool investments; and

an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2026 including the Amite South transmission projects, the Waterford 6 Power Station project, and the Westlake Power Station project.

The increase was partially offset by a $17.1 million true-up in 2025 of Entergy Louisiana's MISO cost recovery mechanism over-recovery balance to the 2024 formula rate plan filing, which was filed with the LPSC in May 2025, and a decrease of $4.5 million in affiliated dividend income from affiliated preferred membership interests related to storm cost securitizations. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing and the storm cost securitizations.

an increase of $18 million in carrying costs on customer advances, including customer advances for construction;

the issuances of $750 million of 5.65% Series mortgage bonds and $750 million of 4.90% Series mortgage bonds, each in February 2026; and

$4.1 million in carrying costs in second quarter 2026 on retained net proceeds from the monetization of nuclear production tax credits.

an increase of $11.4 million in power delivery expenses primarily due toa higher scope of work performed in 2026 as compared to 2025 and higher vegetation maintenance costs;

an increase of $8.9 million in nuclear generation expenses primarily due to a higher scope of work performed in 2026 as compared to 2025;

an increase of $8.8 million in compensation and benefits costs primarily due to a revision to estimated incentive-based compensation expense in first quarter 2025; and

a decrease of $7 million in loss provisions;

a decrease of $4.3 million in insurance expense primarily due to higher nuclear insurance refunds; and

a decrease of $4.3 million due to the absence of natural gas expenses in 2026 following the sale of Entergy Louisiana’s natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana natural gas distribution business on July 1, 2025.

Depreciation and amortization expenses increased primarily due to additions to plant in service, an increase in FERC jurisdictional depreciation rates effective January 2026, and an increase in nuclear depreciation rates effective September 2025 in accordance with the global stipulated settlement agreement approved by the LPSC in August 2024. See Note 2 to the financial statements in the Form 10-K for discussion of the global stipulated settlement agreement.

Entergy Louisiana records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

changes in decommissioning trust fund activity, including portfolio rebalancing of certain decommissioning trust funds in 2026;

an increase of $29.1 million in the amortization of tax gross-up on customer advances, including customer advances for construction;

an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2026, including the Amite South transmission projects, the Waterford 6 Power Station project, and the Westlake Power Station project; and

an increase of $9.7 million in interest earned on money pool investments.

The increase was partially offset by a $17.1 million true-up in 2025 of Entergy Louisiana's MISO cost recovery mechanism over-recovery balance to the 2024 formula rate plan filing, which was filed with the LPSC in May 2025, and a decrease of $9 million in affiliated dividend income from affiliated preferred membership interests related to storm cost securitizations. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing. See Note 2 to the financial statements in the Form 10-K for discussion of the storm cost securitizations.

an increase of $27.9 million in carrying costs on customer advances, including customer advances for construction;

the issuances of $750 million of 5.65% Series mortgage bonds and $750 million of 4.90% Series mortgage bonds, each in February 2026; and

$8.2 million in carrying costs in 2026 on retained net proceeds from the monetization of nuclear production tax credits.

The increase was partially offset by an increase in the allowance for borrowed funds used during construction due to higher construction work in progress in 2026, including the Amite South transmission projects and the Waterford 6 Power Station project.

The effective income tax rates were 17.1% for the second quarter 2026 and 16.4% for the six months ended June 30, 2026. The differences in the effective income tax rates for the second quarter 2026 and the six months ended June 30, 2026 versus the federal statutory rate of 21% were primarily due to the book and tax differences related to the non-taxable income distributions earned on preferred membership interests, the amortization of excess accumulated deferred income taxes, book and tax differences related to the allowance for equity funds used during construction, and certain book and tax differences related to utility plant items, partially offset by the accrual for state income taxes.

The effective income tax rates were 19.5% for the second quarter 2025 and 18.6% for the six months ended June 30, 2025. The differences in the effective income tax rates for the second quarter 2025 and the six months ended June 30, 2025 versus the federal statutory rate of 21% were primarily due to the book and tax differences related to the non-taxable income distributions earned on preferred membership interests, book and tax differences related to the allowance for equity funds used during construction, and certain book and tax differences related to utility plant items, partially offset by the accrual for state income taxes.

Sale of Natural Gas Distribution Business

See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana natural gas distribution business on July 1, 2025.

20262025
(In Thousands)
Cash and cash equivalents at beginning of period$776,961$327,102
Net cash provided by (used in):
Operating activities1,711,203978,699
Investing activities(2,308,068)(1,467,670)
Financing activities1,387,935461,319
Net increase (decrease) in cash and cash equivalents791,070(27,652)
Cash and cash equivalents at end of period$1,568,031$299,450

Net cash flow provided by operating activities increased $732.5 million for the six months ended June 30, 2026 compared to the six months ended June 30, 2025 primarily due to:

an increase of $460 million in receipts of advance payments related to customer agreements, including $398.2 million in customer advances and $61.8 million in tax gross-up on customer advances for construction;

the timing of recovery of fuel and purchased power costs, partially offset by higher fuel and purchased power payments in 2026 as compared to 2025. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery; and

a decrease of $42.2 million in spending on nuclear refueling outage costs in 2026 as compared to 2025.

The increase was partially offset by lower collections from customers and the timing of payments to vendors.

Net cash flow used in investing activities increased $840.4 million for the six months ended June 30, 2026 compared to the six months ended June 30, 2025 primarily due to:

an increase of $574.1 million in non-nuclear generation construction expenditures primarily due to higher spending on the Richland Parish Power Station Units 1-4 project, the Pointe Coupee Units 1-3 project, the Waterford 6 Power Station project, the Waterford 5 Power Station project, and the Westlake Power Station project;

an increase of $299.0 million in transmission construction expenditures primarily due to higher capital expenditures as a result of higher spending on the Amite South transmission projects and on various other transmission projects in 2026;

an increase of $210.4 million in capital expenditures related to storm restoration primarily due to Winter Storm Fern restoration efforts in 2026. See “Winter Storm Fern” above for discussion of storm restoration efforts in 2026; and

the receipt of $33.5 million from the storm reserve escrow account in first quarter 2025. See Note 2 to the financial statements in the Form 10-K for a discussion of the storm reserve funds.

a decrease of $119.2 million in nuclear construction expenditures primarily due to decreased spending on various nuclear projects in 2026;

a decrease in cash used of $88.4 million as a result of fluctuations in nuclear fuel activity due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle; and

a decrease of $39 million in cash collateral posted to support Entergy Louisiana’s obligations to MISO in 2026.

Net cash flow provided by financing activities increased $926.6 million for the six months ended June 30, 2026 compared to the six months ended June 30, 2025 primarily due to:

the issuances of $750 million of 5.65% Series mortgage bonds and $750 million of 4.90% Series mortgage bonds, each in February 2026;

$495 million in common equity distributions paid in 2025 in order to maintain Entergy Louisiana’s capital structure. No common equity distributions were paid in 2026;

the repayment of $190 million of 3.78% Series mortgage bonds in March 2025; and

the repayment of $110 million of 3.78% Series mortgage bonds in March 2025.

the issuance of $750 million of 5.80% Series mortgage bonds in January 2025;

the repayment of $250 million of 4.44% Series mortgage bonds in January 2026;

a decrease of $232.7 million in net customer advances for construction related to transmission, distribution, and generator interconnection agreements; and

net repayments of $37.7 million in 2026 compared to net long-term borrowings of $92.9 million in 2025 on the nuclear fuel company variable interest entities’ credit facilities.

Entergy Louisiana’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio for Entergy Louisiana is primarily due to the net issuance of long-term debt in 2026.

June 30,2026December 31, 2025
Debt to capital48.1%46.6%
Effect of subtracting cash(3.6%)(2.0%)
Net debt to net capital (non-GAAP)44.5%44.6%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy Louisiana uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy Louisiana also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana’s financial condition because net debt indicates Entergy Louisiana’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Louisiana’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Following are updates to the current annual amounts of Entergy Louisiana’s planned construction and other capital investments through 2030.

20262027202820292030
(In Millions)
Planned construction and capital investments:
Generation$3,990$8,235$7,725$6,730$5,190
Transmission1,5601,7401,280875370
Distribution1,320835565610635
Utility Support120110907555
Total$6,990$10,920$9,660$8,290$6,250

The updated capital plan for 2026-2030 reflects incremental capital investments for potential generation projects, primarily related to resources identified in Entergy Louisiana’s application filed with the LPSC in March 2026 as discussed below in “Additional Generation and Transmission Resources.” In addition to routine capital spending to maintain operations, the capital plan for Entergy Louisiana includes investments in generation projects to modernize, decarbonize, expand, and diversify Entergy Louisiana’s portfolio, as well as to support customer growth, including Segno Solar, Votaw Solar, Bogalusa West Solar, Cypress Harvest Solar, Franklin Farms Power Station Units 1 and 2, Waterford 5 Power Station, Cottonwood Power Station, Westlake Power Station, Richland Parish Units 1-4, Pointe Coupee Units 1-3, Waterford 6 Power Station, and other new generation resources; investments in River Bend and Waterford 3; distribution and Utility support spending to improve reliability, resilience, and customer experience; transmission spending to improve reliability and resilience while also supporting customer growth and renewables expansion; and other investments. The planned construction and capital investments amounts above exclude investments expected to be funded with customer advances for construction.

Entergy Louisiana’s receivables from the money pool were as follows:

June 30, 2026December 31, 2025June 30, 2025December 31, 2024
(In Thousands)
$122,145$63,435$81,208$32,668

Entergy Louisiana has a credit facility in the amount of $400 million scheduled to expire in June 2031. The credit facility includes fronting commitments for the issuance of letters of credit against $15 million of the borrowing capacity of the facility. As of June 30, 2026, there were no cash borrowings and no letters of credit outstanding under the credit facility. In addition, Entergy Louisiana is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO and for other purposes. As of June 30, 2026,$148.1 million in MISO letters of credit and$1.5 million in non-MISO letters of credit were outstanding under Entergy Louisiana’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

The Entergy Louisiana nuclear fuel company variable interest entities have two separate credit facilities, each in the amount of $105 million and scheduled to expire in June 2029. As of June 30, 2026, $28.6 million in loans were outstanding under the credit facility for the Entergy Louisiana River Bend nuclear fuel company variable interest entity and $27.7 million in loans were outstanding under the credit facility for the Entergy Louisiana Waterford nuclear fuel company variable interest entity. See Note 4 to the financial statements herein for additional discussion of the nuclear fuel company variable interest entity credit facilities.

Renewables

Cypress Harvest Solar

As discussed in the Form 10-K, in February 2026, Entergy Louisiana filed an application seeking LPSC approval and certification for the Cypress Harvest Solar facility, a 200 MW solar facility to be located in Iberville Parish, Louisiana. In March 2026 the LPSC staff filed an affidavit attesting that the Cypress Harvest Solar facility meets the applicable parameters for Entergy Louisiana’s expedited certification process and recommending that the LPSC grant certification. At its April 2026 meeting, the LPSC voted to grant the requested approval and certification, with a written order issued in May 2026. In July 2026 the Iberville Parish Council adopted a two-year moratorium on battery energy storage system development to allow time for further evaluation of the community impacts of the technology. The facility has a scheduled in service date of 2028.

Segno Solar and Votaw Solar

As discussed in the Form 10-K, in December 2025, Entergy Louisiana filed an application with the LPSC seeking approval and certification to construct the Segno Solar facility and Votaw Solar facility. The application asks that the LPSC approve, subject to certain ongoing discussions, allocation of the two facilities to a designated renewable resources subscription to Entergy Louisiana’s Rider Geaux Zero, and further asserts that the two solar resources fall below certain breakeven parameters established in connection with the LPSC’s order allowing Entergy Louisiana to procure up to 3 GW of solar resources, thus supporting that the resources should be certified as being in the public interest. The application requests consideration by the LPSC at or before its August 2026 meeting. A procedural schedule was set with a hearing initially scheduled for July 2026. In June 2026, Entergy Louisiana filed an unopposed motion asking that the procedural schedule be suspended to allow for settlement negotiations. The motion was granted and the procedural schedule was suspended. The parties’ settlement negotiations are ongoing. Subject to approval by the LPSC, the Segno Solar facility and the Votaw Solar facility are expected to be in service by 2029.

Other Generation and Transmission

Additional Generation and Transmission Resources

See the Form 10-K for discussion of Entergy Louisiana’s October 2024 application with the LPSC seeking approval of a variety of generation and transmission resources proposed in connection with establishing service to a new data center to be developed by a subsidiary of Meta Platforms, Inc. in north Louisiana, for which an electric service agreement was previously executed.

In March 2026, Entergy Louisiana entered into an electric service agreement with Evest LLC (Evest), a subsidiary of Meta Platforms, Inc., in connection with establishing service to a second new data center to be developed by Evest in north Louisiana. The obligations pursuant to the agreement will commence following construction of certain transmission facilities needed to serve Evest, and the effectiveness of the agreement is conditioned upon receipt of required governmental approvals, including approval from the LPSC. Also in March 2026, Entergy Louisiana filed an application with the LPSC for certification to construct seven new combined cycle combustion turbine generation resources totaling 5,278 MW at a total cost of approximately $12.9 billion, each of which will be enabled for future carbon capture and storage, and three battery energy storage systems, including two that will be co-located with solar resources at the Cypress Harvest Solar Facility in Iberville Parish and the Bogalusa West Solar Facility in Washington Parish. The application also seeks approval to construct a new 500 kV transmission line, from West Fork Creek to St. Landry, estimated to cost $1.4 billion, and other related transmission facilities. Four of the new combined cycle combustion turbine generation resources are to be located near the customer site in north Louisiana (Richland Parish Units 1-4), while the remaining three units will be located near the existing Big Cajun site in Pointe Coupee Parish (Pointe Coupee Units 1-3). The seven new combined cycle combustion turbine generation resources have various estimated in-service dates in 2030 and 2031. The application also requests certain approvals related to a corporate sustainability agreement with the new customer. The corporate sustainability agreement contemplates the new customer contributing to the costs of the future addition of 2,500 MW of new renewable and energy storage resources, agreements involving nuclear-related efforts and contributions to bill assistance and other programs for low-income residents. Entergy Louisiana anticipates recovering the incremental cost to serve the customer through direct financial contributions from the customer and the revenues it expects to earn under the electric service agreement. The application is pending before the LPSC. At its April 2026 meeting, the LPSC voted to direct the administrative hearings division to adopt a procedural schedule that would allow for LPSC consideration of the matter at its December 2026 meeting, and also to have the administrative hearings division serve as a hearing examiner and compile a record for the LPSC to consider without the issuance of a formal recommendation from the ALJ. LPSC staff and intervenor testimony is due to be filed by July 31, 2026. Entergy Louisiana’s rebuttal testimony is due in September 2026. A hearing is scheduled to take place in October 2026.

The electric service agreement and related contracts contain provisions that protect Entergy Louisiana’s current customers in a manner consistent with the LPSC’s Lightning Initiative and Entergy Louisiana’s Fair Share Plus guidelines, which the LPSC and Entergy Louisiana, respectively, developed in response to increased investment in large data centers in Louisiana. The protections include terms requiring the customer to pay Entergy Louisiana’s incremental costs to serve the customer, including through contributions in aid of construction, other advanced payments and minimum monthly bills. The agreements also include specified financial obligations in the event that Evest terminates the contracts early, restructures the project, or in the event of default. These specified financial obligations would be based on Entergy Louisiana’s unrecovered incremental costs to serve Evest at the time of such an event. Evest’s obligations under the electric service agreement and related contracts are secured by various forms of collateral, including a guaranty from Meta Platforms, Inc.

Finally, the electric service agreement also includes provisions relating to Entergy Louisiana’s performance obligations, including the timely construction of the facilities supporting service to Evest, audit rights for the construction costs supported by Evest, and service standards during the term of the electric service agreement. Entergy Louisiana’s failure to meet one or more of these performance obligations could result in specified financial and/or non-financial penalties. Such penalties would vary based on the nature and severity of the failure, including the potential termination of the electric service agreement.

In June 2026 certain intervenors filed a motion requesting that the LPSC issue a subpoena to Meta Platforms, Inc. to obtain certain information about the data center project, including the level of expected investment, job creation, load characteristics, and other aspects of the project, as well as certain financial information. In July 2026, after briefing and argument, the ALJ issued a ruling granting this motion in part and denying it in part. In July 2026, Meta Platforms, Inc. filed a motion to quash the subpoena and a motion for interlocutory appeal of the ruling that granted the issuance of the subpoena.

Babel - Webre 500 kV Transmission Project

As discussed in the Form 10-K, in December 2025, Entergy Louisiana filed an application with the LPSC seeking a certificate of public convenience and necessity for a 500 kV transmission project that includes the construction of a new 147-mile Babel to Webre 500 kV transmission line, the reconstruction of the Webre 500 kV switching station in Louisiana, and coordination with Entergy Texas on the construction of an approximately 4-mile 500 kV transmission line in Texas. The project was approved by MISO in the 2025 MISO Transmission Expansion Plan and has an estimated cost of $1,238 million and an estimated in-service date of August 2029. In May 2026 the LPSC staff and the Southern Renewable Energy Association (SREA), an intervenor, filed direct testimony. The LPSC staff’s testimony and SREA’s testimony recommended that the LPSC find the project to be in the public interest and grant certification under the LPSC’s general order on transmission siting. A hearing is scheduled for September 2026.

Waterford 6 Power Station and Westlake Power Station

As discussed in the Form 10-K, in February 2026, Entergy Louisiana filed an application seeking LPSC approval and certification to construct two 754 MW combined cycle combustion turbine generators, the Waterford 6 Power Station and the Westlake Power Station, to be located at Entergy Louisiana’s existing Waterford site near Killona, Louisiana and existing Roy S. Nelson site in Westlake, Louisiana, respectively. In its application, Entergy Louisiana noted the estimated costs are approximately $2,027 million for the Waterford 6 Power Station and $2,091 million for the Westlake Power Station. As described in the application, Entergy Louisiana is considering a third-party financing approach for the Waterford 6 Power Station. A procedural schedule has been set with hearings scheduled in October and November 2026. Entergy Louisiana asked that the LPSC consider the requests in the application at or before its December 2026 meeting. The estimated in-service dates for the Waterford 6 Power Station and Westlake Power Station are July 2030 and October 2030, respectively.

Cottonwood Power Station

As discussed in the Form 10-K, in December 2025, Entergy Louisiana filed an application seeking LPSC approval and a certificate of convenience and necessity to acquire the Cottonwood combined cycle combustion turbine facility, a 1,263 MW combined cycle facility in Deweyville, Texas that was originally placed in commercial service in 2003. The filing seeks findings from the LPSC that the costs of the acquisition, including the approximately $1.5 billion purchase price and $309.3 million in capital upgrades and maintenance items needed to bring the Cottonwood facility into alignment with Entergy Louisiana’s fleet standards with respect to operations and safety, are eligible for recovery in customer rates. In June 2026 the LPSC staff filed direct testimony raising various concerns and objections to the proposed transaction as presented in Entergy Louisiana’s application. The LPSC staff asserts that the need for the Cottonwood facility is driven predominantly by loads associated with certain large data center projects and opines that the costs and future operational risks of the Cottonwood facility should be borne by these customers in particular, not Entergy Louisiana’s customers generally. The LPSC staff’s direct testimony also raises issues regarding the acquisition premium, potential stranded costs, and future operating risks associated with the Cottonwood facility. Discovery is ongoing, and Entergy Louisiana filed rebuttal testimony in July 2026. A hearing is scheduled for September 2026 and Entergy Louisiana’s application requests an LPSC decision by October 2026. The acquisition is currently targeted to close in January 2027, subject to regulatory approvals and other conditions to closing.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation and Fuel Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

Resilience Plan Cost Recovery Rider

In December 2022, Entergy Louisiana filed an application with the LPSC seeking a public interest finding regarding Phase I of Entergy Louisiana’s Future Ready resilience plan and approval of a rider mechanism to recover the program’s costs. Phase I in the December 2022 application reflected the first five years of a ten-year resilience plan and included investment of approximately $5 billion, including hardening investment, transmission dead-end structures, enhanced vegetation management, and telecommunications improvement. In April 2024 the LPSC approved a framework which includes an initial five-year resilience plan providing for an investment of approximately $1.9 billion with cost recovery via a forward-looking rider with semi-annual true-ups. The plan is subject to specified reporting requirements and includes a performance review of the hardened assets. The LPSC order approving the framework does not include any restrictions on Entergy Louisiana’s ability to file applications for approval of additional investments in resilience.

In January 2025, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $40.4 million, or $38.9 million in incremental annual revenues from Entergy Louisiana’s first semi-annual filing in July 2024, for projects expected to be placed in service during the rate-effective period of March 2025 through August 2025. In February 2025 the LPSC staff reviewed the filed rider rates and identified no material issues.

In July 2025, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $50.2 million, or $9.8 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of September 2025 through February 2026. Additionally, Entergy Louisiana’s true-up filing included an under-recovery totaling $5.6 million to be implemented in the January 2026 semi-annual filing. In August 2025 the LPSC staff reviewed the filed rider rates and identified no material issues.

In January 2026, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $101.8 million, or $51.6 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of March 2026 through August 2026. Additionally, Entergy Louisiana’s true-up filing included an over-recovery totaling $16.6 million to be implemented in the July 2026 semi-annual filing. In February 2026 the LPSC staff reviewed the filed rider rates and identified no material issues.

In July 2026, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $114.2 million, or $12.4 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of September 2026 through February 2027. Additionally, Entergy Louisiana’s true-up filing included an under-recovery totaling $2.5 million to be implemented in the January 2027 semi-annual filing. The LPSC staff is reviewing the filed rider rates.

Vegetation Management Rider

In November 2025 the LPSC staff issued notice of its initiation of a rulemaking to implement a vegetation management pilot program for LPSC jurisdictional electric utilities. The pilot program would be voluntary and would allow utilities to establish a rider for distribution vegetation management for up to 100% of the utility’s prior calendar year vegetation management spending. The rider may not exceed 1% of a customer’s bill, and the utility would be required to maintain its prior calendar year level of spending on vegetation management as reflected in its base rates or formula rate plan. In February 2026 the LPSC staff filed a report and recommendation along with a proposed final rule providing for the adoption of the pilot program consistent with the terms outlined in the original notice. In March 2026 the LPSC voted to accept the LPSC staff’s recommendation and adopt the proposed pilot program as presented. In April 2026, Entergy Louisiana filed its vegetation management rider for the rate-effective period of May 2026 through December 2026, which included a revenue requirement of $20 million for incremental spending on distribution vegetation management above the prior calendar year level of spending on vegetation management.

2025 Formula Rate Plan Filing

In June 2026, Entergy Louisiana filed its formula rate plan evaluation report for its 2025 calendar year operations. Consistent with the global stipulated settlement agreement approved by the LPSC in August 2024, the filing reflected a 9.7% allowed return on common equity with a bandwidth of 40 basis points above and below the midpoint. For the test year 2025, the formula produced an earned return on equity of 9.63%, which falls within the established bandwidth and therefore results in no adjustment to base rider formula rate plan revenue.

Additional changes in formula rate plan revenue include: (1) the removal of approximately $73 million in annual customer credits associated with the global stipulated settlement agreement, which have been fully credited to customers in accordance with the agreement; (2) a reduction in customer credits through the tax adjustment mechanism, attributable to the return of Entergy Louisiana’s over-collection of income tax expense associated with Louisiana state tax law changes effective in 2025 and the expiration of certain ad valorem exemptions; (3) increases in transmission and distribution plant in service, as recognized through the transmission and distribution recovery mechanisms, including restoration costs from Winter Storm Fern, for which Entergy Louisiana does not intend to seek relief or exception to the formula rate plan; (4) increases to the additional capacity mechanism; and (5) the final phase-in of additional nuclear depreciation expense, in accordance with the global stipulated settlement agreement. See Note 2 to the financial statements in the Form 10-K for discussion of the global stipulated settlement agreement. Collectively, these factors contributed to a net increase of $222 million in formula rate plan revenue for the period. Subject to LPSC review, the resulting changes from the 2025 formula rate plan evaluation report will become effective for bills rendered during the first billing cycle of September 2026, subject to refund.

In June 2026, Entergy Louisiana submitted a motion requesting the LPSC approve a one-year extension of its current formula rate plan, with all material provisions left unchanged, including the allowed return on common equity of 9.7% with a bandwidth of 40 basis points above and below the midpoint. Entergy Louisiana has requested LPSC action on the proposed extension by August 2026.

River Bend Deregulated Asset Plan Filing

In September 2025, Entergy Louisiana filed an application seeking LPSC approval to recover from customers, prospectively, approximately $49 million in annual revenues associated with the Louisiana retail deregulated portion of River Bend. Costs associated with the deregulated portion of River Bend have historically been excluded from retail ratemaking as a result of a 1988 LPSC decision. Instead, Entergy Louisiana has been allowed by the LPSC to either recover 4.6 cents per kWh for the power generated from that portion of the plant, or sell the power into the applicable market (subject to certain restrictions). The filing presents evidence that River

Bend is a cost-effective and prudent source of needed baseload supply with value to Entergy Louisiana customers and seeks to recover the previously excluded costs, on a prospective basis. In March 2026 the LPSC staff and certain intervenors filed direct testimony recommending that the LPSC deny Entergy Louisiana’s application. The LPSC staff’s testimony further recommends that, if the LPSC were to grant any relief, notwithstanding the LPSC staff’s recommendation, such relief should be limited to allowing only prospective capital additions at River Bend to be included in Entergy Louisiana’s customer rates. Entergy Louisiana’s rebuttal testimony is due in August 2026. A hearing is scheduled for January 2027.

Fuel and purchased power cost recovery

As discussed in the Form 10-K, in June 2025 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings (for Entergy Louisiana’s gas operations). The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from January 2023 through June 2025. The LPSC staff issued its audit report in March 2026. The next step is for the LPSC to issue its final report, but there is no deadline or timing requirement associated with the issuance of the final report.

In February 2026, Entergy Louisiana, in its monthly filing to update its fuel adjustment clause, requested to defer approximately $141.9 million of fuel costs incurred in January 2026 that were primarily attributable to the effects of Winter Storm Fern, consistent with the LPSC’s general order approved at its February 2026 meeting permitting temporary modifications to the LPSC’s fuel adjustment clause general order. The filing proposed to defer the recovery of these fuel costs over a four-month period from March 2026 through June 2026 to mitigate the customer bill impacts of these fuel costs. In March 2026 the LPSC issued a special order delegating authority to the LPSC executive secretary to review and approve utility-specific requests for deferral of fuel costs from Winter Storm Fern, subject to audit as per the LPSC’s fuel clause general order. In April 2026 the LPSC executive secretary approved Entergy Louisiana’s request for deferral.

In April 2026 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2023 through 2025. Discovery is ongoing, and no audit report has been filed.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K and Note 2 to the financial statements herein and in the Form 10-K for a discussion of federal regulation.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters. The following is an update to that discussion.

The NRC’s Reactor Oversight Process is a program to collect information about plant performance, assess the information for its safety significance, and provide for appropriate licensee and NRC response. The NRC evaluates plant performance by analyzing two distinct inputs: inspection findings resulting from the NRC’s inspection program and performance indicators reported by the licensee. The evaluations result in the placement of each plant in one of the NRC’s Reactor Oversight Process Action Matrix columns: “licensee response column,” or Column 1, “regulatory response column,” or Column 2, “degraded cornerstone column,” or Column 3, “multiple/repetitive degraded cornerstone column,” or Column 4, and “unacceptable performance,” or Column 5. Plants in Column 1 are subject to normal NRC inspection activities. Plants in Column 2, Column 3, or Column 4 are subject to progressively increasing levels of inspection by the NRC with, in general, progressively increasing levels of associated costs. Continued plant operation is not permitted for plants in Column 5. All of the nuclear generating plants owned and operated by Entergy Louisiana are currently in Column 1.

In July 2026 the NRC issued an inspection report for River Bend, in which it identified a preliminary “white” finding with “low safety significance” related to one of the service water pumps at River Bend. The NRC is continuing its evaluation of the issue and is expected to complete its determination during third quarter 2026. If the NRC’s review results in a final “white” finding, River Bend would be placed in Column 2 and would remain in Column 2 until the satisfactory completion of an NRC supplemental inspection.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Louisiana’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three and Six Months Ended June 30, 2026 and 2025
(Unaudited)
Three Months EndedSix Months Ended
2026202520262025
(In Thousands) · (In Thousands)
OPERATING REVENUES
Electric$1,606,355$1,495,504$3,030,440$2,767,450
Natural gas—14,559—44,160
TOTAL1,606,3551,510,0633,030,4402,811,610
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale450,330326,256794,453540,108
Purchased power196,376297,179412,809558,967
Nuclear refueling outage expenses9,92414,80919,86533,180
Other operation and maintenance301,428275,187561,081533,224
Decommissioning20,62419,60840,98939,025
Taxes other than income taxes77,38368,010150,916134,231
Depreciation and amortization213,580201,842425,131399,464
Other regulatory charges (credits) - net(6,097)(61,915)(42,567)(109,148)
TOTAL1,263,5481,140,9762,362,6772,129,051
OPERATING INCOME342,807369,087667,763682,559
OTHER INCOME
Allowance for equity funds used during construction25,08218,47045,15833,676
Interest and investment income141,08453,599158,34454,687
Interest and investment income - affiliated71,23775,195142,497151,766
Miscellaneous - net(53,512)(33,797)(30,497)(16,726)
TOTAL183,891113,467315,502223,403
INTEREST EXPENSE
Interest expense158,684116,524296,340237,858
Allowance for borrowed funds used during construction(9,354)(6,691)(16,899)(12,876)
TOTAL149,330109,833279,441224,982
INCOME BEFORE INCOME TAXES377,368372,721703,824680,980
Income taxes64,59872,541115,154126,603
NET INCOME312,770300,180588,670554,377
Net income attributable to noncontrolling interests7007451,4071,497
EARNINGS APPLICABLE TO MEMBER'S EQUITY$312,070$299,435$587,263$552,880
See Notes to Financial Statements.