Consolidated Statements of Comprehensive Income

ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
For the Three Months Ended March 31, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
Net Income$390,805$362,422
Other comprehensive income (loss)
Pension and other postretirement plan changes (net of tax expense (benefit) of $1,037 and ($2,284))3,911(3,729)
Other comprehensive income (loss)3,911(3,729)
Comprehensive Income394,716358,693
Preferred dividend requirements of subsidiaries and noncontrolling interests5,8891,662
Comprehensive Income Attributable to Entergy Corporation$388,827$357,031
See Notes to Financial Statements.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING ACTIVITIES
Consolidated net income$390,805$362,422
Adjustments to reconcile consolidated net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization654,669622,566
Deferred income taxes, tax credits, and non-current taxes accrued86,07394,973
Asset write-offs, impairments, and related charges18,059—
Changes in working capital:
Receivables65,11051,477
Fuel inventory2,1873,261
Accounts payable26,198(189,497)
Taxes accrued(109,734)(95,589)
Interest accrued47,24711,595
Deferred fuel costs(308,610)(277,236)
Customer advances - current251,591105,799
Other working capital accounts(116,674)5,506
Changes in provisions for estimated losses(32,692)(34,239)
Changes in other regulatory assets115,232154,818
Changes in other regulatory liabilities(384,331)(201,803)
Changes in customer advances - non-current117,19825,000
Changes in pension and other postretirement funded status(59,013)(58,834)
Other65,649(44,031)
Net cash flow provided by operating activities828,964536,188
INVESTING ACTIVITIES
Construction/capital expenditures(2,252,293)(1,660,169)
Allowance for equity funds used during construction47,34044,018
Nuclear fuel purchases(150,738)(88,557)
Payment for purchase of plant—(1,282)
Changes in securitization account(5,727)(5,438)
Payments to storm reserve escrow accounts(2,767)(4,448)
Receipts from storm reserve escrow accounts—43,789
Decrease (increase) in other investments(17,929)472
Litigation proceeds for reimbursement of spent nuclear fuel storage costs—3,546
Proceeds from nuclear decommissioning trust fund sales945,975364,837
Investment in nuclear decommissioning trust funds(985,748)(407,146)
Net cash flow used in investing activities(2,421,887)(1,710,378)
See Notes to Financial Statements.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
FINANCING ACTIVITIES
Proceeds from the issuance of:
Long-term debt3,681,6822,447,850
Treasury stock6,59222,660
Common stock345,711—
Retirement of long-term debt(1,290,977)(852,754)
Changes in commercial paper - net724,580402,694
Customer advances received for construction261,711211,459
Customer advances used for construction(190,902)(149,543)
Other(5,890)8,360
Dividends paid:
Common stock(292,867)(258,249)
Preferred stock(4,580)(4,580)
Net cash flow provided by financing activities3,235,0601,827,897
Net increase in cash and cash equivalents1,642,137653,707
Cash and cash equivalents at beginning of period1,928,916859,703
Cash and cash equivalents at end of period$3,571,053$1,513,410
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid (received) during the period for:
Interest - net of amount capitalized$287,389$326,519
Income taxes - net($423)($1,252)
Noncash investing activities:
Accrued construction expenditures$657,112$657,132
See Notes to Financial Statements.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
March 31, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$68,145$45,895
Temporary cash investments3,502,9081,883,021
Total cash and cash equivalents3,571,0531,928,916
Accounts receivable:
Customer770,177735,734
Allowance for doubtful accounts(31,024)(32,324)
Other208,328242,402
Accrued unbilled revenues484,672524,420
Total accounts receivable1,432,1531,470,232
Deferred fuel costs348,18154,133
Fuel inventory - at average cost129,787131,974
Materials and supplies1,753,6591,710,395
Deferred nuclear refueling outage costs127,33286,497
Prepayments and other447,894424,704
TOTAL7,810,0595,806,851
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds6,155,1646,300,880
Non-utility property - at cost (less accumulated depreciation)479,706481,590
Storm reserve escrow accounts311,550308,784
Other123,226124,414
TOTAL7,069,6467,215,668
PROPERTY, PLANT, AND EQUIPMENT
Electric75,415,74274,750,917
Construction work in progress7,730,3376,020,008
Nuclear fuel838,825834,690
TOTAL PROPERTY, PLANT, AND EQUIPMENT83,984,90481,605,615
Less - accumulated depreciation and amortization29,095,97328,751,001
PROPERTY, PLANT, AND EQUIPMENT - NET54,888,93152,854,614
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets (includes securitization property of $212,427 as of March 31, 2026 and $216,107 as of December 31, 2025)4,890,7445,005,976
Deferred fuel costs172,201172,201
Goodwill367,582367,582
Accumulated deferred income taxes22,80715,540
Other582,170452,298
TOTAL6,035,5046,013,597
TOTAL ASSETS$75,804,140$71,890,730
See Notes to Financial Statements.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
March 31, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$1,525,174$2,375,140
Notes payable and commercial paper1,382,354657,774
Accounts payable2,748,8192,565,546
Customer deposits485,236479,796
Taxes accrued415,455525,189
Interest accrued332,904285,657
Deferred fuel costs—14,562
Pension and other postretirement liabilities62,17063,214
Customer advances980,670632,850
Other227,190223,240
TOTAL8,159,9727,822,968
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued5,720,5505,592,681
Accumulated deferred investment tax credits185,123187,173
Regulatory liability for income taxes - net1,047,4651,079,699
Other regulatory liabilities3,559,7423,911,839
Customer advances152,19835,000
Decommissioning and asset retirement cost liabilities5,004,0904,947,530
Accumulated provisions463,087495,779
Pension and other postretirement liabilities98,709113,930
Long-term debt (includes securitization bonds of $221,230 as of March 31, 2026 and $221,139 as of December 31, 2025)31,150,91527,902,021
Customer advances for construction1,665,9141,615,455
Other938,822953,078
TOTAL49,986,61546,834,185
Commitments and Contingencies
Subsidiaries’ preferred stock without sinking fund219,410219,410
EQUITY
Preferred stock, no par value, authorized 1,000,000 shares in 2026 and 2025; issued shares in 2026 and 2025 - none——
Common stock, $0.01 par value, authorized 998,000,000 shares in 2026 and 2025; issued 587,817,564 shares in 2026 and 583,203,774 shares in 20255,8785,832
Paid-in capital9,275,0938,979,387
Retained earnings12,790,48512,698,436
Accumulated other comprehensive income (loss)905(3,006)
Less - treasury stock, at cost (129,985,494 shares in 2026 and 130,864,409 shares in 2025)4,725,6204,757,573
Total shareholders’ equity17,346,74116,923,076
Subsidiaries’ preferred stock without sinking fund and noncontrolling interests91,40291,091
TOTAL17,438,14317,014,167
TOTAL LIABILITIES AND EQUITY$75,804,140$71,890,730
See Notes to Financial Statements.
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
For the Three Months Ended March 31, 2026 and 2025
(Unaudited)
Shareholders’ Equity
Subsidiaries’ Preferred Stock and Noncontrolling InterestsCommonStockTreasuryStockPaid-inCapitalRetained EarningsAccumulated Other Comprehensive Income (Loss)Total
(In Thousands)
Balance at December 31, 2024$101,076$5,620($4,812,321)$7,833,525$12,014,315$42,769$15,184,984
Consolidated net income (a)1,662———360,760—362,422
Other comprehensive loss—————(3,729)(3,729)
Common stock issuances related to stock plans——43,398(40,777)——2,621
Common stock dividends declared————(258,249)—(258,249)
Distributions to noncontrolling interests(1,069)—————(1,069)
Preferred dividend requirements of subsidiaries (a)(4,580)—————(4,580)
Balance at March 31, 2025$97,089$5,620($4,768,923)$7,792,748$12,116,826$39,040$15,282,400
Balance at December 31, 2025$91,091$5,832($4,757,573)$8,979,387$12,698,436($3,006)$17,014,167
Consolidated net income (a)5,889———384,916—390,805
Other comprehensive income—————3,9113,911
Common stock issuances and sales under the at the market equity distribution program—46—349,672——349,718
Common stock issuance costs———(4,007)——(4,007)
Common stock issuances related to stock plans——31,953(49,959)——(18,006)
Common stock dividends declared————(292,867)—(292,867)
Distributions to noncontrolling interests(998)—————(998)
Preferred dividend requirements of subsidiaries (a)(4,580)—————(4,580)
Balance at March 31, 2026$91,402$5,878($4,725,620)$9,275,093$12,790,485$905$17,438,143
See Notes to Financial Statements.
(a) Consolidated net income and preferred dividend requirements of subsidiaries for first quarter 2026 and first quarter 2025 each includes $4 million of preferred dividends on subsidiaries’ preferred stock without sinking fund that is not presented as equity.

NOTES TO FINANCIAL STATEMENTS

(Unaudited)

NOTE 1. COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business. While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report. Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf-Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements, including the Unit Power Sales Agreement and the Availability Agreement.

Exclusivity Agreement with Major Vendor

See Note 8 to the financial statements in the Form 10-K for information regarding Entergy’s exclusivity agreement with a major vendor. The following is an update to that discussion.

As discussed in the Form 10-K, Entergy entered into an exclusivity agreement with a major vendor to manufacture power island equipment (PIE) and combustion turbines (CT) for combustion turbine generator set frames larger than 400 MWs. The agreement was amended in first quarter 2026, updating the minimum order of 21 sets of PIE andtwo CTs to a minimum order of 24 sets of PIE andtwo CTs during that time period, of which 10 sets of PIE andtwo CT slots have been fulfilled.

Entergy Texas Build-to-Suit Lease Arrangement for the Legend Power Station

See Note 8 to the financial statements in the Form 10-K for information regarding the Entergy Texas build-to-suit lease arrangement for the Legend Power Station.

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Regulatory Assets and Regulatory Liabilities

See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets and regulatory liabilities in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries. The following are updates to that discussion.

Fuel and purchased power cost recovery

Energy Cost Recovery Rider

In March 2026, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01333 per kWh to $0.01508 per kWh. The primary reason for the rate increase was an under-recovered balance as a result of higher natural gas prices in 2025. Based on circumstances related to ANO 2’s refueling outage, Entergy Arkansas made an adjustment to projected energy costs to phase-in the rate increase gradually. The redetermined rate of $0.01508 per kWh became effective with the first billing cycle in April 2026 through the normal operation of the tariff.

As discussed in the Form 10-K, in June 2025 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings (for Entergy Louisiana’s gas operations). The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from January 2023 through June 2025. The LPSC staff issued its audit report in March 2026, and although certain internal record keeping recommendations were made, the LPSC staff did not recommend any disallowances. The next step is for the LPSC to issue its final report, but there is no deadline or timing requirement associated with the issuance of the final report.

In February 2026, Entergy Louisiana, in its monthly filing to update its fuel adjustment clause, requested to defer approximately $141.9 million of fuel costs incurred in January 2026 that were primarily attributable to the effects of Winter Storm Fern, consistent with the LPSC’s general order approved at its February 2026 meeting permitting temporary modifications to the LPSC’s fuel adjustment clause general order. The filing proposes to defer the recovery of these fuel costs over a four-month period from March 2026 through June 2026 to mitigate the customer bill impacts of these fuel costs.

In April 2026 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2023 through 2025.

Retail Rate Proceedings

See Note 2 to the financial statements in the Form 10-K for information regarding retail rate proceedings involving the Utility operating companies. The following are updates to that discussion.

Filings with the APSC (Entergy Arkansas)

2026 Base Rate Case

In February 2026, Entergy Arkansas filed with the APSC a general change in rates, charges, and tariffs. The filing requested a base rate increase to recover a base rate revenue deficiency of $44.6 million and notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015. The primary drivers of the revenue deficiency were increased depreciation expense and the impact of net capital additions. Additionally, the filing requested a 9.90% return on common equity and increased depreciation rates as the result of a depreciation study. In March 2026 the APSC issued an order suspending the proposed rates and tariffs filed by Entergy Arkansas and will establish a procedural schedule by subsequent order.

Generating Arkansas Jobs Act Rider

In March 2026, Entergy Arkansas filed its first annual update to the strategic investment recovery rider, requesting recovery of $110.4 million of financing costs during construction of generation and transmission strategic investments related to Ironwood Power Station, Jefferson Power Station, and the Arkansas Cypress Solar facility. The revised rates are requested to be effective for bills rendered on the first billing cycle of June 2026. In April 2026 the APSC general staff filed testimony arguing that the APSC had not issued an order designating Ironwood Power Station as a strategic investment and that related costs should therefore be removed from the annual update. Also in April 2026, Entergy Arkansas filed testimony asserting that the APSC general staff’s position is contrary to the plain language of the statute, which includes an exception for facilities like Ironwood Power Station that were certified by the APSC within a certain timeframe. A hearing was held in April 2026.

Production Tax Credit Tariff

As discussed in Note 3 to the financial statements in the Form 10-K, in January 2026 the APSC opened a docket to investigate the sale of Entergy Arkansas’s nuclear production tax credits and the appropriate ratemaking treatment of production tax credits for all of Entergy Arkansas’s eligible resources, including how the proceeds of any sales should flow through to customers. As directed by the APSC, in February 2026, Entergy Arkansas submitted a compliance filing to the APSC verifying the status of the solar production tax credits. The filing also verified that the net proceeds from the sale of the nuclear production tax credits were recorded in FERC accounts that are accruing a return for customers’ benefit at a rate that is above the customer deposit rate. Subsequently, in March 2026, Entergy Arkansas filed testimony setting forth its proposal for the solar production tax credits. Specifically, Entergy Arkansas requested the same ratemaking treatment for all of the solar facilities that the APSC already approved for Walnut Bend (i.e., the total net monetized proceeds from production tax credits expected to be generated over the first ten years of a solar facility’s operation are estimated and then amortized over the expected useful life of the asset, which is typically 30 years). Additionally, consistent with prior orders for these resources, the deferred tax asset balances associated with both the production tax credits and the tax gross-up of the regulatory liability will be recognized as a reduction to the overall accumulated deferred income tax liability balance in Entergy Arkansas’s calculation of its weighted average cost of capital providing a return on the unamortized balance for the benefit of customers. Further, Entergy Arkansas proposes to flow the benefits of the solar production tax credits to customers through Entergy Arkansas’s formula rate plan, effective with the formula rate plan rates that will go into effect January 1, 2027. Entergy Arkansas’s proposal would result in the benefits of the production tax credits being passed through to customers, if approved, as reductions in revenue requirement evenly over the life of the assets, rather than only during the 10-year period in which the production tax credits are generated. In April 2026 the APSC general staff filed testimony proposing an amortization period of no more than 15 years for the monetized proceeds for the tax credits associated with the West Memphis Solar and Driver Solar facilities. An evidentiary hearing is scheduled for July 2026.

Special Rate Contract and Arkansas Cypress Solar

As discussed in the Form 10-K, in September 2025, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of the Arkansas Cypress Solar facility, a planned 600 MW solar photovoltaic array with a 350 MW battery energy storage system and associated transmission facilities interconnecting at Entergy Arkansas’s White Bluff substation. The estimated cost of the project is $1,602 million. In March 2026 the APSC approved the Arkansas Cypress Solar facility and Entergy Arkansas’s recovery of the costs of the facility through the Generating Arkansas Jobs Act rider. The APSC also ordered implementation of an independent monitor to oversee costs. In April 2026, Entergy Arkansas filed with the APSC its proposal for an independent monitor to oversee the reasonableness of costs. In April 2026 the APSC issued an order consolidating Entergy Arkansas’s cost independent monitor proposals for three pending resources, including the Arkansas Cypress Solar facility, into a single docket and directing parties with full intervention status to respond to the proposals and recommend independent monitor candidates. The facility is expected to be in service by the end of 2028.

Filings with the LPSC (Entergy Louisiana)

Resilience Plan Cost Recovery Rider

In December 2022, Entergy Louisiana filed an application with the LPSC seeking a public interest finding regarding Phase I of Entergy Louisiana’s Future Ready resilience plan and approval of a rider mechanism to recover the program’s costs. Phase I in the December 2022 application reflected the first five years of a ten-year resilience plan and included investment of approximately $5 billion, including hardening investment, transmission dead-end structures, enhanced vegetation management, and telecommunications improvement. In April 2024 the LPSC approved a framework which includes an initial five-year resilience plan providing for an investment of approximately $1.9 billion with cost recovery via a forward-looking rider with semi-annual true-ups. The plan is subject to specified reporting requirements and includes a performance review of the hardened assets. The LPSC order approving the framework does not include any restrictions on Entergy Louisiana’s ability to file applications for approval of additional investments in resilience.

In January 2025, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $40.4 million, or $38.9 million in incremental annual revenues from Entergy Louisiana’s first semi-annual filing in July 2024, for projects expected to be placed in service during the rate-effective period of March 2025 through August 2025. In February 2025 the LPSC staff reviewed the filed rider rates and identified no material issues.

In July 2025, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $50.2 million, or $9.8 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of September 2025 through February 2026. Additionally, Entergy Louisiana’s true-up filing included an under-recovery totaling $5.6 million to be implemented in the January 2026 semi-annual filing. In August 2025 the LPSC staff reviewed the filed rider rates and identified no material issues.

In January 2026, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $101.8 million, or $51.6 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of March 2026 through August 2026. Additionally, Entergy Louisiana’s true-up filing included an over-recovery totaling $16.6 million to be implemented in the July 2026 semi-annual filing. In February 2026 the LPSC staff reviewed the filed rider rates and identified no material issues.

Filings with the MPSC (Entergy Mississippi)

In February 2026, Entergy Mississippi submitted its formula rate plan 2026 test year filing and 2025 look-back filing showing Entergy Mississippi’s earned return on rate base for the historical 2025 calendar year to be within the formula rate plan bandwidth and projected earned return for the 2026 calendar year to also be within the formula rate plan bandwidth. The 2026 test year filing resulted in an earned return on rate base of 7.64% and reflectedno change in formula rate plan revenues. The 2025 look-back filing compared actual 2025 results to the approved benchmark return on rate base and reflectedno change in formula rate plan revenues, although Entergy Mississippi proposes to adjust interim rates by $293 thousand to reflect one outside-the-bandwidth change, a true-up of demand side management costs. A final order is expected in second quarter 2026.

Filings with the City Council (Entergy New Orleans)

In April 2026, Entergy New Orleans submitted to the City Council its formula rate plan 2025 test year filing. The 2025 evaluation report produced an earned return on equity of 7.55% compared to the authorized return on equity of 9.35%. Without adjustments, this would result in an increase in rates of $16.6 million. The increase in rates is driven, in part, by an increase in plant in service, as well as the cost of known and measurable capital additions. The increase is also driven by a decrease in total revenues due to a decline in kWh sales. The filing is subject to a 75-day review and discovery period followed by a 25-day period to resolve any disputes among the parties. For any disputed items, the City Council would set a procedural schedule to resolve such disputes. Resulting rates will be effective with the first billing cycle of September 2026 pursuant to the formula rate plan tariff.

Filings with the PUCT and Texas Cities (Entergy Texas)

Distribution Cost Recovery Factor (DCRF) Rider

In April 2026, Entergy Texas filed with the PUCT a request to amend its DCRF rider. The proposed rider is designed to collect from Entergy Texas’s retail customers approximately $112.5 million annually, or $20.4 million in incremental annual revenues beyond Entergy Texas’s currently effective DCRF rider based on its capital invested in distribution between July 1, 2025 and December 31, 2025.

Transmission Cost Recovery Factor (TCRF) Rider

As discussed in the Form 10-K, in October 2025, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The amended rider was designed to collect from Entergy Texas’s retail customers approximately $30.3 million annually, or $20.6 million in incremental annual revenues beyond Entergy Texas’s then-effective TCRF rider based on its capital invested in transmission between July 1, 2024 and June 30, 2025 and changes in other transmission charges. In April 2026 the PUCT approved the TCRF rider, consistent with Entergy Texas’s as-filed request, and rates became effective for usage on and after April 6, 2026.

Generation Cost Recovery Rider

In March 2026, Entergy Texas filed an application to establish a generation cost recovery rider to begin recovering a return of and on its capital investment in the Orange County Advanced Power Station. The proposed generation cost recovery rider, which includes Entergy Texas’s capital invested in generation for the Orange County Advanced Power Station through December 31, 2025, is designed to collect approximately $150.4 million annually from Entergy Texas’s retail customers. By statute, the proposed generation cost recovery rider rates are to become effective when the Orange County Advanced Power Station is placed into service, which is expected in third quarter 2026.

Entergy Arkansas Opportunity Sales Proceeding

See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Arkansas opportunity sales proceeding.

Complaints Against System Energy

See Note 2 to the financial statements in the Form 10-K for information regarding complaints against System Energy and the settlements approved by the FERC that resolved all significant aspects of these complaints.

Unit Power Sales Agreement

See Note 2 to the financial statements in the Form 10-K for discussion of the Unit Power Sales Agreement.

MSS-4 Replacement Tariff - Net Operating Loss Carryforward Proceeding

See Note 2 to the financial statements in the Form 10-K for discussion of the MSS-4 replacement tariff net operating loss carryforward proceeding.

Storm Cost Recovery Filings with Retail Regulators

See Note 2 to the financial statements in the Form 10-K for discussion regarding storm cost recovery filings.

NOTE 3. EQUITY (Entergy Corporation and Entergy Louisiana)

Common Stock

Earnings per Share

The following table presents Entergy’s basic and diluted earnings per share calculations for the three months ended March 31, 2026 and 2025, included on the consolidated income statements:

2026 · 2025
(Dollars In Thousands, Except Per Share Data; Shares in Millions)
$/share · $/share
Consolidated net income$390,805$362,422
Less: Preferred dividend requirements of subsidiaries and noncontrolling interests5,8891,662
Net income attributable to Entergy Corporation$384,916$360,760
Basic shares and earnings per average common share455.7$0.84430.3$0.84
Average dilutive effect of:
Stock options1.2—0.9—
Other equity plans1.1—1.5—
Equity forwards4.5(0.01)7.9(0.02)
Diluted shares and earnings per average common share462.5$0.83440.6$0.82

Earnings per share dilution resulting from stock options outstanding and other equity plans is determined under the treasury stock method. The calculation of diluted earnings per share excluded 298,829 stock options outstanding for the three months ended March 31, 2026 and 244,091 stock options outstanding for the three months ended March 31, 2025 because their effect would have been antidilutive. Until settlement of the forward sale agreements discussed in Note 7 to the financial statements in the Form 10-K and below in “Equity Distribution Program” and “Equity Forward Sale Agreements”, earnings per share dilution resulting from the agreements, if any, is determined under the treasury stock method. Share dilution occurs when the average market price of Entergy Corporation’s common stock is higher than the average forward sales price. The calculation of diluted earnings per share excluded 185,897 shares for the three months ended March 31, 2025 under forward sale agreements outstanding because their effect would have been antidilutive.

Entergy’s stock options and other equity compensation plans are discussed in Note 5 to the financial statements herein and in Note 12 to the financial statements in the Form 10-K.

Dividends declared per common share were $0.64 for the three months ended March 31, 2026 and $0.60 for the three months ended March 31, 2025.

Equity Distribution Program

See Note 7 to the financial statements in the Form 10-K for discussion of Entergy Corporation’s at the market equity distribution program. The following are updates to that discussion.

The aggregate number of shares of common stock sold under the equity distribution sales agreement and under any forward sale agreement may not exceed an aggregate gross sales price of $4.5 billion. As of March 31, 2026, an aggregate gross sales price of approximately $2.8 billion has been sold under the at the market equity distribution program.

During the three months ended March 31, 2026 and 2025, there wereno shares of common stock directly issued under the at the market equity distribution program.

During the three months ended March 31, 2026, Entergy Corporation physically settled its obligations under the following forward sale agreements:

Effective Date of Forward Sale AgreementsShares of Common Stock IssuedGross Sales PriceForward Sellers FeesForward Sale Price per ShareCash Proceeds at Settlement
(Dollars In Thousands, Except Per Share Data)
Forward sale agreements settled in February 2026:
September 20241,900,000$115,314$1,153
March 20252,713,790$232,216$2,322
Total4,613,790$75.05$346,243

Entergy Corporation incurred an aggregate amount of approximately $0.5 million of general issuance costs associated with the February 2026 settlement. Entergy Corporation used the net proceeds for general corporate purposes.

Equity Forward Sale Agreements

See Note 7 to the financial statements in the Form 10-K for discussion of Entergy Corporation’s equity forward sale agreements.

Treasury Stock

During the three months ended March 31, 2026, Entergy Corporation reissued 878,915 shares of its previously repurchased common stock to satisfy stock option exercises, vesting of shares of restricted stock, and other stock-based awards. Entergy Corporation did not repurchase any of its common stock during the three months ended March 31, 2026.

Retained Earnings

On April 6, 2026, Entergy Corporation’s Board of Directors declared a common stock dividend of $0.64 per share, payable on June 1, 2026 to holders of record as of May 1, 2026.

Comprehensive Income

Accumulated other comprehensive income (loss) is included in the equity section of the balance sheets of Entergy and Entergy Louisiana. The following table presents changes in accumulated other comprehensive income (loss) for Entergy for the three months ended March 31, 2026 and 2025:

Pension and Other Postretirement Plan Changes
20262025
(In Thousands)
Beginning balance, January 1,($3,006)$42,769
Amounts reclassified from accumulated other comprehensive income (loss)3,911(3,729)
Net other comprehensive income (loss) for the period3,911(3,729)
Ending balance, March 31,$905$39,040

The following table presents changes in accumulated other comprehensive income for Entergy Louisiana for the three months ended March 31, 2026 and 2025:

Pension and Other Postretirement Plan Changes
20262025
(In Thousands)
Beginning balance, January 1,$33,916$53,658
Amounts reclassified from accumulated other comprehensive income(1,087)(971)
Net other comprehensive loss for the period(1,087)(971)
Ending balance, March 31,$32,829$52,687

Total reclassifications out of accumulated other comprehensive income (loss) (AOCI) for Entergy for the three months ended March 31, 2026 and 2025 are as follows:

Amounts reclassified from AOCI · Income Statement Location
2026 · 2025
(In Thousands)
Pension and other postretirement plan changes
Amortization of prior service credit$946$3,462(a)
Amortization of net gain (loss)(5,894)2,551(a)
Total amortization(4,948)6,013
Income taxes1,037(2,284)Income taxes
Total amortization (net of tax)($3,911)$3,729
Total reclassifications for the period (net of tax)($3,911)$3,729

(a)These accumulated other comprehensive income (loss) components are included in the computation of net periodic pension and other postretirement cost. See Note 6 to the financial statements herein for additional details.

Total reclassifications out of accumulated other comprehensive income (AOCI) for Entergy Louisiana for the three months ended March 31, 2026 and 2025 are as follows:

Amounts reclassified from AOCI · Income Statement Location
2026 · 2025
(In Thousands)
Pension and other postretirement plan changes
Amortization of prior service credit$309$1,136(a)
Amortization of net gain1,1471,719(a)
Total amortization1,4562,855
Income taxes(369)(1,884)Income taxes
Total amortization (net of tax)$1,087$971
Total reclassifications for the period (net of tax)$1,087$971

(a)These accumulated other comprehensive income components are included in the computation of net periodic pension and other postretirement cost. See Note 6 to the financial statements herein for additional details.

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy Corporation has in place a credit facility that has a borrowing capacity of $3 billion and expires in June 2030. The facility includes fronting commitments for the issuance of letters of credit against $20 million of the total borrowing capacity of the credit facility. The commitment fee is currently 0.225% of the undrawn commitment amount. Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation. Although there wereno borrowings under the facility for the three months ended March 31, 2026, the estimated interest rate as of March 31, 2026 that would have been applied to outstanding borrowings under the facility was 5.27%. The following is a summary of the amounts outstanding and capacity available under the credit facility as of March 31, 2026:

CapacityBorrowingsLettersof CreditCapacityAvailable
(In Millions)
$3,000$—$3$2,997

Entergy Corporation’s credit facility includes a covenant requiring Entergy to maintain a consolidated debt ratio, as defined, of 65% or less of its total capitalization. Entergy is in compliance with this covenant. If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Registrant Subsidiaries (except Entergy New Orleans and System Energy) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the Entergy Corporation credit facility’s maturity date may occur.

Entergy Corporation has a commercial paper program with a Board-approved program limit of $2 billion. As of March 31, 2026, Entergy Corporation had $1,367 million of commercial paper outstanding. The weighted-average interest rate for the three months ended March 31, 2026 was 3.95%.

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each had credit facilities available as of March 31, 2026 as follows:

CompanyExpirationDateAmount ofFacilityInterest Rate (a)Amount Drawnas ofMarch 31, 2026Letters of CreditOutstanding as of March 31, 2026
Entergy ArkansasApril 2026 (d)$25 million (b)5.62%$—$—
Entergy ArkansasJune 2030$300 million (c)4.89%$—$—
Entergy LouisianaJune 2030$400 million (c)5.02%$—$—
Entergy MississippiJune 2030$300 million (c)4.89%$—$—
Entergy New OrleansJune 2027$25 million (c)5.39%$—$—
Entergy TexasJune 2030$300 million (c)5.02%$—$1.1 million

(a)The interest rate is the estimated interest rate as of March 31, 2026 that would have been applied to outstanding borrowings under the facility.

(b)Borrowings under this Entergy Arkansas credit facility may be secured by a security interest in its accounts receivable at Entergy Arkansas’s option.

(c)The credit facility includes fronting commitments for the issuance of letters of credit against a portion of the borrowing capacity of the facility as follows: $5 million for Entergy Arkansas; $15 million for Entergy Louisiana; $5 million for Entergy Mississippi; $10 million for Entergy New Orleans; and $25 million for Entergy Texas.

(d)In April 2026, Entergy Arkansas renewed and extended the expiration of the credit facility to April 2028.

The commitment fees on the credit facilities range from 0.075% to 0.375% of the undrawn commitment amount for Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas, and of the entire facility amount for Entergy New Orleans. Each of the credit facilities requires the Registrant Subsidiary borrower to maintain a debt ratio, as defined, of 65% or less of its total capitalization. Each Registrant Subsidiary is in compliance with this covenant.

In addition, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each has one or more uncommitted standby letter of credit facilities as a means to post collateral to support its obligations to MISO and for other purposes. The following is a summary of the uncommitted standby letter of credit facilities as of March 31, 2026:

CompanyAmount of Uncommitted FacilityLetter of Credit FeeLetters of CreditIssued as ofMarch 31, 2026(a)
Entergy Arkansas$100 million0.78%$14.6 million
Entergy Arkansas$200 million0.50%$75.0 million
Entergy Louisiana$125 million0.78%$81.0 million
Entergy Louisiana$45 million0.50%$37.0 million
Entergy Mississippi$65 million0.78%$43.2 million (b)
Entergy Mississippi$65 million0.50%$43.0 million
Entergy New Orleans$1 million1.625%$0.5 million
Entergy Texas$150 million1.25%$104.4 million
Entergy Texas$160 million1.05%$—

(a)As of March 31, 2026, letters of credit posted with MISO covered financial transmission rights exposure of $0.9 million for Entergy Arkansas and $0.2 million for Entergy Mississippi. See Note 8 to the financial statements herein for discussion of financial transmission rights.

(b)As of March 31, 2026, the letters of credit issued for Entergy Mississippi under this facility include $41.9 million in MISO letters of credit and $1.3 million in non-MISO letters of credit outstanding.

The short-term borrowings of the Registrant Subsidiaries are limited to amounts authorized by the FERC. Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy have FERC-authorized short-term borrowing limits effective through January 2027. The FERC-authorized short-term borrowing limit for Entergy Arkansas is effective through February 2028. In addition to borrowings from commercial banks, these companies may also borrow from the Entergy system money pool and from other internal short-term borrowing arrangements. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and the other internal borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings. Borrowings from internal and external short-term borrowings combined may not exceed the FERC-authorized limits. The following are the FERC-authorized limits for short-term borrowings and the outstanding short-term borrowings as of March 31, 2026 (aggregating both internal and external short-term borrowings) for the Registrant Subsidiaries:

AuthorizedBorrowings
(In Millions)
Entergy Arkansas$250$—
Entergy Louisiana$450$—
Entergy Mississippi$200$—
Entergy New Orleans$150$—
Entergy Texas$200$—
System Energy$200$16

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and System Energy)

See Note 17 to the financial statements in the Form 10-K for a discussion of the consolidation of the nuclear fuel company variable interest entities (VIEs). To finance the acquisition and ownership of nuclear fuel, the nuclear fuel company VIEs have credit facilities and three of the four VIEs also issue commercial paper, details of which follow as of March 31, 2026:

CompanyExpirationDateAmountofFacilityWeighted- Average Interest Rate on Borrowings (a)AmountOutstanding as ofMarch 31, 2026
(Dollars in Millions)
Entergy Arkansas VIEJune 2027$804.78%$59.1
Entergy Louisiana River Bend VIEJune 2027$1054.79%$39.5
Entergy Louisiana Waterford VIEJune 2027$1054.79%$33.2
System Energy VIEJune 2027$1204.96%$61.3

(a)Includes letter of credit fees and bank fronting fees on commercial paper issuances by the nuclear fuel company VIEs for Entergy Arkansas, Entergy Louisiana, and System Energy. The nuclear fuel company VIE for Entergy Louisiana River Bend does not issue commercial paper, but borrows directly on its bank credit facility.

The commitment fees on the credit facilities are 0.100% of the undrawn commitment amount for the Entergy Arkansas, Entergy Louisiana, and System Energy nuclear fuel company VIEs. Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio, as defined, of 70% or less of its total capitalization. Each lessee is in compliance with this covenant.

The nuclear fuel company VIEs had notes payable that were included in debt on the respective balance sheets as of March 31, 2026 as follows:

CompanyDescriptionAmount
Entergy Arkansas VIE1.84% Series N due July 2026$90 million
Entergy Arkansas VIE5.54% Series O due May 2029$70 million
Entergy Louisiana River Bend VIE2.51% Series V due June 2027$70 million
Entergy Louisiana Waterford VIE5.94% Series J due September 2026$70 million
System Energy VIE2.05% Series K due September 2027$90 million
System Energy VIE5.28% Series L due January 2029$80 million

In accordance with regulatory treatment, interest on the nuclear fuel company VIEs’ credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

As of March 31, 2026, Entergy Louisiana and System Energy each has obtained financing authorization from the FERC that extends through January 2027 for issuances by its nuclear fuel company VIEs. Entergy Arkansas has obtained financing authorization from the FERC that extends through February 2028 for issuances by its nuclear fuel company VIE.

Debt Issuances and Retirements

(Entergy Arkansas)

In January 2026, Entergy Arkansas issued $500 million of 4.95% Series mortgage bonds due January 2036 and $500 million of 5.75% Series mortgage bonds due January 2056. Entergy Arkansas used the proceeds, together with other funds, to repay, prior to maturity, its $600 million of 3.5% Series mortgage bonds due April 2026. Entergy Arkansas expects to use the remaining proceeds, together with other funds, to finance a portion of the construction of generation projects, including the Ironwood Power Station and the Arkansas Cypress Solar facility, and for general corporate purposes.

(Entergy Louisiana)

In January 2026, Entergy Louisiana redeemed, at maturity, $250 million of 4.44% Series mortgage bonds.

In February 2026, Entergy Louisiana issued $750 million of 4.90% Series mortgage bonds due April 2036 and $750 million of 5.65% Series mortgage bonds due April 2056. Entergy Louisiana expects to use the proceeds, together with other funds, to finance construction of the Franklin Farms Power Station Units 1 and 2 project, the Waterford 5 Power Station project, and the Westlake Power Station project, to support storm restoration costs related to Winter Storm Fern, and for general corporate purposes.

(Entergy Mississippi)

In March 2026, Entergy Mississippi issued $650 million of 5.05% Series mortgage bonds due April 2036. Entergy Mississippi expects to use the proceeds, together with other funds, to finance construction of the Traceview Advanced Power Station and Vicksburg Advanced Power Station, to finance, on an interim basis, storm restoration costs related to Winter Storm Fern, and for general corporate purposes.

Fair Value

The book value and the fair value of long-term debt for Entergy and the Registrant Subsidiaries as of March 31, 2026 were as follows:

Book Valueof Long-Term DebtFair Valueof Long-Term Debt (a)
(In Thousands)
Entergy$32,676,089$30,215,368
Entergy Arkansas$5,857,752$5,273,097
Entergy Louisiana$11,579,539$10,606,850
Entergy Mississippi$3,666,037$3,360,842
Entergy New Orleans$656,827$619,051
Entergy Texas$4,030,768$3,719,550
System Energy$1,194,652$1,197,732

(a)Fair values were classified as Level 2 in the fair value hierarchy discussed in Note 8 to the financial statements herein.

The book value and the fair value of long-term debt for Entergy and the Registrant Subsidiaries as of December 31, 2025 were as follows:

Book Valueof Long-Term DebtFair Valueof Long-Term Debt (a)
(In Thousands)
Entergy$30,277,161$28,208,822
Entergy Arkansas$5,423,604$4,931,734
Entergy Louisiana$10,366,835$9,510,545
Entergy Mississippi$3,021,324$2,755,286
Entergy New Orleans$656,849$621,670
Entergy Texas$4,030,188$3,780,405
System Energy$1,088,703$1,104,007

(a)Fair values were classified as Level 2 in the fair value hierarchy discussed in Note 8 to the financial statements herein.

NOTE 5. STOCK-BASED COMPENSATION (Entergy Corporation)

Entergy grants stock and stock-based awards, which are described more fully in Note 12 to the financial statements in the Form 10-K. Awards under Entergy’s plans generally vest over three years.

Stock Options

In January 2026 the Board approved and Entergy granted long-term incentive awards in the form of options on 298,829 shares of its common stock under the 2019 Omnibus Incentive Plan with a fair value of $20.81 per option. As of March 31, 2026, there were options on 3,092,022 shares of common stock outstanding with a weighted-average exercise price of $60.40. The intrinsic value, which has no effect on net income, of the outstanding stock options is calculated by the positive difference between the weighted-average exercise price of the stock options granted and Entergy Corporation’s common stock price as of March 31, 2026. The aggregate intrinsic value of the stock options outstanding as of March 31, 2026 was $150.7 million.

The following table includes financial information for stock options for the three months ended March 31, 2026 and 2025:

20262025
(In Millions)
Compensation expense included in Entergy’s consolidated net income$1.0$1.1
Tax benefit recognized in Entergy’s consolidated net income$0.2$0.3
Compensation cost capitalized as part of fixed assets and materials and supplies$0.5$0.5

Other Equity Awards

In January 2026 the Board approved and Entergy granted long-term incentive awards in the form of 461,708 restricted stock awards,20,954 restricted stock units, and 195,692 performance units under the 2019 Omnibus Incentive Plan. The restricted stock awards and restricted stock units were made effective on January 29, 2026, and were valued at $96.03 per share, which was the closing price of Entergy Corporation’s common stock on the grant date. Shares of restricted stock have the same dividend and voting rights as other common stock, are considered issued and outstanding shares of Entergy upon vesting, and are expensed ratably over the three-year vesting period. One-third of the restricted stock awards and accrued dividends will vest upon each anniversary of the grant date. The restricted stock units do not have voting rights and are not considered issued and outstanding shares of Entergy prior to vesting. One-third of the restricted stock units will vest upon each anniversary of the grant date and are paid in the form of shares of Entergy. Dividend equivalents accrue on the restricted stock units and are converted to additional restricted stock units, which are subject to the same vesting schedule as the underlying restricted stock units. The restricted stock units are expensed ratably over the three-year vesting period.

The performance units represent the value of, and are settled with, one share of Entergy Corporation common stock at the end of the three-year performance period, plus dividends accrued during the performance period on the number of performance units earned. For the 2026-2028 performance period, performance will be measured based eighty percent on relative total shareholder return, ten percent on an environmental stewardship achievement measure, andten percent on a reliability achievement measure. The performance units were granted on January 29, 2026 andeighty percent were valued at $118.24 per share based on various factors, primarily market conditions; and both theten percent for the environmental stewardship achievement and theten percent for the reliability achievement were valued at $96.03 per share, the closing price of Entergy Corporation’s common stock on the grant date. Performance units do not have voting rights and are not considered issued and outstanding shares of Entergy prior to vesting. Performance units are expensed ratably over the three-year vesting period, and compensation cost for the portion of the award based on the environmental stewardship achievement measure and the reliability achievement measure will be adjusted based on the number of units that ultimately vest. See Note 12 to the financial statements in the Form 10-K for a description of the Long-Term Performance Unit Program.

The following table includes financial information for other outstanding equity awards for the three months ended March 31, 2026 and 2025:

20262025
(In Millions)
Compensation expense included in Entergy’s consolidated net income$10.0$10.0
Tax benefit recognized in Entergy’s consolidated net income$2.5$2.5
Compensation cost capitalized as part of fixed assets and materials and supplies$5.1$4.8

NOTE 6. RETIREMENT AND OTHER POSTRETIREMENT BENEFITS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Components of Qualified Net Pension Cost

Entergy’s qualified net pension costs, including amounts capitalized, for the three months ended March 31, 2026 and 2025, included the following components:

20262025
(In Thousands)
Service cost - benefits earned during the period$23,078$23,617
Interest cost on projected benefit obligation56,04759,680
Expected return on assets(76,536)(75,280)
Recognized net loss13,95613,309
Net pension cost$16,545$21,326

The Registrant Subsidiaries’ qualified net pension costs, including amounts capitalized, for their current and former employees for the three months ended March 31, 2026 and 2025, included the following components:

2026EntergyArkansasEntergyLouisianaEntergy MississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$4,363$5,320$1,296$265$1,011$1,326
Interest cost on projected benefit obligation12,79613,4113,4341,1912,6603,316
Expected return on assets(17,825)(18,908)(4,945)(1,669)(3,779)(4,684)
Recognized net loss4,7822,1598714644891,148
Net pension cost$4,116$1,982$656$251$381$1,106
2025EntergyArkansasEntergyLouisianaEntergy MississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$4,427$5,454$1,304$411$1,024$1,372
Interest cost on projected benefit obligation13,81414,7043,6991,6472,9733,585
Expected return on assets(17,676)(18,897)(4,949)(2,174)(3,889)(4,575)
Recognized net loss4,7912,2688224154541,114
Net pension cost$5,356$3,529$876$299$562$1,496

Non-Qualified Net Pension Cost

Entergy recognized $2.4 million and $2.5 million in pension cost for its non-qualified pension plans for the three months ended March 31, 2026 and 2025, respectively. For the three months ended March 31, 2026 and 2025, there wereno settlement charges related to the payment of lump sum benefits out of the plan.

The Registrant Subsidiaries recognized the following pension cost for their current and former employees for their non-qualified pension plans for the three months ended March 31, 2026 and 2025:

EntergyArkansas · EntergyLouisiana · EntergyMississippi · EntergyNew Orleans · EntergyTexas
(In Thousands)
2026$13$61$39$35$123
2025$47$36$90$35$39

For the three months ended March 31, 2026 and 2025, there wereno settlement charges for the Registrant Subsidiaries related to the payment of lump sum benefits out of the plan.

Components of Net Other Postretirement Benefits Cost (Income)

Entergy’s net other postretirement benefits cost (income), including amounts capitalized, for the three months ended March 31, 2026 and 2025 included the following components:

20262025
(In Thousands)
Service cost - benefits earned during the period$2,694$2,757
Interest cost on APBO9,5979,690
Expected return on assets(10,314)(10,209)
Amortization of prior service credit(1,585)(5,720)
Recognized net (gain) loss4,680(3,870)
Net other postretirement benefits cost (income)$5,072($7,352)

The Registrant Subsidiaries’ net other postretirement benefits cost (income), including amounts capitalized, for their current and former employees for the three months ended March 31, 2026 and 2025 included the following components:

2026EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$551$688$159$35$129$186
Interest cost on APBO1,7662,039487182495419
Expected return on assets(4,374)—(1,374)(1,258)(2,528)(722)
Amortization of prior service cost (credit)174(309)(85)—(604)9
Recognized net (gain) loss(475)(1,098)(73)(137)9745
Net other postretirement benefits cost (income)($2,358)$1,320($886)($1,178)($2,411)($63)
2025EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Service cost - benefits earned during the period$572$671$162$52$159$174
Interest cost on APBO1,7752,012489249582394
Expected return on assets(4,225)—(1,328)(1,445)(2,452)(702)
Amortization of prior service cost (credit)524(1,136)(239)(229)(1,093)(73)
Recognized net (gain) loss(353)(1,811)(57)(27)153(7)
Net other postretirement benefits income($1,707)($264)($973)($1,400)($2,651)($214)

Reclassification out of Accumulated Other Comprehensive Income (Loss)

Entergy and Entergy Louisiana reclassified the following costs out of accumulated other comprehensive income (loss) (before taxes and including amounts capitalized) for the three months ended March 31, 2026 and 2025:

2026QualifiedPensionCostsOtherPostretirementCostsNon-QualifiedPension CostsTotal
(In Thousands)
Entergy
Amortization of prior service credit (cost)$—$1,008($62)$946
Amortization of net loss(515)(5,283)(96)(5,894)
($515)($4,275)($158)($4,948)
Entergy Louisiana
Amortization of prior service credit$—$309$—$309
Amortization of net gain (loss)(87)1,235(1)1,147
($87)$1,544($1)$1,456
2025QualifiedPensionCostsOtherPostretirementCostsNon-QualifiedPension CostsTotal
(In Thousands)
Entergy
Amortization of prior service credit (cost)$—$3,493($31)$3,462
Amortization of net gain (loss)(411)3,070(108)2,551
($411)$6,563($139)$6,013
Entergy Louisiana
Amortization of prior service credit$—$1,136$—$1,136
Amortization of net gain (loss)(91)1,811(1)1,719
($91)$2,947($1)$2,855

Accounting for Pension and Other Postretirement Benefits

In accordance with accounting standards, the other components of net benefit cost are required to be presented in the income statement separately from the service cost component and outside a subtotal of income from operations and are presented by Entergy in miscellaneous - net in other income. In addition, non-service benefit costs previously eligible for capitalization into property, plant, and equipment are being deferred to a regulatory asset/liability and will be amortized over the estimated lives of the respective assets.

Employer Contributions

Based on current assumptions, Entergy expects to contribute $200 million to its qualified pension plans in 2026. As of March 31, 2026, Entergy had contributed $46.8 million to its pension plans. Based on current assumptions, the Registrant Subsidiaries expect to contribute the following to qualified pension plans for their current and former employees in 2026:

EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNew OrleansEntergyTexasSystemEnergy
(In Thousands)
Expected 2026 pension contributions$29,716$41,599$3,991$3,304$5,931$13,249
Pension contributions made through March 2026$6,192$7,935$1,371$968$1,495$3,085
Remaining estimated pension contributions to be made in 2026$23,524$33,664$2,620$2,336$4,436$10,164

NOTE 7. BUSINESS SEGMENT INFORMATION (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy has a single reportable segment, Utility, which includes the generation, transmission, distribution, and sale of electric power in portions of Arkansas, Mississippi, Texas, and Louisiana, including the City of New Orleans; and included operation of a small natural gas distribution business in portions of Louisiana through June 30, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana and Entergy New Orleans natural gas distribution businesses on July 1, 2025. Parent & Other includes the parent company, Entergy Corporation, and other business activity, including Entergy’s non-utility operations business, which is an operating segment that does not meet the quantitative thresholds for determining reportable segments.

The following table includes operating revenues and significant expense categories regularly provided to the chief operating decision maker for the Utility segment, a reconciliation of Utility operating revenues to Entergy’s consolidated operating revenues, and a reconciliation of Utility net income to consolidated net income and net income attributable to Entergy Corporation for the three months ended March 31, 2026 and 2025:

20262025
(In Thousands)
Utility operating revenues$3,170,273$2,829,597
Reconciliation of revenues:
Other revenues (a)17,37817,303
Elimination of intersegment revenues(25)(26)
Consolidated operating revenues3,187,6262,846,874
Less Utility expenses and other items:
Fuel, fuel-related expenses, and gas purchased for resale605,295338,983
Purchased power358,505342,084
Other operation and maintenance expenses662,442662,474
Other regulatory charges (credits) - net119,299(16,843)
Other Utility items (b)879,3471,011,857
Utility net income545,385491,042
Reconciliation of net income:
Other loss(83,823)(53,372)
Elimination of intersegment loss(70,757)(75,248)
Consolidated net income390,805362,422
Preferred dividend requirements of subsidiaries and noncontrolling interests (c)5,8891,662
Net income attributable to Entergy Corporation$384,916$360,760

(a)See Note 12 to the financial statements herein and Note 19 to the financial statements in the Form 10-K for discussion of other revenues.

(b)Other Utility items includes nuclear refueling outage expenses, decommissioning expenses, taxes other than income taxes, depreciation and amortization expenses, other income, interest expense, and income tax expense.

(c)Preferred dividend requirements of subsidiaries and noncontrolling interests is substantially derived from the Utility segment. See Note 6 to the financial statements in the Form 10-K for discussion of preferred stock and noncontrolling interests.

The following table presents segment financial information for Entergy’s single reportable segment, Utility, and a reconciliation to the corresponding consolidated amounts for Entergy Corporation for the three months ended March 31, 2026 and 2025:

UtilityParent & OtherEliminationsConsolidated
(In Thousands)
Depreciation, amortization, and decommissioning$597,362$1,585$—$598,947
Interest and investment income$283,679$3,418($71,287)$215,810
Interest expense$303,065$77,206($531)$379,740
Income taxes$111,404($23,614)$—$87,790
Total assets as of March 31, 2026$79,636,000$829,719($4,661,579)$75,804,140
Total expenditures for additions to long-lived assets$2,421,886($18,855)$—$2,403,031
Depreciation, amortization, and decommissioning$567,187$1,685$—$568,872
Interest and investment income$107,175$1,688($75,457)$33,406
Interest expense$267,131$62,869($209)$329,791
Income taxes$114,273($14,232)$—$100,041
Total assets as of December 31, 2025$75,726,104$773,056($4,608,430)$71,890,730
Total expenditures for additions to long-lived assets$1,749,817$191$—$1,750,008

Eliminations are primarily intersegment activity. All of Entergy’s goodwill is related to the Utility segment.

Registrant Subsidiaries

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each has one operating and reportable segment, an integrated utility business which includes the generation, transmission, and distribution of electric power; and included operation of a small natural gas distribution business at each of Entergy Louisiana and Entergy New Orleans through June 30, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana and Entergy New Orleans natural gas distribution businesses on July 1, 2025. System Energy has one operating and reportable segment, which is an electricity generation business. Each of the Registrant Subsidiaries’ operations are managed on an integrated basis by that company because of the substantial effect of cost-based rates and regulatory oversight on the business process, cost structures, and operating results. All segment financial information for the Registrant Subsidiaries is as reported on the respective financial statements for each of the Registrant Subsidiaries.

NOTE 8. RISK MANAGEMENT AND FAIR VALUES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Market Risk

In the normal course of business, Entergy is exposed to a number of market risks. Market risk is the potential loss that Entergy may incur as a result of changes in the market or fair value of a particular commodity or instrument. All financial and commodity-related instruments, including derivatives, are subject to market risk including commodity price risk, equity price, and interest rate risk. Entergy uses derivatives primarily to mitigate commodity price risk associated with the price of fuel and to mitigate interest rate exposure related to certain financing agreements.

The Utility has limited exposure to the effects of market risk because it operates primarily under cost-based rate regulation. To the extent approved by their retail regulators, the Utility operating companies use commodity and financial instruments to hedge the exposure to price volatility inherent in their purchased power, fuel, and gas purchased for resale costs, that are recovered from customers.

Derivatives

Entergy designates a significant portion of its derivative instruments as normal purchase/normal sale transactions due to their physical settlement provisions, including power purchase and sales agreements, fuel purchase agreements, and capacity contracts. Certain derivative instruments do not qualify for designation as normal purchase/normal sale transactions due to their financial settlement provisions. See further discussion below regarding the accounting for these derivative instruments.

In 2025, Entergy Texas entered into interest rate swaps, accounted for as derivatives, to manage interest rate risks associated with Entergy Texas’s build-to-suit lease arrangement for the Legend Power Station. See Note 8 to the financial statements in the Form 10-K for further discussion of the build-to-suit lease arrangement for the Legend Power Station. These interest rate swaps are not designated as hedging instruments. Interest will be calculated as the sum of the Secured Overnight Financing Rate plus the blended spreads per the build-to-suit lease arrangement, compounded monthly, with one cash settlement per year over the approximate two year construction period. The notional volume of the hedge was calculated based on the expected costs for the Legend Power Station at the time Entergy Texas entered into the interest rate swaps. Changes in the fair value of these interest rate swaps are recognized each period, with gains and losses deferred as a regulatory asset or liability. The interest rate swaps run through January 31, 2028. The total notional volume is up to $1.1 billion for Entergy Texas as of March 31, 2026. Credit support for the swaps are covered by master agreements that do not require Entergy Texas to provide collateral based on mark-to-market values, but do carry adequate assurance language that may lead to requests for collateral.

Entergy manages fuel price volatility for Entergy Louisiana and Entergy Mississippi through the purchase of natural gas swaps that financially settle against either the average Henry Hub Gas Daily prices or the NYMEX Henry Hub. These swaps are marked-to-market through fuel expense with offsetting regulatory assets or liabilities. All benefits or costs of the program are recorded in fuel costs. The notional volumes of these swaps are based on a portion of projected annual exposure to gas price volatility for electric generation at Entergy Louisiana and Entergy Mississippi. The maximum length of time over which Entergy has executed natural gas swaps as of March 31, 2026 isseven months for Entergy Mississippi. The total volume of natural gas swaps outstanding as of March 31, 2026 is 12,505,900 MMBtu for Entergy and Entergy Mississippi. As of March 31, 2026, Entergy Louisiana hadno outstanding natural gas swaps. Credit support for these natural gas swaps is covered by master agreements that do not require Entergy to provide collateral based on mark-to-market value, but do carry adequate assurance language that may lead to requests for collateral. Prior to the sale of the Entergy New Orleans natural gas distribution business, Entergy also managed fuel price volatility related to projected winter purchases for gas distribution at Entergy New Orleans through the purchase of natural gas swaps. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy New Orleans and Entergy Louisiana natural gas distribution businesses on July 1, 2025.

During the second quarter 2025, Entergy participated in the annual financial transmission rights auction process for the MISO planning year of June 1, 2025 through May 31, 2026. Financial transmission rights are derivative instruments that represent economic hedges of future congestion charges that will be incurred in serving Entergy’s customer load. They are not designated as hedging instruments. Entergy initially records financial transmission rights at their estimated fair value and subsequently adjusts the carrying value to their estimated fair value at the end of each accounting period prior to settlement. Unrealized gains or losses on financial transmission rights held by the non-utility operations are included in operating revenues. The Utility operating companies recognize regulatory liabilities or assets for unrealized gains or losses on financial transmission rights. The total volume of financial transmission rights outstanding as of March 31, 2026 is 18,455 GWh for Entergy, including 3,947 GWh for Entergy Arkansas,9,828 GWh for Entergy Louisiana,1,981 GWh for Entergy Mississippi,661 GWh for Entergy New Orleans, and 2,038 GWh for Entergy Texas. Credit support for financial transmission rights held by the Utility operating companies is covered by cash and/or letters of credit issued by each Utility operating company as required by MISO. No cash was required to be posted for financial transmission rights exposure for the Utility operating companies as of March 31, 2026 and December 31, 2025. Letters of credit posted with MISO covered the financial transmission rights exposure for Entergy Arkansas and Entergy Mississippi as of March 31, 2026 and for Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas as of December 31, 2025. Credit support for financial transmission rights held by Entergy’s non-utility operations business may also be covered by cash and/or letters of credit. No cash or letters of credit were required to be posted for financial transmission rights exposure for the non-utility operations business as of March 31, 2026 and December 31, 2025.

The fair values of Entergy’s derivative instruments not designated as hedging instruments on the consolidated balance sheets as of March 31, 2026 and December 31, 2025 are shown in the table below. Certain investments, including those not designated as hedging instruments, are subject to master netting agreements and are presented in the balance sheet on a net basis in accordance with accounting guidance for derivatives and hedging.

InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)
(In Millions)
Assets:
Financial transmission rightsPrepayments and other$12($1)$11
Interest rate swapsPrepayments and other$1$—$1
Interest rate swapsOther deferred debits and other assets$3$—$3
Liabilities:
Natural gas swapsOther current liabilities$5$—$5
Assets:
Financial transmission rightsPrepayments and other$27$—$27
Interest rate swapsPrepayments and other$1$—$1
Liabilities:
Natural gas swapsOther current liabilities$5$—$5
Interest rate swapsOther non-current liabilities$3$—$3

(a)Represents the gross amounts of recognized assets/liabilities

(b)Represents the netting of fair value balances with the same counterparty

(c)Represents the net amounts of assets/liabilities presented on the Entergy Corporation and Subsidiaries’ Consolidated Balance Sheets

(d)Excludes letters of credit posted with MISO to cover financial transmission rights exposure in the amount of $1 million as of March 31, 2026 and $2 million as of December 31, 2025

The effects of Entergy’s derivative instruments not designated as hedging instruments on the consolidated income statements for the three months ended March 31, 2026 and 2025 are as follows:

Instrument · Income StatementLocation · Amount of gain (loss)recorded in the income statement
(In Millions)
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale(a)$3
Financial transmission rightsPurchased power expense(b)$44
Interest rate swapsInterest expense(c)($4)
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale(a)$11
Financial transmission rightsPurchased power expense(b)$49

(a)Due to regulatory treatment, the natural gas swaps are marked-to-market through fuel, fuel-related expenses, and gas purchased for resale and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as fuel expenses when the swaps are settled are recovered or refunded through fuel cost recovery mechanisms.

(b)Due to regulatory treatment, the changes in the estimated fair value of financial transmission rights for the Utility operating companies are recorded through purchased power expense and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as purchased power expense when the financial transmission rights for the Utility operating companies are settled are recovered or refunded through fuel cost recovery mechanisms.

(c)Due to regulatory treatment, the changes in the estimated fair value of the interest rate swaps for Entergy Texas are recorded through interest expense and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as interest expense when the interest rate swaps for Entergy Texas are settled are expected to be recovered in ratemaking relating to the Legend Power Station. See Note 8 to the financial statements in the Form 10-K for discussion of the build-to-suit lease arrangement for the Legend Power Station.

The fair values of derivative instruments not designated as hedging instruments on the Registrant Subsidiaries’ balance sheets as of March 31, 2026 and December 31, 2025 are shown in the tables below. Certain investments, including those not designated as hedging instruments, are subject to master netting agreements and are presented in the balance sheet on a net basis in accordance with accounting guidance for derivatives and hedging.

InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)Registrant
(In Millions)
Assets:
Financial transmission rightsPrepayments and other$2.4$—$2.4Entergy Arkansas
Financial transmission rightsPrepayments and other$7.4($0.3)$7.1Entergy Louisiana
Financial transmission rightsPrepayments and other$0.2($0.1)$0.1Entergy Mississippi
Financial transmission rightsPrepayments and other$0.8$—$0.8Entergy New Orleans
Financial transmission rightsPrepayments and other$1.0($0.1)$0.9Entergy Texas
Interest rate swapsPrepayments and other$1.1$—$1.1Entergy Texas
Interest rate swapsOther deferred debits and other assets$2.6$—$2.6Entergy Texas
Liabilities:
Natural gas swapsOther current liabilities$5.3$—$5.3Entergy Mississippi
InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)Registrant
(In Millions)
Assets:
Financial transmission rightsPrepayments and other$5.5$—$5.5Entergy Arkansas
Financial transmission rightsPrepayments and other$16.8($0.1)$16.7Entergy Louisiana
Financial transmission rightsPrepayments and other$0.4$—$0.4Entergy Mississippi
Financial transmission rightsPrepayments and other$1.8$—$1.8Entergy New Orleans
Financial transmission rightsPrepayments and other$2.3($0.2)$2.1Entergy Texas
Interest rate swapsPrepayments and other$0.5$—$0.5Entergy Texas
Liabilities:
Natural gas swapsOther current liabilities$5.3$—$5.3Entergy Mississippi
Interest rate swapsOther non-current liabilities$3.0$—$3.0Entergy Texas

(a)Represents the gross amounts of recognized assets/liabilities

(b)Represents the netting of fair value balances with the same counterparty

(c)Represents the net amounts of assets/liabilities presented on the Registrant Subsidiaries’ balance sheets

(d)Excludes letters of credit posted with MISO to cover financial transmission rights exposure in the amount of $0.9 million for Entergy Arkansas and $0.2 million for Entergy Mississippi as of March 31, 2026 and in the amount of $0.1 million for Entergy Arkansas, $0.8 million for Entergy Louisiana, $0.8 million for Entergy Mississippi, and $0.1 million for Entergy Texas as of December 31, 2025

The effects of derivative instruments not designated as hedging instruments on the Registrant Subsidiaries’ income statements for the three months ended March 31, 2026 and 2025 are as follows:

InstrumentIncome Statement LocationAmount of gain(loss) recordedin the income statementRegistrant
(In Millions)
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale$3.0(a)Entergy Mississippi
Financial transmission rightsPurchased power expense$8.4(b)Entergy Arkansas
Financial transmission rightsPurchased power expense$25.5(b)Entergy Louisiana
Financial transmission rightsPurchased power expense$8.4(b)Entergy Mississippi
Financial transmission rightsPurchased power expense($1.0)(b)Entergy New Orleans
Financial transmission rightsPurchased power expense$2.6(b)Entergy Texas
Interest rate swapsInterest expense($3.7)(c)Entergy Texas
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale$11.4(a)Entergy Mississippi
Financial transmission rightsPurchased power expense$18.8(b)Entergy Arkansas
Financial transmission rightsPurchased power expense$22.0(b)Entergy Louisiana
Financial transmission rightsPurchased power expense$2.0(b)Entergy Mississippi
Financial transmission rightsPurchased power expense$2.2(b)Entergy New Orleans
Financial transmission rightsPurchased power expense$3.5(b)Entergy Texas

(a)Due to regulatory treatment, the natural gas swaps are marked-to-market through fuel, fuel-related expenses, and gas purchased for resale and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as fuel expenses when the swaps are settled are recovered or refunded through fuel cost recovery mechanisms.

(b)Due to regulatory treatment, the changes in the estimated fair value of financial transmission rights for the Utility operating companies are recorded through purchased power expense and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as purchased power expense when the financial transmission rights for the Utility operating companies are settled are recovered or refunded through fuel cost recovery mechanisms.

(c)Due to regulatory treatment, the changes in the estimated fair value of the interest rate swaps for Entergy Texas are recorded through interest expense and such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as interest expense when the interest rate swaps for Entergy Texas are settled are expected to be recovered in ratemaking relating to the Legend Power Station. See Note 8 to the financial statements in the Form 10-K for discussion of the build-to-suit lease arrangement for the Legend Power Station.

Fair Values

The estimated fair values of Entergy’s financial instruments and derivatives are determined using historical prices, bid prices, market quotes, and financial modeling. Considerable judgment is required in developing the estimates of fair value. Therefore, estimates are not necessarily indicative of the amounts that Entergy could realize in a current market exchange. Gains or losses realized on financial instruments are reflected in future rates and therefore do not affect net income. Entergy considers the carrying amounts of most financial instruments classified as current assets and liabilities to be a reasonable estimate of their fair value because of the short maturity of these instruments.

Accounting standards define fair value as an exit price, or the price that would be received to sell an asset or the amount that would be paid to transfer a liability in an orderly transaction between knowledgeable market participants at the date of measurement. Entergy and the Registrant Subsidiaries use assumptions or market input data that market participants would use in pricing assets or liabilities at fair value. The inputs can be readily observable, corroborated by market data, or generally unobservable. Entergy and the Registrant Subsidiaries endeavor to use the best available information to determine fair value.

Accounting standards establish a fair value hierarchy that prioritizes the inputs used to measure fair value. The hierarchy establishes the highest priority for unadjusted market quotes in an active market for the identical asset or liability and the lowest priority for unobservable inputs.

The three levels of the fair value hierarchy are:

Level 1 - Level 1 inputs are unadjusted quoted prices in active markets for identical assets or liabilities that the entity has the ability to access at the measurement date. Active markets are those in which transactions for the asset or liability occur in sufficient frequency and volume to provide pricing information on an ongoing basis. Level 1 primarily consists of individually owned common stocks, cash equivalents (temporary cash investments, securitization recovery trust account, and escrow accounts), debt instruments, and gas swaps traded on exchanges with active markets. Cash equivalents includes all unrestricted highly liquid debt instruments with an original or remaining maturity of three months or less at the date of purchase.

Level 2 - Level 2 inputs are inputs other than quoted prices included in Level 1 that are, either directly or indirectly, observable for the asset or liability at the measurement date. Assets are valued based on prices derived by independent third parties that use inputs such as benchmark yields, reported trades, broker/dealer quotes, and issuer spreads. Prices are reviewed and can be challenged with the independent parties and/or overridden by Entergy if it is believed such would be more reflective of fair value. Level 2 inputs include the following:

–quoted prices for similar assets or liabilities in active markets;

–quoted prices for identical assets or liabilities in inactive markets;

–inputs other than quoted prices that are observable for the asset or liability; or

–inputs that are derived principally from or corroborated by observable market data by correlation or other means.

Level 2 consists primarily of individually-owned debt instruments, gas swaps, and interest rate swaps valued using observable inputs.

Level 3 - Level 3 inputs are pricing inputs that are generally less observable or unobservable from objective sources. These inputs are used with internally developed methodologies to produce management’s best estimate of fair value for the asset or liability. Level 3 consists primarily of financial transmission rights.

The values of financial transmission rights are based on unobservable inputs, including estimates of congestion costs in MISO between applicable generation and load pricing nodes based on the 50th percentile of historical prices. They are classified as Level 3 assets and liabilities. The valuations of these assets and liabilities are performed by the Office of Corporate Risk Oversight. The values are calculated internally and verified against the data published by MISO. Entergy’s Accounting group reviews these valuations for reasonableness, with the assistance of others within the organization with knowledge of the various inputs and assumptions used in the valuation. The Office of Corporate Risk Oversight reports to the Vice President and Treasurer. The Accounting group reports to the Chief Accounting Officer.

The following tables set forth, by level within the fair value hierarchy, Entergy’s assets and liabilities that are accounted for at fair value on a recurring basis as of March 31, 2026 and December 31, 2025. The assessment of the significance of a particular input to a fair value measurement requires judgment and may affect placement within the fair value hierarchy levels.

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$3,503$—$—$3,503
Decommissioning trust funds (a):
Equity securities79——79
Debt securities1,0141,396—2,410
Common trusts (b)3,666
Securitization recovery trust account7——7
Storm reserve escrow accounts312——312
Financial transmission rights——1111
Interest rate swaps—4—4
$4,915$1,400$11$9,992
Liabilities:
Natural gas swaps$5$—$—$5
$5$—$—$5
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$1,883$—$—$1,883
Decommissioning trust funds (a):
Equity securities51——51
Debt securities9051,297—2,202
Common trusts (b)4,048
Securitization recovery trust account1——1
Storm reserve escrow accounts309——309
Financial transmission rights——2727
Interest rate swaps—1—1
$3,149$1,298$27$8,522
Liabilities:
Natural gas swaps$5$—$—$5
Interest rate swaps—3—3
$5$3$—$8

(a)The decommissioning trust funds hold equity and fixed income securities. Equity securities are invested to approximate the returns of major market indices. Fixed income securities are held in various governmental and corporate securities. See Note 9 to the financial statements herein for additional information on the investment portfolios.

(b)Common trust funds are not publicly quoted and are valued by the fund administrators using net asset value as a practical expedient. Accordingly, these funds are not assigned a level in the fair value table. The fund administrator of these investments allows daily trading at the net asset value and trades settle at a later date.

The following table sets forth a reconciliation of changes in the net assets for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the three months ended March 31, 2026 and 2025:

20262025
(In Millions)
Balance as of January 1,$27$20
Gains included as a regulatory liability/asset2836
Settlements(44)(49)
Balance as of March 31,$11$7

The fair values of the Level 3 financial transmission rights are based on unobservable inputs calculated internally and verified against historical pricing data published by MISO.

The following tables set forth, by level within the fair value hierarchy, the Registrant Subsidiaries’ assets and liabilities that are accounted for at fair value on a recurring basis as of March 31, 2026 and December 31, 2025. The assessment of the significance of a particular input to a fair value measurement requires judgment and may affect placement within the fair value hierarchy levels.

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$563.4$—$—$563.4
Decommissioning trust funds (a):
Equity securities49.8——49.8
Debt securities322.2364.4—686.6
Common trusts (b)1,039.2
Financial transmission rights——2.42.4
$935.4$364.4$2.4$2,341.4
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$268.5$—$—$268.5
Decommissioning trust funds (a):
Equity securities20.0——20.0
Debt securities251.9362.1—614.0
Common trusts (b)1,182.3
Financial transmission rights——5.55.5
$540.4$362.1$5.5$2,090.3
2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$1,238.7$—$—$1,238.7
Decommissioning trust funds (a):
Equity securities24.2——24.2
Debt securities380.2665.6—1,045.8
Common trusts (b)1,620.3
Storm reserve escrow account237.1——237.1
Financial transmission rights——7.17.1
$1,880.2$665.6$7.1$4,173.2
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$776.7$—$—$776.7
Decommissioning trust funds (a):
Equity securities22.8——22.8
Debt securities373.2619.4—992.6
Common trusts (b)1,738.4
Storm reserve escrow account235.0——235.0
Financial transmission rights——16.716.7
$1,407.7$619.4$16.7$3,782.2

Entergy Mississippi

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$1,083.0$—$—$1,083.0
Financial transmission rights——0.10.1
$1,083.0$—$0.1$1,083.1
Liabilities:
Natural gas swaps$5.3$—$—$5.3
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$341.5$—$—$341.5
Financial transmission rights——0.40.4
$341.5$—$0.4$341.9
Liabilities:
Natural gas swaps$5.3$—$—$5.3

Entergy New Orleans

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$68.9$—$—$68.9
Storm reserve escrow account74.5——74.5
Financial transmission rights——0.80.8
$143.4$—$0.8$144.2
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$110.2$—$—$110.2
Storm reserve escrow account73.8——73.8
Financial transmission rights——1.81.8
$184.0$—$1.8$185.8

Entergy Texas

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$433.8$—$—$433.8
Securitization recovery trust account7.2——$7.2
Financial transmission rights——0.90.9
Interest rate swaps——3.73.7
$441.0$—$4.6$445.6
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$274.9$—$—$274.9
Securitization recovery trust account1.5——1.5
Financial transmission rights——2.12.1
Interest rate swaps—0.5—0.5
$276.4$0.5$2.1$279.0
Liabilities:
Interest rate swaps$—$3.0$—$3.0

System Energy

2026Level 1Level 2Level 3Total
(In Millions)
Assets:
Decommissioning trust funds (a):
Equity securities$4.7$—$—$4.7
Debt securities311.9366.1—678.0
Common trusts (b)1,006.6
$316.6$366.1$—$1,689.3
2025Level 1Level 2Level 3Total
(In Millions)
Assets:
Decommissioning trust funds (a):
Equity securities$8.6$—$—$8.6
Debt securities280.5314.5—595.0
Common trusts (b)1,127.1
$289.1$314.5$—$1,730.7

(a)The decommissioning trust funds hold equity and fixed income securities. Equity securities are invested to approximate the returns of major market indices. Fixed income securities are held in various governmental and corporate securities. See Note 9 to the financial statements herein for additional information on the investment portfolios.

(b)Common trust funds are not publicly quoted and are valued by the fund administrators using net asset value as a practical expedient. Accordingly, these funds are not assigned a level in the fair value table. The fund administrator of these investments allows daily trading at the net asset value and trades settle at a later date.

The following table sets forth a reconciliation of changes in the net assets for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the three months ended March 31, 2026.

Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
(In Millions)
Balance as of January 1, 2026$5.5$16.7$0.4$1.8$2.1
Gains (losses) included as a regulatory liability/asset5.315.98.1(2.0)1.4
Settlements(8.4)(25.5)(8.4)1.0(2.6)
Balance as of March 31, 2026$2.4$7.1$0.1$0.8$0.9

The following table sets forth a reconciliation of changes in the net assets (liabilities) for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the three months ended March 31, 2025.

Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
(In Millions)
Balance as of January 1, 2025$8.6$8.6($0.5)$1.3$1.9
Gains included as a regulatory liability/asset13.216.82.41.32.0
Settlements(18.8)(22.0)(2.0)(2.2)(3.5)
Balance as of March 31, 2025$3.0$3.4($0.1)$0.4$0.4

NOTE 9. DECOMMISSIONING TRUST FUNDS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and System Energy)

The NRC requires certain of the Utility operating companies and System Energy to maintain nuclear decommissioning trusts to fund the costs of decommissioning ANO 1 and 2, River Bend, Waterford 3, and Grand Gulf. Entergy’s nuclear decommissioning trust funds invest in equity securities, fixed-rate debt securities, and cash and cash equivalents.

Entergy records decommissioning trust funds on the balance sheet at their fair value. Because of the ability of the Registrant Subsidiaries to recover decommissioning costs in rates and in accordance with the regulatory treatment for decommissioning trust funds, for unrealized gains/(losses) on investment securities, the Registrant Subsidiaries record an offsetting amount in other regulatory liabilities/assets. For the 30% interest in River Bend formerly owned by Cajun, Entergy Louisiana records an offsetting amount in other long-term liabilities on the consolidated balance sheets of Entergy and Entergy Louisiana for the unrealized trust earnings not currently expected to be needed to decommission the plant. Generally, Entergy records gains and losses on its debt and equity securities using the specific identification method to determine the cost basis of its securities.

The unrealized gains/(losses) recognized during the three months ended March 31, 2026 on equity securities still held as of March 31, 2026 were $185 million. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The available-for-sale debt securities held as of March 31, 2026 and December 31, 2025 are summarized as follows:

20262025
(In Millions)
Fair value$2,410$2,202
Unrealized gains$15$28
Unrealized losses$60$45

As of March 31, 2026 and December 31, 2025, there wereno deferred taxes on unrealized gains/(losses). The amortized cost of available-for-sale debt securities was $2,456 million as of March 31, 2026 and $2,219 million as of December 31, 2025. As of March 31, 2026, available-for-sale debt securities had an average coupon rate of approximately 4.17%, an average duration of approximately 6.22 years, and an average maturity of approximately 10.58 years.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of March 31, 2026 and December 31, 2025:

20262025
FairValueGrossUnrealizedLossesFairValueGrossUnrealizedLosses
(In Millions)
Less than 12 months$991$14$361$3
More than 12 months5024654942
Total$1,493$60$910$45
20262025
(In Millions)
Less than 1 year$27$31
1 year - 5 years611649
5 years - 10 years744645
10 years - 15 years278188
15 years - 20 years284218
20 years+466471
Total$2,410$2,202

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three months ended March 31, 2026 and 2025:

20262025
(In Millions)
Proceeds from disposition of securities$159$262
Realized gains$1$1
Realized losses$2$4

During the three months ended March 31, 2026 and 2025, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

Entergy Arkansas holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts. The available-for-sale debt securities held as of March 31, 2026 and December 31, 2025 are summarized as follows:

20262025
(In Millions)
Fair value$686.6$614.0
Unrealized gains$4.1$7.5
Unrealized losses$18.8$14.2

The amortized cost of available-for-sale debt securities was $701.2 million as of March 31, 2026 and $620.7 million as of December 31, 2025. As of March 31, 2026, the available-for-sale debt securities had an average coupon rate of approximately 3.75%, an average duration of approximately 6.27 years, and an average maturity of approximately 8.55 years.

The unrealized gains/(losses) recognized during the three months ended March 31, 2026 on equity securities still held as of March 31, 2026 were $52 million. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of March 31, 2026 and December 31, 2025:

20262025
FairValueGrossUnrealizedLossesFairValueGrossUnrealizedLosses
(In Millions)
Less than 12 months$233.3$3.7$89.1$0.6
More than 12 months191.715.1211.113.6
Total$425.0$18.8$300.2$14.2
20262025
(In Millions)
Less than 1 year$22.6$27.7
1 year - 5 years144.5140.2
5 years - 10 years278.8256.8
10 years - 15 years99.069.1
15 years - 20 years78.461.4
20 years+63.358.8
Total$686.6$614.0

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three months ended March 31, 2026 and 2025:

20262025
(In Millions)
Proceeds from disposition of securities$3.8$—
Realized gains$—$—
Realized losses$0.1$—

During three months ended March 31, 2026 and 2025, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

Entergy Louisiana holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts. The available-for-sale debt securities held as of March 31, 2026 and December 31, 2025 are summarized as follows:

20262025
(In Millions)
Fair value$1,045.8$992.6
Unrealized gains$6.9$13.0
Unrealized losses$20.3$15.0

The amortized cost of available-for-sale debt securities was $1,059.2 million as of March 31, 2026 and $994.6 million as of December 31, 2025. As of March 31, 2026, the available-for-sale debt securities had an average coupon rate of approximately 4.44%, an average duration of approximately 6.21 years, and an average maturity of approximately 12.21 years.

The unrealized gains/(losses) recognized during the three months ended March 31, 2026 on equity securities still held as of March 31, 2026 were $82.6 million. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of March 31, 2026 and December 31, 2025:

20262025
FairValueGrossUnrealizedLossesFairValueGrossUnrealizedLosses
(In Millions)
Less than 12 months$449.9$5.4$179.8$1.6
More than 12 months176.614.9196.613.4
Total$626.5$20.3$376.4$15.0
20262025
(In Millions)
Less than 1 year$1.5$0.9
1 year - 5 years246.2259.0
5 years - 10 years237.2227.7
10 years - 15 years129.893.6
15 years - 20 years152.2110.9
20 years+278.9300.5
Total$1,045.8$992.6

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three months ended March 31, 2026 and 2025:

20262025
(In Millions)
Proceeds from disposition of securities$75.7$110.0
Realized gains$0.4$0.1
Realized losses$1.5$1.5

During the three months ended March 31, 2026 and 2025, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

System Energy

System Energy holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts. The available-for-sale debt securities held as of March 31, 2026 and December 31, 2025 are summarized as follows:

20262025
(In Millions)
Fair value$678.0$595.0
Unrealized gains$3.7$7.4
Unrealized losses$21.4$16.2

The amortized cost of available-for-sale debt securities was $695.7 million as of March 31, 2026 and $603.7 million as of December 31, 2025. As of March 31, 2026, the available-for-sale debt securities had an average coupon rate of approximately 4.22%, an average duration of approximately 6.18 years, and an average maturity of approximately 10.20 years.

The unrealized gains/(losses) recognized during the three months ended March 31, 2026 on equity securities still held as of March 31, 2026 were $50.5 million. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of March 31, 2026 and December 31, 2025:

20262025
FairValueGrossUnrealizedLossesFairValueGrossUnrealizedLosses
(In Millions)
Less than 12 months$307.5$5.1$91.9$1.1
More than 12 months134.216.3141.715.1
Total$441.7$21.4$233.6$16.2
20262025
(In Millions)
Less than 1 year$2.6$2.2
1 year - 5 years220.5249.8
5 years - 10 years227.6160.3
10 years - 15 years48.825.5
15 years - 20 years53.446.2
20 years+125.1111.0
Total$678.0$595.0

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three months ended March 31, 2026 and 2025:

20262025
(In Millions)
Proceeds from disposition of securities$79.0$152.3
Realized gains$0.3$0.6
Realized losses$0.7$2.7

During the three months ended March 31, 2026 and 2025, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

NOTE 10. INCOME TAXES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See “Income Tax Audits” and “Other Tax Matters” in Note 3 to the financial statements in the Form 10-K for a discussion of income tax audits, the Tax Cuts and Jobs Act, the Inflation Reduction Act of 2022, and other income tax matters involving Entergy. The following are updates to that discussion.

Other Tax Matters

Inflation Reduction Act of 2022

In April 2026 the LPSC issued an order approving an agreement between Entergy Louisiana and the LPSC staff regarding the monetization of the 2025 nuclear production tax credits. The order allows Entergy Louisiana to retain the net proceeds of the monetized credits while the associated tax position remains uncertain. While retaining these proceeds, Entergy Louisiana will accrue carrying charges to its customers at its weighted average cost of capital. The order further provides that customers will be responsible for any associated costs should the IRS reduce some or all of the value of the nuclear production tax credits transferred to third parties. Once the IRS makes a final determination affirming the value of the credits or the audit period expires without a disallowance, Entergy Louisiana will commence flowing the net proceeds of the nuclear production tax credits, including carrying charges, to its customers. This treatment is consistent with the approach previously approved for the 2024 nuclear production tax credits, as discussed in Note 3 to the financial statements in the Form 10-K.

In April 2026, Entergy Arkansas, Entergy Louisiana, and System Energy entered into an agreement with a third-party purchaser to transfer in third quarter 2026 certain nuclear production tax credits for cash, including a reasonable discount, prior to the filing of Entergy’s 2025 federal income tax return. The monetized value of these credits, net of applicable expenses, is expected to be addressed in retail rates in accordance with applicable regulatory mechanisms.

Amortization of Tax Gross-up on Customer Advances

Amortization of tax gross-up on customer advances, including customer advances for construction, were $22.8 million for Entergy, $1.4 million for Entergy Arkansas, $14.7 million for Entergy Louisiana, $6.2 million for Entergy Mississippi, and $0.5 million for Entergy Texas for the three months ended March 31, 2026. Amortization of tax gross-up on customer advances, including customer advances for construction, were $15.5 million for Entergy, $1.1 million for Entergy Arkansas, $6.5 million for Entergy Louisiana, $6.1 million for Entergy Mississippi, and $1.9 million for Entergy Texas for the three months ended March 31, 2025. Amortization of tax gross-up on customer advances is included in miscellaneous – net in other income in the income statement.

NOTE 11. VARIABLE INTEREST ENTITIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See Note 17 to the financial statements in the Form 10-K for a discussion of variable interest entities (VIEs). See Note 4 to the financial statements herein for details of the nuclear fuel companies’ credit facilities, commercial paper borrowings, and long-term debt. See Note 6 to the financial statements in the Form 10-K for discussion of noncontrolling interests.

Restoration Law Trust I (the storm trust I), a trust consolidated by Entergy Louisiana, is a VIE and Entergy Louisiana is the primary beneficiary. As of March 31, 2026 and December 31, 2025, the primary asset held by the storm trust I was $2.6 billion and $2.7 billion, respectively, of outstanding Entergy Finance Company preferred membership interests, which is reflected as an investment in affiliate preferred membership interests on the consolidated balance sheets of Entergy Louisiana. The LURC’s 1% beneficial interest in the storm trust I is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Louisiana, with balances of $26.6 million as of March 31, 2026 and $27.1 million as of December 31, 2025.

Restoration Law Trust II (the storm trust II), a trust consolidated by Entergy Louisiana, is a VIE and Entergy Louisiana is the primary beneficiary. As of March 31, 2026 and December 31, 2025, the primary asset held by the storm trust II was $1.3 billion and $1.3 billion, respectively, of outstanding Entergy Finance Company preferred membership interests, which is reflected as an investment in affiliate preferred membership interests on the consolidated balance sheets of Entergy Louisiana. The LURC’s 1% beneficial interest in the storm trust II is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Louisiana, with balances of $13.3 million as of March 31, 2026 and $13.1 million as of December 31, 2025.

System Energy is considered to hold a variable interest in the lessor from which it leases an undivided interest in the Grand Gulf nuclear plant. System Energy is the lessee under this arrangement, which is described in more detail in Note 5 to the financial statements in the Form 10-K. System Energy made payments under this arrangement, including interest, of $8.6 million in each of the three months ended March 31, 2026 and the three months ended March 31, 2025.

AR Searcy Partnership, LLC is a tax equity partnership that qualifies as a VIE, which Entergy Arkansas is required to consolidate as it is the primary beneficiary. As of March 31, 2026, AR Searcy Partnership, LLC recorded assets equal to $123.8 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Arkansas’s ownership interest in the partnership was approximately $111.8 million. As of December 31, 2025, AR Searcy Partnership, LLC recorded assets equal to $124.4 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Arkansas’s ownership interest in the partnership was approximately $113.1 million. The tax equity investor’s ownership interest is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Arkansas.

MS Sunflower Partnership, LLC is a tax equity partnership that qualifies as a VIE, which Entergy Mississippi is required to consolidate as it is the primary beneficiary. As of March 31, 2026, MS Sunflower Partnership, LLC recorded assets equal to $150.9 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Mississippi’s ownership interest in the partnership was approximately $135.1 million. As of December 31, 2025, MS Sunflower Partnership, LLC recorded assets equal to $154.5 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Mississippi’s ownership interest in the partnership was approximately $134.9 million. The tax equity investor’s ownership interest is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Mississippi.

NOTE 12. REVENUE (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See Note 19 to the financial statements in the Form 10-K for a discussion of revenue recognition. Entergy’s total revenues for the three months ended March 31, 2026 and 2025 were as follows:

20262025
(In Thousands)
Utility:
Residential$1,149,436$1,113,304
Commercial748,119684,007
Industrial934,445774,119
Governmental67,65962,819
Total billed retail2,899,6592,634,249
Sales for resale (a)142,08351,872
Other electric revenues (b)118,99976,218
Revenues from contracts with customers3,160,7412,762,339
Other Utility revenues (c)9,532(4,473)
Electric revenues3,170,2732,757,866
Natural gas revenues—71,731
Other revenues (d)17,35317,277
Total operating revenues$3,187,626$2,846,874

The Utility operating companies’ total revenues for the three months ended March 31, 2026 and 2025 were as follows:

2026EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNewOrleansEntergyTexas
(In Thousands)
Residential$271,388$392,004$206,604$66,992$212,448
Commercial140,198284,548154,12450,939118,310
Industrial173,760534,71470,5716,119149,281
Governmental4,65821,60015,50317,6758,223
Total billed retail590,0041,232,866446,802141,725488,262
Sales for resale (a)37,305111,47557,98630,5234,156
Other electric revenues (b)16,52676,27718,226(2,178)11,491
Revenues from contracts with customers643,8351,420,618523,014170,070503,909
Other revenues (c)2,4623,4672,3701,581(377)
Electric revenues646,2971,424,085525,384171,651503,532
Total operating revenues$646,297$1,424,085$525,384$171,651$503,532
2025EntergyArkansasEntergyLouisianaEntergyMississippiEntergyNewOrleansEntergyTexas
(In Thousands)
Residential$274,606$378,238$186,308$65,689$208,463
Commercial131,617263,200135,87347,622105,695
Industrial149,065465,70747,3455,654106,348
Governmental4,21921,66913,69016,5296,712
Total billed retail559,5071,128,814383,216135,494427,218
Sales for resale (a)36,729111,54828,0973,8892,395
Other electric revenues (b)16,07637,98911,799(565)12,296
Revenues from contracts with customers612,3121,278,351423,112138,818441,909
Other revenues (c)1,199(6,405)59710730
Electric revenues613,5111,271,946423,709138,925441,939
Natural gas revenues—29,601—42,130—
Total operating revenues$613,511$1,301,547$423,709$181,055$441,939

(a)Sales for resale includes day-ahead sales of energy in a market administered by an ISO. These sales represent financially binding commitments for the sale of physical energy the next day. These sales are adjusted to actual power generated and delivered in the real time market. Given the short duration of these transactions, Entergy does not consider them to be derivatives subject to fair value adjustments and includes them as part of customer revenues.

(b)Other electric revenues consist primarily of transmission and ancillary services provided to participants of an ISO-administered market, unbilled revenue, and the return on construction work in progress for certain utility plant investments.

(c)Other Utility revenues include occasional sales of inventory, alternative revenue programs, provisions for revenue subject to refund, late fees, and amounts resulting from other operating activities.

(d)Other revenues include the sale of electric power and capacity to wholesale customers, day-ahead sales of energy in a market administered by an ISO, and operation and management services fees.

Electric Revenues

See Note 19 to the financial statements in the Form 10-K for a discussion of electric revenues. The following is an update to that discussion.

Most of Entergy’s contracts are on demand, with customer bills that vary each month based on an approved tariff and usage. Certain retail customers, primarily large industrial customers from various industries, have electric service agreements that require a fixed amount of consideration to be paid through the end of a contract term longer than one year. As of March 31, 2026, the amount of revenues related to this fixed consideration that Entergy expects to recognize over the remaining contract terms, extending through 2048, was $8,031 million for Entergy, including $4,400 million for Entergy Arkansas, $848 million for Entergy Louisiana, $2,577 million for Entergy Mississippi, and $206 million for Entergy Texas. These contracts also require variable payments based on the actual amount of energy service, which are recognized as revenue as Entergy has the right to bill the customer for services performed.

In the opinion of the management of Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy, the accompanying unaudited financial statements contain all adjustments (consisting primarily of normal recurring accruals and reclassification of previously reported amounts to conform to current classifications) necessary for a fair statement of the results for the interim periods presented. Entergy’s business is subject to seasonal fluctuations, however, with peak periods occurring typically during the first and third quarters. The results for the interim periods presented should not be used as a basis for estimating results of operations for a full year.

Part I, Item 3. Quantitative and Qualitative Disclosures About Market Risk

See the “Market and Credit Risk Sensitive Instruments” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis.

Part I, Item 4. Controls and Procedures

Disclosure Controls and Procedures

As of March 31, 2026, evaluations were performed under the supervision and with the participation of Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy (each individually a “Registrant” and collectively the “Registrants”) management, including their respective Principal Executive Officers (PEO) and Principal Financial Officers (PFO). The evaluations assessed the effectiveness of the Registrants’ disclosure controls and procedures. Based on the evaluations, each PEO and PFO has concluded that, as to the Registrant or Registrants for which they serve as PEO or PFO, the Registrant’s or Registrants’ disclosure controls and procedures are effective to ensure that information required to be disclosed by each Registrant in reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized, and reported within the time periods specified in Securities and Exchange Commission rules and forms; and that the Registrant’s or Registrants’ disclosure controls and procedures are also effective in reasonably assuring that such information is accumulated and communicated to the Registrant’s or Registrants’ management, including their respective PEOs and PFOs, as appropriate to allow timely decisions regarding required disclosure.

Changes in Internal Control over Financial Reporting

Under the supervision and with the participation of each Registrant’s management, including its respective PEO and PFO, each Registrant evaluated changes in internal control over financial reporting that occurred during the quarter ended March 31, 2026 and found no change that has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.

ENTERGY ARKANSAS, LLC AND SUBSIDIARIES

See the “Winter Storm Fern” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis for a discussion of Winter Storm Fern. Entergy Arkansas’s current estimate for the cost of mobilizing crews and restoring power is approximately $50 million, including approximately $40 million in capital costs and approximately $10 million in non-capital costs. Natural gas purchases for Entergy Arkansas were $74 million in January 2026 compared to $25 million in January 2025.

Net income decreased $3.8 million primarily due to higher interest expense and lower volume/weather, partially offset by higher retail electric price.

Following is an analysis of the change in operating revenues comparing the three months ended March 31, 2026 to the three months ended March 31, 2025:

Amount
(In Millions)
2025 operating revenues$613.5
Fuel, rider, and other revenues that do not significantly affect net income21.8
Retail electric price22.5
Volume/weather(11.5)
2026 operating revenues$646.3

Entergy Arkansas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to an increase in formula rate plan rates effective January 2026. See Note 2 to the financial statements in the Form 10-K for discussion of the 2025 formula rate plan filing.

The volume/weather variance is primarily due to the effect of less favorable weather on residential sales, a decrease in weather-adjusted residential usage, and a decrease in commercial usage, partially offset by an increase in industrial usage. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the primary metals and technology industries.

Total electric energy sales for Entergy Arkansas for the three months ended March 31, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential1,9652,210(11)
Commercial1,2391,260(2)
Industrial3,0612,54220
Governmental41395
Total retail6,3066,0514
Sales for resale:
Associated companies236536(56)
Non-associated companies6165639
Total7,1587,150—

See Note 12 to the financial statements herein for additional discussion of Entergy Arkansas’s operating revenues.

Other operation and maintenance expenses increased primarily due to an increase of $6.9 million in power delivery expenses primarily due to higher vegetation maintenance costs and increased contract labor costs, partially offset by a decrease of $6.2 million in insurance expenses primarily due to higher nuclear insurance refunds.

Taxes other than income taxes increased primarily due to increases in ad valorem taxes resulting from higher assessments and millage rate increases.

Depreciation and amortization expenses increased primarily due to additions to plant in service and an increase in FERC jurisdictional depreciation rates effective January 2026.

Entergy Arkansas records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income increased primarily due to changes in decommissioning trust fund activity, including portfolio rebalancing of decommissioning trust funds in first quarter 2026.

the issuances of $500 million of 5.75% Series mortgage bonds and $500 million of 4.95% Series mortgage bonds, each in January 2026;

the issuance of $300 million of 5.45% Series mortgage bonds in May 2025; and

$3.8 million in carrying costs in first quarter 2026 on retained net proceeds from the monetization of nuclear production tax credits.

The effective income tax rate was 17.6% for the first quarter 2026. The difference in the effective income tax rate for the first quarter 2026 versus the federal statutory rate of 21% was primarily due to the amortization of excess accumulated deferred income taxes, certain book and tax differences related to utility plant items, and book and tax differences related to the allowance for equity funds used during construction, partially offset by the accrual for state income taxes.

The effective income tax rate was 21% for the first quarter 2025. The accrual for state income taxes was offset by certain book and tax differences related to utility plant items and the amortization of excess state accumulated deferred income taxes as a result of tax rate changes.

20262025
(In Thousands)
Cash and cash equivalents at beginning of period$275,570$4,747
Net cash provided by (used in):
Operating activities262,281257,177
Investing activities(418,213)(161,111)
Financing activities457,847(45,753)
Net increase in cash and cash equivalents301,91550,313
Cash and cash equivalents at end of period$577,485$55,060

Net cash flow provided by operating activities increased $5.1 million for the three months ended March 31, 2026 compared to the three months ended March 31, 2025 primarily due to higher collections from customers and the receipt of $48.7 million in advance payments related to customer agreements in first quarter 2026. The increase was substantially offset by higher fuel and purchased power payments and the timing of payments to vendors. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery.

Net cash flow used in investing activities increased $257.1 million for the three months ended March 31, 2026 compared to the three months ended March 31, 2025 primarily due to:

an increase of $128.0 million in non-nuclear generation construction expenditures primarily due to higher spending on the Ironwood Power Station project and the Jefferson Power Station project;

an increase of $31.8 million in nuclear construction expenditures primarily due to increased spending on various nuclear projects in 2026;

net purchases of $50.2 million in 2026 compared to net proceeds of $12.3 million in 2025 as a result of fluctuations in nuclear fuel activity due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle; and

money pool activity.

Increases in Entergy Arkansas’s receivable from the money pool are a use of cash flow, and Entergy Arkansas’s receivable from the money pool increased $21.2 million for the three months ended March 31, 2026 compared to increasing by $9.6 million for the three months ended March 31, 2025. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Entergy Arkansas’s financing activities provided $457.8 million of cash for the three months ended March 31, 2026 compared to using $45.8 million of cash for three months ended March 31, 2025 primarily due to the following activity:

the issuances of $500 million of 5.75% Series mortgage bonds and $500 million of 4.95% Series mortgage bonds, each in January 2026;

net long-term borrowings of $45.4 million in 2026 compared to net repayments of $17.1 million in 2025 on the nuclear fuel company variable interest entity’s credit facility;

an increase of $40.5 million in net customer advances for construction related to transmission, distribution, and generator interconnection agreements;

money pool activity; and

the repayment, prior to maturity, of $600 million of 3.5% Series mortgage bonds in February 2026.

Decreases in Entergy Arkansas’s payable to the money pool are a use of cash flow, and Entergy Arkansas’s payable to the money pool decreased $15.2 million for the three months ended March 31, 2025.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Entergy Arkansas’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio for Entergy Arkansas is primarily due to the net issuance of long-term debt in 2026.

March 31, 2026December 31, 2025
Debt to capital55.2%53.7%
Effect of subtracting cash(2.6%)(1.3%)
Net debt to net capital (non-GAAP)52.6%52.4%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy Arkansas uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy Arkansas also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas’s financial condition because net debt indicates Entergy Arkansas’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Arkansas’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Entergy Arkansas’s receivables from or (payables to) the money pool were as follows:

March 31, 2026December 31, 2025March 31, 2025December 31, 2024
(In Thousands)
$42,914$21,715$9,608($15,190)

Entergy Arkansas has a credit facility in the amount of $300 million scheduled to expire in June 2030. Entergy Arkansas also has a $25 million credit facility scheduled to expire in April 2028. The $300 million credit facility includes fronting commitments for the issuance of letters of credit against $5 million of the borrowing capacity of the facility. As of March 31, 2026, there were no cash borrowings under either credit facility and no letters of credit outstanding under the $300 million credit facility. In addition, Entergy Arkansas is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO. As of March 31, 2026, $89.6 million in letters of credit were outstanding under Entergy Arkansas’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

The Entergy Arkansas nuclear fuel company variable interest entity has a credit facility in the amount of $80 million scheduled to expire in June 2027. As of March 31, 2026, there were $59.1 million in loans outstanding under the credit facility for the Entergy Arkansas nuclear fuel company variable interest entity. See Note 4 to the financial statements herein for discussion of the nuclear fuel company variable interest entity credit facility.

Jefferson Power Station

As discussed in the Form 10-K, in August 2025, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of Jefferson Power Station, an approximately 754 MW natural gas-fired combined cycle combustion turbine facility to be located in Jefferson County, Arkansas. The estimated cost of the project is $1,602 million. In January 2026 the APSC issued its order finding that Entergy Arkansas had demonstrated a need for the resource but had not met its burden with respect to supporting the prudence of the costs to construct the resource. The APSC acknowledged that the costs would be greater if Entergy Arkansas waited to pursue the resource. The APSC authorized Entergy Arkansas to proceed with Jefferson Power Station as a strategic investment with estimated costs set at a benchmark, which the APSC erroneously believed reflected the current cost estimate but was, in fact, $90 million below the cost presented. In its January 2026 order, the APSC also approved Entergy Arkansas’s recovery of the costs of constructing Jefferson Power Station through the Generating Arkansas Jobs Act rider. Additionally, in its January 2026 order, the APSC found that Entergy Arkansas should conduct all-source competitive solicitations for future generation additions, with limited exceptions where Entergy Arkansas believes that a specific solicitation should be restricted to a certain resource and provides a detailed explanation to the APSC supporting this belief, which the APSC later confirmed in its March 2026 order that this is a narrow exception. In February 2026, Entergy Arkansas filed for rehearing seeking to correct the benchmark. In March 2026 the APSC issued an order denying Entergy Arkansas’s petition and maintained the benchmark, although costs over the benchmark were not found to be disallowed. Also in its March 2026 order, the APSC ordered Entergy Arkansas to submit a draft of an all-source request for proposals within thirty days of the order, which Entergy Arkansas filed in April 2026. Also in March 2026, Entergy Arkansas filed with the APSC its proposal for an independent monitor to oversee the reasonableness of its construction costs, as required by the APSC order. In April 2026 the APSC issued an order consolidating Entergy Arkansas’s cost independent monitor proposals for three pending resources, including Jefferson Power Station, into a single docket and directing parties with full intervention status to respond to the proposals and recommend independent monitor candidates.

Special Rate Contract and Arkansas Cypress Solar

As discussed in the Form 10-K, in September 2025, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of the Arkansas Cypress Solar facility, a planned 600 MW solar photovoltaic array with a 350 MW battery energy storage system and associated transmission facilities interconnecting at Entergy Arkansas’s White Bluff substation. The estimated cost of the project is $1,602 million. In March 2026 the APSC approved the Arkansas Cypress Solar facility and Entergy Arkansas’s recovery of the costs of the facility through the Generating Arkansas Jobs Act rider. The APSC also ordered implementation of an independent monitor to oversee costs. In April 2026, Entergy Arkansas filed with the APSC its proposal for an independent monitor to oversee the reasonableness of costs. In April 2026 the APSC issued an order consolidating Entergy Arkansas’s cost independent monitor proposals for three pending resources, including the Arkansas Cypress Solar facility, into a single docket and directing parties with full intervention status to respond to the proposals and recommend independent monitor candidates. The facility is expected to be in service by the end of 2028.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation and Fuel-Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

2026 Base Rate Case

In February 2026, Entergy Arkansas filed with the APSC a general change in rates, charges, and tariffs. The filing requested a base rate increase to recover a base rate revenue deficiency of $44.6 million and notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015. The primary drivers of the revenue deficiency were increased depreciation expense and the impact of net capital additions. Additionally, the filing requested a 9.90% return on common equity and increased depreciation rates as the result of a depreciation study. In March 2026 the APSC issued an order suspending the proposed rates and tariffs filed by Entergy Arkansas and will establish a procedural schedule by subsequent order.

Generating Arkansas Jobs Act Rider

In March 2026, Entergy Arkansas filed its first annual update to the strategic investment recovery rider, requesting recovery of $110.4 million of financing costs during construction of generation and transmission strategic investments related to Ironwood Power Station, Jefferson Power Station, and the Arkansas Cypress Solar facility. The revised rates are requested to be effective for bills rendered on the first billing cycle of June 2026. In April 2026 the APSC general staff filed testimony arguing that the APSC had not issued an order designating Ironwood Power Station as a strategic investment and that related costs should therefore be removed from the annual update. Also in April 2026, Entergy Arkansas filed testimony asserting that the APSC general staff’s position is contrary to the plain language of the statute, which includes an exception for facilities like Ironwood Power Station that were certified by the APSC within a certain timeframe. A hearing was held in April 2026.

Production Tax Credit Tariff

As discussed in Note 3 to the financial statements in the Form 10-K, in January 2026 the APSC opened a docket to investigate the sale of Entergy Arkansas’s nuclear production tax credits and the appropriate ratemaking treatment of production tax credits for all of Entergy Arkansas’s eligible resources, including how the proceeds of any sales should flow through to customers. As directed by the APSC, in February 2026, Entergy Arkansas submitted a compliance filing to the APSC verifying the status of the solar production tax credits. The filing also verified that the net proceeds from the sale of the nuclear production tax credits were recorded in FERC accounts that are accruing a return for customers’ benefit at a rate that is above the customer deposit rate. Subsequently, in March 2026, Entergy Arkansas filed testimony setting forth its proposal for the solar production tax credits. Specifically, Entergy Arkansas requested the same ratemaking treatment for all of the solar facilities that the APSC already approved for Walnut Bend (i.e., the total net monetized proceeds from production tax credits expected to be generated over the first ten years of a solar facility’s operation are estimated and then amortized over the expected useful life of the asset, which is typically 30 years). Additionally, consistent with prior orders for these resources, the deferred tax asset balances associated with both the production tax credits and the tax gross-up of the regulatory liability will be recognized as a reduction to the overall accumulated deferred income tax liability balance in Entergy Arkansas’s calculation of its weighted average cost of capital providing a return on the unamortized balance for the benefit of customers. Further, Entergy Arkansas proposes to flow the benefits of the solar production tax credits to customers through Entergy Arkansas’s formula rate plan, effective with the formula rate plan rates that will go into effect January 1, 2027. Entergy Arkansas’s proposal would result in the benefits of the production tax credits being passed through to customers, if approved, as reductions in revenue requirement evenly over the life of the assets, rather than only during the 10-year period in which the production tax credits are generated. In April 2026 the APSC general staff filed testimony proposing an amortization period of no more than 15 years for the monetized proceeds for the tax credits associated with the West Memphis Solar and Driver Solar facilities. An evidentiary hearing is scheduled for July 2026.

Energy Cost Recovery Rider

In March 2026, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01333 per kWh to $0.01508 per kWh. The primary reason for the rate increase was an under-recovered balance as a result of higher natural gas prices in 2025. Based on circumstances related to ANO 2’s refueling outage, Entergy Arkansas made an adjustment to projected energy costs to phase-in the rate increase gradually. The redetermined rate of $0.01508 per kWh became effective with the first billing cycle in April 2026 through the normal operation of the tariff.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Arkansas’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three Months Ended March 31, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING REVENUES
Electric$646,297$613,511
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale62,89647,559
Purchased power74,48964,947
Nuclear refueling outage expenses10,68910,581
Other operation and maintenance172,620171,518
Decommissioning26,10424,622
Taxes other than income taxes41,50435,981
Depreciation and amortization120,690113,268
Other regulatory charges (credits) - net79,277(5,117)
TOTAL588,269463,359
OPERATING INCOME58,028150,152
OTHER INCOME
Allowance for equity funds used during construction5,1224,262
Interest and investment income107,82613,579
Miscellaneous - net1,366(2,778)
TOTAL114,31415,063
INTEREST EXPENSE
Interest expense74,55957,743
Allowance for borrowed funds used during construction(2,530)(2,053)
TOTAL72,02955,690
INCOME BEFORE INCOME TAXES100,313109,525
Income taxes17,61223,002
NET INCOME82,70186,523
Net income (loss) attributable to noncontrolling interest590(1,191)
EARNINGS APPLICABLE TO MEMBER'S EQUITY$82,111$87,714
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING ACTIVITIES
Net income$82,701$86,523
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization167,930159,997
Deferred income taxes, tax credits, and non-current taxes accrued46,05438,647
Changes in assets and liabilities:
Receivables59,80620,884
Fuel inventory(19,592)(6,636)
Accounts payable3,209(10,943)
Taxes accrued(6,965)(1,370)
Interest accrued32,07125,947
Deferred fuel costs(82,715)(42,248)
Other working capital accounts(22,568)(1,447)
Provisions for estimated losses(3,736)4,441
Other regulatory assets96,68610,149
Other regulatory liabilities(146,228)(47,940)
Customer advances - non-current48,700—
Pension and other postretirement funded status(10,809)(13,269)
Other assets and liabilities17,73734,442
Net cash flow provided by operating activities262,281257,177
INVESTING ACTIVITIES
Construction expenditures(342,184)(156,345)
Allowance for equity funds used during construction5,1224,262
Payment for purchase of plant—(1,282)
Nuclear fuel purchases(88,616)(28,000)
Proceeds from sale of nuclear fuel38,36940,260
Proceeds from nuclear decommissioning trust fund sales308,68223,272
Investment in nuclear decommissioning trust funds(318,387)(33,721)
Changes in money pool receivable - net(21,199)(9,608)
Other—51
Net cash flow used in investing activities(418,213)(161,111)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt1,147,17517,607
Retirement of long-term debt(715,606)(34,905)
Change in money pool payable - net—(15,190)
Other26,278(13,265)
Net cash flow provided by (used in) financing activities457,847(45,753)
Net increase in cash and cash equivalents301,91550,313
Cash and cash equivalents at beginning of period275,5704,747
Cash and cash equivalents at end of period$577,485$55,060
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$23,891$31,134
Noncash investing activities:
Accrued construction expenditures$73,826$51,028
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
March 31, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$14,056$7,048
Temporary cash investments563,429268,522
Total cash and cash equivalents577,485275,570
Accounts receivable:
Customer157,229164,296
Allowance for doubtful accounts(7,422)(7,303)
Associated companies72,04643,859
Other62,46187,029
Accrued unbilled revenues110,454130,950
Total accounts receivable394,768418,831
Deferred fuel costs110,41927,704
Fuel inventory - at average cost58,97439,382
Materials and supplies437,349430,662
Deferred nuclear refueling outage costs50,58336,718
Prepayments and other93,17798,975
TOTAL1,722,7551,327,842
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds1,775,5471,816,331
Other792793
TOTAL1,776,3391,817,124
UTILITY PLANT
Electric17,113,42717,022,476
Construction work in progress896,571621,218
Nuclear fuel263,993302,706
TOTAL UTILITY PLANT18,273,99117,946,400
Less - accumulated depreciation and amortization6,675,3176,585,693
UTILITY PLANT - NET11,598,67411,360,707
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets1,647,1621,743,848
Other238,133221,381
TOTAL1,885,2951,965,229
TOTAL ASSETS$16,983,063$16,470,902
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
March 31, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$90,000$690,000
Accounts payable:
Associated companies31,666103,411
Other379,879346,541
Customer deposits137,675136,587
Taxes accrued108,028114,993
Interest accrued71,78039,709
Other55,94056,083
TOTAL874,9681,487,324
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued1,894,4181,846,713
Accumulated deferred investment tax credits24,56824,868
Regulatory liability for income taxes - net421,183422,740
Other regulatory liabilities899,3891,044,060
Customer advances58,70010,000
Decommissioning1,811,2901,791,372
Accumulated provisions81,80385,539
Long-term debt5,767,7524,733,604
Other356,183314,495
TOTAL11,315,28610,273,391
Commitments and Contingencies
EQUITY
Member's equity4,781,4804,699,369
Noncontrolling interest11,32910,818
TOTAL4,792,8094,710,187
TOTAL LIABILITIES AND EQUITY$16,983,063$16,470,902
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
For the Three Months Ended March 31, 2026 and 2025
(Unaudited)
Noncontrolling InterestMember's EquityTotal
(In Thousands)
Balance at December 31, 2024$15,168$4,448,837$4,464,005
Net income (loss)(1,191)87,71486,523
Distributions to noncontrolling interest(181)—(181)
Balance at March 31, 2025$13,796$4,536,551$4,550,347
Balance at December 31, 2025$10,818$4,699,369$4,710,187
Net income59082,11182,701
Distributions to noncontrolling interest(79)—(79)
Balance at March 31, 2026$11,329$4,781,480$4,792,809
See Notes to Financial Statements.

ENTERGY LOUISIANA, LLC AND SUBSIDIARIES

See the “Winter Storm Fern” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis for a discussion of Winter Storm Fern. Entergy Louisiana’s current estimate for the cost of mobilizing crews and restoring power is approximately $250 million, including approximately $215 million in capital costs and approximately $35 million in non-capital costs. Natural gas purchases for Entergy Louisiana were $256 million in January 2026 compared to $115 million in January 2025. See Note 2 to the financial statements herein and in the Form 10-K for discussion of fuel cost recovery at Entergy Louisiana.

Net income increased $21.7 million primarilydue to a higher return on construction work in progress for certain utility plant investments, higher retail electric price, higher volume/weather, and higher other income. The increase was partially offset by higher interest expense, higher depreciation and amortization expenses, and higher taxes other than income taxes.

Amount
(In Millions)
2025 operating revenues$1,301.5
Fuel, rider, and other revenues that do not significantly affect net income114.4
Return on construction work in progress for certain utility plant investments17.6
Retail electric price10.7
Volume/weather9.5
Effect of sale of natural gas distribution business(29.6)
2026 operating revenues$1,424.1

Entergy Louisiana’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The return on construction work in progress for certain utility plant investments variance represents the revenue related to the amortization of certain customer advances designed to provide a return on investment in construction work in progress for certain utility plant investment, which is recognized as the related costs are incurred.

The retail electric price variance is primarily due toincreases in the resilience plan cost recovery rider effective March 2025 and March 2026. See Note 2 to the financial statements herein for discussion of the resilience plan cost recovery rider filings.

The volume/weather variance is primarily due to an increase in industrial usage, partially offset by the effect of less favorable weather on residential sales. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the petroleum refining, solar technology, and agricultural chemicals industries, partially offset by a decrease in demand from large industrial customers in the chlor-alkali and industrial gases industries. The increase in industrial usage is also primarily due to an increase in demand from co-generation customers.

The effect of sale of natural gas distribution business variance represents the decrease in operating revenues resulting from the absence of natural gas revenues following the sale of the natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana natural gas distribution business on July 1, 2025.

Total electric energy sales for Entergy Louisiana for the three months ended March 31, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential2,9463,169(7)
Commercial2,4342,432—
Industrial9,2028,5338
Governmental184195(6)
Total retail14,76614,3293
Sales for resale:
Associated companies1,3981,448(3)
Non-associated companies33322846
Total16,49716,0053

See Note 12 to the financial statements herein for additional discussion of Entergy Louisiana’s operating revenues.

Other operation and maintenance expenses increased slightly primarily due to:

an increase of $5.2 million in compensation and benefits costs primarily due to a revision to estimated incentive-based compensation expense in first quarter 2025;

an increase of $3.1 million in power delivery expenses primarily due toa higher scope of work performed in 2026 as compared to 2025 and increased contract labor costs; and

several individually insignificant items.

The increase was partially offset by:

a decrease of $6.1 million in loss provisions;

a decrease of $4.4 million in non-nuclear generation expenses primarily due to a lower scope of work performed during plant outages in 2026 as compared to 2025; and

a decrease of $4.0 million in insurance expenses primarily due to higher nuclear insurance refunds.

Taxes other than income taxes increased primarily due to increases in ad valorem taxes resulting from higher assessments.

Depreciation and amortization expenses increased primarily due to additions to plant in service, an increase in FERC jurisdictional depreciation rates effective January 2026, and an increase in nuclear depreciation rates effective September 2025 in accordance with the global stipulated settlement agreement approved by the LPSC in August 2024. See Note 2 to the financial statements in the Form 10-K for discussion of the global stipulated settlement agreement.

Entergy Louisiana records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income increased primarily due to:

changes in decommissioning trust fund activity, including portfolio rebalancing of the River Bend decommissioning trust fund in first quarter 2026;

an increase of $6.5 million in the amortization of tax gross-up on customer advances, including customer advances for construction; and

an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2026.

The increase was offset by a decrease of $4.5 million in affiliated dividend income from affiliated preferred membership interests related to storm cost securitizations. See Note 2 to the financial statements in the Form 10-K for discussion of the storm cost securitizations.

an increase of $9.8 million in carrying costs on customer advances, including customer advances for construction;

the issuances of $750 million of 5.65% Series mortgage bonds and $750 million of 4.90% Series mortgage bonds, each in February 2026; and

$4.1 million in carrying costs in first quarter 2026 on retained net proceeds from the monetization of nuclear production tax credits.

The increase was partially offset by the repayment of $250 million of 4.44% Series mortgage bonds in January 2026.

The effective income tax rate was 15.5% for the first quarter 2026. The difference in the effective income tax rate for the first quarter 2026 versus the federal statutory rate of 21% was primarily due to the book and tax differences related to the non-taxable income distributions earned on preferred membership interests, the amortization of excess accumulated deferred income taxes, book and tax differences related to the allowance for equity funds used during construction, and certain book and tax differences related to utility plant items, partially offset by the accrual for state income taxes.

The effective income tax rate was 17.5% for the first quarter 2025. The difference in the effective income tax rate for the first quarter 2025 versus the federal statutory rate of 21% was primarily due to the book and tax differences related to the non-taxable income distributions earned on preferred membership interests, book and tax differences related to the allowance for equity funds used during construction, and certain book and tax differences related to utility plant items, partially offset by the accrual for state income taxes.

Sale of Natural Gas Distribution Business

See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana natural gas distribution business on July 1, 2025.

20262025
(In Thousands)
Cash and cash equivalents at beginning of period$776,961$327,102
Net cash provided by (used in):
Operating activities306,282273,135
Investing activities(948,485)(696,217)
Financing activities1,104,252488,225
Net increase in cash and cash equivalents462,04965,143
Cash and cash equivalents at end of period$1,239,010$392,245

Net cash flow provided by operating activities increased $33.1 million for the three months ended March 31, 2026 compared to the three months ended March 31, 2025 primarily due to:

an increase of $87.1 million in receipts of advance payments related to customer agreements, including $80.6 million in customer advances and $6.5 million in tax gross-up on customer advances for construction;

higher collections from customers; and

a decrease of $17.9 million in spending on nuclear refueling outage costs in 2026 as compared to 2025.

The increase was partially offset by higher fuel and purchased power payments and the timing of payments to vendors. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery.

Net cash flow used in investing activities increased $252.3 million for the three months ended March 31, 2026 compared to the three months ended March 31, 2025 primarily due to:

an increase of $260.5 million in non-nuclear generation construction expenditures primarily due to higher spending on the Richland Parish Power Station Units 1 and 2 project, the Waterford 5 Power Station project, and the Waterford 6 Power Station project;

an increase of $100.3 million in transmission construction expenditures primarily due to higher capital expenditures as a result of increased investment in the resilience of the transmission system and higher spending on the Amite South transmission projects and on various other transmission projects in 2026;

an increase of $64.6 million in capital expenditures related to storm restoration primarily due to Winter Storm Fern. See “Winter Storm Fern” above for discussion of storm restoration efforts in 2026; and

the receipt of $33.5 million from the storm reserve escrow account in first quarter 2025. See Note 2 to the financial statements in the Form 10-K for a discussion of the storm reserve funds.

The increase was partially offset by a decrease of $100.5 million in nuclear construction expenditures primarily due to decreased spending on various nuclear projects in 2026 and a decrease in cash used of $118.2 million as a result of fluctuations in nuclear fuel activity due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle.

Net cash flow provided by financing activities increased $616 million for the three months ended March 31, 2026 compared to the three months ended March 31, 2025 primarily due to:

the issuances of $750 million of 5.65% Series mortgage bonds and $750 million of 4.90% Series mortgage bonds, each in February 2026;

the repayment, prior to maturity, of $190 million of 3.78% Series mortgage bonds in March 2025;

the repayment, prior to maturity, of $110 million of 3.78% Series mortgage bonds in March 2025; and

$36.3 million in common equity distributions paid in 2025 in order to maintain Entergy Louisiana’s capital structure. No common equity distributions were paid in 2026.

The increase was partially offset by:

the issuance of $750 million of 5.80% Series mortgage bonds in January 2025;

the repayment of $250 million of 4.44% Series mortgage bonds in January 2026;

net repayments of $21.3 million in 2026 compared to net long-term borrowings of $100 million in 2025 on the nuclear fuel company variable interest entities’ credit facilities; and

a decrease of $93.6 million in net customer advances for construction related to transmission, distribution, and generator interconnection agreements.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Entergy Louisiana’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio for Entergy Louisiana is primarily due to the net issuance of long-term debt in 2026.

March 31,2026December 31, 2025
Debt to capital48.7%46.6%
Effect of subtracting cash(2.8%)(2.0%)
Net debt to net capital (non-GAAP)45.9%44.6%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy Louisiana uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy Louisiana also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana’s financial condition because net debt indicates Entergy Louisiana’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Louisiana’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Following are the current annual amounts of Entergy Louisiana’s planned construction and other capital investments.

2026202720282029
(In Millions)
Planned construction and capital investments:
Generation$3,990$8,235$7,725$6,730
Transmission1,5601,7401,280875
Distribution1,320835565610
Utility Support1201109075
Total$6,990$10,920$9,660$8,290

The updated capital plan for 2026-2029 reflects incremental capital investments for potential generation projects, primarily related to resources identified in Entergy Louisiana’s application filed with the LPSC in March 2026 as discussed below in “Additional Generation and Transmission Resources”. In addition to routine capital spending to maintain operations, the capital plan for Entergy Louisiana includes investments in generation projects to modernize, decarbonize, expand, and diversify Entergy Louisiana’s portfolio, as well as to support customer growth, including Segno Solar, Votaw Solar, Bogalusa West Solar, Cypress Harvest Solar, Franklin Farms Power Station Units 1 and 2, Waterford 5 Power Station, Cottonwood Power Station, Westlake Power Station, Richland Parish Units 1-4, Pointe Coupee Units 1-3, and other new generation resources; investments in River Bend and Waterford 3; distribution and Utility support spending to improve reliability, resilience, and customer experience; transmission spending to improve reliability and resilience while also supporting customer growth and renewables expansion; and other investments. The planned construction and capital investments amounts above exclude investments expected to be funded with customer advances for construction.

Entergy Louisiana’s receivables from the money pool were as follows:

March 31, 2026December 31, 2025March 31, 2025December 31, 2024
(In Thousands)
$94,840$63,435$71,805$32,668

Entergy Louisiana has a credit facility in the amount of $400 million scheduled to expire in June 2030. The credit facility includes fronting commitments for the issuance of letters of credit against $15 million of the borrowing capacity of the facility. As of March 31, 2026, there were no cash borrowings and no letters of credit outstanding under the credit facility. In addition, Entergy Louisiana is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO. As of March 31, 2026, $118 million in letters of credit were outstanding under Entergy Louisiana’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

The Entergy Louisiana nuclear fuel company variable interest entities have two separate credit facilities, each in the amount of $105 million and scheduled to expire in June 2027. As of March 31, 2026, $39.5 million in loans were outstanding under the credit facility for the Entergy Louisiana River Bend nuclear fuel company variable interest entity and $33.2 million in loans were outstanding under the credit facility for the Entergy Louisiana Waterford nuclear fuel company variable interest entity. See Note 4 to the financial statements herein for additional discussion of the nuclear fuel company variable interest entity credit facilities.

Renewables

Cypress Harvest Solar

As discussed in the Form 10-K, in February 2026, Entergy Louisiana filed an application seeking LPSC approval and certification for the Cypress Harvest Solar facility, a 200 MW solar facility to be located in Iberville Parish, Louisiana. In March 2026 the LPSC staff filed an affidavit attesting that the Cypress Harvest Solar Facility meets the applicable parameters for Entergy Louisiana’s expedited certification process and recommending that the LPSC grant certification. At its April 2026 meeting, the LPSC voted to grant the requested approval and certification. The facility is expected to be in service by 2028.

Other Generation and Transmission

Additional Generation and Transmission Resources

See the Form 10-K for discussion of Entergy Louisiana’s October 2024 application with the LPSC seeking approval of a variety of generation and transmission resources proposed in connection with establishing service to a new data center to be developed by a subsidiary of Meta Platforms, Inc. in north Louisiana, for which an electric service agreement was previously executed.

In March 2026, Entergy Louisiana entered into an electric service agreement with Evest LLC (Evest), a subsidiary of Meta Platforms, Inc., in connection with establishing service to a second new data center to be developed by Evest in north Louisiana. The obligations pursuant to the agreement will commence following construction of certain transmission facilities needed to serve Evest, and the effectiveness of the agreement is conditioned upon receipt of required governmental approvals, including approval from the LPSC. Also in March 2026, Entergy Louisiana filed an application with the LPSC for certification to construct seven new combined cycle combustion turbine generation resources totaling 5,278 MW at a total cost of approximately $12.9 billion, each of which will be enabled for future carbon capture and storage, and three battery energy storage systems, including two that will be co-located with solar resources at the Cypress Harvest Solar Facility in Iberville Parish and the Bogalusa West Solar Facility in Washington Parish. The application also seeks approval to construct a new 500 kV transmission line, from West Fork Creek to St. Landry, estimated to cost $1.4 billion, and other related transmission facilities. Four of the new combined cycle combustion turbine generation resources are to be located near the customer site in north Louisiana (Richland Parish Units 1-4), while the remaining three units will be located near the existing Big Cajun site in Pointe Coupee Parish (Pointe Coupee Units 1-3). The seven new combined cycle combustion turbine generation resources have various estimated in-service dates in 2030 and 2031. The application also requests certain approvals related to a corporate sustainability agreement with the new customer. The corporate sustainability agreement contemplates the new customer contributing to the costs of the future addition of 2,500 MW of new renewable and energy storage resources, agreements involving nuclear-related efforts and contributions to bill assistance and other programs for low-income residents. Entergy Louisiana anticipates recovering the incremental cost to serve the customer through direct financial contributions from the customer and the revenues it expects to earn under the electric service agreement. The application is pending before the LPSC. At its April 2026 meeting, the LPSC voted to direct the administrative hearings division to adopt a procedural schedule that would allow for LPSC consideration of the matter at its December 2026 meeting, and also to have the administrative hearings division serve as a hearing examiner and compile a record for the LPSC to consider without the issuance of a formal recommendation from the ALJ.

The electric service agreement and related contracts contain provisions that protect Entergy Louisiana’s current customers in a manner consistent with the LPSC’s Lightning Initiative and Entergy Louisiana’s Fair Share Plus guidelines, which the LPSC and Entergy Louisiana, respectively, developed in response to increased investment in large data centers in Louisiana. The protections include terms requiring the customer to pay Entergy Louisiana’s incremental costs to serve the customer, including through contributions in aid of construction, other advanced payments and minimum monthly bills. The agreements also include specified financial obligations in the event that Evest terminates the contracts early, restructures the project, or in the event of default. These specified financial obligations would be based on Entergy Louisiana’s unrecovered incremental costs to serve Evest at the time of such an event. Evest’s obligations under the electric service agreement and related contracts are secured by various forms of collateral, including a guaranty from Meta Platforms, Inc.

Finally, the electric service agreement also includes provisions relating to Entergy Louisiana’s performance obligations, including the timely construction of the facilities supporting service to Evest, audit rights for the construction costs supported by Evest, and service standards during the term of the electric service agreement. Entergy Louisiana’s failure to meet one or more of these performance obligations could result in specified financial and/or non-financial penalties. Such penalties would vary based on the nature and severity of the failure, including the potential termination of the electric service agreement.

Babel - Webre 500 kV Transmission Project

As discussed in the Form 10-K, in December 2025, Entergy Louisiana filed an application with the LPSC seeking a certificate of public convenience and necessity for a 500 kV transmission project that includes the construction of a new 147-mile Babel to Webre 500 kV transmission line, the reconstruction of the Webre 500 kV switching station in Louisiana, and coordination with Entergy Texas on the construction of an approximately 4-mile 500 kV transmission line in Texas. The project was approved by MISO in the 2025 MISO Transmission Expansion Plan and has an estimated cost of $1,238 million and an estimated in-service date of August 2029. A procedural schedule has been set with a hearing scheduled for September 2026. Discovery is ongoing.

Waterford 6 Power Station and Westlake Power Station

As discussed in the Form 10-K, in February 2026, Entergy Louisiana filed an application seeking LPSC approval and certification to construct two 754 MW combined cycle combustion turbine generators, the Waterford 6 Power Station and the Westlake Power Station, to be located at Entergy Louisiana’s existing Waterford site near Killona, Louisiana and existing Roy S. Nelson site in Westlake, Louisiana, respectively. In its application, Entergy Louisiana noted the estimated costs are approximately $2,027 million for the Waterford 6 Power Station and $2,091 million for the Westlake Power Station. As described in the application, Entergy Louisiana is considering a third-party financing approach for the Waterford 6 Power Station. Entergy Louisiana asked that the LPSC consider the requests in the application at or before its December 2026 meeting. A procedural schedule has been set with hearings scheduled in October and November 2026. The estimated in-service dates for the Waterford 6 Power Station and Westlake Power Station are July 2030 and October 2030, respectively.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation and Fuel Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

Resilience Plan Cost Recovery Rider

In December 2022, Entergy Louisiana filed an application with the LPSC seeking a public interest finding regarding Phase I of Entergy Louisiana’s Future Ready resilience plan and approval of a rider mechanism to recover the program’s costs. Phase I in the December 2022 application reflected the first five years of a ten-year resilience plan and included investment of approximately $5 billion, including hardening investment, transmission dead-end structures, enhanced vegetation management, and telecommunications improvement. In April 2024 the LPSC approved a framework which includes an initial five-year resilience plan providing for an investment of approximately $1.9 billion with cost recovery via a forward-looking rider with semi-annual true-ups. The plan is subject to specified reporting requirements and includes a performance review of the hardened assets. The LPSC order approving the framework does not include any restrictions on Entergy Louisiana’s ability to file applications for approval of additional investments in resilience.

In January 2025, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $40.4 million, or $38.9 million in incremental annual revenues from Entergy Louisiana’s first semi-annual filing in July 2024, for projects expected to be placed in service during the rate-effective period of March 2025 through August 2025. In February 2025 the LPSC staff reviewed the filed rider rates and identified no material issues.

In July 2025, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $50.2 million, or $9.8 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of September 2025 through February 2026. Additionally, Entergy Louisiana’s true-up filing included an under-recovery totaling $5.6 million to be implemented in the January 2026 semi-annual filing. In August 2025 the LPSC staff reviewed the filed rider rates and identified no material issues.

In January 2026, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $101.8 million, or $51.6 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of March 2026 through August 2026. Additionally, Entergy Louisiana’s true-up filing included an over-recovery totaling $16.6 million to be implemented in the July 2026 semi-annual filing. In February 2026 the LPSC staff reviewed the filed rider rates and identified no material issues.

Fuel and purchased power cost recovery

As discussed in the Form 10-K, in June 2025 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings (for Entergy Louisiana’s gas operations). The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from January 2023 through June 2025. The LPSC staff issued its audit report in March 2026, and although certain internal record keeping recommendations were made, the LPSC staff did not recommend any disallowances. The next step is for the LPSC to issue its final report, but there is no deadline or timing requirement associated with the issuance of the final report.

In February 2026, Entergy Louisiana, in its monthly filing to update its fuel adjustment clause, requested to defer approximately $141.9 million of fuel costs incurred in January 2026 that were primarily attributable to the effects of Winter Storm Fern, consistent with the LPSC’s general order approved at its February 2026 meeting permitting temporary modifications to the LPSC’s fuel adjustment clause general order. The filing proposes to defer the recovery of these fuel costs over a four-month period from March 2026 through June 2026 to mitigate the customer bill impacts of these fuel costs.

In April 2026 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2023 through 2025.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Louisiana’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three Months Ended March 31, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING REVENUES
Electric$1,424,085$1,271,946
Natural gas—29,601
TOTAL1,424,0851,301,547
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale344,123213,852
Purchased power216,433261,788
Nuclear refueling outage expenses9,94118,371
Other operation and maintenance259,653258,037
Decommissioning20,36519,417
Taxes other than income taxes73,53366,221
Depreciation and amortization211,551197,622
Other regulatory charges (credits) - net(36,470)(47,233)
TOTAL1,099,129988,075
OPERATING INCOME324,956313,472
OTHER INCOME
Allowance for equity funds used during construction20,07615,206
Interest and investment income17,2601,088
Interest and investment income - affiliated71,26076,571
Miscellaneous - net23,01517,071
TOTAL131,611109,936
INTEREST EXPENSE
Interest expense137,656121,334
Allowance for borrowed funds used during construction(7,545)(6,185)
TOTAL130,111115,149
INCOME BEFORE INCOME TAXES326,456308,259
Income taxes50,55654,062
NET INCOME275,900254,197
Net income attributable to noncontrolling interests707752
EARNINGS APPLICABLE TO MEMBER'S EQUITY$275,193$253,445
See Notes to Financial Statements.