ENTERGY ARKANSAS LLC
For the period ended Sep 30, 2024. Filed Nov 1, 2024.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2024 · Filed Nov 1, 2024
Extracted filing text, with the paragraph anchors used by the comparison.
See the whole filing, with its images and exhibitsContents
Definitionsvii
DEFINITIONS
Certain abbreviations or acronyms used in the text and notes are defined below:
| Abbreviation or Acronym | Term |
|---|---|
| ALJ | Administrative Law Judge |
| ANO 1 and 2 | Units 1 and 2 of Arkansas Nuclear One (nuclear), owned by Entergy Arkansas |
| APSC | Arkansas Public Service Commission |
| Board | Board of Directors of Entergy Corporation |
| Cajun | Cajun Electric Power Cooperative, Inc. |
| capacity factor | Actual plant output divided by maximum potential plant output for the period |
| City Council | Council of the City of New Orleans, Louisiana |
| D.C. Circuit | U.S. Court of Appeals for the District of Columbia Circuit |
| DOE | United States Department of Energy |
| Entergy | Entergy Corporation and its direct and indirect subsidiaries |
| Entergy Corporation | Entergy Corporation, a Delaware corporation |
| Entergy Gulf States, Inc. | Predecessor company for financial reporting purposes to Entergy Gulf States Louisiana that included the assets and business operations of both Entergy Gulf States Louisiana and Entergy Texas |
| Entergy Gulf States Louisiana | Entergy Gulf States Louisiana, L.L.C., a Louisiana limited liability company formally created as part of the jurisdictional separation of Entergy Gulf States, Inc. and the successor company to Entergy Gulf States, Inc. for financial reporting purposes. The term is also used to refer to the Louisiana jurisdictional business of Entergy Gulf States, Inc., as the context requires. Effective October 1, 2015, the business of Entergy Gulf States Louisiana was combined with Entergy Louisiana. |
| Entergy Louisiana | Entergy Louisiana, LLC, a Texas limited liability company formally created as part of the combination of Entergy Gulf States Louisiana and the company formerly known as Entergy Louisiana, LLC (Old Entergy Louisiana) into a single public utility company and the successor to Old Entergy Louisiana for financial reporting purposes |
| Entergy Texas | Entergy Texas, Inc., a Texas corporation formally created as part of the jurisdictional separation of Entergy Gulf States, Inc. The term is also used to refer to the Texas jurisdictional business of Entergy Gulf States, Inc., as the context requires. |
| Entergy Wholesale Commodities | Prior to January 1, 2023, one of Entergy’s reportable business segments consisting of non-utility business activities primarily comprised of the ownership, operation, and decommissioning of nuclear power plants, the ownership of interests in non-nuclear power plants, and the sale of the electric power produced by its operating power plants to wholesale customers |
| EPA | United States Environmental Protection Agency |
| FERC | Federal Energy Regulatory Commission |
| Form 10-K | Annual Report on Form 10-K for the calendar year ended December 31, 2023, filed with the SEC by Entergy Corporation and its Registrant Subsidiaries |
| GAAP | Generally Accepted Accounting Principles |
| Grand Gulf | Unit No. 1 of Grand Gulf Nuclear Station (nuclear), 90% owned or leased by System Energy |
| GWh | Gigawatt-hour(s), which equals one million kilowatt-hours |
| Independence | Independence Steam Electric Station (coal), owned 16% by Entergy Arkansas, 25% by Entergy Mississippi, and 7% by Entergy Power, LLC |
| Indian Point 2 | Unit 2 of Indian Point Energy Center (nuclear), previously owned as part of Entergy’s non-utility business, which ceased power production in April 2020 and was sold in May 2021 |
vii
DEFINITIONS (Continued)
| Abbreviation or Acronym | Term |
|---|---|
| Indian Point 3 | Unit 3 of Indian Point Energy Center (nuclear), previously owned as part of Entergy’s non-utility business, which ceased power production in April 2021 and was sold in May 2021 |
| IRS | Internal Revenue Service |
| ISO | Independent System Operator |
| kW | Kilowatt, which equals one thousand watts |
| kWh | Kilowatt-hour(s) |
| LPSC | Louisiana Public Service Commission |
| LURC | Louisiana Utilities Restoration Corporation |
| MISO | Midcontinent Independent System Operator, Inc., a regional transmission organization |
| MMBtu | One million British Thermal Units |
| MPSC | Mississippi Public Service Commission |
| MW | Megawatt(s), which equals one thousand kilowatts |
| MWh | Megawatt-hour(s) |
| Nelson Unit 6 | Unit No. 6 (coal) of the Nelson Steam Electric Generating Station, 70% of which is co-owned by Entergy Louisiana (57.5%) and Entergy Texas (42.5%) and 10.9% of which is owned by EAM Nelson Holding, LLC |
| Net debt to net capital ratio | Gross debt less cash and cash equivalents divided by total capitalization less cash and cash equivalents, which is a non-GAAP measure |
| NRC | Nuclear Regulatory Commission |
| Palisades | Palisades Nuclear Plant (nuclear), previously owned as part of Entergy’s non-utility business, which ceased power production in May 2022 and was sold in June 2022 |
| Parent & Other | The portions of Entergy not included in the Utility segment, primarily consisting of the activities of the parent company, Entergy Corporation, and other business activity, including Entergy’s non-utility operations business which owns interests in non-nuclear power plants that sell the electric power produced by those plants to wholesale customers and also provides decommissioning services to nuclear power plants owned by non-affiliated entities in the United States |
| PPA | Purchased power agreement or power purchase agreement |
| PUCT | Public Utility Commission of Texas |
| Registrant Subsidiaries | Entergy Arkansas, LLC, Entergy Louisiana, LLC, Entergy Mississippi, LLC, Entergy New Orleans, LLC, Entergy Texas, Inc., and System Energy Resources, Inc. |
| River Bend | River Bend Station (nuclear), owned by Entergy Louisiana |
| SEC | Securities and Exchange Commission |
| System Agreement | Agreement, effective January 1, 1983, as modified, among the Utility operating companies relating to the sharing of generating capacity and other power resources. The agreement terminated effective August 2016. |
| System Energy | System Energy Resources, Inc. |
| Unit Power Sales Agreement | Agreement, dated as of June 10, 1982, as amended and approved by the FERC, among Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy, relating to the sale of capacity and energy from System Energy’s share of Grand Gulf |
| Utility | Entergy’s reportable segment that generates, transmits, distributes, and sells electric power, with a small amount of natural gas distribution in portions of Louisiana |
| Utility operating companies | Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas |
viii
DEFINITIONS (Concluded)
| Abbreviation or Acronym | Term |
|---|---|
| Vermont Yankee | Vermont Yankee Nuclear Power Station (nuclear), previously owned as part of Entergy’s non-utility business, which ceased power production in December 2014 and was disposed of in January 2019 |
| Waterford 3 | Unit No. 3 (nuclear) of the Waterford Steam Electric Station, owned by Entergy Louisiana |
| weather-adjusted usage | Electric usage excluding the effects of deviations from normal weather |
| White Bluff | White Bluff Steam Electric Generating Station, 57% owned by Entergy Arkansas |
ix
Entergy operates primarily through a single reportable segment, Utility. The Utility segment includes the generation, transmission, distribution, and sale of electric power in portions of Arkansas, Mississippi, Texas, and Louisiana, including the City of New Orleans; and operation of a small natural gas distribution business in portions of Louisiana. See “Planned Sale of Gas Distribution Businesses” herein and in the Form 10-K for discussion of the planned sale of the Entergy New Orleans and Entergy Louisiana gas distribution businesses. See Note 7 to the financial statements herein for discussion of and financial information regarding Entergy’s reportable segment.
Following are income statement variances for Utility, Parent & Other, and Entergy comparing the third quarter 2024 to the third quarter 2023 showing how much the line item increased or (decreased) in comparison to the prior period.
| Utility | Parent &Other (a) | Entergy | |
|---|---|---|---|
| (In Thousands) | |||
| 2023 Net Income (Loss) Attributable to Entergy Corporation | $751,576 | ($84,821) | $666,755 |
| Operating revenues | (189,102) | (17,320) | (206,422) |
| Fuel, fuel-related expenses, and gas purchased for resale | (56,184) | (3,325) | (59,509) |
| Purchased power | (87,139) | (9,165) | (96,304) |
| Other regulatory charges (credits) - net | (19,422) | — | (19,422) |
| Other operation and maintenance | (29,127) | 251 | (28,876) |
| Asset write-offs, impairments, and related charges (credits) | (78,434) | 40,356 | (38,078) |
| Taxes other than income taxes | (5,418) | (109) | (5,527) |
| Depreciation and amortization | 58,591 | 17 | 58,608 |
| Other income (deductions) | 39,470 | (17,729) | 21,741 |
| Interest expense | 23,263 | 16,439 | 39,702 |
| Other expenses | 176 | 31 | 207 |
| Income taxes | 11,236 | (22,758) | (11,522) |
| Preferred dividend requirements of subsidiaries and noncontrolling interests | (2,145) | — | (2,145) |
| 2024 Net Income (Loss) Attributable to Entergy Corporation | $786,547 | ($141,607) | $644,940 |
(a)Parent & Other includes eliminations, which are primarily intersegment activity.
Third quarter 2023 results of operations include write-offs of $78 million ($59 million net-of-tax), recorded at Utility, as a result of a commitment, made in October 2023, by Entergy Arkansas to the APSC to make a filing seeking to forgo recovery of identified costs resulting from the 2013 ANO stator incident. See Note 8 to the financial statements in the Form 10-K for further discussion of the ANO stator incident, Entergy Arkansas’s October 2023 commitment to the APSC, and the subsequently approved motion to forgo recovery.
Utility
| Amount | |
|---|---|
| (In Millions) | |
| 2023 operating revenues | $3,559 |
| Fuel, rider, and other revenues that do not significantly affect net income | (51) |
| Volume/weather | (118) |
| Retail one-time bill credit | (92) |
| Retail electric price | 72 |
| 2024 operating revenues | $3,370 |
The Utility operating companies’ results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.
The volume/weather variance is primarily due to the effect of less favorable weather on residential and commercial sales, partially offset by an increase in industrial usage. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the petroleum refining and chlor-alkali industries.
The retail one-time bill credit represents the disbursement of settlement proceeds in the form of a one-time bill credit provided to Entergy Arkansas’s retail customers during the August 2024 billing cycle through the Grand Gulf credit rider as a result of the System Energy settlement with the APSC. There is no effect on net income because Entergy Arkansas previously recorded a regulatory liability for the effects of the System Energy settlement with the APSC. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the System Energy settlement with the APSC and see Note 2 to the financial statements herein for discussion of Entergy Arkansas’s Grand Gulf credit rider.
The retail electric price variance is primarily due to:
an increase in Entergy Arkansas’s formula rate plan rates effective January 2024;
increases in Entergy Louisiana’s formula rate plan revenues, including increases in the distribution and transmission recovery mechanisms, effective September 2023 and September 2024; and
increases in Entergy Mississippi’s formula rate plan rates effective April 2024 and July 2024.
See Note 2 to the financial statements herein and in the Form 10-K for discussion of the regulatory proceedings discussed above.
Total electric energy sales for Utility for the three months ended September 30, 2024 and 2023 are as follows:
| 2024 | 2023 | % Change | |
|---|---|---|---|
| (GWh) | |||
| Residential | 11,519 | 12,661 | (9) |
| Commercial | 8,394 | 8,648 | (3) |
| Industrial | 15,150 | 13,781 | 10 |
| Governmental | 684 | 700 | (2) |
| Total retail | 35,747 | 35,790 | — |
| Sales for resale | 3,727 | 3,916 | (5) |
| Total | 39,474 | 39,706 | (1) |
See Note 12 to the financial statements herein for additional discussion of operating revenues.
Other Income Statement Items
Utility
Other operation and maintenance expenses decreased from $743 million for the third quarter 2023 to $714 million for the third quarter 2024 primarily due to a decrease of $20 million in power delivery expenses primarily due to the timing of vegetation maintenance costs anda decrease of $10 million in compensation and benefits costs primarily due to lower incentive-based compensation accruals in 2024 as compared to 2023.
Asset write-offs, impairments, and related charges (credits) includesthe effects of a commitment, made in October 2023, by Entergy Arkansas to the APSC to make a filing seeking to forgo recovery of identified costs resulting from the 2013 ANO stator incident. In third quarter 2023, Entergy Arkansas recorded write-offs of its regulatory asset for deferred fuel of $68.9 million and the undepreciated balance of $9.5 million in capital costs related to the ANO stator incident. See Note 8 to the financial statements in the Form 10-K for further discussion of the ANO stator incident, Entergy Arkansas’s October 2023 commitment to the APSC, and the subsequently approved motion to forgo recovery.
Depreciation and amortization expenses increased primarily due to a reduction in depreciation expense of $41 million in 2023 at System Energy as a result of the approval by the FERC in August 2023 of the settlement establishing updated depreciation rates used in calculating Grand Gulf plant depreciation and amortization expenses under the Unit Power Sales Agreement and additions to plant in service. See Note 2 to the financial statements in the Form 10-K for discussion of the Unit Power Sales Agreement depreciation amendment proceeding.
the reversal in third quarter 2024 of a $92 million regulatory liability recognized for Entergy Arkansas’s obligation to return to customers the refund from the System Energy settlement with the APSC. This reversal of the regulatory liability offsets a reduction in gross revenues from the retail one-time bill credits provided to customers in the August 2024 billing cycle through the Grand Gulf credit rider. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the System Energy settlement with the APSC and see Note 2 to the financial statements herein for discussion of Entergy Arkansas’s Grand Gulf credit rider; and
the reversal in third quarter 2023 of $22 million of regulatory liabilities to reflect the recognition of certain receipts by Entergy Texas under affiliated PPAs that have been resolved. See Note 2 to the financial statements in the Form 10-K for discussion of Entergy Texas’s 2022 base rate case.
In addition, Entergy records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.
a decrease of $19 million in non-service pension costs primarily as a result of pension settlement charges recorded in third quarter 2023 and a reduction in 2024 in the amortization of deferred pension losses as a result of an amendment to a qualified pension plan spinning-off predominantly inactive participants into a new qualified plan, extending the amortization period for deferred losses. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Critical Accounting Estimates” in the Form 10-K, Note 6 to the financial statements herein, and Note 11 to the financial statements in the Form 10-K for further discussion of pension and other postretirement benefits costs;
changes in decommissioning trust fund activity, including portfolio rebalancing of decommissioning trust funds in third quarter 2024; and
an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2024, including the Orange County Advanced Power Station project at Entergy Texas.
the issuance by Entergy Arkansas of $300 million of 5.30% Series mortgage bonds in August 2023;
the issuances by Entergy Arkansas of $400 million of 5.75% Series mortgage bonds and $400 million of 5.45% Series mortgage bonds, each in May 2024;
the issuances by Entergy Louisiana of $500 million of 5.35% Series mortgage bonds and $700 million of 5.70% Series mortgage bonds, each in March 2024;
the issuance by Entergy Louisiana of $700 million of 5.15% Series mortgage bonds in August 2024;
the issuance by Entergy Mississippi of $300 million of 5.85% Series mortgage bonds in May 2024;
the issuance by Entergy Texas of $350 million of 5.80% Series mortgage bonds in August 2023; and
the issuance by Entergy Texas of $350 million of 5.55% Series mortgage bonds in August 2024.
the repayment by Entergy Arkansas of $375 million of 3.70% Series mortgage bonds in June 2024;
the repayment by Entergy Louisiana of $325 million of 4.05% Series mortgage bonds in August 2023;
the repayment by Entergy Louisiana of $300 million of 5.59% Series mortgage bonds in December 2023; and
the repayment by Entergy Louisiana of $400 million of 5.40% Series mortgage bonds in April 2024.
Parent and Other
Asset write-offs, impairments, and related charges (credits) includesthe effects of recording a favorable final judgment of $40 million in third quarter 2023 to resolve claims in the Indian Point 2 fourth round and Indian Point 3 third round combined damages case against the DOE. See Note 8 to the financial statements in the Form 10-K for discussion of the spent nuclear fuel litigation.
Other income (deductions) decreased primarily due to higher legal provisions and lower non-service pension income. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Critical Accounting Estimates” in the Form 10-K, Note 6 to the financial statements herein, and Note 11 to the financial statements in the Form 10-K for further discussion of pension and other postretirement benefits costs.
Interest expense increased primarily due to the issuance of $1.2 billion of junior subordinated debentures in May 2024.
The effective income tax rate was 25% for the third quarter 2024. The difference in the effective income tax rate for the third quarter 2024 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, partially offset by the resolution of an Arkansas state income tax audit. See Note 10 to the financial statements herein for discussion of the Arkansas state income tax audit resolution.
The effective income tax rate was 25.3% for the third quarter 2023. The difference in the effective income tax rate for the third quarter 2023 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes.
Following are income statement variances for Utility, Parent & Other, and Entergy comparing the nine months ended September 30, 2024 to the nine months ended September 30, 2023 showing how much the line item increased or (decreased) in comparison to the prior period.
| Utility | Parent &Other (a) | Entergy | |
|---|---|---|---|
| (In Thousands) | |||
| 2023 Net Income (Loss) Attributable to Entergy Corporation | $1,663,106 | ($294,172) | $1,368,934 |
| Operating revenues | (242,262) | (42,997) | (285,259) |
| Fuel, fuel-related expenses, and gas purchased for resale | (400,507) | (1,937) | (402,444) |
| Purchased power | (85,111) | (27,169) | (112,280) |
| Other regulatory charges (credits) - net | 290,360 | — | 290,360 |
| Other operation and maintenance | 73,636 | (5,128) | 68,508 |
| Asset write-offs, impairments, and related charges (credits) | 53,341 | 40,356 | 93,697 |
| Taxes other than income taxes | 5,878 | (470) | 5,408 |
| Depreciation and amortization | 140,738 | 39 | 140,777 |
| Other income (deductions) | 225,273 | (358,176) | (132,903) |
| Interest expense | 54,152 | 45,721 | 99,873 |
| Other expenses | 10,626 | 32 | 10,658 |
| Income taxes | 80,438 | (93,153) | (12,715) |
| Preferred dividend requirements of subsidiaries and noncontrolling interests | (213) | — | (213) |
| 2024 Net Income (Loss) Attributable to Entergy Corporation | $1,422,779 | ($653,636) | $769,143 |
(a)Parent & Other includes eliminations, which are primarily intersegment activity.
Results of operations for the nine months ended September 30, 2024 include: (1) a $317 million ($250 million net-of-tax) settlement charge, reflected in Parent & Other above, recognized as a result of a group annuity contract purchased in May 2024 to settle certain pension liabilities; (2) expenses of $151 million ($112 million net-of-tax), recorded at Utility in second quarter 2024, primarily consisting of regulatory charges to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023; (3) a $132 million ($97 million net-of-tax) charge, recorded at Utility, to reflect the write-off of a previously recorded regulatory asset as a result of an adverse decision in the Entergy
Arkansas opportunity sales proceeding in March 2024; and (4) a $78 million ($57 million net-of-tax) regulatory charge, recorded at Utility in first quarter 2024, primarily to reflect a settlement in principle between Entergy New Orleans and the City Council in April 2024 for additional sharing with customers of income tax benefits from the resolution of the 2016-2018 IRS audit. See Note 6 to the financial statements herein for discussion of the group annuity contract and settlement charge. See Note 2 to the financial statements herein for discussion of the Entergy Louisiana agreement in principle and the subsequently filed global stipulated settlement agreement. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the Entergy Arkansas opportunity sales proceeding. See Note 10 to the financial statements herein for discussion of the April 2024 settlement in principle and Note 3 to the financial statements in the Form 10-K for discussion of the resolution of the 2016-2018 IRS audit.
Results of operations for the nine months ended September 30, 2023 include: (1) a $129 million reduction in income tax expense as a result of the Hurricane Ida securitization in March 2023, which also resulted in a $103 million ($76 million net-of-tax) regulatory charge, recorded at Utility, to reflect Entergy Louisiana’s obligation to provide credits to its customers as described in an LPSC ancillary order issued as part of the securitization regulatory proceeding; and (2) write-offs of $78 million ($59 million net-of-tax), recorded at Utility, as a result of a commitment, made in October 2023, by Entergy Arkansas to the APSC to make a filing seeking to forgo recovery of identified costs resulting from the 2013 ANO stator incident. See Notes 2 and 3 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana March 2023 storm cost securitization. See Note 8 to the financial statements in the Form 10-K for further discussion of the ANO stator incident, Entergy Arkansas’s October 2023 commitment to the APSC, and the subsequently approved motion to forgo recovery.
Utility
| Amount | |
|---|---|
| (In Millions) | |
| 2023 operating revenues | $9,326 |
| Fuel, rider, and other revenues that do not significantly affect net income | (257) |
| Retail one-time bill credit | (92) |
| Storm restoration carrying costs | (31) |
| Volume/weather | (20) |
| Retail electric price | 158 |
| 2024 operating revenues | $9,084 |
The Utility operating companies’ results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.
The retail one-time bill credit represents the disbursement of settlement proceeds in the form of a one-time bill credit provided to Entergy Arkansas’s retail customers during the August 2024 billing cycle through the Grand Gulf credit rider as a result of the System Energy settlement with the APSC. There is no effect on net income because Entergy Arkansas previously recorded a regulatory liability for the effects of the System Energy settlement with the APSC. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the System Energy settlement with the APSC and see Note 2 to the financial statements herein for discussion of Entergy Arkansas’s Grand Gulf credit rider.
Storm restoration carrying costs represent the equity component of storm restoration carrying costs recognized by Entergy Louisiana as part of its March 2023 storm cost securitization. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana March 2023 storm cost securitization.
The volume/weather variance is primarily due to the effect of less favorable weather on residential and commercial sales, partially offset by an increase in industrial usage. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the petroleum refining industry and from new customers in the technology industry.
The retail electric price variance is primarily due to:
an increase in Entergy Arkansas’s formula rate plan rates effective January 2024;
increases in Entergy Louisiana’s formula rate plan revenues, including increases in the distribution and transmission recovery mechanisms, effective September 2023 and September 2024;
increases in Entergy Mississippi’s formula rate plan rates effective April 2024 and July 2024; and
an increase in Entergy Texas’s base rates effective June 2023, partially offset by the implementation of the generation cost recovery relate-back rider for the Hardin County Peaking Facility effective over three months beginning in May 2023.
See Note 2 to the financial statements herein and in the Form 10-K for discussion of the regulatory proceedings discussed above.
Total electric energy sales for Utility for the nine months ended September 30, 2024 and 2023 are as follows:
| 2024 | 2023 | % Change | |
|---|---|---|---|
| (GWh) | |||
| Residential | 28,499 | 28,963 | (2) |
| Commercial | 21,797 | 21,865 | — |
| Industrial | 42,174 | 39,823 | 6 |
| Governmental | 1,883 | 1,887 | — |
| Total retail | 94,353 | 92,538 | 2 |
| Sales for resale | 10,737 | 11,589 | (7) |
| Total | 105,090 | 104,127 | 1 |
See Note 12 to the financial statements herein for additional discussion of operating revenues.
Other Income Statement Items
Utility
Other operation and maintenance expenses increased from $2,007 million for the nine months ended September 30, 2023 to $2,081 million for the nine months ended September 30, 2024 primarily due to:
an increase of $24 million in contract costs related to operational performance, customer service, and organizational health initiatives;
an increase of $14 million in energy efficiency expenses primarily due to the timing of recovery from customers;
the effects of recording a final judgment in first quarter 2023 to resolve claims in the ANO damages case against the DOE related to spent nuclear fuel storage costs. The damages awarded included the reimbursement of approximately $10 million of spent nuclear fuel storage costs previously recorded as other operation and maintenance expenses. See Note 8 to the financial statements in the Form 10-K for discussion of the spent nuclear fuel litigation;
an increase of $9 million in bad debt expense;
an increase of $9 million in transmission costs allocated by MISO. See Note 2 to the financial statements in the Form 10-K for discussion of the recovery of these costs;
an increase of $7 million in non-nuclear generation expenses primarily due to a higher scope of work, including during plant outages, performed in 2024 as compared to 2023; and
a gain of $7 million on the partial sale of a service center at Entergy Texas in April 2023 as part of an eminent domain proceeding.
The increase was partially offset by a decrease of $16 million in power delivery expenses primarily due to the timing of vegetation maintenance costs.
Asset write-offs, impairments, and related charges (credits) includes:
a $132 million ($97 million net-of-tax) charge to reflect the write-off, at Entergy Arkansas, of a previously recorded regulatory asset as a result of an adverse decision in the Entergy Arkansas opportunity sales proceeding in March 2024. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the Entergy Arkansas opportunity sales proceeding; and
the effects of a commitment, made in October 2023, by Entergy Arkansas to the APSC to make a filing seeking to forgo recovery of identified costs resulting from the 2013 ANO stator incident. In third quarter 2023, Entergy Arkansas recorded write-offs of its regulatory asset for deferred fuel of $68.9 million and the undepreciated balance of $9.5 million in capital costs related to the ANO stator incident. See Note 8 to the financial statements in the Form 10-K for further discussion of the ANO stator incident, Entergy Arkansas’s October 2023 commitment to the APSC, and the subsequently approved motion to forgo recovery.
Depreciation and amortization expenses increased primarily due to:
additions to plant in service;
the recognition of $28 million in depreciation expense in 2024 at Entergy Texas for the 2022 base rate case relate back period, effective over six months beginning January 2024. The recognition of depreciation expense for the relate back period is effective over the same period as collections from the relate back surcharge rider and results in no effect on net income;
a reduction in depreciation expense of $41 million in 2023 at System Energy as a result of the approval by the FERC in August 2023 of the settlement establishing updated depreciation rates used in calculating Grand Gulf plant depreciation and amortization expenses under the Unit Power Sales Agreement; and
an increase in depreciation rates at Entergy Texas, effective June 2023.
The increase was partially offset by a decrease in depreciation rates at System Energy effective June 2023. See Note 2 to the financial statements in the Form 10-K for discussion of the Unit Power Sales Agreement depreciation amendment proceeding. See Note 2 to the financial statements in the Form 10-K for discussion of the 2022 base rate case at Entergy Texas.
the reversal in third quarter 2024 of a $92 million regulatory liability recognized for Entergy Arkansas’s obligation to return to customers the refund from the System Energy settlement with the APSC. This reversal of the regulatory liability offsets a reduction in gross revenues from the retail one-time bill credits provided to customers in the August 2024 billing cycle through the Grand Gulf credit rider. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the System Energy settlement with the APSC and see Note 2 to the financial statements herein for discussion of Entergy Arkansas’s Grand Gulf credit rider;
regulatory charges of $150 million, recorded by Entergy Louisiana in second quarter 2024, to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. See Note 2 to the financial statements herein for discussion of the Entergy Louisiana agreement in principle and the subsequently filed global stipulated settlement agreement;
a regulatory charge of$103 million, recorded by Entergy Louisiana in first quarter 2023, to reflect its obligation to provide credits to its customers as described in an LPSC ancillary order issued in the Hurricane Ida securitization regulatory proceeding. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana March 2023 storm cost securitization;
a regulatory charge of$78 million, recorded by Entergy New Orleans in first quarter 2024, primarily to reflect a settlement in principle between Entergy New Orleans and the City Council in April 2024 for additional sharing with customers of income tax benefits from the resolution of the 2016-2018 IRS audit. See Note 10 to the financial statements herein for discussion of the April 2024 settlement in principle and Note 3 to the financial statements in the Form 10-K for discussion of the resolution of the 2016-2018 IRS audit; and
the reversal in third quarter 2023 of $22 million of regulatory liabilities to reflect the recognition of certain receipts by Entergy Texas under affiliated PPAs that have been resolved. See Note 2 to the financial statements in the Form 10-K for discussion of Entergy Texas’s 2022 base rate case.
In addition, Entergy records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.
changes in decommissioning trust fund activity, including portfolio rebalancing of decommissioning trust funds in 2024;
a decrease of $45 million in non-service pension costs primarily as a result of pension settlement charges recorded in 2023 and a reduction in 2024 in the amortization of deferred pension losses as a result of an amendment to a qualified pension plan spinning-off predominantly inactive participants into a new qualified plan, extending the amortization period for deferred losses. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Critical Accounting Estimates” in the Form 10-K, Note 6 to the financial statements herein, and Note 11 to the financial statements in the Form 10-K for further discussion of pension and other postretirement benefits costs;
an increase of $18 million in intercompany dividend income from affiliated preferred membership interests related to storm cost securitizations. The intercompany dividend income on the affiliate preferred membership interests is eliminated for consolidation purposes and has no effect on net income since the investment is in another Entergy subsidiary;
an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2024, including the Orange County Advanced Power Station project at Entergy Texas; and
a $15 million charge, recorded by Entergy Louisiana in first quarter 2023, for the LURC’s 1% beneficial interest in the storm trust II established as part of the March 2023 storm cost securitization. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana March 2023 storm cost securitization.
the issuance by Entergy Arkansas of $300 million of 5.30% Series mortgage bonds in August 2023;
the issuances by Entergy Arkansas of $400 million of 5.75% Series mortgage bonds and $400 million of 5.45% Series mortgage bonds, each in May 2024;
the issuances by Entergy Louisiana of $500 million of 5.35% Series mortgage bonds and $700 million of 5.70% Series mortgage bonds, each in March 2024;
the issuance by Entergy Louisiana of $700 million of 5.15% Series mortgage bonds in August 2024;
the issuance by Entergy Mississippi of $300 million of 5.85% Series mortgage bonds in May 2024; and
the issuance by Entergy Texas of $350 million of 5.80% Series mortgage bonds in August 2023.
the repayment by Entergy Arkansas of $250 million of 3.05% Series mortgage bonds in June 2023;
the repayment by Entergy Arkansas of $375 million of 3.70% Series mortgage bonds in June 2024;
the repayment by Entergy Louisiana of $325 million of 4.05% Series mortgage bonds in August 2023;
the repayment by Entergy Louisiana of $300 million of 5.59% Series mortgage bonds in December 2023; and
the repayment by Entergy Louisiana of $400 million of 5.40% Series mortgage bonds in April 2024.
Parent and Other
Asset write-offs, impairments, and related charges (credits) includesthe effects of recording a favorable final judgment of $40 million in third quarter 2023 to resolve claims in the Indian Point 2 fourth round and Indian Point 3 third round combined damages case against the DOE. See Note 8 to the financial statements in the Form 10-K for discussion of the spent nuclear fuel litigation.
Other income (deductions) decreased primarily due to:
a $317 million ($250 million net-of-tax) non-cash settlement charge recognized as a result of a group annuity contract purchased in May 2024 to settle certain pension liabilities. See Note 6 to the financial statements herein for discussion of the group annuity contract and settlement charge;
the elimination for consolidation purposes of intercompany dividend income of $18 million from affiliated preferred membership interests, as discussed above;
lower non-service pension income. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Critical Accounting Estimates” in the Form 10-K, Note 6 to the financial statements herein, and Note 11 to the financial statements in the Form 10-K for further discussion of pension and other postretirement benefits costs; and
higher legal provisions.
Interest expense increased primarily due to higher commercial paper balances and the issuance of $1.2 billion of junior subordinated debentures in May 2024. See Note 4 to the financial statements herein for discussion of Entergy’s commercial paper program.
The effective income tax rate was 25.9% for the nine months ended September 30, 2024. The difference in the effective income tax rate for the nine months ended September 30, 2024 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, amortization of accumulated deferred income taxes as a result of tax rate changes, and a provision for uncertain tax positions, partially offset by the resolution of an Arkansas state income tax audit, certain book and tax differences related to utility plant items, and book and tax differences related to the allowance for equity funds used during construction. See Note 10 to the financial statements herein for discussion of the Arkansas state income tax audit resolution.
The effective income tax rate was 17.1% for the nine months ended September 30, 2023. The difference in the effective income tax rate for the nine months ended September 30, 2023 versus the federal statutory rate of 21% was primarily due to the reduction in income tax expense as a result of the securitization of Hurricane Ida storm costs pursuant to Louisiana Act 55, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021, and certain book and tax differences related to utility plant items, partially offset by the accrual for state income taxes. See Notes 2 and 3 to the financial statements in the Form 10-K for a discussion of the Entergy Louisiana March 2023 storm cost securitization under Act 293.
See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Income Tax Legislation and Regulation” in the Form 10-K for discussion of income tax legislation and regulation. The following are updates to that discussion.
Entergy Arkansas, Entergy Louisiana, and System Energy have the potential to generate zero-emission nuclear power production tax credits for electricity generated by their respective nuclear power facilities. Based on guidance provided by the United States Treasury Department and the IRS, the nuclear production tax credits will be calculated by multiplying the kWh of qualifying electricity by $0.003, with the value of the credits decreasing ratably, or phasing out, once the annual gross receipts from the sale of nuclear power exceed a certain threshold. If certain prevailing wage requirements are satisfied, the calculation of the credit, as described in the preceding sentence, is multiplied by a factor of five. Additional guidance is needed from the United States Treasury Department and/or the IRS to determine how the value of these credits will be calculated for power generated from nuclear facilities of rate-regulated utilities. Due to the uncertainty of value, if any, of credits Entergy Arkansas, Entergy Louisiana, or System Energy may receive, such credits have not been recognized for the nuclear power produced through the third quarter of 2024. If credits are recognized in future periods, the value of such credits is expected to be provided to customers. As such, recognition of nuclear production tax credits is not expected to have a material effect on the results of operations of Entergy, Entergy Arkansas, Entergy Louisiana, or System Energy.
Entergy Arkansas has accrued solar production tax credits associated with the beginning of commercial operations of the Walnut Bend Solar facility in September 2024. As the value of such credits is expected to be provided to customers, a regulatory liability has been recorded for all credits recognized in the third quarter of 2024. As such, recognition of solar production tax credits is not expected to have a material effect on the results of operations of Entergy or Entergy Arkansas.
Entergy Wholesale Commodities Exit from the Merchant Power Business
See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Entergy Wholesale Commodities Exit from the Merchant Power Business” in the Form 10-K for discussion of the exit from the merchant power business.
Planned Sale of Gas Distribution Businesses
See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Planned Sale of Gas Distribution Businesses” in the Form 10-K for discussion of the planned sale of Entergy New Orleans’s and Entergy Louisiana’s gas distribution businesses. The following are updates to that discussion.
In July 2024 the LPSC staff issued a report recommending LPSC approval of the application of Delta States Utilities LA, LLC (a Bernhard Capital Partners Management LP affiliate) and Entergy Louisiana and the transaction described therein as being in the public interest and proposing certain conditions. In August 2024 the LPSC issued an order accepting the LPSC staff’s report and recommendation.
As discussed in the Form 10-K, in December 2023, Entergy New Orleans and the buyer of Entergy New Orleans’s gas distribution business filed their joint application with the City Council seeking approval for the proposed transaction. In September 2024 the hearing officer certified the record of the proceeding for City Council consideration. A decision is targeted for first quarter 2025.
See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy’s capital structure, capital spending plans and other uses of capital, and sources of capital. The following are updates to that discussion.
Capital Structure and Resources
Entergy’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio is primarily due to the net issuance of long-term debt in 2024.
| September 30, 2024 | December 31,2023 | |
|---|---|---|
| Debt to capital | 65.4% | 63.8% |
| Effect of excluding securitization bonds | (0.1%) | (0.3%) |
| Debt to capital, excluding securitization bonds (non-GAAP) (a) | 65.3% | 63.5% |
| Effect of subtracting cash | (1.2%) | (0.1%) |
| Net debt to net capital, excluding securitization bonds (non-GAAP) (a) | 64.1% | 63.4% |
(a)Calculation excludes the New Orleans and Texas securitization bonds, which are non-recourse to Entergy New Orleans and Entergy Texas, respectively.
As of September 30, 2024, 21.7% of the debt outstanding is at the parent company, Entergy Corporation, and 77.8% is at the Utility. The remaining 0.5% of the debt outstanding relates to the Vermont Yankee credit facility, as discussed in Note 4 to the financial statements herein. Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable and commercial paper, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt, equity, and subsidiaries’ preferred stock without sinking fund. Net capital consists of capital less cash and cash equivalents. The debt to capital ratio excluding securitization bonds and net debt to net capital ratio excluding securitization bonds are non-GAAP measures. Entergy uses the debt to capital ratios excluding securitization bonds in analyzing its financial condition and believes they provide useful information to its investors and creditors in evaluating Entergy’s financial condition because the securitization bonds are non-recourse to Entergy, as more fully described in Note 5 to the financial statements in the Form 10-K. Entergy also uses the net debt to net capital ratio excluding securitization bonds in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy’s financial condition because net debt indicates Entergy’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.
Entergy Corporation has in place a credit facility that has a borrowing capacity of $3 billion and expires in June 2029. The facility includes fronting commitments for the issuance of letters of credit against $20 million of the total borrowing capacity of the credit facility. The commitment fee is currently 0.225% of the undrawn commitment amount. Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation. The estimated interest rate as of September 30, 2024 that would have been applied to outstanding borrowings under the facility was 6.45%. The following is a summary of the amounts outstanding and capacity available under the credit facility as of September 30, 2024:
| Capacity | Borrowings | Lettersof Credit | CapacityAvailable |
|---|---|---|---|
| (In Millions) | |||
| $3,000 | $— | $4 | $2,996 |
Entergy Corporation’s credit facility includes a covenant requiring Entergy to maintain a consolidated debt ratio, as defined, of 65% or less of its total capitalization. The calculation of this debt ratio under Entergy Corporation’s credit facility is different than the calculation of the debt to capital ratio above. Entergy is currently in compliance with the covenant and expects to remain in compliance with this covenant. If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Registrant Subsidiaries (except Entergy New Orleans and System Energy) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the Entergy Corporation credit facility’s maturity date may occur. See Note 4 to the financial statements herein for additional discussion of the Entergy Corporation credit facility and discussion of the Registrant Subsidiaries’ credit facilities.
Entergy Corporation has a commercial paper program with a Board-approved program limit of $2 billion. As of September 30, 2024, Entergy Corporation had $1,122.4 million of commercial paper outstanding. The weighted-average interest rate for the nine months ended September 30, 2024 was 5.64%.
Equity Issuances and Equity Distribution Program
See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources - Sources of Capital - Equity Issuances and Equity Distribution Program” in the Form 10-K and Note 3 to the financial statements herein for discussion of the equity distribution program. The following is an update to that discussion.
Entergy Corporation currently expects to issue approximately $4.4 billion of equity through 2028, which it may issue under its at the market equity distribution program or otherwise, with approximately $1.4 billion already contracted under forward sale agreements as of September 30, 2024.
Entergy Corporation Two-For-One Forward Stock Split
In October 2024, Entergy announced a two-for-one forward stock split of Entergy Corporation’s issued common stock. The split will be effected through an amendment to Entergy Corporation’s Restated Certificate of Incorporation, which will result in a proportionate increase in the number of shares of authorized common stock. Each record holder of common stock as of the close of market on Thursday, December 5, 2024, will receive one additional share of common stock for each then-held share, to be distributed after market close on December 12, 2024. Trading is expected to commence on a split-adjusted basis at market open on Friday, December 13, 2024.
Capital Expenditure Plans and Other Uses of Capital
See the table and discussion in the Form 10-K under “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources - Capital Expenditure Plans and Other Uses of Capital,” that sets forth the amounts of Entergy’s planned construction and other capital investments for 2025 through 2027. The following are updates to that discussion.
Entergy is developing its capital investment plan for 2025 through 2027 and currently anticipates that the Utility will make approximately $25 billion in capital investments during that period. In addition to routine capital spending to maintain operations, the preliminary Utility estimate includes investments in generation projects to modernize, decarbonize, and diversify Entergy’s portfolio, as well as to support customer growth, including Bayou
Power Station, Delta Blues Advanced Power Station, Orange County Advanced Power Station, Lone Star Power Station, Segno Solar, Votaw Solar, and potential construction of additional generation; investments in the Utility’s nuclear fleet; transmission spending to improve reliability and resilience while also supporting renewables expansion and customer growth; distribution and Utility support spending to improve reliability, resilience, and customer experience through projects focused on asset renewals and enhancements and grid stability; and other investments. Estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of business restructuring, regulatory constraints and requirements, government actions, environmental regulations, business opportunities, market volatility, economic trends, changes in project plans, and the ability to access capital.
Renewables
As discussed in the Form 10-K, in October 2020, Entergy Arkansas filed a petition with the APSC seeking a finding that the purchase of the 100 MW Walnut Bend Solar facility pursuant to a build-own-transfer agreement is in the public interest. Entergy Arkansas primarily requested cost recovery through the formula rate plan rider. Acquisition of the Walnut Bend Solar facility was initially approved by the APSC in July 2021. The agreement was amended by the parties in February 2023, and the revised agreement was approved by the APSC in July 2023. In February 2024, Entergy Arkansas made an initial payment of approximately $169.7 million to acquire the facility. Substantial completion was achieved and commercial operation commenced in September 2024, at which time Entergy Arkansas made a substantial completion payment of approximately $15.8 million for acquisition of the facility. See Note 14 to the financial statements herein and in the Form 10-K for discussion of the purchase of the Walnut Bend Solar facility.
As discussed in the Form 10-K, in January 2021, Entergy Arkansas filed a petition with the APSC seeking a finding that the purchase of the 180 MW West Memphis Solar facility pursuant to a build-own-transfer agreement is in the public interest. In September 2020, Entergy Arkansas signed an agreement for the purchase of the West Memphis Solar facility, to be sited on approximately 1,500 acres in Crittenden County, Arkansas. Acquisition of the West Memphis Solar facility was initially approved by the APSC in October 2021. In March 2022 the counterparty to the build-own-transfer agreement notified Entergy Arkansas that it was seeking changes to certain terms of the agreement, including both cost and schedule. Entergy Arkansas filed a supplemental application with the APSC in January 2023 for a change in the transmission route and updates to the cost and schedule, which was approved by the APSC in March 2023. In August 2024, Entergy Arkansas made an initial payment of approximately $48.4 million to acquire the facility. The project will commence commercial operation once testing is completed and the project has achieved substantial completion. Entergy Arkansas expects the project to commence commercial operation in November 2024, at which time a substantial completion payment of approximately $200 million is expected. See Note 14 to the financial statements herein for discussion of the purchase of the West Memphis Solar facility.
As discussed in the Form 10-K, in April 2022, Entergy Arkansas filed a petition with the APSC seeking a finding that the purchase of the 250 MW Driver Solar facility pursuant to a build-own-transfer agreement is in the public interest and requested cost recovery through the formula rate plan rider. In August 2022 the APSC granted Entergy Arkansas’s petition and approved the acquisition of Driver Solar and cost recovery through the formula rate plan rider. In August 2024, Entergy Arkansas made an initial payment of approximately $307.7 million to acquire the facility. The project will commence commercial operation once testing is completed and the project has achieved substantial completion. Entergy Arkansas currently expects the project to commence commercial operation by the end of 2024, at which time a substantial completion payment of approximately $100 million is expected. See Note 14 to the financial statements herein for discussion of the purchase of the Driver Solar facility.
Alternative RFP and Certification
As discussed in the Form 10-K, in March 2023, Entergy Louisiana made the first phase of a bifurcated filing to seek approval from the LPSC for an alternative to the requests for proposals (RFP) process that would enable the acquisition of up to 3 GW of solar resources on a faster timeline than the current RFP and certification process allows. The initial phase of the filing established the need for the acquisition of additional resources and the need for an alternative to the RFP process. The second phase of the filing, which contains the details of the proposal for the alternative competitive procurement process and the information necessary to support certification, was filed in May 2023. In addition to the acquisition of up to 3 GW of solar resources, the filing also seeks approval of a new renewable energy credits-based tariff, Rider Geaux ZERO. In May 2024 the LPSC voted to approve the application, and in June 2024 the LPSC issued an order reflecting that approval. In August 2024, Entergy Louisiana issued the first RFP pursuant to this order in solicitation of solar resources that meet the requirements of the LPSC’s order.
Segno Solar and Votaw Solar
In July 2024, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the Segno Solar facility, a 170 MW solar facility to be located in Polk County, Texas, and the Votaw Solar facility, a 141 MW solar facility to be located in Hardin County, Texas. The Segno Solar facility will cost an estimated $351.6 million, and the Votaw Solar facility will cost an estimated $303.8 million, in each case inclusive of estimated transmission interconnection and upgrade costs. In September 2024 the PUCT referred the proceeding to the State Office of Administrative Hearings and the ALJ with the State Office of Administrative Hearings adopted an agreed procedural schedule, with a hearing on the merits to be held in March 2025. A PUCT decision is expected in third quarter 2025. Subject to receipt of required regulatory approval and other conditions, the Segno Solar facility is expected to be in service by early 2027, and the Votaw Solar facility is expected to be in service by mid-2028.
Other Generation
Bayou Power Station
In March 2024, Entergy Louisiana filed an application with the LPSC seeking certification that the public convenience and necessity would be served by the construction of the Bayou Power Station, a 112 MW aggregated capacity floating natural gas power station with black-start capability in Leeville, Louisiana and an associated microgrid that would serve nearby areas, including Port Fourchon, Golden Meadow, Leeville, and Grand Isle. In its application, Entergy Louisiana noted that the estimated cost of the Bayou Power Station was $411 million, including estimated costs of transmission interconnection and other related costs. In October 2024, Entergy Louisiana filed a motion to suspend the procedural schedule in this proceeding in order to evaluate certain recent developments related to the project including potential changes to the estimated cost of the project. Entergy Louisiana will determine next steps for the project after fully evaluating these developments. Subject to timely approval by the LPSC and receipt of other permits and approvals, commercial operation is expected to occur by the end of 2028.
Entergy Louisiana Additional Generation and Transmission Resources
In October 2024, Entergy Louisiana filed an application with the LPSC seeking approval of a variety of generation and transmission resources proposed in connection with establishing service to a new customer facility in north Louisiana, for which an electric service agreement has been executed. The filing requests LPSC certification of three new combined cycle combustion turbine generation resources totaling 2,262 MW, each of which will be enabled for future carbon capture and storage, a new 500 kV transmission line, and 500 kV substation upgrades. The application also requests approval to implement a corporate sustainability rider applicable to the new customer. The corporate sustainability rider contemplates the new customer contributing to the costs of the future addition of 1,500 MW of new solar and energy storage resources, agreements involving carbon capture and storage at Entergy Louisiana’s existing Lake Charles Power Station, and potential future wind and nuclear resources. The combined cost of the first two new generation resources is estimated to be approximately $2,387 million, and these units are expected to achieve commercial operation in 2028. The third new generation resource is currently expected to have an estimated cost similar to the first two new generation resources and is expected to achieve commercial operation in 2029. The cost of the new 500 kV transmission line is estimated to be $546 million. Entergy Louisiana anticipates funding the incremental cost to serve the customer through direct financial contributions from the customer and the revenues it expects to earn under the electric service agreement. The application requests an LPSC decision by September 2025 in order to support the customer’s schedule for taking electric service for the new facility.
Delta Blues Advanced Power Station
In September 2024, Entergy Mississippi announced plans to construct, own, and operate the Delta Blues Advanced Power Station, a 754 MW combined-cycle combustion turbine facility, to be located in Washington County, Mississippi. The facility will primarily be powered by natural gas, and it will also be enabled with carbon capture and hydrogen co-firing optionality. The Delta Blues Advanced Power Station will cost an estimated $1.2 billion. State legislation passed in January 2024 provides for the pre-certification of construction for certain types of facilities that directly or indirectly provide electric service to customers with defined projects under the legislation. Construction of the Delta Blues Advanced Power Station qualifies under this legislation for pre-certification. As enabled by this legislation, Entergy Mississippi began recovery of certain costs of construction of the Delta Blues Advanced Power Station through the interim facilities rate adjustments provision of its formula rate plan rider, which rates became effective in July 2024. Non-fuel revenue collected from the facility’s customer will be included in the formula rate plan to offset the facility’s revenue requirement. Construction is in progress and the facility is expected to be in service by 2028.
Legend Power Station and Lone Star Power Station
In June 2024, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the Legend Power Station, a 754 MW combined-cycle combustion turbine facility, which will be enabled with both carbon capture and storage and hydrogen co-firing optionality, to be located in Jefferson County, Texas, and the Lone Star Power Station, a 453 MW simple-cycle combustion turbine facility, which will be enabled with hydrogen co-firing optionality, to be located in Liberty County, Texas. In its application, Entergy Texas noted that the Legend Power Station was expected to cost an estimated $1.46 billion and the Lone Star Power Station was expected to cost an estimated $735.3 million, in each case inclusive of the estimated costs of the generation facilities, interconnection costs, transmission network upgrades, and an allowance for funds used during construction. As described in the application, Entergy Texas is considering alternative financing approaches for the Legend Power Station and plans to pursue the financing option that is in the best interest of its customers. In July 2024 the PUCT referred the proceeding to the State Office of Administrative Hearings and, also in July 2024, the ALJ with the State Office of Administrative Hearings adopted a procedural schedule, with a hearing on the merits scheduled to begin in October 2024. In September 2024, Entergy Texas filed, and the ALJ with the State Office of Administrative Hearings granted, a motion to extend the procedural schedule in this proceeding in order to address certain developments relating to the cost and scope of the Legend Power Station and the Lone Star Power Station. As soon as the required information is developed, Entergy Texas plans to update the economic analyses in the application for both projects and to file a proposed updated procedural schedule. Subject to receipt of required regulatory approval and other conditions, both facilities are expected to be in service by mid-2028.
As discussed in the Form 10-K, in December 2022, Entergy Louisiana filed an application with the LPSC seeking a public interest finding regarding Phase I of Entergy Louisiana’s Future Ready resilience plan and approval of a rider mechanism to recover the program’s costs. Phase I in the December 2022 application reflected the first five years of a ten-year resilience plan and included investment of approximately $5 billion, including hardening investment, transmission dead-end structures, enhanced vegetation management, and telecommunications improvement. In April 2024 the LPSC approved a framework which includes an initial five-year resilience plan providing for an investment of approximately $1.9 billion with cost recovery via a forward-looking rider with semi-annual true-ups. The plan is subject to specified reporting requirements and includes a performance review of the hardened assets. The LPSC order approving the framework does not include any restrictions on Entergy Louisiana’s ability to file applications for approval of additional investments in resilience.
Entergy New Orleans
As discussed in the Form 10-K, in October 2021 the City Council passed a resolution and order establishing a docket and procedural schedule with respect to system resiliency and storm hardening. In July 2022, Entergy New Orleans filed with the City Council a response identifying a preliminary plan for storm hardening and resiliency projects, including microgrids, to be implemented over ten years at an approximate cost of $1.5 billion. In February 2023 the City Council approved a revised procedural schedule requiring Entergy New Orleans to make a filing in April 2023 containing a narrowed list of proposed hardening projects. In April 2023, Entergy New Orleans filed the required application and supporting testimony seeking City Council approval of the first phase (five years and $559 million) of a ten-year infrastructure hardening plan totaling approximately $1 billion. Entergy New Orleans also sought, among other relief, City Council approval of a rider to recover from customers the costs of the infrastructure hardening plan. In February 2024 the City Council approved a resolution authorizing Entergy New Orleans to implement a resilience project to be partially funded by $55 million of matching funding through the DOE’s Grid Resilience and Innovation Partnerships program. The resolution also required Entergy New Orleans to submit, no later than July 2024, a revised resilience plan consisting of projects over a three-year period. In March 2024, Entergy New Orleans filed with the City Council for approval the requested three-year resilience plan, which includes $168 million in hardening projects. The three-year resilience plan is in addition to the previously authorized resilience project to be partially funded by the DOE’s Grid Resilience and Innovation Partnerships program. In July 2024 the City Council held a technical conference regarding Entergy New Orleans’s three-year resilience plan. In October 2024 the City Council approved a resolution authorizing a two-year resilience plan totaling $100 million. The resolution directs Entergy New Orleans to notify the City Council of the subset of hardening projects from the revised three-year resilience plan to be included in the two-year resilience plan.
In June 2024, Entergy Texas filed an application with the PUCT requesting approval of Phase I of its Texas Future Ready Resiliency Plan, a cost-effective set of measures to begin accelerating the resiliency of Entergy Texas’s transmission and distribution system. Phase I is comprised of projects totaling approximately $335.1 million, including approximately $198 million of projects contingent upon Entergy Texas’s receipt of grant funds in that amount from the Texas Energy Fund. The projects in Phase I include distribution and transmission hardening and modernization projects and targeted vegetation management projects to mitigate the risk of wildfire. These projects are expected to be implemented within approximately three years of PUCT approval. The PUCT referred the proceeding to the State Office of Administrative Hearings in June 2024. In July 2024, Entergy Texas filed a motion, on behalf of the parties to the proceeding, requesting the ALJ with the State Office of Administrative Hearings adopt an agreed proposed procedural schedule, with a hearing on the merits scheduled for September 2024. The ALJ with the State Office of Administrative Hearings adopted the agreed procedural schedule in August 2024. In September 2024, Entergy Texas filed, on behalf of the parties to the proceeding, and the ALJ with the
State Office of Administrative Hearings granted, an unopposed motion to abate the procedural schedule, including the hearing on the merits, noting the parties had reached a settlement in principle and to allow the parties time to finalize a settlement agreement. In October 2024, Entergy Texas filed an unopposed settlement that would resolve all issues in the proceeding, supporting testimony, and a motion to admit evidence and remand the proceeding to the PUCT. Also in October 2024, the PUCT staff filed testimony in support of the unopposed settlement. A PUCT decision is expected in fourth quarter 2024.
Hurricane Francine
In September 2024, Hurricane Francine caused damage to the areas served by Entergy Louisiana and Entergy New Orleans. The storm resulted in widespread power outages, primarily due to damage to distribution infrastructure as a result of strong winds and heavy rain, and the loss of sales during the power outages. Total restoration costs for the repair and/or replacement of Entergy’s electric facilities damaged by Hurricane Francine are currently estimated to be in the range of $220 million to $240 million. Entergy is considering all available avenues to recover storm-related costs from Hurricane Francine, including accessing funded storm reserve escrows. Storm cost recovery or financing will be subject to review by applicable regulatory authorities.
Based on the historic treatment of such costs for similar storm events in the areas served by Entergy, management believes that recovery of restoration costs is probable. There are well established mechanisms and precedent for addressing these events and providing for recovery of prudently incurred storm costs in accordance with applicable regulatory and legal principles. Because Entergy has not gone through the regulatory processes regarding these storm costs; however, there is an element of risk, and Entergy is unable to predict with certainty the degree of success it may have in its recovery initiatives, the amount of restoration costs that it may ultimately recover, or the timing of such recovery.
Dividends
Declarations of dividends on Entergy’s common stock are made at the discretion of the Board. Among other things, the Board evaluates the level of Entergy’s common stock dividends based upon earnings per share from the Utility segment and the Parent and Other portion of the business, financial strength, and future investment opportunities. At its October 2024 meeting, the Board declared a dividend of $1.20 per share.
Cash Flow Activity
As shown in Entergy’s Consolidated Statements of Cash Flows, cash flows for the nine months ended September 30, 2024 and 2023 were as follows:
| 2024 | 2023 | |
|---|---|---|
| (In Millions) | ||
| Cash and cash equivalents at beginning of period | $133 | $224 |
| Net cash provided by (used in): | ||
| Operating activities | 3,109 | 3,231 |
| Investing activities | (4,002) | (3,579) |
| Financing activities | 2,172 | 1,644 |
| Net increase in cash and cash equivalents | 1,279 | 1,296 |
| Cash and cash equivalents at end of period | $1,412 | $1,520 |
Net cash flow provided by operating activities decreased $122 million for the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023 primarily due to:
lower collections from Utility customers, including the effect of higher deferred fuel collections in 2023;
an increase of $110 million in interest paid;
one-time bill credits of $92 million in third quarter 2024 to Entergy Arkansas’s retail customers through the Grand Gulf credit rider as a result of the System Energy settlement with the APSC. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the System Energy settlement agreement with the APSC and see Note 2 to the financial statements herein for discussion of Entergy Arkansas’s Grand Gulf credit rider; and
$57 million in proceeds received in 2023 from the DOE resulting from litigation regarding spent nuclear fuel storage costs that were previously expensed. See Note 8 to the financial statements in the Form 10-K for discussion of the spent nuclear fuel litigation.
The decrease was offset by a decrease of $103 million in pension contributions resulting from the timing of contributions in 2024 compared to 2023 and lower fuel and purchased power costs. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Critical Accounting Estimates”in the Form 10-K and Note 6 to the financial statements herein for a discussion of qualified pension and other postretirement benefits funding.
Net cash flow used in investing activities increased $423 million for the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023 primarily due to:
the initial payment of approximately $308 million in August 2024 for the purchase of the Driver Solar facility by Entergy Arkansas;
the initial and substantial completion payments totaling approximately $186 million in 2024 for the purchase of the Walnut Bend Solar facility by Entergy Arkansas;
an increase of $115 million in transmission construction expenditures primarily due to higher capital expenditures as a result of increased development in the Utility service area and increased spending on various transmission projects in 2024, partially offset by lower capital expenditures for storm restoration in 2024; and
the initial payment of approximately $48 million in August 2024 for the purchase of the West Memphis Solar facility by Entergy Arkansas.
a decrease of $121 million in nuclear construction expenditures primarily due to decreased spending on various nuclear projects in 2024;
a decrease of $63 million in distribution construction expenditures primarily due to lower capital expenditures for storm restoration in 2024, partially offset by increased investment in the resilience of the Utility distribution system; and
the substantial completion payment of approximately $30 million in April 2023 for the purchase of the Sunflower Solar facility by the Entergy Mississippi tax equity partnership.
See Note 14 to the financial statements herein for discussion of the Driver Solar facility, the Walnut Bend Solar facility, and the West Memphis Solar facility purchases. See Note 14 to the financial statements in the Form 10-K for discussion of the Sunflower Solar facility purchase.
Net cash flow provided by financing activities increased $528 million for the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023 primarily due to long-term debt activity providing approximately $2,742 million of cash in 2024 compared to providing approximately $221 million of cash in 2023 and an increase of $91 million in proceeds received from treasury stock issuances in 2024 due to a larger amount of previously repurchased Entergy Corporation common stock issued in 2024 to satisfy stock option exercises. The increase was partially offset by:
proceeds from securitization of $1.5 billion received by the storm trust II at Entergy Louisiana in 2023;
net repayments of $16 million of commercial paper in 2024 as compared to net issuances of $523 million of commercial paper in 2023; and
an increase of $45 million in common stock dividends paid in 2024 as a result of an increase in the dividend paid per share in 2024 as compared to 2023.
See Note 2 to the financial statements in the Form 10-K for a discussion of the Entergy Louisiana March 2023 storm cost securitization. See Note 4 to the financial statements herein and Notes 4 and 5 to the financial statements in the Form 10-K for details of Entergy’s commercial paper program and long-term debt.
Rate, Cost-recovery, and Other Regulation
See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Rate, Cost-recovery, and Other Regulation” in the Form 10-K for discussions of rate regulation, federal regulation, and related regulatory proceedings.
See Note 2 to the financial statements herein for updates to the discussion in the Form 10-K regarding these proceedings.
See Note 2 to the financial statements herein for updates to the discussion in the Form 10-K regarding federal regulatory proceedings.
Market and Credit Risk Sensitive Instruments
See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Market and Credit Risk Sensitive Instruments” in the Form 10-K for a discussion of market and credit risk sensitive instruments. The following is an update to that discussion.
Some of the agreements to sell the power produced by Entergy’s non-utility operations business contain provisions that require an Entergy subsidiary to provide credit support to secure its obligations under such agreement. The primary form of credit support used to satisfy these requirements is an Entergy Corporation guarantee. Cash and letters of credit are also acceptable forms of credit support. At September 30, 2024, based on power prices at that time, Entergy had liquidity exposure of $6 million under the guarantees in place supporting its non-utility operations business transactions and $3 million of posted cash collateral.
See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters. The following is an update to that discussion.
The NRC’s Reactor Oversight Process is a program to collect information about plant performance, assess the information for its safety significance, and provide for appropriate licensee and NRC response. The NRC evaluates plant performance by analyzing two distinct inputs: inspection findings resulting from the NRC’s inspection program and performance indicators reported by the licensee. The evaluations result in the placement of each plant in one of the NRC’s Reactor Oversight Process Action Matrix columns: “licensee response column,” or Column 1, “regulatory response column,” or Column 2, “degraded cornerstone column,” or Column 3, “multiple/repetitive degraded cornerstone column,” or Column 4, and “unacceptable performance,” or Column 5. Plants in Column 1 are subject to normal NRC inspection activities. Plants in Column 2, Column 3, or Column 4 are subject to progressively increasing levels of inspection by the NRC with, in general, progressively increasing levels of associated costs. Continued plant operation is not permitted for plants in Column 5. All of the nuclear generating plants owned and operated by Entergy’s Utility business are currently in Column 1, except Waterford 3, which is in Column 2.
In August 2024 the NRC placed Waterford 3 in Column 2, effective second quarter 2024, based on exceeding the threshold for reactor scrams in June 2024. Waterford 3 will remain in Column 2 until a supplemental inspection is satisfactorily completed.
See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.
See Note 1 to the financial statements in the Form 10-K for discussion of new accounting pronouncements. The following is an update to that discussion.
In March 2024 the SEC issued final rules that require registrants to provide certain climate-related disclosures in annual reports and registration statements in order to enhance and standardize climate-related disclosures for investors. The final rules require a registrant to disclose, among other things: material climate-related risks; activities to mitigate or adapt to such risks; information about the registrant’s board of directors’ oversight of climate-related risks and management’s role in managing material climate-related risks; and information on any climate-related targets or goals that are material to the registrant’s business, results of operations, or financial condition. In addition, the final rules require disclosure of Scope 1 and/or Scope 2 greenhouse gas emissions on a phased-in basis by certain larger registrants when those emissions are material; the filing of an attestation report covering the required disclosure of such registrants’ Scope 1 and/or Scope 2 emissions, also on a phased-in basis; and disclosure of the financial statement effects of severe weather events and other natural conditions. The phase-in compliance period is effective for Entergy beginning with its annual report for the fiscal year ending December 31, 2025. In April 2024 the SEC stayed the final rules, pending judicial review of consolidated challenges to the rules by the Court of Appeals for the Eighth Circuit. Entergy is evaluating the impact the final rules will have on its disclosures and will continue to monitor developments related to the SEC’s stay of the rules and the litigation challenging such rules.
| ENTERGY CORPORATION AND SUBSIDIARIES | ||||
|---|---|---|---|---|
| CONSOLIDATED INCOME STATEMENTS | ||||
| For the Three and Nine Months Ended September 30, 2024 and 2023 | ||||
| (Unaudited) | ||||
| Three Months Ended | Nine Months Ended | |||
| 2024 | 2023 | 2024 | 2023 | |
| (In Thousands, Except Share Data) | ||||
| OPERATING REVENUES | ||||
| Electric | $3,337,820 | $3,526,935 | $8,950,373 | $9,195,588 |
| Natural gas | 32,318 | 32,305 | 133,342 | 130,389 |
| Other | 18,962 | 36,282 | 53,633 | 96,630 |
| TOTAL | 3,389,100 | 3,595,522 | 9,137,348 | 9,422,607 |
| OPERATING EXPENSES | ||||
| Operation and Maintenance: | ||||
| Fuel, fuel-related expenses, and gas purchased for resale | 647,982 | 707,491 | 1,787,148 | 2,189,592 |
| Purchased power | 213,072 | 309,376 | 641,919 | 754,199 |
| Nuclear refueling outage expenses | 36,280 | 39,057 | 112,820 | 111,075 |
| Other operation and maintenance | 722,887 | 751,763 | 2,111,692 | 2,043,184 |
| Asset write-offs, impairments, and related charges (credits) | — | 38,078 | 131,775 | 38,078 |
| Decommissioning | 55,320 | 52,336 | 162,894 | 153,981 |
| Taxes other than income taxes | 192,127 | 197,654 | 572,077 | 566,669 |
| Depreciation and amortization | 498,481 | 439,873 | 1,503,505 | 1,362,728 |
| Other regulatory charges (credits) - net | (102,911) | (83,489) | 132,043 | (158,317) |
| TOTAL | 2,263,238 | 2,452,139 | 7,155,873 | 7,061,189 |
| OPERATING INCOME | 1,125,862 | 1,143,383 | 1,981,475 | 2,361,418 |
| OTHER INCOME (DEDUCTIONS) | ||||
| Allowance for equity funds used during construction | 33,126 | 24,225 | 89,196 | 72,238 |
| Interest and investment income | 64,316 | 2,562 | 285,600 | 96,250 |
| Miscellaneous - net | (66,932) | (18,018) | (460,226) | (121,014) |
| TOTAL | 30,510 | 8,769 | (85,430) | 47,474 |
| INTEREST EXPENSE | ||||
| Interest expense | 308,502 | 264,934 | 887,508 | 781,613 |
| Allowance for borrowed funds used during construction | (13,359) | (9,493) | (35,588) | (29,565) |
| TOTAL | 295,143 | 255,441 | 851,920 | 752,048 |
| INCOME BEFORE INCOME TAXES | 861,229 | 896,711 | 1,044,125 | 1,656,844 |
| Income taxes | 215,475 | 226,997 | 270,103 | 282,818 |
| CONSOLIDATED NET INCOME | 645,754 | 669,714 | 774,022 | 1,374,026 |
| Preferred dividend requirements of subsidiaries and noncontrolling interests | 814 | 2,959 | 4,879 | 5,092 |
| NET INCOME ATTRIBUTABLE TO ENTERGY CORPORATION | $644,940 | $666,755 | $769,143 | $1,368,934 |
| Earnings per average common share: | ||||
| Basic | $3.01 | $3.15 | $3.60 | $6.47 |
| Diluted | $2.99 | $3.14 | $3.58 | $6.45 |
| Basic average number of common shares outstanding | 214,012,467 | 211,459,244 | 213,592,637 | 211,420,117 |
| Diluted average number of common shares outstanding | 215,694,209 | 212,238,117 | 214,736,950 | 212,195,735 |
| See Notes to Financial Statements. | ||||
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.