ENTERGY ARKANSAS LLC

For the period ended Jun 30, 2024. Filed Aug 2, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2024 · Filed Aug 2, 2024

ETR$111.79+1.1%Stored close · as of Nov 9, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Definitionsvii

DEFINITIONS

Certain abbreviations or acronyms used in the text and notes are defined below:

Abbreviation or AcronymTerm
ALJAdministrative Law Judge
ANO 1 and 2Units 1 and 2 of Arkansas Nuclear One (nuclear), owned by Entergy Arkansas
APSCArkansas Public Service Commission
BoardBoard of Directors of Entergy Corporation
CajunCajun Electric Power Cooperative, Inc.
capacity factorActual plant output divided by maximum potential plant output for the period
City CouncilCouncil of the City of New Orleans, Louisiana
COVID-19The novel coronavirus disease declared a pandemic by the World Health Organization and the Centers for Disease Control and Prevention in March 2020
DOEUnited States Department of Energy
EntergyEntergy Corporation and its direct and indirect subsidiaries
Entergy CorporationEntergy Corporation, a Delaware corporation
Entergy Gulf States, Inc.Predecessor company for financial reporting purposes to Entergy Gulf States Louisiana that included the assets and business operations of both Entergy Gulf States Louisiana and Entergy Texas
Entergy Gulf States LouisianaEntergy Gulf States Louisiana, L.L.C., a Louisiana limited liability company formally created as part of the jurisdictional separation of Entergy Gulf States, Inc. and the successor company to Entergy Gulf States, Inc. for financial reporting purposes. The term is also used to refer to the Louisiana jurisdictional business of Entergy Gulf States, Inc., as the context requires. Effective October 1, 2015, the business of Entergy Gulf States Louisiana was combined with Entergy Louisiana.
Entergy LouisianaEntergy Louisiana, LLC, a Texas limited liability company formally created as part of the combination of Entergy Gulf States Louisiana and the company formerly known as Entergy Louisiana, LLC (Old Entergy Louisiana) into a single public utility company and the successor to Old Entergy Louisiana for financial reporting purposes
Entergy TexasEntergy Texas, Inc., a Texas corporation formally created as part of the jurisdictional separation of Entergy Gulf States, Inc. The term is also used to refer to the Texas jurisdictional business of Entergy Gulf States, Inc., as the context requires.
Entergy Wholesale CommoditiesPrior to January 1, 2023, one of Entergy’s reportable business segments consisting of non-utility business activities primarily comprised of the ownership, operation, and decommissioning of nuclear power plants, the ownership of interests in non-nuclear power plants, and the sale of the electric power produced by its operating power plants to wholesale customers
EPAUnited States Environmental Protection Agency
FERCFederal Energy Regulatory Commission
Form 10-KAnnual Report on Form 10-K for the calendar year ended December 31, 2023, filed with the SEC by Entergy Corporation and its Registrant Subsidiaries
GAAPGenerally Accepted Accounting Principles
Grand GulfUnit No. 1 of Grand Gulf Nuclear Station (nuclear), 90% owned or leased by System Energy
GWhGigawatt-hour(s), which equals one million kilowatt-hours
IndependenceIndependence Steam Electric Station (coal), owned 16% by Entergy Arkansas, 25% by Entergy Mississippi, and 7% by Entergy Power, LLC
Indian Point 2Unit 2 of Indian Point Energy Center (nuclear), previously owned as part of Entergy’s non-utility business, which ceased power production in April 2020 and was sold in May 2021

vii

DEFINITIONS (Continued)

Abbreviation or AcronymTerm
Indian Point 3Unit 3 of Indian Point Energy Center (nuclear), previously owned as part of Entergy’s non-utility business, which ceased power production in April 2021 and was sold in May 2021
IRSInternal Revenue Service
ISOIndependent System Operator
kWKilowatt, which equals one thousand watts
kWhKilowatt-hour(s)
LPSCLouisiana Public Service Commission
LURCLouisiana Utilities Restoration Corporation
MISOMidcontinent Independent System Operator, Inc., a regional transmission organization
MMBtuOne million British Thermal Units
MPSCMississippi Public Service Commission
MWMegawatt(s), which equals one thousand kilowatts
MWhMegawatt-hour(s)
Nelson Unit 6Unit No. 6 (coal) of the Nelson Steam Electric Generating Station, 70% of which is co-owned by Entergy Louisiana (57.5%) and Entergy Texas (42.5%) and 10.9% of which is owned by EAM Nelson Holding, LLC
Net debt to net capital ratioGross debt less cash and cash equivalents divided by total capitalization less cash and cash equivalents, which is a non-GAAP measure
NRCNuclear Regulatory Commission
PalisadesPalisades Nuclear Plant (nuclear), previously owned as part of Entergy’s non-utility business, which ceased power production in May 2022 and was sold in June 2022
Parent & OtherThe portions of Entergy not included in the Utility segment, primarily consisting of the activities of the parent company, Entergy Corporation, and other business activity, including Entergy’s non-utility operations business which owns interests in non-nuclear power plants that sell the electric power produced by those plants to wholesale customers and also provides decommissioning services to nuclear power plants owned by non-affiliated entities in the United States
PPAPurchased power agreement or power purchase agreement
PUCTPublic Utility Commission of Texas
Registrant SubsidiariesEntergy Arkansas, LLC, Entergy Louisiana, LLC, Entergy Mississippi, LLC, Entergy New Orleans, LLC, Entergy Texas, Inc., and System Energy Resources, Inc.
River BendRiver Bend Station (nuclear), owned by Entergy Louisiana
SECSecurities and Exchange Commission
System AgreementAgreement, effective January 1, 1983, as modified, among the Utility operating companies relating to the sharing of generating capacity and other power resources. The agreement terminated effective August 2016.
System EnergySystem Energy Resources, Inc.
Unit Power Sales AgreementAgreement, dated as of June 10, 1982, as amended and approved by the FERC, among Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy, relating to the sale of capacity and energy from System Energy’s share of Grand Gulf
UtilityEntergy’s reportable segment that generates, transmits, distributes, and sells electric power, with a small amount of natural gas distribution in portions of Louisiana
Utility operating companiesEntergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas

viii

DEFINITIONS (Concluded)

Abbreviation or AcronymTerm
Vermont YankeeVermont Yankee Nuclear Power Station (nuclear), previously owned as part of Entergy’s non-utility business, which ceased power production in December 2014 and was disposed of in January 2019
Waterford 3Unit No. 3 (nuclear) of the Waterford Steam Electric Station, owned by Entergy Louisiana
weather-adjusted usageElectric usage excluding the effects of deviations from normal weather
White BluffWhite Bluff Steam Electric Generating Station, 57% owned by Entergy Arkansas

ix

Entergy operates primarily through a single reportable segment, Utility. The Utility segment includes the generation, transmission, distribution, and sale of electric power in portions of Arkansas, Mississippi, Texas, and Louisiana, including the City of New Orleans; and operation of a small natural gas distribution business in portions of Louisiana. See “Planned Sale of Gas Distribution Businesses” herein and in the Form 10-K for discussion of the planned sale of the Entergy New Orleans and Entergy Louisiana gas distribution businesses. See Note 7 to the financial statements herein for discussion of and financial information regarding Entergy’s business segment.

Following are income statement variances for Utility, Parent & Other, and Entergy comparing the second quarter 2024 to the second quarter 2023 showing how much the line item increased or (decreased) in comparison to the prior period.

UtilityParent &Other (a)Entergy
(In Thousands)
2023 Net Income (Loss) Attributable to Entergy Corporation$514,227($122,983)$391,244
Operating revenues122,657(15,063)107,594
Fuel, fuel-related expenses, and gas purchased for resale(60,277)(890)(61,167)
Purchased power1,801(7,632)(5,831)
Other regulatory charges (credits) - net224,108—224,108
Other operation and maintenance41,8423941,881
Taxes other than income taxes3,925173,942
Depreciation and amortization36,4012436,425
Other income (deductions)50,001(314,439)(264,438)
Interest expense20,97717,73238,709
Other expenses6,53216,533
Income taxes(31,472)(69,690)(101,162)
Preferred dividend requirements of subsidiaries and noncontrolling interests2,040—2,040
2024 Net Income (Loss) Attributable to Entergy Corporation$441,008($392,086)$48,922

(a)Parent & Other includes eliminations, which are primarily intersegment activity.

Second quarter 2024 results of operations include: (1) a $317 million ($250 million net-of-tax) settlement charge, reflected in Parent & Other above, recognized as a result of a group annuity contract purchased in May 2024 to settle certain pension liabilities; and (2) expenses of $151 million ($112 million net-of-tax), recorded at Utility in second quarter 2024, primarily consisting of regulatory charges to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. See Note 6 to the financial statements herein for discussion of the group annuity contract and settlement charge. See Note 2 to the financial statements herein for discussion of the Entergy Louisiana agreement in principle and the subsequently filed global stipulated settlement agreement.

Utility

Amount
(In Millions)
2023 operating revenues$2,819
Fuel, rider, and other revenues that do not significantly affect net income8
Volume/weather79
Retail electric price35
2024 operating revenues$2,941

The Utility operating companies’ results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The volume/weather variance is primarily due to the effect of more favorable weather on residential and commercial sales and an increase in industrial usage. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the petroleum refining industry.

The retail electric price variance is primarily due to:

an increase in Entergy Arkansas’s formula rate plan rates effective January 2024;

an increase in Entergy Louisiana’s formula rate plan revenues, including increases in the distribution and transmission recovery mechanisms, effective September 2023; and

an increase in Entergy Mississippi’s formula rate plan rates effective April 2024.

See Note 2 to the financial statements herein and in the Form 10-K for discussion of the regulatory proceedings discussed above.

Total electric energy sales for Utility for the three months ended June 30, 2024 and 2023 are as follows:

20242023% Change
(GWh)
Residential9,5579,0276
Commercial7,2366,9694
Industrial13,97313,3015
Governmental6266083
Total retail31,39229,9055
Sales for resale3,0523,171(4)
Total34,44433,0764

See Note 12 to the financial statements herein for additional discussion of operating revenues.

Other Income Statement Items

Utility

Other operation and maintenance expenses increased from $644 million for the second quarter 2023 to $686 million for the second quarter 2024 primarily due to:

an increase of $12 million in contract costs related to operational performance, customer service, and organizational health initiatives;

an increase of $11 million in energy efficiency expenses primarily due to the timing of recovery from customers;

a gain of $7 million on the partial sale of a service center at Entergy Texas in April 2023 as part of an eminent domain proceeding; and

an increase of $5 million in transmission costs allocated by MISO. See Note 2 to the financial statements in the Form 10-K for discussion of the recovery of these costs.

additions to plant in service;

the recognition of $14 million in depreciation expense in second quarter 2024 at Entergy Texas for the 2022 base rate case relate back period, effective over six months beginning January 2024. The recognition of depreciation expense for the relate back period is effective over the same period as collections from the relate back surcharge rider and results in no effect on net income; and

an increase in depreciation rates at Entergy Texas, effective June 2023.

The increase was partially offset by a reduction in depreciation expense at System Energy as a result of the approval by the FERC in August 2023 of the settlement establishing updated depreciation rates used in calculating Grand Gulf plant depreciation and amortization expenses under the Unit Power Sales Agreement. See Note 2 to the financial statements in the Form 10-K for discussion of the Unit Power Sales Agreement depreciation amendment proceeding. See Note 2 to the financial statements in the Form 10-K for discussion of the 2022 base rate case at Entergy Texas.

Other regulatory charges (credits) - net includes regulatory charges of $150 million, recorded by Entergy Louisiana in second quarter 2024, to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. See Note 2 to the financial statements herein for discussion of the Entergy Louisiana agreement in principle and the subsequently filed global stipulated settlement agreement. In addition, Entergy records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

changes in decommissioning trust fund activity, including portfolio rebalancing of decommissioning trust funds in second quarter 2024; and

a decrease of $11 million in net periodic pension and other postretirement benefits non-service costs primarily as a result of pension settlement charges recorded in second quarter 2023 and a reduction in 2024 in the amortization of deferred pension losses as a result of an amendment to a qualified pension plan spinning-off predominantly inactive participants into a new qualified plan, extending the amortization period for deferred losses. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Critical Accounting Estimates” in the Form 10-K, Note 6 to the financial statements herein, and Note 11 to the financial statements in the Form 10-K for further discussion of pension and other postretirement benefits costs.

Interest expense increased primarily due to:

the issuance by Entergy Arkansas of $300 million of 5.30% Series mortgage bonds in August 2023;

the issuances by Entergy Arkansas of $400 million of 5.75% Series mortgage bonds and $400 million of 5.45% Series mortgage bonds, each in May 2024; and

the issuance by Entergy Texas of $350 million of 5.80% Series mortgage bonds in August 2023.

Parent and Other

Other income (deductions) decreased primarily due to a $317 million ($250 million net-of-tax) non-cash settlement charge recognized as a result of a group annuity contract purchased in May 2024 to settle certain pension liabilities. See Note 6 to the financial statements herein for discussion of the group annuity contract and settlement charge.

Interest expense increased primarily due to higher commercial paper balances and the issuance of $1.2 billion of junior subordinated debentures in May 2024. See Note 4 to the financial statements herein for discussion of Entergy’s commercial paper program.

The effective income tax rate was 39.4% for the second quarter 2024. The difference in the effective income tax rate for the second quarter 2024 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, a provision for uncertain tax positions, and amortization of accumulated deferred income taxes as a result of tax rate changes, partially offset by certain book and tax differences related to utility plant items and book and tax differences related to the allowance for equity funds used during construction.

The effective income tax rate was 25.6% for the second quarter 2023. The difference in the effective income tax rate for the second quarter 2023 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes.

Following are income statement variances for Utility, Parent & Other, and Entergy comparing the six months ended June 30, 2024 to the six months ended June 30, 2023 showing how much the line item increased or (decreased) in comparison to the prior period.

UtilityParent &Other (a)Entergy
(In Thousands)
2023 Net Income (Loss) Attributable to Entergy Corporation$911,529($209,350)$702,179
Operating revenues(53,161)(25,676)(78,837)
Fuel, fuel-related expenses, and gas purchased for resale(344,322)1,388(342,934)
Purchased power2,028(18,004)(15,976)
Other regulatory charges (credits) - net309,781—309,781
Other operation and maintenance102,763(5,378)97,385
Asset write-offs, impairments, and related charges131,775—131,775
Taxes other than income taxes11,295(361)10,934
Depreciation and amortization82,1472282,169
Other income (deductions)185,805(340,449)(154,644)
Interest expense30,89029,28160,171
Other expenses10,450210,452
Income taxes69,202(70,396)(1,194)
Preferred dividend requirements of subsidiaries and noncontrolling interests1,932—1,932
2024 Net Income (Loss) Attributable to Entergy Corporation$636,232($512,029)$124,203

(a)Parent & Other includes eliminations, which are primarily intersegment activity.

Results of operations for the six months ended June 30, 2024 include: (1) a $317 million ($250 million net-of-tax) settlement charge, reflected in Parent & Other above, recognized as a result of a group annuity contract purchased in May 2024 to settle certain pension liabilities; (2) expenses of $151 million ($112 million net-of-tax), recorded at Utility in second quarter 2024, primarily consisting of regulatory charges to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023; (3) a $132 million ($97 million net-of-tax) charge, recorded at Utility, to reflect the write-off of a previously recorded regulatory asset as a result of an adverse decision in the Entergy Arkansas opportunity sales proceeding in March 2024; and (4) a $78 million ($57 million net-of-tax) regulatory charge, recorded at Utility in first quarter 2024, primarily to reflect a settlement in principle between Entergy New Orleans and the City Council in April 2024 for additional sharing with customers of income tax benefits from the resolution of the 2016-2018 IRS audit. See Note 6 to the financial statements herein for discussion of the group annuity contract and settlement charge. See Note 2 to the financial statements herein for discussion of the Entergy Louisiana agreement in principle and the subsequently filed global stipulated settlement agreement. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the Entergy Arkansas opportunity sales proceeding. See Note 10 to the financial statements herein for discussion of the April 2024 settlement in principle and Note 3 to the financial statements in the Form 10-K for discussion of the resolution of the 2016-2018 IRS audit.

Results of operations for the six months ended June 30, 2023 include a $129 million reduction in income tax expense as a result of the Hurricane Ida securitization in March 2023, which also resulted in a $103 million ($76 million net-of-tax) regulatory charge, recorded at Utility, to reflect Entergy Louisiana’s obligation to provide credits to its customers as described in an LPSC ancillary order issued as part of the securitization regulatory proceeding.

See Notes 2 and 3 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana March 2023 storm cost securitization.

Utility

Amount
(In Millions)
2023 operating revenues$5,767
Fuel, rider, and other revenues that do not significantly affect net income(201)
Storm restoration carrying costs(31)
Retail electric price81
Volume/weather98
2024 operating revenues$5,714

The Utility operating companies’ results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

Storm restoration carrying costs represent the equity component of storm restoration carrying costs recognized by Entergy Louisiana as part of its March 2023 storm cost securitization. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana March 2023 storm cost securitization.

The retail electric price variance is primarily due to:

an increase in Entergy Arkansas’s formula rate plan rates effective January 2024;

an increase in Entergy Louisiana’s formula rate plan revenues, including increases in the distribution and transmission recovery mechanisms, effective September 2023;

increases in Entergy Mississippi’s formula rate plan rates effective April 2023 and April 2024; and

an increase in Entergy Texas’s base rates effective June 2023, partially offset by the implementation of the generation cost recovery relate-back rider for the Hardin County Peaking Facility effective over three months beginning in May 2023.

See Note 2 to the financial statements herein and in the Form 10-K for discussion of the regulatory proceedings discussed above.

The volume/weather variance is primarily due to the effect of more favorable weather on residential and commercial sales.

Total electric energy sales for Utility for the six months ended June 30, 2024 and 2023 are as follows:

20242023% Change
(GWh)
Residential17,31516,3036
Commercial13,46013,2172
Industrial26,63326,0412
Governmental1,1981,1851
Total retail58,60656,7463
Sales for resale7,0107,674(9)
Total65,61664,4202

See Note 12 to the financial statements herein for additional discussion of operating revenues.

Other Income Statement Items

Utility

Other operation and maintenance expenses increased from $1,264 million for the six months ended June 30, 2023 to $1,367 million for the six months ended June 30, 2024 primarily due to:

an increase of $21 million in contract costs related to operational performance, customer service, and organizational health initiatives;

an increase of $15 million in energy efficiency expenses primarily due to the timing of recovery from customers;

an increase of $14 million in compensation and benefits costs primarily due to higher healthcare claims activity in 2024;

the effects of recording a final judgment in first quarter 2023 to resolve claims in the ANO damages case against the DOE related to spent nuclear fuel storage costs. The damages awarded included the reimbursement of approximately $10 million of spent nuclear fuel storage costs previously recorded as other operation and maintenance expenses. See Note 8 to the financial statements in the Form 10-K for discussion of the spent nuclear fuel litigation;

an increase of $7 million in nuclear generation expenses primarily due to a higher scope of work, including during plant outages, performed in 2024 as compared to 2023;

an increase of $7 million in transmission costs allocated by MISO. See Note 2 to the financial statements in the Form 10-K for discussion of the recovery of these costs; and

a gain of $7 million on the partial sale of a service center at Entergy Texas in April 2023 as part of an eminent domain proceeding.

Asset write-offs, impairments, and related charges includes a $132 million ($97 million net-of-tax) charge to reflect the write-off, at Entergy Arkansas, of a previously recorded regulatory asset as a result of an adverse decision in the Entergy Arkansas opportunity sales proceeding in March 2024. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the Entergy Arkansas opportunity sales proceeding.

additions to plant in service;

the recognition of $28 million in depreciation expense in 2024 at Entergy Texas for the 2022 base rate case relate back period, effective over six months beginning January 2024. The recognition of depreciation expense for the relate back period is effective over the same period as collections from the relate back surcharge rider and results in no effect on net income; and

an increase in depreciation rates at Entergy Texas, effective June 2023.

The increase was partially offset by a reduction in depreciation expense at System Energy as a result of the approval by the FERC in August 2023 of the settlement establishing updated depreciation rates used in calculating Grand Gulf plant depreciation and amortization expenses under the Unit Power Sales Agreement. See Note 2 to the financial statements in the Form 10-K for discussion of the Unit Power Sales Agreement depreciation amendment proceeding. See Note 2 to the financial statements in the Form 10-K for discussion of the 2022 base rate case at Entergy Texas.

Other regulatory charges (credits) - net includes:

regulatory charges of $150 million, recorded by Entergy Louisiana in second quarter 2024, to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. See Note 2 to the financial statements here in for discussion of the Entergy Louisiana agreement in principle and the subsequently filed global stipulated settlement agreement;

a regulatory charge of$103 million, recorded by Entergy Louisiana in first quarter 2023, to reflect its obligation to provide credits to its customers as described in an LPSC ancillary order issued in the Hurricane Ida securitization regulatory proceeding. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana March 2023 storm cost securitization; and

a regulatory charge of$78 million, recorded by Entergy New Orleans in first quarter 2024, primarily to reflect a settlement in principle between Entergy New Orleans and the City Council in April 2024 for additional sharing with customers of income tax benefits from the resolution of the 2016-2018 IRS audit. See Note 10 to the financial statements herein for discussion of the April 2024 settlement in principle and Note 3 to the financial statements in the Form 10-K for discussion of the resolution of the 2016-2018 IRS audit.

In addition, Entergy records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

changes in decommissioning trust fund activity, including portfolio rebalancing of decommissioning trust funds in 2024;

a decrease of $26 million in net periodic pension and other postretirement benefits non-service costs primarily as a result of pension settlement charges recorded in 2023 and a reduction in 2024 in the amortization of deferred pension losses as a result of an amendment to a qualified pension plan spinning-off predominantly inactive participants into a new qualified plan, extending the amortization period for deferred losses. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Critical Accounting Estimates” in the Form 10-K, Note 6 to the financial statements herein, and Note 11 to the financial statements in the Form 10-K for further discussion of pension and other postretirement benefits costs;

an increase of $21 million in intercompany dividend income from affiliated preferred membership interests related to storm cost securitizations. The intercompany dividend income on the affiliate preferred membership interests is eliminated for consolidation purposes and has no effect on net income since the investment is in another Entergy subsidiary; and

a $15 million charge, recorded by Entergy Louisiana in first quarter 2023, for the LURC’s 1% beneficial interest in the storm trust II established as part of the March 2023 storm cost securitization. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana March 2023 storm cost securitization.

Interest expense increased primarily due to:

the issuance by Entergy Arkansas of $300 million of 5.30% Series mortgage bonds in August 2023;

the issuances by Entergy Arkansas of $400 million of 5.75% Series mortgage bonds and $400 million of 5.45% Series mortgage bonds, each in May 2024; and

the issuance by Entergy Texas of $350 million of 5.80% Series mortgage bonds in August 2023.

Parent and Other

Other income (deductions) decreased primarily due to:

a $317 million ($250 million net-of-tax) non-cash settlement charge recognized as a result of a group annuity contract purchased in May 2024 to settle certain pension liabilities. See Note 6 to the financial statements herein for discussion of the group annuity contract and settlement charge; and

the elimination for consolidation purposes of intercompany dividend income of $21 million from affiliated preferred membership interests, as discussed above.

Interest expense increased primarily due to higher commercial paper balances and the issuance of $1.2 billion of junior subordinated debentures in May 2024. See Note 4 to the financial statements herein for discussion of Entergy’s commercial paper program.

The effective income tax rate was 29.9% for the six months ended June 30, 2024. The difference in the effective income tax rate for the six months ended June 30, 2024 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, amortization of accumulated deferred income taxes as a result of tax rate changes, and a provision for uncertain tax positions, partially offset by certain book and tax differences related to utility plant items and book and tax differences related to the allowance for equity funds used during construction.

The effective income tax rate was 7.3% for the six months ended June 30, 2023. The difference in the effective income tax rate for the six months ended June 30, 2023 versus the federal statutory rate of 21% was primarily due to the reduction in income tax expense as a result of the securitization of Hurricane Ida storm costs pursuant to Louisiana Act 55, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021. See Notes 2 and 3 to the financial statements in the Form 10-K for a discussion of the Entergy Louisiana March 2023 storm cost securitization under Act 293.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Income Tax Legislation and Regulation” in the Form 10-K for discussion of income tax legislation and regulation. The following is an update to that discussion.

Entergy Arkansas, Entergy Louisiana, and System Energy have the potential to generate zero-emission nuclear power production tax credits for electricity generated by their respective nuclear power facilities. Based on guidance provided by the United States Treasury Department and the IRS, the production tax credits will be calculated by multiplying the kWh of qualifying electricity by $0.003, with the value of the credits decreasing ratably, or phasing out, once the annual gross receipts from the sale of nuclear power exceed a certain threshold. If certain prevailing wage requirements are satisfied, the calculation of the credit, as described in the preceding sentence, is multiplied by a factor of five. Additional guidance is needed from the United States Treasury Department and/or the IRS to determine how the value of these credits will be calculated for power generated from nuclear facilities of rate-regulated utilities. Due to the uncertainty of value, if any, of credits Entergy Arkansas, Entergy Louisiana, or System Energy may receive, such credits have not been recognized for the nuclear power produced through the second quarter of 2024. If credits are recognized in future periods, the value of such credits is expected to be provided to customers. As such, recognition of production tax credits is not expected to have a material effect on the results of operations of Entergy, Entergy Arkansas, Entergy Louisiana, or System Energy.

Entergy Wholesale Commodities Exit from the Merchant Power Business

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Entergy Wholesale Commodities Exit from the Merchant Power Business” in the Form 10-K for discussion of the exit from the merchant power business.

Planned Sale of Gas Distribution Businesses

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS -Planned Sale of Gas Distribution Businesses” in the Form 10-K for discussion of the planned sale of Entergy New Orleans’s and Entergy Louisiana’s gas distribution businesses. The following is an update to that discussion.

In July 2024 the LPSC staff issued a report recommending LPSC approval of the application of Delta States Utilities LA, LLC (a Bernhard Capital Partners Management LP affiliate) and Entergy Louisiana and the transaction described therein as being in the public interest and proposing certain conditions. Entergy Louisiana anticipates that the LPSC will review the matter at its August Business and Executive meeting.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy’s capital structure, capital spending plans and other uses of capital, and sources of capital. The following are updates to that discussion.

Capital Structure and Resources

Entergy’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio is primarily due to the net issuance of long-term debt in 2024.

June 30, 2024December 31,2023
Debt to capital65.9%63.8%
Effect of excluding securitization bonds(0.2%)(0.3%)
Debt to capital, excluding securitization bonds (non-GAAP) (a)65.7%63.5%
Effect of subtracting cash(1.1%)(0.1%)
Net debt to net capital, excluding securitization bonds (non-GAAP) (a)64.6%63.4%

(a)Calculation excludes the New Orleans and Texas securitization bonds, which are non-recourse to Entergy New Orleans and Entergy Texas, respectively.

As of June 30, 2024, 21.3% of the debt outstanding is at the parent company, Entergy Corporation, and 78.2% is at the Utility. The remaining 0.5% of the debt outstanding relates to the Vermont Yankee credit facility, as discussed in Note 4 to the financial statements herein. Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable and commercial paper, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt, equity, and subsidiaries’ preferred stock without sinking fund. Net capital consists of capital less cash and cash equivalents. The debt to capital ratio excluding securitization bonds and net debt to net capital ratio excluding securitization bonds are non-GAAP measures. Entergy uses the debt to capital ratios excluding securitization bonds in analyzing its financial condition and believes they provide useful information to its investors and creditors in evaluating Entergy’s financial condition because the securitization bonds are non-recourse to Entergy, as more fully described in Note 5 to the financial statements in the Form 10-K. Entergy also uses the net debt to net capital ratio excluding securitization bonds in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy’s financial condition because net debt indicates Entergy’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Entergy Corporation has in place a credit facility that has a borrowing capacity of $3 billion and expires in June 2029. The facility includes fronting commitments for the issuance of letters of credit against $20 million of the total borrowing capacity of the credit facility. The commitment fee is currently 0.225% of the undrawn commitment amount. Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation. As there were no borrowings under the facility for the six months ended June 30, 2024, the estimated interest rate as of June 30, 2024 that would have been applied to outstanding borrowings under the facility was 6.94%. The following is a summary of the amounts outstanding and capacity available under the credit facility as of June 30, 2024:

CapacityBorrowingsLettersof CreditCapacityAvailable
(In Millions)
$3,000$—$4$2,996

Entergy Corporation’s credit facility includes a covenant requiring Entergy to maintain a consolidated debt ratio, as defined, of 65% or less of its total capitalization. The calculation of this debt ratio under Entergy Corporation’s credit facility is different than the calculation of the debt to capital ratio above. Entergy is currently in compliance with the covenant and expects to remain in compliance with this covenant. If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Registrant Subsidiaries (except Entergy New Orleans and System Energy) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the Entergy Corporation credit facility’s maturity date may occur. See Note 4 to the financial statements herein for additional discussion of the Entergy Corporation credit facility and discussion of the Registrant Subsidiaries’ credit facilities.

Entergy Corporation has a commercial paper program with a Board-approved program limit of $2 billion. As of June 30, 2024, Entergy Corporation had $932.4 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2024 was 5.67%.

Equity Issuances and Equity Distribution Program

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources - Sources of Capital - Equity Issuances and Equity Distribution Program” in the Form 10-K and Note 3 to the financial statements herein for discussion of the equity distribution program.

Capital Expenditure Plans and Other Uses of Capital

See the table and discussion in the Form 10-K under “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources - Capital Expenditure Plans and Other Uses of Capital,” that sets forth the amounts of Entergy’s planned construction and other capital investments for 2024 through 2026. The following are updates to that discussion.

Following are the current annual amounts of Entergy’s planned construction and other capital investments.

Planned construction and capital investments202420252026
(In Millions)
Generation$2,215$2,850$2,470
Transmission1,2451,5801,930
Distribution2,0802,4702,045
Utility Support355295315
Total$5,895$7,195$6,760

The updated capital plan for 2024-2026 reflects accelerated resilience spending and a change in the timing of capital investment for certain potential generation projects. The capital plan includes amounts Entergy plans to spend on routine capital projects that are necessary to support reliability of its service, equipment, or systems and to support normal customer growth. In addition to routine capital projects, the capital plan also includes amounts Entergy plans to spend on non-routine capital investments for which Entergy is either contractually obligated, has Board approval, or otherwise expects to make to satisfy regulatory or legal requirements. Amounts include the following types of construction and capital investments:

Investments in generation projects to modernize, decarbonize, and diversify Entergy’s portfolio, including Walnut Bend Solar, West Memphis Solar, Driver Solar, Bayou Power Station, Orange County Advanced Power Station, Lone Star Power Station, Segno Solar, Votaw Solar, and potential construction of additional generation;

Investments in Entergy’s Utility nuclear fleet;

Transmission spending to improve reliability and resilience while also supporting renewables expansion and customer growth; and

Distribution and Utility support spending to improve reliability, resilience, and customer experience through projects focused on asset renewals and enhancements and grid stability.

Renewables

Alternative RFP and Certification

As discussed in the Form 10-K, in March 2023, Entergy Louisiana made the first phase of a bifurcated filing to seek approval from the LPSC for an alternative to the requests for proposals (RFP) process that would enable the acquisition of up to 3 GW of solar resources on a faster timeline than the current RFP and certification process allows. The initial phase of the filing established the need for the acquisition of additional resources and the need for an alternative to the RFP process. The second phase of the filing, which contains the details of the proposal for the alternative competitive procurement process and the information necessary to support certification, was filed in May 2023. In addition to the acquisition of up to 3 GW of solar resources, the filing also seeks approval of a new renewable energy credits-based tariff, Rider Geaux ZERO. In May 2024 the LPSC voted to approve the application, and in June 2024 the LPSC issued an order reflecting that approval.

Segno Solar and Votaw Solar

In July 2024, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the Segno Solar facility, a 170 MW solar facility to be located in Polk County, Texas, and the Votaw Solar facility, a 141 MW solar facility to be located in Hardin County, Texas. The Segno Solar facility will cost an estimated $351.6 million, and the Votaw Solar facility will cost an estimated $303.8 million, in each case inclusive of estimated transmission interconnection and upgrade costs. Subject to receipt of required regulatory approval and other conditions, the Segno Solar facility is expected to be in service by early 2027, and the Votaw Solar facility is expected to be in service by mid-2028.

Other Generation

Bayou Power Station

In March 2024, Entergy Louisiana filed an application with the LPSC seeking certification that the public convenience and necessity would be served by the construction of the Bayou Power Station, a 112 MW aggregated capacity floating natural gas power station with black-start capability in Leeville, Louisiana and an associated microgrid that would serve nearby areas, including Port Fourchon, Golden Meadow, Leeville, and Grand Isle. The current estimated cost of the Bayou Power Station is $411 million, including estimated costs of transmission interconnection and other related costs. Subject to timely approval by the LPSC and receipt of other permits and approvals, commercial operation is expected to occur by the end of 2028. A procedural schedule has been established with a hearing in December 2024.

Legend Power Station and Lone Star Power Station

In June 2024, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the Legend Power Station, a 754 MW combined-cycle combustion turbine facility, which will be enabled with both carbon capture and storage and hydrogen co-firing optionality, to be located in Jefferson County, Texas, and the Lone Star Power Station, a 453 MW simple-cycle combustion turbine facility, which will be enabled with hydrogen co-firing optionality, to be located in Liberty County, Texas. Legend Power Station will cost an estimated $1.46 billion and Lone Star Power Station will cost an estimated $735.3 million, in each case inclusive of the estimated costs of the generation facilities, interconnection costs, transmission network upgrades, and an allowance for funds used during construction. As described in the application, Entergy Texas is considering alternative financing approaches for Legend Power Station and plans to pursue the financing option that is in the best interest of customers. In July 2024 the PUCT referred the proceeding to the State Office of Administrative Hearings and, also in July 2024, the ALJ with the State Office of Administrative Hearings adopted a procedural schedule, with a hearing on the merits scheduled to begin in October 2024. Subject to receipt of required regulatory approval and other conditions, both facilities are expected to be in service by mid-2028.

As discussed in the Form 10-K, in December 2022, Entergy Louisiana filed an application with the LPSC seeking a public interest finding regarding Phase I of Entergy Louisiana’s Future Ready resilience plan and approval of a rider mechanism to recover the program’s costs. Phase I in the December 2022 application reflected the first five years of a ten-year resilience plan and included investment of approximately $5 billion, including hardening investment, transmission dead-end structures, enhanced vegetation management, and telecommunications improvement. In April 2024 the LPSC approved a framework which includes an initial five-year resilience plan providing for an investment of approximately $1.9 billion with cost recovery via a forward-looking rider with semi-annual true-ups. The plan is subject to specified reporting requirements and includes a performance review of the hardened assets. The LPSC order approving the framework does not include any restrictions on Entergy Louisiana’s ability to file applications for approval of additional investments in resilience.

Entergy New Orleans

As discussed in the Form 10-K, in October 2021 the City Council passed a resolution and order establishing a docket and procedural schedule with respect to system resiliency and storm hardening. In July 2022, Entergy New Orleans filed with the City Council a response identifying a preliminary plan for storm hardening and resiliency projects, including microgrids, to be implemented over ten years at an approximate cost of $1.5 billion. In February 2023 the City Council approved a revised procedural schedule requiring Entergy New Orleans to make a filing in April 2023 containing a narrowed list of proposed hardening projects. In April 2023, Entergy New Orleans filed the required application and supporting testimony seeking City Council approval of the first phase (five years and $559 million) of a ten-year infrastructure hardening plan totaling approximately $1 billion. Entergy New Orleans also sought, among other relief, City Council approval of a rider to recover from customers the costs of the infrastructure hardening plan. In February 2024 the City Council approved a resolution authorizing Entergy New Orleans to implement a resilience project to be partially funded by $55 million of matching funding through the DOE’s Grid Resilience and Innovation Partnerships program. The resolution also required Entergy New Orleans to submit, no later than July 2024, a revised resilience plan consisting of projects over a three-year period. In March 2024, Entergy New Orleans filed with the City Council for approval the requested three-year resilience plan, which includes $168 million in hardening projects. The three-year resilience plan is in addition to the previously authorized resilience project to be partially funded by the DOE’s Grid Resilience and Innovation Partnerships program. In July 2024 the City Council held a technical conference regarding Entergy New Orleans’s three-year resilience plan.

Entergy Texas

In June 2024, Entergy Texas filed an application with the PUCT requesting approval of Phase I of its Texas Future Ready Resiliency Plan, a cost-effective set of measures to begin accelerating the resiliency of Entergy Texas’s transmission and distribution system. Phase I is comprised of projects totaling approximately $335.1 million, including approximately $198 million of projects contingent upon Entergy Texas’s receipt of grant funds in that amount from the Texas Energy Fund. The projects in Phase I include distribution and transmission hardening and modernization projects and targeted vegetation management projects to mitigate the risk of wildfire. Work on these projects is expected to commence within approximately three years of PUCT approval. The PUCT referred the proceeding to the State Office of Administrative Hearings in June 2024. In July 2024, Entergy Texas filed a motion, on behalf of the parties to the proceeding, requesting the ALJ with the State Office of Administrative Hearings adopt an agreed proposed procedural schedule, with a hearing on the merits scheduled for September 2024. A PUCT decision is expected in fourth quarter 2024.

Dividends

Declarations of dividends on Entergy’s common stock are made at the discretion of the Board. Among other things, the Board evaluates the level of Entergy’s common stock dividends based upon earnings per share from the Utility segment and the Parent and Other portion of the business, financial strength, and future investment opportunities. At its July 2024 meeting, the Board declared a dividend of $1.13 per share.

Cash Flow Activity

As shown in Entergy’s Consolidated Statements of Cash Flows, cash flows for the six months ended June 30, 2024 and 2023 were as follows:

20242023
(In Millions)
Cash and cash equivalents at beginning of period$133$224
Net cash provided by (used in):
Operating activities1,5461,826
Investing activities(2,466)(2,445)
Financing activities2,1421,589
Net increase in cash and cash equivalents1,222970
Cash and cash equivalents at end of period$1,355$1,194

Net cash flow provided by operating activities decreased $280 million for the six months ended June 30, 2024 compared to the six months ended June 30, 2023 primarily due tolower collections from Utility customers, including the effect of higher deferred fuel collections in 2023, and the timing of payments to vendors.

Net cash flow used in investing activities increased $21 million for the six months ended June 30, 2024 compared to the six months ended June 30, 2023 primarily due to:

the initial payment of approximately $170 million in February 2024 for the purchase of the Walnut Bend Solar facility by Entergy Arkansas; and

an increase of $34 million in transmission construction expenditures primarily due to increased spending on various transmission projects in 2024 and increased development in the Utility service area, partially offset by lower capital expenditures for storm restoration in 2024.

a decrease of $115 million in nuclear construction expenditures primarily due to decreased spending on various nuclear projects in 2024;

a decrease of $44 million in distribution construction expenditures primarily due to lower capital expenditures for storm restoration in 2024 and a lower scope of work on projects in 2024 as compared to 2023; and

the substantial completion payment of approximately $30 million in April 2023 for the purchase of the Sunflower Solar facility by the Entergy Mississippi tax equity partnership.

See Note 14 to the financial statements herein for discussion of the Walnut Bend Solar facility purchase and Note 14 to the financial statements in the Form 10-K for discussion of the Sunflower Solar facility purchase.

Net cash flow provided by financing activities increased $553 million for the six months ended June 30, 2024 compared to the six months ended June 30, 2023 primarily due to long-term debt activity providing approximately $2,688 million of cash in 2024 compared to providing approximately $216 million of cash in 2023. The increase was partially offset by:

proceeds from securitization of $1.5 billion received by the storm trust II at Entergy Louisiana in 2023; and

net repayments of $206 million of commercial paper in 2024 as compared to net issuances of $281 million of commercial paper in 2023.

See Note 2 to the financial statements in the Form 10-K for a discussion of the Entergy Louisiana March 2023 storm cost securitization. See Note 4 to the financial statements herein and Notes 4 and 5 to the financial statements in the Form 10-K for details of Entergy’s commercial paper program and long-term debt.

Rate, Cost-recovery, and Other Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Rate, Cost-recovery, and Other Regulation” in the Form 10-K for discussions of rate regulation, federal regulation, and related regulatory proceedings.

See Note 2 to the financial statements herein for updates to the discussion in the Form 10-K regarding these proceedings.

See Note 2 to the financial statements herein for updates to the discussion in the Form 10-K regarding federal regulatory proceedings.

Market and Credit Risk Sensitive Instruments

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Market and Credit Risk Sensitive Instruments” in the Form 10-K for a discussion of market and credit risk sensitive instruments. The following is an update to that discussion.

Some of the agreements to sell the power produced by Entergy’s non-utility operations business contain provisions that require an Entergy subsidiary to provide credit support to secure its obligations under such agreement. The primary form of credit support used to satisfy these requirements is an Entergy Corporation guarantee. Cash and letters of credit are also acceptable forms of credit support. At June 30, 2024, based on power prices at that time, Entergy had liquidity exposure of $6 million under the guarantees in place supporting its non-utility operations business transactions and $3 million of posted cash collateral.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters. The following is an update to that discussion.

The NRC’s Reactor Oversight Process is a program to collect information about plant performance, assess the information for its safety significance, and provide for appropriate licensee and NRC response. The NRC evaluates plant performance by analyzing two distinct inputs: inspection findings resulting from the NRC’s inspection program and performance indicators reported by the licensee. The evaluations result in the placement of each plant in one of the NRC’s Reactor Oversight Process Action Matrix columns: “licensee response column,” or

Column 1, “regulatory response column,” or Column 2, “degraded cornerstone column,” or Column 3, “multiple/repetitive degraded cornerstone column,” or Column 4, and “unacceptable performance,” or Column 5. Plants in Column 1 are subject to normal NRC inspection activities. Plants in Column 2, Column 3, or Column 4 are subject to progressively increasing levels of inspection by the NRC with, in general, progressively increasing levels of associated costs. Continued plant operation is not permitted for plants in Column 5. All of the nuclear generating plants owned and operated by Entergy’s Utility business are currently in Column 1, except Waterford 3. Entergy expects the NRC to determine that Waterford 3 entered Column 2, effective second quarter 2024, based on exceeding the threshold for reactor scrams in June 2024. Waterford 3 will remain in Column 2 until a supplemental inspection is satisfactorily completed.

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

See Note 1 to the financial statements in the Form 10-K for discussion of new accounting pronouncements. The following is an update to that discussion.

In March 2024 the SEC issued final rules that require registrants to provide certain climate-related disclosures in annual reports and registration statements in order to enhance and standardize climate-related disclosures for investors. The final rules require a registrant to disclose, among other things: material climate-related risks; activities to mitigate or adapt to such risks; information about the registrant’s board of directors’ oversight of climate-related risks and management’s role in managing material climate-related risks; and information on any climate-related targets or goals that are material to the registrant’s business, results of operations, or financial condition. In addition, the final rules require disclosure of Scope 1 and/or Scope 2 greenhouse gas emissions on a phased-in basis by certain larger registrants when those emissions are material; the filing of an attestation report covering the required disclosure of such registrants’ Scope 1 and/or Scope 2 emissions, also on a phased-in basis; and disclosure of the financial statement effects of severe weather events and other natural conditions. The phase-in compliance period is effective for Entergy beginning with its annual report for the fiscal year ending December 31, 2025. In April 2024 the SEC stayed the final rules, pending judicial review of consolidated challenges to the rules by the Court of Appeals for the Eighth Circuit. Entergy is evaluating the impact the final rules will have on its disclosures and will continue to monitor developments related to the SEC’s stay of the rules and the litigation challenging such rules.

ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three and Six Months Ended June 30, 2024 and 2023
(Unaudited)
Three Months EndedSix Months Ended
2024202320242023
(In Thousands, Except Share Data)
OPERATING REVENUES
Electric$2,906,047$2,785,244$5,612,553$5,668,654
Natural gas35,35733,503101,02498,084
Other12,21627,27934,67160,347
TOTAL2,953,6202,846,0265,748,2485,827,085
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale522,550583,7171,139,1661,482,100
Purchased power200,705206,536428,847444,823
Nuclear refueling outage expenses38,27734,78576,54072,018
Other operation and maintenance701,775659,8941,388,8061,291,421
Asset write-offs, impairments, and related charges——131,775—
Decommissioning54,19351,152107,574101,644
Taxes other than income taxes187,520183,578379,949369,015
Depreciation and amortization505,363468,9381,005,024922,855
Other regulatory charges (credits) - net125,607(98,501)234,954(74,827)
TOTAL2,335,9902,090,0994,892,6354,609,049
OPERATING INCOME617,630755,927855,6131,218,036
OTHER INCOME (DEDUCTIONS)
Allowance for equity funds used during construction29,27524,86756,07048,013
Interest and investment income70,58745,428221,28393,687
Miscellaneous - net(342,549)(48,544)(393,294)(102,997)
TOTAL(242,687)21,751(115,941)38,703
INTEREST EXPENSE
Interest expense301,263261,349579,006516,678
Allowance for borrowed funds used during construction(11,686)(10,481)(22,229)(20,072)
TOTAL289,577250,868556,777496,606
INCOME BEFORE INCOME TAXES85,366526,810182,895760,133
Income taxes33,634134,79654,62755,821
CONSOLIDATED NET INCOME51,732392,014128,268704,312
Preferred dividend requirements of subsidiaries and noncontrolling interests2,8107704,0652,133
NET INCOME ATTRIBUTABLE TO ENTERGY CORPORATION$48,922$391,244$124,203$702,179
Earnings per average common share:
Basic$0.23$1.85$0.58$3.32
Diluted$0.23$1.84$0.58$3.31
Basic average number of common shares outstanding213,617,110211,449,211213,380,414211,400,230
Diluted average number of common shares outstanding214,376,721212,201,529214,155,768212,173,254
See Notes to Financial Statements.