AEP Texas Inc.
For the period ended Mar 31, 2026. Filed May 5, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2026 · Filed May 5, 2026
Extracted filing text, with the paragraph anchors used by the comparison.
See the whole filing, with its images and exhibitsContents
Item 2. RESULTS OF OPERATIONS
EXECUTIVE OVERVIEW
AEP CONSOLIDATED RESULTS OF OPERATIONS
Earnings Attributable to AEP Common Shareholders increased from $800 million in 2025 to $874 million in 2026 primarily due to:
Investment in transmission assets, which resulted in higher revenues and income.
Favorable rate proceedings in AEP’s various jurisdictions.
An increase in sales volume driven primarily by new data processing load added in the commercial and industrial customer classes.
A gain related to renewable contract termination proceeds.
A gain from the sale of a non-utility investment in land at APCo.
A decrease in sales volumes in the residential class driven by unfavorable weather.
Unfavorable mark-to-market economic hedging activity driven by a decrease in commodity prices.
A decrease due to a probable partial disallowance of the Pirkey Plant net book value in the SWEPCo 2025 Texas Base Rate Case.
See Results of Operations section for additional information by segment.
Non-GAAP Financial Measures
AEP reports its financial results in accordance with GAAP. AEP supplements its reporting of financial information with certain non-GAAP financial measures, such as operating earnings. The most comparable GAAP measure to operating earnings is GAAP earnings. Operating earnings, which could differ from earnings reported in accordance with GAAP, exclude certain gains and losses and other specified items, including mark-to-market adjustments from commodity hedging activities and other items as set forth in the reconciliation below, that management believes are not indicative of AEP’s ongoing performance.
This information is intended to enhance an investor’s overall understanding of period over period financial results and provide an indication of AEP’s baseline operating performance by excluding items that are considered by management to be not directly related to the ongoing operations of the business. In addition, this information is among the primary indicators management uses as a basis for evaluating performance, allocating resources, setting incentive compensation targets and planning and forecasting of future periods. These non-GAAP financial measures are not a presentation defined under GAAP and may not be comparable to other companies’ presentations. These non-GAAP measures should not be deemed more useful than, a substitute for, or an alternative to the most comparable GAAP measures.
Reconciliation of GAAP Earnings to Operating Earnings
The following tables present a reconciliation of operating earnings to the most directly comparable GAAP measure.
| AEP | AEP Texas | AEPTCo | APCo | I&M | OPCo | PSO | SWEPCo | |
|---|---|---|---|---|---|---|---|---|
| (in millions) | ||||||||
| GAAP Earnings (a) | $874 | $120 | $183 | $195 | $148 | $117 | $15 | $56 |
| Adjustments to GAAP Earnings: | ||||||||
| Mark-to-Market Impact of Commodity Hedging Activities (b) | 26 | — | — | — | 7 | — | — | — |
| Impact of WVPSC Order (c) | (35) | — | — | (29) | — | — | — | — |
| Pirkey Plant Disallowance (d) | 31 | — | — | — | — | — | — | 31 |
| Income Tax Effect of Specified Items (e) | (5) | — | — | 6 | (2) | — | — | (6) |
| Total Specified Items | 17 | — | — | (23) | 5 | — | — | 25 |
| Operating Earnings (Non-GAAP) | $891 | $120 | $183 | $172 | $153 | $117 | $15 | $81 |
(a)Represents the earnings (loss) attributable to common shareholders or net income (loss) for registrants with no noncontrolling interest.
(b)Represents the mark‑to‑market impact of economic hedging activities which are excluded to align with the recognition of the underlying hedged exposures.
(c)Represents the impact of the WVPSC order related to the 2024 Modified Rate Base Cost surcharge update filing. These amounts represent the deferral of costs incurred in prior periods and are not indicative of the Company’s baseline operating performance in the current year.
(d)Represents the impact of the probable partial disallowance of the Pirkey Plant net book value in the 2025 Texas Base Rate Case. This disallowance is related to expectations related to the outcome of a pending case and is not indicative of the Company’s baseline operating performance in the current year.
(e)Tax effect is calculated using the statutory tax rate unless otherwise noted.
| AEP | AEP Texas | AEPTCo | APCo | I&M | OPCo | PSO | SWEPCo | |
|---|---|---|---|---|---|---|---|---|
| (in millions) | ||||||||
| GAAP Earnings (a) | $800 | $102 | $211 | $165 | $58 | $63 | $28 | $48 |
| Adjustments to GAAP Earnings (b): | ||||||||
| Mark-to-Market Impact of Commodity Hedging Activities (c) | (14) | — | — | — | 26 | — | — | — |
| Sale of AEP Onsite Partners (d) | 10 | — | — | — | — | — | — | — |
| Impact of Ohio Legislation (e) | 27 | — | — | — | — | 27 | — | — |
| Total Specified Items | 23 | — | — | — | 26 | 27 | — | — |
| Operating Earnings (Non-GAAP) | $823 | $102 | $211 | $165 | $84 | $90 | $28 | $48 |
(a)Represents the earnings (loss) attributable to common shareholders or net income (loss) for registrants with no noncontrolling interest.
(b)Excluding tax related adjustments, all items presented in the table are tax adjusted at the statutory rate unless otherwise noted.
(c)Represents the mark‑to‑market impact of economic hedging activities which are excluded to align with the recognition of the underlying hedged exposures.
(d)Represents an adjustment to the estimated loss on sale of AEP OnSite Partners as a result of the contractual working capital true-up.
(e)Represents the estimated reduction in regulatory assets for OVEC-related purchased power costs as a result of approved legislation in Ohio.
ELECTRIC INDUSTRY TRANSFORMATION
The electric utility industry is undergoing a historic transformation, fueled by rapid commercial customer class load growth, especially from data processing and other energy-intensive operations, as well as shifting regulator and customer expectations, evolving public policies, rising stakeholder demands, demographic changes, new competitive pressures, emerging technologies, necessary reliability investments and volatile commodity markets. AEP projects growth in system peak demand across its diversified service territory, with especially strong projected growth in Indiana, Ohio, Oklahoma and Texas. To meet this accelerating demand, AEP outlined a $78 billion, five-year capital plan focused on strengthening transmission infrastructure, adding new generation resources to serve both existing customers and forecasted large load additions and continuing to enhance distribution system reliability. Throughout this investment cycle, AEP remains committed to focusing on customer affordability. AEP expects to utilize various levers to address affordability including incremental load growth, rate design, continued operation and maintenance expense efficiency and financing mechanisms such as securitizations.
AEP has advanced large load tariff proposals and tariff modifications aimed at enabling the rapid interconnection of committed large load customers while protecting existing customers from increased costs. Additionally, several AEP utility subsidiaries have made rate filings with state commissions to establish new tariffs for data centers and other large load customers. The new tariffs are designed to protect existing customers by strengthening and lengthening contract terms with large customers. These new protections include contract lengths of up to 20 years and take-or-pay contractual minimums which can require a customer to pay for as much as 80-90% of their contracted demand. In practice, these provisions reduce risks around the buildout of large load infrastructure on existing customers, promoting stability and affordability. These proposals have been filed in eight of AEP’s jurisdictions, with four already approved by state commissions. As of March 31, 2026, there were four pending proposals in Michigan, Oklahoma, Texas and Virginia. AEP is actively engaging with regulators, policymakers, RTOs, customers and suppliers to advance system reliability, resiliency and affordability across its service territory during this period of rapid transformation.
AEP continues to secure resources to support forecasted load requirements in its regulated jurisdictions including:
The addition of 870 MWs of owned generating capacity in 2026.
Signing agreements in 2026 to acquire 1,236 MWs in additional generation facilities.
RFPs seeking approximately 12,700 MWs of generating capacity.
Capacity purchase agreements to satisfy capacity reserve margins to serve customers.
Long-term transmission construction partnership with a major U.S.-based infrastructure services company.
Customer Demand
AEP uses sales volumes by customer class as a way to measure drivers of customer demand. In 2026, AEP experienced higher customer demand, driven primarily by new data processing load added in the commercial and industrial customer classes. This growth was partially offset by weather-related impacts in the residential class, including unusually cold weather in the first quarter of 2025 and unusually warm weather in 2026. The table below shows the percentage change in sales volume by customer class.
(a)Percentage change for the three months ended March 31, 2026 as compared to the three months ended March 31, 2025. Load figures are billed and accrued retail sales excluding firm wholesale load.
New Generation Resources
The growth of AEP’s regulated generation portfolio reflects the Company’s focus on meeting increasing customer demand for power while balancing cost and reliability.
Acquired Generation Facilities
In March 2026, I&M acquired the Oregon Clean Energy Center (Oregon Plant). The transaction reflects the Company’s focus on securing necessary generation to meet future customer demand. See “Acquisitions” section of Note 6 for additional information. The table below summarizes the acquisition:
| Company | Plant Name | Fuel Type | Location | Acquisition Date | Net Maximum Capacity |
|---|---|---|---|---|---|
| (in MWs) | |||||
| I&M | Oregon Plant | Natural Gas | Oregon, OH | March 2026 | 870 |
Pending Natural Gas Generation
In December 2024, SWEPCo filed an application for a CCN with the APSC, LPSC and PUCT for construction of the Hallsville Natural Gas Plant (450 MWs) and the fuel conversion of Welsh Plant, Units 1 and 3 to natural gas. In the application for the CCN, SWEPCo seeks to site the Hallsville Natural Gas Plant at the location of the now-retired Pirkey Plant. In February 2026, the APSC approved both projects and regulatory proceedings in Louisiana and Texas are still underway. SWEPCo estimates the combined capital cost of these projects to be approximately $723 million and the projects would be placed in service between December 2027 and May 2028.
In September 2025, PSO filed an application with the OCC seeking regulatory approval of a new 450 MW combustion turbine configuration at its existing Northeastern facility in Oklahoma as part of a project portfolio. If approved, the combustion turbines would be projected to be online by the end of 2028.
In January 2026, the IURC issued an order approving the settlement agreement in I&M’s Indiana Expedited Generation Resource (EGR) Plan filing. This order approved the settlement agreement allowing I&M to seek expedited IURC approval of future proposed PPAs, CPAs and owned generation resources to serve I&M’s increasing customer load and to implement deferral accounting for the generation resources that are approved by the IURC through the EGR Plan process.
In February 2026, I&M entered into a PSA to acquire the Big Sandy Peaker Plant, a six-unit, 318 MW combustion turbine plant located in Kenova, West Virginia. In April 2026, I&M filed an application with the IURC seeking approval of the purchase under its EGR plan. The acquisition is expected to close in the second half of 2026.
In April 2026, I&M entered into a PSA to acquire Sycamore Riverside Energy Center (Sycamore Plant), a 918 MW natural gas and ultra-low sulfur distillate (dual-fuel)-fired generation facility located in Sullivan County, Indiana. I&M proposes to acquire the Sycamore Plant to provide capacity and energy to I&M Indiana retail and FERC wholesale customers. Also in April 2026, I&M filed an application with the IURC seeking a CPCN for acquisition and development through a PSA of the Sycamore Plant. Through the application, I&M also seeks approval of the estimated project costs, proposed ratemaking and accounting treatment, and an alternative regulatory plan. A final order from the IURC is expected in December 2026.
Significant Approved Renewable Generation Filings
AEP received regulatory approvals from various state regulatory commissions to acquire approximately 1,024 MWs of owned renewable generation facilities, totaling approximately $2.6 billion. The Financial Condition section below includes the estimated cost of these facilities in the Budgeted Capital Expenditures. In addition, AEP received regulatory approvals for 1,067 MWs of renewable PPAs. The recently enacted OBBBA legislation is not expected to affect the eligibility of these generation facilities for federal tax incentives. The following table summarizes regulatory approvals received for active renewable projects that are not yet in service as of March 31, 2026:
| Company | Generation Type | Expected CommercialOperation | Owned/PPA | Generating Capacity |
|---|---|---|---|---|
| (in MWs) | ||||
| APCo | Solar | 2026-2027 | PPA | 113 |
| APCo (a) | Wind | 2026 | Owned | 140 |
| I&M | Solar | 2026-2027 | PPA | 280 |
| I&M | Wind | 2026-2030 | PPA | 674 |
| I&M | Solar | 2028 | Owned | 469 |
| PSO (b) | Wind | 2026 | Owned | 265 |
| PSO (b) | Solar | 2027 | Owned | 150 |
| Total Approved Renewable Projects | 2,091 | |||
(a)APCo has one wind project under construction and one wind project was terminated in the first quarter of 2026.
(b)PSO has one wind project and one solar project under construction.
Significant Generation Requests for Proposal (RFP)
The table below includes active RFPs issued for both owned and purchased power generation. Projects selected will be subject to regulatory approval:
| Company | Issuance Date | Resource Type | Projected In-Service Dates | GeneratingCapacity |
|---|---|---|---|---|
| (in MWs) | ||||
| APCo | May 2025 | Owned wind, solar, co-located or stand-alone BESS | 2029 | 800 |
| APCo | May 2025 | Purchased power from wind, solar, hydro or geothermal | 2029 | 300 |
| I&M (a) | September 2024 | Wind, solar, dispatchable resources, BESS and emerging technology resources | 2029 | 4,000 |
| PSO (b) | November 2023 | All-source | 2027/2028 | 1,500 |
| PSO | January 2026 | All-source | 2029 | 4,000 |
| SWEPCo (c) | January 2024 | Wind, solar, BESS and natural gas resources | 2027/2028 | 2,100 |
| Total Significant RFPs | 12,700 | |||
(a)Five wind resources selected totaling 574 MWs from the 2024 RFP have already been submitted and approved by the IURC. I&M expects to file applications with the IURC for regulatory approval of additional resources from the 2024 RFP in 2026.
(b)RFP was negotiated and filed for regulatory approval in September 2025.
(c)Two self-build natural gas resources totaling 1,503 MWs were selected and filed for regulatory approval in December 2024. A draft 2026 All-source RFP totaling 3,000 MWs was issued in March 2026, and the final RFP is expected to be issued in May 2026.
Capacity Purchase Agreements
In addition to the generation projects discussed above, AEP enters into CPAs to satisfy operating companies’ capacity reserve margins to serve customers. The following table includes CPA amounts under contract as of March 31, 2026, by year, for the five-year period 2026-2030:
| I&M · PSO · SWEPCo | ||||||
|---|---|---|---|---|---|---|
| Natural Gas · Wind · Natural Gas · Wind · Natural Gas · Wind | ||||||
| Delivery Start Year · (in MWs) | ||||||
| 2026 | — | 73 | 460 | 86 | 150 | 74 |
| 2027 | 160 | — | 410 | 86 | 300 | 67 |
| 2028 | 1,000 | — | 438 | — | 472 | — |
| 2029 | 996 | — | 493 | — | 525 | — |
| 2030 | 996 | — | 568 | — | 299 | — |
Regulatory Matters - Utility Rates and Rate Proceedings
The Registrants are involved in rate cases and other proceedings with their regulatory commissions in order to establish fair and appropriate electric service rates to recover their costs and earn a fair return on their investments. Depending on the outcomes, these rate cases and proceedings can have a material impact on results of operations, cash flows and financial condition.
The following tables summarize the completed and pending base rate case proceedings. See Note 4 - Rate Matters for additional information.
Completed Base Rate Case Proceedings
| Annual · Previously | ||||||
|---|---|---|---|---|---|---|
| Base Revenue · Approved · Approved · New Rates | ||||||
| Company · Jurisdiction · Increase · ROE · ROE · Effective | ||||||
| (in millions) | ||||||
| APCo/WPCo | West Virginia | $91 | 9.75% | 9.75% | August 2025 | (a) |
| SWEPCo | Arkansas | 85 | 9.5% | 9.65% | February 2026 | (b) |
| KPCo | Kentucky | 55 | 9.75% | 9.75% | March 2026 | (c) |
| OPCo | Ohio | 11 | 9.7% | 9.84% | April 2026 | |
(a)In August 2025, in response to APCo’s and WPCo’s 2024 West Virginia Base Rate Case filing, the WVPSC originally approved a combined $76 million annual increase in base rates based upon a 9.25% ROE. In February 2026, the WVPSC issued an order on reconsideration of the 2024 West Virginia Base Rate Case, approving a revised ROE of 9.75%, resulting in a $15 million prospective annual increase in base rates, to arrive at an authorized annual increase of $91 million effective February 2026.
(b)See “2025 Arkansas Base Rate Case” section of Note 4 in the 2025 Annual Report for additional information.
(c)In March 2026, KPCo filed a request with the KPSC seeking rehearing on the vegetation management finding in the base case order in addition to certain other denied costs. In April 2026, the KPSC issued an order approving KPCo’s request for rehearing and set a procedural schedule for submitting information requests.
Pending Base Rate Case Proceedings
| Annual | ||||
|---|---|---|---|---|
| Filing · Base Revenue · Requested | ||||
| Company | Jurisdiction | Date | Increase Request | ROE |
| (in millions) | ||||
| SWEPCo | Texas | October 2025 | $95 | 10.75% |
| PSO | Oklahoma | January 2026 | 299 | 10.5% |
Other Significant Regulatory Matters
2025 UTM Filing
In October 2025, AEP Texas submitted its first filing with the PUCT seeking recovery of eligible costs through the UTM. In March 2026, a Texas ALJ issued a PFD recommending partial disallowance of the requested amounts. In April 2026, AEP Texas filed responses reflective of the legislative intent of Texas House Bill 5247 (2025). The impact of the final decision, and any potential retroactive impacts, as authorized by the PUCT, will be reflected in AEP Texas’ financial statements in the period in which a final decision is issued. A decision is expected in the second quarter of 2026.
In March 2026, AEP Texas began billing interim rates subject to refund as part of the UTM filing. If the PUCT issues a ruling that differs from AEP Texas’ position, a refund or billing credit could be required. Investments included in the UTM and the existing capital tracker filings remain subject to prudency review in the utility’s next base rate review before the PUCT. AEP Texas deferred approximately $80 million of eligible costs in the UTM through March 31, 2026 as a regulatory asset. If any of these deferred costs are not approved for recovery, it could reduce future net income and cash flows and impact financial condition.
2026 West Virginia Orders
In March 2026, the WVPSC issued a financing order approving APCo’s and WPCo’s (the Companies) proposed securitization for a maximum of $2.6 billion. See “2025 West Virginia Securitization Filing” section of Note 4 for additional information.
In April 2026, the WVPSC issued an order conditionally approving an annual Inflation-Based Rate Adjustment to current base rates of 4% for residential and commercial customers and 2.5% for industrial customers, provided that the Companies: (a) agree with proceeding with securitization, unless otherwise ordered by the WVPSC, (b) agree that the April 2026 Notice of Intent to file a 2026 West Virginia base rate case will be withdrawn and (c) agree that a new base rate case will not be filed prior to July 1, 2027. In April 2026, the Companies agreed to the terms of the Inflation-Based Rate Adjustment described above and filed revised tariff sheets reflecting a $40 million combined annual increase to base rates effective June 1, 2026.
In April 2026, the WVPSC issued an order that adjudicated the Companies’ 2024 MRBC surcharge update filing. This order affirms previously approved MRBC revenue requirements and allows the Companies to perform a final true-up to recover past MRBC costs that were not reflected in MRBC surcharge rates in a timely manner during the four-year existence of the surcharge. The WVPSC order increased APCo’s and WPCo’s first quarter 2026 pretax net income by $29 million and $6 million, respectively. See “West Virginia Modified Rate Base Cost (MRBC) Surcharge Update Filing” section of Note 4 for additional information.
2025 Virginia Securitization Filing
In November 2025, the Virginia SCC issued a financing order approving securitization of the requested $1.4 billion of Virginia jurisdictional costs. In accordance with Virginia statutory requirements and the financing order, the issuance of the securitization bonds is subject to final review by the Virginia SCC after bond pricing. APCo expects to proceed with the securitization bond issuance process and to complete the securitization process in the first half of 2026, subject to market conditions. If any of these costs are not recoverable, it could reduce future net income and cash flows and impact financial condition. See “2025 Virginia Securitization Filing” section of Note 4 for additional information.
Indiana Earnings Test
In February 2026, I&M submitted its FAC filing and earnings test evaluation for the period ended November 2025. I&M proposed an over-earnings credit to customers for the earnings test period ending November 2025 of $53 million based on requested modifications to jurisdictional cost allocations to more accurately reflect I&M’s cost to serve Indiana retail customers. In April 2026, I&M and an intervening party submitted a settlement agreement recommending that the IURC approve I&M’s proposed modifications to jurisdictional cost allocations and proposed over-earnings credit of $53 million for the earnings test period ending November 2025. A hearing will be held in May 2026 and an IURC order is expected in the second quarter of 2026. An IURC order approving I&M’s proposed jurisdictional cost allocation modifications as included in the settlement agreement would increase future net income and cash flows and impact financial condition. See “Indiana Earnings Test” section of Note 4 for additional information.
Federal Tax Legislation
On February 18, 2026, the Department of Treasury and the IRS issued additional interim guidance on the application of CAMT, Notice 2026-7. This guidance allows taxpayers to deduct certain tax-deductible repairs when determining adjusted financial statement income for CAMT purposes. This guidance is expected to result in a reduction to applicable Registrants’ prior and future CAMT liabilities. The Company continues to evaluate the impact of the interim guidance.
Additional significant guidance from the Department of Treasury and the IRS is expected on the tax provisions in recently enacted legislation. AEP will continue to monitor any issued guidance and evaluate the impact on AEP’s future net income, cash flows and financial condition.
Fuel Cell Agreement
In January 2026, an unregulated AEP subsidiary entered into an agreement to acquire solid oxide fuel cells for approximately $2.65 billion to develop a fuel cell generation facility near Cheyenne, Wyoming. The subsidiary also entered into a 20-year offtake agreement with an investment-grade customer for 100% of the facility’s output. The offtake arrangement is subject to certain conditions that AEP expects to be satisfied by the second quarter of 2026. If these conditions are not met, AEP will receive financial compensation for all capital and costs incurred.
Grid Growth Ventures Investment (Applies to AEP)
In 2026, Transource Energy executed agreements to form Grid Growth Ventures, LLC (Grid Growth Ventures) with First Energy Transmission, LLC to participate in PJM’s 2025 Regional Transmission Expansion Plan (RTEP) competitive process. In February 2026, PJM selected the projects proposed by Grid Growth Ventures to address forecasted reliability and load growth requirements. The RTEP projects awarded by PJM were estimated to cost approximately $1.2 billion and AEP’s share of this investment was estimated to be $600 million. The RTEP projects awarded by PJM will be developed, owned and operated by Grid Ohio Growth EHV Holdings, LLC and Grid Growth Ventures Ohio, LLC, subsidiaries of Grid Growth Ventures.
In March 2026, subsidiaries of Grid Growth Ventures, Grid Growth Ohio EHV, LLC and Grid Growth Ohio, LLC, submitted to the FERC a request for acceptance of formula rates for each company, consisting of a formula rate template and implementation protocols, effective May 2026. The filing also requested approval of Federal Power Act Section 219 transmission incentive rate treatments for the projects awarded by PJM to the Grid Growth Ventures subsidiaries. The requested incentive rate treatments include: (a) recovery of abandonment costs if the projects are cancelled for reasons beyond Grid Growth Ventures’ control, (b) inclusion of CWIP in rates while the projects are in development, (c) use of hypothetical cap structure of 40% debt and 60% equity until the earlier of either December 31, 2032 or the date all of the projects are in service, after which Grid Growth Ventures will use its actual capital structure and (d) regulatory asset treatment for pre-commercial costs including carrying charges. The filing also proposed depreciation rates, requested a base ROE of 10.8% for both companies and requested authorization to replicate the formula rate and rate incentive treatments for any subsidiaries of Grid Growth Ventures. FERC approval of the filing is pending.
Midcontinent Grid Solutions Investment (Applies to AEP)
In 2025, Transource Energy and an affiliate of Berkshire Hathaway Energy formed Midcontinent Grid Solutions, LLC to participate in MISO’s 2024 Regional Transmission Expansion Plan competitive process. In January 2026, MISO selected the upgrades proposed by Midcontinent Grid Solutions to address forecasted reliability and load growth requirements. The projects awarded by MISO were estimated to cost approximately $1.2 billion and AEP’s share of this investment was estimated to be $500 million. The projects awarded by MISO will be developed, owned and operated by Midcontinent Grid Solutions Wisconsin, LLC (MGS Wisconsin), a subsidiary of Midcontinent Grid Solutions, LLC.
In September 2025, the FERC issued an order accepting the formula rates requested by Midcontinent Grid Solutions, LLC’s subsidiary, Midcontinent Grid Solutions Iowa, LLC (MGS Iowa), granting its requested effective date of July 2025 and the following: (a) regulatory asset treatment for pre-commercial and formation costs with carrying charges, (b) a hypothetical capital structure of 60% equity and 40% debt through the date of the company’s first transmission project being placed in service, (c) conditional approval of a 50-basis point ROE adder due to participation in an RTO, effective upon the date on which operational control transitions to MISO, and (d) authorization of the company’s request to replicate its formula rate and related treatments for future subsidiaries in MISO. FERC also accepted MGS Iowa’s proposed use of a 9.98% base ROE, the MISO regional base ROE effective at the time of the FERC order, and the depreciation rates proposed by the company.
As an affiliate of MGS Iowa, MGS Wisconsin is authorized to replicate MGS Iowa’s FERC-approved formula rate. This request was filed in April 2026 and included an additional incentive for the recovery of abandonment costs if the projects are cancelled for reasons beyond MGS Wisconsin’s control.
NOLCs in Retail Jurisdictions - IRS PLRs
AEP’s utility subsidiaries have made rate filings with state commissions to transition to stand-alone treatment of NOLCs in retail ratemaking. In April 2024, supportive PLRs for certain retail jurisdictions were received from the IRS, effective March 2024. The PLRs concluded NOLCs on a stand-alone ratemaking basis should be included in rate base and in the computation of Excess ADIT regulatory liabilities to be refunded to customers. As of March 31, 2026, there were four jurisdictions awaiting approval and two jurisdictions that have been approved but are subject to refund in their status of transitioning to stand-alone treatment of NOLCs in retail ratemaking. Beginning in the second quarter of 2024 and continuing until the NOLC revenue requirement is in rates, AEP is recognizing additional regulatory assets related to revenue requirement amounts to be collected from customers. As of March 31, 2026, AEP had NOLC regulatory assets of $103 million, of which $87 million are classified as pending final regulatory approval and $16 million are classified as approved for recovery.
LITIGATION
In the ordinary course of business, AEP is involved in employment, commercial, environmental and regulatory litigation. Since it is difficult to predict the outcome of these proceedings, management cannot predict the eventual resolution, timing or amount of any loss, fine or penalty. Management assesses the probability of loss for each contingency and accrues a liability for cases that have a probable likelihood of loss if the loss can be estimated. Adverse results in these proceedings have the potential to reduce future net income and cash flows and impact financial condition. See Note 4 – Rate Matters and Note 5 – Commitments, Guarantees and Contingencies for additional information.
Claims for Indemnification Made by Owners of the Gavin Power Station
AEP sold the Gavin Power Station to Gavin Power LLC and Lighthouse Generation LLC in 2017. Pursuant to the PSA for that transaction, AEP maintained responsibility to complete closure of the 300 acre unlined fly ash reservoir (FAR) pond in accordance with the closure plan approved by the Ohio Environmental Protection Agency and to indemnify the purchasers for that work. In November 2022, the Federal EPA made several assertions related to the CCR Rule (see “CCR Rule” section below for additional information), including an assertion that the closure of the FAR is noncompliant with the CCR Rule in multiple respects. The owners of the Gavin Power Station have notified AEP that they believe they are entitled to indemnification for any damages that may result from these claims. Management does not believe that the owners of the Gavin Power Station have any valid claim for indemnity or otherwise against AEP under the PSA. See “Claims for Indemnifications Made by Owners of the Gavin Power Station” section of Note 5 for additional information.
ENVIRONMENTAL ISSUES
AEP has a substantial capital investment program and incurs additional operational costs to comply with environmental control requirements. Additional investments and operational changes will be made in response to existing and potential future requirements to reduce emissions from fossil generation and in response to rules governing the beneficial use and disposal of coal combustion by-products, clean water and renewal permits for certain water discharges. AEP is unable to predict changes in regulations, regulatory guidance, legal interpretations, policy positions and implementation actions that may evolve.
AEP is engaged in litigation about environmental issues, was notified of potential responsibility for the clean-up of contaminated sites and incurred costs for disposal of SNF and future decommissioning of the nuclear units. Management is engaged in the development of possible future requirements including the items discussed below.
AEP will seek recovery of expenditures for pollution control technologies and associated costs from customers through rates in regulated jurisdictions. Environmental rules could result in accelerated depreciation, impairment of assets or regulatory disallowances. If AEP cannot recover the costs of environmental compliance, it would reduce future net income and cash flows and impact financial condition.
Impact of Environmental Compliance on the Generating Fleet
The rules and environmental control requirements discussed below will have a material impact on AEP’s operations. As of March 31, 2026, AEP owned generating capacity of approximately 26,300 MWs, of which approximately 10,200 MWs were coal-fired. In April 2024, the Federal EPA announced four major new rules directed at fossil-fuel electric generation facilities. Management continues to evaluate the impacts of these rules on the plans for the future of AEP’s generating fleet, in particular, the economic feasibility of making the requisite environmental investments in AEP’s fossil generation fleet. AEP continues to refine the cost estimates of complying with these rules to identify the best alternative for promoting compliance with all of the rules while meeting AEP’s obligations to provide reliable and affordable electricity.
The costs of complying with new rules may also change based on: (a) potential state rules that impose additional more stringent standards, (b) additional rulemaking activities in response to court decisions, (c) actual performance of the pollution control technologies installed, (d) changes in costs for new pollution controls, (e) new generating technology developments, (f) total MWs of capacity retired and replaced, including the type and amount of such replacement capacity, (g) policy changes implemented by the Presidential administration and (h) other factors.
Clean Air Act Requirements
The CAA establishes a comprehensive program to protect and improve the nation’s air quality and control sources of air emissions. The states and localities implement and administer many of these programs and could impose additional or more stringent requirements. Primary CAA regulatory programs that continue to drive investments in AEP’s existing generating units include the following: (a) periodic revisions to NAAQS and the development of SIPs to achieve more stringent standards, (b) implementation of the regional haze program by the states and the Federal EPA, (c) regulation of hazardous air pollutant emissions under MATS, (d) implementation and review of CSAPR and (e) the Federal EPA’s regulation of GHG emissions from fossil generation under Section 111 of the CAA. Certain notable developments in significant CAA regulatory requirements affecting AEP’s operations are discussed in the following sections.
National Ambient Air Quality Standards
The Federal EPA periodically reviews and revises the NAAQS for criteria pollutants under the CAA. Revisions tend to increase the stringency of the standards, which in turn may require AEP to make investments in pollution control equipment at existing generating units, or, since most units are already well controlled, to make changes in how units are dispatched and operated. In February 2024, the Federal EPA finalized a new more stringent annual primary PM 2.5 standard.
Areas with air quality that does not meet the new standard will be designated by the Federal EPA as “nonattainment,” which will trigger an obligation for states to revise their SIPs to include additional requirements, resulting in further emission reductions to meet the new standard. In November 2025, in connection with pending litigation challenging the new standards, the Federal EPA filed a motion asking the court to vacate the stricter PM 2.5 standard.
If the rule is not vacated, areas around some of AEP’s generating facilities may be deemed nonattainment, which may require those facilities to install additional pollution controls or to implement operational constraints. Any nonattainment designations by the Federal EPA and the subsequent SIP revisions by affected states will take time to finalize and complete. Management cannot reasonably estimate any impacts on AEP’s operations, cash flows, net income or financial condition.
Regional Haze
The Federal EPA issued a Clean Air Visibility Rule (CAVR) in 2005, which would require certain power plants and other facilities to install best available retrofit technology to address regional haze in federal parks and other protected areas. CAVR is implemented by the states, through SIPs, or by the Federal EPA, through FIPs. The rules implementing the Regional Haze requirements of the CAA have been revisited over time. In January 2026, the Federal EPA published a final rule extending the due date for the next round of Regional Haze SIP submittals by states to July 31, 2031.
The Federal EPA disapproved portions of the Texas regional haze SIP and finalized a FIP that allows participation in the CSAPR ozone season program to satisfy the NOX regional haze obligations for electric generating units in Texas. Additionally, the Federal EPA finalized an intrastate SO 2 emissions trading program based on CSAPR allowance allocations. Environmental groups filed challenges to these various rulemakings in district courts in the Fifth Circuit and the District of Columbia Circuit. Management cannot predict the outcome of that litigation, although management supports the intrastate trading program as a compliance alternative to source-specific controls and intervened in the Fifth Circuit litigation in support of the Federal EPA. In July 2024, the U.S. District Court for the District of Columbia Circuit entered a consent decree setting deadlines for the Federal EPA to rule on Regional Haze SIPs for 32 states, including Texas. In September 2024, the Federal EPA signed a proposed rule to partially approve and partially disapprove the Texas SIP revision. In May 2025, the Federal EPA proposed to withdraw the prior proposed rule, including the proposed partial disapproval of the Texas SIP revision, and instead proposed to approve the Texas Regional Haze SIP. In December 2025, the Federal EPA finalized its approval of the Texas and Oklahoma SIPs. The Federal EPA has recently approved Regional Haze SIP submissions for Ohio and West Virginia, both of which have been appealed by environmental groups. In February 2026, the Federal EPA proposed to approve the Regional Haze SIP for Oklahoma’s second implementation period. Management will continue to monitor the rulemakings and litigation and cannot predict the outcome.
New Source Performance Standards
In January 2026, the Federal EPA finalized revisions to the New Source Performance Standards for stationary combustion turbine units that commenced construction, modification, or reconstruction after December 13, 2024. The new standards for NOX require a level of performance equivalent to the application of selective catalytic reduction for large, high-utilization natural gas-fired turbines, but establish various levels of combustion controls as the best system of emission reductions for smaller and lower-utilization turbines. The rule does not change the SO 2 limits applicable to combustion turbines. Management is evaluating the implications of the rule on new combustion turbine projects. Several environmental groups have challenged the rule and in April 2026, AEP and other utilities moved to intervene in support of the Federal EPA in that litigation.
Cross-State Air Pollution Rule
CSAPR is a regional trading program that the Federal EPA began implementing in 2015 to address interstate transport of emissions that contribute significantly to nonattainment and interfere with maintenance of the 1997 ozone NAAQS and the 1997 and 2006 PM 2.5 NAAQS in downwind states. CSAPR relies on SO 2 and NOX allowances and individual state budgets to compel further emission reductions from electric utility generating units. Interstate trading of allowances is allowed on a restricted basis. The Federal EPA has revised, or updated, the CSAPR trading programs several times since they were established.
In February 2023, the Federal EPA Administrator finalized the disapproval of interstate transport SIPs submitted by 19 states, including Texas, addressing the 2015 Ozone NAAQS. The Federal EPA disapproved interstate transport SIPs submitted by additional states soon thereafter. Disapproval of the SIPs provided the Federal EPA with authority to impose a FIP for those states, replacing the SIPs that were disapproved. In August 2023, a FIP (the Good Neighbor Plan) went into effect that further revised the ozone season NOX budgets under the existing CSAPR program in states to which the FIP applies. The FIP has since been administratively stayed pending the Supreme Court lifting its order staying enforcement of the Good Neighbor Plan, other courts lifting any judicial orders staying the SIP disapproval action as to the state, and the Federal EPA taking subsequent rulemaking action consistent with any judicial rulings on the merits. Additionally, in April 2025, the court placed the challenges to the Good Neighbor Plan in abeyance pending further order of the court. The Federal EPA has indicated it intends to propose rulemaking to revise the rule. Management will continue to monitor the litigation and any further actions by the Federal EPA for any potential impact to operations.
Climate Change, CO 2 Regulation and Energy Policy
In April 2024, the Administrator of the Federal EPA signed new GHG standards and guidelines for new and existing fossil-fuel fired sources. The rule relies on carbon capture and sequestration and natural gas co-firing as means to reduce CO 2 emissions from coal fired plants and carbon capture and sequestration or limited utilization to reduce CO 2 emissions from new gas turbines. The rule also offers early retirement of coal plants in lieu of carbon capture and storage as an alternative means of compliance.
Twenty-seven states, numerous companies, trade associations and others challenged the rule. AEP has joined with several other utilities to challenge the rule and has asked the court to stay the rule during the litigation, and the appeals have been consolidated. The court stayed the litigation pending rulemaking by the Federal EPA. In June 2025, the Federal EPA proposed to repeal the GHG emissions standards for fossil-fueled fired electric generating units because GHG emissions from power plants do not significantly contribute to air pollution that may endanger public health or the environment. As an alternative, the Federal EPA proposed to eliminate GHG standards for existing coal and gas units and to keep only certain emission limits applicable to new sources. These proposals have not been finalized. In February 2026, the Federal EPA repealed the 2009 findings of contribution and endangerment for light-duty, medium-duty and heavy-duty vehicles and engines, which determined that GHG emissions from motor vehicles endanger public health and welfare. The Federal EPA also repealed the GHG standards for these vehicle and engine categories as part of that rulemaking. The 2009 Endangerment Finding is the basis of the Federal EPA’s authority to regulate GHG emissions under the Clean Air Act. Management is evaluating the Federal EPA’s proposed repeal of the 2009 motor vehicle Endangerment Finding and its impact on the Federal EPA’s authority to regulate GHG emissions from electric generators. Management cannot predict the outcome of the current litigation or the Federal EPA’s proposed action related to the GHG rule or its recent repeal of the Endangerment Finding related to emissions from fossil-fuel fired sources or any litigation that may result. More stringent rules directed at the fossil-fuel fired electric utility industry could force AEP to close additional coal-fired generation facilities earlier than their estimated useful life, if those rules remain in place. If AEP is unable to recover the costs of its investments, it would reduce future net income and cash flows and impact financial condition.
AEP is committed to delivering reliable, affordable power and routinely submits IRPs in various regulatory jurisdictions to address future generation needs. Accordingly, AEP continues to focus on supporting state-based clean energy mandates and decarbonization targets, including meeting the Virginia Clean Economy Act and Michigan Public Act 235 mandates that are on track for achievement. AEP remains committed to seeking advanced low-carbon generation solutions where supported. As an example, APCo and I&M are seeking early site permits to bring small modular reactors to Virginia and Indiana. AEP’s performance will ultimately be driven by the needs and desires of the states AEP serves and the company will continue to engage with regulators and policymakers to meet the energy needs while facilitating the delivery of reliable, affordable energy.
MATS Rule
In April 2024, the Federal EPA issued a revised MATS rule for power plants, which includes a more stringent standard for emissions of filterable PM for coal-fired electric generating units, as well as a new mercury standard for lignite-fired electric generating units. The rule also requires the installation and operation of continuous emissions monitors for PM. Several states and other parties have challenged the rule in the United States Court of Appeals for the District of Columbia Circuit, but management cannot predict the outcome of the litigation. The litigation is being held in abeyance. In February 2026, the Federal EPA finalized its repeal of the 2024 MATS rule, and the rule’s requirements reverted to the 2012 MATS rule emission standards. That repeal has been challenged by various groups. Management will continue to monitor the litigation but does not anticipate any challenges complying with the standards in the now-repealed 2024 rule should its repeal be reversed by the court.
CCR Rule
The Federal EPA’s CCR Rule regulates the disposal and beneficial re-use of CCR, including fly ash and bottom ash created from coal-fired generating units and FGD gypsum generated at some coal-fired plants. As originally promulgated in 2015, the rule applied to active and inactive CCR landfills and surface impoundments at facilities of active electric utility or independent power producers.
In August 2018, the District of Columbia Circuit Court vacated and remanded certain aspects of the 2015 CCR rule, including an exemption for legacy impoundments. Following this, the Federal EPA issued a final rule in August 2020, setting an April 11, 2021 deadline for unlined CCR impoundments to cease waste acceptance and commence closure. This rule permits a facility to request a deadline extension from the Federal EPA if alternative disposal capacity is unavailable or a compliant conversion or a plant retirement is in progress.
In January 2022, the Federal EPA made public statements in the context of a deadline extension request submitted by the Gavin Power Station suggesting more stringent closure requirements for CCR units. See “Claims for Indemnification Made by Owners of the Gavin Power Station” above for additional information. In April 2022, a petition was filed with the District of Columbia Circuit Court of Appeals, arguing that the Federal EPA could not enforce these new purported requirements without proper rulemaking. In June 2024, the District of Columbia Circuit Court dismissed these petitions, finding the statements were not amendments to existing regulations and thus the court lacked jurisdiction.
In April 2024, the Federal EPA finalized revisions to the CCR Rule to expand the scope of the rule to include inactive impoundments at inactive facilities (“legacy CCR surface impoundments”) as well as to establish requirements for currently exempt solid waste management units that involve the direct placement of CCR on the land (“CCR management units”). That rule has been challenged in the District of Columbia Circuit Court. In the second quarter of 2024, AEP evaluated the applicability of the rule to current and former plant sites and recorded a $674 million increase in ARO, based on initial cost estimates primarily reflecting compliance with the rule through closure in place and future groundwater monitoring requirements pursuant to the Legacy CCR Rule. In March 2025, the Federal EPA announced plans to make changes to the CCR Rule and to work with states to implement future CCR requirements. As a result, the litigation challenging the 2024 Legacy Rule is being held in abeyance. In November 2025, the Federal EPA proposed to extend by three years the compliance deadline applicable to certain facilities operating pursuant to alternative closure deadlines for unlined surface impoundments greater than 40 acres. In February 2026, the Federal EPA finalized a rule that provides additional time to meet facility evaluation requirements for identifying CCR management units and to comply with groundwater monitoring provisions. Additionally, this rule makes conforming changes to the remaining CCR management units compliance deadlines. In April 2026, the Federal EPA proposed revisions to the CCR Rule that would rescind requirements for CCR management units, revise requirements for beneficial use of CCR materials, allow expanded reliance on state-approved and other regulatory closures of legacy units, and introduce a new, permit-based, site-specific compliance pathway. The proposal is expected to be finalized by the end of 2026. Management is evaluating the proposal and intends to participate in the rulemaking process.
Should additional corrective measures like groundwater treatment or ash removal be mandated at any of AEP’s coal-fired facilities, AEP could face substantial costs that could materially and adversely affect financial condition, results of operations, and cash flows. See “Federal EPA’s Revised CCR Rule” section in Note 5 for additional information.
Clean Water Act Regulations
The Federal EPA’s ELG rule for generating facilities establishes limits for FGD wastewater, fly ash and bottom ash transport water and flue gas mercury control wastewater, which are to be implemented through each facility’s wastewater discharge permit. A revision to the ELG rule, published in October 2020, established additional options for reusing and discharging small volumes of bottom ash transport water, provided an exception for retiring units and extended the compliance deadline to a date as soon as possible beginning one year after the rule was published but no later than December 2025. Management has assessed technology additions and retrofits to comply with the rule and the impacts of the Federal EPA’s actions on facilities’ wastewater discharge permitting for FGD wastewater and bottom ash transport water. For affected facilities required to install additional technologies to meet the ELG rule limits, permit modifications were filed in January 2021 that reflect the outcome of that assessment. AEP continues to work with state agencies to finalize permit terms and conditions. Other facilities opted to file Notices of Planned Participation (NOPP), pursuant to which the facilities are not required to install additional controls to meet ELG limits provided they make commitments to cease coal combustion by a date certain.
In April 2024, the Federal EPA finalized further revisions to the ELG rule that establish a zero liquid discharge standard for FGD wastewater, bottom ash transport water, and managed combustion residual leachate, as well as more stringent discharge limits for unmanaged combustion residual leachate. The revised rule provides a new compliance alternative that would eliminate the need to install zero liquid discharge systems for facilities that comply with the 2020 rule’s control technology requirements and have committed by December 31, 2025 to retire by 2034. Management is evaluating the compliance alternatives in the rule, taking into consideration the requirements of the other new rules and their combined impacts to operations. Several appeals have been filed with various federal courts challenging the 2024 ELG rule. SWEPCo also challenged the rule by filing a joint appeal with a utility trade association in which AEP participates. The litigation challenging the ELG Rule is being held in abeyance while the new administration evaluates the rule and the Federal EPA has subsequently announced plans to reconsider the standards and deadlines established by the 2024 ELG rule. Management cannot predict the outcome of the rulemaking and litigation.
In December 2025, the Federal EPA issued the Deadline Extension ELG Rule to extend the compliance deadlines in the 2024 ELG Rule by five years as well as to establish a site-specific mechanism for extending compliance deadlines for both the 2020 and 2024 ELG Rules. Management cannot predict the outcome of any further rulemaking actions by the Federal EPA related to the ELG rule.
In January 2026, the Federal EPA proposed a rule titled Updating the Water Quality Certification Regulations. Through the proposed rule, the Federal EPA is attempting to clarify the Clean Water Act section 401 certification process for states and tribes. Under section 401, a federal agency cannot conduct any activity that may result in a discharge into waters of the United States without obtaining a permit from a State or authorized tribe in the location of the discharge certifying compliance with applicable water quality requirements. The proposed rule aims to reduce regulatory delays associated with the certification process. Management will monitor the rulemaking for any potential impacts to operations.
The definition of “waters of the United States” has been subject to rulemaking and litigation which has led to inconsistent scope among the states. In November 2025, the Federal EPA and the United States Army Corps of Engineers proposed a revised definition of “waters of the United States” to conform to a decision by the United States Supreme Court. Management will continue to monitor developments in rulemaking and litigation for any potential impact to operations.
Impact of Environmental Regulation on Coal-Fired Generation
Compliance with extensive environmental regulations requires significant capital investment in environmental monitoring, installation of pollution control equipment, emission fees, disposal, remediation and permits. Management regularly evaluates cost estimates of complying with these regulations which may result in a decision to retire coal-fired generating facilities earlier than their currently estimated useful lives.
For generating facilities retired or planned for retirement in advance of the retirement date currently authorized for ratemaking purposes, with related accelerated depreciation regulatory assets pending regulatory approval, the table below summarizes the net book value and related regulatory asset balances recorded as of March 31, 2026:
| Company | Plant | NetInvestment (a) | Accelerated Depreciation Regulatory Asset | Actual/ProjectedRetirementDate | Current Authorized RecoveryPeriod | Annual Depreciation (b) |
|---|---|---|---|---|---|---|
| (in millions) · (in millions) | ||||||
| PSO | Northeastern Plant, Unit 3 | $53 | $247 | 2026 | (c) | $13 |
| SWEPCo | Pirkey Plant | — | 76(d) | 2023 | (e) | — |
| SWEPCo | Welsh Plant, Units 1 and 3 | 249 | 235 | 2028(f) | (g) | 43 |
(a)Net book value, including CWIP, excluding cost of removal and materials and supplies.
(b)These amounts represent the amount of annual depreciation that has been collected from customers over the prior 12-month period.
(c)Northeastern Plant, Unit 3 is currently being recovered through 2040. In April 2025, PSO and the ODEQ finalized a second amended regional haze agreement that would allow continued operation of the Northeastern Plant, Unit 3, on natural gas, through May 31, 2041. This agreement is contingent upon approval by the Federal EPA in the form of a revised SIP, which the ODEQ has submitted. In anticipation of approval from the Federal EPA, PSO began operating Northeastern Plant, Unit 3 on natural gas in January 2026.
(d)Represents Texas jurisdictional share.
(e)SWEPCo requested recovery of the Texas jurisdictional share of the remaining net book value of the Pirkey Plant in its 2025 Texas Base Rate Case. See the “Regulated Generating Unit that has been Retired and Related Fuel Operations” section of Note 4 for additional information. In January 2026, the FERC issued an order providing recovery of the Pirkey Plant based on blended recovery periods determined by all SWEPCo jurisdictions including Texas.
(f)In November 2020, management announced it will cease using coal at the Welsh Plant in 2028. In December 2024, SWEPCo filed an application for a CCN with the APSC, LPSC and PUCT to convert Welsh Plant, Units 1 and 3 to natural gas in 2028 and 2027, respectively. In February 2026, the APSC issued an order approving the application for a CCN.
(g)Welsh Plant, Unit 1 is being recovered through 2027 in the Louisiana jurisdiction and through 2037 in the Arkansas and Texas jurisdictions. Welsh Plant, Unit 3 is being recovered through 2032 in the Louisiana jurisdiction and through 2042 in the Arkansas and Texas jurisdictions.
Management is seeking or will seek regulatory recovery, as necessary, for any net book value remaining when the plants are retired. To the extent the net book value of these generation assets is not deemed recoverable, it could materially reduce future net income, cash flows and impact financial condition.
AEP’s Reportable Segments
AEP’s primary business is the generation, transmission and distribution of electricity. Within its Vertically Integrated Utilities segment, AEP centrally dispatches generation assets and manages its overall utility operations on an integrated basis because of the substantial impact of cost-based rates and regulatory oversight applicable to each public utility subsidiary. Intersegment sales and transfers are generally based on underlying contractual arrangements and agreements. AEP’s reportable segments are as follows:
Vertically Integrated Utilities
Transmission and Distribution Utilities
AEP Transmission Holdco
Generation & Marketing
The remainder of AEP’s activities are presented as Corporate and Other, which is not considered a reportable segment. See Note 8 - Business Segments for additional information on AEP’s segments.
The following discussion of AEP’s results of operations by segment provides a comparison of Earnings (Loss) Attributable to AEP Common Shareholders for the three months ended March 31, 2026 as compared to the three months ended March 31, 2025. For AEP’s Vertically Integrated Utilities and Transmission and Distribution Utilities segments and Registrant Subsidiaries within these segments, the results include revenues from rate rider mechanisms designed to recover fuel, purchased power and other recoverable expenses such that the revenues and expenses associated with these items generally offset and do not affect Earnings Attributable to AEP Common Shareholders. For additional information regarding the financial results for the three months ended March 31, 2026 and 2025, see the discussions of Results of Operations by Registrant Subsidiary.
A detailed discussion of AEP’s 2025 results of operations by segment can be found in Management’s Discussion and Analysis of Financial Condition and Results of Operations section included in the 2025 Annual Report.
The following table presents Earnings Attributable to AEP Common Shareholders by segment:
| Three Months Ended | ||
|---|---|---|
| March 31, | ||
| 2026 | 2025 | |
| (in millions) | ||
| Vertically Integrated Utilities | $462 | $324 |
| Transmission and Distribution Utilities | 237 | 165 |
| AEP Transmission Holdco | 209 | 235 |
| Generation & Marketing | 75 | 102 |
| Corporate and Other | (109) | (26) |
| Earnings Attributable to AEP Common Shareholders | $874 | $800 |
See Note 8 - Business Segments for additional information on Earnings (Loss) Attributable to AEP Common Shareholders by segment.
Heating Degree Days and Cooling Degree Days
Heating degree days and cooling degree days are metrics commonly used in the utility industry as a measure of the impact of weather on revenues. In general, degree day changes in the Eastern Region have a larger effect on revenues than changes in the Western Region due to the relative size of the two regions and the number of customers within each region.
The actual heating degree days are calculated on a 55-degree temperature base and the actual cooling degree days are calculated on a 65-degree temperature base for Registrant Subsidiaries except AEP Texas. AEP Texas’ actual heating degree days are calculated on a 55-degree temperature base and actual cooling degree days are calculated on a 70-degree temperature base.
VERTICALLY INTEGRATED UTILITIES
Summary of KWh Energy Sales for Vertically Integrated Utilities
| Three Months Ended March 31, | ||
|---|---|---|
| 2026 | 2025 | |
| (in millions of KWhs) | ||
| Retail: | ||
| Residential | 8,873 | 9,404 |
| Commercial | 6,827 | 5,896 |
| Industrial | 7,998 | 8,101 |
| Miscellaneous | 534 | 533 |
| Total Retail | 24,232 | 23,934 |
| Wholesale (a) | 3,545 | 4,791 |
| Total KWhs | 27,777 | 28,725 |
Summary of Heating and Cooling Degree Days for Vertically Integrated Utilities
| Three Months Ended March 31, | ||
|---|---|---|
| 2026 | 2025 | |
| (in degree days) | ||
| Eastern Region | ||
| Actual – Heating | 1,575 | 1,617 |
| Normal – Heating | 1,566 | 1,567 |
| Actual – Cooling | 19 | 8 |
| Normal – Cooling | 5 | 4 |
| Western Region | ||
| Actual – Heating | 630 | 945 |
| Normal – Heating | 877 | 869 |
| Actual – Cooling | 121 | 59 |
| Normal – Cooling | 35 | 33 |
| Vertically Integrated Utilities | |
|---|---|
| Reconciliation of 2025 to 2026 Earnings Attributable to AEP Common Shareholders | |
| (in millions) | |
| Three Months Ended March 31, | |
| 2025 Earnings Attributable to AEP Common Shareholders | $324 |
| Changes in Revenues: | |
| Retail Revenues | 183 |
| Off-system Sales | 82 |
| Transmission Revenues | 39 |
| Other Revenues | (2) |
| Total Change in Revenues | 302 |
| Changes in Expenses and Other: | |
| Other Operation and Maintenance | (133) |
| Asset Impairments and Other Related Charges | (31) |
| Depreciation and Amortization | (44) |
| Taxes Other Than Income Taxes | (10) |
| Other Income | (1) |
| Allowance for Equity Funds Used During Construction | 7 |
| Interest Expense | (45) |
| Total Change in Expenses and Other | (257) |
| Income Tax Benefit | 93 |
| 2026 Earnings Attributable to AEP Common Shareholders | $462 |
Retail Revenues increased $183 million primarily due to the following:
A $191 million increase in base case and rider revenues.
A $50 million increase in weather-normalized revenues primarily in the commercial and industrial classes, partially offset by a decrease in the residential class.
A $56 million decrease in fuel revenues primarily due to decreases at APCo and SWEPCo, partially offset by an increase at I&M.
A $21 million decrease in weather-related usage primarily in the residential class driven by a 14% decrease in heating degree days primarily in the Western Region.
Off-system Sales increased $82 million primarily due to Rockport Plant, Unit 2 merchant sales during Winter Storm Fern in January 2026, partially offset by economic hedging activity at I&M.
Transmission Revenues increased $39 million primarily due to continued transmission investment.
Other Operation and Maintenance expenses increased $133 million primarily due to the following:
A $34 million increase in transmission and distribution vegetation management expenses.
A $33 million increase in generation expenses due to non-outage maintenance, nuclear and renewable energy.
A $31 million increase in PJM and SPP transmission expenses.
A $17 million increase in distribution-related expenses driven by system improvements, reliability programs, meters and transformers, customer driven third-party work and amortization of storm-related regulatory assets.
A $13 million increase in employee-related costs.
A $13 million increase in storm expenses.
A $23 million gain from the sale of a non-utility investment in land at APCo.
Asset Impairments and Other Related Charges increased $31 million due to a probable partial disallowance of the Pirkey Plant net book value in the 2025 Texas Base Rate Case at SWEPCo.
Depreciation and Amortization expenses increased $44 million primarily due to the following:
A $33 million increase due to a higher depreciable base at I&M, PSO and SWEPCo.
A $27 million increase at APCo primarily due to the cumulative regulatory deferral true-up for the impact of CAMT expense incurred related to IRS Notice 2026-07 allowing tax repair deductions in the calculation of CAMT.
A $24 million decrease at APCo due to an April 2026 order approving a final true-up to recover past MRBC costs that were not reflected in MRBC surcharge rates in a timely manner.
Taxes Other Than Income Taxes increased $10 million primarily due to the following:
A $6 million increase at APCo due to higher business and occupation taxes.
A $5 million increase at PSO due to property taxes on acquired generation facilities.
Allowance for Equity Funds Used During Construction increased $7 million primarily due to a higher AFUDC base at SWEPCo.
Interest Expense increased $45 million primarily due to higher long-term debt balances.
Income Tax Benefit increased $93 million primarily due to the following:
A $72 million increase due to an increase in PTCs.
A $27 million increase due to the cumulative true-up of CAMT related to IRS Notice 2026-07 allowing tax repair deductions in the calculation of CAMT.
A $9 million decrease due to an increase in pretax book income.
TRANSMISSION AND DISTRIBUTION UTILITIES
Summary of KWh Energy Sales for Transmission and Distribution Utilities
| Three Months Ended March 31, | ||
|---|---|---|
| 2026 | 2025 | |
| (in millions of KWhs) | ||
| Retail: | ||
| Residential | 6,532 | 7,011 |
| Commercial | 12,777 | 9,588 |
| Industrial | 6,872 | 6,756 |
| Miscellaneous | 166 | 172 |
| Total Retail (a) | 26,347 | 23,527 |
| Wholesale (b) | 643 | 667 |
| Total KWhs | 26,990 | 24,194 |
(a)Represents energy delivered to distribution customers.
(b)Primarily Ohio’s contractually obligated purchases of OVEC power sold to PJM.
Summary of Heating and Cooling Degree Days for Transmission and Distribution Utilities
| Three Months Ended March 31, | ||
|---|---|---|
| 2026 | 2025 | |
| (in degree days) | ||
| Eastern Region | ||
| Actual – Heating | 1,864 | 1,907 |
| Normal – Heating | 1,819 | 1,820 |
| Actual – Cooling | 12 | 6 |
| Normal – Cooling | 3 | 2 |
| Western Region | ||
| Actual – Heating | 143 | 292 |
| Normal – Heating | 211 | 204 |
| Actual – Cooling | 224 | 161 |
| Normal – Cooling | 116 | 112 |
| Transmission and Distribution Utilities | |
|---|---|
| Reconciliation of 2025 to 2026 Earnings Attributable to AEP Common Shareholders | |
| (in millions) | |
| Three Months Ended March 31, | |
| 2025 Earnings Attributable to AEP Common Shareholders | $165 |
| Changes in Revenues: | |
| Retail Revenues | 33 |
| Off-system Sales | 25 |
| Transmission Revenues | 20 |
| Other Revenues | 4 |
| Total Change in Revenues | 82 |
| Changes in Expenses and Other: | |
| Purchased Electricity for Resale | (4) |
| Purchased Electricity from AEP Affiliates | (4) |
| Other Operation and Maintenance | (3) |
| Depreciation and Amortization | (14) |
| Taxes Other Than Income Taxes | 5 |
| Other Income | (1) |
| Allowance for Equity Funds Used During Construction | 6 |
| Non-Service Cost Components of Net Periodic Benefit Cost | 5 |
| Interest Expense | 7 |
| Total Change in Expenses and Other | (3) |
| Income Tax Expense | (6) |
| Equity Earnings of Unconsolidated Subsidiary | (1) |
| 2026 Earnings Attributable to AEP Common Shareholders | $237 |
Retail Revenues increased $33 million primarily due to the following:
A $51 million increasedue to higher prices for purchased power to serve OPCo’s SSO customers.
A $14 million increase in weather-normalized revenues primarily in the residential class in Ohio.
A $28 million decrease in weather-related usage primarily due to a 51% decrease in heating degree days in Texas and a 2% decrease in heating degree days in Ohio.
Off-system Sales increased$25 million primarily due to increased sales of OVEC purchased power driven by higher market prices.
Transmission Revenues increased $20 million primarily due to increased transmission investments in Ohio and Texas.
Purchased Electricity for Resale increased $4 million primarily due to the following:
A $51 million increase in recoverable auction purchases to serve SSO customers in Ohio.
A $35 million decrease due to the prior year reduction in regulatory assets for OVEC-related purchased power costs that were no longer probable of recovery due to approved legislation in Ohio in May 2025.
A $9 million decrease due to the elimination of an OVEC-related regulatory mechanism in August 2025 as a result of approved legislation in Ohio in May 2025.
A $5 million decrease in OVEC purchased power costs.
Depreciation and Amortization expenses increased $14 million primarily due to the deferral of income tax benefit from Excess ADIT credits to be refunded to customers as approved in the 2025 Ohio base rate case.
Taxes Other Than Income Taxes decreased$5 million primarily due to a decrease in property taxes in Ohio.
Allowance for Equity Funds Used During Construction increased $6 million primarily due to a higher AFUDC base in Texas.
Non-Service Cost Components of Net Periodic Benefit Cost expenses decreased $5 million primarily due to the deferral of pension settlement expense approved in the 2025 base rate case.
Interest Expense decreased $7 million primarily due tothe following:
A $12 million decrease due to the deferral of eligible costs related to the UTM in Texas.
A $6 million increase primarily due to higher long-term debt balances in Texas.
Income Tax Expense increased $6 million primarily due to the following:
A $16 million increase due to an increase in pretax book income.
A $9 million decrease from Excess ADIT credits to be refunded to customers as approved in the 2025 Ohio base rate case.
AEP TRANSMISSION HOLDCO
Summary of Investment in Transmission Assets for AEP Transmission Holdco
| March 31, | ||
|---|---|---|
| 2026 | 2025 | |
| (in millions) | ||
| Plant in Service | $18,015 | $16,121 |
| Construction Work in Progress | 2,167 | 2,342 |
| Accumulated Depreciation and Amortization | 2,055 | 1,715 |
| Total Transmission Property, Net | $18,127 | $16,748 |
| AEP Transmission Holdco | |
|---|---|
| Reconciliation of 2025 to 2026 | |
| Earnings Attributable to AEP Members from AEP Transmission Holdco | |
| (in millions) | |
| Three Months Ended March 31, | |
| 2025 Earnings Attributable to AEP Members from AEP Transmission Holdco | $235 |
| Changes in Transmission Revenues: | |
| Transmission Revenues | 56 |
| Total Change in Transmission Revenues | 56 |
| Changes in Expenses and Other: | |
| Other Operation and Maintenance | (16) |
| Depreciation and Amortization | (15) |
| Taxes Other Than Income Taxes | (15) |
| Interest and Investment Income | 2 |
| Interest Expense | (12) |
| Total Change in Expenses and Other | (56) |
| Equity Earnings of Unconsolidated Subsidiaries | 1 |
| Net Income Attributable to Noncontrolling Interests | (27) |
| 2026 Earnings Attributable to AEP Members from AEP Transmission Holdco | $209 |
The major components of the increase in Transmission Revenues, which consists of wholesale sales to affiliates and nonaffiliates were as follows:
Transmission Revenues increased $56 million primarily due to continued transmission investment.
Expenses and Other and Net Income Attributable to Noncontrolling Interests changed between years as follows:
Other Operation and Maintenance expenses increased $16 million primarily due to an increase in employee-related costs, vegetation management expenses and other miscellaneous expenses.
Depreciation and Amortization expenses increased $15 million primarily due to a higher depreciable base.
Taxes Other than Income Taxes increased $15 million due to higher property taxes driven by higher transmission investment.
Interest Expense increased $12 million primarily due to higher long-term debt balances and interest rates.
Net Income Attributable to Noncontrolling Interests increased $27 million primarily due to the Midwest Transmission Holdings noncontrolling interest transaction that closed in June 2025.
GENERATION & MARKETING
| Reconciliation of 2025 to 2026 Earnings Attributable to AEP Common Shareholders | |
|---|---|
| (in millions) | |
| Three Months Ended March 31, | |
| 2025 Earnings Attributable to AEP Common Shareholders | $102 |
| Changes in Revenues: | |
| Retail, Trading and Marketing | 174 |
| Merchant Generation | 9 |
| Other Revenues | 22 |
| Total Change in Revenues | 205 |
| Changes in Expenses and Other: | |
| Purchased Electricity, Fuel and Other Consumables Used for Electric Generation | (271) |
| Other Operation and Maintenance | 21 |
| Depreciation and Amortization | (1) |
| Interest and Investment Income | 5 |
| Non-Service Cost Components of Net Periodic Benefit Cost | (1) |
| Interest Expense | 1 |
| Total Change in Expenses and Other | (246) |
| Income Tax Expense | 14 |
| 2026 Earnings Attributable to AEP Common Shareholders | $75 |
Retail, Trading and Marketing increased $174 million primarily due to higher market prices in 2026, partially offset by reduced MTM hedging gains.
Merchant Generation increased $9 million primarily due to higher realized prices in 2026.
Other Revenues increased $22 million primarily due to continued progress on projects in 2026.
Purchased Electricity, Fuel and Other Consumables Used for Electric Generation expenses increased $271 million primarily due to an increase in energy costs in 2026.
Other Operation and Maintenance expenses decreased $21 million primarily due to renewable contract restructuring and termination proceeds in 2026.
Interest and Investment Income increased $5 million primarily due to an increase in interest due to higher advances to affiliates.
Income Tax Expense decreased $14 million primarily due to a decrease in pretax book income.
CORPORATE AND OTHER
Earnings Attributable to AEP Common Shareholders from Corporate and Other decreased from a loss of $26 million in 2025 to a loss of $109 million in 2026 primarily due to:
A $20 million decrease in Income Tax Benefit primarily due to a $32 million decrease in PTCs, partially offset by a $12 million increase due to a decrease in pretax book income.
A $19 million increase in interest expense primarily due to higher long-term debt balances.
A $13 million decrease in earnings from equity method investments.
An $11 million decrease in the recognition of deferred revenues on completed contracts.
A $6 million decrease at EIS primarily due to increased reserves.
These decreases in earnings were partially offset by:
An $8 million increase in interest income primarily due to higher advances to affiliates.
AEP CONSOLIDATED INCOME TAXES
Income Tax Expense decreased $81 million primarily due to:
A $41 million decrease due to an increase in PTCs.
A $27 million decrease due to the cumulative true-up of CAMT related to IRS Notice 2026-07 allowing tax repair deductions in the calculation of CAMT.
A $10 million decrease due to unfavorable adjustments in 2025.
FINANCIAL CONDITION
AEP measures financial condition by the strength of its balance sheet and the liquidity provided by its cash flows.
LIQUIDITY AND CAPITAL RESOURCES
Debt and Equity Capitalization
| March 31, 2026 · December 31, 2025 | ||||
|---|---|---|---|---|
| (dollars in millions) | ||||
| Long-term Debt, including amounts due within one year | $49,554 | 58.9% | $47,322 | 58.4% |
| Short-term Debt | 1,555 | 1.9 | 1,508 | 1.9 |
| Total Debt | 51,109 | 60.8 | 48,830 | 60.3 |
| AEP Common Equity | 31,808 | 37.8 | 31,138 | 38.4 |
| Noncontrolling Interests | 1,170 | 1.4 | 1,080 | 1.3 |
| Total Debt and Equity Capitalization | $84,087 | 100.0% | $81,048 | 100.0% |
AEP’s ratio of debt-to-total capital increased from 60.3% to 60.8% as of December 31, 2025 and March 31, 2026, respectively, primarily due to an increase in long-term debt to support AEP’s capital investment plan in addition to working capital needs.
Liquidity
Liquidity, or access to cash, is an important factor in determining AEP’s financial stability. Management believes AEP has adequate liquidity for the next twelve months and for the foreseeable future. As of March 31, 2026, AEP had $6 billion of revolving credit facilities to support its commercial paper program. Additional liquidity is available from cash from operations and a receivables securitization agreement. Management is committed to maintaining adequate liquidity. AEP generally uses short-term borrowings to fund working capital needs, property acquisitions and construction until long-term funding is arranged. Sources of long-term funding include issuance of long-term debt, long-term asset securitizations, leasing agreements, hybrid securities or common stock. AEP and its utilities finance its operations with commercial paper and other variable rate instruments that are subject to fluctuations in interest rates. To the extent that there is an increase in interest rates, it could reduce future net income and cash flows and impact financial condition. In addition, market volatility and reduced liquidity in the financial markets could affect AEP’s ability to raise capital on reasonable terms to fund capital needs, including construction costs and refinancing maturing indebtedness.
Net Available Liquidity
AEP manages liquidity by maintaining adequate external financing commitments. As of March 31, 2026, available liquidity was approximately $5.7 billion as illustrated in the table below:
| Amount · Maturity (a) | |||
|---|---|---|---|
| Commercial Paper: · (in millions) | |||
| Revolving Credit Facility | $5,000 | March 2029 | |
| Revolving Credit Facility | 1,000 | March 2027 | |
| Cash and Cash Equivalents | 306 | ||
| Total Liquidity Sources | 6,306 | ||
| Less: | AEP Commercial Paper Outstanding | 651 | |
| Net Available Liquidity | $5,655 | ||
a)In April 2026, AEP increased its $5 billion Revolving Credit Facility to $6.5 billion and extended the maturity date from March 2029 to April 2031. Also, in April 2026, AEP increased its $1 billion Revolving Credit Facility to $1.5 billion and extended the maturity date from March 2027 to April 2029.
AEP uses its commercial paper program to meet the short-term borrowing needs of its subsidiaries. The program funds a Utility Money Pool, which funds AEP’s utility subsidiaries; a Nonutility Money Pool, which funds certain AEP nonutility subsidiaries; and the short-term debt requirements of subsidiaries that are not participating in either money pool for regulatory or operational reasons, as direct borrowers. The maximum amount of commercial paper outstanding during the first three months of 2026 was $2.0 billion. The weighted-average interest rate for AEP’s commercial paper for the three months ended March 31, 2026 was 3.87%.
Other Credit Facilities
An uncommitted facility gives the issuer of the facility the right to accept or decline each request made under the facility. AEP issues letters of credit on behalf of subsidiaries under six uncommitted facilities totaling $450 million. The Registrants’ maximum future payments for letters of credit issued under the uncommitted facilities as of March 31, 2026 was $404 million with maturities ranging from April 2026 to March 2027.
Securitized Accounts Receivables
AEP Credit’s receivables securitization agreement provides a commitment of $900 million from bank conduits to purchase receivables and expires in September 2027. As of March 31, 2026, the affiliated utility subsidiaries were in compliance with all requirements under the agreement.
Debt Covenants and Borrowing Limitations
AEP’s credit agreements contain certain covenants and require it to maintain a percentage of debt-to-total capitalization at a level that does not exceed 67.5%. The method for calculating outstanding debt and capitalization is contractually defined in AEP’s credit agreements. Debt as defined in the revolving credit agreement excludes securitization bonds and debt of AEP Credit. As of March 31, 2026, this contractually defined percentage was 55.5%. Non-performance under these covenants could result in an event of default under these credit agreements. In addition, the acceleration of AEP’s payment obligations, or the obligations of certain of AEP’s major subsidiaries, prior to maturity under any other agreement or instrument relating to debt outstanding in excess of $100 million, would cause an event of default under these credit agreements. This condition also applies, at the more restrictive level of $50 million of debt outstanding, in a majority of AEP’s non-exchange-traded commodity contracts and would similarly allow lenders and counterparties to declare the outstanding amounts payable. However, a default under AEP’s non-exchange-traded commodity contracts would not cause an event of default under its credit agreements.
The revolving credit facilities do not permit the lenders to refuse a draw on any facility if a material adverse change occurs.
Utility Money Pool borrowings and external borrowings may not exceed amounts authorized by regulatory orders and AEP manages its borrowings to stay within those authorized limits.
ATM Program
In November 2025, AEP filed a prospectus supplement under which it may sell up to $3.5 billion of its common stock through an ATM program. In the first quarter of 2026, 2 million shares of common stock were issued for $264 million in net proceeds. In addition to these issuances and sales of shares of common stock, AEP also may use the ATM program to enter into forward sale agreements.
See “Forward Equity Agreements” section of Note 12 for additional information regarding shares issued or expected to be issued under forward sale agreements.
Dividend Policy and Restrictions
The Board of Directors declared a quarterly dividend of $0.95 per share in April 2026. Future dividends may vary depending upon AEP’s profit levels, operating cash flow levels and capital requirements, as well as financial and other business conditions existing at the time. Parent’s income primarily derives from common stock equity in the earnings of its utility subsidiaries. Various financing arrangements and regulatory requirements may impose certain restrictions on the ability of the subsidiaries to transfer funds to Parent in the form of dividends. Management does not believe these restrictions will have any significant impact on its ability to access cash to meet the payment of dividends on its common stock. See “Dividend Restrictions” section of Note 12 for additional information.
Credit Ratings
AEP and its utility subsidiaries do not have any credit arrangements that would require material changes in payment schedules or terminations as a result of a credit downgrade, but its access to the commercial paper market may depend on its credit ratings. In addition, downgrades in AEP’s credit ratings by one of the rating agencies could increase its borrowing costs. Counterparty concerns about the credit quality of AEP or its utility subsidiaries could subject AEP to additional collateral demands under adequate assurance clauses under its derivative and non-derivative energy contracts.
CASH FLOW
AEP relies primarily on cash flows from operations, debt issuances, issuances of common stock and its existing cash and cash equivalents to fund its liquidity and investing activities. AEP’s investing and capital requirements are primarily capital expenditures, repaying of long-term debt and paying dividends to shareholders. AEP uses short-term debt, including commercial paper and bank term loans, as a bridge to long-term debt financing. The levels of borrowing may vary significantly due to the timing of long-term debt financings and the impact of fluctuations in cash flows.
| Three Months Ended March 31, | ||
|---|---|---|
| 2026 | 2025 | |
| (in millions) | ||
| Cash, Cash Equivalents and Restricted Cash at Beginning of Period | $268 | $246 |
| Net Cash Flows from Operating Activities | 1,519 | 1,450 |
| Net Cash Flows Used for Investing Activities | (3,569) | (2,102) |
| Net Cash Flows from Financing Activities | 2,121 | 698 |
| Net Increase in Cash, Cash Equivalents and Restricted Cash | 71 | 46 |
| Cash, Cash Equivalents and Restricted Cash at End of Period | $339 | $292 |
Operating Activities
| Three Months Ended March 31, | ||
|---|---|---|
| 2026 | 2025 | |
| (in millions) | ||
| Net Income | $903 | $802 |
| Non-Cash Adjustments to Net Income (a) | 1,056 | 941 |
| Mark-to-Market of Risk Management Contracts | 100 | (15) |
| Property Taxes | (108) | (88) |
| Deferred Fuel Over/Under-Recovery, Net | (122) | (75) |
| Change in Other Noncurrent Assets | (351) | (131) |
| Change in Other Noncurrent Liabilities | 433 | 142 |
| Change in Certain Components of Working Capital | (392) | (126) |
| Net Cash Flows from Operating Activities | $1,519 | $1,450 |
(a)Non-Cash Adjustments to Net Income includes Depreciation and Amortization, Deferred Income Taxes, Asset Impairments and Other Related Charges and AFUDC.
Net Cash Flows from Operating Activities increased by $69 million primarily due to the following:
A $216 million increase in cash from Net Income, after non-cash adjustments. See Results of Operations for further detail.
A $115 million increase in cash due to changes in risk management contract collateral positions.
A $71 million increase in cash from Change in Other Noncurrent Assets and Change in Other Noncurrent Liabilities. This increase is primarily due to changes in regulatory assets and liabilities driven by timing differences in collections from and refunds to customers under rate rider mechanisms, including storm restoration expenses incurred in several jurisdictions, as well as an increase in customer security deposits.
These increases in cash were partially offset by:
A $266 million decrease in cash from the Change in Certain Components of Working Capital primarily due to an increase in fuel, material and supplies driven by higher coal inventory on hand, the timing of accounts receivable collections, decreased margin deposits driven by decreases in power prices and changes in income tax accruals and tax credits. These decreases in cash were partially offset by the timing of accounts payable and employee-related benefits.
Investing Activities
| Three Months Ended March 31, | ||
|---|---|---|
| 2026 | 2025 | |
| (in millions) | ||
| Construction Expenditures | $(2,830) | $(2,100) |
| Acquisitions of Generation Facilities | (965) | — |
| Acquisitions of Nuclear Fuel | (13) | (36) |
| Other | 239 | 34 |
| Net Cash Flows Used for Investing Activities | $(3,569) | $(2,102) |
Net Cash Flows Used for Investing Activities increased by $1.5 billion primarily due to the following:
A $965 million increase due to the acquisition of the Oregon Clean Energy Center. See “Acquisitions” section of Note 6 for additional information.
A $730 million increase in Construction Expenditures primarily due to increases in Transmission and Distribution Utilities of $357 million, Vertically Integrated Utilities of $258 million and Corporate and Other of $117 million.
Financing Activities
| Three Months Ended March 31, | ||
|---|---|---|
| 2026 | 2025 | |
| (in millions) | ||
| Issuance of Common Stock | $358 | $75 |
| Issuance/Retirement of Debt, Net | 2,275 | 1,155 |
| Principal Payments for Finance Lease Obligations | (24) | (13) |
| Dividends Paid on Common Stock | (520) | (500) |
| Other | 32 | (19) |
| Net Cash Flows from Financing Activities | $2,121 | $698 |
Net Cash Flows from Financing Activities increased by $1.4 billion primarily due to the following:
A $2.3 billion increase in issuances of long-term debt. See Note 12 - Financing Activities for additional information.
A $283 million increase in issuances of common stock primarily under AEP’s ATM Program. See Note 12 - Financing Activities for additional information.
These increases in cash were partially offset by:
A $775 million decrease due to changes in short-term debt.
A $449 million increase in retirements of long-term debt. See Note 12 - Financing Activities for additional information.
See the “Financing Activities Subsequent Events” section of Note 12 for Long-term debt and other securities issued, retired and principal payments made after March 31, 2026 through May 5, 2026, the date that the first quarter Form 10-Q was filed.
BUDGETED CAPITAL EXPENDITURES
Management forecasts approximately$12.8 billion of capital expenditures in 2026. For the four-year period, 2027 through 2030, management forecasts capital expenditures of $65.1 billion. Management’s forecasted capital expenditures reflect planned investments for transmission infrastructure and new generation resources to support existing customers and forecasted large load increases and continued improvements in distribution system reliability.
Estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints, environmental regulations, business opportunities, market volatility, economic trends, supply chain issues, weather, legal reviews, technology advancements, inflation and the ability to access capital. Management has funded, or expects to fund, these capital expenditures through cash flows from operations and financing activities. Generally, the Registrant Subsidiaries use cash or short-term borrowings under the money pool to fund these expenditures until long-term funding is arranged.
The 2026-2030 estimated capital expenditures by Business Segment are as follows:
| Segment | 2026-2030 Budgeted Capital Expenditures |
|---|---|
| (in millions) | |
| Vertically Integrated Utilities | $40,879 |
| Transmission and Distribution Utilities | 22,537 |
| AEP Transmission Holdco | 12,855 |
| Generation & Marketing | 111 |
| Corporate and Other | 1,555 |
| Total | $77,937 |
SIGNIFICANT CASH REQUIREMENTS
A summary of significant cash requirements is included in the 2025 Annual Report and has not changed significantly from year-end other than the debt issuances and retirements discussed in the “Cash Flow” section above.
CRITICAL ACCOUNTING POLICIES AND ESTIMATES AND ACCOUNTING STANDARDS
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
See the “Critical Accounting Policies and Estimates” section of “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in the 2025 Annual Report for a discussion of the estimates and judgments required for regulatory accounting, revenue recognition, derivative instruments, the valuation of long-lived assets, the accounting for pension and other postretirement benefits and asset retirement obligations.
ACCOUNTING STANDARDS
See Note 2 - New Accounting Standards for information related to accounting standards and SEC rulemaking activity.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.