Skip to main content

Cheniere Energy, Inc.

For the period ended Dec 31, 2025. Filed Feb 26, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 26, 2026

LNG$293.49+3.0%Stored close · as of Nov 10, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits
Contents

Item 15. Exhibits and Financial Statement Schedules

(a) Financial Statements, Schedules and Exhibits

(1) Financial Statements—Cheniere Energy, Inc. and Subsidiaries:

Management’s Report to the Stockholders of Cheniere Energy, Inc.55
Reports of Independent Registered Public Accounting Firm56
Consolidated Statements of Operations59
Consolidated Balance Sheets60
Consolidated Statements of Stockholders’ Equity (Deficit) and Redeemable Non-Controlling Interest61
Consolidated Statements of Cash Flows62
Notes to Consolidated Financial Statements63

(2) Financial Statement Schedules:

All financial statement schedules have been omitted because they are not required, are not applicable, or the required information has been included in the consolidated financial statements and accompanying notes included in this Form 10-K.

(3) Exhibits:

Certain of the agreements filed as exhibits to this Form 10-K contain representations, warranties, covenants and conditions by the parties to the agreements that have been made solely for the benefit of the parties to the agreement. These representations, warranties, covenants and conditions:

should not in all instances be treated as categorical statements of fact, but rather as a way of allocating the risk to one of the parties if those statements prove to be inaccurate;

may have been qualified by disclosures that were made to the other parties in connection with the negotiation of the agreements, which disclosures are not necessarily reflected in the agreements;

may apply standards of materiality that differ from those of a reasonable investor; and

were made only as of specified dates contained in the agreements and are subject to subsequent developments and changed circumstances.

Accordingly, these representations and warranties may not describe the actual state of affairs as of the date they were made or at any other time. These agreements are included to provide you with information regarding their terms and are not intended to provide any other factual or disclosure information about the Company or the other parties to the agreements. Investors should not rely on them as statements of fact.

Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
2.1Amended and Restated Purchase and Sale Agreement, dated as of August 9, 2012, by and among CQP, Cheniere Pipeline Company, Grand Cheniere Pipeline, LLC and the CompanyCQP8-K10.28/9/2012
3.1Restated Certificate of Incorporation of the CompanyCheniere10-Q3.18/10/2004
3.2Certificate of Amendment of Restated Certificate of Incorporation of the CompanyCheniere8-K3.12/8/2005
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
3.3Certificate of Amendment of Restated Certificate of Incorporation of the CompanyCheniere(SEC File No. 333-160017)S-84.36/16/2009
3.4Certificate of Amendment of Restated Certificate of Incorporation of the CompanyCheniere8-K3.16/7/2012
3.5Certificate of Amendment of Restated Certificate of Incorporation of the CompanyCheniere8-K3.12/5/2013
3.6Certificate of Amendment of Restated Certificate of Incorporation of the CompanyCheniere8-K3.15/24/2024
3.7Amended and Restated Bylaws of the Company, effective August 30, 2024Cheniere8-K3.19/3/2024
4.1Specimen Common Stock Certificate of the CompanyCheniere(SEC File No. 333-10905)S-14.18/27/1996
4.2Indenture, dated as of February 1, 2013, by and among SPL, the guarantors that may become party thereto from time to time and The Bank of New York Mellon, as trusteeCQP8-K4.12/4/2013
4.3First Supplemental Indenture, dated as of April 16, 2013, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.1.14/16/2013
4.4Second Supplemental Indenture, dated as of April 16, 2013, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.1.24/16/2013
4.5Third Supplemental Indenture, dated as of November 25, 2013, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.111/25/2013
4.6Fourth Supplemental Indenture, dated as of May 20, 2014, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.15/22/2014
4.7Fifth Supplemental Indenture, dated as of May 20, 2014, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.25/22/2014
4.8Sixth Supplemental Indenture, dated as of March 3, 2015, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.13/3/2015
4.9Seventh Supplemental Indenture, dated as of June 14, 2016, between SPL and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.16/14/2016
4.10Form of 5.875% Senior Secured Note due 2026 (Included as Exhibit A-1 to Exhibit 4.09 above)CQP8-K4.16/14/2016
4.11Eighth Supplemental Indenture, dated as of September 19, 2016, between SPL and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.19/23/2016
4.12Ninth Supplemental Indenture, dated as of September 23, 2016, between SPL and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.29/23/2016
4.13Form of 5.00% Senior Secured Note due 2027 (Included as Exhibit A-1 to Exhibit 4.12 above)CQP8-K4.29/23/2016
4.14Tenth Supplemental Indenture, dated as of March 6, 2017, between SPL and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.13/6/2017
4.15Form of 4.200% Senior Secured Note due 2028 (Included as Exhibit A-1 to Exhibit 4.14 above)CQP8-K4.13/6/2017
4.16Eleventh Supplemental Indenture, dated as of May 8, 2020, between SPL and The Bank of New York Mellon, as Trustee under the IndentureSPL8-K4.15/8/2020
4.17Form of 4.500% Senior Secured Note due 2030 (Included as Exhibit A-1 to Exhibit 4.16 above)SPL8-K4.15/8/2020
4.18Twelfth Supplemental Indenture, dated as of November 29, 2022, between SPL and The Bank of New York Mellon, as Trustee under the IndentureSPL8-K4.111/29/2022
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
4.19Form of 5.900% Senior Secured Amortizing Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.18 above)SPL8-K4.111/29/2022
4.20Indenture, dated as of February 24, 2017, between SPL, the guarantors that may become party thereto from time to time and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.12/27/2017
4.21Form of 5.00% Senior Secured Note due 2037 (Included as Exhibit A-1 to Exhibit 4.20 above)CQP8-K4.12/27/2017
4.22Indenture, dated as of December 15, 2021, between SPL and The Bank of New York Mellon, as TrusteeCheniere10-K4.242/24/2022
4.23Form of 2.95% Senior Secured Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.22 above)Cheniere10-K4.242/24/2022
4.24Indenture, dated as of December 15, 2021, between SPL and The Bank of New York Mellon, as TrusteeCheniere10-K4.262/24/2022
4.25Form of 3.17% Senior Secured Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.24 above)Cheniere10-K4.262/24/2022
4.26First Supplemental Indenture, dated as of December 15, 2021, between SPL and The Bank of New York Mellon, as TrusteeCheniere10-K4.282/24/2022
4.27Form of 3.19% Senior Secured Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.26 above)Cheniere10-K4.282/24/2022
4.28Second Supplemental Indenture, dated as of December 15, 2021, between SPL and The Bank of New York Mellon, as TrusteeCheniere10-K4.302/24/2022
4.29Form of 3.08% Senior Secured Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.28 above)Cheniere10-K4.302/24/2022
4.30Third Supplemental Indenture, dated as of December 15, 2021, between SPL and The Bank of New York Mellon, as TrusteeCheniere10-K4.322/24/2022
4.31Form of 3.10% Senior Secured Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.30 above)Cheniere10-K4.322/24/2022
4.32Indenture, dated as of September 22, 2020, between the Company, as issuer, and the Bank of New York Mellon, as trusteeCheniere8-K4.19/22/2020
4.33First Supplemental Indenture, dated as of September 22, 2020, between the Company, as issuer, and the Bank of New York Mellon, as trusteeCheniere8-K4.29/22/2020
4.34Form of 4.625% Senior Secured Notes due 2028 (Included as Exhibit A-1 to Exhibit 4.33 above)Cheniere8-K4.29/22/2020
4.35Indenture, dated as of March 19, 2024, between the Company, as issuer, and the Bank of New York Mellon, as trusteeCheniere8-K4.13/19/2024
4.36First Supplemental Indenture, dated as of March 19, 2024, between the Company, as issuer, and the Bank of New York Mellon, as trusteeCheniere8-K4.23/19/2024
4.37Form of 5.650% Senior Notes due 2034 (Included as Exhibit A to Exhibit 4.36 above)Cheniere8-K4.23/19/2024
4.38Indenture, dated as of May 18, 2016, among CCH, as Issuer, CCL, CCP and Corpus Christi Pipeline GP, LLC, as Guarantors, and The Bank of New York Mellon, as TrusteeCheniere8-K4.15/18/2016
4.39First Supplemental Indenture, dated as of December 9, 2016, among CCH, as Issuer, CCL, CCP and Corpus Christi Pipeline GP, LLC, as Guarantors, and The Bank of New York Mellon, as TrusteeCheniere8-K4.112/9/2016
4.40Second Supplemental Indenture, dated as of May 19, 2017, among CCH, as issuer, CCL, CCP and Corpus Christi Pipeline GP, LLC, as Guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.15/19/2017
4.41Form of 5.125% Senior Secured Note due 2027 (Included as Exhibit A-1 to Exhibit 4.40 above)CCH8-K4.15/19/2017
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
4.42Third Supplemental Indenture, dated as of September 6, 2019, among CCH, as issuer, CCL, CCP and Corpus Christi Pipeline GP, LLC, as Guarantors, and The Bank of New York Mellon, as TrusteeCCH8-K4.19/12/2019
4.43Fourth Supplemental Indenture, dated as of November 13, 2019, among CCH, as issuer, CCL, CCP and Corpus Christi Pipeline GP, LLC, as guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.111/13/2019
4.44Form of 3.700% Note due 2029 (Included as Exhibit A-1 to Exhibit 4.43 above)CCH8-K4.111/13/2019
4.45Fifth Supplemental Indenture, dated as of August 24, 2021, among CCH, as issuer, CCL, CCP, and Corpus Christi Pipeline GP, LLC, as guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.18/24/2021
4.46Form of 2.742% Senior Secured Note due 2039 (Included as Exhibit A-1 to Exhibit 4.45 above)CCH8-K4.18/24/2021
4.47Indenture, dated as of August 20, 2020, among CCH, as issuer, and CCL, CCP and Corpus Christi Pipeline GP, LLC, as guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.18/21/2020
4.48Form of 3.52% Senior Secured Note due December 31, 2039 (Included as Exhibit A-1 to Exhibit 4.47 above)CCH8-K4.18/21/2020
4.49Indenture, dated as of September 27, 2019, among CCH, as issuer, and CCL, CCP and Corpus Christi Pipeline GP, LLC, as guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.19/30/2019
4.50Form of 4.80% Senior Note due December 31, 2039 (Included as Exhibit A-1 to Exhibit 4.49 above)CCH8-K4.19/30/2019
4.51Indenture, dated as of October 17, 2019, among CCH, as issuer, and CCL, CCP and Corpus Christi Pipeline GP, LLC, as guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.110/18/2019
4.52Form of 3.925% Senior Note due December 31, 2039 (Included as Exhibit A to Exhibit 4.51 above)CCH8-K4.110/18/2019
4.53Indenture, dated as of September 18, 2017, between CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.19/18/2017
4.54First Supplemental Indenture, dated as of September 18, 2017, between CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.29/18/2017
4.55Second Supplemental Indenture, dated as of September 11, 2018, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.19/12/2018
4.56Third Supplemental Indenture, dated as of September 12, 2019, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.19/12/2019
4.57Form of 4.500% Senior Notes due 2029 (Included as Exhibit A-1 to Exhibit 4.56 above)CQP8-K4.19/12/2019
4.58Fourth Supplemental Indenture, dated as of November 5, 2020, between CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCheniere10-Q4.411/6/2020
4.59Fifth Supplemental Indenture, dated as of March 11, 2021, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.13/11/2021
4.60Form of 4.000% Senior Notes due 2031 (Included as Exhibit A-1 to Exhibit 4.59 above)CQP8-K4.13/11/2021
4.61Sixth Supplemental Indenture, dated as of September 27, 2021, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.19/27/2021
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
4.62Form of 3.25% Senior Notes due 2032 (Included as Exhibit A-1 to Exhibit 4.61 above)CQP8-K4.19/27/2021
4.63Seventh Supplemental Indenture, dated as of September 27, 2021, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.110/1/2021
4.64Eighth Supplemental Indenture, dated as of June 21, 2023, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.16/21/2023
4.65Form of 5.950% Senior Notes due 2033 (Included as Exhibit A to Exhibit 4.64 above)CQP8-K4.16/21/2023
4.66Ninth Supplemental Indenture, dated as of May 22, 2024, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.15/22/2024
4.67Form of 5.750% Senior Secured Notes due 2034 (Included as Exhibit A to Exhibit 4.66 above)CQP8-K4.15/22/2024
4.68Tenth Supplemental Indenture, dated as of July 10, 2025, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.17/10/2025
4.69Form of 5.550% Senior Notes due 2035 (Included as Exhibit A to Exhibit 4.68 above)CQP8-K4.17/10/2025
4.70Description of the Registrant’s Securities Registered Pursuant to Section 12 of the Securities Exchange Act of 1934Cheniere10-K4.692/20/2025
10.1†Cheniere Energy, Inc. 2020 Incentive PlanCheniere (SEC No. 333-238261)S-84.95/14/2020
10.2†Cheniere Energy, Inc. Amended and Restated 2020 Incentive PlanCheniere8-K10.15/24/2024
10.3†Form of Restricted Stock Grant under the Cheniere Energy, Inc. 2020 Incentive Plan (Director)Cheniere10-Q10.18/5/2021
10.4†Form of Restricted Stock Unit Award Agreement under the Cheniere Energy, Inc. 2020 Incentive Plan (NEO) (2024, 2025 and 2026)Cheniere10-K10.52/2/2024
10.5†Form of Performance Stock Unit Award Agreement Under the Cheniere Energy, Inc. 2020 Incentive Plan (NEO) (2024, 2025 and 2026)Cheniere10-K10.82/22/2024
10.6†Amended and Restated Cheniere Energy, Inc. Key Executive Severance Pay Plan (Effective as of November 17, 2023) and Summary Plan DescriptionCheniere10-K10.92/22/2024
10.7†Director Deferred Compensation Plan (Effective February 10, 2022)Cheniere10-K10.462/24/2022
10.8†Form of Deferred Stock Unit Award Agreement Under the Director Deferred Compensation PlanCheniere10-K10.472/24/2022
10.9†Employment Agreement between the Company and Jack A. Fusco, dated May 12, 2016Cheniere8-K10.15/12/2016
10.10†Employment Agreement Amendment between the Company and Jack Fusco, dated August 15, 2019Cheniere8-K10.18/15/2019
10.11†Second Employment Agreement Amendment between the Company and Jack Fusco, dated August 11, 2021Cheniere8-K10.18/13/2021
10.12†Cheniere Energy, Inc. Amended and Restated Retirement Policy, dated effective January 1, 2021Cheniere10-K10.152/22/2024
10.13†Form of Indemnification Agreement for officers of the CompanyCheniere8-K10.25/20/2020
10.14†Form of Indemnification Agreement for directors of the CompanyCheniere8-K10.15/20/2020
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
10.15Senior Revolving Credit and Guaranty Agreement, among SPL, as borrower, certain subsidiaries of the Company, The Bank of Nova Scotia, as Senior Facility Agent, Société Générale, as the Common Security Trustee, the issuing banks and lenders from time to time party thereto and other participantsSPL(SEC File No. 333-273238)S-410.467/13/2023
10.16Fourth Amended and Restated Common Terms Agreement, among SPL, as borrower, the Secured Debt Holder Group Representatives party thereto, the Secured Hedge Representatives party thereto, the Secured Gas Hedge Representatives party thereto and Société Générale, as the Common Security Trustee and the Intercreditor AgentSPL(SEC File No. 333-273238)S-410.447/13/2023
10.17Third Amended and Restated Accounts Agreement, among SPL, certain subsidiaries of SPL, Société Générale, as the Common Security Trustee, and Citibank, N.A. as the Accounts BankSPL8-K10.33/23/2020
10.18Second Amended and Restated Term Loan Facility Agreement, dated June 15, 2022, among CCH, CCP, Corpus Christi Pipeline GP, LLC, CCL, the lenders party thereto from time to time and Société Générale as the Term Loan Facility AgentCheniere8-K10.16/22/2022
10.19First Amendment to Second A&R Term Loan Facility Agreement, dated April 19, 2024Cheniere10-Q10.48/8/2024
10.20Second Amended and Restated Common Terms Agreement, dated June 15, 2022, among CCH, CCP, Corpus Christi Pipeline GP, LLC, CCL, Société Générale, as Term Loan Facility Agent, The Bank of Nova Scotia as Working Capital Facility Agent, and Société Générale as Intercreditor Agent, and any other facility lenders party thereto from time to timeCheniere8-K10.36/22/2022
10.21First Amendment to Second A&R Common Terms Agreement, dated April 19, 2024Cheniere10-Q10.58/8/2024
10.22Second Amended and Restated Common Security and Account Agreement, dated June 15, 2022, among CCH, CCP, Corpus Christi Pipeline GP, LLC, CCL, the Senior Creditor Group Representatives, Société Générale as the Intercreditor Agent, Société Générale as Security Trustee and Mizuho Bank, Ltd as the Account BankCheniere8-K10.46/22/2022
10.23First Amendment to Second A&R Common Security and Account Agreement, dated April 19, 2024Cheniere10-Q10.68/8/2024
10.24Amended and Restated Pledge Agreement, dated May 22, 2018, among CCH HoldCo I and Société Générale as Security TrusteeCheniere8-K10.45/24/2018
10.25Amended and Restated Equity Contribution Agreement, dated May 22, 2018, among CCH and the CompanyCheniere8-K10.55/24/2018
10.26Second Amended and Restated Working Capital Facility Agreement, dated June 15, 2022, among CCH, CCP, Corpus Christi Pipeline GP, LLC, CCL, the lenders party thereto from time to time, the issuing banks party thereto from time to time, the swing line lenders party thereto from time to time, The Bank of Nova Scotia as Working Capital Facility Agent and Société Générale as Security TrusteeCheniere8-K10.26/22/2022
10.27First Amendment to Second A&R Working Capital Facility Agreement, dated April 19, 2024Cheniere10-Q10.78/8/2024
10.28Third Amended and Restated Revolving Credit Agreement, dated as of August 1, 2025, among the Company, Various Lenders and Issuing Banks, MUFG Bank, Ltd., as Coordinating Lead Arranger, the Joint Lead Arrangers party thereto, Sumitomo Mitsui Banking Corporation, as Sustainability Advisor, and Société Générale, as Administrative AgentCheniere10-Q10.38/7/2025
10.29Credit Agreement, dated June 18, 2020, among the Company, the Lenders party thereto, Société Générale, as Administrative Agent, and the other agents and arrangers party thereto from time to timeCheniere8-K10.16/19/2020
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
10.30Credit and Guaranty Agreement, dated as of June 23, 2023, among CQP, as borrower, certain subsidiaries of CQP, as Subsidiary Guarantors, the lenders from time to time party thereto, Société Générale, Natixis, Sumitomo Mitsui Banking Corporation, The Bank of Nova Scotia, and Wells Fargo Bank, as Issuing Banks, MUFG Bank, LTD as Administrative Agent and Coordinating Lead Arranger, and certain arrangers and other participantsCheniere10-Q10.48/3/2023
10.31Fixed Price Separated Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL (successor of CCL Stage III) and Bechtel Energy Inc. (Portions of this exhibit have been omitted and filed separately with the SEC pursuant to a request for confidential treatment)Cheniere10-Q10.15/4/2022
10.32Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL (successor of CCL Stage III) and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00001 Maintaining Elevated Ground Flare Option, dated March 28, 2022, (ii) the Change Order CO-00002 Package 7 Pre-Investment of Trains 8 and 9 (Without Site Work), dated April 29, 2022 and (iii) the Change Order CO-00003 Modifications to Insurance Language, dated June 13, 2022 (Portions of this exhibit have been omitted)Cheniere10-Q10.78/4/2022
10.33Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00004 Currency Conversion, dated June 27, 2022, (ii) the Change Order CO-00005 Fuel Adjustment, dated July 15, 2022, (iii) the Change Order CO-00006 Removal of Laydown Yard Scope Option, dated August 2, 2022, (iv) the Change Order CO-00007 Removal of Air Bridges Scope Option, dated August 22, 2022, (v) the Change Order CO-00008 Acid Gas Flare K/O Drum, dated August 16, 2022, and (vi) the Change Order CO-00009 Package 7A (Without Site Work), dated August 16, 2022 (Portions of this exhibit have been omitted)Cheniere10-Q10.211/3/2022
10.34Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-000010 Insurance Provisional Sum Interim Adjustment, dated September 13, 2022 and (ii) the Change Order CO-000011 Package 6 Descope and Transfer to Owner, dated September 14, 2022 (Portions of this exhibit have been omitted)Cheniere10-K10.962/23/2023
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
10.35Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between Corpus Christi Liquefaction Stage III, LLC and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00012 Chart License Fee Provisional Sum Closure, dated September 16, 2022, (ii) the Change Order CO-00013 HRU Nozzles and Block Headers, dated September 21, 2022, (iii) the Change Order CO-00014 Addition of Nitrogen Receiver, dated December 13, 2022, (iv) the Change Order CO-00015 Package 6 Feed Gas Pipeline Interfaces, dated December 14, 2022, (v) the Change Order CO-00016 Old Sherwin Building Security, dated November 23, 2022, (vi) the Change Order CO-00017 Remote Monitoring Diagnostic for Mixed Refrigerant (MR) Compressors, dated December 14, 2022, (vii) the Change Order CO-00018 EFG Package #1, dated January 9, 2023, (viii) the Change Order CO-00019 Q3 2022 Commodity Price Rise and Fall (ATT MM), dated January 17, 2023, (ix) the Change Order CO-00020 ICSS Vendor Selection and EPC Warranty (Yokogawa), dated September 21, 2022 and (x) the Change Order CO-00021 Laydown Development Package, dated February 6, 2023 (Portions of this exhibit have been omitted.)Cheniere10-Q10.25/2/2023
10.36Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between Corpus Christi Liquefaction, LLC and Bechtel Energy, Inc.: (i) the Change Order CO-00022 Refrigerant Storage Packages 1 and 2, dated February 13, 2023, (ii) the Change Order CO-00023 EFG Package #2, dated February 21, 2023, (iii) the Change Order CO-00024 Defrost Improvements (Cold Box), dated February 23, 2023, (iv) the Change Order CO-00025 Miscellaneous Design Improvements, dated February 23, 2023, (v) the Change Order CO-00026 EFG Package #3, dated February 23, 2023, (vi) the Change Order CO-00027 Addition of 86 Lockout Relay on Transformers, dated February 14, 2023, (vii) the Change Order CO-00028 Additional Duct Banks, dated September 15, 2022, (viii) the Change Order CO-00029 2022 FERC Support Hours Interim Adjustment, dated March 13, 2023, (ix) the Change Order CO-00030 Drainage Blanket (A Street), dated April 6, 2023, (x) the Change Order CO-00031 Refrigerant Storage Interface Package #3, dated April 7, 2023, (xi) the Change Order CO-00032 Q4 2022 Commodity Price Rise and Fall (ATT MM), dated April 24, 2023, (xii) the Change Order CO-00033 Lift Owner-Provided Dewar System (Nitrogen Receiver Facility), dated March 1, 2022, (xiii) the Change Order CO-00034 HAZOP Package #1 - Addition of Flame Arrestors for Oil Mist Eliminator Vent, dated April 25, 2023 and (xiv) the Change Order CO-00035 EFG Package #4 (Water Pipeline Pipe Bridge), dated May 19, 2023 (Portions of this exhibit have been omitted.)Cheniere10-Q10.18/3/2023
10.37Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-00036 Payment Milestone Updates (Schedule C-1), dated June 19, 2023, (ii) the Change Order CO-00037 Geotechnical Soils Investigation Period & Security Division of Responsibility Change, dated June 20, 2023, (iii) the Change Order CO-00038 Power Monitoring System (ETAP HMI), dated June 29, 2023 and (iv) the Change Order CO-00039 EFG Firewater Connection, dated June 30, 2023 (Portions of this exhibit have been omitted.)Cheniere10-Q10.211/2/2023
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
10.38Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-00040 Q1 2023 Commodity Price Rise and Fall (ATT MM), dated August 29, 2023, (ii) the Change Order CO-00041 Q2 2023 Commodity Price Rise and Fall (ATT MM), dated August 29, 2023, (iii) the Change Order CO-00042 HAZOP Package #2 – Additional IPL (Pressure Transmitter Across the Strainer), dated July 5, 2023, (iv) the Change Order CO-00043 Total Condensate Flowmeter on Three (3) Inch Condensate Line, dated August 31, 2023, (v) the Change Order CO-00044 FERC Package #1 ISA 84 (Accommodation for Two Hundred and Fifty (250) Fire and Gas Detectors), dated August 31, 2023, (vi) the Change Order CO-00045 Increase LNG Rundown Line Check Valve Bypass Size to Six (6) Inches, dated August 31, 2023, (vii) the Change Order CO-00046 Add Manual Bypass Valves Around 31XV-13071, dated September 13, 2023, (viii) the Change Order CO-00047 Relocate Existing 16” Process Water Line and Provide Tie-In, dated September 8, 2023, (ix) the Change Order CO-00048 Future HRU Bypass Tie-In and Thermowell Updates, dated September 12, 2023, (x) the Change Order CO-00049 Butterfly Valves for Flare Drums, dated September 5, 2023, (xi) the Change Order CO-00050 Condensate Shroud on Condensate Rundown Line (Blue Engineering Report), dated September 12, 2023, (xii) the Change Order CO-00051 EFG Package #5 (138KV Feeder Cable), dated September 8, 2023, (xiii) the Change Order CO-00052 Defect Correction Period for Cementitious Fireproofing, dated August 7, 2023, (xiv) the Change Order CO-00053 Chart Transition Joint Spares, dated October 5, 2023, (xv) the Change Order CO-00054 CCL Tank(s) “A” and “C” Tie-In Study & Long Lead Item Purchases, dated September 19, 2023, (xvi) the Change Order CO-00055 FERC Package #2 Firewater Layout, dated September 13, 2023, (xvii) the Change Order CO-00056 HAZOP Package #3 – Stainless Steel C And D Pass Piping / Two Temperature Transmitters per Train, dated February 14, 2023, (xviii) the Change Order CO-00057 HAZOP Package #4 (“Phase Two Items”), dated October 10, 2023, (xix) the Change Order CO-00058 E-HAZOP Package #1 (“LV MCC Ride Through”), dated September 8, 2023, (xx) the Change Order CO-00059 Level Transmitter on Stand Pipe Inside Liquefaction Cold Boxes, dated October 13, 2023, (xxi) the Change Order CO-00060 Small Spill Containment (Additional Curbs), dated July 5, 2023, (xxii) the Change Order CO-00061 Remote Input/Output (RIO) Junction Box Grounding, dated October 10, 2023, (xxiii) the Change Order CO-00062 Geomembrane Liner and Geocell for Laydown 6 Channel, dated August 31, 2023, (xxiv) the Change Order CO-00063 Phased Surfacing of Permanent Plant Roads, dated August 7, 2023, (xxv) the Change Order CO-00064 Provisional Sum Interim Adjustment - Schedule KK-1 12-Month COVID Countermeasures, dated July 24, 2023, (xxvi) the Change Order CO-00065 Modification to FTZ Zone Site (Exhibit A of Attachment LL), dated August 3, 2023, (xxvii) the Change Order CO-00066 Attachment B (Contract Deliverables), dated June 2, 2023, (xxviii) the Change Order CO-00067 Sheet Pile Joint Sealing 310Q02 Sump, dated October 5, 2023, (xxix) the Change Order CO-00068 E-HAZOP Package #2 (“Phase One Items”), dated October 19, 2023, (xxx) the Change Order CO-00069 Package 6 Feed Gas Pipeline and Pig Receiver DMM, dated August 3, 2023, (xxxi) the Change Order CO-00070 Dry Flare Knockout Drum Spill Pad Drain Specification Change, dated October 5, 2023, (xxxii) the Change Order CO-00071 Viewing Platform Piles, dated October 18, 2023, (xxxiii) the Change Order CO-00072 Site Plan Update Package #1 – Re-Route Contractor’s Utility Water & Nitrogen Pipelines and Provide Power & Fiber Cables To Nitrogen Tie-In Point, dated November 2, 2023, (Portions of this exhibit have been omitted.)Cheniere10-K10.572/22/2024
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
10.39Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-00073 Amendment to Add Provisional Sums for the Performance and Attendance Bonus (PAB) and Saturday Work Shift Program, dated November 6, 2023, (ii) the Change Order CO-00074 Q3 2023 Commodity Price Rise and Fall Adjustment (Final Attachment MM Adjustment), dated November 6, 2023, (iii) the Change Order CO-00075 Surcharge Fill Material Transportation, dated October 11, 2023, (iv) the Change Order CO-00076 FERC Package #3 Firewall Layout (310R18), dated November 6, 2023, (v) the Change Order CO-00077 Site Plan Update Package #2 - Re-route Heavy Haul Road, dated November 2, 2023, (vi) the Change Order CO-00078 Firewater Loop Interconnect with CCL Stage 1 and CCL Stage 2, dated December 6, 2023, (vii) the Change Order CO-00079 Refrigerant Loading Manifold Design Changes, dated December 6, 2023, (viii) the Change Order CO-00080 CCL Tank(s) “A” and “C” Tie-in Long Lead Item Purchases Package #2, dated January 26, 2024, (ix) the Change Order CO-00081 CCL Tank(s) “A” and “C” Tie-in Bridging Engineering (Through 29-Mar-2024), dated February 8, 2024, (x) the Change Order CO-00082 ISA 84 Owner Requested Changes, dated January 24, 2024, (xi) the Change Order CO-00083 HAZOP Package #5 (“Phase Three Items”), dated October 19, 2023, (xii) the Change Order CO-00084 CCL Tank(s) “A” and “C” Long-Lead Item Purchases Package #3, dated March 4, 2024, (xiii) the Change Order CO-00085 Site Plan Update Package #3 - Fencing, dated January 17, 2024 (Portions of this exhibit have been omitted.)Cheniere10-Q10.25/3/2024
10.40Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-00086 CCL Tanks “A” and “C” Engineering, Procurement and Construction, dated March 15, 2024, (ii) the Change Order CO-00087 HAZOP Package #6 (“Phase Four Items”), dated January 1, 2024, (iii) the Change Order CO-00088 FERC & PHMSA (DOT) Support Hours (Through to Period 24-Dec-2023), dated February 2, 2024, and (iv) the Change Order CO-00089 30PK-3301A/B/C Firewater Pump Protection - Blast Analysis, Design and Calculation Report, dated May 7, 2024 (Portions of this exhibit have been omitted.)Cheniere10-Q10.18/8/2024
10.41Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-00090 30PK-3301 A/B/C Firewater Pump Protection - Detailed Design and Partial Procurement of Blast Resistant Doors, dated June 11, 2024, (ii) the Change Order CO-00091 30PK-3301 A/B/C Firewater Pump Protection - Purchase and Installation of Retrofit Steel, dated July 30, 2024, and (iii) the Change Order CO-00092 Intermediate Work Platform for the Tank(s) “A” and “C” Finger Rack, dated July 31, 2024 (Portions of this exhibit have been omitted.)Cheniere10-Q10.210/31/2024
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
10.42Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-00093 Local Temperature Indication at LNG Rundown Line, dated September 23, 2024, (ii) the Change Order CO-00094 Tie-In Connection for Future Isopentane Injection, dated October 21, 2024, (iii) the Change Order CO-00095 Flame Detection Coverage Package #1, dated October 21, 2024, (iv) the Change Order CO-00096 Metering Telemetry in GIS Substation, dated November 13, 2024, (v) the Change Order CO-00097 Sifting and Sorting Operations, dated October 1, 2024, and (vi) the Change Order CO-000-98 Acceleration Program Provisional Sum, dated December 20, 2024 (Portions of this exhibit have been omitted.)Cheniere10-K10.462/20/2025
10.43Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: the Change Order CO-00099 #57 Crushed Rock for Surface Paving - ISBL Areas, dated January 24, 2025 (Portions of this exhibit have been omitted.)Cheniere10-Q10.15/8/2025
10.44Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-000100 HAZOP Provisional Sum Closure, dated August 24, 2024, (ii) the Change Order CO-00101 Hot Oil Spools and Heat Exchange Coating Specification, dated March 5, 2025, (iii) the Change Order CO-00102 Reconciliation (Tax) - Change Orders CO-00014 through CO-00061, dated February 2, 2024, (iv) the Change Order CO-00103 Lube Oil for Refrigeration Compressor, dated April 30, 2025, (v) the Change Order CO-00104 Miscellaneous Scope Revisions, dated March 13, 2025, (vi) the Change Order CO-00105 FERC and PHMSA (DOT) Support Hours (2024 Period), dated May 16, 2025, (vii) the Change Order CO-00106 Closure of Performance and Attendance Bonus (PAB) and Saturday Work Shift Program Provisional Sum, dated May 16, 2025, (viii) the Change Order CO-00107 P&ID Natives for Trains 1- 2 and OSBL Phase 1, dated May 16, 2025, (ix) the Change Order CO-00108 Stormwater Sampling Outfall 003 (Small Triangle Area), dated May 22, 2025, and (x) the Change Order CO-00109 Owner Request for Train 1 Refrigerant Staging (Standby Driver), dated May 22, 2025 (Portions of this exhibit have been omitted.)Cheniere10-Q10.18/7/2025
10.45Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-00110 Owner Accommodations at Contractor CityWest Offices, dated May 22, 2025, (ii) the Change Order CO-00111 Trim Modifications on PV-17016 and PV-17516 Valves, dated July 21, 2025, (iii) the Change Order CO-00112 Supply of Train 2 Demineralized Water (Owner Request), dated July 25, 2025 and (iv) the Change Order CO-00113 Acceleration Program Extension (August - November 2025), dated August 4, 2025 (Portions of this exhibit have been omitted.)Cheniere10-Q10.110/30/2025
Exhibit No. · Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
10.46* · Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-00114 P&ID Natives for Trains 3 through 7 and OSBL Phase 2, dated October 29, 2025 and (ii) the Change Order CO-00115 Acceleration Program Extension (January - April 2026), dated December 23, 2025 (Portions of this exhibit have been omitted.)
10.47LNG Sale and Purchase Agreement (FOB), dated November 21, 2011, between SPL (Seller) and Gas Natural Aprovisionamientos SDG S.A. (subsequently assigned to Gas Natural Fenosa LNG GOM, Limited) (Buyer)CQP8-K10.111/21/2011
10.48Amendment No. 1 of LNG Sale and Purchase Agreement (FOB), dated April 3, 2013, between SPL (Seller) and Gas Natural Aprovisionamientos SDG S.A. (subsequently assigned to Gas Natural Fenosa LNG GOM, Limited) (Buyer)CQP10-Q10.15/3/2013
10.49Amendment of LNG Sale and Purchase Agreement (FOB), dated January 12, 2017, between SPL (Seller) and Gas Natural Fenosa LNG GOM, Limited (assignee of Gas Natural Aprovisionamientos SDG S.A.) (Buyer)SPL(SEC File No. 333-215882)S-410.32/3/2017
10.50Letter agreement regarding change from LIBOR to SOFR, dated June 8, 2023, to LNG Sale and Purchase Agreement, dated November 21, 2011, between SPL and Naturgy LNG GOM, Limited (assignee of Gas Natural Aprovisionamientos SDG S.A.), as amendedCheniere10-Q10.138/3/2023
10.51Amended and Restated LNG Sale and Purchase Agreement (FOB), dated January 25, 2012, between SPL (Seller) and BG Gulf Coast LNG, LLC (Buyer)CQP8-K10.11/26/2012
10.52Letter agreement regarding change from LIBOR to SOFR, dated May 18, 2023, to LNG Sale and Purchase Agreement, dated January 25, 2012, between SPL and BG Gulf Coast LNG, LLC, as amendedCheniere10-Q10.108/3/2023
10.53LNG Sale and Purchase Agreement (FOB), dated June 2, 2014, between CCL (Seller) and Gas Natural Fenosa LNG SL (subsequently assigned to Gas Natural Fenosa LNG GOM, Limited) (Buyer)Cheniere8-K10.16/2/2014
10.54Amendment No. 1 of LNG Sale and Purchase Agreement (FOB), dated February 27, 2018, between CCL (Seller) and Gas Natural Fenosa LNG GOM, Limited (Buyer)Cheniere10-Q10.65/4/2018
10.55Letter agreement regarding change from LIBOR to SOFR, dated June 8, 2023, to LNG Sale and Purchase Agreement, dated June 2, 2014, between CCL and Naturgy LNG GOM, Limited (assignee of Gas Natural Fenosa LNG SL), as amendedCheniere10-Q10.98/3/2023
10.56Cooperative Endeavor Agreement & Payment in Lieu of Tax Agreement with eleven Cameron Parish taxing authorities, dated October 23, 2007, by and between Cheniere Marketing, Inc. and SPLNGCheniere10-Q10.711/6/2007
10.57Investors’ and Registration Rights Agreement, dated as of July 31, 2012, by and among the Company, Cheniere Energy Partners GP, LLC, CQP, Cheniere Class B Units Holdings, LLC, Blackstone CQP Holdco LP and the other investors party thereto from time to timeCQP8-K10.18/6/2012
10.58Fourth Amended and Restated Agreement of Limited Partnership of CQP, dated February 14, 2017CQP8-K3.12/21/2017
10.59Amended and Restated Limited Liability Company Agreement of Cheniere GP Holding Company, LLC, dated December 13, 2013Cheniere Holdings8-K10.312/18/2013
14.1*Code of Business Conduct and Ethics
19*Policy on Insider Trading and Compliance
Exhibit No.Incorporated by Reference (1)
Exhibit No.DescriptionEntityFormExhibitFiling Date
21.1*Subsidiaries of the Company
23.1*Consent of KPMG LLP
31.1*Certification by Chief Executive Officer required by Rule 13a-14(a) and 15d-14(a) under the Exchange Act
31.2*Certification by Chief Financial Officer required by Rule 13a-14(a) and 15d-14(a) under the Exchange Act
32.1**Certification by Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
32.2**Certification by Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
97*Cheniere Energy Inc. Clawback Policy
101.INS*XBRL Instance Document
101.SCH*XBRL Taxonomy Extension Schema Document
101.CAL*XBRL Taxonomy Extension Calculation Linkbase Document
101.DEF*XBRL Taxonomy Extension Definition Linkbase Document
101.LAB*XBRL Taxonomy Extension Labels Linkbase Document
101.PRE*XBRL Taxonomy Extension Presentation Linkbase Document
104*Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)
(1)Exhibits are incorporated by reference to reports of Cheniere (SEC File No. 001-16383), CQP (SEC File No. 001-33366), Cheniere Energy Partners LP Holdings, LLC (“Cheniere Holdings”) (SEC File No. 001-36234), SPL (SEC File No. 333-192373), CCH (SEC File No. 333-215435) and SPLNG (SEC File No. 333-138916), as applicable, unless otherwise indicated.
*Filed herewith.
**Furnished herewith.
†Management contract or compensatory plan or arrangement.
ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.