Skip to main content

Cheniere Energy Inc

For the period ended Dec 31, 2023. Filed Feb 22, 2024.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2023 · Filed Feb 22, 2024

LNG$293.49+3.0%Stored close · as of Nov 10, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits
Contents

Item 15. Exhibits and Financial Statement Schedules

(a) Financial Statements, Schedules and Exhibits

(1) Financial Statements—Cheniere Energy, Inc. and Subsidiaries:

Management’s Report to the Stockholders of Cheniere Energy, Inc.52
Reports of Independent Registered Public Accounting Firm53
Consolidated Statements of Operations56
Consolidated Balance Sheets57
Consolidated Statements of Stockholders’ Equity (Deficit)58
Consolidated Statements of Cash Flows59
Notes to Consolidated Financial Statements60

(2) Financial Statement Schedules:

All financial statement schedules have been omitted because they are not required, are not applicable, or the required information has been included in the consolidated financial statements and accompanying notes included in this Form 10-K.

(3) Exhibits:

Certain of the agreements filed as exhibits to this Form 10-K contain representations, warranties, covenants and conditions by the parties to the agreements that have been made solely for the benefit of the parties to the agreement. These representations, warranties, covenants and conditions:

should not in all instances be treated as categorical statements of fact, but rather as a way of allocating the risk to one of the parties if those statements prove to be inaccurate;

may have been qualified by disclosures that were made to the other parties in connection with the negotiation of the agreements, which disclosures are not necessarily reflected in the agreements;

may apply standards of materiality that differ from those of a reasonable investor; and

were made only as of specified dates contained in the agreements and are subject to subsequent developments and changed circumstances.

Accordingly, these representations and warranties may not describe the actual state of affairs as of the date they were made or at any other time. These agreements are included to provide you with information regarding their terms and are not intended to provide any other factual or disclosure information about the Company or the other parties to the agreements. Investors should not rely on them as statements of fact.

Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
2.1Amended and Restated Purchase and Sale Agreement, dated as of August 9, 2012, by and among CQP, Cheniere Pipeline Company, Grand Cheniere Pipeline, LLC and the CompanyCQP8-K10.28/9/2012
3.1Restated Certificate of Incorporation of the CompanyCheniere10-Q3.18/10/2004
3.2Certificate of Amendment of Restated Certificate of Incorporation of the CompanyCheniere8-K3.12/8/2005
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
3.3Certificate of Amendment of Restated Certificate of Incorporation of the CompanyCheniere(SEC File No. 333-160017)S-84.36/16/2009
3.4Certificate of Amendment of Restated Certificate of Incorporation of the CompanyCheniere8-K3.16/7/2012
3.5Certificate of Amendment of Restated Certificate of Incorporation of the CompanyCheniere8-K3.12/5/2013
3.6Bylaws of the Company, as amended and restated December 9, 2015Cheniere8-K3.112/15/2015
3.7Amendment No. 1 to the Amended and Restated Bylaws of the Company, dated September 15, 2016Cheniere8-K3.19/19/2016
4.1Specimen Common Stock Certificate of the CompanyCheniere(SEC File No. 333-10905)S-14.18/27/1996
4.2Indenture, dated as of February 1, 2013, by and among SPL, the guarantors that may become party thereto from time to time and The Bank of New York Mellon, as trusteeCQP8-K4.12/4/2013
4.3First Supplemental Indenture, dated as of April 16, 2013, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.1.14/16/2013
4.4Second Supplemental Indenture, dated as of April 16, 2013, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.1.24/16/2013
4.5Third Supplemental Indenture, dated as of November 25, 2013, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.111/25/2013
4.6Fourth Supplemental Indenture, dated as of May 20, 2014, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.15/22/2014
4.7Form of 5.750% Senior Secured Note due 2024 (Included as Exhibit A-1 to Exhibit 4.6 above)CQP8-K4.15/22/2014
4.8Fifth Supplemental Indenture, dated as of May 20, 2014, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.25/22/2014
4.9Sixth Supplemental Indenture, dated as of March 3, 2015, between SPL and The Bank of New York Mellon, as TrusteeCQP8-K4.13/3/2015
4.10Form of 5.625% Senior Secured Note due 2025 (Included as Exhibit A-1 to Exhibit 4.9 above)CQP8-K4.13/3/2015
4.11Seventh Supplemental Indenture, dated as of June 14, 2016, between SPL and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.16/14/2016
4.12Form of 5.875% Senior Secured Note due 2026 (Included as Exhibit A-1 to Exhibit 4.11 above)CQP8-K4.16/14/2016
4.13Eighth Supplemental Indenture, dated as of September 19, 2016, between SPL and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.19/23/2016
4.14Ninth Supplemental Indenture, dated as of September 23, 2016, between SPL and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.29/23/2016
4.15Form of 5.00% Senior Secured Note due 2027 (Included as Exhibit A-1 to Exhibit 4.14 above)CQP8-K4.29/23/2016
4.16Tenth Supplemental Indenture, dated as of March 6, 2017, between SPL and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.13/6/2017
4.17Form of 4.200% Senior Secured Note due 2028 (Included as Exhibit A-1 to Exhibit 4.16 above)CQP8-K4.13/6/2017
4.18Eleventh Supplemental Indenture, dated as of May 8, 2020, between SPL and The Bank of New York Mellon, as Trustee under the IndentureSPL8-K4.15/8/2020
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
4.19Form of 4.500% Senior Secured Note due 2030 (Included as Exhibit A-1 to Exhibit 4.18 above)SPL8-K4.15/8/2020
4.20Twelfth Supplemental Indenture, dated as of November 29, 2022, between SPL and The Bank of New York Mellon, as Trustee under the IndentureSPL8-K4.111/29/2022
4.21Form of 5.900% Senior Secured Amortizing Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.20 above)SPL8-K4.111/29/2022
4.22Indenture, dated as of February 24, 2017, between SPL, the guarantors that may become party thereto from time to time and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.12/27/2017
4.23Form of 5.00% Senior Secured Note due 2037 (Included as Exhibit A-1 to Exhibit 4.22 above)CQP8-K4.12/27/2017
4.24Indenture, dated as of December 15, 2021, between SPL and The Bank of New York Mellon, as TrusteeCheniere10-K4.242/24/2022
4.25Form of 2.95% Senior Secured Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.24 above)Cheniere10-K4.242/24/2022
4.26Indenture, dated as of December 15, 2021, between SPL and The Bank of New York Mellon, as TrusteeCheniere10-K4.262/24/2022
4.27Form of 3.17% Senior Secured Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.26 above)Cheniere10-K4.262/24/2022
4.28First Supplemental Indenture, dated as of December 15, 2021, between SPL and The Bank of New York Mellon, as TrusteeCheniere10-K4.282/24/2022
4.29Form of 3.19% Senior Secured Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.28 above)Cheniere10-K4.282/24/2022
4.30Second Supplemental Indenture, dated as of December 15, 2021, between SPL and The Bank of New York Mellon, as TrusteeCheniere10-K4.302/24/2022
4.31Form of 3.08% Senior Secured Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.30 above)Cheniere10-K4.302/24/2022
4.32Third Supplemental Indenture, dated as of December 15, 2021, between SPL and The Bank of New York Mellon, as TrusteeCheniere10-K4.322/24/2022
4.33Form of 3.10% Senior Secured Notes due 2037 (Included as Exhibit A-1 to Exhibit 4.32 above)Cheniere10-K4.322/24/2022
4.34Indenture, dated as of September 22, 2020, between the Company, as issuer, and the Bank of New York Mellon, as trusteeCheniere8-K4.19/22/2020
4.35First Supplemental Indenture, dated as of September 22, 2020, between the Company, as issuer, and the Bank of New York Mellon, as trusteeCheniere8-K4.29/22/2020
4.36Form of 4.625% Senior Secured Notes due 2028 (Included as Exhibit A-1 to Exhibit 4.35 above)Cheniere8-K4.29/22/2020
4.37Indenture, dated as of May 18, 2016, among CCH, as Issuer, CCL, CCP and Corpus Christi Pipeline GP, LLC, as Guarantors, and The Bank of New York Mellon, as TrusteeCheniere8-K4.15/18/2016
4.38First Supplemental Indenture, dated as of December 9, 2016, among CCH, as Issuer, CCL, CCP and Corpus Christi Pipeline GP, LLC, as Guarantors, and The Bank of New York Mellon, as TrusteeCheniere8-K4.112/9/2016
4.39Form of 5.875% Senior Secured Note due 2025 (Included as Exhibit A-1 to Exhibit 4.39 above)Cheniere8-K4.112/9/2016
4.40Second Supplemental Indenture, dated as of May 19, 2017, among CCH, as issuer, CCL, CCP and Corpus Christi Pipeline GP, LLC, as Guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.15/19/2017
4.41Form of 5.125% Senior Secured Note due 2027 (Included as Exhibit A-1 to Exhibit 4.41 above)CCH8-K4.15/19/2017
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
4.42Third Supplemental Indenture, dated as of September 6, 2019, among CCH, as issuer, CCL, CCP and Corpus Christi Pipeline GP, LLC, as Guarantors, and The Bank of New York Mellon, as TrusteeCCH8-K4.19/12/2019
4.43Fourth Supplemental Indenture, dated as of November 13, 2019, among CCH, as issuer, CCL, CCP and Corpus Christi Pipeline GP, LLC, as guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.111/13/2019
4.44Form of 3.700% Note due 2029 (Included as Exhibit A-1 to Exhibit 4.44 above)CCH8-K4.111/13/2019
4.45Fifth Supplemental Indenture, dated as of August 24, 2021, among CCH, as issuer, CCL, CCP, and Corpus Christi Pipeline GP, LLC, as guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.18/24/2021
4.46Form of 2.742% Senior Secured Note due 2039 (Included as Exhibit A-1 to Exhibit 4.46 above)CCH8-K4.18/24/2021
4.47Indenture, dated as of August 20, 2020, among CCH, as issuer, and CCL, CCP and Corpus Christi Pipeline GP, LLC, as guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.18/21/2020
4.48Form of 3.52% Senior Secured Note due December 31, 2039 (Included as Exhibit A-1 to Exhibit 4.48 above)CCH8-K4.18/21/2020
4.49Indenture, dated as of September 27, 2019, among CCH, as issuer, and CCL, CCP and Corpus Christi Pipeline GP, LLC, as guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.19/30/2019
4.50Form of 4.80% Senior Note due December 31, 2039 (Included as Exhibit A-1 to Exhibit 4.50 above)CCH8-K4.19/30/2019
4.51Indenture, dated as of October 17, 2019, among CCH, as issuer, and CCL, CCP and Corpus Christi Pipeline GP, LLC, as guarantors, and The Bank of New York Mellon, as trusteeCCH8-K4.110/18/2019
4.52Form of 3.925% Senior Note due December 31, 2039 (Included as Exhibit A to Exhibit 4.52 above)CCH8-K4.110/18/2019
4.53Indenture, dated as of September 18, 2017, between CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.19/18/2017
4.54First Supplemental Indenture, dated as of September 18, 2017, between CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.29/18/2017
4.55Second Supplemental Indenture, dated as of September 11, 2018, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.19/12/2018
4.56Third Supplemental Indenture, dated as of September 12, 2019, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.19/12/2019
4.57Form of 4.500% Senior Notes due 2029 (Included as Exhibit A-1 to Exhibit 4.57 above)CQP8-K4.19/12/2019
4.58Fourth Supplemental Indenture, dated as of November 5, 2020, between CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCheniere10-Q4.411/6/2020
4.59Fifth Supplemental Indenture, dated as of March 11, 2021, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.13/11/2021
4.60Form of 4.000% Senior Notes due 2031 (Included as Exhibit A-1 to Exhibit 4.60 above)CQP8-K4.13/11/2021
4.61Sixth Supplemental Indenture, dated as of September 27, 2021, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.19/27/2021
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
4.62Form of 3.25% Senior Notes due 2032 (Included as Exhibit A-1 to Exhibit 4.62 above)CQP8-K4.19/27/2021
4.63Seventh Supplemental Indenture, dated as of September 27, 2021, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.110/1/2021
4.64Eighth Supplemental Indenture, dated as of June 21, 2023, among CQP, the guarantors party thereto and The Bank of New York Mellon, as Trustee under the IndentureCQP8-K4.16/21/2023
4.65Form of 5.950% Senior Notes due 2033 (Included as Exhibit A to Exhibit 4.65 above)CQP8-K4.16/21/2023
4.66*Description of the Registrant’s Securities Registered Pursuant to Section 12 of the Securities Exchange Act of 1934
10.1†Cheniere Energy, Inc. 2020 Incentive PlanCheniere (SEC No. 333-238261)S-84.95/14/2020
10.2†Form of Restricted Stock Grant under the Cheniere Energy, Inc. 2020 Incentive Plan (Director)Cheniere10-Q10.18/5/2021
10.3†*Form of Restricted Stock Unit Award Agreement under the Cheniere Energy, Inc. 2020 Incentive Plan (NEO) (2022)
10.4†Form of Restricted Stock Unit Award Agreement under the Cheniere Energy, Inc. 2020 Incentive Plan (NEO) (2023)Cheniere10-K10.432/23/2023
10.5†*Form of Restricted Stock Unit Award Agreement under the Cheniere Energy, Inc. 2020 Incentive Plan (NEO) (2024)
10.6†Form of Performance Stock Unit Award Agreement Under the Cheniere Energy, Inc. 2020 Incentive Plan (NEO) (2022)Cheniere10-K10.442/24/2022
10.7†Form of Performance Stock Unit Award Agreement Under the Cheniere Energy, Inc. 2020 Incentive Plan (NEO) (2023)Cheniere10-K10.462/23/2023
10.8†*Form of Performance Stock Unit Award Agreement Under the Cheniere Energy, Inc. 2020 Incentive Plan (NEO) (2024)
10.9†*Amended and Restated Cheniere Energy, Inc. Key Executive Severance Pay Plan (Effective as of November 17, 2023) and Summary Plan Description
10.10†Director Deferred Compensation Plan (Effective February 10, 2022)Cheniere10-K10.462/24/2022
10.11†Form of Deferred Stock Unit Award Agreement Under the Director Deferred Compensation PlanCheniere10-K10.472/24/2022
10.12†Employment Agreement between the Company and Jack A. Fusco, dated May 12, 2016Cheniere8-K10.15/12/2016
10.13†Employment Agreement Amendment between the Company and Jack Fusco, dated August 15, 2019Cheniere8-K10.18/15/2019
10.14†Second Employment Agreement Amendment between the Company and Jack Fusco, dated August 11, 2021Cheniere8-K10.18/13/2021
10.15†*Cheniere Energy, Inc. Amended and Restated Retirement Policy, dated effective January 1, 2021Cheniere10-K10.492/25/2020
10.16†Form of Indemnification Agreement for officers of the CompanyCheniere8-K10.25/20/2020
10.17†Form of Indemnification Agreement for directors of the CompanyCheniere8-K10.15/20/2020
10.18†Letter Agreement, dated February 15, 2023, between the Company and Aaron StephensonCheniere8-K10.12/15/2023
10.19Senior Revolving Credit and Guaranty Agreement, among SPL, as borrower, certain subsidiaries of the Company, The Bank of Nova Scotia, as Senior Facility Agent, Société Générale, as the Common Security Trustee, the issuing banks and lenders from time to time party thereto and other participantsSPL(SEC File No. 333-273238)S-410.467/13/2023
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
10.20Fourth Amended and Restated Common Terms Agreement, among SPL, as borrower, the Secured Debt Holder Group Representatives party thereto, the Secured Hedge Representatives party thereto, the Secured Gas Hedge Representatives party thereto and Société Générale, as the Common Security Trustee and the Intercreditor AgentSPL(SEC File No. 333-273238)S-410.447/13/2023
10.21Third Amended and Restated Accounts Agreement, among SPL, certain subsidiaries of SPL, Société Générale, as the Common Security Trustee, and Citibank, N.A. as the Accounts BankSPL8-K10.33/23/2020
10.22Second Amended and Restated Term Loan Facility Agreement, dated June 15, 2022, among CCH, CCP, Corpus Christi Pipeline GP, LLC, CCL, the lenders party thereto from time to time and Société Générale as the Term Loan Facility AgentCheniere8-K10.16/22/2022
10.23Second Amended and Restated Common Terms Agreement, dated June 15, 2022, among CCH, CCP, Corpus Christi Pipeline GP, LLC, CCL, Société Générale, as Term Loan Facility Agent, The Bank of Nova Scotia as Working Capital Facility Agent, and Société Générale as Intercreditor Agent, and any other facility lenders party thereto from time to timeCheniere8-K10.36/22/2022
10.24Second Amended and Restated Common Security and Account Agreement, dated June 15, 2022, among CCH, CCP, Corpus Christi Pipeline GP, LLC, CCL, the Senior Creditor Group Representatives, Société Générale as the Intercreditor Agent, Société Générale as Security Trustee and Mizuho Bank, Ltd as the Account BankCheniere8-K10.46/22/2022
10.25Amended and Restated Pledge Agreement, dated May 22, 2018, among CCH HoldCo I and Société Générale as Security TrusteeCheniere8-K10.45/24/2018
10.26Amended and Restated Equity Contribution Agreement, dated May 22, 2018, among CCH and the CompanyCheniere8-K10.55/24/2018
10.27Second Amended and Restated Working Capital Facility Agreement, dated June 15, 2022, among CCH, CCP, Corpus Christi Pipeline GP, LLC, CCL, the lenders party thereto from time to time, the issuing banks party thereto from time to time, the swing line lenders party thereto from time to time, The Bank of Nova Scotia as Working Capital Facility Agent and Société Générale as Security TrusteeCheniere8-K10.26/22/2022
10.28Second Amended and Restated Revolving Credit Agreement, dated as of October 28, 2021, among the Company, the Lenders and Issuing Banks party thereto, Sumitomo Mitsui Banking Corporation, as ESG Coordinator, and Société Générale, as Administrative AgentCheniere8-K10.111/1/2021
10.29First Amendment to Second Amended and Restated Revolving Credit Agreement, dated as of June 15, 2023, among the Company, the Lenders and Issuing Banks party thereto, Sumitomo Mitsui Banking Corporation, as ESG Coordinator, and Société Générale, as Administrative AgentCheniere10-Q10.28/3/2023
10.30Credit Agreement, dated June 18, 2020, among the Company, the Lenders party thereto, Société Générale, as Administrative Agent, and the other agents and arrangers party thereto from time to timeCheniere8-K10.16/19/2020
10.31Credit and Guaranty Agreement, dated as of June 23, 2023, among CQP, as borrower, certain subsidiaries of CQP, as Subsidiary Guarantors, the lenders from time to time party thereto, Société Générale, Natixis, Sumitomo Mitsui Banking Corporation, The Bank of Nova Scotia, and Wells Fargo Bank, as Issuing Banks, MUFG Bank, LTD as Administrative Agent and Coordinating Lead Arranger, and certain arrangers and other participantsCheniere10-Q10.48/3/2023
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
10.32Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil, Gas and Chemicals, Inc. (Portions of this exhibit have been omitted and filed separately with the Securities and Exchange Commission pursuant to a request for confidential treatment.)Cheniere8-K10.111/9/2018
10.33Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: the Change Order CO-00001 Modifications to Insurance Language Change Order, dated June 3, 2019Cheniere10-Q10.68/8/2019
10.34Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00002 Fuel Provisional Sum Closure, dated July 8, 2019, (ii) the Change Order CO-00003 Currency Provisional Sum Closure, dated July 8, 2019, (iii) the Change Order CO-00004 Foreign Trade Zone, dated July 2, 2019, (iv) the Change Order CO-00005 NGPL Gate Access Security Coordination Provisional Sum, dated July 17, 2019, (v) the Change Order CO-00006 Alternate to Adams Valves, dated August 14, 2019, (vi) the Change Order CO-00007 E-1503 to HRU Permanent Drain Piping, dated August 14, 2019, (vii) the Change Order CO-00008 Differing Subsurface Soil Conditions - Train 6 ISBL, dated August 27, 2019, (viii) the Change Order CO-00009 LNG Berth 3, dated September 25, 2019 and (ix) the Change Order CO-00010 Cold Box Redesign and Addition of Inspection Boxes on Methane Cold Box, dated September 16, 2019Cheniere10-Q10.1011/1/2019
10.35Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00011 Insurance Provisional Sum Interim Adjustment, dated October 1, 2019 and (ii) the Change Order CO-00012 Replacement of Timber Piles with Pre-Stressed Concrete Piles, dated October 30, 2019Cheniere10-K10.882/25/2020
10.36Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00013 Cost to Comply with SPL FTZ (FTZ entries, bonded transports and receipts for AG Pipe Spools Only), dated February 10, 2020, (ii) the Change Order CO-00014 Permanent Access Road to Third Berth, dated February 10, 2020, (iii) the Change Order CO-00015 Modifications to Schedule Bonus Language, dated February 10, 2020, (iv) the Change Order CO-00016 LNG Berth 3 LNTP No 3, dated January 31, 2020 and (v) the Change Order CO-00017 Construction Doc Fender Guards and LP Fuel Gas Overpressure Interlock, dated March 18, 2020Cheniere10-Q10.64/30/2020
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
10.37Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00018 Electrical Studies for GTG Grid Modification, dated April 2, 2020, (ii) the Change Order CO-00019 Third Berth - Change in 5kV Electrical Tie-In, dated April 30, 2020, (iii) the Change Order CO-00020 LNG Berth 3 LNTP No. 4, dated May 4, 2020, (iv) the Change Order CO-00021 Train 6 P1601 A/B/ Flange Changes, dated May 27, 2020 and (v) the Change Order CO-00022 Train 6 H2S Skid Modifications to Level Transmitters & GTG Pressure Range Change on PT-573 A/B, dated June 4, 2020Cheniere10-Q10.98/6/2020
10.38Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00023 Third Berth Vapor Fence Provisional Sum Scope Removal and Closeout, dated June 22, 2020, (ii) the Change Order CO-00024 Train 6 Thermowell Upgrades, dated June 22, 2020, (iii) the Change Order CO-00025 Third Berth Bubble Curtain, dated June 22, 2020, (iv) the Change Order CO-00026 Third Berth Fuel Provisional Sum Closure Change Order, dated July 14, 2020, (v) the Change Order CO-00027 Third Berth Currency Provisional Sum Closure Change Order, dated July 20, 2020, (vi) the Change Order CO-00028 Train 6 Hot Oil WHRU PSV Bypass, dated August 11, 2020 and (vii) the Change Order CO-00029 Change in Law IMO 2020 Regulatory Change – Low Sulphur Emissions on Marine Vessels, dated August 25, 2020Cheniere10-Q10.211/6/2020
10.39Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between the SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00030 Third Berth Soil Preparation Provisional Sum Interim Adjustment Change Order, dated September 16, 2020, (ii) the Change Order CO-00031 Provisional Sum Consolidation (PAB, Taxes & Insurance), dated October 2, 2020, (iii) the Change Order CO-00032 COVID-19 Impacts, dated October 2, 2020, (iv) the Change Order CO-00033 Third Berth - Jetty Building (00A-4041) - Clean Agent System, dated November 2, 2020 and (v) the Change Order CO-00034 Vanessa Spare Valves, dated November 18, 2020Cheniere10-K10.882/24/2021
10.40Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00035 Impacts from Hurricanes Laura and Delta, dated December 22, 2020, (ii) the Change Order CO-00036 Third Berth - Add N2 Connection on Liquid & Hybrid SVT Loading Arm Apex, dated December 22, 2020, (iii) the Change Order CO-00037 Third Berth Design Vessels Update, dated December 22, 2020, (iv) the Change Order CO-00038 Train 6 PV-16002 & FV-15104 Valve Trim Upgrades, dated January 21, 2021, (v) the Change Order CO-00039 Third Berth Design Update to Supply Bunkering Fuel, dated February 11, 2021, (vi) the Change Order CO-00040 LNG Benchmark 7 Elevation Change, dated February 11, 2021, (vii) the Change Order CO-00041 Costs to Comply with SPL FTZ (Excluding Pipe Spools), dated February 12, 2021 and (viii) the Change Order CO-00042 COVID-19 Impacts 1Q2021, dated March 12, 2021Cheniere10-Q10.25/4/2021
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
10.41Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00043 Third Berth SVT Loading Arm Spares, dated April 9, 2021, (ii) the Change Order CO-00044 Third Berth U/G Directional Drilling & Cathodic Protection Provisional Sum Closures, dated April 9, 2021, (iii) the Change Order CO-00045 Winter Storm Impacts, dated April 9, 2021, (iv) the Change Order CO-00046 NGPL Security Provisional Sum Interim Adjustment, dated June 15, 2021, (v) the Change Order CO-00047 80 Acres Bridge, dated June 15, 2021 and (vi) the Change Order CO-00048 AGRU Additions for Lean Solvent Overpressure, dated June 15, 2021Cheniere10-Q10.48/5/2021
10.42Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00049 COVID-19 Impacts 2Q2021, dated July 6, 2021, (ii) CO-00050 Third Berth Bunkering Ship Modifications — Pre-Investment for Foundations, dated July 6, 2021, (iii) CO-00051 Thermal Oxidizer Controls Change, dated September 8, 2021, (iv) CO-00052 Third Berth Spare Beacon and Additional Cable Tray, dated September 8, 2021 and (v) CO-00053 Train 6 Gearbox Assembly Replacement for Unit 1411, dated September 24, 2021Cheniere10-Q10.111/4/2021
10.43Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00054 80 Acres Bridge Credit, dated November 30, 2021, (ii) CO-00055 Change in Law LPDES Permit - Water Treatment Filter Washing, dated December15, 2021, (iii) CO-00056 Impacts from Hurricane Ida, dated December 15, 2021 and (iv) CO-00057 Impacts from Hurricane Nicholas, dated December 15, 2021Cheniere10-K10.992/24/2022
10.44Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00058 COVID-19 Impacts 3Q2021, dated January 6, 2022, (ii) CO-00059 Spill Containment SIL 2 Interlock, dated January 11, 2022, (iii) the Change Order CO-00060 Third Berth Soil Preparation Provisional Sum Closure, dated March 15, 2022, (iv) the Change Order CO-00061 COVID-19 Impacts 4Q2021, dated March 15, 2022 and (v) the Change Order CO-00062 FERC Condition 61, dated March 15, 2022Cheniere10-Q10.25/4/2022
10.45Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00063 FERC Condition 78, dated May 6, 2022, (ii) the Change Order CO-00064 FERC Impact to Pipe Installation, dated June 14, 2022, (iii) the Change Order CO-00065 Spill Containment Sil 2 Interlock, dated June 15, 2022 and (iv) the Change Order CO-00066 Marine Dredging and Management Oversight Provisional Sums Closure, dated June 16, 2022Cheniere10-Q10.68/4/2022
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
10.46Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00067 Performance and Attendance Bonus (“PAB”) Provisional Sum Closure, dated August 18, 2022, (ii) the Change Order CO-00068 Performance and Attendance Bonus (“PAB”) Provisional Sum Closure (Reconciliation to CO-00067), dated August 18, 2022, and (iii) the Change Order CO-00069 COVID-19 Impacts 1Q2022 and 2Q2022, dated August 29, 2022Cheniere10-Q10.111/3/2022
10.47Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 7, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00070 80-Acres Bridge, dated October 28, 2022, (ii) the Change Order CO-00071 Mooring System Low-Tension Common Alarm, dated October 31, 2022, (iii) the Change Order CO-00072 FERC Hydrocarbon Permit Conditions, dated October 31, 2022, (iv) the Change Order CO-00073 BN#2 Beacon Pile Relocation, dated October 31, 2022 and (v) the Change Order CO-00074 FERC Condition 56: ISA 84 Gas Detection, dated October 31, 2022Cheniere10-K10.922/23/2023
10.48Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 8, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: the Change Order CO-00075 Section 232 Duties (Final Settlement FTZ), dated December 16, 2022Cheniere10-Q10.15/2/2023
10.49Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 4 Liquefaction Facility, dated November 8, 2018, by and between SPL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00076 Supplemental FERC Condition 80 Requirements, dated May 5, 2023, (ii) the Change Order CO-00077 Louisiana Sales and Use Tax Provisional Sum Closure, dated June 16, 2023, (iii) the Change Order CO-00078 Natural Gas Pipeline (NGPL) Security Coordination Provisional Sum Closure, dated June 22, 2023, (iv) the Change Order CO-00079 Insurance Provisional Sum Closure, dated July 27, 2023 and (v) the Change Order Co-00080 Borrowed Items, dated September 6, 2023Cheniere10-Q10.111/2/2023
10.50Fixed Price Separated Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL Stage III and Bechtel Energy Inc. (Portions of this exhibit have been omitted and filed separately with the SEC pursuant to a request for confidential treatment)Cheniere10-Q10.15/4/2022
10.51Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL Stage III and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00001 Maintaining Elevated Ground Flare Option, dated March 28, 2022, (ii) the Change Order CO-00002 Package 7 Pre-Investment of Trains 8 and 9 (Without Site Work), dated April 29, 2022 and (iii) the Change Order CO-00003 Modifications to Insurance Language, dated June 13, 2022 (Portions of this exhibit have been omitted)Cheniere10-Q10.78/4/2022
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
10.52Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00004 Currency Conversion, dated June 27, 2022, (ii) the Change Order CO-00005 Fuel Adjustment, dated July 15, 2022, (iii) the Change Order CO-00006 Removal of Laydown Yard Scope Option, dated August 2, 2022, (iv) the Change Order CO-00007 Removal of Air Bridges Scope Option, dated August 22, 2022, (v) the Change Order CO-00008 Acid Gas Flare K/O Drum, dated August 16, 2022, and (vi) the Change Order CO-00009 Package 7A (Without Site Work), dated August 16, 2022 (Portions of this exhibit have been omitted)Cheniere10-Q10.211/3/2022
10.53Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-000010 Insurance Provisional Sum Interim Adjustment, dated September 13, 2022 and (ii) the Change Order CO-000011 Package 6 Descope and Transfer to Owner, dated September 14, 2022 (Portions of this exhibit have been omitted)Cheniere10-K10.962/23/2023
10.54Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between Corpus Christi Liquefaction Stage III, LLC and Bechtel Oil Gas and Chemicals, Inc.: (i) the Change Order CO-00012 Chart License Fee Provisional Sum Closure, dated September 16, 2022, (ii) the Change Order CO-00013 HRU Nozzles and Block Headers, dated September 21, 2022, (iii) the Change Order CO-00014 Addition of Nitrogen Receiver, dated December 13, 2022, (iv) the Change Order CO-00015 Package 6 Feed Gas Pipeline Interfaces, dated December 14, 2022, (v) the Change Order CO-00016 Old Sherwin Building Security, dated November 23, 2022, (vi) the Change Order CO-00017 Remote Monitoring Diagnostic for Mixed Refrigerant (MR) Compressors, dated December 14, 2022, (vii) the Change Order CO-00018 EFG Package #1, dated January 9, 2023, (viii) the Change Order CO-00019 Q3 2022 Commodity Price Rise and Fall (ATT MM), dated January 17, 2023, (ix) the Change Order CO-00020 ICSS Vendor Selection and EPC Warranty (Yokogawa), dated September 21, 2022 and (x) the Change Order CO-00021 Laydown Development Package, dated February 6, 2023 (Portions of this exhibit have been omitted.)Cheniere10-Q10.25/2/2023
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
10.55Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between Corpus Christi Liquefaction, LLC and Bechtel Energy, Inc.: (i) the Change Order CO-00022 Refrigerant Storage Packages 1 and 2, dated February 13, 2023, (ii) the Change Order CO-00023 EFG Package #2, dated February 21, 2023, (iii) the Change Order CO-00024 Defrost Improvements (Cold Box), dated February 23, 2023, (iv) the Change Order CO-00025 Miscellaneous Design Improvements, dated February 23, 2023, (v) the Change Order CO-00026 EFG Package #3, dated February 23, 2023, (vi) the Change Order CO-00027 Addition of 86 Lockout Relay on Transformers, dated February 14, 2023, (vii) the Change Order CO-00028 Additional Duct Banks, dated September 15, 2022, (viii) the Change Order CO-00029 2022 FERC Support Hours Interim Adjustment, dated March 13, 2023, (ix) the Change Order CO-00030 Drainage Blanket (A Street), dated April 6, 2023, (x) the Change Order CO-00031 Refrigerant Storage Interface Package #3, dated April 7, 2023, (xi) the Change Order CO-00032 Q4 2022 Commodity Price Rise and Fall (ATT MM), dated April 24, 2023, (xii) the Change Order CO-00033 Lift Owner-Provided Dewar System (Nitrogen Receiver Facility), dated March 1, 2022, (xiii) the Change Order CO-00034 HAZOP Package #1 - Addition of Flame Arrestors for Oil Mist Eliminator Vent, dated April 25, 2023 and (xiv) the Change Order CO-00035 EFG Package #4 (Water Pipeline Pipe Bridge), dated May 19, 2023 (Portions of this exhibit have been omitted.)Cheniere10-Q10.18/3/2023
10.56Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-00036 Payment Milestone Updates (Schedule C-1), dated June 19, 2023, (ii) the Change Order CO-00037 Geotechnical Soils Investigation Period & Security Division of Responsibility Change, dated June 20, 2023, (iii) the Change Order CO-00038 Power Monitoring System (ETAP HMI), dated June 29, 2023 and (iv) the Change Order CO-00039 EFG Firewater Connection, dated June 30, 2023 (Portions of this exhibit have been omitted.)Cheniere10-Q10.211/2/2023
Exhibit No.Incorporated by Reference (1)
DescriptionEntityFormExhibitFiling Date
10.57*Change orders to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Liquefaction Stage 3 Project, dated March 1, 2022, by and between CCL and Bechtel Energy, Inc.: (i) the Change Order CO-00040 Q1 2023 Commodity Price Rise and Fall (ATT MM), dated August 29, 2023, (ii) the Change Order CO-00041 Q2 2023 Commodity Price Rise and Fall (ATT MM), dated August 29, 2023, (iii) the Change Order CO-00042 HAZOP Package #2 – Additional IPL (Pressure Transmitter Across the Strainer), dated July 5, 2023, (iv) the Change Order CO-00043 Total Condensate Flowmeter on Three (3) Inch Condensate Line, dated August 31, 2023, (v) the Change Order CO-00044 FERC Package #1 ISA 84 (Accommodation for Two Hundred and Fifty (250) Fire and Gas Detectors), dated August 31, 2023, (vi) the Change Order CO-00045 Increase LNG Rundown Line Check Valve Bypass Size to Six (6) Inches, dated August 31, 2023, (vii) the Change Order CO-00046 Add Manual Bypass Valves Around 31XV-13071, dated September 13, 2023, (viii) the Change Order CO-00047 Relocate Existing 16” Process Water Line and Provide Tie-In, dated September 8, 2023, (ix) the Change Order CO-00048 Future HRU Bypass Tie-In and Thermowell Updates, dated September 12, 2023, (x) the Change Order CO-00049 Butterfly Valves for Flare Drums, dated September 5, 2023, (xi) the Change Order CO-00050 Condensate Shroud on Condensate Rundown Line (Blue Engineering Report), dated September 12, 2023, (xii) the Change Order CO-00051 EFG Package #5 (138KV Feeder Cable), dated September 8, 2023, (xiii) the Change Order CO-00052 Defect Correction Period for Cementitious Fireproofing, dated August 7, 2023, (xiv) the Change Order CO-00053 Chart Transition Joint Spares, dated October 5, 2023, (xv) the Change Order CO-00054 CCL Tank(s) “A” and “C” Tie-In Study & Long Lead Item Purchases, dated September 19, 2023, (xvi) the Change Order CO-00055 FERC Package #2 Firewater Layout, dated September 13, 2023, (xvii) the Change Order CO-00056 HAZOP Package #3 – Stainless Steel C And D Pass Piping / Two Temperature Transmitters per Train, dated February 14, 2023, (xviii) the Change Order CO-00057 HAZOP Package #4 (“Phase Two Items”), dated October 10, 2023, (xix) the Change Order CO-00058 E-HAZOP Package #1 (“LV MCC Ride Through”), dated September 8, 2023, (xx) the Change Order CO-00059 Level Transmitter on Stand Pipe Inside Liquefaction Cold Boxes, dated October 13, 2023, (xxi) the Change Order CO-00060 Small Spill Containment (Additional Curbs), dated July 5, 2023, (xxii) the Change Order CO-00061 Remote Input/Output (RIO) Junction Box Grounding, dated October 10, 2023, (xxiii) the Change Order CO-00062 Geomembrane Liner and Geocell for Laydown 6 Channel, dated August 31, 2023, (xxiv) the Change Order CO-00063 Phased Surfacing of Permanent Plant Roads, dated August 7, 2023, (xxv) the Change Order CO-00064 Provisional Sum Interim Adjustment - Schedule KK-1 12-Month COVID Countermeasures, dated July 24, 2023, (xxvi) the Change Order CO-00065 Modification to FTZ Zone Site (Exhibit A of Attachment LL), dated August 3, 2023, (xxvii) the Change Order CO-00066 Attachment B (Contract Deliverables), dated June 2, 2023, (xxviii) the Change Order CO-00067 Sheet Pile Joint Sealing 310Q02 Sump, dated October 5, 2023, (xxix) the Change Order CO-00068 E-HAZOP Package #2 (“Phase One Items”), dated October 19, 2023, (xxx) the Change Order CO-00069 Package 6 Feed Gas Pipeline and Pig Receiver DMM, dated August 3, 2023, (xxxi) the Change Order CO-00070 Dry Flare Knockout Drum Spill Pad Drain Specification Change, dated October 5, 2023, (xxxii) the Change Order CO-00071 Viewing Platform Piles, dated October 18, 2023, (xxxiii) the Change Order CO-00072 Site Plan Update Package #1 – Re-Route Contractor’S Utility Water & Nitrogen Pipelines and Provide Power & Fiber Cables To Nitrogen Tie-In Point, dated November 2, 2023, (Portions of this exhibit have been omitted.)
Exhibit No. · Incorporated by Reference (1)
Description · Entity · Form · Exhibit · Filing Date
10.58LNG Sale and Purchase Agreement (FOB), dated November 21, 2011, between SPL (Seller) and Gas Natural Aprovisionamientos SDG S.A. (subsequently assigned to Gas Natural Fenosa LNG GOM, Limited) (Buyer)CQP8-K10.111/21/2011
10.59Amendment No. 1 of LNG Sale and Purchase Agreement (FOB), dated April 3, 2013, between SPL (Seller) and Gas Natural Aprovisionamientos SDG S.A. (subsequently assigned to Gas Natural Fenosa LNG GOM, Limited) (Buyer)CQP10-Q10.15/3/2013
10.60Amendment of LNG Sale and Purchase Agreement (FOB), dated January 12, 2017, between SPL (Seller) and Gas Natural Fenosa LNG GOM, Limited (assignee of Gas Natural Aprovisionamientos SDG S.A.) (Buyer)SPL(SEC File No. 333-215882)S-410.32/3/2017
10.61Letter agreement regarding change from LIBOR to SOFR, dated June 8, 2023, to LNG Sale and Purchase Agreement, dated November 21, 2011, between SPL and Naturgy LNG GOM, Limited (assignee of Gas Natural Aprovisionamientos SDG S.A.), as amendedCheniere10-Q10.138/3/2023
10.62Amended and Restated LNG Sale and Purchase Agreement (FOB), dated January 25, 2012, between SPL (Seller) and BG Gulf Coast LNG, LLC (Buyer)CQP8-K10.11/26/2012
10.63Letter agreement regarding change from LIBOR to SOFR, dated May 18, 2023, to LNG Sale and Purchase Agreement, dated January 25, 2012, between SPL and BG Gulf Coast LNG, LLC, as amendedCheniere10-Q10.108/3/2023
10.64LNG Sale and Purchase Agreement (FOB), dated June 2, 2014, between CCL (Seller) and Gas Natural Fenosa LNG SL (subsequently assigned to Gas Natural Fenosa LNG GOM, Limited) (Buyer)Cheniere8-K10.16/2/2014
10.65Amendment No. 1 of LNG Sale and Purchase Agreement (FOB), dated February 27, 2018, between CCL (Seller) and Gas Natural Fenosa LNG GOM, Limited (Buyer)Cheniere10-Q10.65/4/2018
10.66Letter agreement regarding change from LIBOR to SOFR, dated June 8, 2023, to LNG Sale and Purchase Agreement, dated June 2, 2014, between CCL and Naturgy LNG GOM, Limited (assignee of Gas Natural Fenosa LNG SL), as amendedCheniere10-Q10.98/3/2023
10.67Cooperative Endeavor Agreement & Payment in Lieu of Tax Agreement with eleven Cameron Parish taxing authorities, dated October 23, 2007, by and between Cheniere Marketing, Inc. and SPLNGCheniere10-Q10.711/6/2007
10.68Investors’ and Registration Rights Agreement, dated as of July 31, 2012, by and among the Company, Cheniere Energy Partners GP, LLC, CQP, Cheniere Class B Units Holdings, LLC, Blackstone CQP Holdco LP and the other investors party thereto from time to timeCQP8-K10.18/6/2012
10.69Fourth Amended and Restated Agreement of Limited Partnership of CQP, dated February 14, 2017CQP8-K3.12/21/2017
10.70Amended and Restated Limited Liability Company Agreement of Cheniere GP Holding Company, LLC, dated December 13, 2013Cheniere Holdings8-K10.312/18/2013
21.1*Subsidiaries of the Company
23.1*Consent of KPMG LLP
31.1*Certification by Chief Executive Officer required by Rule 13a-14(a) and 15d-14(a) under the Exchange Act
31.2*Certification by Chief Financial Officer required by Rule 13a-14(a) and 15d-14(a) under the Exchange Act
Exhibit No.Incorporated by Reference (1)
DescriptionEntityFormExhibitFiling Date
32.1**Certification by Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
32.2**Certification by Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
97*Cheniere Energy Inc. Clawback Policy
101.INS*XBRL Instance Document
101.SCH*XBRL Taxonomy Extension Schema Document
101.CAL*XBRL Taxonomy Extension Calculation Linkbase Document
101.DEF*XBRL Taxonomy Extension Definition Linkbase Document
101.LAB*XBRL Taxonomy Extension Labels Linkbase Document
101.PRE*XBRL Taxonomy Extension Presentation Linkbase Document
104*Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)
(1)Exhibits are incorporated by reference to reports of Cheniere (SEC File No. 001-16383), CQP (SEC File No. 001-33366), Cheniere Energy Partners LP Holdings, LLC (“Cheniere Holdings”) (SEC File No. 001-36234), SPL (SEC File No. 333-192373), CCH (SEC File No. 333-215435) and SPLNG (SEC File No. 333-138916), as applicable, unless otherwise indicated.
*Filed herewith.
**Furnished herewith.
†Management contract or compensatory plan or arrangement.
ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.